6- JAHVH_A-B_11_PLUMBING_MED_GAS_DRAWINGS_03JAN 2023.pdf
PDF 36 MB Posted
- Solicitation number
- 36C24826Q0305
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PATIENT ROOM #4 ISO
2D-252l
CORRIDOR
C2-30-100
1/2"O2, MA & 3/4"MV TO BE
REMOVED BACK TO SHUT-OFF
VALVES. CAP GAS TIGHT.
REMOVE ALL
CEILING OUTLETS
1/2" MA
(E)
3/4" MV
(E)
1/2" O2 (E)
AC
E.10
E.9
GENERAL NOTES
1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL
NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER
THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL
STRUCTURE PACKAGE, DATED 17 DEC 2018.
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B A
SEC 1SEC 2
SEC 3
SEC 4SEC 5SEC 6
SEC 7
SEC 8SEC 9
SEC 10
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:3
A
M
01.MGD-102
MEDICAL GAS - FLOOR PLAN -
DEMOLITION - LEVEL 02 - SECTOR 13
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
SCALE: 1/4" = 1'-0"6D
MEDICAL GAS FLOOR PLAN - DEMOLITION - LEVEL 02 - SECTOR
16' 32'8'0-8'
Revision Number
Revisions: Date:
1 RECORD DRAWINGS 03 JAN 2023
AC
AC
E.10 E.10
E.9 E.9
4" RD
(E) UP
4" RD
(E) UP
4" RD
(E) UP
4" RD
(E)
AC
AC
E.10 E.10
E.9 E.9
4"
RD (E)
4" RD
(E) UP
4" RD
(E) UP
4" RD
(E) UP
4" RD
(E)
4"
RD (D)
REFER TO CIVIL FOR
CONTINUATION
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
SECTOR 1SECTOR 3SECTOR 4
SECTOR 5SECTOR 6SECTOR 8
SECTOR 9
SECTOR 7
SECTOR 10SECTOR 11SECTOR 12
SECTOR 13SECTOR 14SECTOR 15SECTOR 16
SECTOR 17SECTOR 18SECTOR 19SECTOR 20
SECTOR 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
21 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
3 4
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:4
A
M
01.P-100
PLUMBING - UNDERFLOOR PLAN -
SECTOR 13
03 JAN 2023 Breanne D.
Hanson
Ricardo Soto
FINAL AS-BUILT
SUBMISSION
SCALE: 1/4" = 1'-0"F5 PLUMBING UNDERFLOOR PLAN - RENOVATION - SECTOR 13
SCALE: 1/4" = 1'-0"F2 PLUMBING UNDERFLOOR PLAN - DEMOLITION - SECTOR 13
Revision Number
4" RD
(E)
AC
E.10
E.9
4" RD
GENERAL NOTES
1. REFER TO DRAWING 100.P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. REFER TO PLUMBING RISERS FOR ADDITIONAL PIPE SIZES AND INFORMATION.
3. COORDINATE PIPING AND ACCESSORIES SHOWN ON THIS SHEET WITH ALL TRADES. THE PIPING LAYOUT IS
INTENDED TO PROVIDE THE OVERALL ENGINEERING DESIGN CONCEPT AND DOES NOT PROVIDE FOR
RELOCATIONS, OFFSETS, ETC. REQUIRED BY FIELD COORDINATION OF ALL TRADES.
4. PROVIDE AND INSTALL SHUTOFF VALVES AT ALL TAKEOFFS FROM MAIN PIPING. INSTALL VALVES NEAR THE PIPING MAIN UNLESS ACCESSIBILITY IS COMPROMISED TO THE VALVE LOCATION OR INDICATED
OTHERWISE ON THE DRAWING.
5. ALL VALVES AND ACCESSORIES REQUIRING ACCESS THAT ARE LOCATED ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILINGS SHALL BE PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY THE GENERAL CONTRACTOR. THE PLUMBING CONTRACTOR SHALL COORDINATE THE EXACT
LOCATION OF ACCESS PANELS WITH THE GENERAL CONTRACTOR.
6. SLEEVE ALL PIPING THAT PENETRATES FIRE RATED WALLS, FLOORS AND PARTITIONS. PENETRATIONS SHALL BE SEALED WITH A U.L. LISTED ASSEMBLY TO PROVIDE A RATING EQUAL TO OR GREATER THAN
THAT OF THE PENETRATED WALL, FLOOR OR PARTITION.
7. ALL PIPING SHALL BE IDENTIFIED IN ACCORDANCE WITH THE SPECIFICATIONS.
8. COORDINATE LOCATION OF FLOOR DRAINS/SINKS WITH STRUCTURE, ASSOCIATED EQUIPMENT AND
ARCHITECT.
9. INSTALL MIXING VALVES AS CLOSE TO THE FIXTURE AS POSSIBLE TO REDUCE THE AMOUNT OF STORED
TEMPERED WATER AND REDUCE THE RISK OF LEGIONELLA GROWTH.
KEY NOTES
KEY NOTE SYMBOLX
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
SECTOR 1SECTOR 3SECTOR 4
SECTOR 5SECTOR 6SECTOR 8
SECTOR 9
SECTOR 7
SECTOR 10SECTOR 11SECTOR 12
SECTOR 13SECTOR 14SECTOR 15SECTOR 16
SECTOR 17SECTOR 18SECTOR 19SECTOR 20
SECTOR 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
21 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
3 4
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:4
A
M
01.P-101
PLUMBING - FLOOR PLAN - LEVEL 01
SECTOR 13
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
SCALE: 1/4" = 1'-0"6D PLUMBING FLOOR PLAN - RENOVATION - LEVEL 01 - SECTOR 13
1 EXISTING (E) 4" ROOF DRAIN IN CEILING AND DOWN TO BELOW SLAB TO
REMAIN.
2 RELOCATED ROOF DRAIN. TIE BACK INTO EXISTING ROOF DRAIN ABOVE
CEILING.
Revision Number
4"RD
PATIENT ROOM #4 ISO
2D-252l
FREEZER
2A-205d
1/2" DHW
(E)
1/2" DCW
(E)
2" V (E)
CAP WATER AND VENT
LINES WATER/GAS TIGHT
2D-252n
MULTI-PURPOSE
WORKROOM
2D-252k
PATIENT
ROOM #5
2A-205b
COMPUTER
ROOM
2A-205a
OFFICE
2A-205
KITCHEN
AC
E.10
E.9
GENERAL NOTES
1. REFER TO DRAWING 100.P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. REFER TO PLUMBING RISERS FOR ADDITIONAL PIPE SIZES AND INFORMATION.
3. COORDINATE PIPING AND ACCESSORIES SHOWN ON THIS SHEET WITH ALL TRADES. THE PIPING LAYOUT IS
INTENDED TO PROVIDE THE OVERALL ENGINEERING DESIGN CONCEPT AND DOES NOT PROVIDE FOR
RELOCATIONS, OFFSETS, ETC. REQUIRED BY FIELD COORDINATION OF ALL TRADES.
4. PROVIDE AND INSTALL SHUTOFF VALVES AT ALL TAKEOFFS FROM MAIN PIPING. INSTALL VALVES NEAR THE PIPING MAIN UNLESS ACCESSIBILITY IS COMPROMISED TO THE VALVE LOCATION OR INDICATED
OTHERWISE ON THE DRAWING.
5. ALL VALVES AND ACCESSORIES REQUIRING ACCESS THAT ARE LOCATED ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILINGS SHALL BE PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY THE GENERAL CONTRACTOR. THE PLUMBING CONTRACTOR SHALL COORDINATE THE EXACT
LOCATION OF ACCESS PANELS WITH THE GENERAL CONTRACTOR.
6. SLEEVE ALL PIPING THAT PENETRATES FIRE RATED WALLS, FLOORS AND PARTITIONS. PENETRATIONS SHALL BE SEALED WITH A U.L. LISTED ASSEMBLY TO PROVIDE A RATING EQUAL TO OR GREATER THAN
THAT OF THE PENETRATED WALL, FLOOR OR PARTITION.
7. ALL PIPING SHALL BE IDENTIFIED IN ACCORDANCE WITH THE SPECIFICATIONS.
8. COORDINATE LOCATION OF FLOOR DRAINS/SINKS WITH STRUCTURE, ASSOCIATED EQUIPMENT AND
ARCHITECT.
9. INSTALL MIXING VALVES AS CLOSE TO THE FIXTURE AS POSSIBLE TO REDUCE THE AMOUNT OF STORED
TEMPERED WATER AND REDUCE THE RISK OF LEGIONELLA GROWTH.
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
SECTOR 1SECTOR 3SECTOR 4
SECTOR 5SECTOR 6SECTOR 8
SECTOR 9
SECTOR 7
SECTOR 10SECTOR 11SECTOR 12
SECTOR 13SECTOR 14SECTOR 15SECTOR 16
SECTOR 17SECTOR 18SECTOR 19SECTOR 20
SECTOR 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
21 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
3 4
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:4
A
M
01.P-102
PLUMBING - FLOOR PLAN -
RENOVATION - LEVEL 02 SECTOR 13
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
SCALE: 1/4" = 1'-0"6D PLUMBING FLOOR PLAN - RENOVATION - LEVEL 02 - SECTOR 13
Revision Number
4"
RD(D)
4"
RD (E)UP
2 2
4" RD
(E)
AC
E.10
E.9
01.5
01.4
AC
KEY NOTES
KEY NOTE SYMBOLX
GENERAL DEMOLITION NOTES
1. CONTACT GENERAL CONTRACTOR PRIOR TO ANY DISTURBANCE IN EXISTING BUILDINGS. WORK PLANS ARE REQUIRED FOR ANY WORK IN EXISTING BUILDINGS. WORK PLANS SHALL ADDRESS ANY IDENTIFIED HAZARDOUS MATERIALS AND INCLUDE PROPER PROTOCOLS. SEE SPECIFICATIONS 028311 - ASBESTOS ABATEMENT AND 028333.13 - LEAD-BASED PAINT REMOVAL FOR ANY WORK IN AREAS IDENTIFIED IN HAVING
HAZARDOUS MATERIALS.
2. PRIOR TO BEGINNING EXCAVATIONS OR DEMOLITION OF ANY NATURE WHATSOEVER, CONTRACTOR SHALL LOCATE ALL SERVICES AND UTILITIES OCCURRING WITHIN THE BOUNDS OF THE PROJECT. THE CONTRACTOR SHALL THEN PROCEED WITH CAUTION IN HIS WORK SO THAT NO UTILITY OR LINE SERVING AREAS THAT ARE TO REMAIN IS DAMAGED WITH A RESULTANT LOSS OF SERVICE. VERIFY THE SOURCE AND SERVICE OF EACH AND EVERY LINE ENCOUNTERED AND RECORD EACH SERVICE, SIZE, AND
LOCATION ON RECORD DRAWINGS.
3. ALL PLUMBING FIXTURES AND EQUIPMENT REMOVED SHALL BE SUBMITTED TO THE OWNER WITH THE OPTION TO BE REUSED. ITEMS THE OWNER DOES NOT WISH TO REUSE BUT WISHES TO RETAIN SHALL BE DELIVERED TO STORAGE AS DIRECTED BY THE OWNER. ITEMS THE OWNER DOES NOT WISH TO REUSE OR RETAIN SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF LEGALLY.
4. PLUG PIPES AND PATCH FLOOR FLUSH WITH EXISTING SLAB ON GRADE AT ANY PLUMBING FLOOR
PENETRATIONS NO LONGER REQUIRED.
5. CONTRACTOR SHALL REMOVE ALL PIPING AND ASSOCIATED SUPPORTS FROM ABOVE SLAB ON GRADE TO
BELOW ROOF WHICH WAS PREVIOUSLY ABANDONED OR WHICH SERVES PLUMBING FIXTURES AND
EQUIPMENT DESIGNATED FOR REMOVAL. REFER TO PLUMBING FLOOR PLANS FOR NEW FIXTURES OR EQUIPMENT TO BE INSTALLED IN THOSE LOCATIONS. PRIOR TO ANY REMOVAL, FIELD VERIFY THAT LINES TO BE REMOVED DO NOT SERVE ANY FIXTURES OR EQUIPMENT TO REMAIN. CAP REMOVED BRANCH LINES
AS CLOSE AS POSSIBLE TO EXISTING MAINS.
6. ALL PLUMBING FIXTURES AND EQUIPMENT NOT SPECIFICALLY IDENTIFIED FOR REMOVAL SHALL REMAIN.
THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONFLICTS
FOUND IN THE FIELD.
7. CONTRACTOR SHALL FIELD VERIFY AS NECESSARY THE EXACT LOCATION OF PLUMBING FIXTURES, PIPING, AND EQUIPMENT TO BE REMOVED. REFER TO ARCHITECTURAL DRAWINGS FOR CLARIFICATION AS
REQUIRED.
8. COORDINATE EACH AND EVERY INTERRUPTION OF SERVICES AND UTILITIES IN ADVANCE WITH THE OWNER, FIRE DEPARTMENT, AND UTILITY COMPANIES TO ENSURE MINIMAL SHUT DOWN TIMES THAT ARE
ACCEPTABLE TO THE OWNER AND AUTHORITIES.
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
SECTOR 1SECTOR 3SECTOR 4
SECTOR 5SECTOR 6SECTOR 8
SECTOR 9
SECTOR 7
SECTOR 10SECTOR 11SECTOR 12
SECTOR 13SECTOR 14SECTOR 15SECTOR 16
SECTOR 17SECTOR 18SECTOR 19SECTOR 20
SECTOR 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
21 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
3 4
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:5
A
M
01.PD-101
PLUMBING - FLOOR PLAN - DEMOLITION
- LEVEL 01 SECTOR 13 AND 5
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
SCALE: 1/4" = 1'-0"6D PLUMBING FLOOR PLAN - DEMOLITION - LEVEL 01 - SECTOR 13
SCALE: 1/4" = 1'-0"3D PLUMBING FLOOR PLAN - DEMOLITION - LEVEL 01 - SECTOR 5
1 REMOVE SINK. REMOVE WATER AND SANITARY VENT SERVICES BACK TO MAIN
BRANCH AND CAP WATER/GAS TIGHT. REMOVE SANITARY WASTE TO BELOW
FLOOR AND CAP GAS TIGHT. PATCH CONCRETE TO MATCH EXISTING FLOOR.
2 EXISTING (E) 4" ROOF DRAIN IN CEILING AND DOWN TO BELOW SLAB TO
REMAIN.
3 ROOF DRAIN PIPING IN CEILING AND DOWN TO BELOW SLAB TO REMAIN.
Revision Number
GENERAL DEMOLITION NOTES
1. CONTACT GENERAL CONTRACTOR PRIOR TO ANY DISTURBANCE IN EXISTING BUILDINGS. WORK PLANS ARE REQUIRED FOR ANY WORK IN EXISTING BUILDINGS. WORK PLANS SHALL ADDRESS ANY IDENTIFIED HAZARDOUS MATERIALS AND INCLUDE PROPER PROTOCOLS. SEE SPECIFICATIONS 028311 - ASBESTOS ABATEMENT AND 028333.13 - LEAD-BASED PAINT REMOVAL FOR ANY WORK IN AREAS IDENTIFIED IN HAVING
HAZARDOUS MATERIALS.
2. PRIOR TO BEGINNING EXCAVATIONS OR DEMOLITION OF ANY NATURE WHATSOEVER, CONTRACTOR SHALL LOCATE ALL SERVICES AND UTILITIES OCCURRING WITHIN THE BOUNDS OF THE PROJECT. THE CONTRACTOR SHALL THEN PROCEED WITH CAUTION IN HIS WORK SO THAT NO UTILITY OR LINE SERVING AREAS THAT ARE TO REMAIN IS DAMAGED WITH A RESULTANT LOSS OF SERVICE. VERIFY THE SOURCE AND SERVICE OF EACH AND EVERY LINE ENCOUNTERED AND RECORD EACH SERVICE, SIZE, AND
LOCATION ON RECORD DRAWINGS.
3. ALL PLUMBING FIXTURES AND EQUIPMENT REMOVED SHALL BE SUBMITTED TO THE OWNER WITH THE OPTION TO BE REUSED. ITEMS THE OWNER DOES NOT WISH TO REUSE BUT WISHES TO RETAIN SHALL BE DELIVERED TO STORAGE AS DIRECTED BY THE OWNER. ITEMS THE OWNER DOES NOT WISH TO REUSE OR RETAIN SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF LEGALLY.
4. PLUG PIPES AND PATCH FLOOR FLUSH WITH EXISTING SLAB ON GRADE AT ANY PLUMBING FLOOR
PENETRATIONS NO LONGER REQUIRED.
5. CONTRACTOR SHALL REMOVE ALL PIPING AND ASSOCIATED SUPPORTS FROM ABOVE SLAB ON GRADE TO
BELOW ROOF WHICH WAS PREVIOUSLY ABANDONED OR WHICH SERVES PLUMBING FIXTURES AND
EQUIPMENT DESIGNATED FOR REMOVAL. REFER TO PLUMBING FLOOR PLANS FOR NEW FIXTURES OR EQUIPMENT TO BE INSTALLED IN THOSE LOCATIONS. PRIOR TO ANY REMOVAL, FIELD VERIFY THAT LINES TO BE REMOVED DO NOT SERVE ANY FIXTURES OR EQUIPMENT TO REMAIN. CAP REMOVED BRANCH LINES
AS CLOSE AS POSSIBLE TO EXISTING MAINS.
6. ALL PLUMBING FIXTURES AND EQUIPMENT NOT SPECIFICALLY IDENTIFIED FOR REMOVAL SHALL REMAIN.
THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONFLICTS
FOUND IN THE FIELD.
7. CONTRACTOR SHALL FIELD VERIFY AS NECESSARY THE EXACT LOCATION OF PLUMBING FIXTURES, PIPING, AND EQUIPMENT TO BE REMOVED. REFER TO ARCHITECTURAL DRAWINGS FOR CLARIFICATION AS
REQUIRED.
8. COORDINATE EACH AND EVERY INTERRUPTION OF SERVICES AND UTILITIES IN ADVANCE WITH THE OWNER, FIRE DEPARTMENT, AND UTILITY COMPANIES TO ENSURE MINIMAL SHUT DOWN TIMES THAT ARE
ACCEPTABLE TO THE OWNER AND AUTHORITIES.
PATIENT ROOM #4 ISO
2D-252l
FREEZER
2A-205d
4"RD(D)
2" V (E)
1/2" DCW
(E)
1/2" DHW
(E)
REMOVE ROOF DRAIN. INSPECT ROOF
DRAIN FOR RE-USE.
REMOVE DCW, DHW VENT ABOVE CEILING BACK TO
SHUT-OFF VALVES. CAP WATER /GAS TIGHT. REMOVE
WASTE TO BELOW FLOOR AND CAP GAS TIGHT. PATCH
CONCRETE TO MATCH.
AC
E.10
E.9
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
SECTOR 1SECTOR 3SECTOR 4
SECTOR 5SECTOR 6SECTOR 8
SECTOR 9
SECTOR 7
SECTOR 10SECTOR 11SECTOR 12
SECTOR 13SECTOR 14SECTOR 15SECTOR 16
SECTOR 17SECTOR 18SECTOR 19SECTOR 20
SECTOR 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
21 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
3 4
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:5
A
M
01.PD-102
PLUMBING - FLOOR PLAN - DEMOLITION
- LEVEL 02 SECTOR 13
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
SCALE: 1/4" = 1'-0"6D PLUMBING FLOOR PLAN - DEMOLITION - LEVEL 02 - SECTOR 13
Revision Number
S T L.
R A
IL
IN
G
S T L.
R A
IL
IN
G
E .W .C
A C
A C
M O T O R
U P
D O W N
D O W N
T O
P
IP
E
B A S E M E N T
D O W N
D O W N
U P
D O W N
U P
UP
UP
W H E E L C H A
IR
R A M P
W H E E L C H A
IR
R A M P
U P
PLENUM
P A S S T H R U
W
IN
D O W
A B O V E
M E T A L D E C K
M H
O
3" O2
3" O2
3" O2
CONNECT NEW 3' OXYGEN LINE, WITH SHUT OFF VALVE, TO
EXISTING OXYGEN STORAGE TANK AND ROUTE DOWN TO
BELOW GRADE PER NFPA 99 AT A MINIMUM DEPTH OF 2' IN
ACCORDANCE WITH VA GUIDELINES. REFER TO BULK TANK
SCHEMATIC 9E/100.MG-501
EXISTING BULK OXYGEN
STORAGE TANK
BURIED OXYGEN PIPE
PVC, ASTM D1785,
SCHEDULE 80 MINIMUM 2'-0"
BELOW GRADE
BELOW GRADE OXYGEN PIPE SLEEVED PENETRATION
THRU BASEMENT FOUNDATION WALL, INTO BUILDING 2
BASEMENT. CORE DRILL FOUNDATION WALL AND PROVIDE
LINK SEAL AND WATERPROOFING. RE.: 9F/100.MG-501
OXYGEN PIPE ROUTED IN
BASEMENT OF BUILDING 2 TIGHT TO
BOTTOM OF STEEL STRUCTURE
CONTINUE 3" OXYGEN PIPE THRU
BASEMENT CORRIDOR FROM BUILDING 2.
CORE DRILL PENETRATION THRU
CONCRETE WALL ABOVE DOOR HEADER.
REFER TO BULK TANK
SCHEMATIC 9E/100.MG-501
NO FUTURE VALVE AVAILABLE THEREFORE AUXILIARY
OXYGEN SOURCE REQUIRED TO ISOLATE AND SHUT
DOWN THE MAIN BULK TANK AND INSTALL A VALVE FOR
NEW BED TOWER OXYGEN LINE. REFER TO BULK TANK
SCHEMATIC 9E/100.MG-501
CONTRACTOR TO LOCATE/SCAN REINFORCING PRIOR
TO CORE DRILLING. CONTRACTOR TO LOCATE CORE
OPENING TO MISS REINFORCING BARS.
HATCH AREA INDICATES
LIMITS OF BUILDING 1.
CONTINUE 3" OXYGEN PIPE THRU
BASEMENT CORRIDOR FROM BUILDING 2.
CORE DRILL PENETRATION THRU
CONCRETE WALL ABOVE DOOR HEADER.
CONTINUE 3" OXYGEN PIPE THRU
BASEMENT CORRIDOR FROM BUILDING 2.
CORE DRILL PENETRATION THRU
CONCRETE WALL ABOVE DOOR HEADER.
REFER TO SHEET 100.MG-100G FOR
CONTINUATION
3" O2
3" O2
METAL CONDUIT FOR MEDICAL
GAS ALARM WIRING REQUIRED
GENERAL NOTES
1. CONTRACTOR SHALL INFORM ENGINEER AND OWNER OF ANY CONDITIONS PREVIOUSLY
UNDISCOVERED, WHICH IMPACT THE ABILITY TO PERFORM THE DEMOLITION WORK AS DESCRIBED.
2. CONTRACTOR TO VERIFY ELECTRICAL SERVICES (SOURCES AT END POINT-OF-USE) PRIOR TO
DISCONNECTING ANY SUCH SERVICES.
3. CONTRACTOR TO USE EXTREME CAUTION WHEN PERFORMING ANY DEMOLITION WORK OR
EXCAVATION. EXISTING UNDERGROUND UTILITIES MAY BE PRESENT ALTHOUGH THEY MAY NOT BE
INDICATED ON DRAWINGS OR OTHER DOCUMENTATION.
4. CONTRACTOR TO COORDINATE DEMOLITION WORK WITH EXISTING UTILITY SERVICES. AVOID DEMOLISHING ANY ITEMS THAT WOULD IMPACT ONGOING OPERATIONS TO THE FACILITY WITHOUT
PRIOR COORDINATION WITH THE OWNER.
5. RECERTIFY ANY IMPACTED MEDICAL GAS SYSTEMS IN ACCORDANCE WITH NFPA99.
6. THIS DRAWING REPRESENTS ONLY GENERAL LOCATION AND ROUTING OF EXISTING PIPING AND
EQUIPMENT. ACTUAL LOCATIONS SHALL BE DETERMINED BY THE CONTRACTOR WHO SHALL
COORDINATE ALL WORK WITH ALL TRADES NECESSARY TO DEMOLISH EXISTING SYSTEMS AND/OR
INSTALL NEW PIPING OR EQUIPMENT AS SHOWN.
7. "HOT TAPS" ARE PROHIBITED FOR OPERATING MEDICAL OXYGEN SYSTEMS.
8. APPLY PIPING IDENTIFICATION LABELS AT THE TIME OF INSTALLATION IN ACCORDANCE WITH NFPA99.
APPLY SUPPLEMENTARY COLOR IDENTIFICATION IN ACCORDANCE WITH CGA PAMPHLET C-9.
9. 3" TO 4" INLINE BALL VALVES ARE BRONZE/BRASS BODY, STRAIGHT THROUGH DESIGN FOR MINIMUM
PRESSURE DROP, SPRING LOADED, SELF-ALIGNING WITH TEFLON CONE SEAT, VIBRATION FREE, SILENT OPERATION, SUPPLIED NPT FEMALE THREADS AT EACH END WITH FLOW DIRECTION ARROW
PERMANENTLY CAST INTO, CLEANED FOR OXYGEN USE AND LABELED FOR INTENDED SERVICE.
10. OPEN ENDS OF TUBE SHALL BE CAPPED OR PLUGGED AT ALL TIMES OR OTHERWISE SEALED UNTIL
FINAL ASSEMBLY TO PREVENT INFILTRATION OF ANY FOREIGN MATTER.
11. CUT PIPING SQUARE AND ACCURATELY WITH A TUBE CUTTER. (SAWING IS PROHIBITED) TO MEASUREMENTS DETERMINED AT PLACE OF INSTALLATION. REAM TUBE TO REMOVE BURRS, BEING CAREFUL NOT TO EXPAND TUBE, AND SO NO CHIPS OF COPPER REMAIN IN THE TUBE. WORK INTO
SPACE WITHOUT SPRINGING OR FORCING. BOTTOM TUBE IN SOCKET SO THERE ARE NO GAPS
BETWEEN TUBE AND FITTING. EXERCISE CARE IN HANDLING EQUIPMENT AND TOOLS USED IN CUTTING OR REAMING OF TUBE TO PREVENT OIL OR GREASE FROM BEING INTRODUCED INTO TUBING. WHERE
CONTAMINATION HAS OCCURRED, MATERIAL IS NO LONGER SUITABLE FOR OXYGEN SERVICE.
12. RIGIDLY SUPPORT VALVES AND OTHER EQUIPMENT TO PREVENT STRAIN ON TUBE OR JOINTS.
13. DO NOT BEND TUBING. USE FITTINGS.
Key Plan
NORTH
BLDG. 2
BLDG. 1
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:5
A
M
100.MG-100
MEDICAL GAS - SITE PLAN
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
SCALE: 1/16" = 1'-0"6F MEDICAL GAS SITE PLAN GROUND LEVEL
16' 32'8'0-8'
Revision Number
MLKJHGFEDBA
BUILDING OUTLINE ABOVE
BUILDING OUTLINE ABOVE
ENCLOSED CONNECTOR
T O
C
LC
COOLING TOWERS
C
A
B
Key Plan
NORTH
GENERAL NOTES
1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL
NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER
THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL
STRUCTURE PACKAGE, DATED 17 DEC 2018.
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:0
A
M
100.MG-100G
MEDICAL GAS - FLOOR PLAN LEVEL G
COMPOSITE
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
16' 32'8'0-8'
SCALE: 1/16" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL 0G COMPOSITE
Revision Number
GFEDBA
BUILDING OUTLINE ABOVE
ENCLOSED CONNECTOR
GB001-100
COMPUTER
TERMINAL
SERVER
GB003-100
COMMAND
SERVER
GB002-100
TLT/
SHWR,
STAFF
GA060-100
ELEC
V0-04-100
SERVICE
ELEV
GA012-100
DISPOSAL
CHUTE
ROOM,
TRASH
GA011-100
DISPOSAL
CHUTE
ROOM,
LINEN GA010-100
HAC
GA009-100
RECEIVING
FOOD
COURT/
SERVICE
GB000-100
ESSENTIAL
ELECTRICAL
ROOM
GA006-100
FIRE
PUMP
GA005-100
PATIENT
TRAY
ASSEMBLY
GA009C-100
SANITATION
RECYCLING
GA007-100
MED
AIR/VAC
GA054-100
OI&T
GA058-100
SIGNAL
GA009A-100
ELEV
MACHINE
ROOM
GA004-100
EQUIPMENT
DISTRIBUTION
GA013-100
TUG /
STORAGE
GA014-100
WASTE
PUMPER
SYSTEM
GA005A-100
HAC
C0-04-100
CORRIDOR
ELEVATOR
MH 8
ELEVATOR
MH 7
C0-01-100
CORRIDOR
ELEVATOR
CS1
C0-02-100
CORRIDOR
C0-03-100
CORRIDOR
GA009B-100
RECEIVING
AREA
C0-06-100
CONNECTOR
CORRIDOR
100.MG-401
8C
3" O2
3"O2 SUPPLY IN BUILDING TUNNEL RACKED
WITH BUILDING CHILLED WATER. REFER TO
MEDICAL GAS SITE PLAN 100.MG-100 FOR
ROUTING THRU SITE, BUILDINGS AND
BASEMENTS.
PLEASE NOTE THAT SHEET 100.MG-100 WAS
ISSUED UNDER THE FINAL FAST TRACK
FOUNDATIONS, MEP ROUGH-IN AND STEEL
STRUCTURE PACKAGE, DATED 17 DEC 2018.
2" O2
3" O2
2" O2
UP
2 1/2" MA
UP
4" MV
UP
MAINTENANCE SHUT
OFF VALVES, MUST
REMAIN LOCKED OPEN
GB007-100
ELEVATOR
PIT
GB006-100
MECHANICAL
ROOM
C
EXTERIOR
4" MV
2 1/2" MA
C0-05-100
CONNECTOR
CORRIDOR
GENERAL NOTES
1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL
NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER
THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL
STRUCTURE PACKAGE, DATED 17 DEC 2018.
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B A
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:0
A
M
100.MG-100G-A
MEDICAL GAS - FLOOR PLAN - LEVEL G -
AREA A
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
SCALE: 1/8" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL G - AREA A 16'4' 8'0-4'
Revision Number
MLKJHGFEDBA
BUILDING OUTLINE ABOVE
BUILDING OUTLINE ABOVE
ENCLOSED CONNECTOR
T O
C
LC
COOLING TOWERS
C
GENERAL NOTES
1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL
NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER
THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL
STRUCTURE PACKAGE, DATED 17 DEC 2018.
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B A
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:1
A
M
100.MG-101
MEDICAL GAS - FLOOR PLAN - LEVEL 01
- COMPOSITE
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
16' 32'8'0-8'
SCALE: 1/16" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL 1 COMPOSITE
Revision Number
GFEDBA
BUILDING OUTLINE ABOVE
ENCLOSED CONNECTOR
1A128-100
SERVING
AREA
1B110-100
VETERAN
MEMORIAL
V1-03-100
PUBLIC
ELEV
1A184-100
FOOD
PREP &
PRODUCTION
1A185-100
STORAGE,
REF/ FRZ
1A128A-100
STORAGE,
NON-FOOD
1A186-100
STORAGE,
REF/ FRZ
1A183-100
STORAGE,
REF/ FRZ
C1-08-100
CORRIDOR
1A180-100
REMOTE
STORAGE,
RECV
1A110-100
STORAGE
1A194B-100
HAC
1A162-100
RETAIL
DISPLAY
STORAGE
1A161-100
FEMALE
TOILET,
MULTIPLE
1A163-100
MALE
TOILET,
MULTIPLE
1A160-100
ELEC
1A158-100
SIGNAL
1A154-100
OI&T
1A169A-100
OFFICE,
SECURE
MONEY
1A137-100
RETAIL
AREA
(COFFEE)
V1-01-100
PATIENT
ELEV
V1-04-100
SERVICE
ELEV
1A137A-100
STORAGE
ROOM
1A169B-100
OFFICE,
VCS
CHIEF
1A169D-100
OFFICE,
VCS
ASST
CHIEF
1A169C-100
OFFICE,
VCS
ASST
CHIEF
1A169E-100
CUBICLE,
CLERK
1A173-100
LOCKER
ROOM
STAFF
1A171-100
LOCKER
ROOM
STAFF
1A175-100
LOUNGE,
STAFF
1A177-100
TOILET,
STAFF
1A179-100
TOILET,
STAFF
1A139-100
STORAGE
ROOM
1A178-100
STORAGE,
RETAIL
1A170-100
VENDING
MACHINE
MASTER
1A191-100
HAC
C1-11-100
CORRIDOR
2" O2
DN
2 1/2" MA
DN
4" MV
DN
4" MV
UP
2 1/2" MA
UP
2" O2
UP
S1-01-100
STAIR 1
LEVEL 1
C1-08-100
CORRIDOR
ELEVATOR
S 6
ELEVATOR
S 5
1A152-100
DINING
AREA
HEALING
GARDEN
1A187-100
STORAGE,
REF/ FRZ
1A106-100
WHEELCHAIR
STORAGE
1A125A-100
INFO
DESK
1A176-100
STORAGE,
DRY
FOOD
ELEVATOR
P 2
ELEVATOR
P 1
ELEVATOR
S 6
ELEVATOR
S 5
C1-10-100
CORRIDOR
1A110A-100
HAC
1A128B-100
SODA
SYSTEM
C1-14-100
CORRIDOR
1A152-100
DINING
AREA
1A125-100
LOBBY/WAITING
1A134-100
DINING
AREA
C1-09-100
CORRIDOR
1A125B-100
CUBICLE,
VOLUNTEER
1A194-100
POT
WASH
AREA
C1-17-100
CORRIDOR
1A125C-100
TELEPHONE
PUBLIC
C1-18-100
CORRIDOR
C1-12-100
CORRIDOR
1A194A-100
DISH
WASH
AREA
4" MV 2 1/2" MA 2" O2
4" MV
2 1/2" MA
2" O2
C
EXTERIOR
4" MV
UP/DN
ALL SERVICE VALVES SHALL BE
LOCKED OPEN, EACH LINE TO
INCLUDE SHUT OFF VALVE TO
ISOLATE THIS SCOPE OF WORK
6" MA
UP/DN
6" MA
UP
6" MA
GENERAL NOTES
1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL
NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER
THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL
STRUCTURE PACKAGE, DATED 17 DEC 2018.
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B A
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:2
A
M
100.MG-101A
MEDICAL GAS - FLOOR PLAN - LEVEL 01
- AREA A
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
SCALE: 1/8" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL 1 - AREA A 16'4' 8'0-4'
Revision Number
M A
O
OMA
MLKJHGFEDBA
BUILDING OUTLINE ABOVE
BUILDING OUTLINE ABOVE
ENCLOSED CONNECTOR
T O
C
LC
COOLING TOWERS
C
GENERAL NOTES
1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL
NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER
THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL
STRUCTURE PACKAGE, DATED 17 DEC 2018.
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B A
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:3
A
M
100.MG-102
MEDICAL GAS - FLOOR PLAN - LEVEL 02
- COMPOSITE
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
16' 32'8'0-8'
SCALE: 1/16" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL 02 COMPOSITE
Revision Number
OMA
GFEDBA
BUILDING OUTLINE ABOVE
ENCLOSED CONNECTOR
2B203-100
CICU
PATIENT
ROOM 1
2B205-100
CICU
PATIENT
ROOM 22B203A-100
BATHROOM,
PATIENT
2B205A-100
BATHROOM,
PATIENT
N2B-03-100
NURSE
SUB-STATION
2A280-100
STORAGE,
EQUIPMENT
2A272-100
LOUNGE,
STAFF
2A274-100
TOILET,
STAFF
2A204C-100
OFFICE
2A204D-100
OFFICE
2A204B-100
OFFICE
2A204A-100
OFFICE
2B200-100
TOILET,
FAMILY
ASSIST 2B202-100
TOILET,
STAFF
V2-03-100
PUBLIC
ELEV
2B275-100
GREETER
2B272-100
OFFICE
2B270-100
OFFICE
2B271-100
CONSULTATION
ROOM
2B273-100
CONSULTATION
ROOM
2A207-100
VISITOR
KITCHENETTE
2A205-100
KIOSK,
PATIENT
EDUC/
RESRC
2B274-100
TOILET,
PUBLIC
2A206-100
KIOSK,
PATIENT
EDUC/
RESRC
2A203-100
WAITING/
LOUNGE
C2-07-100
CORRIDOR
C2-01-100
CORRIDOR
C2-06-100
CORRIDOR
C2-19-100
CORRIDOR
2A251-100
SICU
PATIENT
ROOM 9
2A263-100
SICU
PATIENT
ROOM 13
2A257-100
SICU
PATIENT
ROOM 11
2A241-100
SICU
PATIENT
ROOM 5,
NEG
ISOLATION
2A247-100
SICU
PATIENT
ROOM 7
2A259-100
SICU
PATIENT
ROOM 12
2A231-100
SICU
PATIENT
ROOM 1
2A243-100
SICU
PATIENT
ROOM 6,
NEG
ISOLATION
2A265-100
SICU
PATIENT
ROOM 14
2A233-100
SICU
PATIENT
ROOM 2
2A249-100
SICU
PATIENT
ROOM 8
2A267-100
SICU
PATIENT
ROOM 15
2A237-100
SICU
PATIENT
ROOM 4
2A269-100
SICU
PATIENT
ROOM 16
2A253-100
SICU
PATIENT
ROOM 10
S2-01-100
STAIR 1
LEVEL 2
2A269A-100
BATHROOM,
PATIENT
2A241A-100
BATHROOM,
PATIENT
2A235A-100
BATHROOM,
PATIENT
2A237A-100
BATHROOM,
PATIENT
2A263A-100
BATHROOM,
PATIENT
2A267A-100
BATHROOM,
PATIENT
2A243A-100
BATHROOM,
PATIENT
2A253A-100
BATHROOM,
PATIENT 2A265A-100
BATHROOM,
PATIENT
2A233A-100
BATHROOM,
PATIENT
2A247A-100
BATHROOM,
PATIENT
2A259A-100
BATHROOM,
PATIENT
2A249A-100
BATHROOM,
PATIENT
2A231A-100
BATHROOM,
PATIENT
2A257A-100
BATHROOM,
PATIENT
2A251A-100
BATHROOM,
PATIENT
2A243B-100
ANTEROOM
2A241B-100
ANTEROOM
N2A-67-100
NURSE
SUB-STATION
N2A-63-100
NURSE
SUB-STATION
N2A-57-100
NURSE
SUB-STATION
N2A-51-100
NURSE
SUB-STATION
N2A-41-100
NURSE
SUB-STATION
N2A-47-100
NURSE
SUB-STATION
N2A-35-100
NURSE
SUB-STATION
N2A-31-100
NURSE
SUB-STATION
2A276A-100
MOBILE
X-RAY
ALCOVE
2A276-100
BLOOD
GAS LAB
2A236-100
UTILITY
ROOM,
CLEAN,
LINEN
2A238C-100
CONFERENCE/
REPORT
ROOM
2A260-100
ELEC
2A226-100
EMPL
WELLNESS
2A286A-100
FS CART
STORAGE
2A258-100
SIGNAL
2A282-100
DISPOSAL
CHUTE
ROOM,
LINEN
2A239-100
MEDICATION
ROOM
2A234-100
NOURISHMENT
STATION
2A254-100
OI&T
2A264-100
TEAM
ROOM
2A284-100
DISPOSAL
CHUTE
ROOM,
TRASH
V2-04-100
SERVICE
ELEV
2A238D-100
CC
ALCOVE
2A238A-100
WARD
CLERK
2A262-100
LOCKER
ROOM
STAFF
2A238-100
NURSE
STATION,
ICU
2A227-100
CONSULTATION
ROOM
2A223-100
CONSULTATION
ROOM
2A224-100
TOILET,
STAFF
2A229-100
VENDING
MACHINE
AREA
2A286B-100
WC
ALCOVE
2A289-100
STORAGE,
EMS
2A281-100
STORAGE,
EQUIPMENT
2A212D-100
TOILET,
PUBLIC
2A288-100
HAC
2A287-100
UTILITY,
SOILED
2A214-100
TEAM
ROOM
2A208-100
CONFERENCE
2A286-100
STORAGE,
MEDICAL
GAS
2A212A-100
TOILET,
PUBLIC
2A212C-100
TOILET,
FAMILY
ASSIST
2A212B-100
TOILET,
FAMILY
ASSIST
2A225A-100
KIOSK,
PATIENT
EDUC/
RESRC 2A225-100
WAITING/
LOUNGE
C2-05-100
CORRIDOR
C2-04-100
CORRIDOR
C2-09-100
CORRIDOR
V2-01-100
PATIENT
ELEV
C2-02-100
CORRIDOR
C2-10-100
CORRIDOR
C2-12-100
CORRIDOR
1" O21 1/4" MA2 1/2" MV
1 1/2" MV
3/4" MA
3/4" O2
ZVB-2A1
LPA-2A1
ZVB-2A2
LPA-2A2
1" O2
UP
ALL SERVICE VALVES SHALL BE
LOCKED OPEN, EACH LINE TO
INCLUDE SHUT OFF VALVE TO
ISOLATE THIS SCOPE OF WORK
C2-03-100
CORRIDOR
2A215-100
WAITING/
LOUNGE
2B204-100
PATIENT
SHOWER
M
AT
C H
LI
NE
R
EF
6F
0.
M G
-1
-B
LPA LOCATION AT NURSE WORKROOM
TO BE COORDINATED WITH FACILITIES
AND ARCHITECTURAL ELEVATIONS.
2A235-100
SICU
PATIENT
ROOM 3
MG-3
3" MV 2" MA 1 1/2" O2
C
C2-30-100
CORRIDOR
C2-04-100
CORRIDOR
C2-11-100
CORRIDOR
C2-31-100
CORRIDOR
C2-08-100
CORRIDOR
C2-15-100
CORRIDOR
C2-19-100
CORRIDOR
C2-24-100
CORRIDOR
C2-01-100
CORRIDOR
MG-1MG-1MG-1MG-1
MG-1
MG-1
MG-1MG-1MG-1MG-1
MG-1
MG-1
MG-1
MG-1
MG-1 MG-1
MG-1
MG-1
4" MV
UP/DN
3/4" MV 1/2" MA
1/2" O2
3" MV
2" MA
1 1/2" O2
3/4" MV
1/2" MA
1/2" O2
3/4" O2
3/4" MA
1" MV
1/2" O2
1/2" MA
3/4" MV
1" O2
1 1/4" MA
2" MV
2" MV
1 1/4" MA
1" O2
1" O2
1 1/4" MA
2" MV
1" MV 1" MV
3/4" MA 3/4" O23/4" MA3/4" O2
1" MV
3/4" MA 3/4" O2
1" MV
3/4" MA 3/4" O2
3/4" MV
1/2" MA 1/2" O2
1/2" O2
1/2" MA
3/4" MV
3/4" O2
3/4" MA
1" MV
3/4" O2
3/4" MA
1" MV
3/4" MV
1/2" MA
1/2" O2
1/2" MA1/2" O2
LINE
PRESSURE
SWITCHES
LINE PRESSURE
SWITCHES3/4" O2
3/4" MA
1 1/2" MV
2" O2
DN
1 1/2" MV
UP
4" MV
DN1 1/2" MA
UP
2 1/2" MA
DN
2A238B-100
NURSE
WORKROOM
GENERAL NOTES
1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL
NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER
THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL
STRUCTURE PACKAGE, DATED 17 DEC 2018.
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B A
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:4
A
M
100.MG-102-A
MEDICAL GAS - FLOOR PLAN - LEVEL 02
- AREA A
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
SCALE: 1/8" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL 02 - AREA A 16'4' 8'0-4'
Revision Number
A
O
MLKJHGF
BUILDING OUTLINE ABOVE
2B261-100
MICU
PATIENT
ROOM 9
2B241-100
MICU
PATIENT
ROOM 3
2B247-100
MICU
PATIENT
ROOM 4,
NEG
ISOLATION
2B253-100
MICU
PATIENT
ROOM 6
2B239-100
MICU
PATIENT
ROOM 2
2B259-100
MICU
PATIENT
ROOM 8
2B249-100
MICU
PATIENT
ROOM 5,
NEG
ISOLATION
2B269-100
MICU
PATIENT
ROOM 12
2B221-100
CICU
PATIENT
ROOM 7
2B229-100
CICU
PATIENT
ROOM
10, NEG
ISOLATION
2B223-100
CICU
PATIENT
ROOM 8
2B215-100
CICU
PATIENT
ROOM 5
2B265-100
MICU
PATIENT
ROOM 10
2B203-100
CICU
PATIENT
ROOM 1 2B211-100
CICU
PATIENT
ROOM 4
2B267-100
MICU
PATIENT
ROOM 11
2B209-100
CICU
PATIENT
ROOM 3 2B227-100
CICU
PATIENT
ROOM 9
2B205-100
CICU
PATIENT
ROOM 2
2B249B-100
ANTEROOM
2B231B-100
ANTEROOM
2B247B-100
ANTEROOM
2B229B-100
ANTEROOM
S2-03-100
STAIR 3
LEVEL 2
2B241A-100
BATHROOM,
PATIENT
2B269A-100
BATHROOM,
PATIENT
2B247A-100
BATHROOM,
PATIENT
2B265A-100
BATHROOM,
PATIENT
2B249A-100
BATHROOM,
PATIENT
2B203A-100
BATHROOM,
PATIENT
2B267A-100
BATHROOM,
PATIENT
2B223A-100
BATHROOM,
PATIENT
2B227A-100
BATHROOM,
PATIENT2B205A-100
BATHROOM,
PATIENT
2B215A-100
BATHROOM,
PATIENT
2B235A-100
BATHROOM,
PATIENT
2B221A-100
BATHROOM,
PATIENT
2B209A-100
BATHROOM,
PATIENT
2B229A-100
BATHROOM,
PATIENT
2B217A-100
BATHROOM,
PATIENT
2B237A-100
BATHROOM,
PATIENT
2B239A-100
BATHROOM,
PATIENT
2B211A-100
BATHROOM,
PATIENT
N2B-69-100
NURSE
SUB-STATION
N2B-65-100
NURSE
SUB-STATION
N2B-47-100
NURSE
SUB-STATION
N2B-39-100
NURSE
SUB-STATION
N2B-35-100
NURSE
SUB-STATION
N2B-29-100
NURSE
SUB-STATION
N2B-03-100
NURSE
SUB-STATION
N2B-21-100
NURSE
SUB-STATION
N2B-15-100
NURSE
SUB-STATION
N2B-09-100
NURSE
SUB-STATION
2A272-100
LOUNGE,
STAFF
2A274-100
TOILET,
STAFF
2A204D-100
OFFICE
2A204A-100
OFFICE
2B200-100
TOILET,
FAMILY
ASSIST
2B281-100
STORAGE,
MEDICAL
GAS
2B212-100
MEDICATION
ROOM
2B214-100
NOURISHMENT
STATION
2B287-100
UTILITY,
SOILED
2B202-100
TOILET,
STAFF
V2-03-100
PUBLIC
ELEV
S2-02-100
STAIR 2
LEVEL 2
2B216C-100
CONFERENCE/
REPORT
ROOM
2B216-100
NURSE
STATION,
ICU
2B216D-100
CC
ALCOVE
2B285-100
TOILET,
STAFF
2B283-100
HAC
2B214A-100
FS CART
STORAGE
2B216B-100
WARD
CLERK
2B208-100
TOUCHDOWN
SPACE
2B290-100
UTILITY
ROOM,
CLEAN,
LINEN
2B240C-100
CONFERENCE/
REPORT
ROOM
2B256-100
ELEC
2B280-100
STORAGE,
EQUIPMENT
2B258-100
SIGNAL
2B284-100
NOURISHMENT
STATION
2B240-100
NURSE
STATION,
ICU
2B262-100
OI&T
2B260-100
TEAM
ROOM
2B275-100
GREETER
2B284A-100
FS CART
STORAGE
2B240D-100
CC
ALCOVE
2B240B-100
WARD
CLERK
2B282-100
BLOOD
GAS LAB
2B272-100
OFFICE
2B270-100
OFFICE
2B288-100
TOILET,
STAFF
2B286-100
TOILET,
STAFF
2B254-100
MEDICATION
ROOM
2B271-100
CONSULTATION
ROOM
2B273-100
CONSULTATION
ROOM
2A207-100
VISITOR
KITCHENETTE
2A205-100
KIOSK,
PATIENT
EDUC/
RESRC
2B268-100
LOUNGE,
STAFF
2B274-100
TOILET,
PUBLIC
2A206-100
KIOSK,
PATIENT
EDUC/
RESRC
2A203-100
WAITING/
LOUNGE
2B237-100
MICU
PATIENT
ROOM 1
C2-12-100
CORRIDOR
N2-27-100
NURSE
SUB-STATION
C2-17-100
CORRIDOR
C2-18-100
CORRIDOR
C2-19-100
CORRIDOR
2B216e-100
ALCOVE
2A276A-100
MOBILE
X-RAY
ALCOVE
3" MV
1 1/2" MA
1 1/4" O2
2" MV
1 1/4" MA
1" O2
LPA-2B2
ZVB-2B1
LPA-2B1
MG-1 MG-1
ALL SERVICE VALVES SHALL BE
LOCKED OPEN, EACH LINE TO
INCLUDE SHUT OFF VALVE TO
ISOLATE THIS SCOPE OF WORK
2B204-100
PATIENT
SHOWER
M
AT
C H
LI
NE
R
EF
6F
0.
M G
-1
-A
LPA LOCATION AT NURSE WORKROOM
TO BE COORDINATED WITH FACILITIES
AND ARCHITECTURAL ELEVATIONS.
LPA LOCATION AT CC ALCOVE TO
BE COORDINATED WITH FACILITIES
AND ARCHITECTURAL ELEVATIONS.
2B217-100
CICU
PATIENT
ROOM 6
1/2" O2
1/2" MA
2B261A-100
BATHROOM,
PATIENT
2B259A-100
BATHROOM,
PATIENT
2B255A-100
BATHROOM,
PATIENT
2B231-100
CICU
PATIENT
ROOM
11, NEG
ISOLATION
2B231A-100
BATHROOM,
PATIENT
MG-3
1 1/2" O22" MA3" MV
1" O2
1 1/4" MA
2" MV
3" MV
2" MA
1 1/2" O2
C2-14-100
CORRIDOR
C2-15-100
CORRIDOR
C2-19-100
CORRIDOR
C2-24-100
CORRIDOR
2B235-100
CICU
PATIENT
ROOM 12
C2-13-100
CORRIDOR
C2-20-100
CORRIDOR
C2-01-100
CORRIDOR
C2-22-100
CORRIDOR
MG-1 MG-1 MG-1 MG-1 MG-1
MG-1
MG-1
MG-1
MG-1
MG-1
MG-1
MG-1MG-1MG-1
MG-1 MG-1 MG-1 MG-1
MG-1MG-1MG-1 MG-1
3" MV
2" MA
1 1/2" O2
ZVB-2B2
1" O2
1 1/4" MA2" MV
1 1/2" MV
UP
1 1/2" MA
UP
1" O2
UP
1" MV
3/4" MA
3/4" O2
3/4" MV
1/2" MA
1/2" O2
1" MV 3/4" MA 3/4" O2
1" MV 3/4" MA 3/4" O2
1" MV 3/4" MA 3/4" O2
3/4" MV 1/2" MA
1/2" O2
2" MV
1 1/4" MA
1" O2
2" MV
1 1/4" MA
1" O2
1" O2 1 1/4" MA 2" MV
3/4" O2
3/4" MA
1" MV
3/4" O2
3/4" MA
1" MV
3/4" O2 3/4" MA 1" MV
1" MV 3/4" MA 3/4" O2
2B255-100
MICU
PATIENT
ROOM 7
2B253A-100
BATHROOM,
PATIENT3/4" O2 3/4" MA 1" MV
1/2" O2
1/2" MA
3/4" MV
3" MV
2" MA
1 1/2" O2
1/2" MA1/2" O2
LINE PRESSURE
SWITCHES
LINE PRESSURE
SWITCHES
2B216A-100
NURSE
WORKROOM
GENERAL NOTES
1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL
NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER
THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL
STRUCTURE PACKAGE, DATED 17 DEC 2018.
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B A
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:5
A
M
100.MG-102-B
MEDICAL GAS - FLOOR PLAN - LEVEL 02
- AREA B
03 JAN 2023 Breanne D.
Hanson
Ricardo A.
Treviño
FINAL AS-BUILT
SUBMISSION
SCALE: 1/8" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL 02 - AREA B
16'4' 8'0-4'
Revision Number
ED
2IA180-100
MECHANICAL
ROOM
2IA180-100
MECHANICAL
ROOM
1 1/2" MV
1 1/2" MA
1" O2
1 1/2" MV
DN
1 1/2" MA
DN
1" O2
DN
1" O2
UP
1 1/2" MA
UP
1 1/2" MV
UP
C JHG
1 1/2" MV
UP 1 1/2" MA
UP
1" O2
UP
GENERAL NOTES
1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL
NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER
THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL
STRUCTURE PACKAGE, DATED 17 DEC 2018.
HGF
6" MA
UP/DN
4" MV
UP/DN
4" MV4" MV
UP
RECORD DOCUMENTS
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B A
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
P -R
-C
E N
T R
A L .r v t
/2 /2
:5
:5
A
M
100.MG-102I
MEDICAL GAS - FLOOR PLAN -
INTERSTITIAL - AREAS A&B
03 JAN 2023 Breanne D.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .