PATIENT ROOM #4 ISO

2D-252l

CORRIDOR

C2-30-100

1/2"O2, MA & 3/4"MV TO BE

REMOVED BACK TO SHUT-OFF

VALVES. CAP GAS TIGHT.

REMOVE ALL

CEILING OUTLETS

1/2" MA

(E)

3/4" MV

(E)

1/2" O2 (E)

AC

E.10

E.9

GENERAL NOTES

1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL

NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER

THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL

STRUCTURE PACKAGE, DATED 17 DEC 2018.

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B A

SEC 1SEC 2

SEC 3

SEC 4SEC 5SEC 6

SEC 7

SEC 8SEC 9

SEC 10

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:3

A

M

01.MGD-102

MEDICAL GAS - FLOOR PLAN -

DEMOLITION - LEVEL 02 - SECTOR 13

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

SCALE: 1/4" = 1'-0"6D

MEDICAL GAS FLOOR PLAN - DEMOLITION - LEVEL 02 - SECTOR

16' 32'8'0-8'

Revision Number

Revisions: Date:

1 RECORD DRAWINGS 03 JAN 2023

AC

AC

E.10 E.10

E.9 E.9

4" RD

(E) UP

4" RD

(E) UP

4" RD

(E) UP

4" RD

(E)

AC

AC

E.10 E.10

E.9 E.9

4"

RD (E)

4" RD

(E) UP

4" RD

(E) UP

4" RD

(E) UP

4" RD

(E)

4"

RD (D)

REFER TO CIVIL FOR

CONTINUATION

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

SECTOR 1SECTOR 3SECTOR 4

SECTOR 5SECTOR 6SECTOR 8

SECTOR 9

SECTOR 7

SECTOR 10SECTOR 11SECTOR 12

SECTOR 13SECTOR 14SECTOR 15SECTOR 16

SECTOR 17SECTOR 18SECTOR 19SECTOR 20

SECTOR 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

21 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

3 4

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:4

A

M

01.P-100

PLUMBING - UNDERFLOOR PLAN -

SECTOR 13

03 JAN 2023 Breanne D.

Hanson

Ricardo Soto

FINAL AS-BUILT

SUBMISSION

SCALE: 1/4" = 1'-0"F5 PLUMBING UNDERFLOOR PLAN - RENOVATION - SECTOR 13

SCALE: 1/4" = 1'-0"F2 PLUMBING UNDERFLOOR PLAN - DEMOLITION - SECTOR 13

Revision Number

4" RD

(E)

AC

E.10

E.9

4" RD

GENERAL NOTES

1. REFER TO DRAWING 100.P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO PLUMBING RISERS FOR ADDITIONAL PIPE SIZES AND INFORMATION.

3. COORDINATE PIPING AND ACCESSORIES SHOWN ON THIS SHEET WITH ALL TRADES. THE PIPING LAYOUT IS

INTENDED TO PROVIDE THE OVERALL ENGINEERING DESIGN CONCEPT AND DOES NOT PROVIDE FOR

RELOCATIONS, OFFSETS, ETC. REQUIRED BY FIELD COORDINATION OF ALL TRADES.

4. PROVIDE AND INSTALL SHUTOFF VALVES AT ALL TAKEOFFS FROM MAIN PIPING. INSTALL VALVES NEAR THE PIPING MAIN UNLESS ACCESSIBILITY IS COMPROMISED TO THE VALVE LOCATION OR INDICATED

OTHERWISE ON THE DRAWING.

5. ALL VALVES AND ACCESSORIES REQUIRING ACCESS THAT ARE LOCATED ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILINGS SHALL BE PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY THE GENERAL CONTRACTOR. THE PLUMBING CONTRACTOR SHALL COORDINATE THE EXACT

LOCATION OF ACCESS PANELS WITH THE GENERAL CONTRACTOR.

6. SLEEVE ALL PIPING THAT PENETRATES FIRE RATED WALLS, FLOORS AND PARTITIONS. PENETRATIONS SHALL BE SEALED WITH A U.L. LISTED ASSEMBLY TO PROVIDE A RATING EQUAL TO OR GREATER THAN

THAT OF THE PENETRATED WALL, FLOOR OR PARTITION.

7. ALL PIPING SHALL BE IDENTIFIED IN ACCORDANCE WITH THE SPECIFICATIONS.

8. COORDINATE LOCATION OF FLOOR DRAINS/SINKS WITH STRUCTURE, ASSOCIATED EQUIPMENT AND

ARCHITECT.

9. INSTALL MIXING VALVES AS CLOSE TO THE FIXTURE AS POSSIBLE TO REDUCE THE AMOUNT OF STORED

TEMPERED WATER AND REDUCE THE RISK OF LEGIONELLA GROWTH.

KEY NOTES

KEY NOTE SYMBOLX

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

SECTOR 1SECTOR 3SECTOR 4

SECTOR 5SECTOR 6SECTOR 8

SECTOR 9

SECTOR 7

SECTOR 10SECTOR 11SECTOR 12

SECTOR 13SECTOR 14SECTOR 15SECTOR 16

SECTOR 17SECTOR 18SECTOR 19SECTOR 20

SECTOR 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

21 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

3 4

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:4

A

M

01.P-101

PLUMBING - FLOOR PLAN - LEVEL 01

SECTOR 13

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

SCALE: 1/4" = 1'-0"6D PLUMBING FLOOR PLAN - RENOVATION - LEVEL 01 - SECTOR 13

1 EXISTING (E) 4" ROOF DRAIN IN CEILING AND DOWN TO BELOW SLAB TO

REMAIN.

2 RELOCATED ROOF DRAIN. TIE BACK INTO EXISTING ROOF DRAIN ABOVE

CEILING.

Revision Number

4"RD

PATIENT ROOM #4 ISO

2D-252l

FREEZER

2A-205d

1/2" DHW

(E)

1/2" DCW

(E)

2" V (E)

CAP WATER AND VENT

LINES WATER/GAS TIGHT

2D-252n

MULTI-PURPOSE

WORKROOM

2D-252k

PATIENT

ROOM #5

2A-205b

COMPUTER

ROOM

2A-205a

OFFICE

2A-205

KITCHEN

AC

E.10

E.9

GENERAL NOTES

1. REFER TO DRAWING 100.P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO PLUMBING RISERS FOR ADDITIONAL PIPE SIZES AND INFORMATION.

3. COORDINATE PIPING AND ACCESSORIES SHOWN ON THIS SHEET WITH ALL TRADES. THE PIPING LAYOUT IS

INTENDED TO PROVIDE THE OVERALL ENGINEERING DESIGN CONCEPT AND DOES NOT PROVIDE FOR

RELOCATIONS, OFFSETS, ETC. REQUIRED BY FIELD COORDINATION OF ALL TRADES.

4. PROVIDE AND INSTALL SHUTOFF VALVES AT ALL TAKEOFFS FROM MAIN PIPING. INSTALL VALVES NEAR THE PIPING MAIN UNLESS ACCESSIBILITY IS COMPROMISED TO THE VALVE LOCATION OR INDICATED

OTHERWISE ON THE DRAWING.

5. ALL VALVES AND ACCESSORIES REQUIRING ACCESS THAT ARE LOCATED ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILINGS SHALL BE PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY THE GENERAL CONTRACTOR. THE PLUMBING CONTRACTOR SHALL COORDINATE THE EXACT

LOCATION OF ACCESS PANELS WITH THE GENERAL CONTRACTOR.

6. SLEEVE ALL PIPING THAT PENETRATES FIRE RATED WALLS, FLOORS AND PARTITIONS. PENETRATIONS SHALL BE SEALED WITH A U.L. LISTED ASSEMBLY TO PROVIDE A RATING EQUAL TO OR GREATER THAN

THAT OF THE PENETRATED WALL, FLOOR OR PARTITION.

7. ALL PIPING SHALL BE IDENTIFIED IN ACCORDANCE WITH THE SPECIFICATIONS.

8. COORDINATE LOCATION OF FLOOR DRAINS/SINKS WITH STRUCTURE, ASSOCIATED EQUIPMENT AND

ARCHITECT.

9. INSTALL MIXING VALVES AS CLOSE TO THE FIXTURE AS POSSIBLE TO REDUCE THE AMOUNT OF STORED

TEMPERED WATER AND REDUCE THE RISK OF LEGIONELLA GROWTH.

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

SECTOR 1SECTOR 3SECTOR 4

SECTOR 5SECTOR 6SECTOR 8

SECTOR 9

SECTOR 7

SECTOR 10SECTOR 11SECTOR 12

SECTOR 13SECTOR 14SECTOR 15SECTOR 16

SECTOR 17SECTOR 18SECTOR 19SECTOR 20

SECTOR 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

21 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

3 4

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:4

A

M

01.P-102

PLUMBING - FLOOR PLAN -

RENOVATION - LEVEL 02 SECTOR 13

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

SCALE: 1/4" = 1'-0"6D PLUMBING FLOOR PLAN - RENOVATION - LEVEL 02 - SECTOR 13

Revision Number

4"

RD(D)

4"

RD (E)UP

2 2

4" RD

(E)

AC

E.10

E.9

01.5

01.4

AC

KEY NOTES

KEY NOTE SYMBOLX

GENERAL DEMOLITION NOTES

1. CONTACT GENERAL CONTRACTOR PRIOR TO ANY DISTURBANCE IN EXISTING BUILDINGS. WORK PLANS ARE REQUIRED FOR ANY WORK IN EXISTING BUILDINGS. WORK PLANS SHALL ADDRESS ANY IDENTIFIED HAZARDOUS MATERIALS AND INCLUDE PROPER PROTOCOLS. SEE SPECIFICATIONS 028311 - ASBESTOS ABATEMENT AND 028333.13 - LEAD-BASED PAINT REMOVAL FOR ANY WORK IN AREAS IDENTIFIED IN HAVING

HAZARDOUS MATERIALS.

2. PRIOR TO BEGINNING EXCAVATIONS OR DEMOLITION OF ANY NATURE WHATSOEVER, CONTRACTOR SHALL LOCATE ALL SERVICES AND UTILITIES OCCURRING WITHIN THE BOUNDS OF THE PROJECT. THE CONTRACTOR SHALL THEN PROCEED WITH CAUTION IN HIS WORK SO THAT NO UTILITY OR LINE SERVING AREAS THAT ARE TO REMAIN IS DAMAGED WITH A RESULTANT LOSS OF SERVICE. VERIFY THE SOURCE AND SERVICE OF EACH AND EVERY LINE ENCOUNTERED AND RECORD EACH SERVICE, SIZE, AND

LOCATION ON RECORD DRAWINGS.

3. ALL PLUMBING FIXTURES AND EQUIPMENT REMOVED SHALL BE SUBMITTED TO THE OWNER WITH THE OPTION TO BE REUSED. ITEMS THE OWNER DOES NOT WISH TO REUSE BUT WISHES TO RETAIN SHALL BE DELIVERED TO STORAGE AS DIRECTED BY THE OWNER. ITEMS THE OWNER DOES NOT WISH TO REUSE OR RETAIN SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF LEGALLY.

4. PLUG PIPES AND PATCH FLOOR FLUSH WITH EXISTING SLAB ON GRADE AT ANY PLUMBING FLOOR

PENETRATIONS NO LONGER REQUIRED.

5. CONTRACTOR SHALL REMOVE ALL PIPING AND ASSOCIATED SUPPORTS FROM ABOVE SLAB ON GRADE TO

BELOW ROOF WHICH WAS PREVIOUSLY ABANDONED OR WHICH SERVES PLUMBING FIXTURES AND

EQUIPMENT DESIGNATED FOR REMOVAL. REFER TO PLUMBING FLOOR PLANS FOR NEW FIXTURES OR EQUIPMENT TO BE INSTALLED IN THOSE LOCATIONS. PRIOR TO ANY REMOVAL, FIELD VERIFY THAT LINES TO BE REMOVED DO NOT SERVE ANY FIXTURES OR EQUIPMENT TO REMAIN. CAP REMOVED BRANCH LINES

AS CLOSE AS POSSIBLE TO EXISTING MAINS.

6. ALL PLUMBING FIXTURES AND EQUIPMENT NOT SPECIFICALLY IDENTIFIED FOR REMOVAL SHALL REMAIN.

THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONFLICTS

FOUND IN THE FIELD.

7. CONTRACTOR SHALL FIELD VERIFY AS NECESSARY THE EXACT LOCATION OF PLUMBING FIXTURES, PIPING, AND EQUIPMENT TO BE REMOVED. REFER TO ARCHITECTURAL DRAWINGS FOR CLARIFICATION AS

REQUIRED.

8. COORDINATE EACH AND EVERY INTERRUPTION OF SERVICES AND UTILITIES IN ADVANCE WITH THE OWNER, FIRE DEPARTMENT, AND UTILITY COMPANIES TO ENSURE MINIMAL SHUT DOWN TIMES THAT ARE

ACCEPTABLE TO THE OWNER AND AUTHORITIES.

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

SECTOR 1SECTOR 3SECTOR 4

SECTOR 5SECTOR 6SECTOR 8

SECTOR 9

SECTOR 7

SECTOR 10SECTOR 11SECTOR 12

SECTOR 13SECTOR 14SECTOR 15SECTOR 16

SECTOR 17SECTOR 18SECTOR 19SECTOR 20

SECTOR 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

21 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

3 4

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:5

A

M

01.PD-101

PLUMBING - FLOOR PLAN - DEMOLITION

- LEVEL 01 SECTOR 13 AND 5

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

SCALE: 1/4" = 1'-0"6D PLUMBING FLOOR PLAN - DEMOLITION - LEVEL 01 - SECTOR 13

SCALE: 1/4" = 1'-0"3D PLUMBING FLOOR PLAN - DEMOLITION - LEVEL 01 - SECTOR 5

1 REMOVE SINK. REMOVE WATER AND SANITARY VENT SERVICES BACK TO MAIN

BRANCH AND CAP WATER/GAS TIGHT. REMOVE SANITARY WASTE TO BELOW

FLOOR AND CAP GAS TIGHT. PATCH CONCRETE TO MATCH EXISTING FLOOR.

2 EXISTING (E) 4" ROOF DRAIN IN CEILING AND DOWN TO BELOW SLAB TO

REMAIN.

3 ROOF DRAIN PIPING IN CEILING AND DOWN TO BELOW SLAB TO REMAIN.

Revision Number

GENERAL DEMOLITION NOTES

1. CONTACT GENERAL CONTRACTOR PRIOR TO ANY DISTURBANCE IN EXISTING BUILDINGS. WORK PLANS ARE REQUIRED FOR ANY WORK IN EXISTING BUILDINGS. WORK PLANS SHALL ADDRESS ANY IDENTIFIED HAZARDOUS MATERIALS AND INCLUDE PROPER PROTOCOLS. SEE SPECIFICATIONS 028311 - ASBESTOS ABATEMENT AND 028333.13 - LEAD-BASED PAINT REMOVAL FOR ANY WORK IN AREAS IDENTIFIED IN HAVING

HAZARDOUS MATERIALS.

2. PRIOR TO BEGINNING EXCAVATIONS OR DEMOLITION OF ANY NATURE WHATSOEVER, CONTRACTOR SHALL LOCATE ALL SERVICES AND UTILITIES OCCURRING WITHIN THE BOUNDS OF THE PROJECT. THE CONTRACTOR SHALL THEN PROCEED WITH CAUTION IN HIS WORK SO THAT NO UTILITY OR LINE SERVING AREAS THAT ARE TO REMAIN IS DAMAGED WITH A RESULTANT LOSS OF SERVICE. VERIFY THE SOURCE AND SERVICE OF EACH AND EVERY LINE ENCOUNTERED AND RECORD EACH SERVICE, SIZE, AND

LOCATION ON RECORD DRAWINGS.

3. ALL PLUMBING FIXTURES AND EQUIPMENT REMOVED SHALL BE SUBMITTED TO THE OWNER WITH THE OPTION TO BE REUSED. ITEMS THE OWNER DOES NOT WISH TO REUSE BUT WISHES TO RETAIN SHALL BE DELIVERED TO STORAGE AS DIRECTED BY THE OWNER. ITEMS THE OWNER DOES NOT WISH TO REUSE OR RETAIN SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF LEGALLY.

4. PLUG PIPES AND PATCH FLOOR FLUSH WITH EXISTING SLAB ON GRADE AT ANY PLUMBING FLOOR

PENETRATIONS NO LONGER REQUIRED.

5. CONTRACTOR SHALL REMOVE ALL PIPING AND ASSOCIATED SUPPORTS FROM ABOVE SLAB ON GRADE TO

BELOW ROOF WHICH WAS PREVIOUSLY ABANDONED OR WHICH SERVES PLUMBING FIXTURES AND

EQUIPMENT DESIGNATED FOR REMOVAL. REFER TO PLUMBING FLOOR PLANS FOR NEW FIXTURES OR EQUIPMENT TO BE INSTALLED IN THOSE LOCATIONS. PRIOR TO ANY REMOVAL, FIELD VERIFY THAT LINES TO BE REMOVED DO NOT SERVE ANY FIXTURES OR EQUIPMENT TO REMAIN. CAP REMOVED BRANCH LINES

AS CLOSE AS POSSIBLE TO EXISTING MAINS.

6. ALL PLUMBING FIXTURES AND EQUIPMENT NOT SPECIFICALLY IDENTIFIED FOR REMOVAL SHALL REMAIN.

THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONFLICTS

FOUND IN THE FIELD.

7. CONTRACTOR SHALL FIELD VERIFY AS NECESSARY THE EXACT LOCATION OF PLUMBING FIXTURES, PIPING, AND EQUIPMENT TO BE REMOVED. REFER TO ARCHITECTURAL DRAWINGS FOR CLARIFICATION AS

REQUIRED.

8. COORDINATE EACH AND EVERY INTERRUPTION OF SERVICES AND UTILITIES IN ADVANCE WITH THE OWNER, FIRE DEPARTMENT, AND UTILITY COMPANIES TO ENSURE MINIMAL SHUT DOWN TIMES THAT ARE

ACCEPTABLE TO THE OWNER AND AUTHORITIES.

PATIENT ROOM #4 ISO

2D-252l

FREEZER

2A-205d

4"RD(D)

2" V (E)

1/2" DCW

(E)

1/2" DHW

(E)

REMOVE ROOF DRAIN. INSPECT ROOF

DRAIN FOR RE-USE.

REMOVE DCW, DHW VENT ABOVE CEILING BACK TO

SHUT-OFF VALVES. CAP WATER /GAS TIGHT. REMOVE

WASTE TO BELOW FLOOR AND CAP GAS TIGHT. PATCH

CONCRETE TO MATCH.

AC

E.10

E.9

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

SECTOR 1SECTOR 3SECTOR 4

SECTOR 5SECTOR 6SECTOR 8

SECTOR 9

SECTOR 7

SECTOR 10SECTOR 11SECTOR 12

SECTOR 13SECTOR 14SECTOR 15SECTOR 16

SECTOR 17SECTOR 18SECTOR 19SECTOR 20

SECTOR 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

21 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

3 4

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:5

A

M

01.PD-102

PLUMBING - FLOOR PLAN - DEMOLITION

- LEVEL 02 SECTOR 13

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

SCALE: 1/4" = 1'-0"6D PLUMBING FLOOR PLAN - DEMOLITION - LEVEL 02 - SECTOR 13

Revision Number

S T L.

R A

IL

IN

G

S T L.

R A

IL

IN

G

E .W .C

A C

A C

M O T O R

U P

D O W N

D O W N

T O

P

IP

E

B A S E M E N T

D O W N

D O W N

U P

D O W N

U P

UP

UP

W H E E L C H A

IR

R A M P

W H E E L C H A

IR

R A M P

U P

PLENUM

P A S S T H R U

W

IN

D O W

A B O V E

M E T A L D E C K

M H

O

3" O2

3" O2

3" O2

CONNECT NEW 3' OXYGEN LINE, WITH SHUT OFF VALVE, TO

EXISTING OXYGEN STORAGE TANK AND ROUTE DOWN TO

BELOW GRADE PER NFPA 99 AT A MINIMUM DEPTH OF 2' IN

ACCORDANCE WITH VA GUIDELINES. REFER TO BULK TANK

SCHEMATIC 9E/100.MG-501

EXISTING BULK OXYGEN

STORAGE TANK

BURIED OXYGEN PIPE

PVC, ASTM D1785,

SCHEDULE 80 MINIMUM 2'-0"

BELOW GRADE

BELOW GRADE OXYGEN PIPE SLEEVED PENETRATION

THRU BASEMENT FOUNDATION WALL, INTO BUILDING 2

BASEMENT. CORE DRILL FOUNDATION WALL AND PROVIDE

LINK SEAL AND WATERPROOFING. RE.: 9F/100.MG-501

OXYGEN PIPE ROUTED IN

BASEMENT OF BUILDING 2 TIGHT TO

BOTTOM OF STEEL STRUCTURE

CONTINUE 3" OXYGEN PIPE THRU

BASEMENT CORRIDOR FROM BUILDING 2.

CORE DRILL PENETRATION THRU

CONCRETE WALL ABOVE DOOR HEADER.

REFER TO BULK TANK

SCHEMATIC 9E/100.MG-501

NO FUTURE VALVE AVAILABLE THEREFORE AUXILIARY

OXYGEN SOURCE REQUIRED TO ISOLATE AND SHUT

DOWN THE MAIN BULK TANK AND INSTALL A VALVE FOR

NEW BED TOWER OXYGEN LINE. REFER TO BULK TANK

SCHEMATIC 9E/100.MG-501

CONTRACTOR TO LOCATE/SCAN REINFORCING PRIOR

TO CORE DRILLING. CONTRACTOR TO LOCATE CORE

OPENING TO MISS REINFORCING BARS.

HATCH AREA INDICATES

LIMITS OF BUILDING 1.

CONTINUE 3" OXYGEN PIPE THRU

BASEMENT CORRIDOR FROM BUILDING 2.

CORE DRILL PENETRATION THRU

CONCRETE WALL ABOVE DOOR HEADER.

CONTINUE 3" OXYGEN PIPE THRU

BASEMENT CORRIDOR FROM BUILDING 2.

CORE DRILL PENETRATION THRU

CONCRETE WALL ABOVE DOOR HEADER.

REFER TO SHEET 100.MG-100G FOR

CONTINUATION

3" O2

3" O2

METAL CONDUIT FOR MEDICAL

GAS ALARM WIRING REQUIRED

GENERAL NOTES

1. CONTRACTOR SHALL INFORM ENGINEER AND OWNER OF ANY CONDITIONS PREVIOUSLY

UNDISCOVERED, WHICH IMPACT THE ABILITY TO PERFORM THE DEMOLITION WORK AS DESCRIBED.

2. CONTRACTOR TO VERIFY ELECTRICAL SERVICES (SOURCES AT END POINT-OF-USE) PRIOR TO

DISCONNECTING ANY SUCH SERVICES.

3. CONTRACTOR TO USE EXTREME CAUTION WHEN PERFORMING ANY DEMOLITION WORK OR

EXCAVATION. EXISTING UNDERGROUND UTILITIES MAY BE PRESENT ALTHOUGH THEY MAY NOT BE

INDICATED ON DRAWINGS OR OTHER DOCUMENTATION.

4. CONTRACTOR TO COORDINATE DEMOLITION WORK WITH EXISTING UTILITY SERVICES. AVOID DEMOLISHING ANY ITEMS THAT WOULD IMPACT ONGOING OPERATIONS TO THE FACILITY WITHOUT

PRIOR COORDINATION WITH THE OWNER.

5. RECERTIFY ANY IMPACTED MEDICAL GAS SYSTEMS IN ACCORDANCE WITH NFPA99.

6. THIS DRAWING REPRESENTS ONLY GENERAL LOCATION AND ROUTING OF EXISTING PIPING AND

EQUIPMENT. ACTUAL LOCATIONS SHALL BE DETERMINED BY THE CONTRACTOR WHO SHALL

COORDINATE ALL WORK WITH ALL TRADES NECESSARY TO DEMOLISH EXISTING SYSTEMS AND/OR

INSTALL NEW PIPING OR EQUIPMENT AS SHOWN.

7. "HOT TAPS" ARE PROHIBITED FOR OPERATING MEDICAL OXYGEN SYSTEMS.

8. APPLY PIPING IDENTIFICATION LABELS AT THE TIME OF INSTALLATION IN ACCORDANCE WITH NFPA99.

APPLY SUPPLEMENTARY COLOR IDENTIFICATION IN ACCORDANCE WITH CGA PAMPHLET C-9.

9. 3" TO 4" INLINE BALL VALVES ARE BRONZE/BRASS BODY, STRAIGHT THROUGH DESIGN FOR MINIMUM

PRESSURE DROP, SPRING LOADED, SELF-ALIGNING WITH TEFLON CONE SEAT, VIBRATION FREE, SILENT OPERATION, SUPPLIED NPT FEMALE THREADS AT EACH END WITH FLOW DIRECTION ARROW

PERMANENTLY CAST INTO, CLEANED FOR OXYGEN USE AND LABELED FOR INTENDED SERVICE.

10. OPEN ENDS OF TUBE SHALL BE CAPPED OR PLUGGED AT ALL TIMES OR OTHERWISE SEALED UNTIL

FINAL ASSEMBLY TO PREVENT INFILTRATION OF ANY FOREIGN MATTER.

11. CUT PIPING SQUARE AND ACCURATELY WITH A TUBE CUTTER. (SAWING IS PROHIBITED) TO MEASUREMENTS DETERMINED AT PLACE OF INSTALLATION. REAM TUBE TO REMOVE BURRS, BEING CAREFUL NOT TO EXPAND TUBE, AND SO NO CHIPS OF COPPER REMAIN IN THE TUBE. WORK INTO

SPACE WITHOUT SPRINGING OR FORCING. BOTTOM TUBE IN SOCKET SO THERE ARE NO GAPS

BETWEEN TUBE AND FITTING. EXERCISE CARE IN HANDLING EQUIPMENT AND TOOLS USED IN CUTTING OR REAMING OF TUBE TO PREVENT OIL OR GREASE FROM BEING INTRODUCED INTO TUBING. WHERE

CONTAMINATION HAS OCCURRED, MATERIAL IS NO LONGER SUITABLE FOR OXYGEN SERVICE.

12. RIGIDLY SUPPORT VALVES AND OTHER EQUIPMENT TO PREVENT STRAIN ON TUBE OR JOINTS.

13. DO NOT BEND TUBING. USE FITTINGS.

Key Plan

NORTH

BLDG. 2

BLDG. 1

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:5

A

M

100.MG-100

MEDICAL GAS - SITE PLAN

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

SCALE: 1/16" = 1'-0"6F MEDICAL GAS SITE PLAN GROUND LEVEL

16' 32'8'0-8'

Revision Number

MLKJHGFEDBA

BUILDING OUTLINE ABOVE

BUILDING OUTLINE ABOVE

ENCLOSED CONNECTOR

T O

C

LC

COOLING TOWERS

C

A

B

Key Plan

NORTH

GENERAL NOTES

1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL

NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER

THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL

STRUCTURE PACKAGE, DATED 17 DEC 2018.

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:0

A

M

100.MG-100G

MEDICAL GAS - FLOOR PLAN LEVEL G

COMPOSITE

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

16' 32'8'0-8'

SCALE: 1/16" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL 0G COMPOSITE

Revision Number

GFEDBA

BUILDING OUTLINE ABOVE

ENCLOSED CONNECTOR

GB001-100

COMPUTER

TERMINAL

SERVER

GB003-100

COMMAND

SERVER

GB002-100

TLT/

SHWR,

STAFF

GA060-100

ELEC

V0-04-100

SERVICE

ELEV

GA012-100

DISPOSAL

CHUTE

ROOM,

TRASH

GA011-100

DISPOSAL

CHUTE

ROOM,

LINEN GA010-100

HAC

GA009-100

RECEIVING

FOOD

COURT/

SERVICE

GB000-100

ESSENTIAL

ELECTRICAL

ROOM

GA006-100

FIRE

PUMP

GA005-100

PATIENT

TRAY

ASSEMBLY

GA009C-100

SANITATION

RECYCLING

GA007-100

MED

AIR/VAC

GA054-100

OI&T

GA058-100

SIGNAL

GA009A-100

ELEV

MACHINE

ROOM

GA004-100

EQUIPMENT

DISTRIBUTION

GA013-100

TUG /

STORAGE

GA014-100

WASTE

PUMPER

SYSTEM

GA005A-100

HAC

C0-04-100

CORRIDOR

ELEVATOR

MH 8

ELEVATOR

MH 7

C0-01-100

CORRIDOR

ELEVATOR

CS1

C0-02-100

CORRIDOR

C0-03-100

CORRIDOR

GA009B-100

RECEIVING

AREA

C0-06-100

CONNECTOR

CORRIDOR

100.MG-401

8C

3" O2

3"O2 SUPPLY IN BUILDING TUNNEL RACKED

WITH BUILDING CHILLED WATER. REFER TO

MEDICAL GAS SITE PLAN 100.MG-100 FOR

ROUTING THRU SITE, BUILDINGS AND

BASEMENTS.

PLEASE NOTE THAT SHEET 100.MG-100 WAS

ISSUED UNDER THE FINAL FAST TRACK

FOUNDATIONS, MEP ROUGH-IN AND STEEL

STRUCTURE PACKAGE, DATED 17 DEC 2018.

2" O2

3" O2

2" O2

UP

2 1/2" MA

UP

4" MV

UP

MAINTENANCE SHUT

OFF VALVES, MUST

REMAIN LOCKED OPEN

GB007-100

ELEVATOR

PIT

GB006-100

MECHANICAL

ROOM

C

EXTERIOR

4" MV

2 1/2" MA

C0-05-100

CONNECTOR

CORRIDOR

GENERAL NOTES

1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL

NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER

THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL

STRUCTURE PACKAGE, DATED 17 DEC 2018.

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B A

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:0

A

M

100.MG-100G-A

MEDICAL GAS - FLOOR PLAN - LEVEL G -

AREA A

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

SCALE: 1/8" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL G - AREA A 16'4' 8'0-4'

Revision Number

MLKJHGFEDBA

BUILDING OUTLINE ABOVE

BUILDING OUTLINE ABOVE

ENCLOSED CONNECTOR

T O

C

LC

COOLING TOWERS

C

GENERAL NOTES

1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL

NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER

THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL

STRUCTURE PACKAGE, DATED 17 DEC 2018.

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B A

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:1

A

M

100.MG-101

MEDICAL GAS - FLOOR PLAN - LEVEL 01

- COMPOSITE

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

16' 32'8'0-8'

SCALE: 1/16" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL 1 COMPOSITE

Revision Number

GFEDBA

BUILDING OUTLINE ABOVE

ENCLOSED CONNECTOR

1A128-100

SERVING

AREA

1B110-100

VETERAN

MEMORIAL

V1-03-100

PUBLIC

ELEV

1A184-100

FOOD

PREP &

PRODUCTION

1A185-100

STORAGE,

REF/ FRZ

1A128A-100

STORAGE,

NON-FOOD

1A186-100

STORAGE,

REF/ FRZ

1A183-100

STORAGE,

REF/ FRZ

C1-08-100

CORRIDOR

1A180-100

REMOTE

STORAGE,

RECV

1A110-100

STORAGE

1A194B-100

HAC

1A162-100

RETAIL

DISPLAY

STORAGE

1A161-100

FEMALE

TOILET,

MULTIPLE

1A163-100

MALE

TOILET,

MULTIPLE

1A160-100

ELEC

1A158-100

SIGNAL

1A154-100

OI&T

1A169A-100

OFFICE,

SECURE

MONEY

1A137-100

RETAIL

AREA

(COFFEE)

V1-01-100

PATIENT

ELEV

V1-04-100

SERVICE

ELEV

1A137A-100

STORAGE

ROOM

1A169B-100

OFFICE,

VCS

CHIEF

1A169D-100

OFFICE,

VCS

ASST

CHIEF

1A169C-100

OFFICE,

VCS

ASST

CHIEF

1A169E-100

CUBICLE,

CLERK

1A173-100

LOCKER

ROOM

STAFF

1A171-100

LOCKER

ROOM

STAFF

1A175-100

LOUNGE,

STAFF

1A177-100

TOILET,

STAFF

1A179-100

TOILET,

STAFF

1A139-100

STORAGE

ROOM

1A178-100

STORAGE,

RETAIL

1A170-100

VENDING

MACHINE

MASTER

1A191-100

HAC

C1-11-100

CORRIDOR

2" O2

DN

2 1/2" MA

DN

4" MV

DN

4" MV

UP

2 1/2" MA

UP

2" O2

UP

S1-01-100

STAIR 1

LEVEL 1

C1-08-100

CORRIDOR

ELEVATOR

S 6

ELEVATOR

S 5

1A152-100

DINING

AREA

HEALING

GARDEN

1A187-100

STORAGE,

REF/ FRZ

1A106-100

WHEELCHAIR

STORAGE

1A125A-100

INFO

DESK

1A176-100

STORAGE,

DRY

FOOD

ELEVATOR

P 2

ELEVATOR

P 1

ELEVATOR

S 6

ELEVATOR

S 5

C1-10-100

CORRIDOR

1A110A-100

HAC

1A128B-100

SODA

SYSTEM

C1-14-100

CORRIDOR

1A152-100

DINING

AREA

1A125-100

LOBBY/WAITING

1A134-100

DINING

AREA

C1-09-100

CORRIDOR

1A125B-100

CUBICLE,

VOLUNTEER

1A194-100

POT

WASH

AREA

C1-17-100

CORRIDOR

1A125C-100

TELEPHONE

PUBLIC

C1-18-100

CORRIDOR

C1-12-100

CORRIDOR

1A194A-100

DISH

WASH

AREA

4" MV 2 1/2" MA 2" O2

4" MV

2 1/2" MA

2" O2

C

EXTERIOR

4" MV

UP/DN

ALL SERVICE VALVES SHALL BE

LOCKED OPEN, EACH LINE TO

INCLUDE SHUT OFF VALVE TO

ISOLATE THIS SCOPE OF WORK

6" MA

UP/DN

6" MA

UP

6" MA

GENERAL NOTES

1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL

NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER

THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL

STRUCTURE PACKAGE, DATED 17 DEC 2018.

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B A

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:2

A

M

100.MG-101A

MEDICAL GAS - FLOOR PLAN - LEVEL 01

- AREA A

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

SCALE: 1/8" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL 1 - AREA A 16'4' 8'0-4'

Revision Number

M A

O

OMA

MLKJHGFEDBA

BUILDING OUTLINE ABOVE

BUILDING OUTLINE ABOVE

ENCLOSED CONNECTOR

T O

C

LC

COOLING TOWERS

C

GENERAL NOTES

1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL

NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER

THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL

STRUCTURE PACKAGE, DATED 17 DEC 2018.

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B A

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:3

A

M

100.MG-102

MEDICAL GAS - FLOOR PLAN - LEVEL 02

- COMPOSITE

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

16' 32'8'0-8'

SCALE: 1/16" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL 02 COMPOSITE

Revision Number

OMA

GFEDBA

BUILDING OUTLINE ABOVE

ENCLOSED CONNECTOR

2B203-100

CICU

PATIENT

ROOM 1

2B205-100

CICU

PATIENT

ROOM 22B203A-100

BATHROOM,

PATIENT

2B205A-100

BATHROOM,

PATIENT

N2B-03-100

NURSE

SUB-STATION

2A280-100

STORAGE,

EQUIPMENT

2A272-100

LOUNGE,

STAFF

2A274-100

TOILET,

STAFF

2A204C-100

OFFICE

2A204D-100

OFFICE

2A204B-100

OFFICE

2A204A-100

OFFICE

2B200-100

TOILET,

FAMILY

ASSIST 2B202-100

TOILET,

STAFF

V2-03-100

PUBLIC

ELEV

2B275-100

GREETER

2B272-100

OFFICE

2B270-100

OFFICE

2B271-100

CONSULTATION

ROOM

2B273-100

CONSULTATION

ROOM

2A207-100

VISITOR

KITCHENETTE

2A205-100

KIOSK,

PATIENT

EDUC/

RESRC

2B274-100

TOILET,

PUBLIC

2A206-100

KIOSK,

PATIENT

EDUC/

RESRC

2A203-100

WAITING/

LOUNGE

C2-07-100

CORRIDOR

C2-01-100

CORRIDOR

C2-06-100

CORRIDOR

C2-19-100

CORRIDOR

2A251-100

SICU

PATIENT

ROOM 9

2A263-100

SICU

PATIENT

ROOM 13

2A257-100

SICU

PATIENT

ROOM 11

2A241-100

SICU

PATIENT

ROOM 5,

NEG

ISOLATION

2A247-100

SICU

PATIENT

ROOM 7

2A259-100

SICU

PATIENT

ROOM 12

2A231-100

SICU

PATIENT

ROOM 1

2A243-100

SICU

PATIENT

ROOM 6,

NEG

ISOLATION

2A265-100

SICU

PATIENT

ROOM 14

2A233-100

SICU

PATIENT

ROOM 2

2A249-100

SICU

PATIENT

ROOM 8

2A267-100

SICU

PATIENT

ROOM 15

2A237-100

SICU

PATIENT

ROOM 4

2A269-100

SICU

PATIENT

ROOM 16

2A253-100

SICU

PATIENT

ROOM 10

S2-01-100

STAIR 1

LEVEL 2

2A269A-100

BATHROOM,

PATIENT

2A241A-100

BATHROOM,

PATIENT

2A235A-100

BATHROOM,

PATIENT

2A237A-100

BATHROOM,

PATIENT

2A263A-100

BATHROOM,

PATIENT

2A267A-100

BATHROOM,

PATIENT

2A243A-100

BATHROOM,

PATIENT

2A253A-100

BATHROOM,

PATIENT 2A265A-100

BATHROOM,

PATIENT

2A233A-100

BATHROOM,

PATIENT

2A247A-100

BATHROOM,

PATIENT

2A259A-100

BATHROOM,

PATIENT

2A249A-100

BATHROOM,

PATIENT

2A231A-100

BATHROOM,

PATIENT

2A257A-100

BATHROOM,

PATIENT

2A251A-100

BATHROOM,

PATIENT

2A243B-100

ANTEROOM

2A241B-100

ANTEROOM

N2A-67-100

NURSE

SUB-STATION

N2A-63-100

NURSE

SUB-STATION

N2A-57-100

NURSE

SUB-STATION

N2A-51-100

NURSE

SUB-STATION

N2A-41-100

NURSE

SUB-STATION

N2A-47-100

NURSE

SUB-STATION

N2A-35-100

NURSE

SUB-STATION

N2A-31-100

NURSE

SUB-STATION

2A276A-100

MOBILE

X-RAY

ALCOVE

2A276-100

BLOOD

GAS LAB

2A236-100

UTILITY

ROOM,

CLEAN,

LINEN

2A238C-100

CONFERENCE/

REPORT

ROOM

2A260-100

ELEC

2A226-100

EMPL

WELLNESS

2A286A-100

FS CART

STORAGE

2A258-100

SIGNAL

2A282-100

DISPOSAL

CHUTE

ROOM,

LINEN

2A239-100

MEDICATION

ROOM

2A234-100

NOURISHMENT

STATION

2A254-100

OI&T

2A264-100

TEAM

ROOM

2A284-100

DISPOSAL

CHUTE

ROOM,

TRASH

V2-04-100

SERVICE

ELEV

2A238D-100

CC

ALCOVE

2A238A-100

WARD

CLERK

2A262-100

LOCKER

ROOM

STAFF

2A238-100

NURSE

STATION,

ICU

2A227-100

CONSULTATION

ROOM

2A223-100

CONSULTATION

ROOM

2A224-100

TOILET,

STAFF

2A229-100

VENDING

MACHINE

AREA

2A286B-100

WC

ALCOVE

2A289-100

STORAGE,

EMS

2A281-100

STORAGE,

EQUIPMENT

2A212D-100

TOILET,

PUBLIC

2A288-100

HAC

2A287-100

UTILITY,

SOILED

2A214-100

TEAM

ROOM

2A208-100

CONFERENCE

2A286-100

STORAGE,

MEDICAL

GAS

2A212A-100

TOILET,

PUBLIC

2A212C-100

TOILET,

FAMILY

ASSIST

2A212B-100

TOILET,

FAMILY

ASSIST

2A225A-100

KIOSK,

PATIENT

EDUC/

RESRC 2A225-100

WAITING/

LOUNGE

C2-05-100

CORRIDOR

C2-04-100

CORRIDOR

C2-09-100

CORRIDOR

V2-01-100

PATIENT

ELEV

C2-02-100

CORRIDOR

C2-10-100

CORRIDOR

C2-12-100

CORRIDOR

1" O21 1/4" MA2 1/2" MV

1 1/2" MV

3/4" MA

3/4" O2

ZVB-2A1

LPA-2A1

ZVB-2A2

LPA-2A2

1" O2

UP

ALL SERVICE VALVES SHALL BE

LOCKED OPEN, EACH LINE TO

INCLUDE SHUT OFF VALVE TO

ISOLATE THIS SCOPE OF WORK

C2-03-100

CORRIDOR

2A215-100

WAITING/

LOUNGE

2B204-100

PATIENT

SHOWER

M

AT

C H

LI

NE

R

EF

6F

0.

M G

-1

-B

LPA LOCATION AT NURSE WORKROOM

TO BE COORDINATED WITH FACILITIES

AND ARCHITECTURAL ELEVATIONS.

2A235-100

SICU

PATIENT

ROOM 3

MG-3

3" MV 2" MA 1 1/2" O2

C

C2-30-100

CORRIDOR

C2-04-100

CORRIDOR

C2-11-100

CORRIDOR

C2-31-100

CORRIDOR

C2-08-100

CORRIDOR

C2-15-100

CORRIDOR

C2-19-100

CORRIDOR

C2-24-100

CORRIDOR

C2-01-100

CORRIDOR

MG-1MG-1MG-1MG-1

MG-1

MG-1

MG-1MG-1MG-1MG-1

MG-1

MG-1

MG-1

MG-1

MG-1 MG-1

MG-1

MG-1

4" MV

UP/DN

3/4" MV 1/2" MA

1/2" O2

3" MV

2" MA

1 1/2" O2

3/4" MV

1/2" MA

1/2" O2

3/4" O2

3/4" MA

1" MV

1/2" O2

1/2" MA

3/4" MV

1" O2

1 1/4" MA

2" MV

2" MV

1 1/4" MA

1" O2

1" O2

1 1/4" MA

2" MV

1" MV 1" MV

3/4" MA 3/4" O23/4" MA3/4" O2

1" MV

3/4" MA 3/4" O2

1" MV

3/4" MA 3/4" O2

3/4" MV

1/2" MA 1/2" O2

1/2" O2

1/2" MA

3/4" MV

3/4" O2

3/4" MA

1" MV

3/4" O2

3/4" MA

1" MV

3/4" MV

1/2" MA

1/2" O2

1/2" MA1/2" O2

LINE

PRESSURE

SWITCHES

LINE PRESSURE

SWITCHES3/4" O2

3/4" MA

1 1/2" MV

2" O2

DN

1 1/2" MV

UP

4" MV

DN1 1/2" MA

UP

2 1/2" MA

DN

2A238B-100

NURSE

WORKROOM

GENERAL NOTES

1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL

NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER

THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL

STRUCTURE PACKAGE, DATED 17 DEC 2018.

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B A

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:4

A

M

100.MG-102-A

MEDICAL GAS - FLOOR PLAN - LEVEL 02

- AREA A

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

SCALE: 1/8" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL 02 - AREA A 16'4' 8'0-4'

Revision Number

A

O

MLKJHGF

BUILDING OUTLINE ABOVE

2B261-100

MICU

PATIENT

ROOM 9

2B241-100

MICU

PATIENT

ROOM 3

2B247-100

MICU

PATIENT

ROOM 4,

NEG

ISOLATION

2B253-100

MICU

PATIENT

ROOM 6

2B239-100

MICU

PATIENT

ROOM 2

2B259-100

MICU

PATIENT

ROOM 8

2B249-100

MICU

PATIENT

ROOM 5,

NEG

ISOLATION

2B269-100

MICU

PATIENT

ROOM 12

2B221-100

CICU

PATIENT

ROOM 7

2B229-100

CICU

PATIENT

ROOM

10, NEG

ISOLATION

2B223-100

CICU

PATIENT

ROOM 8

2B215-100

CICU

PATIENT

ROOM 5

2B265-100

MICU

PATIENT

ROOM 10

2B203-100

CICU

PATIENT

ROOM 1 2B211-100

CICU

PATIENT

ROOM 4

2B267-100

MICU

PATIENT

ROOM 11

2B209-100

CICU

PATIENT

ROOM 3 2B227-100

CICU

PATIENT

ROOM 9

2B205-100

CICU

PATIENT

ROOM 2

2B249B-100

ANTEROOM

2B231B-100

ANTEROOM

2B247B-100

ANTEROOM

2B229B-100

ANTEROOM

S2-03-100

STAIR 3

LEVEL 2

2B241A-100

BATHROOM,

PATIENT

2B269A-100

BATHROOM,

PATIENT

2B247A-100

BATHROOM,

PATIENT

2B265A-100

BATHROOM,

PATIENT

2B249A-100

BATHROOM,

PATIENT

2B203A-100

BATHROOM,

PATIENT

2B267A-100

BATHROOM,

PATIENT

2B223A-100

BATHROOM,

PATIENT

2B227A-100

BATHROOM,

PATIENT2B205A-100

BATHROOM,

PATIENT

2B215A-100

BATHROOM,

PATIENT

2B235A-100

BATHROOM,

PATIENT

2B221A-100

BATHROOM,

PATIENT

2B209A-100

BATHROOM,

PATIENT

2B229A-100

BATHROOM,

PATIENT

2B217A-100

BATHROOM,

PATIENT

2B237A-100

BATHROOM,

PATIENT

2B239A-100

BATHROOM,

PATIENT

2B211A-100

BATHROOM,

PATIENT

N2B-69-100

NURSE

SUB-STATION

N2B-65-100

NURSE

SUB-STATION

N2B-47-100

NURSE

SUB-STATION

N2B-39-100

NURSE

SUB-STATION

N2B-35-100

NURSE

SUB-STATION

N2B-29-100

NURSE

SUB-STATION

N2B-03-100

NURSE

SUB-STATION

N2B-21-100

NURSE

SUB-STATION

N2B-15-100

NURSE

SUB-STATION

N2B-09-100

NURSE

SUB-STATION

2A272-100

LOUNGE,

STAFF

2A274-100

TOILET,

STAFF

2A204D-100

OFFICE

2A204A-100

OFFICE

2B200-100

TOILET,

FAMILY

ASSIST

2B281-100

STORAGE,

MEDICAL

GAS

2B212-100

MEDICATION

ROOM

2B214-100

NOURISHMENT

STATION

2B287-100

UTILITY,

SOILED

2B202-100

TOILET,

STAFF

V2-03-100

PUBLIC

ELEV

S2-02-100

STAIR 2

LEVEL 2

2B216C-100

CONFERENCE/

REPORT

ROOM

2B216-100

NURSE

STATION,

ICU

2B216D-100

CC

ALCOVE

2B285-100

TOILET,

STAFF

2B283-100

HAC

2B214A-100

FS CART

STORAGE

2B216B-100

WARD

CLERK

2B208-100

TOUCHDOWN

SPACE

2B290-100

UTILITY

ROOM,

CLEAN,

LINEN

2B240C-100

CONFERENCE/

REPORT

ROOM

2B256-100

ELEC

2B280-100

STORAGE,

EQUIPMENT

2B258-100

SIGNAL

2B284-100

NOURISHMENT

STATION

2B240-100

NURSE

STATION,

ICU

2B262-100

OI&T

2B260-100

TEAM

ROOM

2B275-100

GREETER

2B284A-100

FS CART

STORAGE

2B240D-100

CC

ALCOVE

2B240B-100

WARD

CLERK

2B282-100

BLOOD

GAS LAB

2B272-100

OFFICE

2B270-100

OFFICE

2B288-100

TOILET,

STAFF

2B286-100

TOILET,

STAFF

2B254-100

MEDICATION

ROOM

2B271-100

CONSULTATION

ROOM

2B273-100

CONSULTATION

ROOM

2A207-100

VISITOR

KITCHENETTE

2A205-100

KIOSK,

PATIENT

EDUC/

RESRC

2B268-100

LOUNGE,

STAFF

2B274-100

TOILET,

PUBLIC

2A206-100

KIOSK,

PATIENT

EDUC/

RESRC

2A203-100

WAITING/

LOUNGE

2B237-100

MICU

PATIENT

ROOM 1

C2-12-100

CORRIDOR

N2-27-100

NURSE

SUB-STATION

C2-17-100

CORRIDOR

C2-18-100

CORRIDOR

C2-19-100

CORRIDOR

2B216e-100

ALCOVE

2A276A-100

MOBILE

X-RAY

ALCOVE

3" MV

1 1/2" MA

1 1/4" O2

2" MV

1 1/4" MA

1" O2

LPA-2B2

ZVB-2B1

LPA-2B1

MG-1 MG-1

ALL SERVICE VALVES SHALL BE

LOCKED OPEN, EACH LINE TO

INCLUDE SHUT OFF VALVE TO

ISOLATE THIS SCOPE OF WORK

2B204-100

PATIENT

SHOWER

M

AT

C H

LI

NE

R

EF

6F

0.

M G

-1

-A

LPA LOCATION AT NURSE WORKROOM

TO BE COORDINATED WITH FACILITIES

AND ARCHITECTURAL ELEVATIONS.

LPA LOCATION AT CC ALCOVE TO

BE COORDINATED WITH FACILITIES

AND ARCHITECTURAL ELEVATIONS.

2B217-100

CICU

PATIENT

ROOM 6

1/2" O2

1/2" MA

2B261A-100

BATHROOM,

PATIENT

2B259A-100

BATHROOM,

PATIENT

2B255A-100

BATHROOM,

PATIENT

2B231-100

CICU

PATIENT

ROOM

11, NEG

ISOLATION

2B231A-100

BATHROOM,

PATIENT

MG-3

1 1/2" O22" MA3" MV

1" O2

1 1/4" MA

2" MV

3" MV

2" MA

1 1/2" O2

C2-14-100

CORRIDOR

C2-15-100

CORRIDOR

C2-19-100

CORRIDOR

C2-24-100

CORRIDOR

2B235-100

CICU

PATIENT

ROOM 12

C2-13-100

CORRIDOR

C2-20-100

CORRIDOR

C2-01-100

CORRIDOR

C2-22-100

CORRIDOR

MG-1 MG-1 MG-1 MG-1 MG-1

MG-1

MG-1

MG-1

MG-1

MG-1

MG-1

MG-1MG-1MG-1

MG-1 MG-1 MG-1 MG-1

MG-1MG-1MG-1 MG-1

3" MV

2" MA

1 1/2" O2

ZVB-2B2

1" O2

1 1/4" MA2" MV

1 1/2" MV

UP

1 1/2" MA

UP

1" O2

UP

1" MV

3/4" MA

3/4" O2

3/4" MV

1/2" MA

1/2" O2

1" MV 3/4" MA 3/4" O2

1" MV 3/4" MA 3/4" O2

1" MV 3/4" MA 3/4" O2

3/4" MV 1/2" MA

1/2" O2

2" MV

1 1/4" MA

1" O2

2" MV

1 1/4" MA

1" O2

1" O2 1 1/4" MA 2" MV

3/4" O2

3/4" MA

1" MV

3/4" O2

3/4" MA

1" MV

3/4" O2 3/4" MA 1" MV

1" MV 3/4" MA 3/4" O2

2B255-100

MICU

PATIENT

ROOM 7

2B253A-100

BATHROOM,

PATIENT3/4" O2 3/4" MA 1" MV

1/2" O2

1/2" MA

3/4" MV

3" MV

2" MA

1 1/2" O2

1/2" MA1/2" O2

LINE PRESSURE

SWITCHES

LINE PRESSURE

SWITCHES

2B216A-100

NURSE

WORKROOM

GENERAL NOTES

1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL

NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER

THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL

STRUCTURE PACKAGE, DATED 17 DEC 2018.

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B A

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:5

A

M

100.MG-102-B

MEDICAL GAS - FLOOR PLAN - LEVEL 02

- AREA B

03 JAN 2023 Breanne D.

Hanson

Ricardo A.

Treviño

FINAL AS-BUILT

SUBMISSION

SCALE: 1/8" = 1'-0"6F MEDICAL GAS FLOOR PLAN - LEVEL 02 - AREA B

16'4' 8'0-4'

Revision Number

ED

2IA180-100

MECHANICAL

ROOM

2IA180-100

MECHANICAL

ROOM

1 1/2" MV

1 1/2" MA

1" O2

1 1/2" MV

DN

1 1/2" MA

DN

1" O2

DN

1" O2

UP

1 1/2" MA

UP

1 1/2" MV

UP

C JHG

1 1/2" MV

UP 1 1/2" MA

UP

1" O2

UP

GENERAL NOTES

1. REFER TO SHEET 100.P-001 FOR TYPICAL LEGENDS, ABBREVIATIONS, GENERAL

NOTES AND SYMBOLS. PLEASE NOTE THAT THIS SHEET WAS ISSUED UNDER

THE FINAL FAST TRACK FOUNDATIONS, MEP ROUGH-IN AND STEEL

STRUCTURE PACKAGE, DATED 17 DEC 2018.

HGF

6" MA

UP/DN

4" MV

UP/DN

4" MV4" MV

UP

RECORD DOCUMENTS

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B A

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

P -R

-C

E N

T R

A L .r v t

/2 /2

:5

:5

A

M

100.MG-102I

MEDICAL GAS - FLOOR PLAN -

INTERSTITIAL - AREAS A&B

03 JAN 2023 Breanne D.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .