6-North Yard Storage Upgrades Plans.pdf

PDF 2 MB Posted

Attached to
North Yard Storage Site Construction Project
Solicitation number
269- 2026-2033
Issued by
Mecklenburg County, Charlotte City, North Carolina

About this file

This is an electrical infrastructure design document prepared by HNTB North Carolina for the North Yard Storage Site Construction Project in North Carolina, which will serve as a secured storage facility for CATS (likely the local transit authority). The project encompasses electrical infrastructure upgrades including the installation of a new 100-ampere outdoor panel (Panel NYS), conduit systems, receptacle outlets, lighting control systems, and motor stubs for future gate access control equipment. The design specifies Schedule 40 PVC conduit with 24 inches minimum cover for underground installations, rigid galvanized steel for exposed conduit, and interconnection between existing Panel NYDP and the new Panel NYS using #1 AWG conductors. The document includes twelve conduit runs ranging from 3/4 inches to 1-1/4 inches in diameter, with provisions for three quadplex outlets, future motor installations, and CCTV infrastructure. An optional lighting addition is presented as a separate scope, featuring new light fixtures, a lighting control panel with photocell automation, and a mechanically held contactor system with manual override capability.

The specifications require all electrical materials and equipment to be label-listed by a North Carolina-approved third-party testing agency and comply with NEMA 3R outdoor rating standards. The design includes coordination with Duke Energy for the existing utility transformer connection and mandates that contractors verify existing utility locations prior to installation. All receptacles must include ground fault protection where located in wet areas, with identification labels indicating originating panel and circuit numbers. The document notes that the access control installation will be completed under a separate contract, and the optional lighting design remains subject to further discussion with the contractor regarding optimal routing and cost reduction. The prepared and approved dates on the document are dated 8/20/25.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWN BY:

CHECKED BY:

NO. DWN CHK APR

NORTH YARD STORAGEPREPARED BY:

APPROVED BY:DATE REVISION BY

DATE:

SHEET:

DRAWING NO.:

PROJECT NO.: n/a

CBS

CBS

CMR

CLM

08/20/25

HNTB NORTH CAROLINA, P.C.

101 SOUTH TRYON STREET, SUITE 3610

CHARLOTTE, NC 28280

(704) 372-8020

NC LICENSE NO: C-1554

NYS-000

TITLE SHEET

NORTH YARD STORAGE

ELECTRICAL INFRASTRUCTURE

ELECTRICAL INFRASTRUCTURE

PROJECT LOCATION

NO. DWN CHK APR

NORTH YARD STORAGEPREPARED BY:

APPROVED BY:DATE REVISION BY

DATE:

SHEET:

DRAWING NO.:

PROJECT NO.: n/a

CBS

CBS

CMR

CLM

8/20/25

HNTB NORTH CAROLINA, P.C.

101 SOUTH TRYON STREET, SUITE 3610

CHARLOTTE, NC 28280

(704) 372-8020

NC LICENSE NO: C-1554

NYS-001

INDEX

SHEET

NO.

DRAWING

NO. DESCRIPTION REVISION

0 1 2 3 4 5

0 NYS-000 TITLE SHEET

1 NYS-001 INDEX

2 NYS-002 GENERAL NOTES, ABBREVIATIONS, & SYMBOLS

3 NYS-003 SITE PLAN (SHEET 1 OF 2)

4 NYS-004 SITE PLAN (SHEET 2 OF 2)

5 NYS-005 RISER DIAGRAM

6 NYS-006 PANEL SCHEDULES

7 NYS-007 OPTIONAL LIGHTING ADDITION

8 NYS-008 OPTIONAL LIGHTING ADDITION CALCULATIONS

NO. DWN CHK APR

NORTH YARD STORAGEPREPARED BY:

APPROVED BY:DATE REVISION BY

DATE:

SHEET:

DRAWING NO.:

PROJECT NO.: n/a

CBS

CBS

CMR

CLM

8/20/25

HNTB NORTH CAROLINA, P.C.

101 SOUTH TRYON STREET, SUITE 3610

CHARLOTTE, NC 28280

(704) 372-8020

NC LICENSE NO: C-1554

NYS-002

GENERAL NOTES, SYMBOLS, & ABBREVIATIONS

ABBREVIATIONS AND ACRONYMS

JB

X X

OE OE

ELECTRICAL INFRASTRUCTURE

ABBREVIATIONS AND ACRONYMS

18"

6"

24" MIN.

11x18 (POWER)

TYPICAL PULLBOX ELEVATION

UP TO (12) CONDUITS

TOP

OF

GRADE

TYPICAL STUB UP INSTALLATION

CAP CONDUIT TO DETER

ACCUMULATING OF RAIN

WATER

CONDUIT STUB-UP

BOOTLEG TO CONNECT TO CONDUIT

STUB-UP WHERE REQUIRED.

GRADE

24x24 (COMMS)

EXISTING CATS

LIGHTING

X

X X

X X

X

X X

X X

X X

X

X X X X X

XXXXXX

PARKING

LOT

(ASPHALT)

PANEL "NYY"

X X

X

EXISTING CATS LIGHTING

TRENCHING (AVOID)

EXISTING CATS LIGHTING

ASPHALT

LOT

ASPHALT

LOT

SOFTSCAPE

SOFTSCAPE

SOFTSCAPE

SOFTSCAPE

DRIVEWAY

(CONCRETE)

SIGNAL

HOUSE

SL

ID

IN

G

G

AT

E

SLIDING GATE

TO DUKE ENERGYEXISTING CATS

LIGHTING

CONNEX BOX

SUBSTATION

DRIVEWAY

ENTRY

X X

EX

IS

TI

N

G

SL

ID

IN

G G

AT

E

X X

X X X X X X X X X X X X X X X X X X X X X X

TWO VERTICAL

PIVOTING FENCES

CCTV

POLE

EXISTING DUKE

ENERGY TRENCHING

FOR SERVICE CONNECTION

SOFT

SCAPE

SOFTSCAPE

SIDEWALK

(CONCRETE)PARKING

LOT

DRIVEWAY

(CONCRETE)

(CONCRETE)

EXISTING

GATE MOTOR

EXISTING

GATE MOTOR

EXISTING

GATE

MOTOR

(E) PANEL "NYDP"

(208/120V 3Ø-4W)

COMMS ROOM

DRAINAGE

RAVINE

SOFTSCAPE

GRAVEL

SOFTSCAPEASPHALT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

JB

JB

JB

JB

JB

JB

XFMR

M

INSTALL (1) 1-1/4" SCH 40 PVC CONDUIT (EA)

FOR 3 QUADPLEX OUTLETS

(N) PANEL "NYS"

(208/120V 3Ø-4W)

NYS-5

NYS-2

GEN

ASPHALT

LOT

X X

X X

X

X X X X X X X X X X X

NEW PEDESTRIAN

GATE

EXISTING

PEDESTRIAN

GATE

COMMS JB

24"X24" MIN

JB

POWER JB

11"X18" MIN

DRAWN BY:

CHECKED BY:

NO. DWN CHK APR

NORTH YARD STORAGEPREPARED BY:

APPROVED BY:DATE REVISION BY

DATE:

SHEET:

DRAWING NO.:

PROJECT NO.: n/a

CBS

CBS

CMR

CLM

8/20/25

HNTB NORTH CAROLINA, P.C.

101 SOUTH TRYON STREET, SUITE 3610

CHARLOTTE, NC 28280

(704) 372-8020

NC LICENSE NO: C-1554

SCALE: 1/32" = 1'

NOTES:

1.) PROVIDE SCHEDULE 40 PVC WITH 24" MINIMUM OF COVER WHERE RACEWAY IS LOCATED

BELOW GRADED SURFACES.

2.) EXPOSED CONDUIT SHALL BE RIGID GALVANIZED STEEL.

3.) CONDUITS ARE TO STUB UP 6" IN THE CENTER OF THE EQUIPMENT, BE TIGHTLY GROUPED, SHALL BE SECURELY CAPPED IMMEDIATELY AFTER INSTALL, AND SHALL BE BE PROTECTED FROM

DAMAGE. CONDUITS SHALL HAVE PULL STRINGS PROVIDED.

4.) ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL BE LABEL-LISTED

BY A NORTH CAROLINA APPROVED THIRD PARTY TESTING AGENCY.

5.) AS-BUILT INFORMATION IS SHOWN AS REFERENCE. CONTRACTOR MUST VERIFY LOCATION

OF EXISTING UTILITIES AND EQUIPMENT PRIOR TO INSTALL.

6.) RECEPTACLE ON A DEDICATED 20A CIRCUIT SHALL BE RATED 20A. PROVIDE GROUND FAULT

PROTECTION FOR ALL RECEPTACLES LOCATED IN WET AREAS.

7.) PROVIDE IDENTIFICATION LABEL ACCORDING TO SPECIFICATIONS AT EVERY RECEPTACLE

COVER PLATE INDICATING ORIGINATING PANEL AND CIRCUIT NUMBER SO THAT LABEL CAN BE

CLEARLY READ WHILE DEVICE IS IN USE WITH STANDARD PLUGS INSERTED. LABEL SHALL

DISTINCTLY IDENTIFY DEDICATED RECEPTACLES.

8.) COORDINATE DEVICE LOCATIONS WITH CITY'S REPRESENTATIVE.

NYS-003

SITE PLAN

(SHEET 1 OF 2)

M

AT

H C

LI

N

E

(S

EE

S H

EE

T

4)

ELECTRICAL INFRASTRUCTURE

SITE PLAN CONDUIT SCHEDULE

CONDUIT

ID FROM TO

CONDUIT CONDUCTORS

NOTESSIZE TYPE SIZE GND

1 PANEL NYDP PANEL NYS 1-1/4" RGS (3) #1 AWG #6 AWG SWAP TO PVC ONCE

OUTSIDE OF BUILDING.

2 PANEL NYDP PANEL NYS 1-1/4" SCH. 40 PVC (3) #1 AWG #6 AWG

3 PANEL NYS MOTOR STUB UP 1" SCH. 40 PVC - - MOTOR TO BE INSTALLED IN

FUTURE.

4 PANEL NYS MOTOR STUB UP 1" SCH. 40 PVC - - MOTOR TO BE INSTALLED IN

FUTURE.

5 PANEL NYS OUTLETS (3) 1-1/4" SCH. 40 PVC #8, #6, #4 AWG * #6 AWG *THE FURTHER THE OUTLET, THE

LARGER THE WIRE REQUIRED.

6 JB NEAR GEN NEW JB (2) 1-1/4" SCH. 40 PVC - -

JB BY GEN IS FROM COMMS ROOM.

MANY FREE CONDUIT SPACES TO USE.

INSTALLING 2ND CONDUIT AS SPARE.

7 NEW JB MOTOR STUB UP 3/4" SCH. 40 PVC - - ACCESS CONTROL BEING

INSTALLED IN OTHER CONTRACT

8 NEW JB ACCESS CONTROL

PANEL STUB UP 3/4" SCH. 40 PVC - - ACCESS CONTROL BEING

INSTALLED IN OTHER CONTRACT

9 NEW JB MOTOR STUB UP 3/4" SCH. 40 PVC - - ACCESS CONTROL BEING

INSTALLED IN OTHER CONTRACT

10 NEW JB ACCESS CONTROL

PANEL STUB UP (3) 3/4" SCH. 40 PVC - -

INSTALLING 3 CONDUITS FROM THE NEW

JB TO TERMINATE AT DIFFERENT SPOTS

SEEN IN CONDUIT IDS: 10, 11, 12

11 ACCESS CONTROL

PANEL STUB UP

PEDESTRIAN ACCESS

PANEL STUB UP (2) 3/4" SCH. 40 PVC - - ACCESS CONTROL BEING

INSTALLED IN OTHER CONTRACT

12 PEDESTRIAN ACCESS

PANEL STUB UP

NEW PEDESTRIAN

GATE 3/4" SCH. 40 PVC - - STUB UP SHOULD BE RIGHT BY GATE TO RUN

WIRES TO MAGLOCK OR OTHER MEANS OF

ELECTRIC LOCKING MECHANISM

M

AT

H C

LI

N

E

(S

EE

S H

EE

T

8)

EXISTING CATS

LIGHTING

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

ASPHALT

LOTASPHALT

LOT

ASPHALT

LOT

CCTV

POLE

INSTALL (1) 1-1/4" SCH 40 PVC CONDUIT (EA)

FOR 3 QUADPLEX OUTLETS

NYS-2NYS-6 NYS-4

DRAWN BY:

CHECKED BY:

NO. DWN CHK APR

PREPARED BY:

APPROVED BY:DATE REVISION BY

DATE:

SHEET:

DRAWING NO.:

PROJECT NO.: n/a

CBS

CBS

CMR

CLM

8/20/25

HNTB NORTH CAROLINA, P.C.

101 SOUTH TRYON STREET, SUITE 3610

CHARLOTTE, NC 28280

(704) 372-8020

NC LICENSE NO: C-1554

SCALE: 1/32" = 1'

M

AT

H C

LI

N

E

NORTH YARD STORAGE

SITE PLAN

(2 OF 2)

NYS-004

004ELECTRICAL INFRASTRUCTURE

NOTES:

1.) PROVIDE SCHEDULE 40 PVC WITH 24" MINIMUM OF COVER WHERE RACEWAY IS LOCATED

BELOW GRADED SURFACES.

2.) EXPOSED CONDUIT SHALL BE RIGID GALVANIZED STEEL.

3.) CONDUITS ARE TO STUB UP 6" IN THE CENTER OF THE EQUIPMENT, BE TIGHTLY GROUPED, SHALL BE SECURELY CAPPED IMMEDIATELY AFTER INSTALL, AND SHALL BE BE PROTECTED FROM

DAMAGE. CONDUITS SHALL HAVE PULL STRINGS PROVIDED.

4.) ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL BE LABEL-LISTED

BY A NORTH CAROLINA APPROVED THIRD PARTY TESTING AGENCY.

5.) AS-BUILT INFORMATION IS SHOWN AS REFERENCE. CONTRACTOR MUST VERIFY LOCATION

OF EXISTING UTILITIES AND EQUIPMENT PRIOR TO INSTALL.

6.) RECEPTACLE ON A DEDICATED 20A CIRCUIT SHALL BE RATED 20A. PROVIDE GROUND FAULT

PROTECTION FOR ALL RECEPTACLES LOCATED IN WET AREAS.

7.) PROVIDE IDENTIFICATION LABEL ACCORDING TO SPECIFICATIONS AT EVERY RECEPTACLE

COVER PLATE INDICATING ORIGINATING PANEL AND CIRCUIT NUMBER SO THAT LABEL CAN BE

CLEARLY READ WHILE DEVICE IS IN USE WITH STANDARD PLUGS INSERTED. LABEL SHALL

DISTINCTLY IDENTIFY DEDICATED RECEPTACLES.

8.) COORDINATE DEVICE LOCATIONS WITH CITY'S REPRESENTATIVE.

208Y/120V

UTILITY

XFMR

M

FROM

DUKE

ENERGY

EXISTING

C/T's

EXISTING

PANEL

"NYDP"

EXISTING

GRADE FIRST FLOOR

INTERIOREXTERIOR INTERIOR EXTERIOR

GRADE

NEW

PANEL

"NYS"

WIRE SIZING TABLE

CALLOUT WIRE SIZE GROUND CONDUIT

1 (3) #1 AWG #6 AWG 1 1/4" RGS

2 (3) #1 AWG #6 AWG 1 1/4" PVC

DRAWN BY:

CHECKED BY:

NORTH YARD STORAGEPREPARED BY:

APPROVED BY:

DATE:

SHEET:

DRAWING NO.:

PROJECT NO.: n/a

CBS

CBS

CMR

CLM

8/20/25

HNTB NORTH CAROLINA, P.C.

101 SOUTH TRYON STREET, SUITE 3610

CHARLOTTE, NC 28280

(704) 372-8020

NC LICENSE NO: C-1554

NYS-005

NO. DWN CHK APRDATE REVISION BY

RISER DIAGRAM

#6G

NOTES:

1.) PROVIDE FABRICATED METAL STRUCTURAL SUPPORT

ASSEMBLY FOR NEW PANEL. ENSURE SUPPORT IS PROPERLY

GROUNDED.

2.) PROVIDE ENCLOSURE RATED FOR OUTDOOR EQUIPMENT

THAT IS NEMA 3R OR RATED SUITABLE FOR ENVIRONMENT

WHERE INSTALLED.

3.) SIMPLIFIED RISER DIAGRAM SHOWN FOR SCOPE OF WORK.

FULL FACILITY RISER DIAGRAM AVAILABLE UPON REQUEST.

NORTH YARD STORAGEPREPARED BY:

APPROVED BY:

DATE:

SHEET:

DRAWING NO.:

PROJECT NO.: n/a

CBS

CBS

CMR

CLM

8/20/25

HNTB NORTH CAROLINA, P.C.

101 SOUTH TRYON STREET, SUITE 3610

CHARLOTTE, NC 28280

(704) 372-8020

NC LICENSE NO: C-1554

NYS-006

NO. DWN CHK APRDATE REVISION BY

PANEL SCHEDULES

NOTES:

1.) ALL EQUIPMENT SHALL BE SELECTIVELY COORDINATED WITH

UPSTREAM AND DOWNSTREAM BREAKERS.

2.) COORDINATE BREAKER AND WIRING SIZES WITH EQUIPMENT

MANUFACTURERS.

3.) CONTRACTORS SHALL FIELD VERIFY THE AMPERAGE RATING

AND WIRE SIZES OF ALL CIRCUIT BREAKERS IN PANEL NYDP AND

UPDATE DRAWING APPROPRIATELY FOR USE IN AS-BUILTS.

NYS-11

4X X

X X

X

X X X X

PARKING

LOT

(ASPHALT)

ASPHALT

LOT

ASPHALT

LOT

ASPHALT

(N) PANEL "NYS"

(208/120V 3Ø-4W)

New Light Fixtures (TYP) Existing Light Posts (TYP)

ASPHALT

OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X

XXXXXXXXXXXXXXXXXXXXXXXXXX

(E) ANTENNA POLE

(LCP AND PHOTOCELL

INSTALLED HERE)

OE OE OE OE OE OE OE OE

INSTALL (1) 3/4" SCH 40 PVC CONDUIT

TO CONNECT LIGHTING

TO "NYS" PANEL

NYS-13,15

TO REST OF LIGHTING

ASPHALT

LOT

OE

X

X

X X

X

X X

X

X X

X

OEOEOEOEOEOEOE OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE

X

X

X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

New Light Fixtures (TYP) Existing Light Posts (TYP)

TO REST OF LIGHTING

ASPHALT

LOT

ASPHALT

LOT

OE

208Y/120V

UTILITY

XFMR

M

FROM

DUKE

ENERGY

EXISTING

C/T's

PANEL

"NYDP"

EXISTING

GRADE FIRST FLOOR

INTERIOREXTERIOR INTERIOR EXTERIOR

GRADE

NEW

100A

PANEL

"NYS"

WIRE SIZING TABLE

CALLOUT WIRE SIZE GROUND CONDUIT

1 (3) #1 AWG #6 AWG 1 1/4" RGS

2 (3) #1 AWG #6 AWG 1 1/4" PVC

LIGHTING

CONTROL PANEL

"LCPS"

PHOTOCELL

LIGHTING CONTROL NOTES:

1.) PROVIDE 'PC' PHOTOCELL WITH 5 YEAR WARRANTY.

MOUNT PHOTOCELL NEAR CONTROL PANEL FACING NORTH

AND SHIELD FROM ARTIFICIAL LIGHT SOURCES. ADJUST

SENSITIVITY AS REQUIRED BY OWNER. SET PHOTOCELL SO

THAT ON AND OFF SWITCHING WILL OCCUR WHEN THE

ILLUMINATION LEVEL OF ±10 FOOT-CANDLES IS DETECTED

BY THE PHOTOCELL DEVICE.

2.) PROVIDE AND MOUNT CONTACTOR IN NEMA 1

ENCLOSURE WITHIN CONTROL PANEL. MOUNT SELECTOR

SWITCH WITHIN CONTROL PANEL ADJACENT TO

CONTACTOR ENCLOSURE. ALL LIGHTING CONTROL

COMPONENTS SHALL BE IN A SINGLE NEMA 3R ENCLOSURE

WITH HINGED DOOR INSTALLED DIRECTLY NEXT TO NEW

PANEL NYS. PROVIDE PERMANENT NAMEPLATE ON DOOR

TO READ "STORAGE YARD LIGHTING CONTROL"

3.) AUTO OFF-ON SWITCH SHALL ALLOW MANUAL OVERRIDE

OF THE AUTOMATIC CONTROL SYSTEM. SWITCH SHALL BE

MOUNTED WITHIN CONTROL PANEL.

4.) PROVIDE MECHANICALLY HELD LIGHTING CONTACTOR

IN NEMA 1 ENCLOSURE WITH 30A BALLAST RATED

CONTACTS AND 120V COIL. CONTACTOR SHALL BE OPEN

TYPE. PROVIDE NUMBER OF POLES TO SERVE LOADS

SHOWN. CONNECT ALL STORAGE YARD LIGHTING

THROUGH LIGHTING CONTACTOR. LIGHTING CONTACTOR

SHALL BE CONTROLLED BY RELAY PANEL LCPS THROUGH

COMMON PHOTOCELL.

} 208V

CIRCUIT

NYS-13,15

SPARE

SPARE

SPARE

SPARE

LC

PC

LC

ON

OFF

AUTO

120 VOLTSH N

NOTE 4

NOTE 4

NOTE 3

NOTE 1

NOTE 2

DRAWN BY:

CHECKED BY:

NO. DWN CHK APR

PREPARED BY:

APPROVED BY:DATE REVISION BY

DATE:

SHEET:

DRAWING NO.:

PROJECT NO.: n/a

CBS

CBS

CMR

CLM

8/20/25

HNTB NORTH CAROLINA, P.C.

101 SOUTH TRYON STREET, SUITE 3610

CHARLOTTE, NC 28280

(704) 372-8020

NC LICENSE NO: C-1554

NORTH YARD STORAGE

OPTIONAL LIGHTING ADDITION

LIGHTING SITE PLAN AND RISER DIAGRAM

NYS-007

007ELECTRICAL INFRASTRUCTURE

SCALE: 1/128" = 1' M

AT

H C

LI

N

E

M

AT

H C

LI

N

E

M

AT

H C

LI

N

E

SCALE: 1/64" = 1'

NOTES:

1.) PROVIDE SCHEDULE 40 PVC WITH 24" MINIMUM OF COVER WHERE

RACEWAY IS LOCATED BELOW GRADED SURFACES.

2.) EXPOSED CONDUIT SHALL BE RIGID GALVANIZED STEEL.

3.) CONDUITS ARE TO STUB UP 6" IN THE CENTER OF THE EQUIPMENT, BE

TIGHTLY GROUPED, SHALL BE SECURELY CAPPED IMMEDIATELY AFTER INSTALL,

AND SHALL BE BE PROTECTED FROM DAMAGE. CONDUITS SHALL HAVE PULL

STRINGS PROVIDED.

4.) ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL

BE LABEL-LISTED BY A NORTH CAROLINA APPROVED THIRD PARTY TESTING

AGENCY.

5.) COORDINATE FINAL DEVICE LOCATIONS WITH CITY'S REPRESENTATIVE.

6.) AS-BUILT INFORMATION IS SHOWN AS REFERENCE. CONTRACTOR MUST

VERIFY LOCATION OF EXISTING UTILITIES AND EQUIPMENT PRIOR TO INSTALL.

7.) LIGHTING ADDITION IS OPTIONAL AND CURRENT OPTIONAL DESIGN IS UP

FOR FURTHER DISCUSSION WITH THE CONTRACTOR TO DETERMINE OPTIMAL

AERIAL AND CONDUIT RUNS TO REDUCE VOLTAGE DROP AND COSTS.

RISER DIAGRAM W/ ADDITIONAL LIGHTING (NTS)

NO. DWN CHK APR

PREPARED BY:

APPROVED BY:DATE REVISION BY

DATE:

SHEET:

DRAWING NO.:

PROJECT NO.: n/a

CBS

CBS

CMR

CLM

8/20/25

HNTB NORTH CAROLINA, P.C.

101 SOUTH TRYON STREET, SUITE 3610

CHARLOTTE, NC 28280

(704) 372-8020

NC LICENSE NO: C-1554

NORTH YARD STORAGE

OPTIONAL LIGHTING ADDITION

LIGHTING SITE PLAN AND RISER DIAGRAM

NYS-008

008ELECTRICAL INFRASTRUCTURE

NOTES:

1.) ALL EQUIPMENT SHALL BE SELECTIVELY COORDINATED WITH

UPSTREAM AND DOWNSTREAM BREAKERS.

2.) COORDINATE BREAKER AND WIRING SIZES WITH EQUIPMENT

MANUFACTURERS.

3.) CONTRACTORS SHALL FIELD VERIFY THE AMPERAGE RATING

AND WIRE SIZES OF ALL CIRCUIT BREAKERS IN PANEL NYDP AND

UPDATE DRAWING APPROPRIATELY FOR USE IN AS-BUILTS.

Sheets and Views
Site Plan-COVER
Site Plan-INDEX
Site Plan-NOTES
Site Plan-PHASE 1
Site Plan-PHASE 1 (2)
Riser Diagram-Layout1
Riser Diagram-Layout1 (2)
Site Plan-OPTIONAL
Site Plan-OPTIONAL CALCS