FIRE PROTECTION

SYMBOLS

GENERAL NOTES

MISC SYMBOLS

ABBREVIATIONS

XXX-1

1 KEY NOTE

EQUIPMENT DESIGNATIONS

PIPE BREAK CONTINUATION

POINT OF DISCONNECTION

POINT OF CONNECTION

EXISTING PIPE TO REMAIN

LIMIT OF PIPE TO BE

REMOVED

NEW PIPING

EXISTING PIPING TO NEW PIPING

CONNECTION

X,XXX

INDICATES ROOF AREA (IN

SQUARE FEET) SERVED BY

ROOF DRAIN

AD

AFF

AHU

APPROX

AVG

BA

BLDG

BOP

BYP

C

CA

CO.

CONN

CW

DCW

DWV

EL

EX.

HD

HP

HW

HWCP

HVC

HWR

HWS

IN WC

INV

KW

LB

LF

LP

MAX

MIN

NA

NC

NIC

NPW

NO

NTS

OS&Y

PDI

PDISCH

PRS

PRV

PLBG

PRESS

PTRV

PW

REF

REFRI

G

RPZA

SAN

SPEC

SPK

T T&P

TEMP

TOP

TP

TSTAT

V

VERT

VTR

WG

WHA

AREA DRAIN

ABOVE FINISHED FLOOR

AIR HANDLING UNIT

APPROXIMATE

AVERAGE

BREATHING AIR

BUILDING

BOTTOM OF PIPE

BY-PASS

CELSIUS

COMPRESSED AIR

CLEANOUT

CONNECTION

COLD WATER

DOMESTIC COLD WATER

DRAIN, WASTE & VENT

ELEVATION

EXISTING

HYDRAULIC DRAIN

HORSE POWER

HOT WATER

HOT WATER CIRCULATING PUMP

HOSE VALVE CABINET

HOT WATER RETURN

HOT WATER SUPPLY

INCHES, WATER COLUMN

INVERT

KILOWATT

POUNDS

LINEAR FEET

LOW PRESSURE

MAXIMUM

MINIMUM

NOT APPLICABLE

NORMALLY CLOSED

NOT IN CONTRACT

NON-POTABLE WATER

NORMALLY OPEN

NOT TO SCALE

OUTSIDE SCREW AND YOKE

PLUMBING DRAINAGE INSTITUTE

PUMP DISCHARGE

PRESSURE REDUCING STATION

PRESSURE REDUCING VALVE

PLUMBING

PRESSURE

PRESSURE TEMPERATURE RELIEF VALVE

PROTECTED WATER

REFERENCE

REFRIGERATOR

REDUCED PRESSURE ZONE

ASSEMBLY

SANITARY

SPECIFICATION

SPRINKLER

TEMPERATURE SENSOR

TEMPERATURE AND PRESSURE VALVE

TEMPERATURE

TOP OF PIPE

TRAP PRIMER OR TRAP PRIMER LINE

THERMOSTAT

VENT

VERTICAL

VENT THROUGH ROOF

WATER GAGE

WATER HAMMER

ARRESTER

F

G.CO.

FIRE LINE

GRADE CLEANOUT

1. PROVIDE 100% SPRINKLER COVERAGE FOR BUILDING AREA SHOWN

ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM SHALL BE

DESIGNED IN ACCORDANCE WITH LOCAL BUILDING CODES, NFPA 13

AND OWNER INSURANCE REQUIREMENTS.

2. THE FIRE SUPPRESSION SYSTEM, AS SHOWN ON THE CONTRACT

DOCUMENTS, IS SCHEMATIC IN NATURE AND INDICATES THE AREAS TO

BE COVERED BY THE SUPPRESSION SYSTEMS. THE FINAL DESIGN OF

THE SYSTEM SHALL BE PERFORMED BY A LICENSED INDIVIDUAL

CERTIFIED TO A MINIMUM NICET LEVEL IV, IN THE FIELD OF WATER-

BASED SYSTEM LAYOUT.

3. PIPE SIZES SHOWN ARE SUBJECT TO CHANGE BASED ON HYDRAULIC

CALCULATIONS PERFORMED BY FIRE PROTECTION CONTRACTOR. FINAL

PIPING LAY-OUT & SIZE SHALL BE DETERMINED BY FIRE PROTECTION

CONTRACTOR.

4.

COORDINATE WORK WITH ALL OTHER TRADES.

5.

6. ROUTE PIPING CONCEALED THROUGHOUT EXCEPT WHERE INDICATED.

7.

FIRE PROTECTION SYSTEM COMPONENTS MUST BE LISTED AND

APPROVED FOR ITS USE WITH UL AND/OR FM. DESIGN AND

INSTALLATION MUST COMPLY WITH THE LISTING LIMITATIONS AND THE

MANUFACTURER'S INSTRUCTIONS.

8. WHERE SPRINKLERS ARE NOT SHOWN, CONTRACTOR SHALL

DETERMINE LOCATION, CENTER IN CEILING TILES IN LAY-IN CEILING

AREAS, ALIGN WITH LIGHTS AND OTHER CEILING ELEMENTS IN HARD

CEILING AREAS. COORDINATE EXACT LOCATION WITH ARCHITECT

DURING SHOP DRAWING SUBMITTAL PROCESS.

9.

10.

11.

12.

FIRE PROTECTION

APPLICABLE CODES &

STANDARDS

VA REQUIREMENTS

VA FIRE PROTECTION DESIGN MANUAL (7th ed.)

NFPA CODES AND STANDARDS

NFPA 13 (2013 ed.)

NFPA 14 (2013 ed.)

NFPA 20 (2015 ed.)

NFPA 82 (2014 ed.)

ICC CODES AND STANDARDS

INTERNATIONAL BUILDING CODE (2015 ed.)

SYSTEM DESCRIPTION

THE NEW BED TOWER IS A FULLY SPRINKLERED BUILDING. THE WATER SUPPLY FOR THE NEW BED TOWER IS A CONNECTION TO THE EXISTING SITE FIRE WATER MAIN. THE BUILDING HAS A NEW FIRE PUMP, LOCATED IN THE LEVEL G FIRE PUMP ROOM GA106-100, WHICH WILL BE FED FROM THE SITE FIRE WATER MAIN.

THE BUILDING IS CLASSIFIED AS A HEALTHCARE FACILITY, AND HAS THREE LEVELS CLASSIFIED AS HEALTHCARE USE:

LEVEL 2, LEVEL 3 AND LEVEL 4. THESE LEVELS ARE EACH SEPERATED INTO THREE SMOKE ZONES: SMOKE ZONE A, SMOKE ZONE B, AND SMOKE ZONE C. EACH SMOKE ZONE IS SERVED FROM A SEPERATE SPRINKLER ZONE. THE REST OF THE BUILDING IS SERVED BY ONE SPRINKLER ZONE PER LEVEL. THE SPRINKLER ZONES WILL BE AS FOLLOWS:

LEVEL G: ZONE G

LEVEL 1: ZONE 1

LEVEL 2: ZONE 2A, ZONE 2B, ZONE 2C

LEVEL 2 INTERSTITIAL: ZONE 2I

LEVEL 3: ZONE 3A, ZONE 3B, ZONE 3C

LEVEL 4: ZONE 4A, ZONE 4B, ZONE 4C

MECHANICAL PENTHOUSE LEVEL: ZONE 5

LEVEL 2 INTERSTITIAL WILL NOT BE SPRINKLERED IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL.

THE ENCLOSED MECHANICAL ROOM LOCATED ON LEVEL 2 INTERSTITIAL WILL BE SPRINKLERED.

ELEVATOR HOISTWAYS AND MACHINE ROOMS WILL NOT BE SPRINKLERED PER NFPA 13 EXEMPTION.

THE BUILDING CONTAINS THREE STAIRWELLS. ALL THREE STAIRWELLS CONTAIN A COMBINED SPRINKLER/STANDPIPE SYSTEM, AS WELL AS AN EXPRESS DRAIN. THE FLOOR CONTROL VALVE ASSEMBLY FOR THE SPRINKLER SYSTEM IS LOCATED AT THE MAIN LANDING OF STAIR 2 ON EACH LEVEL. ADDITIONAL CONTROL VALVE ASSEMBLIES ARE LOCATED IN STAIR 1 AND STAIR 3 TO SERVE THE ADDITIONAL SPRINKLER ZONES ON LEVEL 2, LEVEL 3, AND LEVEL 4.

ALL STANDPIPES HAVE A FIRE HOSE VALVE AT EACH LEVEL.

ONLY PIPING SERVING SPRINKLERS WITHIN ELECTRICAL ROOMS SHALL

BE ROUTED THROUGH SUCH ROOMS. PIPING WITHIN SHALL NOT SERVE

SPRINKLERS OUTSIDE OF THESE ROOMS.

WHERE NOT SHOWN, PIPING LAYOUT AND SIZE SHALL BE DETERMINED

BY FIRE PROTECTION CONTRACTOR.

SHOW ALL DUCTWORK AND OTHER OBSTRUCTIONS IN ROOMS THAT

ARE WITHOUT CEILINGS ON SHOP DRAWINGS. PROVIDE COVERAGE

AROUND AND UNDER ALL OBSTRUCTIONS AS REQUIRED BY NFPA 13,

INCLUDING BUT NOT LIMITED TO COVERAGE UNDER DUCTWORK 48" AND

WIDER. SPRINKLERS THAT ARE BELOW OBSTRUCTIONS SHALL BE

PROVIDED WITH CAGE PROTECTORS.

CONTRACTOR SHALL VERIFY LOCATION OF ANY PIPING/DUCTWORK

THAT MAY CONFLICT WITH ROUTING OF FIRE PROTECTION PIPING

PRIOR TO COMMENCEMENT OF WORK. CONTRACTOR SHALL SUBMIT

REPORT OF CONFLICT DIRECTLY TO ENGINEER.

NOTIFY AND COORDINATE WITH OWNERS REPRESENTATIVE PRIOR TO

SHUTDOWN OF ANY FIRE PROTECTION UTILITY. SHUTDOWN TIME TO BE

MINIMUM. NOTIFICATION SHALL BE IN WRITING A MINIMUM OF 48 HOURS

PRIOR TO SHUTDOWN.

PENDANT SPRINKLER HEAD PLAN

PRE-ACTION VALVE RELEASE CONTROL PANEL

FLOW SWITCH

PREACTION/DELUGE VALVE

SUPERVISED CONTROL VALVE

GATE VALVE

PIPE CAP

PIPE DOWN

PIPE UP

F

FIRE STANDPIPE RISER

FH

FIRE PROTECTION DRY PIPE HEADER RISER

UPRIGHT SPRINKLER HEAD

2 1/2" FIRE VALVE (AT STANDPIPES)

CHECK VALVE

SUPERVISED BUTTERFLY VALVE

S

SUPERVISED BALL VALVE

S

THE SYMBOLS BELOW ARE FOR SCHEMATIC USE ONLY

FIRE PROTECTION

SHEET LIST

FLOW METER

F

PRESSURE RELEIF VALVE

WATER SUPPLY INFORMATION

13. ALL WET-PIPE SPRINKLER ZONES SHALL BE EQUIPPED WITH AN

AUTOMATIC AIR VENTING VALVE AT THE HIGH-POINT OF THE PIPING.

200 400 600 800 1000 1200 1400

FLOW — GPM

1600 1800 2000

N1.85

P R

E S

S U

R E

P

S I)

N1.85

FLOW TEST DATE: 11/14/18

LOCATION:

RESIDUAL HYDRANT - HYDRANT #3 - NEAR PATIENT DROP OFF EAST OF BUILDING 1

FLOW HYDRANT - HYDRANT #10 - NORTHEAST CORNER OF BUILDING 1

STATIC: 60 PSI

RESIDUAL: 45 PSI

OPENING SIZE: 2.5"

COEFFICIENT: 0.9

PITOT READING: 26

FLOW: 856 GPM

RESULTS AT 20 PSI: 1453 GPM

RESULTS AT 0 PSI: 1809 GPM

DURATION OF FLOW: 5 MINUTES

WATER CONSUMPTION ESTIMATE: 4278 GALLONS

ADJUSTED SUPPLY

INCLUDING 250 GPM HOSE

DEMAND

FLOW TEST SUPPLY CURVE

PUMP + ADJUSTED

SUPPLY CURVE

SPRINKLER

DEMAND POINT 100.FP-001 FIRE PROTECTION - LEGEND AND NOTES

100.FP-002 FIRE PROTECTION - RISER DIAGRAM

100.FP-100 FIRE PROTECTION - OVERALL FLOOR PLAN - LEVEL G

100.FP-101 FIRE PROTECTION - OVERALL FLOOR PLAN - LEVEL 01

100.FP-102 FIRE PROTECTION - OVERALL FLOOR PLAN - LEVEL 02

100.FP-102I FIRE PROTECTION - OVERALL FLOOR PLAN - LEVEL 2I

100.FP-103 FIRE PROTECTION - OVERALL FLOOR PLAN - LEVEL 03

100.FP-104 FIRE PROTECTION - OVERALL FLOOR PLAN - LEVEL 04

100.FP-105 FIRE PROTECTION - OVERALL FLOOR PLAN - PENTHOUSE

100.FP-301 FIRE PROTECTION - STAIR SECTIONS

100.FP-401 FIRE PROTECTION - ENLARGED FIRE PUMP ROOM

100.FP-402 FIRE PROTECTION - ENLARGED FLOOR PLANS

100.FP-501 FIRE PROTECTION DETAILS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

RECORD DOCUMENTS

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

F

P -R

-C

E N

T R

A L .r v t

/2 /2

:0

:4

P M

100.FP-001

FIRE PROTECTION - LEGEND AND NOTES

RSK JDR

FINAL AS-BUILT SUBMISSION

03 JAN 2023Revision Number

Revisions: Date:

LEVEL 1

LEVEL 2

6" COMBINED

SPRINKLER/STANDPIPE

LEVEL 2

INTERSTITIAL

LEVEL 1

6" COMBINED

SPRINKLER/STANDPIPE

STAIR 3

LEVEL 1

6" COMBINED

SPRINKLER/STANDPIPE

STAIR 2STAIR 1

SPRINKLERS SERVING

SMOKE ZONE 2B

SPRINKLERS SERVING

SMOKE ZONE 5

SPRINKLERS SERVING

SMOKE ZONE 3B

SPRINKLERS SERVING

SMOKE ZONE 1

LEVEL 3

SPRINKLERS SERVING

SMOKE ZONE 4B

LEVEL 4

SPRINKLERS SERVING

SMOKE ZONE 2I

SPRINKLERS SERVING

SMOKE ZONE G

LEVEL G

ROUTE DRAIN TO EXTERIOR

FIRE DEPARTMENT

CONNECTION

2" DRAIN

ROUTE DRAIN TO EXTERIOR

2" DRAIN

ROUTE DRAIN TO DRAIN

2" DRAIN

6"

6"

LEVEL 2

LEVEL 2

INTERSTITIAL

SPRINKLERS SERVING

SMOKE ZONE 2A

SPRINKLERS SERVING

SMOKE ZONE 3A

LEVEL 3

SPRINKLERS SERVING

SMOKE ZONE 4A

LEVEL 4

PENTHOUSE

LEVEL 2

LEVEL 2

INTERSTITIAL

SPRINKLERS SERVING

SMOKE ZONE 2C

SPRINKLERS SERVING

SMOKE ZONE 3C

LEVEL 3

SPRINKLERS SERVING

SMOKE ZONE 4C

LEVEL 4

FIRE DEPARTMENT

CONNECTION

PENTHOUSE

FROM EXTERIOR SITE

WATER SUPPLY

FIRE PUMP TEST

HEADER

DOUBLE BACKFLOW PREVENTER

& REDUCED PRESSURE

DETECTOR ASSEMBLY

FIRE PUMP (FP)

F

JOCKEY PUMP (JP)

8"

8" 8"

8"

6"

1 1/4"

8"

8"

HOSE CONNECTIONS AT EITHER

SIDE OF HORIZONTAL EXIT

FROM INTERIOR

WATER SUPPLY

ROOF HOSE

CONNECTIONS

ROOF - OPENT TO

ATMOSPHERE

ROOF HOSE

CONNECTIONS

PIPING ROUTES

THROUGH MECH ROOM

8"

GENERAL NOTES:

1.

2.

PROVIDE FULL SPRINKLER COVERAGE FOR BUILDING AREA

SHOWN ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM

SHALL BE DESIGNED IN ACCORDANCE WITH VA DESIGN MANUAL

AND NFPA 13.

REFER TO SHEET FP-001 FOR SYMBOL LEGEND, ABBREVIATIONS,

AND GENERAL NOTES.

3.

ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS

OTHERWISE NOTED.

4.

ROUTE SPRINKLER PIPING TO PROVIDE COMPLETE SYSTEM

DRAINAGE BACK TO SYSTEM VALVE TO THE EXTENT POSSIBLE.

PROVIDE AUXILIARY DRAINS AS NECESSARY. MEET NFPA 13

REQUIREMENTS FOR AREAS OF SPRINKLER PIPING WITH

TRAPPED WATER.

5.

COORDINATE WORK WITH ALL OTHER TRADES.

THIS DRAWING IS INTENDED TO DESCRIBE THE GENERAL DESIGN

INTENT BY WHICH THE SPRINKLER PLANNER CAN CORRECTLY

PLAN THE SYSTEM(S). SOME PARTS OF THE SYSTEM MAY NOT BE

DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER

TO SPECIFICATION SECTIONS 21 1313 AND 21 3013 FOR COMPLETE

PERFORMANCE REQUIREMENTS.

PROVIDE COVERAGE AROUND ALL CEILING OBSTRUCTIONS,

INCLUDING MECHANICAL DUCTWORK, AS REQUIRED BY NFPA 13.

6.

7.

KEYED NOTES:

FIRE DEPARTMENT CONNECTION TO BE 5 INCH STORZ TYPE WITH 30

DEGREE DOWNTURN

DRAIN LOCATED IN MECHANICAL ROOM GB005-100, DIRECTLY ADJACENT

TO STAIR 2. REFER TO PLUMBING FLOOR PLANS AND RISER DIAGRAMS

FOR DRAIN INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

RECORD DOCUMENTS

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

F

P -R

-C

E N

T R

A L .r v t

/2 /2

:0

:4

P M

100.FP-002

FIRE PROTECTION - RISER DIAGRAM

RSK JDR

FINAL AS-BUILT SUBMISSION

03 JAN 2023

SCALE: NONE1 FIRE PROTECTION - RISER

Revision

B C.5 D.5 E.5 F.5 H J K L M

3.5

4.5

5.5

4.2

7.5

A B.3 C D E F

F

H.5 J.5 K.5 L.5

B.6 G

E.8

7.8

5.3

6.6

F.3 F.8

2.5

5.8

7.4

8.5

9.3

9.6

6.5

1.5

0.7

AAABACAD

0.2

3.2

ZONE G

GB001-100

COMPUTER

TERMINAL

SERVER

GB003-100

COMMAND

SERVER

GB002-100

TLT/ SHWR,

STAFF

GA060-100

ELEC

V0-04-100

SERVICE

ELEV

GA012-100

DISPOSAL

CHUTE ROOM,

TRASH

GA011-100

DISPOSAL

CHUTE ROOM,

LINEN GA010-100

HAC

GA009-100

RECEIVING

FOOD COURT/

SERVICE

GB000-100

ESSENTIAL

ELECTRICAL

ROOM

GB004-100

ELECTRICAL

SUBSTATION

ROOM

GA006-100

FIRE PUMP

GA005-100

PATIENT

TRAY

ASSEMBLY

GA009C-100

SANITATION &

RECYCLING

GA007-100

MED AIR/VAC

GA054-100

OI&T

GA009A-100

ELEV

MACHINE

ROOM

GA004-100

EQUIPMENT

DISTRIBUTION

GA013-100

TUG /

STORAGE

GA014-100

WASTE

PUMPER

SYSTEM

GA005A-100

HAC

C0-04-100

CORRIDOR

ELEVATOR

MH 8

ELEVATOR

MH 7

C0-01-100

CORRIDOR

ELEVATOR

CS1

C0-02-100

CORRIDOR

C0-03-100

CORRIDOR

SG-02-100

STAIR 2

LEVEL G

GA009B-100

RECEIVING

AREA

C0-06-100

CONNECTOR

CORRIDOR

GA058-100

SIGNAL

GB006-100

MECHANICAL

ROOM

GB005-100

MECHANICAL

ROOM

100.FP-401

100.FP-301

100.FP-301

100.FP-401

100.FP-402

100.FP-402

100.FP-402

GB007-100

ELEVATOR

PIT

GB008-100

ELEVATOR

PIT

GA-011

UNFINISHED

ROOM /

EXISTING

POOL ROOM

GENERAL NOTES:

1.

2.

PROVIDE FULL SPRINKLER COVERAGE FOR BUILDING AREA

SHOWN ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM

SHALL BE DESIGNED IN ACCORDANCE WITH VA DESIGN MANUAL

AND NFPA 13.

REFER TO SHEET FP-001 FOR SYMBOL LEGEND, ABBREVIATIONS,

AND GENERAL NOTES.

3.

ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS

OTHERWISE NOTED.

4.

ROUTE SPRINKLER PIPING TO PROVIDE COMPLETE SYSTEM

DRAINAGE BACK TO SYSTEM VALVE TO THE EXTENT POSSIBLE.

PROVIDE AUXILIARY DRAINS AS NECESSARY. MEET NFPA 13

REQUIREMENTS FOR AREAS OF SPRINKLER PIPING WITH

TRAPPED WATER.

5.

COORDINATE WORK WITH ALL OTHER TRADES.

THIS DRAWING IS INTENDED TO DESCRIBE THE GENERAL DESIGN

INTENT BY WHICH THE SPRINKLER PLANNER CAN CORRECTLY

PLAN THE SYSTEM(S). SOME PARTS OF THE SYSTEM MAY NOT BE

DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER

TO SPECIFICATION SECTIONS 21 1313 AND 21 3013 FOR COMPLETE

PERFORMANCE REQUIREMENTS.

PROVIDE COVERAGE AROUND ALL CEILING OBSTRUCTIONS,

INCLUDING MECHANICAL DUCTWORK, AS REQUIRED BY NFPA 13.

6.

7.

KEYED NOTES:

SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER

STANDPIPE IN STAIR 2

PROVIDE STANDARD RESPONSE SIDEWALL SPRINKLER AT BOTTOM OF

ELEVATOR HOISTWAY IN ACCORDANCE WITH NFPA 13 8.15.5 AND VA FIRE

PROTECTION DESIGN MANUAL SECTION 6.1.

EXTEND SPRINKLER COVERAGE OVER THE FILLED-IN PULL AREA TO

PROVIDE COMPLETE SPRINKLER COVERAGE IN ROOM.

LEGEND

SPRINKLER ZONE BOUNDARY

ORDINARY HAZARD 1

ORDINARY HAZARD 2

HYDRAULIC DESIGN CRITERIA

ZONE G - GROUND LEVEL

OCCUPANCY CLASSIFICATION

DENSITY AND COVERAGE AREA

TOTAL HOSE STREAM

K-FACTOR

SAFETY MARGIN

ORDINARY HAZARD - GROUP 1

0.15 GPM/FT2 OVER 1,500FT2

250 GPM

8.0

GREATER OF 10 PSI OR 10% REQUIRED

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B

A

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

RECORD DOCUMENTS

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

F

P -R

-C

E N

T R

A L .r v t

/2 /2

:0

:5

P M

100.FP-100

FIRE PROTECTION - OVERALL FLOOR PLAN -

LEVEL G

RSK JDR

FINAL AS-BUILT SUBMISSION

03 JAN 2023

SCALE: 1/16" = 1'-0"1 FIRE PROTECTION OVERALL PLAN - LEVEL G

16' 32'8'0-8'

Revision

3.5

4.5

5.5

4.2

7.5

A B.3 C D E F H.5 J.5 K.5 L.5

B.6 G

E.8

7.8

5.3

6.6

F.3 F.8

2.5

5.8

7.4

8.5

9.3

9.6

6.5

1.5

0.7

AAABACAD

0.2

3.2

ZONE 1

1A128-100

SERVING

AREA

1A162-100

RETAIL

DISPLAY &

STORAGE

1B100-100

RETAIL AREA

1A187-100

STORAGE,

REF/ FRZ

1A161-100

FEMALE

TOILET,

MULTIPLE

1A163-100

MALE TOILET,

MULTIPLE

1A160-100

ELEC

1A158-100

SIGNAL

1A154-100

OI&T

1A169A-100

OFFICE,

SECURE

MONEY

1B110-100

VETERAN

MEMORIAL

1B111-100

FEMALE

TOILET,

MULTIPLE

1B113-100

MALE TOILET,

MULTIPLE

1A137-100

RETAIL AREA

(COFFEE)

1A104-100

SECURITY

SCREENING

ROOM

1A106-100

WHEELCHAIR

STORAGE

1A125A-100

INFO DESK

1B121-100

RECEPTION

1B121A-100

CALL CENTER

1B158-100

SIGNAL 1B156-100

ELEC

1B121B-100

OFFICE

1B121C-100

OFFICE

1B121D-100

CUBICLE 9

1B121E-100

CUBICLE 8

1B121F-100

CUBICLE 7

1B121G-100

CUBICLE 6

1B121H-100

CUBICLE 5

1B121I-100

CUBICLE 4

1B121J-100

CUBICLE 3

1B121K-100

CUBICLE 2

1B121L-100

CUBICLE 1

1B121M-100

COPIER &

STORAGE

ROOM

1B121N-100

OFFICE,

SUPER

1B121O-100

OFFICE,

ENROL COOR

1B142-100

VIDEO

CONFERENCE 1B143-100

CLASSROOM

1B137-100

COMPUTER

LAB

1B138C-100

OFFICE, AO

CASE

MANAGER

1B138B-100

OFFICE, AO

CASE

MANAGER

1B136-100

CONFERENCE

ROOM,

ADMINISTRATIVE

1B138D-100

OFFICE,

CHIEF

1B138A-100

OFFICE,

STAFFING

ANALYST

1B138E-100

OFFICE,

ASSISTANT

CHIEF NURSE

V1-01-100

PATIENT ELEV

V1-04-100

SERVICE

ELEV

1B100B-100

REMOTE

STORAGE,

RECV

V1-00-100

VESTIBULE

1A100-100

ENTRY

V1-03-100

PUBLIC ELEV

1B120-100

WAITING

1A184-100

FOOD PREP &

PRODUCTION

S1-03-100

STAIR 3

LEVEL 1

1A137A-100

STORAGE

ROOM

1A169B-100

OFFICE, VCS

CHIEF

1A169D-100

OFFICE, VCS

ASST CHIEF

1A169C-100

OFFICE, VCS

ASST CHIEF

1A169E-100

CUBICLE,

CLERK

1A173-100

LOCKER

ROOM STAFF

1A171-100

LOCKER

ROOM STAFF

1A175-100

LOUNGE,

STAFF

1A177-100

TOILET,

STAFF

1A179-100

TOILET,

STAFF

1B115-100

VENDING

MACHINE

AREA

1B138-100

OFFICE,

SECRETARY

1A185-100

STORAGE,

REF/ FRZ

1A178-100

STORAGE,

RETAIL

1A128A-100

STORAGE,

NON-FOOD

1A170-100

VENDING

MACHINE

MASTER

1A191-100

HAC

1B115A-100

RSA

STORAGE

1A186-100

STORAGE,

REF/ FRZ

1A183-100

STORAGE,

REF/ FRZ

C1-11-100

CORRIDOR

C1-08-100

CORRIDOR

1A180-100

REMOTE

STORAGE,

RECV

C1-01-100

CORRIDOR

1A110-100

STORAGE

C1-05-100

CORRIDOR

C1-06-100

CORRIDOR

C1-15-100

CORRIDOR

C1-16-100

CORRIDOR

C1-13-100

CORRIDOR

C1-03-100

CORRIDOR

C1-02-100

CORRIDOR

1A194B-100

HAC

1A176-100

STORAGE,

DRY FOOD

1B144-100

PASSAGE

ELEVATOR P

ELEVATOR P

ELEVATOR P

ELEVATOR P

S1-02-100

STAIR 2

LEVEL 1

C1-04-100

CORRIDOR

C1-10-100

CORRIDOR

C1-07-100

CORRIDOR

1A110A-100

HAC

1A128B-100

SODA

SYSTEM

C1-14-100

CORRIDOR

1A152-100

DINING AREA

1A125-100

LOBBY/WAITING

1A134-100

DINING AREA

C1-09-100

CORRIDOR

1A125B-100

CUBICLE,

VOLUNTEER

1A194-100

POT WASH

AREA

C1-17-100

CORRIDOR

1A152-100

DINING AREA

1A152-100

DINING AREA

1A125C-100

TELEPHONE

PUBLIC

1A194A-100

DISH WASH

AREA

C1-12-100

CORRIDOR

1B112-100

WATER

FOUNTAIN

C1-09-100

CORRIDOR

1B162-100

OI&T

HEALING

GARDEN

100.FP-301

100.FP-301

100.FP-301

100.FP-301

100.FP-301

100.FP-301

S1-01-100

STAIR 1

LEVEL 1

C1-08-100

CORRIDOR

ELEVATOR S

ELEVATOR S

C2-25-100

CORRIDOR

1A100-100

ENTRY

S1-03-100B

STAIR 3

LEVEL 1

PASSAGE

GB004-100

ELECTRICAL

SUBSTATION

ROOM

C1-18-100

CORRIDOR

1B100A-100

RETAIL AREA

C1-20-100

CORRIDOR

1A194C-100

CLEAN

STORAGE

C1-21-100

CORRIDOR

1B141-100

CENTRAL

STORAGE

ROOM,

MEDIUM

STORAGE

2 2

1A139-100

STORAGE

ROOM

ELEVATOR

CS1

ELEVATOR

MH 7

ELEVATOR

MH 8

GENERAL NOTES:

1.

2.

PROVIDE FULL SPRINKLER COVERAGE FOR BUILDING AREA

SHOWN ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM

SHALL BE DESIGNED IN ACCORDANCE WITH VA DESIGN MANUAL

AND NFPA 13.

REFER TO SHEET FP-001 FOR SYMBOL LEGEND, ABBREVIATIONS,

AND GENERAL NOTES.

3.

ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS

OTHERWISE NOTED.

4.

ROUTE SPRINKLER PIPING TO PROVIDE COMPLETE SYSTEM

DRAINAGE BACK TO SYSTEM VALVE TO THE EXTENT POSSIBLE.

PROVIDE AUXILIARY DRAINS AS NECESSARY. MEET NFPA 13

REQUIREMENTS FOR AREAS OF SPRINKLER PIPING WITH

TRAPPED WATER.

5.

COORDINATE WORK WITH ALL OTHER TRADES.

THIS DRAWING IS INTENDED TO DESCRIBE THE GENERAL DESIGN

INTENT BY WHICH THE SPRINKLER PLANNER CAN CORRECTLY

PLAN THE SYSTEM(S). SOME PARTS OF THE SYSTEM MAY NOT BE

DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER

TO SPECIFICATION SECTIONS 21 1313 AND 21 3013 FOR COMPLETE

PERFORMANCE REQUIREMENTS.

PROVIDE COVERAGE AROUND ALL CEILING OBSTRUCTIONS,

INCLUDING MECHANICAL DUCTWORK, AS REQUIRED BY NFPA 13.

6.

7.

KEYED NOTES:

SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER

STANDPIPE IN STAIR 2

PROVIDE STANDARD RESPONSE SIDEWALL SPRINKLER AT BOTTOM OF

ELEVATOR HOISTWAY IN ACCORDANCE WITH NFPA 13 8.15.5 AND VA FIRE

PROTECTION DESIGN MANUAL SECTION 6.1.

CONTRACTOR TO MODIFY EXISTING BUILDING 1 SPRINKLER SYSTEM TO

ACCOMODATE ARCHITECTURAL CHANGES AT BUILDING CONNECTOR

CONTRACTOR TO PROVIDE 1 1/2" WATER CONNECTION FROM SPRINKLER

SYSTEM TO KITCHEN HOOD WET-CHEM SYSTEMS. COORDINATE WITH

SPECIFICATION 21 21 03 FOR KITCHEN EQUIPMENT FIRE SUPPRESSION

DETAILS. PROVIDE A LOCKED-OPEN BALL VALVE AT EACH CONNECTION

POINT.

LEGEND

SPRINKLER ZONE BOUNDARY

ORDINARY HAZARD 1

ORDINARY HAZARD 2

HYDRAULIC DESIGN CRITERIA

ZONE 1 - LEVEL 1

OCCUPANCY CLASSIFICATION

DENSITY AND COVERAGE AREA

TOTAL HOSE STREAM

K-FACTOR

SAFETY MARGIN

ORDINARY HAZARD 2

0.2 GPM/FT2 OVER 1,500FT2

100 GPM

5.6

GREATER OF 10 PSI OR 10% REQUIRED

SHEET NOTES:

1. REFER TO FOOD SERVICE DRAWINGS AND SPECIFICATIONS FOR DETAILS

ON WET CHEMICAL EXTINGUISHING EQUIPMENT INTEGRAL TO KITCHEN

EQUIPMENT.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B

A

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

RECORD DOCUMENTS

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

F

P -R

-C

E N

T R

A L .r v t

/2 /2

:0

:0

P M

100.FP-101

FIRE PROTECTION - OVERALL FLOOR PLAN -

LEVEL 01

RSK JDR

FINAL AS-BUILT SUBMISSION

03 JAN 2023

SCALE: 1/16" = 1'-0"1 FIRE PROTECTION OVERALL PLAN - LEVEL 1

16' 32'8'0-8'

Revision

M A

O

OMA

2 2

2 2

2 2

B C.5 D.5 E.5 F.5 H J K L M

3.5

4.5

5.5

4.2

7.5

A B.3 C D E F H.5 J.5 K.5 L.5

B.6 G

E.8

7.8

5.3

6.6

F.3 F.8

2.5

5.8

7.4

8.5

9.3

9.6

6.5

1.5

0.7

AAABACAD

0.2

3.2

ZONE 2C

ZONE 2B

ZONE 2A

2A251-100

SICU PATIENT

ROOM 9

2A263-100

SICU PATIENT

ROOM 13

2B261-100

MICU PATIENT

ROOM 9

2B241-100

MICU PATIENT

ROOM 3

2B247-100

MICU PATIENT

ROOM 4, NEG

ISOLATION

2A257-100

SICU PATIENT

ROOM 11

2A241-100

SICU PATIENT

ROOM 5, NEG

ISOLATION

2A247-100

SICU PATIENT

ROOM 7

2B253-100

MICU PATIENT

ROOM 6

2A259-100

SICU PATIENT

ROOM 12

2B239-100

MICU PATIENT

ROOM 2

2A231-100

SICU PATIENT

ROOM 1

2B259-100

MICU PATIENT

ROOM 8

2B249-100

MICU PATIENT

ROOM 5, NEG

ISOLATION

2A243-100

SICU PATIENT

ROOM 6, NEG

ISOLATION

2A265-100

SICU PATIENT

ROOM 14

2A233-100

SICU PATIENT

ROOM 2

2A249-100

SICU PATIENT

ROOM 8

2B269-100

MICU PATIENT

ROOM 12

2B221-100

CICU PATIENT

ROOM 7

2B229-100

CICU PATIENT

ROOM 10,

NEG

ISOLATION

2A267-100

SICU PATIENT

ROOM 15

2B223-100

CICU PATIENT

ROOM 82B215-100

CICU PATIENT

ROOM 5

2B265-100

MICU PATIENT

ROOM 10

2A237-100

SICU PATIENT

ROOM 4

2B203-100

CICU PATIENT

ROOM 1

2B211-100

CICU PATIENT

ROOM 4

2A269-100

SICU PATIENT

ROOM 16

2B267-100

MICU PATIENT

ROOM 11

2B209-100

CICU PATIENT

ROOM 3

2A253-100

SICU PATIENT

ROOM 10

2B227-100

CICU PATIENT

ROOM 9

2B205-100

CICU PATIENT

ROOM 2

2B249B-100

ANTEROOM

2B231B-100

ANTEROOM

2B247B-100

ANTEROOM

2B229B-100

ANTEROOM

S2-03-100

STAIR 3

LEVEL 2

S2-01-100

STAIR 1

LEVEL 2

2B241A-100

BATHROOM,

PATIENT

2B269A-100

BATHROOM,

PATIENT

2B247A-100

BATHROOM,

PATIENT

2A269A-100

BATHROOM,

PATIENT

2A241A-100

BATHROOM,

PATIENT

2A235A-100

BATHROOM,

PATIENT

2B265A-100

BATHROOM,

PATIENT

2A237A-100

BATHROOM,

PATIENT

2A263A-100

BATHROOM,

PATIENT

2B249A-100

BATHROOM,

PATIENT

2B203A-100

BATHROOM,

PATIENT

2A267A-100

BATHROOM,

PATIENT

2A243A-100

BATHROOM,

PATIENT

2A253A-100

BATHROOM,

PATIENT

2B267A-100

BATHROOM,

PATIENT

2B223A-100

BATHROOM,

PATIENT

2A265A-100

BATHROOM,

PATIENT

2A233A-100

BATHROOM,

PATIENT

2B227A-100

BATHROOM,

PATIENT

2B205A-100

BATHROOM,

PATIENT

2A247A-100

BATHROOM,

PATIENT

2B215A-100

BATHROOM,

PATIENT

2A259A-100

BATHROOM,

PATIENT

2A249A-100

BATHROOM,

PATIENT

2B235A-100

BATHROOM,

PATIENT

2B221A-100

BATHROOM,

PATIENT

2B209A-100

BATHROOM,

PATIENT

2B229A-100

BATHROOM,

PATIENT

2A231A-100

BATHROOM,

PATIENT

2B217A-100

BATHROOM,

PATIENT

2B237A-100

BATHROOM,

PATIENT

2A257A-100

BATHROOM,

PATIENT

2B239A-100

BATHROOM,

PATIENT

2A251A-100

BATHROOM,

PATIENT

2B211A-100

BATHROOM,

PATIENT

N2B-69-100

NURSE

SUB-STATION

N2B-65-100

NURSE

SUB-STATION

N2B-47-100

NURSE

SUB-STATION

N2B-39-100

NURSE

SUB-STATION

N2B-35-100

NURSE

SUB-STATION

N2B-29-100

NURSE

SUB-STATION

N2B-03-100

NURSE

SUB-STATION

2A243B-100

ANTEROOM

2A241B-100

ANTEROOM

2A238B-100

NURSE

WORKROOM

N2B-21-100

NURSE

SUB-STATION

N2B-15-100

NURSE

SUB-STATION

N2B-09-100

NURSE

SUB-STATION

N2A-67-100

NURSE

SUB-STATION

N2A-63-100

NURSE

SUB-STATION

N2A-57-100

NURSE

SUB-STATION

N2A-51-100

NURSE

SUB-STATION

N2A-41-100

NURSE

SUB-STATION

N2A-47-100

NURSE

SUB-STATION

N2A-35-100

NURSE

SUB-STATION

N2A-31-100

NURSE

SUB-STATION

2A276A-100

MOBILE

X-RAY

ALCOVE

2A276-100

BLOOD GAS

LAB

2A236-100

UTILITY

ROOM,

CLEAN, LINEN

2A238C-100

CONFERENCE/

REPORT

ROOM

2A260-100

ELEC

2A226-100

EMPL

WELLNESS

2A286A-100

FS CART

STORAGE

2A258-100

SIGNAL

2A282-100

DISPOSAL

CHUTE ROOM,

LINEN

2A239-100

MEDICATION

ROOM

2A234-100

NOURISHMENT

STATION

2A254-100

OI&T

2A280-100

STORAGE,

EQUIPMENT

2A272-100

LOUNGE,

STAFF

2A274-100

TOILET,

STAFF

2A264-100

TEAM ROOM

2A284-100

DISPOSAL

CHUTE ROOM,

TRASH

V2-04-100

SERVICE

ELEV

2A238D-100

CC ALCOVE

2A238A-100

WARD CLERK

2A262-100

LOCKER

ROOM STAFF

2A238-100

NURSE

STATION, ICU

2A227-100

CONSULTATION

ROOM

2A223-100

CONSULTATION

ROOM

2A224-100

TOILET,

STAFF

2A229-100

VENDING

MACHINE

AREA

2A286B-100

WC ALCOVE

2A289-100

STORAGE,

EMS

2A281-100

STORAGE,

EQUIPMENT

2A212D-100

TOILET,

PUBLIC

2A204C-100

OFFICE

2A204D-100

OFFICE

2A288-100

HAC

2A287-100

UTILITY,

SOILED

2A214-100

TEAM ROOM

2A208-100

CONFERENCE

2A286-100

STORAGE,

MEDICAL GAS

2A204B-100

OFFICE

2A204A-100

OFFICE

2A212A-100

TOILET,

PUBLIC

2A212C-100

TOILET,

FAMILY

ASSIST

2A212B-100

TOILET,

FAMILY

ASSIST

2B200-100

TOILET,

FAMILY

ASSIST

2B281-100

STORAGE,

MEDICAL GAS

2B212-100

MEDICATION

ROOM

2B214-100

NOURISHMENT

STATION

2B287-100

UTILITY,

SOILED

2B202-100

TOILET,

STAFF

V2-03-100

PUBLIC ELEV S2-02-100

STAIR 2

LEVEL 2

2B216C-100

CONFERENCE/

REPORT

ROOM

2B216-100

NURSE

STATION, ICU

2B216D-100

CC ALCOVE

2B204-100

PATIENT

SHOWER

2B285-100

TOILET,

STAFF

2B283-100

HAC

2B214A-100

FS CART

STORAGE

2B216B-100

WARD CLERK

2B208-100

TOUCHDOWN

SPACE

2B290-100

UTILITY

ROOM,

CLEAN, LINEN

2B240C-100

CONFERENCE/

REPORT

ROOM

2B256-100

ELEC

2B280-100

STORAGE,

EQUIPMENT

2B258-100

SIGNAL

2B284-100

NOURISHMENT

STATION

2B240-100

NURSE

STATION, ICU

2B262-100

OI&T

2B260-100

TEAM ROOM

2B275-100

GREETER

2B240D-100

CC ALCOVE

2B240B-100

WARD CLERK

2B282-100

BLOOD GAS

LAB

2B272-100

OFFICE

2B270-100

OFFICE

2B288-100

TOILET,

STAFF

2B286-100

TOILET,

STAFF

2B254-100

MEDICATION

ROOM

2B271-100

CONSULTATION

ROOM

2B273-100

CONSULTATION

ROOM

2A207-100

VISITOR

KITCHENETTE

2A205-100

KIOSK,

PATIENT

EDUC/ RESRC

2B268-100

LOUNGE,

STAFF

2B274-100

TOILET,

PUBLIC

2A206-100

KIOSK,

PATIENT

EDUC/ RESRC

2A203-100

WAITING/

LOUNGE

2A225A-100

KIOSK,

PATIENT

EDUC/ RESRC 2A225-100

WAITING/

LOUNGE

2B237-100

MICU PATIENT

ROOM 1

C2-12-100

CORRIDOR

N2-27-100

NURSE

SUB-STATION

C2-05-100

CORRIDOR

C2-04-100

CORRIDOR

C2-09-100

CORRIDOR

V2-01-100

PATIENT ELEV

C2-07-100

CORRIDOR

C2-01-100

CORRIDOR

C2-17-100

CORRIDOR

C2-18-100

CORRIDOR

C2-06-100

CORRIDOR

C2-19-100

CORRIDOR

C2-02-100

CORRIDOR

C2-10-100

CORRIDOR

2B216e-100

ALCOVE

2A282A-100

ALCOVE

2B240A-100

NURSE

WORKROOM

2B216A-100

NURSE

WORKROOM

2B231A-100

BATHROOM,

PATIENT

C2-16-100

CORRIDOR

C2-13-100

CORRIDOR

C2-11-100

CORRIDOR

C2-08-100

CORRIDOR

C2-03-100

CORRIDOR

C2-14-100

CORRIDOR

C2-20-100

CORRIDOR

C2-15-100

CORRIDOR

2B217-100

CICU PATIENT

ROOM 6

2B261A-100

BATHROOM,

PATIENT

2B259A-100

BATHROOM,

PATIENT

2B255A-100

BATHROOM,

PATIENT

N2B-53-100

NURSE

SUB-STATION

N2B-59-100

NURSE

SUB-STATION

2B235-100

CICU PATIENT

ROOM 12

2B231-100

CICU PATIENT

ROOM 11,

NEG

ISOLATION

2A215-100

WAITING/

LOUNGE

C2-24-100

CORRIDOR

C2-22-100

CORRIDOR

2B200A-100

ALCOVE

C2-23-100

CORRIDOR

2A281A-100

ALCOVE

100.FP-301

100.FP-301

100.FP-301

100.FP-301

100.FP-301

100.FP-301

2B255-100

MICU PATIENT

ROOM 7

2B253A-100

BATHROOM,

PATIENT

ELEVATOR P

ELEVATOR P

ELEVATOR P

ELEVATOR P

ELEVATOR S

ELEVATOR S

ELEVATOR

MH 8

ELEVATOR

MH 7

GENERAL NOTES:

1.

2.

PROVIDE FULL SPRINKLER COVERAGE FOR BUILDING AREA

SHOWN ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM

SHALL BE DESIGNED IN ACCORDANCE WITH VA DESIGN MANUAL

AND NFPA 13.

REFER TO SHEET FP-001 FOR SYMBOL LEGEND, ABBREVIATIONS,

AND GENERAL NOTES.

3.

ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS

OTHERWISE NOTED.

4.

ROUTE SPRINKLER PIPING TO PROVIDE COMPLETE SYSTEM

DRAINAGE BACK TO SYSTEM VALVE TO THE EXTENT POSSIBLE.

PROVIDE AUXILIARY DRAINS AS NECESSARY. MEET NFPA 13

REQUIREMENTS FOR AREAS OF SPRINKLER PIPING WITH

TRAPPED WATER.

5.

COORDINATE WORK WITH ALL OTHER TRADES.

THIS DRAWING IS INTENDED TO DESCRIBE THE GENERAL DESIGN

INTENT BY WHICH THE SPRINKLER PLANNER CAN CORRECTLY

PLAN THE SYSTEM(S). SOME PARTS OF THE SYSTEM MAY NOT BE

DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER

TO SPECIFICATION SECTIONS 21 1313 AND 21 3013 FOR COMPLETE

PERFORMANCE REQUIREMENTS.

PROVIDE COVERAGE AROUND ALL CEILING OBSTRUCTIONS,

INCLUDING MECHANICAL DUCTWORK, AS REQUIRED BY NFPA 13.

6.

7.

KEYED NOTES:

SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER

STANDPIPE IN STAIR 1

2 SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER

STANDPIPE IN STAIR 2

SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER

STANDPIPE IN STAIR 3

HOSE CONNECTIONS ON EITHER SIDE OF HORIZONTAL EXIT.4

PROVIDE SPRINKLER AT LINEN/TRASH CHUTE. SEE FIRE PROTECTION

DETAILS FOR INSTALLATION DETAIL.

CONTRACTOR TO MODIFY EXISTING BUILDING 1 SPRINKLER SYSTEM TO

ACCOMODATE ARCHITECTURAL CHANGES AT BUILDING CONNECTOR

LEGEND

SPRINKLER ZONE BOUNDARY

ORDINARY HAZARD 1

ORDINARY HAZARD 2

SMOKE ZONE KEYPLAN

SMOKE ZONE A

SMOKE ZONE B

SMOKE ZONE C

HYDRAULIC DESIGN CRITERIA

ZONE 2A - LEVEL 2

OCCUPANCY CLASSIFICATION

DENSITY AND COVERAGE AREA

TOTAL HOSE STREAM

K-FACTOR

SAFETY MARGIN

LIGHT HAZARD

0.1 GPM/FT2 OVER 1,500FT2

100 GPM

5.6

GREATER OF 10 PSI OR 10% REQUIRED

HYDRAULIC DESIGN CRITERIA

ZONE 2B - LEVEL 2

OCCUPANCY CLASSIFICATION

DENSITY AND COVERAGE AREA

TOTAL HOSE STREAM

K-FACTOR

SAFETY MARGIN

LIGHT HAZARD

0.1 GPM/FT2 OVER 1,500FT2

100 GPM

5.6

GREATER OF 10 PSI OR 10% REQUIRED

HYDRAULIC DESIGN CRITERIA

ZONE 2C - LEVEL 2

OCCUPANCY CLASSIFICATION

DENSITY AND COVERAGE AREA

TOTAL HOSE STREAM

K-FACTOR

SAFETY MARGIN

ORDINARY HAZARD 2

0.2 GPM/FT2 OVER 1,500FT2

100 GPM

5.6

GREATER OF 10 PSI OR 10% REQUIRED

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B

A

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

RECORD DOCUMENTS

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

F

P -R

-C

E N

T R

A L .r v t

/2 /2

:0

:1

P M

100.FP-102

FIRE PROTECTION - OVERALL FLOOR PLAN -

LEVEL 02

RSK JDR

FINAL AS-BUILT SUBMISSION

03 JAN 2023

SCALE: 1/16" = 1'-0"1 FIRE PROTECTION OVERALL PLAN - LEVEL 2

16' 32'8'0-8'

Revision

3.5

4.5

5.5

4.2

7.5

A B.3 C D E F

F

H.5 J.5 K.5 L.5

B.6 G

E.8

7.8

5.3

6.6

F.3 F.8

2.5

5.8

7.4

8.5

9.3

9.6

6.5

1.5

0.7

AAABACAD

0.2

3.2

ZONE 2I

S2I-01-100

STAIR 1

LEVEL 2I

S2I-02-100

STAIR 2

LEVEL 2I

S2I-03-100

STAIR 3

LEVEL 2I

100.FP-301

100.FP-301

100.FP-301

100.FP-301

100.FP-301

100.FP-301

2IA180-100

MECHANICAL

ROOM

V2I-02-100

VESTIBULE

V2I-03-100

VESTIBULE

V2I-01-100

VESTIBULE

ELEVATOR

MH 8

GENERAL NOTES:

1.

2.

PROVIDE FULL SPRINKLER COVERAGE FOR BUILDING AREA

SHOWN ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM

SHALL BE DESIGNED IN ACCORDANCE WITH VA DESIGN MANUAL

AND NFPA 13.

REFER TO SHEET FP-001 FOR SYMBOL LEGEND, ABBREVIATIONS,

AND GENERAL NOTES.

3.

ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS

OTHERWISE NOTED.

4.

ROUTE SPRINKLER PIPING TO PROVIDE COMPLETE SYSTEM

DRAINAGE BACK TO SYSTEM VALVE TO THE EXTENT POSSIBLE.

PROVIDE AUXILIARY DRAINS AS NECESSARY. MEET NFPA 13

REQUIREMENTS FOR AREAS OF SPRINKLER PIPING WITH

TRAPPED WATER.

5.

COORDINATE WORK WITH ALL OTHER TRADES.

THIS DRAWING IS INTENDED TO DESCRIBE THE GENERAL DESIGN

INTENT BY WHICH THE SPRINKLER PLANNER CAN CORRECTLY

PLAN THE SYSTEM(S). SOME PARTS OF THE SYSTEM MAY NOT BE

DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER

TO SPECIFICATION SECTIONS 21 1313 AND 21 3013 FOR COMPLETE

PERFORMANCE REQUIREMENTS.

PROVIDE COVERAGE AROUND ALL CEILING OBSTRUCTIONS,

INCLUDING MECHANICAL DUCTWORK, AS REQUIRED BY NFPA 13.

6.

7.

KEYED NOTES:

SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER

STANDPIPE IN STAIR 2

LEGEND

SPRINKLER ZONE BOUNDARY

ORDINARY HAZARD 1

ORDINARY HAZARD 2

HYDRAULIC DESIGN CRITERIA

ZONE 2I - LEVEL 2I

OCCUPANCY CLASSIFICATION

DENSITY AND COVERAGE AREA

TOTAL HOSE STREAM

K-FACTOR

SAFETY MARGIN

ORDINARY HAZARD - GROUP 2

0.2GPM/FT2 OVER 1,500FT2

250 GPM

8.0

GREATER OF 10 PSI OR 10% REQUIRED

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B

A

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

RECORD DOCUMENTS

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

F

P -R

-C

E N

T R

A L .r v t

/2 /2

:0

:2

P M

100.FP-102I

FIRE PROTECTION - OVERALL FLOOR PLAN -

LEVEL 2I

RSK JDR

FINAL AS-BUILT SUBMISSION

03 JAN 2023

SCALE: 1/16" = 1'-0"1 FIRE PROTECTION OVERALL PLAN - LEVEL 2 INTERSTITAL

16' 32'8'0-8'

Revision

2 2

2 2

2 2 2

B C.5 D.5 E.5 F.5 H J K L M

3.5

4.5

5.5

4.2

7.5

A B.3 C D E F H.5 J.5 K.5 L.5

B.6 G

E.8

7.8

5.3

6.6

F.3

F.3

F.8

2.5

5.8

7.4

8.5

9.3

9.6

6.5

1.5

0.7

AAABACAD

0.2

3.2

ZONE 3C

ZONE 3B

ZONE 3A

3A358-100

SIGNAL

3A317-100

PATIENT

ROOM 5

3A327-100

PATIENT

ROOM 8, POS

ISOLATION

3A307-100

PATIENT

ROOM 2 3A305-100

BARIATRIC

PATIENT

ROOM 1

3A367-100

PATIENT

ROOM 23

3A337-100

PATIENT

ROOM 12

3B367-100

PATIENT

ROOM 23

3A347-100

BARIATRIC

PATIENT

ROOM 15

3B369-100

BARIATRIC

PATIENT

ROOM 24

3A325-100

PATIENT

ROOM 7, POS

ISOLATION

3B329-100

PATIENT

ROOM 10,

NEG

ISOLATION

3B331-100

PATIENT

ROOM 11,

NEG

ISOLATION

3B349-100

PATIENT

ROOM 17, POS

ISOLATION

3B365-100

PATIENT

ROOM 22

3A349-100

PATIENT

ROOM 16

3A357-100

PATIENT

ROOM 19

3A343-100

PATIENT

ROOM 14,

NEG

ISOLATION

3A359-100

PATIENT

ROOM 20

3A369-100

BARIATRIC

PATIENT

ROOM 24

3A341-100

PATIENT

ROOM 13,

NEG

ISOLATION

3A351-100

PATIENT

ROOM 17

3A335-100

PATIENT

ROOM 11

3A333-100

PATIENT

ROOM 10

3A353-100

PATIENT

ROOM 18

3A331-100

PATIENT

ROOM 9, POS

ISOLATION

3A365-100

PATIENT

ROOM 22

3B303-100

PATIENT

ROOM 1

3B325-100

BARIATRIC

PATIENT

ROOM 9, NEG

ISOLATION

3A363-100

PATIENT

ROOM 21

3B309-100

PATIENT

ROOM 3

3A357A-100

TLT/ SHWR,

PATIENT

3A351A-100

TLT/ SHWR,

PATIENT

3A359A-100

TLT/ SHWR,

PATIENT

3B331A-100

TLT/ SHWR,

PATIENT

3A343A-100

TLT/ SHWR,

PATIENT

3A353A-100

TLT/ SHWR,

PATIENT

3A365A-100

TLT/ SHWR,

PATIENT

3A331A-100

TLT/ SHWR,

PATIENT

3B317A-100

TLT/ SHWR,

PATIENT

3A341A-100

TLT/ SHWR,

PATIENT

3B337A-100

TLT/ SHWR,

PATIENT

3A333A-100

TLT/ SHWR,

PATIENT

3B321A-100

TLT/ SHWR,

PATIENT

3B315A-100

TLT/ SHWR,

PATIENT

3B339A-100

TLT/ SHWR,

PATIENT

3B323A-100

TLT/ SHWR,

PATIENT

3B335A-100

TLT/ SHWR,

PATIENT

3B341A-100

TLT/ SHWR,

PATIENT

3B347A-100

TLT/ SHWR,

PATIENT

3B349A-100

TLT/ SHWR,

PATIENT

3B353A-100

TLT/ SHWR,

PATIENT

3B355A-100

TLT/ SHWR,

PATIENT

3B359A-100

TLT/ SHWR,

PATIENT

3B361A-100

TLT/ SHWR,

PATIENT

3B365A-100

TLT/ SHWR,

PATIENT

3A327A-100

TLT/ SHWR,

PATIENT

3A317A-100

TLT/ SHWR,

PATIENT

3B329A-100

TLT/ SHWR,

PATIENT

3A313A-100

TLT/ SHWR,

PATIENT

3B325A-100

TLT/ SHWR,

BARIATRIC

3B369A-100

TLT/ SHWR,

BARIATRIC

3B367A-100

TLT/ SHWR,

PATIENT

3A307A-100

TLT/ SHWR,

PATIENT

3A305A-100

TLT/ SHWR,

BARIATRIC

3A319A-100

TLT/ SHWR,

PATIENT

3A325A-100

TLT/ SHWR,

PATIENT

3A327B-100

ANTEROOM

3A325B-100

ANTEROOM

3B329B-100

ANTEROOM

3B331B-100

ANTEROOM

3A331B-100

ANTEROOM

3A319-100

PATIENT

ROOM 6

S3-03-100

STAIR 3

LEVEL 3

S3-01-100

STAIR 1

LEVEL 3

3B347-100

PATIENT

ROOM 16, POS

ISOLATION

3A343B-100

ANTEROOM

3A341B-100

ANTEROOM

3B349B-100

ANTEROOM

N3B-29-100

NURSE

SUB-STATION

N3B-35-100

NURSE

SUB-STATION

N3B-23-100

NURSE

SUB-STATION

N3B-39-100

NURSE

SUB-STATION

N3B-47-100

NURSE

SUB-STATION

3B325B-100

ANTEROOM

3B347B-100

ANTEROOM

N3A-51-100

NURSE

SUB-STATION

N3A-57-100

NURSE

SUB-STATION

N3A-41-100

NURSE

SUB-STATION

N3A-31-100

NURSE

SUB-STATION

N3A-17-100

NURSE

SUB-STATION

N3A-25-100

NURSE

SUB-STATION

N3B-53-100

NURSE

SUB-STATION

N3B-59-100

NURSE

SUB-STATION

N3B-65-100

NURSE

SUB-STATION

3A338B-100

WARD CLERK

3B374-100

PATIENT

KIOSK

3A375E-100

COPIER/

PRINTER

ROOM

3A384-100

STORAGE,

MEDICAL GAS

3A375C-100

OFFICE

3A377-100

MOBILE

X-RAY

ALCOVE

3A338E-100

UTILITY

ROOM,

CLEAN, LINEN

3A338C-100

CONFERENCE/

REPORT

ROOM

3A314-100

CONFERENCE

3A360-100

ELEC

3A324-100

EMPL

WELLNESS

3A380-100

STORAGE,

EMS

3A370-100

STORAGE,

EQUIPMENT

3A378-100

TOILET,

STAFF

3A387-100

HAC

3A382-100

DISPOSAL

CHUTE ROOM,

LINEN

3A362-100

MEDICATION

ROOM

3A336-100

NOURISHMENT

STATION

3A338-100

NURSE

STATION

3A354-100

OI&T

3A381B-100

ON CALL

3A381C-100

ON CALL

3A381A-100

ON CALL

3A381D-100

ON CALL

SHOWER

3A381E-100

ON CALL

SHOWER

3A308-100

TOILET,

PUBLIC

3A388-100

UTILITY,

SOILED

3A368A-100

LOCKER

ROOM STAFF

3A368-100

LOUNGE,

STAFF

3A389-100

TEAM ROOM

3A386-100

DISPOSAL

CHUTE ROOM,

TRASH

V3-04-100

SERVICE

ELEV

3A338D-100

CC ALCOVE

3A385-100

TOILET,

STAFF

3A332-100

FS CART

STORAGE

3A334-100

MEDICATION

ROOM

3A338A-100

NURSE

WORKROOM

3A389A-100

COPIER/

PRINTER

ROOM

3A375B-100

OFFICE

3A375A-100

OFFICE

3A375D-100

OFFICE

3A326-100

WC ALCOVE

3A332A-100

CC ALCOVE

3B383-100

TOILET,

STAFF

3B381-100

HAC

3B385-100

STORAGE,

MEDICAL GAS

3B312-100

MEDICATION

ROOM

3B314-100

NOURISHMENT

STATION

3B387-100

UTILITY,

SOILED

3B316-100

TEAM ROOM

V3-03-100

PUBLIC ELEV

S3-02-100

STAIR 2

LEVEL 3

3B308-100

HOT OFFICE

3B316A-100

COPIER/

PRINTER

ROOM

3B314A-100

FS CART

STORAGE

3B300-100

TOILET,

FAMILY

ASSIST

3B302-100

HOT OFFICE

3B304-100

HOT OFFICE

3B352-100

MEDICATION

ROOM

3B334-100

UTILITY

ROOM,

CLEAN, LINEN

3B356-100

ELEC

3B380-100

STORAGE,

EQUIPMENT

3B378-100

TOILET,

FAMILY

ASSIST

3B358-100

SIGNAL

3B362-100

OI&T

3B371a-100

VENDING

MACHINE

AREA

3B336-100

TOILET,

PUBLIC

3B384-100

TOILET,

STAFF

3B371-100

WAITING/

LOUNGE

3B340C-100

CONFERENCE/

REPORT

ROOM

3B340A-100

WARD CLERK

3B340-100

NURSE

STATION

3B386-100

NOURISHMENT

STATION

3B371b-100

VISITOR

KITCHENETTE

3B340D-100

CC ALCOVE

3B382-100

STORAGE,

EMS

3B360-100

TEAM ROOM

3B354-100

FS CART

STORAGE

3B375-100

GREETER

3B315-100

PATIENT

ROOM 5

3B321-100

PATIENT

ROOM 7

3B323-100

PATIENT

ROOM 8

3B361-100

PATIENT

ROOM 21

3B359-100

PATIENT

ROOM 20

3B355-100

PATIENT

ROOM 19

3B353-100

PATIENT

ROOM 18

3B341-100

PATIENT

ROOM 15

3B339-100

PATIENT

ROOM 14

3B337-100

PATIENT

ROOM 13

3B335-100

PATIENT

ROOM 12

C3-10-100

CORRIDOR

C3-14-100

CORRIDOR

C3-15-100

CORRIDOR

C3-11-100

CORRIDOR

C3-07-100

CORRIDOR

C3-01-100

CORRIDOR

C3-13-100

CORRIDOR

C3-08-100

CORRIDOR

V3-01-100

PATIENT ELEV

C3-06-100

CORRIDOR

C3-02-100

CORRIDOR

C3-03-100

CORRIDOR

C3-16-100

CORRIDOR

3A347A-100

TLT/ SHWR,

BARIATRIC

3A381-100

CORRIDOR

C3-17-100

CORRIDOR

3B314B-100

CC ALCOVE

3B368-100

CONSULTATION

ROOM

3B366-100

CONSULTATION

ROOM

3B340B-100

NURSE

WORKROOM

3A380A-100

ALCOVE

3B354A-100

ALCOVE

3A369A-100

TLT/ SHWR,

BARIATRIC

C3-05-100

CORRIDOR

3A313-100

PATIENT

ROOM 4

N3A-63-100

NURSE

SUB-STATION

3A363A-100

TLT/ SHWR,

PATIENT

3A367A-100

TLT/ SHWR,

PATIENT

3A311-100

PATIENT

ROOM 3

3B305-100

PATIENT

ROOM 2

3B311-100

PATIENT

ROOM 4

3B317-100

PATIENT

ROOM 6

N3A-11-100

NURSE

SUB-STATION

3A311A-100

TLT/ SHWR,

PATIENT

3A335A-100

TLT/ SHWR,

PATIENT

N3A-35-100

NURSE

SUB-STATION

3A337A-100

TLT/ SHWR,

PATIENT

C3-04-100

CORRIDOR

3A349A-100

TLT/ SHWR,

PATIENT

C3-09-100

CORRIDOR

3B303A-100

TLT/ SHWR,

PATIENT

N3B-03-100

NURSE

SUB-STATION

3B305A-100

TLT/ SHWR,

PATIENT

3B309A-100

TLT/ SHWR,

PATIENT

N3B-09-100

NURSE

SUB-STATION

3B311A-100

TLT/ SHWR,

PATIENT

N3B-15-100

NURSE

SUB-STATION

3B352A-100

ALCOVE

3B352B-100

ALCOVE

3B340E-100

ALCOVE

C3-12-100

CORRIDOR

3B360a-100

COPIER/

PRINTER

ROOM

100.FP-301

100.FP-301

100.FP-301

100.FP-301

100.FP-301

100.FP-301

ELEVATOR P

ELEVATOR P

ELEVATOR P

ELEVATOR P

ELEVATOR

MH 8

ELEVATOR

MH 7

ELEVATOR S

ELEVATOR S

GENERAL NOTES:

1.

2.

PROVIDE FULL SPRINKLER COVERAGE FOR BUILDING AREA

SHOWN ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM

SHALL BE DESIGNED IN ACCORDANCE WITH VA DESIGN MANUAL

AND NFPA 13.

REFER TO SHEET FP-001 FOR SYMBOL LEGEND, ABBREVIATIONS,

AND GENERAL NOTES.

3.

ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS

OTHERWISE NOTED.

4.

ROUTE SPRINKLER PIPING TO PROVIDE COMPLETE SYSTEM

DRAINAGE BACK TO SYSTEM VALVE TO THE EXTENT POSSIBLE.

PROVIDE AUXILIARY DRAINS AS NECESSARY. MEET NFPA 13

REQUIREMENTS FOR AREAS OF SPRINKLER PIPING WITH

TRAPPED WATER.

5.

COORDINATE WORK WITH ALL OTHER TRADES.

THIS DRAWING IS INTENDED TO DESCRIBE THE GENERAL DESIGN

INTENT BY WHICH THE SPRINKLER PLANNER CAN CORRECTLY

PLAN THE SYSTEM(S). SOME PARTS OF THE SYSTEM MAY NOT BE

DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER

TO SPECIFICATION SECTIONS 21 1313 AND 21 3013 FOR COMPLETE

PERFORMANCE REQUIREMENTS.

PROVIDE COVERAGE AROUND ALL CEILING OBSTRUCTIONS,

INCLUDING MECHANICAL DUCTWORK, AS REQUIRED BY NFPA 13.

6.

7.

KEYED NOTES:

SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER

STANDPIPE IN STAIR 1

2 SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER

STANDPIPE IN STAIR 2

SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER

STANDPIPE IN STAIR 3

PROVIDE SPRINKLER AT LINEN/TRASH CHUTE. SEE FIRE PROTECTION DETAILS

FOR INSTALLATION DETAIL.

LEGEND

SPRINKLER ZONE BOUNDARY

ORDINARY HAZARD 1

ORDINARY HAZARD 2

SMOKE ZONE KEYPLAN

SMOKE ZONE A

SMOKE ZONE B

SMOKE ZONE C

HYDRAULIC DESIGN CRITERIA

ZONE 3A - LEVEL 3

OCCUPANCY CLASSIFICATION

DENSITY AND COVERAGE AREA

TOTAL HOSE STREAM

K-FACTOR

SAFETY MARGIN

LIGHT HAZARD

0.1 GPM/FT2 OVER 1,500FT2

100 GPM

5.6

GREATER OF 10 PSI OR 10% REQUIRED

HYDRAULIC DESIGN CRITERIA

ZONE 3B - LEVEL 3

OCCUPANCY CLASSIFICATION

DENSITY AND COVERAGE AREA

TOTAL HOSE STREAM

K-FACTOR

SAFETY MARGIN

100 GPM

5.6

GREATER OF 10 PSI OR 10% REQUIRED

LIGHT HAZARD

0.1 GPM/FT2 OVER 1,500FT2

HYDRAULIC DESIGN CRITERIA

ZONE 3C - LEVEL 3

OCCUPANCY CLASSIFICATION

DENSITY AND COVERAGE AREA

TOTAL HOSE STREAM

K-FACTOR

SAFETY MARGIN

100 GPM

5.6

GREATER OF 10 PSI OR 10% REQUIRED

ORDINARY HAZARD 2

0.2 GPM/FT2 OVER 1,500FT2

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGN BUILD TEAM

321 4 5 6 7 8 9 10

Key Plan

Page Southerland Page, Inc.

pagethink.com

TEL

ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING

Austin / Dallas / Denver / Houston / San Francisco / Washington DC /

International Affiliate Offices

400 W. Cesar Chavez Street Fifth Floor

Austin, TX 78701 512 472 6721

512 477 3211

VA-0007-2016JAMES A. HALEY VETERANS'

HOSPITAL - NEW BED TOWER

Project Abbreviation:

13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612

US ARMY CORPS OF ENGINEERS

STAMP

JAHVHNBT

135 W Central Blvd. Suite 950

Orlando, FL 32801

Turner Construction turnerconstruction.com

TEL

FAX

407 210 2500

TC 180221 | PSP 117265

CONTRACTOR:

DESIGNER:

B

A

THESE RECORD DOCUMENTS HAVE

BEEN PREPARED BASED ON

INFORMATION PROVIDED BY OTHERS.

PAGE SOUTHERLAND PAGE, INC. HAS

NOT VERIFIED THE ACCURACY AND/OR

COMPLETENESS OF THIS INFORMATION

AND SHALL NOT BE RESPONSIBLE FOR

ANY ERRORS OR OMISSIONS THAT MAY

BE INCORPORATED AS A RESULT OF

ERRONEOUS INFORMATION PROVIDED

BY OTHERS.

RECORD DOCUMENTS

B

IM

/1

-V A

T a m p a N e w

B e d to w e r/

B

F

P -R

-C

E N

T R

A L .r v t

/2 /2

:0

:3

P M

100.FP-103

FIRE PROTECTION - OVERALL FLOOR PLAN -

LEVEL 03

RSK JDR

FINAL AS-BUILT SUBMISSION

03 JAN 2023

SCALE: 1/16" = 1'-0"1 FIRE PROTECTION OVERALL PLAN - LEVEL 3

16' 32'8'0-8'

Revision

2 2

2 2

2 2 2

2 2

B C.5 D.5 E.5 F.5 H J K L M

3.5

4.5

5.5

4.2

7.5

A B.3 C D E F H.5 J.5 K.5 L.5

B.6 G

E.8

7.8

5.3

6.6

F.3 F.8

2.5

5.8

7.4

8.5

9.3

9.6

6.5

1.5

0.7

AAABACAD

0.2

3.2

ZONE 4C

ZONE 4B

ZONE 4A

4A471-100

STORAGE,

EQUIPMENT

4A411-100

PATIENT

ROOM 3

4B474-100

PATIENT

KIOSK

4B425B-100

ANTEROOM

V4-01-100

PATIENT ELEV

S4-01-100

STAIR 1

LEVEL 4

4A441B-100

ANTEROOM

4A431B-100

ANTEROOM

4A479-100

CONFERENCE

4A481-100

TELEMETRY

4A424-100

EMPL

WELLNESS

4A426-100

WC ALCOVE

4B471A-100

VISITOR

KITCHENETTE

4B468-100

CONSULTATION

ROOM

A4-480A-100

ALCOVE

4A451-100

PATIENT

ROOM 17

4A453-100

PATIENT

ROOM 18

4A457-100

PATIENT

ROOM 19

4A459-100

PATIENT

ROOM 20

4A463-100

PATIENT

ROOM 21

4A465-100

PATIENT

ROOM 22

4A467-100

PATIENT

ROOM 23

4A467A-100

TLT/ SHWR,

PATIENT

4A465A-100

TLT/ SHWR,

PATIENT

4A463A-100

TLT/ SHWR,

PATIENT

4A459A-100

TLT/ SHWR,

PATIENT

4A457A-100

TLT/ SHWR,

PATIENT

4A451A-100

TLT/ SHWR,

PATIENT

N4A-63-100

NURSE

SUB-STATION

N4A-57-100

NURSE

SUB-STATION

N4A-51-100

NURSE

SUB-STATION

4A449-100

RADIATION

PATIENT

ROOM 16

4A443-100

PATIENT

ROOM 14,

NEG

ISOLATION

4A441-100

PATIENT

ROOM 13,

NEG

ISOLATION

4A437-100

PATIENT

ROOM 12

4A435-100

PATIENT

ROOM 11

4A431-100

PATIENT

ROOM 9, POS

ISOLATION

4A433-100

PATIENT

ROOM 10

4A437A-100

TLT/ SHWR,

PATIENT

4A441A-100

TLT/ SHWR,

PATIENT

4A443A-100

TLT/ SHWR,

PATIENT

4A443B-100

ANTEROOM

4A427B-100

ANTEROOM

4A435A-100

TLT/ SHWR,

PATIENT

4A425B-100

ANTEROOM

N4A-31-100

NURSE

SUB-STATION

4A431A-100

TLT/ SHWR,

PATIENT

N4A-41-100

NURSE

SUB-STATION

N4A-35-100

NURSE

SUB-STATION

N4A-25-100

NURSE

SUB-STATION

4A427-100

PATIENT

ROOM 13, POS

ISOLATION

4A425-100

PATIENT

ROOM 12, POS

ISOLATION 4A419-100

PATIENT

ROOM 11

4A413-100

PATIENT

ROOM 4

4A417-100

PATIENT

ROOM 5

4A407-100

PATIENT

ROOM 2 4A405-100

BARIATRIC

PATIENT

ROOM 1

4A427A-100

TLT/ SHWR,

PATIENT 4A425A-100

TLT/ SHWR,

PATIENT

4A419A-100

TLT/ SHWR,

PATIENT

4A417A-100

TLT/ SHWR,

PATIENT

4A413A-100

TLT/ SHWR,

PATIENT

4A411A-100

TLT/ SHWR,

PATIENT

N4A-17-100

NURSE

SUB-STATION

N4A-11-100

NURSE

SUB-STATION

4A433A-100

TLT/ SHWR,

PATIENT

C4-06-100

CORRIDOR

C4-11-100

CORRIDOR

4B466-100

CONSULTATION

ROOM

4B467-100

PATIENT

ROOM 23

4B469-100

BARIATRIC

PATIENT

ROOM 24

4B429-100

PATIENT

ROOM 10,

NEG

ISOLATION

4B431-100

PATIENT

ROOM 11,

NEG

ISOLATION

4B449-100

PATIENT

ROOM 17, POS

ISOLATION4B465-100

PATIENT

ROOM 22

4B403-100

PATIENT

ROOM 1

4B425-100

BARIATRIC

PATIENT

ROOM 9, NEG

ISOLATION

4B409-100

PATIENT

ROOM 3

4B405-100

PATIENT

ROOM 2

4B403A-100

TLT/ SHWR,

PATIENT

4B431A-100

TLT/ SHWR,

PATIENT

4B417A-100

TLT/ SHWR,

PATIENT

4B437A-100

TLT/ SHWR,

PATIENT

4B405A-100

TLT/ SHWR,

PATIENT

4B421A-100

TLT/ SHWR,

PATIENT

4B409A-100

TLT/ SHWR,

PATIENT

4B411A-100

TLT/ SHWR,

PATIENT

4B415A-100

TLT/ SHWR,

PATIENT

4B439A-100

TLT/ SHWR,

PATIENT

4B435A-100

TLT/ SHWR,

PATIENT

4B441A-100

TLT/ SHWR,

PATIENT

4B447A-100

TLT/ SHWR,

PATIENT

4B449A-100

TLT/ SHWR,

PATIENT

4B453A-100

TLT/ SHWR,

PATIENT

4B455A-100

TLT/ SHWR,

PATIENT

4B459A-100

TLT/ SHWR,

PATIENT

4B461A-100

TLT/ SHWR,

PATIENT

4B465A-100

TLT/ SHWR,

PATIENT

4B429A-100

TLT/ SHWR,

PATIENT

4B469A-100

TLT/ SHWR,

BARIATRIC

4B467A-100

TLT/ SHWR,

PATIENT

4B429B-100

ANTEROOM

4B431B-100

ANTEROOM

S4-03-100

STAIR 3

LEVEL 4

4B447-100

PATIENT

ROOM 16, POS

ISOLATION

4B449B-100

ANTEROOM

N4B-29-100

NURSE

SUB-STATION

N4B-35-100

NURSE

SUB-STATION

N4B-09-100

NURSE

SUB-STATION

N4B-15-100

NURSE

SUB-STATION N4B-23-100

NURSE

SUB-STATION

N4B-39-100

NURSE

SUB-STATION

N4B-47-100

NURSE

SUB-STATION

4B447B-100

ANTEROOM

N4B-03-100

NURSE

SUB-STATION

N4B-53-100

NURSE

SUB-STATION

N4B-59-100

NURSE

SUB-STATION

N4B-65-100

NURSE

SUB-STATION

4B483-100

TOILET,

STAFF

4B481-100

HAC

4B485-100

STORAGE,

MEDICAL GAS

4B412-100

MEDICATION

ROOM

4B414-100

NOURISHMENT

STATION

4B487-100

UTILITY,

SOILED

4B416-100

TEAM ROOM

V4-03-100

PUBLIC ELEV

S4-02-100

STAIR 2

LEVEL 4

4B408-100

HOT OFFICE

4B416A-100

COPIER/

PRINTER

ROOM

4B414B-100

FS CART

STORAGE

4B400-100

TOILET,

FAMILY

ASSIST 4B402-100

HOT OFFICE

4B404-100

HOT OFFICE

4B452-100

MEDICATION

ROOM

4B434-100

UTILITY

ROOM,

CLEAN, LINEN

4B456-100

ELEC

4B478-100

TOILET,

FAMILY

ASSIST

4B458-100

SIGNAL

4B462-100

OI&T

4B436-100

TOILET,

PUBLIC

4B484-100

TOILET,

STAFF

4B460-100

TEAM ROOM

4B440C-100

CONFERENCE/

REPORT

ROOM

4B440A-100

WARD CLERK

4B440-100

NURSE

STATION

4B486-100

NOURISHMENT

STATION

4B440D-100

CC ALCOVE

4B482-100

STORAGE,

EMS

4B460A-100

COPIER/

PRINTER

ROOM

4B486A-100

FS CART

STORAGE

4B411-100

PATIENT

ROOM 4

4B415-100

PATIENT

ROOM 5

4B417-100

PATIENT

ROOM 6

4B421-100

PATIENT

ROOM 7

4B461-100

PATIENT

ROOM 21

4B459-100

PATIENT

ROOM 20

4B455-100

PATIENT

ROOM 19

4B453-100

PATIENT

ROOM 18

4B441-100

PATIENT

ROOM 15

4B439-100

PATIENT

ROOM 14

4B437-100

PATIENT

ROOM 13

4B435-100

PATIENT

ROOM 12

C4-14-100

CORRIDOR

C4-15-100

CORRIDOR

C4-01-100

CORRIDOR

C4-13-100

CORRIDOR

4A438B-100

WARD CLERK

4A484-100

STORAGE,

MEDICAL GAS

4A475C-100

OFFICE

4A477-100

MOBILE

X-RAY

ALCOVE

4A438E-100

UTILITY

ROOM,

CLEAN, LINEN

4A438C-100

CONFERENCE/

REPORT

ROOM

4A414-100

CONFERENCE

4A460-100

ELEC

4A480-100

STORAGE,

EMS

4A478-100

TOILET,

STAFF

4A487-100

HAC

4A458-100

SIGNAL

4A482-100

DISPOSAL

CHUTE ROOM,

LINEN

4A462-100

MEDICATION

ROOM

4A436-100

NOURISHMENT

STATION

4A438-100

NURSE

STATION

4A454-100

OI&T

4A408-100

TOILET,

PUBLIC

4A488-100

UTILITY,

SOILED

4A468A-100

LOCKER

ROOM STAFF

4A468-100

LOUNGE,

STAFF

4A489-100

TEAM ROOM

4A486-100

DISPOSAL

CHUTE ROOM,

TRASH

V4-04-100

SERVICE

ELEV

4A438D-100

CC ALCOVE

4A485-100

TOILET,

STAFF

4A432A-100

FS CART

STORAGE

4A434-100

MEDICATION

ROOM

4A489A-100

COPIER/

PRINTER

ROOM

4A475B-100

OFFICE

4A475A-100

OFFICE

4A475D-100

OFFICE

4A432B-100