6-Pratts Dam Road Construction Schedule.pdf
PDF 102 KB Posted
- Attached to
- Pratts Dam Road Bank Stabilization Project
- Solicitation number
- US.235576
- Issued by
- Chester County, Pennsylvania
About this file
This document is a pre-bid construction schedule for the Pratts Dam Road Creek Embankment Reconstruction Project in West Brandywine Township, Chester County, Pennsylvania. The project involves the replacement of existing retaining walls with soldier pile retaining walls, construction of a second soldier pile retaining wall, placement of rock protection along both walls, drainage improvements, full depth pavement resurfacing, safety feature upgrades, and associated work. The construction schedule spans from November 19, 2026, through May 30, 2029, comprising 41 distinct tasks with durations ranging from 1 to 222 days. Work is organized into two primary phases: Phase 1 focuses on Wall 1 reconstruction from August 2027 through July 2028, while Phase 2 addresses Wall 2 from July 2028 through December 2028. The schedule includes utility relocations with lead times for Verizon pole relocation (6 weeks) and PECO facilities relocation (16 weeks), mobilization activities, erosion and sediment control measures, winter shutdown from January through March 2029, and final construction inspection and closeout activities. All work is planned on a 5-day work week basis with 8-hour days, excluding U.S. holidays.
The schedule reflects a complex, multi-phase project requiring coordination of significant infrastructure work including caisson drilling, steel post installation, concrete lagging panel installation, temporary shoring, pavement excavation and milling, and asphalt binder and wearing surface installation. The project incorporates environmental controls throughout, with erosion and sediment control measures and pumped water filter bags required during both wall construction phases. Notable milestone tasks include detour notification and installation at project commencement, grading and topsoil placement following each wall phase, and final pavement markings and guide rail installation near project completion. The schedule demonstrates careful sequencing to manage constructability constraints, site access, and environmental compliance across the 30-month project duration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pratts Dam Road Creek Embankment Reconstruction Project West Brandywine Township, Chester County
Pre-Bid Construction Schedule
10/5/2026 Tiffany McClure
Drawn by: Planner - Chart Properties Dwg No. 00001 Revision No. A Notes: Comment - Chart Properties
Project Ref. \\extfs\Projects\10190_PA_WestBrandyTwp_Pratts\200_Disciplines\224_Roadway\Construction_Schedule\Pratts Dam Construction Schedule.pp Planned by Asta Powerproject
Line Unique Task
ID
Name Duration Start Finish Total float Calendar
2027 20282026 2029
December January February March April May June July August September October November December January February March April May June July August September October November December January February March April MayNov
23 30 7 14 21 28 4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 31 7 14 21 28 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26 5 12 19 26 2 9 16 23 30 7 14 21 28
520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652
Let Date
NTP
Verizon Pole Relocation - 6 week lead time
PECO Facilities Relocation - 16 week lead time
Detour Notification and Install Detour
Mobilization
Delineate Limits Of Disturbance
Clear & Grub Trees And Vegetation as Needed
Install Rock Construction Entrance
Phase 1 - Wall 1
Install Erosion and Sediment Control Measures for Wall 1 up to Station 212+50.00. Install Pumped Water Filter Bags As Needed
Install Temporary Shoring to Stabilize the Existing Wall.
Drill Caissons
Install Steel Posts
Backfill the Front Face of Wall 1 with Rock, Class R-4, Grouted as Indicated on the Plans
Install Timber Lagging
Install Precast Concrete Lagging Panels. Remove and Install Proposed Drainage for Wall 1 as the Panels are Being Installed.
Install Inlet Filter Bags Immediately.
Remove the Existing Wall 1 and Backfill in Accordance with the Structure Plans.
Grade Areas Affected by the Construction of Wall 1 to the Proposed Contours. Place Topsoil, Erosion Control Blanket, and Seed as Required
Excavate Existing Pavement up to Station 212+50.00. Install Up to Proposed Base Course to the Proposed Elevations and Cross Slopes. Install Temporary Barrier Immediately.
Phase 2 - Wall 2
Install Erosion and Sediment Control Measures for Wall 2. Install Pumped Water Filter Bags As Needed
Install Temporary Shoring to Stabilize the Existing Wall
Dril Caissons
Install Steel Posts
Backfill the Front Face of Wall 2 with Rock, Class R-4, Grouted as Indicated on the Plans
Install Timber Lagging
Install Precast Concrete Lagging Panels
Remove Wall 2 and Backfill in Accordance with the Structure Plans
Grade Areas Affected by the Construction of Wall 2 to the Proposed Contours. Place Topsoil, Erosion Control Blanket, and Seed as Required
Winter Shutdown
Excavate Existing Pavement from Station 212+50.00 to the End of the Full Depth Section. Install Up to Proposed Base Course to the Proposed Elevations and Cross Slopes.
Mill Pratts Dam Road as Indicated on the Plans
Install Proposed Binder and Wearing Surface Throughout the Project Limits
Remove Temporary Barrier. Install Proposed Guide Rail Immediately.
Install Proposed Pavement Markings
Final Grade All Disturbed Areas. Place Topsoil, Erosion Control Blanket, and Seed as Required
Final Construction Inspection
Remove Erosion And Sediment Controls
Remove Detour
Project Complete
86d
1d
30d
80d
15d
3d
2d
7d
1d
222d
2d
150d
150d
150d
150d
150d
150d
150d
10d
25d
218d
2d
60d
60d
60d
60d
60d
60d
60d
5d
48d
10d
2d
5d
15d
2d
5d
1d
1d
1d
1d
11/19/2026
3/19/2027
3/22/2027
3/22/2027
7/12/2027
8/2/2027
8/5/2027
8/9/2027
8/18/2027
8/19/2027
8/19/2027
8/23/2027
9/6/2027
9/20/2027
10/4/2027
10/18/2027
11/1/2027
11/15/2027
6/12/2028
6/26/2028
7/31/2028
7/31/2028
8/2/2028
8/16/2028
8/30/2028
9/13/2028
9/27/2028
10/11/2028
10/25/2028
1/17/2029
1/24/2029
4/2/2029
4/16/2029
4/18/2029
4/25/2029
5/16/2029
5/18/2029
5/25/2029
5/28/2029
5/29/2029
5/30/2029
3/18/2027
3/19/2027
4/30/2027
7/9/2027
7/30/2027
8/4/2027
8/6/2027
8/17/2027
8/18/2027
6/23/2028
8/20/2027
3/17/2028
3/31/2028
4/14/2028
4/28/2028
5/12/2028
5/26/2028
6/9/2028
6/23/2028
7/28/2028
5/30/2029
8/1/2028
10/24/2028
11/7/2028
11/21/2028
12/5/2028
12/19/2028
1/2/2029
1/16/2029
1/23/2029
3/30/2029
4/13/2029
4/17/2029
4/24/2029
5/15/2029
5/17/2029
5/24/2029
5/25/2029
5/28/2029
5/29/2029
5/30/2029
65d
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work
Week, US
Holidays
8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work
Week, US
Holidays
8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
5 Day Work Week, US Holidays 8hrs/day
File details come from the government source that posted it. Updated .