6_Phase 2 Contract Area Map.pdf
PDF 3 MB Posted
- Attached to
- BCLH Stewardship IRSC Phase 2
- Solicitation number
- 12363N25R4002
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a contract area map for the BCLH Stewardship Integrated Resource Service Contract (IRSC) Phase 2 project located in the Detroit Ranger District of the Willamette National Forest in Oregon. The map details 1,152 acres of burned forest areas affected by the 2020 Lionshead Fire, with multiple subdivisions (LH-1 through LH-72) identified for treatment. The project involves cutting and removing fire-killed timber within 100 feet of roads, performing hazard tree mitigation, reducing roadside fuel accumulation, and conducting road maintenance and reconstruction.
The contract includes mandatory and optional work components, with total tree felling acres ranging from 284 acres (mandatory) to 555 acres (optional). The project is part of a broader stewardship effort under Section 604 of Public Law 108-148, with a performance period from the date of award through September 30, 2030. The estimated timber volume for cutting and removing fire-killed trees is 23,186 tons for mandatory acres and 41,266 tons for optional acres. A site visit is scheduled for August 13, 2025, at the Detroit Ranger Station, and the contract will be awarded using a best value source selection method with a firm fixed price.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
Æ_
ÆQ
ÆQ
ÆQ
ÆQ
ÆQÆQ
ÆQ
ÆQ
ÆQ
ÆQ
ÆQ
ÆQ
ÆQ
ÆQ
ÆQ
ÆQ
ÆQ
ÆQ
ÆQ
LH-15
LH-14
LH-54
LH-66
LH-14A
LH-55
LH-66A
LH-55A
LH-55D
LH-15D
LH-53
LH-13
LH-15C
LH-1
LH-51
LH-55C
LH-64
LH-15CA LH-64A
LH-55B
LH-3A
LH-63
LH-4
LH-54D
LH-50
LH-52ALH-54C
LH-72
LH-52
LH-15A
LH-54B
LH-15B
LH-54A
LH-3B
LH-64B
BC-8
LH-51A
LH-15E
32 5
3 14 25
24 1 4
6 4
9 8
34 32
33 31
31 28
12 10
7 711 612 10
8 5
505535
7 315
461 313
773793
506365
056 058
16286
739 17
156118
859 878
055J
305 056
310 330
LH-52B
T 1 1 S
T 1 2 S
T 0 9 S
T 1 0 S
T 0 8 S
T 1 1 S
T 1 2 S
T 0 8 S
T 0 9 S
T 1 0 S
R 06 ER 05 E
R 07 E
R 07 E R 08 E
R 04 E R 05 E R 06 E R 07 E
R 04 E
Hwy 22 R 0 1.5 30.75
MilesTJR - 7/8/2025
Hwy 22
Portland
BendEugene
Roseburg
§̈¦80
§̈¦5
§̈¦5 ¬«97
¬«97
¬«58
Willamette National Forest
BCLH Phase 2 DxP IRSC Project Area
¬«58
¬«22
¬«20
¬«126
§̈¦80
ÆQ Campground
!. Gate
ÆI Picnic Site
Æ_ Trailhead
!! !! !! Trails
}} }} }} Powerlines
BC-8
LH-1
LH-13
LH-14
LH-14A
LH-15
LH-15A
LH-15B
LH-15C
LH-15CA
LH-15D
LH-15E
LH-3A
LH-3B
LH-4
LH-50
LH-51
LH-51A
LH-52
LH-52A
LH-52B
LH-53
LH-54
LH-54A
LH-54B
LH-54C
LH-54D
LH-55
LH-55A
LH-55B
LH-55C
LH-55D
LH-63
LH-64
LH-64A
LH-64B
LH-66
LH-66A
LH-72
BCLH Phase 2 DxP IRSC Boundary
Waterbody
! ! ! ! Protect Streams
PRIVATE
Wilderness
Mt. Jefferson Wilderness
Bull of the Woods Wilderness
# Subdivision
Hwy 22
BCLH Phase 2 DxP IRSC Contract Area Map
Detroit Ranger District Willamette National Forest
Road Name From To
1000000 BLOWOUT ROAD 0.00 2.09 R 1, 3, 4
1003000 TOM CREEK 0.00 9.98 R
2200020 HOMESTEAD ROAD 0.00 2.25 R
2212000 KINNEY CREEK 0.00 1.70 R 1, 3, 4
2233000 MCCOY_CREEK 0.00 4.19 R 1, 3, 4
2233000
MCCOY_CREEK
ROAD
4.19 11.60 R 1, 3, 4
2233515 BULL FROG 0.00 2.19 R 1, 3, 4
2233620
LITTLE PIGEON
PRARIE
0.00 5.52 R 1, 3, 4
2234100 COLD DECK 0.00 3.29 R 1, 3, 4
2236000 UPPER HAWKINS 0.00 1.65 R 1, 3, 4
*1003308 NO NAME 0.00 1.30 R
1003416 FOGGY TOM ROAD 0.00 4.74 R
1003420 NO NAME 0.00 0.48 R
1011000 DIVIDE CREEK 0.00 1.96 R
2200040
WOODPECKER
RIDGE ROAD
0.00 4.82 R
*2200045 NO NAME 0.00 0.60 R
2200420 NO NAME 0.00 0.60 R
*2231518 NO NAME 0.00 0.59 R
*2233000 BOULDER RIDGE 0.00 7.64 R 1, 2, 3, 4
*2233505 NO NAME 0.00 1.38 R
*2233506 NO NAME 0.00 0.39 R
*2233601 NO NAME 0.00 0.97 R
*2233607 NO NAME 0.00 0.18 R
2233609 NO NAME 0.00 1.30 R
*2233624 NO NAME 0.00 1.43 R
2233628
UPPER TUNNEL
CREEK
0.00 2.72 R
*2233630 NO NAME 0.00 0.35 R
*2233651 NO NAME 0.00 1.08 R
2234000 BRUNO MEADOWS 0.00 4.78 R
2234205 RAINBOW LAKE 0.00 3.11 R
*2236000 UPPER HAWKINS 0.00 1.65 R
2242000 MARI-LINN ROAD 0.00 2.81 R
2242805 BRUNO MTN 0.00 3.90 R
2242806 NO NAME 0.00 1.77 R
2242810 NO NAME 0.00 1.17 R
2242840 NO NAME 0.00 1.08 R
2243100 NO NAME 0.00 0.14 R
2243302 SEITZINGER ROAD 0.00 0.44 R
2243440
SOUTH
WHITEWATER
ROAD
0.00 4.89 R
Road Number
Termini
All roads
Map Legend
Description of
Restrictions
Map Legend / Code Use Limitations R: Hauling restricted
Mandatory Roads
Optional Roads
-All use to be in accordance with Willamette National Forest Commercial Road Rules, dated December 2016.
-Contractor is required to monitor road conditions and perform erosion control mitigation or maintenance work as needed. Road use shall be suspended during periods of heavy rainfall to prevent sedimentation from entering stream courses or if use is causing road distress, road damage as defined in the 2016 Willamette National Forest Road Rules.
-All road reconstruction and pre and post haul maintenance work is to occur during the dry season (May 15 to October 15).
2. Pre-haul—Road is unsuitable for hauling prior to all pre-haul road maintenance requirements identified in C5.31# being completed and
3. Keep Open—Road is to remain open and accessible at all times to fire suppression resources. This includes nights and weekends.
4. Summer Weekend Haul—Hauling is restricted on weekends starting at 1700 Friday through 2400 Sunday. Hauling on Federal Holidays is restricted if holiday is on a Friday or Monday. This restriction is effective Memorial Day through Labor Day.
-Road closed by gates are to remain closed at all times except during periods of active haul, unless otherwise agreed.
-All Forest Service Bridges—Use of road by commercial users with loads exceeding Oregon state legal loading for a Single Trip Permit and that will cross bridges under Forest Service jurisdiction shall apply for a Bridge Overload Permit (FSM 7736.05). A State highway overload permit (issued by ODOT, WSDOT) is not a valid permit for crossing Forest Service bridges. Bridge permit processing may take up to 30 days.
-Paved roads are restricted to rubber tire or rubber tracked equipment only.
-Skidding is not permitted on all paved and aggregate roads and bridges.
-Ditches shall always be free from logs and brush.
Restrictions
1. Dry Season Only — Road use by vehicles that weigh more than 16,500 GVWR may only occur during the normal operating period (May 15 through October 15).
Contract Provision References C5.12# Use of Roads by Purchaser: Applies to All Roads Identified on the Contract Area Map and as Agreed to by Forest Service Appendix A.II.1 & 2 - Applies to All Subdivisions Appendix A.II.3 - Pay Item 4 & 11- Slash Treatment Requirements: Applies to All Subdivisions
Subdivision # B1.1
Total Tree Felling Ac.
App A.II.2 - Pay Item
1&2
Total Required
Fuels Treatment (0-
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .