This document is a contract area map for the BCLH Stewardship Integrated Resource Service Contract (IRSC) Phase 2 project located in the Detroit Ranger District of the Willamette National Forest in Oregon. The map details 1,152 acres of burned forest areas affected by the 2020 Lionshead Fire, with multiple subdivisions (LH-1 through LH-72) identified for treatment. The project involves cutting and removing fire-killed timber within 100 feet of roads, performing hazard tree mitigation, reducing roadside fuel accumulation, and conducting road maintenance and reconstruction.

The contract includes mandatory and optional work components, with total tree felling acres ranging from 284 acres (mandatory) to 555 acres (optional). The project is part of a broader stewardship effort under Section 604 of Public Law 108-148, with a performance period from the date of award through September 30, 2030. The estimated timber volume for cutting and removing fire-killed trees is 23,186 tons for mandatory acres and 41,266 tons for optional acres. A site visit is scheduled for August 13, 2025, at the Detroit Ranger Station, and the contract will be awarded using a best value source selection method with a firm fixed price.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

Æ_

ÆQ

ÆQ

ÆQ

ÆQ

ÆQÆQ

ÆQ

ÆQ

ÆQ

ÆQ

ÆQ

ÆQ

ÆQ

ÆQ

ÆQ

ÆQ

ÆQ

ÆQ

ÆQ

LH-15

LH-14

LH-54

LH-66

LH-14A

LH-55

LH-66A

LH-55A

LH-55D

LH-15D

LH-53

LH-13

LH-15C

LH-1

LH-51

LH-55C

LH-64

LH-15CA LH-64A

LH-55B

LH-3A

LH-63

LH-4

LH-54D

LH-50

LH-52ALH-54C

LH-72

LH-52

LH-15A

LH-54B

LH-15B

LH-54A

LH-3B

LH-64B

BC-8

LH-51A

LH-15E

32 5

3 14 25

24 1 4

6 4

9 8

34 32

33 31

31 28

12 10

7 711 612 10

8 5

505535

7 315

461 313

773793

506365

056 058

16286

739 17

156118

859 878

055J

305 056

310 330

LH-52B

T 1 1 S

T 1 2 S

T 0 9 S

T 1 0 S

T 0 8 S

T 1 1 S

T 1 2 S

T 0 8 S

T 0 9 S

T 1 0 S

R 06 ER 05 E

R 07 E

R 07 E R 08 E

R 04 E R 05 E R 06 E R 07 E

R 04 E

Hwy 22 R 0 1.5 30.75

MilesTJR - 7/8/2025

Hwy 22

Portland

BendEugene

Roseburg

§̈¦80

§̈¦5

§̈¦5 ¬«97

¬«97

¬«58

Willamette National Forest

BCLH Phase 2 DxP IRSC Project Area

¬«58

¬«22

¬«20

¬«126

§̈¦80

ÆQ Campground

!. Gate

ÆI Picnic Site

Æ_ Trailhead

!! !! !! Trails

}} }} }} Powerlines

BC-8

LH-1

LH-13

LH-14

LH-14A

LH-15

LH-15A

LH-15B

LH-15C

LH-15CA

LH-15D

LH-15E

LH-3A

LH-3B

LH-4

LH-50

LH-51

LH-51A

LH-52

LH-52A

LH-52B

LH-53

LH-54

LH-54A

LH-54B

LH-54C

LH-54D

LH-55

LH-55A

LH-55B

LH-55C

LH-55D

LH-63

LH-64

LH-64A

LH-64B

LH-66

LH-66A

LH-72

BCLH Phase 2 DxP IRSC Boundary

Waterbody

! ! ! ! Protect Streams

PRIVATE

Wilderness

Mt. Jefferson Wilderness

Bull of the Woods Wilderness

# Subdivision

Hwy 22

BCLH Phase 2 DxP IRSC Contract Area Map

Detroit Ranger District Willamette National Forest

Road Name From To

1000000 BLOWOUT ROAD 0.00 2.09 R 1, 3, 4

1003000 TOM CREEK 0.00 9.98 R

2200020 HOMESTEAD ROAD 0.00 2.25 R

2212000 KINNEY CREEK 0.00 1.70 R 1, 3, 4

2233000 MCCOY_CREEK 0.00 4.19 R 1, 3, 4

2233000

MCCOY_CREEK

ROAD

4.19 11.60 R 1, 3, 4

2233515 BULL FROG 0.00 2.19 R 1, 3, 4

2233620

LITTLE PIGEON

PRARIE

0.00 5.52 R 1, 3, 4

2234100 COLD DECK 0.00 3.29 R 1, 3, 4

2236000 UPPER HAWKINS 0.00 1.65 R 1, 3, 4

*1003308 NO NAME 0.00 1.30 R

1003416 FOGGY TOM ROAD 0.00 4.74 R

1003420 NO NAME 0.00 0.48 R

1011000 DIVIDE CREEK 0.00 1.96 R

2200040

WOODPECKER

RIDGE ROAD

0.00 4.82 R

*2200045 NO NAME 0.00 0.60 R

2200420 NO NAME 0.00 0.60 R

*2231518 NO NAME 0.00 0.59 R

*2233000 BOULDER RIDGE 0.00 7.64 R 1, 2, 3, 4

*2233505 NO NAME 0.00 1.38 R

*2233506 NO NAME 0.00 0.39 R

*2233601 NO NAME 0.00 0.97 R

*2233607 NO NAME 0.00 0.18 R

2233609 NO NAME 0.00 1.30 R

*2233624 NO NAME 0.00 1.43 R

2233628

UPPER TUNNEL

CREEK

0.00 2.72 R

*2233630 NO NAME 0.00 0.35 R

*2233651 NO NAME 0.00 1.08 R

2234000 BRUNO MEADOWS 0.00 4.78 R

2234205 RAINBOW LAKE 0.00 3.11 R

*2236000 UPPER HAWKINS 0.00 1.65 R

2242000 MARI-LINN ROAD 0.00 2.81 R

2242805 BRUNO MTN 0.00 3.90 R

2242806 NO NAME 0.00 1.77 R

2242810 NO NAME 0.00 1.17 R

2242840 NO NAME 0.00 1.08 R

2243100 NO NAME 0.00 0.14 R

2243302 SEITZINGER ROAD 0.00 0.44 R

2243440

SOUTH

WHITEWATER

ROAD

0.00 4.89 R

Road Number

Termini

All roads

Map Legend

Description of

Restrictions

Map Legend / Code Use Limitations R: Hauling restricted

Mandatory Roads

Optional Roads

-All use to be in accordance with Willamette National Forest Commercial Road Rules, dated December 2016.

-Contractor is required to monitor road conditions and perform erosion control mitigation or maintenance work as needed. Road use shall be suspended during periods of heavy rainfall to prevent sedimentation from entering stream courses or if use is causing road distress, road damage as defined in the 2016 Willamette National Forest Road Rules.

-All road reconstruction and pre and post haul maintenance work is to occur during the dry season (May 15 to October 15).

2. Pre-haul—Road is unsuitable for hauling prior to all pre-haul road maintenance requirements identified in C5.31# being completed and

3. Keep Open—Road is to remain open and accessible at all times to fire suppression resources. This includes nights and weekends.

4. Summer Weekend Haul—Hauling is restricted on weekends starting at 1700 Friday through 2400 Sunday. Hauling on Federal Holidays is restricted if holiday is on a Friday or Monday. This restriction is effective Memorial Day through Labor Day.

-Road closed by gates are to remain closed at all times except during periods of active haul, unless otherwise agreed.

-All Forest Service Bridges—Use of road by commercial users with loads exceeding Oregon state legal loading for a Single Trip Permit and that will cross bridges under Forest Service jurisdiction shall apply for a Bridge Overload Permit (FSM 7736.05). A State highway overload permit (issued by ODOT, WSDOT) is not a valid permit for crossing Forest Service bridges. Bridge permit processing may take up to 30 days.

-Paved roads are restricted to rubber tire or rubber tracked equipment only.

-Skidding is not permitted on all paved and aggregate roads and bridges.

-Ditches shall always be free from logs and brush.

Restrictions

1. Dry Season Only — Road use by vehicles that weigh more than 16,500 GVWR may only occur during the normal operating period (May 15 through October 15).

Contract Provision References C5.12# Use of Roads by Purchaser: Applies to All Roads Identified on the Contract Area Map and as Agreed to by Forest Service Appendix A.II.1 & 2 - Applies to All Subdivisions Appendix A.II.3 - Pay Item 4 & 11- Slash Treatment Requirements: Applies to All Subdivisions

Subdivision # B1.1

Total Tree Felling Ac.

App A.II.2 - Pay Item

1&2

Total Required

Fuels Treatment (0-

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .