15_PreproposalMeetingHandout.pdf

PDF 568 KB Posted

Attached to
BCLH Stewardship IRSC Phase 2
Solicitation number
12363N25R4002
Issued by

About this file

This document is a Request for Proposal (RFP) for the BCLH Stewardship IRSC Phase 2 contract with the U.S. Forest Service. The project objectives are to reduce hazardous fuels risks along road systems in fire-affected areas of the Willamette National Forest, covering 936 acres across Marion and Linn Counties, Oregon. The work includes cutting and removing fire-killed timber within 100 feet of roads, hazard tree felling, small fuels treatment, road maintenance, and road reconstruction across multiple units.

The contract includes mandatory and optional work items with an estimated total timber volume of 64,452 tons, with mandatory items covering 23,186 tons and optional items covering 41,266 tons. The contract has a performance period from the notice to proceed through October 15, 2028 for mandatory work and September 30, 2030 for optional items. Specific requirements include mechanized ground-based equipment operations on slopes less than 30%, adherence to special measure area restrictions, and environmental protection measures. The estimated price for road reconstruction work is between $1,000,000-$5,000,000 for mandatory items and $250,000-$500,000 for optional items.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BCLH Stewardship IRSC Phase 2 – 12363N25R4002 Attachment 15: Pre-proposal Meeting Handout

Meeting Date: 8/13/25; 10:00 am

RFP Section B Excerpts

MANDATORY WORK ACTIVITIES

ITEM

NO.

DESCRIPTION OF

MANDATORY WORK ACTIVITIES UNIT EST

QTY

UNIT

PRICE TOTAL

Cut and Remove Included Fire Killed Timber within 100 feet of the Road Prism (Units LH-

1, LH-14, LH-51, LH-51A, LH-54, LH-66)

Acre 146 $ $

Required Cost Data:

Total Logging Cost of Item 1 (cut, yard, process, haul, profit, etc.) Do not include the Road Maintenance or Road Reconstruction costs priced separately under Item 5(a-c) and 6(a-p): $____________________________ Total Delivered Value of Item 1 (combined value of all products removed): $___________________________ **Item 1 total price shall equal Total Logging Cost minus Total Delivered Value

Hazard Tree Felling within 100 feet From Road Edge (Units LH-1, LH-14, LH-51, LH-

51A, LH-54, LH-66)

Acre 138 $ $

Fall and Leave Hazard Trees >100 feet From Road Edge (LH-1, LH-14, LH-51, LH-54, LH- 66)

Acre 10 $ $

Small Fuels Treatment <16” DBH 0-30 Feet from Road Edge (Units BC-8, LH-1, LH-14, LH-15, LH-51, LH-51A, LH-54, LH-63, LH-

64, LH-64B, LH-66)

Acre 177 $ $

5 Road Maintenance – Forest Service Roads: 1000000, 1003000, 220020, 2212000, 2233000, 2233515, 2233620, 2234100, 2236000

5a: Prehaul Road Maintenance Mile 40.27 $ $

5b: During Haul Road Maintenance Mile 40.27 $ $

5c: Post Haul Road Maintenance Mile 40.27 $ $

6 Road Reconstruction of Haul Routes Forest Service Roads: 100000, 100300, 2200020, 2212000, 2233000, 2233515, 2233620, 2234100, 2236000

6(a): Mobilization – 15101 Lump Sum 1 XXXX $

6(b): Soil Erosion and Pollution Control – 15713

Lump Sum 1 XXXX $

6(c): Removal of Culvert, Disposal Method (a)

– 20302 Each 9 $ $

6(d): Removal of Asphalt, Disposal Method

(a) – 20304 SY* 2,180.8 $ $

6(e): Reinforced Soil Slope, Type IV – 26101 SF* 26,942 $ $

6(f): Subbase, Grading A, Compaction Method (b) – 30109 CY* 562

6(g): Aggregate Surface Course, Grading F, Compaction Method (b) – 30115 CY* 146

6(h): Ditch Reconditioning - 30301 Mile 8.31

6(i): Roadway Reconditioning - 30315 Mile 31.56

6(j): Full Depth Reclamation, Compaction Method 2 – 30401 Mile 4.19

6(k): Asphalt Concrete, Type 1, Grading 1/2"- 40301 Ton 9,541.33

6(l): 24-inch Corrugated Aluminized Steel Pipe, 0.064-inch Thickness, Method 2 – 60201A

FT 46

6(m): 36-inch Corrugated Aluminized Steel Pipe, 0.079-inch Thickness, Method 2 – 60201B

FT 169

6(n): 48-inch Corrugated Aluminized Steel Pipe, 0.109-inch Thickness, Method 2 – 60202C

FT 84

6(o): 60-inch Corrugated Aluminized Steel Pipe, 0.138-inch Thickness, Method 2 – 60202D

FT 50

6(p): Temporary Traffic Control - 63501 Lump Sum 1 $ $

Total All Mandatory Items $

OPTIONAL WORK ACTIVITIES:

ITEM

NO.

DESCRIPTION OF

OPTIONAL WORK ACTIVITIES UNIT EST

QTY

UNIT

PRICE TOTAL

Hazardous Fuels Treatment >16" DBH Within 100 Feet from Road Edge (Units LH-

15, LH-63, LH-64, LH-64B)

Acre 53 $ $

Cut and Remove Included Fire Killed Timber within 100 feet of Road Prism (Units LH-13, LH-14A, LH-15A, LH-15B, LH-15C, LH-

15CA, LH-15D, LH-15E, LH-3A, LH-3B, LH-

4, LH-50, LH-52, LA-52A, LH-53, LH-54A,

LH-54B, LH-54C, LH-54D, LH-55, LH-55A,

LH-55B, LH-55C, LH-55D, LH-64A, LH-66A,

LH-72)

Acre 265 $ $

Item 8 Required Cost Data:

Total Logging Cost of Item 8 (cut, yard, process, haul, profit, etc.) Do not include the Road Maintenance or Road Reconstruction costs priced separately under Item 12 (a-c) & 13 (a-h): $ Total Delivered Value of Item 8 (combined value of all products removed): $ **Item 8 total price shall equal Total Logging Cost minus Total Delivered Value

Hazard Tree Felling within 100 feet from Road Edge (Units LH-13, LH-14A, LH-15A, LH-15B, LH-15C, LH-15CA, LH-15D, LH-

15E, LH-3A, LH-3B, LH-4, LH-50, LH-52,

LA-52A, LH-53, LH-54A, LH-54B, LH-54C,

LH-54D, LH-55, LH-55A, LH-55B, LH-55C,

LH-55D, LH-64A, LH-66A, LH-72)

Acre 288 $ $

Fall & Leave Hazard Trees >100' from Road (Units LH-13, LH-14A, LH-15A, LH-15B, LH-15C, LH-15CA, LH-15D, LH-15E, LH-

3A, LH-3B, LH-4, LH-50, LH-52, LA-52A,

LH-53, LH-54A, LH-54B, LH-54C, LH-54D,

LH-55, LH-55A, LH-55B, LH-55C, LH-55D,

LH-64A, LH-66A, LH-72)

Acre 35.8 $ $

Small Fuels Treatment <16” DBH 0-30 feet from Road Edge (Units LH-13, LH-14A, LH-

15A, LH-15B, LH-15C, LH-15CA, LH-15D,

LH-15E, LH-3A, LH-3B, LH-4, LH-50, LH-

52, LA-52A, LH-53, LH-54A, LH-54B, LH-

54C, LH-54D, LH-55, LH-55A, LH-55B, LH-

55C, LH-55D, LH-64A, LH-66A, LH-72)

Acre 227 $ $

Road Maintenance – Forest Service Roads: 1003308, 1003416, 1003420, 1011000, 2200040, 2200045, 2200420, 2231518, 2233505, 2233601, 2233607, 2233609, 2233624, 2233628, 2233630, 2233651, 2234000, 2234205, 2236000, 2242000, 2242805, 2242806, 2242810, 2242840, 2243100, 2243302, 2243440

12a: Prehaul Road Maintenance Mile 49.97 $ $

12b: During Haul Road Maintenance Mile

49.97 $ $

12c: Post Haul Road Maintenance Mile

49.97 $ $

Road Reconstruction of Haul Routes – 1003416, 1003420, 1011000, 2200040, 2200420, 2233609, 2233628, 2234000, 2234205, 2234207, 2242000, 2242805, 2242806, 2242810, 2242840, 2243100, 2243302, 2243440

13(a): Mobilization - 15101 Lump Sum 1 XXXX $

13(b): Soil Erosion and Pollution Control – 15713

Lump Sum 1 XXXX $

13(c): Removal of Culvert, Disposal Method

(a) – 20302 Each 5 $ $

13(d): Aggregate Surface Course, Grading F, Compaction Method (b) - 30115 CY* 100 $ $

13(e): Roadway Reconditioning – 30315 Mile 41.29 $ $

13(f): 36-inch Corrugated Aluminized Steel Pipe, 0.079-inch Thickness, Method 2 – 60201B

FT 120 $ $

13(g): 48-inch Corrugated Aluminized Steel Pipe, 0.109-inch Thickness, Method 2 – 60201C

FT 70 $ $

13(h): Temporary Traffic Control - 63501 Lump Sum 1 XXXX $

14 Fall and Leave Individual Hazard Trees >100’ from the Road Each NTE

2,000 $ $

Total All Optional Items $

Total All Mandatory and Optional Items

* Contract Quantity is designated with an asterisk. See Section 109.02(b) of the Standard Specifications for

Construction and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units incorporated into the contract by reference.

B.2 TIMBER/PRODUCT REMOVAL PRICE SCHEDULES

MANDATORY WORK PRODUCT

OPTIONAL WORK PRODUCT - TIMBER SUBJECT TO AGREEMENT:

AWARD OF OPTIONAL WORK: Optional Items and corresponding timber removal may be awarded at time of contract award or by modification. If funding dictates and it is in the best interest of the government, optional work items may be awarded by treatment Unit and Road for amounts less than the total estimates based on the unit prices quoted. Unit prices prevail.

If all optional construction cannot be awarded, worklists shall be utilized to determine road construction quantities. The lump sum prices for road reconstruction Items 13(a) Mobilization, 13(b) Soil Erosion and Pollution Control and 13(h) Temporary Traffic Control shall be awarded based on the percentage of Item 13(e) Road Reconditioning miles awarded.

The award amount for optional Item 14 Fall and Leave Individual Hazard Trees shall be based on a rough percentage of the total Unit acreage awarded. Payment for this item shall be based on the actual number of trees fallen.

SPECIAL REQUIREMENTS:

A. Service Contract Act minimum wages applies to all fuels management work and road maintenance work. See Wage Determination in Section J.

B. The road reconstruction work required within Mandatory Items 6(a-p) and Optional Items 13(a-h) is subject the the Construction Wage Rate Requirements (see Wage Decision in Section J) and related regulations, formerly referred to as Davis-Bacon (i.e. certified payroll submission).

C. A Bid Guarantee is required in an amount equal to 20% of the total price offered for the Mandatory and Optional Construction Items only. BID BONDS MUST BE PROVIDED WITH THE INITIAL OFFER. See FAR 52.228-1 Bid Guarantee (SEP 1996) (DEVIATION MAY 2023) in Section I.

D. Payment and Performance Bonds shall be required in an amount equal to 100% of the awarded value of road reconstruction work. See Section I. FAR 52.228-1\Performance and Payment Bonds --

SPECIES PRODUCT QUANTITY UNIT OF

MEASURE

MINIMUM

ACCEPTABLE

OFFER

OFFER

(FLAT)

TOTAL

OFFER

All Species Grn Bio CV 23,186 Ton $0.40 $ $

SPECIES PRODUCT QUANTITY UNIT OF

MEASURE

MINIMUM

ACCEPTABLE

OFFER

OFFER

(FLAT)

TOTAL OFFER

All Species Grn Bio CV 41,266 Ton $0.40 $ $

All Species Grn Bio CV Un-estimated Ton $0.40 $ $

Construction (JUN 2020) (DEVIATION MAY 2023). Bonding costs shall be included in the prices quoted for Mobilization. No separate payment for bond premiums shall be made.

E. As service requirements, fuels management and road maintenance work are not subject to bonding requirements.

F. A Draft Small Business Subcontracting Plan is required with any proposal from a large business. Refer to FAR 52.219-9 Small Business Subcontracting Plan for requirements.

USDA FY2025 Subcontracting Goals as of 2/24/2025 are as follows: Small Business – 22%, Small Disadvantaged Business – 5%, Service-Disabled Veteran-Owned Small Business – 5%, Women Owned Small Business – 5% and HUBZone Small Business – 3%. These goals may be subject to change and were found at the following link: https://www.sba.gov/document/support-agency-contracting-goals.

Click on Download .pdf.

RFP Section C Excerpts

C.1 BACKGROUND

The BCLH Stewardship IRSC Phase 2 shall be awarded under stewardship contracting authority. This authorizes the U.S. Forest Service (Government) to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs.

C.2 SCOPE OF CONTRACT

The objectives of this project are to reduce the risks of hazardous fuels that have fallen across or remain standing along important access routes of the 2020 fire-affected road system so that access to and through the burned area can be restored. Fire severity varied across the treatment areas; burn severity maps and tables are included for planning purposes.

Activities include performing mitigation of risk along roads from fire killed/damaged trees, reduction of roadside fuel accumulation and essential maintenance and reconstruction of roads. This will be done by accomplishing the following:

• Cut and remove fire killed timber within 100 feet of roads from the Contract Area. Hazard trees to be cut are Designated by Prescription. Mechanized ground-based equipment may operate outside of the road prism on slopes generally less than 30%. Additional mechanized ground-based restrictions apply for some Special Measure Areas (SMAs).

• Fall hazard trees within Special Measure Areas (SMAs). SMAs may include Riparian Reserves, cultural resource areas, wildlife habitat protection areas or other areas that require special protections.

SMAs do not overlap acres that require the cutting and removal of fire killed trees.

• Within unit boundaries, fall and leave hazard trees that can strike the road outside of the 100-foot fuels removal area.

• Perform small fuels treatment within 30 feet of roads.

• Perform road reconstruction within the Contract Area.

• Perform pre-haul, during-haul and post-haul road maintenance on designated roads within the Contract

Area.

• Fall and leave individual hazard trees that are outside of unit boundary but within striking distance of the road.

• Treat hazardous fuels in Units LH-15, LH-63, LH-64, and LH-64B https://www.sba.gov/document/support-agency-contracting-goals

C.9 MAGNITUDE OF CONSTRUCTION PROJECT

For Road Reconstruction work requirements, the total estimated price for all Mandatory Items 6(a-p) is between $1,000,000-$5,000,000. The total estimated price for all Optional Items 13(a-h) is between $250,000-500,000.

RFP Section F Excerpts

F.2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/15/2028 for the Mandatory Work Items and 09/30/2030 for the Optional Items awarded.

See F.4 Contract Operations Schedule below for operating conditions/work restrictions.

F.4 CONTRACT OPERATIONS SCHEDULE

Subdivision Operating Conditions Purpose

ALL

No contract operations utilizing vehicles that weigh more than 16,500 lbs. GVWR will be performed between October 16 – May 14. No tree feeling on the uphill side of the road shall occur between October 16 – May 14 unless approved by the COR. All work shall comply with Attachment 5. Willamette National Forest Commercial Road Rules December 2016.

Snowplowing is prohibited.

Protect soil resources and water quality

Ground-based operations and haul on aggregate surface roads will be suspended during wet periods when soil moisture is high and after heavy or prolonged rain.

Additional measures for clarification:

Ground-based operations would temporarily cease when:

• Precipitation ≥ 0.3” for 3 consecutive days or more.

• Precipitation ≥ 0.6” per 4 hours.

• Precipitation ≥ 1.0” per 24 hours.

• Precipitation ≥2.0” per 72-hours.

Ground-based operations may continue after a shutdown if both of the following conditions are met unless otherwise approved to resume by the COR:

• No rainfall in 48-hours.

Precipitation be measured according to a running average of the data measured from the appropriate Remote Automated Weather Station (RAWS).

• Primary station: Breitenbush R Abv French CR NR Detroit:

https://waterdata.usgs.gov/monitoring-location/14179000/#dataTypeId=continuous-00065- 0&period=P7D&showMedian=false

Protect soil resources and water quality https://waterdata.usgs.gov/monitoring-location/14179000/#dataTypeId=continuous-00065-0&period=P7D&showMedian=false https://waterdata.usgs.gov/monitoring-location/14179000/#dataTypeId=continuous-00065-0&period=P7D&showMedian=false https://waterdata.usgs.gov/monitoring-location/14179000/#dataTypeId=continuous-00065-0&period=P7D&showMedian=false

Additional visual indicator factors that may require a temporary cessation of operations are visible signs of road damage as described in the 2016 Willamette Road Rules.

Road reconstruction as specified in Appendix D shall occur during the dry season (May 15 through October 15). Live stream crossings shall only be replaced during the designated ODFW In-Water-Work Window (June 1 to August 31) for the watershed unless a variance is authorized by ODFW and the FS Fish Biologist.

To minimize erosion and sediment to streams

Unless agreed to by the contracting officer, fuel treatments shall be completed within one year from when trees are fallen.

Fire safety

ALL Prior to timber haul, prehaul road maintenance shall be completed.

To minimize erosion and sediment to streams

Mandatory:

LH-14, LH-

15, LH-51A,

and LH-66

Optional: LH-

13, LH-15A,

LH-15B, LH-

15C, LH-15E,

LH-3B, LH-4,

LH-50, LH-

54A, LH-54D,

and LH-55A

Log and fuel hauling by trucks on roads, culvert replacements, mechanical activities, including chainsaw use, log/fuel decking, log and fuel yarding, loading logs and fuels on trucks, and chipping are prohibited from March 15 to July 15 within 65 yards of Northern Spotted Owl Nesting Habitat and Nest Patches.

Restrictions can be waived for mechanical activities if all activities within a potential or known nesting area can be completed within a one-day period during the critical breeding season (March 1-July 15).

Unit Total Unit Size (Acres)

Acres Restricted March 15 to July 15

Percentage of Unit Restricted

LH-13 38 1 3%

LH-14 82 10 12%

LH-15 72 47 65%

LH-15A 29 24 82%

LH-15B 3 3 83%

LH-15C 30 7 22%

LH-15E 1 0.1 8%

LH-3B 10 2 17%

LH-4 9 4 44%

LH-50 11 4 41%

LH-51A 2 0.3 15%

LH-54A 9 2 17%

LH-54D 10 2 20%

LH-55A 55 6 11%

Nesting Habitat

LH-66 54 6 12%

TOTAL 415 117 28%

If grey wolf denning or rendezvous sites are identified, the project wildlife biologist will coordinate with USFWS biologists to determine if seasonal restrictions are warranted on logging operations to protect the wolf use of the sites. Typical seasonal restrictions could include a one-mile radius around the sites from April 1-July 15. However, restrictions are site-specific and depend on things such as individual pack behavior and existing baseline activities by humans in the area.

Grey Wolf

F.5 SCHEDULES AND REPORTS

Contractor shall provide the following submittals as stated below unless otherwise mutually agreed upon. The Contractor shall update all submittals as needed, or as required by the CO, but in no case less than once per calendar year on a date specified by the Contracting Officer:

ITEM DESCRIPTION SUMBITTAL

DUE

COPIES

REQUIRED

Proposed Operation Plan (Overall Schedule): The Contractor shall prepare and submit one electronic copy of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the estimated starting and completion dates of various phases of the work.

The schedule shall comply with the contract time requirements in the contract, including, but not limited to Clauses F.2 and F.4.

With Proposal 1

Schedule for Construction Items: The Contractor shall comply with the requirements of FAR 52.236-15 – Schedules for Construction Contracts. (Clause referenced I.10).

At Prework Meeting 1

Detailed Operation Schedule: During performance, the Contractor shall prepare and submit one electronic copy of a detailed schedule showing Units to be treated, roads to be maintained, and roads and construction items of work to be performed within the next 2 weeks. This schedule shall be submitted weekly. This submittal will serve as the 14-day notice referred to in H.5 for SMA-1 and SMA-3 work activities.

Weekly During Performance 1

Subcontractors. List of proposed sub-contractors and their intended work. For each subcontractor performing construction work, an SF-1413 Statement of Acknowledgement form shall be completed. Sub-contractors must have Contracting Officer’s written approval prior to starting work on the project.

Subcontractor List - With Proposal

SF-1413 at Prework

Meeting

Quality Control Plan. Submit original with proposal. Any updates need to be provided for approval to the CO. Refer to E.1.

With Proposal 1

Small Business Subcontracting Plan. Applies to large businesses only- A Draft Small Business Subcontracting Plan is required with any proposal from a large business. Refer to

With Proposal 1

Solicitation Section I.5, 52.219-9 Small Business Subcontracting Plan for requirements.

Traffic Control Plan. The Contractor shall prepare and submit a Traffic Control Plan detailing conformance with OSHA requirements, MUTCD requirements, and all other contract requirements, including, but not limited to Paragraph H.17, “Traffic Control Plan” and the requirements included in the Appendices, if any.

At Prework Meeting 1

Soil Erosion and Water Pollution Control Plan. The Contractor shall prepare and submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after contract performance. Plan shall conform to all contract requirements, including but not limited to H.6, “Erosion Prevention and Control”, and the requirements in the Appendices, if any.

At Prework Meeting 1

Safety Plan. The Contractor shall comply with the requirements of FAR 52.236-13 – Accident Prevention Alt I, for all activities under this contract.

With Proposal 1

Designation of Contractor personnel describing responsibilities and authorities.

At Prework Meeting 1

BioBased Report. Submit annually via sam.gov. Refer Section C.7. October 31

Service Contract Inventory Report. Submit annually via sam.gov. Refer to Section I.1 – FAR 52.204-14. October 31

(Note Added for Meeting: Service Contract Report is being emphasized by the WO. Compliance is required to be addressed in CPARS. If you don’t have your report done, your rating for Management will suffer. I do not monitor this; by the time I am notified of a contractor’s non-compliance, it is often too late for the contractor to remedy.)

RFP Section G Excerpts

G.2 MEASUREMENT AND UNIT BOUNDARIES

Light Detection and Ranging (LiDAR) imagery was utilized to estimate the actual tree heights along the roadways within the project area. Basal Area (BA) mortality was estimated through burn severity using satellite imagery. Unit boundaries were subsequently delineated based on mortality estimates (>25% BA mortality) and remotely measured tree heights. Unit widths are variable throughout the unit length and on the uphill/downhill side of the road. Unit widths will be wider or narrower based on changes in estimated tree height at any specific location.

RFP Section H Excerpts

H.4 SAFETY

Logging operations, thinning, slash treatments, and roadwork are inherently hazardous. Conditions, which are inherently hazardous, that could lead to serious injury or loss of life include, but are not limited to:

1. Traffic hazards 5. Heavy equipment operations

a. Narrow gravel or native surface forest roads, some single lane with turnouts (limited visibility)

a. Backing into objects

b. Long, steep grades (less than 20%) b. Steep side slopes or soft ground for rollovers

c. Logging, Administrative, and Recreational Traffic

c. Refueling hazards

d. Unskilled visitor traffic d. Exceeding equipment limitations

e. Dusty conditions hindering visibility behind vehicles

e. Unsafe equipment / lack of safety equipment

f. Horse traffic at crossings f. Operator fatigue

g. May be overwidth/overweight equipment to watch for on roads

2. Work environment 6. Excavation

a. Inclement weather for potential hypo/hyperthermia

a. Slope or trench wall instability

b. High winds that can bring down trees and blow dust

b. Air quality/ventilation

c. Wet, snowy or ice conditions making ground unstable

d. High db noise 7. Truck Driving & Trailer Towing

e. Insects, plants, animals a. Increased stopping distance

f. Hazardous footing/terrain b. Loads insecurely lashed

c. Low clearances (power lines, etc.)

3. Communications

a. Cell phone or radio availability for emergencies

8. Personnel

4. Chainsaw operations a. Carry adequate liquids to prevent dehydration

a. Improper safety equipment b. Dress for working conditions including wearing appropriate safety equip.

b. Overhead/falling debris c. Keep in communications for safety

c. Fatigue/improper cutting techniques

H.5 PROTECTION MEASURES NEEDED FOR PLANTS, ANIMALS, CULTURAL RESOURCES,

AND CAVE RESOURCES

Label on Contract Area Map Restrictions

SMA-1

Mandatory: LH-1, LH-14, LH-51, LH-54, LH-66; and

Optional: LH-14A, LH-

15A, LH-15C, LH-15D,

LH-15E, LH-15F, LH-3A,

LH-3B, LH-4, LH-53, LH-

54A, LH-54B, LH-54C,

LH-55, LH-55B, LH-55C,

LH-55D, LH-72, LH-74

1) Special Measure Areas (SMA-1) that are designated on the Tree Removal Guideline Maps shall be protected from all ground disturbing activities. Full suspension is required for removal under Mandatory Items 2 and 4 and Optional Items 9 and 11. Hazardous fuels will be felled and left on site if full suspension cannot be achieved.

2) No mechanized equipment is allowed to leave the road prism within

SMA-1.

3) No log decks in SMA-1.

4) A 14-day notice of intent to begin operating in SMA-1 is required to allow time for consultation with a professional, qualified archaeologist regarding direction of felling. Notice shall be submitted to the COR. FS personnel shall flag known cultural resources in advance of the commencement of hazard tree falling.

5) Hazard trees must be felled away from known archeology sites within SMA-1 in consultation with a professional, qualified government-assigned archeologist.

Label on Contract Area Map Restrictions

6) Culturally modified trees shall remain on site, if feasible. If not, culturally modified trees shall be stored at a temporary location, separate from non-culturally modified trees, until final disposition can be determined. Avoid cutting trees through the “peel”. Coordinate with archaeologist if tree must be moved.

SMA-2

ALL Units contain SMA-2 areas

1) Special Measure Areas (SMA-2) that are designated on the Tree Removal Guideline Maps shall be treated to ensure tree retention requirements are met.

2) All Riparian Reserves must be delineated by the contractor prior to starting work in a unit. Boundaries will extend from the stream edge on the ground, not the mapped edge since stream mapping may be incorrect.

If an unmapped stream is found, SMA restrictions are still applicable.

3) Within SMA-2, mechanized equipment is restricted from operating within 100 feet of fish bearing streams, 60 feet of perennial, non-fish bearing streams, and 30 feet of intermittent streams. The presence of fish can be determined by the width of the SMA as displayed on the Tree Cutting Guideline maps (344’ on either side of a stream indicates fish presence).

SMA-3

Mandatory: LH-1, LH-14, LH-51, LH-66; and

Optional: LH-13, LH-3A, LH-3C, LH-52, LH-54, LH-54A, LH-54D, LH-55, LH-55A, LH-66A

1) Special Measure Areas (SMA-3) that are designated on the Tree Removal Guideline Maps shall be protected from all ground disturbing activities.

2) Hazardous fuels will be felled and left on site except for small fuels treated under Items 4 and 11.

3) A 14-day notice of intent to begin operating in SMA-3 shall be submitted to the COR and is required to allow time for consultation regarding locations of rare plant populations and wetlands.

4) Directionally fall trees away from rare plant populations or their habitats.

5) In wetlands, fall trees toward the wetland.

6) No mechanized equipment is allowed to leave the road prism within

SMA-3 buffers unless pre-approved by COR.

H.6 EROSION PREVENTION AND CONTROL

Contractor’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. The kinds and intensity of erosion control work done by Contractor shall be adjusted to ground and weather conditions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding expected seasonal periods of precipitation or runoff. By October 1 of each respective year, erosion control measures shall be installed at disturbed landings and the roads shall be prepared for winter conditions. If Contractor fails to do seasonal erosion control work prior to any seasonal period of precipitation or runoff, Forest Service may temporarily assume responsibility for the work and the Contractor shall be liable for the cost of the supplies and labor utilized.

There are no temporary roads being constructed under this contract. Logging equipment operations and landing locations are restricted to existing roads only. No new landings shall be constructed without prior approval of the Forest Service. Use of existing vegetatively recovered landings is prohibited within 200 feet of any live stream channel.

a. Seed and mulch will be applied as indicated below. All applications shall be current and done during the period from May 15 to October 1 unless otherwise agreed to. Applications shall be done only during favorable conditions.

Seed mixture will be any of the following: winter wheat, spring wheat, or triticale. Seed shall be applied at a rate of 20/lbs per acre. Seed will be certified weed free (Blue tag). The contractor shall purchase the seed.

Mulch shall meet the appropriate State's certification specifications, with evidence of its certification traceable to the certifying agency's records. It shall be applied within 48 hours after seeding and shall provide approximately 50% coverage of the disturbed ground.

b. Erosion Control on all roads used by Contractor.

1. Erosion control devices such as silt fences, straw bales, and/or cross drain culverts shall be installed immediately upon reaching live stream crossings after hazard trees are abated. Cross drain culverts must be within approximately 200 feet of the stream crossing to function as an erosion control device.

2. When ditch lines are cleaned in moderate to high burn severity areas, or ditches are moving sediment and are hydrologically connected to any stream, install an effective sediment barrier to prevent ditch erosion from entering streams (e.g., wattles, straw bales, mulching cleared ditches within 100 feet of stream crossing culverts) until vegetation is re-established.

3. Dust abatement is limited to the application of water.

H.8 PROTECTION OF IMPROVEMENTS

During the period specified in H.21.1 Fire Precautions and Control, the Contractor shall keep all roads and trails needed for fire protection or other purposes and designated on the Contract Area Map reasonably free of equipment and products, slash, and debris resulting from the Contractor’s operations.

All protected improvements will be protected from damage by the Contractor. If any protected improvements are disturbed, the Contractor shall immediately contact the COR and will be liable for the cost of repairs.

PROTECTED IMPROVEMENTS

IMPROVEMENT FEATURE DESCRIPTION SPECIAL REQUIREMENT

Roads

All Roads (including associated features) adjacent to treatment units or used for haul of commercial product or fish logs.

Identified on the CAM.

No tracked equipment shall be offloaded or operated on paved roads to access areas being treated or utilized for this contract.

Gates Identified on the CAM.

Contractor furnished locks may be installed as needed provided that Forest Service locks remain accessible through the use of a splitter or other means.

Developed Recreation Areas Identified on CAM. Coordinate all tree falling within 300 feet of developed recreation sites with the COR.

Trails Identified on CAM.

Directional felling shall be utilized to fall away from system trails and trailheads. Do not drag trees across system trails. If a tree falls across a trail, the section blocking the trail shall be bucked out and rolled off the trail.

H.16 ROAD MAINTENANCE

Unless agreed in writing, prehaul maintenance shall be completed on any portion of road prior to hauling on that portion. Maintenance, as used in this contract, does not include road reconstruction or repairs of an extraordinary nature.

H.21 AGAR 452.236-70 EMERGENCY RESPONSE, FIRE SUPPRESSION, AND LIABILITY (JUN

2025)

(a) Contractor's Responsibility for Responding to Emergencies. When directed by the contracting officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). This is considered to be within the general scope of the contract. An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.

(b) Contractor's Responsibility for Fire Fighting. The Contractor, under the provisions of FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents, subcontractors, or employees subject to the fire classifications listed in subsection (c).

(c) Fire Suppression Costs. The Contractor's obligations for cost of fire suppression vary according to three classifications of fires as follows:

(1) Operations Fire. An “operations fire” is a fire caused by the Contractor's operations other than a negligent fire. The Contractor agrees to reimburse the Forest Service for such cost for each operations fire, subject to a maximum dollar amount of $300,000.00. The cost of the Contractor's actions, supplies, and equipment expended or used on suppressing any such fire, or otherwise provided at the request of Forest Service, shall be credited toward such maximum. If the Contractor's actual cost exceeds the contractor's maximum obligation stated above, the Forest Service shall reimburse the contractor for the excess.

(2) Negligent Fire. A “negligent fire” is a fire caused by the negligence or fault of the Contractor's operations including, but not limited to, one caused by smoking by persons engaged in the Contractor's operations during the course of their employment, or during rest or lunch periods; or if the Contractor's failure to comply with requirements under this contract results in a fire starting or permits a fire to spread. Damages and the cost of suppressing negligent fires shall be borne by the Contractor.

(3) Other Fires on Contract Area. The Forest Service shall pay the Contractor, at firefighting rates common in the area or at prior agreed rates, for equipment or personnel furnished by the Contractor at the request of the Forest Service, on any fire on the contract area other than an operations fire or a negligent fire.

(d) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.

(e) Performance by the Contractor. Where the Contractor's employees, agents, contractors, subcontractors, or their employees or agents perform the Contractor's operations in connection with fire responsibilities, the Contractor's obligations shall be the same as if performance was by the Contractor.

(f) State Law. The Contractor shall not be relieved by the terms of this contract of any liability to the United States for fire suppression costs recovered in an action based on State law, except for such costs resulting from operations fires. Amounts due to the Contractor for firefighting expenditures on operations fires shall not be withheld pending settlement of any such claim or action based on State law.

(End of Clause)

H.21.1 FIRE PRECAUTIONS AND CONTROL

Specific fire prevention measures are listed below and shall be effective for the period April 1 to October 31 of each year.

RFP Section I Excerpts

CLAUSES I.1-I.7 APPLY TO ALL WORK:

FAR 52.204-14 Service Contract Reporting Requirements (OCT 2016) *yearly reports due by October 31; compliance will be assessed in CPARS

FAR 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) FAR 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) *14-day payments

FAR 52.243-4 Changes (JUN 2007) *Modifications will be negotiated and priced up front; close coordination with the CO and COR will be required

I.5 FAR 52.219-9 Small Business Subcontracting Plan (JAN 2025)

(a) This clause does not apply to small business concerns.

CLAUSES I.10-I.15 APPLY TO ROAD RECONSTRUCTION ITEMS ONLY

FAR 52.222-8 Payrolls and Basic Records (JUL 2021) FAR 52.246-21 Warranty of Construction (MAR 1994) *1-year warranty applies to all construction work

I.12 FAR 52.228-1 BID GUARANTEE (SEP 1996) (DEVIATION MAY 2023)

The required bid guarantee amount is 20% of the total offer value of all Mandatory and Optional road reconstruction pay items: 6(a-p) and 13(a-g). The bid guarantee must be submitted electronically with the offer.

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

I.13 FAR 52.228-15 Performance and Payment Bonds -- Construction (JUN 2020) (DEVIATION MAY 2023) **This clause applies to the construction work only, Mandatory Items 6(a-p) and Optional Items 13(a-g).

The required bond amount equals the total awarded value of this work.

RFP Section J Excerpts The following attachments are made a part of this solicitation and any resultant contract.

# TITLE Pgs

1 Appendix A – Performance Work Statement for Service Items 20

2 Appendix B – Timber Removal Specifications - Scaled 24

3 Appendix C – Road Maintenance Specifications 40 https://www.usda.gov/sites/default/files/documents/far-class-deviation-eliminate-hard-copy-original-documents-signatures-notarization-seals-bonds-other-seals.pdf https://www.usda.gov/sites/default/files/documents/far-class-deviation-eliminate-hard-copy-original-documents-signatures-notarization-seals-bonds-other-seals.pdf https://www.usda.gov/sites/default/files/documents/far-class-deviation-eliminate-hard-copy-original-documents-signatures-notarization-seals-bonds-other-seals.pdf

Appendix D -

4a: BCLH IRSC PHASE 2 - FS Supplemental Specifications Road Reconstruction 4b: BCLH IRSC PHASE 2 – Signed Road Reconstruction Plans

5 Willamette National Forest Commercial Road Rules December 2016 14

6 Contract Area Map (CAM) 1

7a: Tree Removal Guideline Maps (Maps have been uploaded to sam.gov in a zip file due to size.

7b: Grid Map Locator has also been provided to orient each map into the overall landscape.)

8 Burn Severity Map 1

9 Burn Severity Table 1

10 Small Fuels Treatment Photo Series 3

Forestry Services – SCA Wage Determination #1977-0079

Revision #78 dated 12/23/2024

Highway Construction – Davis-Bacon Wage Decision #OR20250001 Dated 06/27/2025

13 Shape Files n/a

RFP Section L Excerpts

L.5 INSTRUCTIONS FOR SUBMISSION OF OFFERS AND OTHER INFORMATION

(a) General Instructions

The offer must include a technical proposal and price proposal. Each of the parts shall be separate and complete so that evaluation of one may be accomplished independently from evaluation of the other. The technical proposal must not contain reference to price/cost; however, resource information (such as data concerning labor hours and categories, materials, subcontracts, etc.) must be contained in the technical proposal so that the contractor's understanding of the performance work statement may be evaluated. The price proposal shall be submitted using the solicitation forms; aside from the aggregated logging costs and delivered product values associated with Mandatory Item 1 and Optional Item 8, no breakdown of unit prices is required.

Offerors are cautioned that sufficient and detailed information must be presented in their technical proposals to enable the Government to evaluate their proposals fully in accordance with the evaluation and award criteria contained herein. The Government is not obligated to ask for additional information and in the absence of required information, the proposal shall be rated deficient.

Offerors may, at their discretion, submit alternate proposals or proposals which deviate from the requirement;

provided, that an offeror also submit a proposal for performance of the work as specified in this solicitation. Any "alternate" proposal may be considered if overall performance would be improved or not compromised, and if it is in the best interest of the Government. Alternate proposals, or deviations from any requirement of this RFP, must be clearly identified.

The Government will evaluate proposals in accordance with the evaluation criteria set forth in Section M of this

RFP.

Offerors shall submit their proposal(s) electronically to the Issuing Office (karen.ruklic@usda.gov). It is the vendor’s responsibility to ensure delivery of all required documents by the date and time set for receipt of offers. All proposals shall include:

(1) One copy of the completed, signed Standard Form 33 (blocks 12-18 completed).

(2) One copy of the price proposal - Section B, Schedules of Items with all blocks completed. All

Mandatory and Optional Items must be priced. Timber Product Removal Price Schedule and Timber Subject to Agreement Price Schedule with all blocks completed. Offers (Flat) must meet or exceed the Minimum Acceptable Offer Amounts.

(3) One copy of Section K completed. There is no need to return the entire solicitation, just the applicable provisions in that section.

(4) Acknowledgement of solicitation amendments (if any). This can be accomplished by completing section 14 on the SF-33 or by submitting the signed SF-30(s) from https://sam.gov with your price proposal.

(5) Scanned copy of fully executed Bid Guarantee (Standard Form 24 and Power of Attorney). See I.12 for specific requirements.

(6) One copy of the technical proposal responsive to all Evaluation Criteria.

(b) Technical Proposal -The technical proposal must present sufficient information to reflect a thorough understanding of the requirements and a detailed description of the organization, techniques, and procedures for achieving the objectives of the specifications and the project. Proposals that merely paraphrase the requirements of the Government's specifications or use such phrases as "will comply" or "standard techniques will be employed" will be considered unacceptable and will not be considered further. As a minimum, address the following evaluation criteria and provide the following information:

(1) Technical Approach

(i) Work Activity Plan. Clearly describe how you and/or your subcontractors will meet the project objectives while minimizing resource damage and ensuring a safe working environment. Include an explanation about how you have determined this approach, and what coordination will occur between the various operations. Limit your description to 2 pages.

(ii) Method. Describe the method or combination of methods you plan to utilize to accomplish the Mandatory and Optional Work Items. Please limit this narrative to 4 pages. Include responses to each of these end results, specifications, and objectives:

• How will operations implement and accomplish the identification, cutting and removal from NFS land (when applicable) of fire killed and damaged trees?

• How will roadside small fuels be treated?

• Describe how product will be sold or otherwise disposed of.

mailto:karen.ruklic@usda.gov

• Detail if and/or how non-traditional methods of disposal and/or beneficial reuse, such as air curtain burners, carbonizers, or biochar production may be used. If a non-traditional disposal method is proposed, describe the product type/size planned for each disposal type with an estimated tonnage.

• Provide a Quality Control Plan that details how operations will be implemented to assure that the work performed will meet or exceed contract requirements. This plan will not count towards the 4-page limit.

The QCP shall specify:

How quality will be monitored and reported to the Contracting Officer and the COR to assure the performance standards are met, including plot numbers and plot size and types, and sample design (units with spacing)?

How work will be inspected if plots will not be used (visual inspection)? What type of equipment will be used to inspect?

What personnel will perform the quality control? Indicate whether persons who will conduct inspections will have other responsibilities (supervision, production work, etc.)?

How will the work be supervised?

• Provide a Safety Plan that details how operations will be implemented to mitigate safety concerns. This plan will not count towards the 4-page limit.

The Safety Plan shall at a minimum specify:

Describe how your operations will safeguard worker and government employee safety.

What specific safety measures will be implemented and how will they be reported to the Contracting Officer and the COR to assure mitigations are in place?

What training shall be provided to employees and what resources will be available to them in the event of an emergency?

• How will operations implement and accomplish road maintenance and road reconstruction work within the schedule constraints?

• How will operations be performed to protect natural resources and protected improvements located within the project area?

• For large businesses only – provide a Draft Small Business Subcontracting Plan. Refer to Section I: 52.216-9 Small Business Subcontracting Plan provided in full text for requirements. This plan will not count towards the 4-page limit.

(iii) Equipment. Describe the equipment you will use to accomplish the Mandatory and Optional Work Items. Include make and model of proposed equipment as well as equipment specifications if needed to demonstrate that the equipment will meet performance requirements. Please limit this information to 1 page.

(iv) Key Personnel. List the names and proposed duties of key personnel who will be assigned to the various work items of the project including, at a minimum, the overall Project Manager, Logging Supervisor, Road Reconstruction/Maintenance Site Superintendent, and individual sub-managers (such as individuals supervising sub-contractors). Detail each individual’s experience performing relevant work and the current certifications, education, licenses and training held or completed. In addition, describe the crew(s) to be utilized. Limit this response to no more than 3 pages.

(v) Timing. Provide a general plan for the sequence of work, including an estimated start date and completion date for both the Mandatory and Optional work items. Provide estimated daily production rates to complete hazard tree treatments with the period of performance. Address all Section F completion deadlines and restrictions. Please limit this information to no more than 2 pages.

(2) Relevant Past Performance - Submit past performance information for both the Offeror and any proposed major subcontractors. OFFERORS SHOULD PROVIDE ONLY THE INFORMATION LISTED BELOW. Performance information will be requested from references provided and other known clients. Limit your response to no more than 3 pages.

List and describe similar project work currently in progress or completed by your firm and proposed major subcontractors in the last 3 years. Experience with implementation and successful accomplishment of Designation x Prescription treatments should be noted within the past 5 years.

Address past work specifically related to the work items shown in the Schedule of Items.

Names, addresses, emails, and telephone numbers of principal officials in charge of the project who are familiar with your performance.

Contract Numbers and the agency/company or individuals contracting the work.

Brief descriptions of work and Key Personnel utilized.

The size (dollar value and acreage/miles treated) and location of the work.

If applicable, provide information on problems encountered on the contracts listed and disclose accidents/incidents that occurred along with corrective actions taken to resolve the problems.

(3) Benefit to Local Community – For the purposes of this solicitation, “local” is identified as Lane, Linn and Marion counties. Contractor, subcontractor, and employee locations for determination of “local” will be based on primary business/home address.

(i) Describe how you will recruit and utilize local labor, including the hiring or training of local residents as employees or as subcontractors. Describe efforts to retain, expand and create employment or training opportunities in the local community.

(ii) Describe how and to what degree materials, supplies, lodging, meals, or incidentals would be purchased within the local community.

(iii) Describe how any materials removed from Forest Service lands would be marketed;

specifically, detail to which enterprises the timber products will be sold or otherwise disposed of in the local community or elsewhere. Describe contributions to the development of biomass energy, integrated utilization, and/or value-added products for an existing market or emerging market (if applicable).

(c) Price Proposal - To fulfill the Government’s price proposal requirements, offerors shall provide unit prices (where applicable) and total amounts in the Schedules of Items in Section B of the solicitation.

Offerors must provide prices for all Mandatory Work Activities and a corresponding offer within the Timber/Product Removal Price Schedule for Mandatory Item 1 product removal. Offerors shall also provide prices for all Optional Work Items and offers for the product that may be removed via Timber Subject to Agreement (TSTA) if Optional Items 7 and/or 8 are awarded or other TSTA is removed. The un-estimated TSTA corresponds with product that may be removed from SMAs, as a result of small fuels treatments or as a by-product of construction work.

Offers (Flat) shall be submitted within the Timber Price Removal Schedule and Timber Subject to Agreement Price Schedule for all products with prices per ton that meet or exceed the Minimum Acceptable Offer amount.

**Offerors shall also provide logging costs and delivered product values associated with Mandatory Item 1 and Optional Item 8. This data shall be used for government review purposes only, is considered proprietary, will not be made public, and will not be incorporated into the awarded contract.

Appendix A Excerpts

SECTION II – WORK ITEMS

The following requirements apply to work items 1-3, 8-10 and 14. The general yarding specifications also apply to work item 7.

1. GENERAL FELLING AND YARDING SPECIFICATIONS

• Notwithstanding applicable provisions in Appendix B, felling objectives shall be accomplished in accordance with the requirements detailed below.

• To protect streams and streambanks from damage, trees that are adjacent to Riparian Reserves should be felled away from, or parallel to, the Riparian Reserve.

• Within Riparian Reserves, fall trees larger than 16 inches in diameter into stream channels but do not block the inlet or outlet of a culvert or create a roadside hazard.

• Fuel and other petroleum products must be stored and refueling must occur at least 150 feet from any stream or other waterbody.

• Mechanized equipment used for felling and/or yarding are allowed outside of the road prism on slopes less than 30%. Equipment is allowed to traverse short pitches (less than 250 feet) on vegetated slopes of less than 45% to access benches or plateaus.

• Ground based equipment is only allowed to operate outside of the road prism on designated skid trails.

Skid trails shall be placed a minimum of 50 feet apart, not exceed 15 feet wide with an average width no greater than 12 feet, and ground-based equipment will make no more than three passes per trail.

• Off-road yarding operations will achieve full-suspension of logs to the maximum extent possible and will maintain a minimum of one-end suspension when transporting logs along trail corridors.

• Ground-based equipment shall not operate within 200 feet of bogs or wetlands.

• Ground-based equipment shall not operate within 30 feet of any perennially wet areas.

• Skidding logs down roadways is prohibited.

• Cut stumps to a maximum height of 12 inches, or 1/3rd of stump diameter.

• Yarding and decking operations (i.e., log loader) must avoid blocking drainage features (i.e., ditch lines, cross drain culverts, stream crossings) to the maximum extent…

This is the start of the file's text. The full file is on GovTribe.