This is a bid specification document for the City of Reading, Pennsylvania, for a Playground Safety Surfaces project funded through Community Development Block Grant resources. The City is soliciting sealed proposals via the PennBid website until 2:00 PM on February 3, 2026, with no pre-bid meeting scheduled. The project involves the installation of playground safety surfaces at one or more City of Reading locations. Each proposal must be accompanied by a bid surety of ten percent (10%) of the total bid amount, provided as either a certified check or bid bond. The successful bidder will be required to execute a contract within ten (10) calendar days of receiving contract documents and furnish Performance, Payment, and Maintenance Bonds each equal to 100% of the contract value. The contract becomes effective upon issuance of the Notice to Proceed and is valid until work completion or September 1, 2026, whichever occurs first, with the City reserving the right to extend the contract term for up to three (3) months if necessary to prevent coverage lapses.

The project is subject to Davis-Bacon Act prevailing wage requirements, with applicable wage rates specified for various classifications including cement masons, carpenters, ironworkers, laborers, painters, truck drivers, and equipment operators in the applicable Pennsylvania counties. All materials must comply with Build America, Buy America Act (BABAA) requirements, ensuring that iron, steel, and construction materials are produced in the United States. The contractor must obtain general liability insurance of $1,000,000 per occurrence and $2,000,000 aggregate, automobile liability of $1,000,000, umbrella/excess liability of $5,000,000, workers' compensation at statutory limits, and pollution liability of $1,000,000. The City of Reading imposes a Business Privilege License fee of $55.00 annually and a Business Privilege Tax of 2-1/4 mills on gross receipts. The project is subject to Section 3 requirements for contracts exceeding $100,000, requiring good faith efforts to employ low-income City residents and utilize Section 3 business concerns. Affirmative Action goals establish targets of 2.5% minority participation and 6.9% female participation across all trades. All contract work is subject to federal labor standards provisions, including prevailing wage determinations, compliance with the Clean Air and Water Acts, and adherence to multiple state and federal environmental and workplace regulations. Stipulated liquidated damages are assessed at $500.00 per day for delays beyond the completion deadline.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLAYGROUND SAFETY SURFACES

THE CITY OF READING

PENNSYLVANIA

TABLE OF CONTENTS

PART

NOTICES AND INSTRUCTIONS I

Notice to Contractors Instructions to Bidders Notice of Requirement for Affirmative Action

DOCUMENTS TO BE SUBMITTED WITH BID II

Build America, Buy America Material Certification Bid Proposal Form Bid Bond Non-Collusion Affidavit Certificate of Non-Indebtedness Resolution & Statement Regarding Manufacture of Cement Statement of Bidder’s Qualifications Equal Employment Opportunity and Section 3 Questionnaire Certification of Non-Segregated Facilities Contractor’s Statement for Public Disclosure Certificate of Acknowledgment of Receipt of Addendum (if required)

CONTRACT DOCUMENTS III

Contract Performance Bond Payment Bond Maintenance Bond Statement Accepting Provisions of PA Workers’ Compensation Act Stipulation Against Liens Indemnity Agreement Notice to Proceed

DAVIS-BACON LABOR AND INDUSTRY WAGE RATES IV

SECTION 3 REQUIREMENTS V

GENERAL PROVISIONS VI

SUPPLEMENTARY GENERAL TERMS AND CONDITIONS VII

TECHNICAL SPECIFICATIONS LOCATED ON PENNBID

DRAWINGS LOCATED ON PENNBID

BID FORM LOCATED ON PENNBID VIII

The City of Reading recognizes the benefits of recycling, and actively supports recycling. This specification is printed double-sided on recycled paper, 20% post consumer waste.

NOTICE AND INSTRUCTIONS

CITY OF READING, PENNSYLVANIA

NOTICE TO CONTRACTORS

The City of Reading will receive sealed proposals via the PennBid program at www.pennbidprocureware.com until 2:00 PM, prevailing time on February 3, 2026, for the Playgrund Safety Surfaces Rebid for the City of Reading, Pennsylvania, as per specifications on file on Pennbid.

There will be no prebid meeting for this project.

Each proposal shall be accompanied by bid surety in the amount of ten percent (10%) of the proposal. A certified check or bid bond will be accepted.

Attention is called to the fact that Davis-Bacon Act prevailing wage rates must be paid by the contractor and that employees shall not be discriminated against because of race, color, age, religion, sex or national origin.

The Project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. 177-58. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States, as further outlined by the Office of Management and Budget’s Memorandum M-22-11, Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, April 18, 2022

The City of Reading reserves the right to accept or reject any and all bids, and to accept or reject any part of a bid, as may be in the public interest.

Funding for this project is from the City of Reading’s Community Development Block Grant.

INSTRUCTIONS TO BIDDERS

PROPOSAL SUBMISSION

Proposals shall be submitted on the PennBid website at www.pennbidprocureware.com on February 3, 2026, at 2:00 PM prevailing time.

Bids received on Pennbid, at www.pennbidprocureware.com after the hour specified, will not be considered. Bidders are invited to be present at the opening of bids.

BONDS

3.2.1 Bid security, in the amount of ten percent (10%) of the bid price shall accompany each proposal.

This bid security may be a Certified or Cashier's Check, or a bid bond furnished by a surety company, satisfactory to the City of Reading. The successful bidder, upon award of contract, shall furnish at the time of execution of the same, a Maintenance Bond, Payment Bond, and Performance Bond by a surety company acceptable to the City of Reading, in an amount equal to ONE HUNDRED PERCENT (100%) of the contract to guarantee satisfactory performance. All bonds are subject to approval by the City

Solicitor. In case the contract is awarded to a bidder who fails to enter the contract or to deliver all required bonds and affidavits, the cash or check deposited shall become absolute property of the City; or if a bond has been deposited, it shall become payable immediately. Cash, checks or bonds deposited will be returned to unsuccessful bidders as soon as the contract is awarded, or all bids rejected.

3.2.2 Any surety bond submitted must be covered with surety of a company authorized to do business in the Commonwealth of Pennsylvania.

3.3.3 Surety bonds must be furnished using the form provided herein or a replication of this form by the surety company.

3.3.4 Bid security shall be made payable to the “City of Reading”.

3.3.5 Use of a Bid Bond form other than the one provided herein. Such Bids may be rejected immediately.

after opening as non-conforming.

INSURANCE

The Contractor, at the time of execution of the contract, shall also furnish the City with insurance certificates of adequate limits, as later indicated, to protect the City of Reading, its agents, and employees from any litigation involving Worker's Compensation, Public Liability and Property Damage, involved in the work. All subcontractors must also furnish copies of their liability insurance and Worker's Compensation Insurance certificates to the City. No subcontractor will be allowed to perform any work under this contract by the City unless such certificates are submitted to and approved by the City beforehand.

Each Bid shall be accompanied by a (COI providing the coverages and limits outlined herein).

The successful Contractor shall assume and be liable for all blame and loss of whatsoever nature by reason of neglect or violation of any Federal, State, County or Local laws, regulations, or ordinances; the Contractor shall indemnify and hold harmless the City of Reading from all suits or actions at law of any kind whatsoever in connection with this work and shall if required by the City, produce evidence of settlement of any such action before final payment shall be made by the City. The selected Contractor shall protect the City, its agents, and employees, from any litigation involved in this contracted work. The Contractor’s Liability Insurance Certificate shall include the hold harmless clause and shall be filed with the City of Reading. All subcontractors must also furnish copies of their liability insurance certificates to the City. No subcontractor will be allowed to perform any work under this contract by the City unless such certificates are submitted to and approved by the City beforehand.

A. General Liability – for bodily injury and property damage – including any liability normally covered by a general liability policy with limits of not less than $1,000,000 per occurrence and $2,000,000 in the annual aggregate.

B. Business Automobile Liability – For owned, non-owned, leased and hired vehicles with a combined single limit of not less than $1,000,000 for bodily injury and property damage.

http://www.pennbidprocureware.com/ http://www.pennbidprocureware.com/

C. Umbrella/Excess Liability – with limits of not less than $5,000,000 per occurrence and $5,000,000 aggregate following from underlying liability coverage.

D. Workers’ Compensation – Statutory limits in each state in which Service Provider is required to provide Worker’s Compensation coverage including “All States” and “Voluntary Compensation” endorsement, and a Waiver of Subrogation endorsement in favor of the City.

E. Employer’s Liability – with limits of not less than $100,000 Accident – Each Accident, $100,000 Disease – Each Employee; and $500,000 Disease – Policy Limit.

Prior to commencement of the performance of the Agreement, Contractor shall furnish to the City a certificate of insurance evidencing all required coverage in at least the limits required herein, naming the City of Reading, its elected officials, agents, and employees as Additional Insured for “ongoing operations” and “products and completed operations” for a period of three years after final payment under the Commercial General Liability Coverage. Coverage should be provided by ISO Endorsements CG20 10 04 13 and CG2037 04 13 or their equivalent. Contractor’s Commercial General Liability, Automobile Liability, and Umbrella/Excess Policy shall be Primary to and will not require contribution from any other insurance under which the Additional Insured is a Named Insured. To the fullest extent permitted by applicable state law, all policies shall contain a Waiver of Subrogation Clause. The Certificate shall note the project and provide that no policies may be cancelled without thirty (30) days advance written notice to the City. Such certificate shall be issued to: City of Reading, Attn: Risk and Safety Coordinator, 815 Washington Street, Reading, PA 19601. All insurance policies shall be in effect with companies holding an A.M. Best rating of “A-“ or better or financial rating of IX or better with the A.M. Best’s Company Key Rating, Guide Latest Edition and shall be licensed or authorized to do business in the Commonwealth of Pennsylvania. Such companies shall also be acceptable to the City. Said policies shall remain in full force and effect until the expiration of the terms of the contract or until completion of all duties to be performed hereunder by the Contractor, whichever shall occur later.

The Awarded Contractor(s) is required to submit a current COI each year during the term of the contract.

Pollution Liability – in minimum amounts of $1,000,000 per claim and $1,000,000 aggregate.

EMPLOYMENT OF CERTAIN PERSONS PROHIBITED

No person who, at the time, is serving sentence in a penal or correctional institution shall be employed on the work covered by this Contract.

SUPERVISION OF WORKERS

The Contractor shall provide qualified supervision of each crew at all times while working under this contract. Each supervisor shall be authorized by the Contractor to accept and act upon all directives issued by the City. Failure for the supervisor to act on said directives shall be sufficient cause to give notice that the Contractor is in default of the contract unless such directives would create potential personal injury or safety hazards.

This contract will be under the direct supervision of the City or its authorized representatives. Any alterations or modifications of the work performed under this contract shall be made only by written agreement between the Contractor and the City authorized representatives and shall be made prior to commencement of the altered or modified work. No claims for extra work or materials shall be allowed unless covered by written agreement.

SUBCONTRACTS

The Contractor will not be allowed to subcontract work under this contract unless written approval is granted by the City. The Subcontractor, as approved, shall be bound by the conditions of the contract between the City and the Contractor. The authorization of a Subcontractor is to perform in accordance with all terms of the contract and specifications. All required notices, work orders, directives, and requests for emergency services will be directed to the Contractor. All directions given to the Subcontractor in the field shall bind the Contractor as if the notice had been given directly to the Contractor.

QUALITY

Where a bid is asked for a certain article or "Approved Equal" and the bidder intends to furnish an article which the bidder considers equal to the one named, the bidder must specify in the bid the name and grade of said article. All disputes concerning grade and quality of materials or work shall be determined by a person duly authorized by the City.

TIME OF COMPLETION

The bidders are herewith cautioned that the time of completion shall be as stated on the bid form. To insure timely completion, the successful bidder will be required to furnish adequate equipment, and qualified personnel in sufficient numbers at all times.

Where a date is set for delivery of materials or the performance of work, said materials must be delivered, or work performed, in accordance with the specifications or description herein contained on or before said date, or the order to the delinquent party will be canceled and awarded to the next lowest responsible bidder.

BUSINESS PRIVILEGE TAX

The City of Reading imposes a Business Privilege License, at $55.00 per calendar year. In addition, a Business Privilege Tax is imposed at the rate of 2-1/4 mills upon the gross receipts attributable to business conducted within the City of Reading.

PERMITS/LICENSES

The Contractor shall, at his expense, pay all fees and procure all necessary licenses and permits needed to conduct the work required under the terms of this contract. The Contractor shall give any and all necessary formal notices required in conjunction with the lawful prosecution of the work of this contract.

BASIS OF PAYMENT

All prices to be quoted F.O.B. Reading, PA destination. The City of Reading is tax exempt.

OBSERVANCE OF LAWS, ORDINANCES AND REGULATIONS

The Contractor at all times during the term of this contract shall observe and abide by all Federal, State, and Local laws which in any way affect the conduct of the work and shall comply with all decrees and orders of courts of competent jurisdiction. The Contractor shall comply fully and completely with any and all applicable State and Federal Statutes, rules and regulations as they relate to hiring, wages, and any other applicable conditions of employment.

PRE-BID MEETING

There will be no prebid meeting for this project.

WITHDRAWAL OF PROPOSALS/BIDS

After a bid has been opened, it may not be withdrawn except as provided by Act of January 23, 1974, P.L. 9 No. 4, as same may be amended.

No bids may be withdrawn for a period of ninety (90) days following the formal opening and receipt of bids by the City of Reading.

BID REJECTION

The City of Reading reserves the right to reject any or all bids and to accept or reject any part of any bid.

It also reserves the right to waive any technical defects or minor irregularities, which in its discretion, is in the best interest of the City.

EXECUTION OF CONTRACT

The successful Bidder shall, within ten (10) calendar days after mailing of contract documents by the City to the Principal, enter into contract with the City on form as included within the bidding documents for the appropriate bonds, indemnities and insurances required hereunder.

The contract, when executed, shall be deemed to include the entire agreement between the parties; the Contractor shall not base any claim for modification of the contract upon any prior representation or promise made by the representatives or the City, or other persons.

All attachments are considered as part of this document.

TERM OF CONTRACT

This contract shall be effective when the Notice to Proceed form is completed and valid until work is completed or September 1, 2026, whichever comes first, unless terminated in accordance with the terms and conditions of this contract.

If work is not completed within thirty days of Notice to Proceed refer to the contract, paragraph Stipulated Damages herein.

METHOD OF PAYMENT

Payments shall be based on an invoice submitted by the General Contractor or approved representative Construction Manager. The City shall have the right to withhold disbursement funds if in the City's opinion construction work for which payment has been requested is of poor workmanship, contrary to any applicable codes and contract specifications, violation of appropriate paperwork requirements that are not up to date and approved for this billing period, General Contractor fails to comply with this Agreement, or for other conditions or circumstances which the City deems not to be in the best interest of the public.

Ten percent (10%) of each General Contractor invoice request shall be retained by the City on this contract until it is completed up to City codes and contract specifications and approved by a City Official or person representing a City Official (Architect or Engineer).

ACCESS TO ACCOUNTING RECORDS

The contractor shall certify that all materials, equipment, and labor charged to the City are accounted for and shall keep such full and detailed accounts as may be necessary for proper financial management under this Agreement. The City or its representative shall be afforded access the all the Contractor’s records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to this Contract, and the Contractor shall preserve all such records for a period of three (3) years, or for such longer period as may be required by law, after the final payment.

ASSIGNMENT OF REFUND RIGHTS

The City is not subject to federal, state, or local sales or use tax or federal excise tax. Contractor hereby assigns to City all of its rights, title, and interest in any sales or use tax which may be refunded as a result of the purchase of any materials purchased in connection with the Contract and Contractor, unless directed by the City, shall not file a claim for any sales or use tax refund subject to this assignment.

Contractor authorizes the City, in its own name or the name of the Contractor, to file a claim for a refund of any sales or use tax subject to this assignment.

CONTRACTS WITH SUBCONTRACTORS

The Contractor agrees to include the above references paragraphs in any contract with subcontractors and to provide proof thereof to the City of Reading if requested.

NOTICE TO PROCEED

The Contractor shall begin work on the job site within ten (10) days after receiving Notice to Proceed from the City.

DISCONTINUANCE OF WORK

Any practice obviously hazardous as determined by the City shall be immediately discontinued by the Contractor upon receipt of either written or oral notice to discontinue such practice.

CONTRACT TERMINATION

The City shall have the right to terminate a contract or a part thereof before the work is completed in the event:

1. Previous unknown circumstances arise making it desirable in the public interest to void the contract.

2. The contractor is not adequately complying with the specifications.

3. The contractor refuses, neglects, or fails to supply properly trained or skilled supervisory personal and/or workers or proper equipment.

4. The contractor in the judgment of the City is unnecessarily or willfully delaying the performance and completion of the work.

5. The contractor refuses to proceed with work when and as directed by the City.

6. The contractor abandons the work.

Contractors who have questions concerning various aspects of this Contract should contact the following persons:

QUESTIONS REGARDING SPECIFICATIONS OR BID PROCESS

To ensure fair consideration for all proposers, the City prohibits communication to or with any department director, division manager or employee during the submission process with the exception of those questions relative to interpretation of specifications or the proposal process. No interpretations of the meaning of the RFP documents will be made to any bidder orally.

Every request for such interpretation shall be submitted via the PennBid Program (pennbid.procureware.com) to be given consideration must be sent in prior to January 20, 2026, at 2:00

PM.

Any and all such interpretation will be in the form of an Addendum to the Contract Documents and will be issued via PennBid to all prospective proposers no later than January 23, 2026, at 2:00 PM.

Notice: Payment of invoices are subject to the terms and conditions of the sources of funding for this project.

THE FOLLOWING INSTRUCTIONS FOR CONTRACTORS REGARDING AFFIRMATIVE ACTION ARE

PROVIDED FOR INFORMATION PURPOSES. THE SUCCESSFUL BIDDER ASSUMES THE

OBLIGATION TO TAKE WHATEVER AFFIRMATIVE ACTIONS ARE NECESSARY TO ASSURE EQUAL

EMPLOYMENT OPPORTUNITY IN ALL ASPECTS OF EMPLOYMENT, IRRESPECTIVE OF RACE,

COLOR, CREED, OR NATIONAL ORIGIN.

NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION

TO ENSURE EQUAL EMPLOYMENT

OPPORTUNITY (EXECUTIVE ORDER 11246, AS AMENDED)

(1) The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein.

(2) The goals are timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

These goals are applicable to all the Contractor's construction work (whether or not it is federal or federally-assisted) performed in the covered area.

The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals established for the geographical area where the contract resulting from this solicitation is to be performed.

The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed.

(3) THE CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO THE DIRECTOR OF THE OFFICE OF

FEDERAL CONTRACT COMPLIANCE PROGRAMS WITHIN 10 WORKING DAYS OF AWARD OF ANY CONSTRUCTION

SUBCONTRACT IN EXCESS OF $10,000 AT ANY TIER FOR CONSTRUCTION WORK UNDER THE CONTRACT

RESULTING FROM THIS SOLICITATION. THE NOTIFICATION SHALL LIST THE NAME, ADDRESS AND TELEPHONE

NUMBER OF THE SUBCONTRACTOR; EMPLOYER IDENTIFICATION NUMBER; ESTIMATED DOLLAR AMOUNT OF THE

SUBCONTRACT; ESTIMATED STARTING AND COMPLETION DATES OF THE SUBCONTRACT; AND, THE

GEOGRAPHICAL AREA IN WHICH THE CONTRACT IS TO BE PERFORMED.

OFFICE OF FEDERAL CONTRACT COMPLIANCE PROGRAMS

THE CURTIS CENTER SUITE 750 WEST

170 SOUTH INDEPENDENCE MALL WEST

PHILADELPHIA, PA 19106-3309

PHONE (215) 861-5764

As used in this Notice, and in the contract resulting from this solicitation, the "covered area" is the City of Reading, Pennsylvania.

Timetables Goals for Minority Goals for Female Participation in Each Trade Participation for Each Trade Until Further Notice 2.5% for all trades 6.9% for All Trades

State of ________________________) ) ss.

County of ______________________)

I, ______________________________, Notary Public, being duly sworn, deposes and says that he is _________________________________ of ________________________________, (Name of Organization) and that the answers to the foregoing questions and all statements therein contained are true and correct.

Subscribed and sworn to before me this ______ day of _____________________, _______.

NOTARY PUBLIC

My Commission Expires:

DOCUMENTS TO BE SUBMITTED WITH BID

Build America, Buy America Material Certification

The “Buy America Certification Form” is used to certify that, as required by federal law, all of the iron, steel (for FY23 funded projects forward), specific construction materials – non-ferrous metals, lumber, composite building materials, plastic and polymer-based pipe and tube, (for FY24 funded projects and forward), all construction materials, including manufactured products (for FY25 funded projects and forward) utilized in federally funded projects with an aggregate of $250,000 or more funds, including HUD CDBG funds, are produced in the United States in a manner that complies with the Build America, Buy America Act*, unless an applicable waiver applies or is granted by the Made in America Office of Management and Budget (MIAO).

BABA guidance requires the following Buy America preference:

All iron and steel used in the project are produced in the United States. This means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States for FY2023 funded projects forward; and, for FY2024 funded projects forward;

All listed manufactured products used in the project are produced in the United States. This means the manufactured product was manufactured in the United States, and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation; and, for FY2025 funded projects forward;

All (listed and non-listed) construction materials are manufactured in the United States. This means that all manufacturing processes for the construction material occurred in the United States.

I hereby certify the materials installed/to be installed pursuant to the attached Submittal conform to the Build America, Buy America Provisions. Signing this document does not alleviate the signee of providing evidence of such a request. I hereby certify that the information provided on this form is true and accurate.

Contract Name________________________________________________________________________

Authorized Representative (Print)_________________________________________________________

Signature____________________________________________________________________________

Company____________________________________________________________________________

Representing (Contractor, supplier, manufacturer, etc.)________________________________________

Phone Number________________________________________________________________________

Email_______________________________________________________________________________

Responsible Contractors, manufacturers, and suppliers certify materials with the understanding that those certifying the material assume full legal responsibility for the material and are subject to providing documentation verifying the material meets all requirements upon demand.

Design Teams and/or Architects signed or stamped acceptance of the attached submittal declares the submittals and accompanying materials meet BABA requirements.

* The Project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. 177-58. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States, as further outlined by the Office of Management and Budget’s Memorandum M-22-11, Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, April 18, 2022.

PROPOSAL

Proposal of:

Name:

Address:

TO: Mayor Moran City of Reading 815 Washington Street Reading, PA 19601

Dear Mayor Moran:

In conformity with City Plans and specifications, all as prepared by the Community Development Department and after an examination of the site of the work, and the Contract Documents, including the instructions to Bidders, Form of Proposal, and Terms and Conditions, and the undersigned submits this proposal, which it is understood will be forfeited if this proposal is accepted by the City of Reading, and the undersigned fails to furnish and execute the contract within the time stipulated; otherwise, the guarantee will be returned.

The contractor must purchase and maintain insurance coverage in the amounts and types specified to protect against claims arising from the contractor's personnel, work, or any subcontractor performing work for the contractor. Insurance coverage must meet or exceed the minimum requirements set by law.

Certificates of insurance must be included with the bid proposal.

The undersigned declares that no Member of Council, Director of Department, Division Manager, Deputy thereof or Clerk therein, or other officer of the City of Reading, is directly or indirectly interested as principal, surety of otherwise in this proposal or has any supervision or overall responsibility for the implementation in administration of the contract.

It is certified that the undersigned is the only person(s) interested in this proposal as principal and that the proposal is made without collusion with any person, firm, or corporation.

This contract shall be effective when the Notice to Proceed form is completed and valid until work is completed by September 1, 2026, or whichever comes first, unless terminated in accordance with the terms and conditions of this contract.

The City reserves the right to extend the term of the Contract period for up to three (3) months to prevent a lapse of coverage and only for the time necessary to issue and award a new Invitation for Bid.

In the event our company is awarded the Contract as a result of the IFB and this Bid, the following individual will serve as project liaison/manager:

Name / Title: ___________________________________________________

Office Address: ___________________________________________________

Telephone: __________________________ Email: ________________________________

It is proposed to furnish and deliver all materials, tools, equipment, power, tests and transportation, perform all labor, superintendence, and all means of construction, and do all incidental work, and to execute, construct and finish in an expeditious and workman-like manner, in accordance with the plans and specifications, to the satisfaction and acceptance of the Department of Community Development of the City of Reading and its Engineer for the total base bid as herein bid:

IN WITNESS WHEREOF, this proposal has been executed this ____ day ______ A.D. 20____, by the setting hereunto of his or its hand and seal.

(INDIVIDUAL: PRINCIPAL)

_______________________________(Seal) (Signature of Individual) Witness:

Trading and Doing Business as:

(PARTNERSHIP PRINCIPAL)

_______________________________(Seal) (Name of Partnership) Witness:

_____________________________ By:____________________________(Seal) (Partner) Witness:

_____________________________ By:____________________________(Seal) (Partner)

Witness:

_____________________________ By:____________________________(Seal) (Partner) Witness:

_____________________________ By:____________________________(Seal) (Partner)

(CORPORATION PRINCIPAL)

Attest:

(Assistant Secretary)

(Name of Corporation)

By:_______________________________ (Vice) President

(CORPORATE SEAL)

or (if appropriate)

By:_______________________________ Authorized Representative

FORM OF BID BOND

BOND

KNOW ALL MEN BY THESE PRESENTS that we, the undersigned, ________________________, as Principal (the "Principal"), and _______________________________ a corporation organized and existing under laws of the __________________ of ____________, as

Surety (the "Surety"), are held and firmly bound unto______________________________________ as

Obligee (the "Obligee"), as hereinafter set forth, in the full and just sum of

__________________________________________________________________Dollars lawful money of the United States of America, for the payment of which sum we bind ourselves, our heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents.

WITNESSETH THAT:

WHEREAS, the Principal herewith is submitting a Proposal to the Obligee to perform the _____________________ Work in connection with the construction of ____________________________ pursuant to plans, specifications and other documents constituting the Contract Documents which are incorporated into said Proposal by reference (the "Contract Documents"), as prepared by the Department of Public Works, City Hall, 815 Washington Streets, Reading, PA 19601- 3690.

WHEREAS, it is a condition of the receipt and consideration by the Obligee of said Proposal that it shall be accompanied by proposal guaranty to be held by the Obligee on terms hereinafter set forth NOW, THEREFORE, the condition of this Bond shall be such that, if the Principal, within ten (10) days after mailing of contract document by the City to Principal, shall furnish to the Obligee a Performance Bond, Payment Bond and upon award of a contract to him by the Obligee, shall execute and deliver the Agreement and furnish to the Obligee proper evidence of effectiveness of insurance coverage, respectively within the time, in the forms and in the amounts, as appropriate, required by the Contract Documents, then this Bond shall be void, otherwise, this Bond shall remain in full force and effect.

The Principal and the Surety agree to pay to the Obligee the difference between the amount of said Proposal, as accepted by the Obligee, and any higher amount for which the required work shall be contracted for by the Obligee, together with any additional advertising costs, architect's fees, legal fees and any all other fees and expenses incurred by the Obligee by reason of the failure of the Principal to enter into such Agreement with the obligee, or to furnish such Contract Bonds, or to furnish evidence of effectiveness of such insurance coverage; provided, however, that (1) the obligation of the Surety shall not exceed the stated principal amount of this Bond; and (2) if the Obligee should not procure an executed contract with any other person for the performance of the work contemplated in said Proposal, as accepted by the Obligee, upon the same terms and conditions, other than price, as provided in the Contract Documents, within the period provided in the Contract Documents during which no proposals of bidders may be withdrawn, whether because of the lack of other proposals, or because of the inability or refusal of any other bidder to enter into an appropriate contract, or because the cost under any higher proposal would be greater than the Obligee shall determine, in its sole discretion, that it can afford, then the Principal and the Surety agree to pay to the Obligee the full amount of this Bond as liquidated damages.

IN WITNESS WHEREOF, the Principal and the Surety cause this Bond to be signed, sealed and delivered this ___________day of _______________, 20____.

(INDIVIDUAL PRINCIPAL)

(Seal) (Signature of Individual)

Witness:

(Seal) (Name of Partnership)

Witness:

____________________________ By: ________________________________ (Seal) (Partner)

Witness:

By: ________________________________ (Seal) (Partner)

By: ________________________________ (Seal) (Partner)

By: ________________________________

By:_____________________________________

Attest:

(Corporate Seal)

(OR, IF APPROPRIATE)

(Authorized Representative)

Signed ______________________________

(Title)

Subscribed and sworn to before me on this ___ day of ___________, 20 ___

(Title)

My Commission Expires:

(CORPORATION SURETY)

By:_________________________________ (Attorney-In-Fact)

** Attach an appropriate Power of Attorney, valid and in effect as of the date of this affidavit, evidencing the authority of the Attorney-In-Fact to act in behalf of the corporation.

NON-COLLUSION AFFIDAVIT

INSTRUCTIONS FOR NON-COLLUSION AFFIDAVIT

This Non-Collusion Affidavit is material to any contract pursuant to this bid. According to the Pennsylvania Antibid-Rigging Act, 73 P.S. 1611 et seq., governmental agencies may require Non- Collusion Affidavits to be submitted together with bids.

This Non-Collusion affidavit must be executed by the member, officer, or employee of the bidder who is authorized to legally bind the bidder.

Bid rigging and other efforts to restrain competition, and the making of false sworn statements in connection with the submission of bids are unlawful and may be subject to criminal prosecution. The person who signs the Affidavit should examine it carefully before signing and assure himself or herself that each statement is true and accurate, making diligent inquiry, as necessary, of all other persons employed by or associated with the bidder with responsibilities for the preparation, approval, or submission of the bid.

In the case of a bid submitted by a joint venture, each party to the venture must be identified in the bid documents, and an Affidavit must be submitted separately on behalf of each party.

The term "complementary bid" as used in the Affidavit has the meaning commonly associated with that term in the bidding process, and includes the knowing submission of bids higher than the bid of another firm, any intentionally high or noncompetitive bid, and any form of bid submitted for the purpose of giving a false appearance of competition.

Failure to file an Affidavit in compliance with these instructions will result in disqualification of the bid.

NON-COLLUSION AFFIDAVIT OF PRIME BIDDER

State of ________________________

County of ______________________

_______________________________, being first duly sworn, deposes and says that:

He/She is _____________________(Owner, Partner, Officer, Representative or Agent) of ________________________________________, the Bidder that has submitted the attached Bid or Bids;

He/She is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;

Such Bid is genuine and is not a collusive or sham Bid;

Neither the said Bidder nor any of its officers;

partners, owners, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication of conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overheld, profit or cost element of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against the City of Reading or any person interested in the proposed Contract;

The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant; and, Neither the said Bidder nor any of its officers, partners, owners, agents or parties in interest, have any interest, present or prospective, that can be reasonably construed to result in a conflict of interest between them and the City of Reading, which the Bidder will be required to perform.

I state that ___________________________ understands (Name of Firm) and acknowledges that the above representations are material and important and will be relied on by the City of Reading in awarding the contract(s) for which this bid is submitted. I understand and my firm understands that any misstatement in this affidavit is and shall be treated as fraudulent concealment from the City of Reading of the true facts relating to the submission of bids for this contract.

(Name and Company Position)

SWORN TO AND SUBSCRIBED

BEFORE ME THIS ________

DAY OF _________, 20___

_________________________ My Commission Expires Notary Public

PROVIDER'S CERTIFICATION OF NON-INDEBTEDNESS

TO THE CITY OF READING

Provider hereby certifies and represents that Provider and Provider's parent company(ies) and subsidiary(ies) are not currently indebted to the City of Reading (the "City"), and will not at any time during the term of this Contract (including any extensions or renewals thereof) be indebted to the City, for or on account of any delinquent taxes, liens, judgments, fees or other debts for which no written agreement or payment plan satisfactory to the City has been established. In addition to any other rights or remedies available to the City at law or in equity, Provider acknowledges that any breach or failure to conform to this certification may, at the option of the City, result in the withholding of payments otherwise due to Provider and, if such breach or failure is not resolved to the City's satisfaction within a reasonable timeframe specified by the City in writing, may result in the offset of any such indebtedness against said payments and/or the termination of this Contract for default (in which case Provider shall be liable for all excess costs and other damages resulting from the termination).

NAME OF PROVIDER

By: _____________________________________

AUTHORIZED SIGNATORY

Title: _____________________________________

PRESIDENT OR VICE PRESIDENT

Attest: _____________________________________

RESOLUTION NO. 192-92

WHEREAS, reportedly, twenty-five cement manufacturing facilities in the United States are currently burning well over two billion pounds a year of hazardous waste as a source of fuel and additional profit in the cement manufacturing process; and

WHEREAS, approximately twenty cement manufacturing facilities are seeking permission to start this practice; and

WHEREAS, sufficient data and evidence as to the safety of cement products made from hazardous waste has not been proven; and

WHEREAS, it is in the best interest of the citizens of the City of Reading in regard to their health and quality of life that cement derived from hazardous waste be banned from any City projects.

NOW, THEREFORE, the Council of the City of Reading resolves that the City of Reading will not purchase cement from any facility that burns hazardous waste as fuel in its manufacturing process, nor allow the use of concrete made from this type of cement. This policy shall be reflected in city bid specifications.

PASSED COUNCIL April 1, 1993

WARREN H. HAGGERTY, JR.

Mayor

ATTEST:

RUTH M. THOMPSON

City Clerk

STATEMENT REGARDING MANUFACTURE OF CEMENT

The following statement is to be signed by an authorized officer of the company.

The undersigned contractor hereby certifies in accordance with City of Reading Resolution #192-92, that any cement used in performance of this contract shall not have been manufactured by a process using hazardous materials, as defined by the Environmental Protection Agency, in the manufacture and makeup thereof.

CONTRACTOR

By:___________________________

Title:________________________

STATEMENT OF BIDDER'S QUALIFICATIONS

All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires.

1. Name of Bidder:__________________________________________________________

2. Permanent main office address:______________________________________________

3. When organized:_________________________________________________________

4. If a corporation, where incorporated:_________________________________________

5. How many years have you been engaged in the contracting business under your present firm or trade name:________________________________________________________

6. Contracts on hand: (Schedule these on an attached sheet, showing amount of each contract and the appropriate anticipated dates of completion.)

7. Have you ever failed to complete any work awarded to you? If so, where and why?

8. Have you ever defaulted on a contract ?______________. If so, where and why?

9. List the more important projects recently completed by your company on an attached sheet, stating the approximate cost of each, and the month and year completed.

10. List your major equipment available for this contract.

11. Describe experience in construction work similar in importance to this project on an attached sheet.

Statement of Bidder's Qualifications

12. Background and experience of the principal members of your organization, including the officers.

13. Credit available: $________________________________________________________

14. Give Bank reference:______________________________________________________

15. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the City? ____________________________________________

16. (A) Have you ever been a party to or otherwise involved in any action or legal proceeding involving matters related to race, color, nationality or religion?______________ If so, give full details.

(B) Have you ever been accused of discrimination based upon race, color, nationality or religion in any action or legal proceeding including any proceeding related to any Federal Agency? ____________. If so, give full details _______________________________________

17. All prospective bidders are required to present proof of an acceptable disposal method approved by the Pennsylvania Department of Environmental Protection. The proof may consist of a copy of a State Solid Waste Disposal Permit issued to the prospective bidder by the Pennsylvania Department of Environmental Protection, or a letter of approval from the Pennsylvania Department of Environmental Protection for the use of a proposed or existing disposal facility which has a permit or is under review for a permit. Same to be in accordance with Section 7 (a) application and permits, Pennsylvania Solid Waste Management - "Act 241."

Statement of Bidder's Qualifications

18. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the "City of Reading" in verification of the recitals comprising this Statement of Bidder's Qualifications.

19. Name, address, phone number, and contact person at surety company who will provide bonding for this contract:

20. Name, address, phone number, and contact person at insurance company who will provide insurance coverage for this contract:

21. The undersigned hereby authorizes any person, firm or corporation to furnish any information requested by the City of Reading in verification of the recitals comprising this Statement of Bidder's Qualifications.

DATED at _________________________ this _____ day of ______________________, 20_____.

(NAME OF BIDDER)

BY: ______________________________

TITLE:____________________________

EQUAL EMPLOYMENT OPPORTUNITY AND SECTION 3 QUESTIONNAIRE

(Please complete the following information and answer all questions; use an attached sheet as necessary.)

1. (a) Contractor: How many persons from the City of Reading ________, low income City residents ________, and minorities: ______Black, ______ Hispanic, ______ White, ______ Asian/Pacific Islander, ______Other, are on your present basic payroll?

(b) Subcontractor: How many persons from the City of Reading _______, low income City residents ________, and minority groups: ______Black, ______ Hispanic, ______ White, ______ Asian/Pacific Islander, ______Other, are on your present basic payroll?

2. How many City of Reading residents ________, low income City residents ________, and minorities: _______Black, ________Hispanic, ________White, _________Asian/ Pacific Islander, ________Other, are presently in training programs run by your company, your subcontractors, and associations to which you or your subcontractors may belong or with unions with which you and your subcontractors have collective bargaining agreements?

3. Does your firm, subcontractors, associations to which you or they belong or unions with which you or your subcontractors have collective bargaining agreements a definite plan for creating career situations, training and employment for residents of the City of Reading, low income citizens, and minorities? _____________. If so, please include a copy of the plan with your formal bid and specify the number of individuals (from the groups referred to previously), to be placed in apprenticeship or other training situations. When is the program scheduled to begin?_______________ What portion of the program is already in operation?

4. What plans does your firm have to utilize business concerns located in, or owned in substantial part by persons residing in the City?

CERTIFICATION OF NON-SEGREGATED FACILITIES

The Bidder certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments and that he does not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. The Bidder certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he will not permit his employees to perform their services at any location under his control where segregated facilities are maintained. The Bidder agrees that a breach of this certification will be a violation of the Equal Opportunity clause in any contract resulting from acceptance of this bid. As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, restrooms and washrooms, restaurants and other eating areas, timeclocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, color, religion or national origin, because of habit, local custom or otherwise. The Bidder agrees that (except where he has obtained identical certification from proposed subcontractors for specific time periods) he will obtain identical certification from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files.

Note: The penalty for making false statement in offers is prescribed in 18 U.S.C. 1001.

DATE: _________________,

BY: ______________________________ ________________________________

(NAME OF BIDDER) (TITLE)

OFFICIAL ADDRESS:

CONTRACTOR'S STATEMENT FOR PUBLIC DISCLOSURE *

1. a/ Name of Contractor:

b/ Address and Zip Code of Contractor:

2. If the Contractor is not an individual doing business under his own name, the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .