5-Bid Form - North Yard Storage Site.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- North Yard Storage Site Construction Project
- Solicitation number
- 269- 2026-2033
- Issued by
- Mecklenburg County, Charlotte City, North Carolina
About this file
This is a bid form for the North Yard Storage Site Construction Project, a CATS North Yard Annex Site Improvement project in North Carolina. The project encompasses construction upfits to convert the North Yard Facility into a secured storage yard with access control, security lighting, CCTV cameras, fencing, and power supply infrastructure. The bid form itemizes construction work including gate assemblies, underground conduit installation, a 208/120V 100-amp subpanel, weatherproof receptacles, PVC conduit raceway systems, access control conduit rough-ins, and conduit trenching per site plans. An alternate bid section includes storage yard light fixture upgrades with two new Lithonia RSXF1 LED flood fixtures per pole on ten existing wood poles, a mechanical lighting contactor with photocell, underground conduit and power conductors totaling 350 linear feet, and aerial lighting conductors spanning 2,000 linear feet. Additional miscellaneous items include mobilization at five percent of total construction costs, pull boxes, circuit tagging and labeling, sub-base materials, asphalt repair and replacement, commissioning and testing, and de-mobilization.
The bid form structure includes a subtotal for construction costs with additional line items for taxes and insurances at 8.5 percent, bonds at three percent, permits and fees at five percent, and contingency at twenty-five percent to calculate the total bid amount. The form is blank with all pricing fields showing $0.00, indicating this is an unfilled template awaiting bidder cost submissions. No specific response dates, due dates, award dates, or contract term information is provided in this bid form document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form PROJECT: CATS North Yard Annex Site Improvement
| North Yard Annex Site Improvement | Qty | Unit | Unit Price | Total | Comments | |
| Construction | ||||||
| - Gate Assemblies | ||||||
| - U/G Conduit | 1 | LS | 0.00 | |||
| - Site Fence Line Power | 0.00 | |||||
| - (1) 208/120V - 100Amp SubPanel | 1 | LS | 0.00 | |||
| - (1) New 70A Breaker in Existing Panel | 1 | LS | 0.00 | |||
| - (1) 120V 20 Amp Quad Weatherproof Receptacles | 1 | LS | 0.00 | |||
| - (3) Fence Line 120V 20 Amp Quad Weatherproof Receptacles | 1 | LS | 0.00 | |||
| - SCH 40 PVC Conduit Raceway and Junction Boxes per Site Plan | 1 | LS | 0.00 | |||
| - Access Control Conduit Rough-In's Per Site Plan | 1 | LS | 0.00 | |||
| - Conduit Trenching Per Site Plan | 1 | INC | 0.00 | |||
| - Utility Locating Service | 1 | LS | 0.00 | |||
| - ADD ALTERNATE: Storage Yard Light Fixture Upgrade | 0.00 | ADD ALTERNATE | ||||
| - (2) New Lithonia RSXF1 LED Flood Fixtures per Pole (20) Total, Installed on (10) Existing Wood Poles | 0 | LS | 0.00 | |||
| - (1) New Mechanical Lighting Contactor with photocell | 0 | LS | 0.00 | |||
| - Lift Equipment to Energize (10) Existing Incandescent Light Fixtures | 0 | LS | 0.00 | |||
| - U/G Conduit | 150 | LF | 0.00 | |||
| - U/G Power Conductors | 350 | LF | 0.00 | |||
| - Furnish & Install Aerial Lighting Conductors | 2000 | LF | 0.00 | |||
| - Gates Access Controls | ||||||
| - U/G Conduit | 1 | LS | 0.00 | |||
| - Miscellaneous Expenditures | ||||||
| - Mobilization (5% of total construction) | 1 | LS | 0.00 | |||
| - Comms, Signal & Power Pull Boxes W/Lids | 4 | LS | 0.00 | |||
| - Circuits, Tags & Labeling | 1 | LS | 0.00 | |||
| - Sub-base Materials (#57 Stone) | 5 | CY | 0.00 | |||
| - Misc. Asphalt Repair & Replacement | 1 | EA | 0.00 | |||
| - Commissioning & Testing | 1 | LS | 0.00 | |||
| - De-Mobilization | 1 | LS | 0.00 |
| Subtotal | ||
| Construction Subtotal | 0.00 | |
| Taxes & Insurances @ 8.5% | 0.00 | |
| Bonds @ 3% | 0.00 | |
| Permits & Fees @ 5% | 0.00 | |
| Contingency @ 25% | 0.00 |
Total Bid 0.00