1-Pratts Dam Rd Wall L-696 Approved Plans April 2026.pdf

PDF 3 MB Posted

Attached to
Pratts Dam Road Bank Stabilization Project
Solicitation number
US.235576
Issued by
Chester County, Pennsylvania

About this file

This document is an approved plans file for the Pratts Dam Road Bank Stabilization Project in West Brandywine Township, Pennsylvania. The plans, designated as L-696, were digitally signed and approved on March 11, 2026, by Thomas Canataro and on March 12, 2026, by Brad D. Barndt, with final certification by Steven N. Bartkovich, P.E. on April 9, 2026. The project involves the replacement of existing retaining walls along the west side of Pratts Dam Road, including furnishing all necessary labor, equipment, and materials to construct a soldier pile retaining wall system, installation of a second soldier pile retaining wall, placement of rock protection along both walls, drainage improvements, full depth pavement, and safety feature upgrades.

The approved plans document serves as the technical blueprint for bidders and contractors to reference during the solicitation and execution phases of the project. No specific pricing terms, funding amounts, or set-asides are detailed within this plans document, as it functions solely to provide the engineered design and specifications necessary for project implementation. Contractors bidding on this project will be required to follow the approved plans and specifications as signed and certified by the professional engineer and township officials.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Digitally signed by Thomas Canataro Date: 2026.03.11 15:21:49-04'00'

Brad D. Barndt Digitally signed by Brad D. Barndt Date: 2026.03.12 09:03:06 -04'00'

04/09/2026

2026-04-09T10:59:57-0400
Steven N. Bartkovich, P.E.

File details come from the government source that posted it. Updated .