6- JAHVH_A-B_10_FIRE-PROTECTION_DRAWINGS_03 JAN 2023.pdf
PDF 10 MB Posted
- Solicitation number
- 36C24826Q0305
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION
SYMBOLS
GENERAL NOTES
MISC SYMBOLS
ABBREVIATIONS
XXX-1
1 KEY NOTE
EQUIPMENT DESIGNATIONS
PIPE BREAK CONTINUATION
POINT OF DISCONNECTION
POINT OF CONNECTION
EXISTING PIPE TO REMAIN
LIMIT OF PIPE TO BE
REMOVED
NEW PIPING
EXISTING PIPING TO NEW PIPING
CONNECTION
X,XXX
INDICATES ROOF AREA (IN
SQUARE FEET) SERVED BY
ROOF DRAIN
AD
AFF
AHU
APPROX
AVG
BA
BLDG
BOP
BYP
C
CA
CO.
CONN
CW
DCW
DWV
EL
EX.
HD
HP
HW
HWCP
HVC
HWR
HWS
IN WC
INV
KW
LB
LF
LP
MAX
MIN
NA
NC
NIC
NPW
NO
NTS
OS&Y
PDI
PDISCH
PRS
PRV
PLBG
PRESS
PTRV
PW
REF
REFRI
G
RPZA
SAN
SPEC
SPK
T T&P
TEMP
TOP
TP
TSTAT
V
VERT
VTR
WG
WHA
AREA DRAIN
ABOVE FINISHED FLOOR
AIR HANDLING UNIT
APPROXIMATE
AVERAGE
BREATHING AIR
BUILDING
BOTTOM OF PIPE
BY-PASS
CELSIUS
COMPRESSED AIR
CLEANOUT
CONNECTION
COLD WATER
DOMESTIC COLD WATER
DRAIN, WASTE & VENT
ELEVATION
EXISTING
HYDRAULIC DRAIN
HORSE POWER
HOT WATER
HOT WATER CIRCULATING PUMP
HOSE VALVE CABINET
HOT WATER RETURN
HOT WATER SUPPLY
INCHES, WATER COLUMN
INVERT
KILOWATT
POUNDS
LINEAR FEET
LOW PRESSURE
MAXIMUM
MINIMUM
NOT APPLICABLE
NORMALLY CLOSED
NOT IN CONTRACT
NON-POTABLE WATER
NORMALLY OPEN
NOT TO SCALE
OUTSIDE SCREW AND YOKE
PLUMBING DRAINAGE INSTITUTE
PUMP DISCHARGE
PRESSURE REDUCING STATION
PRESSURE REDUCING VALVE
PLUMBING
PRESSURE
PRESSURE TEMPERATURE RELIEF VALVE
PROTECTED WATER
REFERENCE
REFRIGERATOR
REDUCED PRESSURE ZONE
ASSEMBLY
SANITARY
SPECIFICATION
SPRINKLER
TEMPERATURE SENSOR
TEMPERATURE AND PRESSURE VALVE
TEMPERATURE
TOP OF PIPE
TRAP PRIMER OR TRAP PRIMER LINE
THERMOSTAT
VENT
VERTICAL
VENT THROUGH ROOF
WATER GAGE
WATER HAMMER
ARRESTER
F
G.CO.
FIRE LINE
GRADE CLEANOUT
1. PROVIDE 100% SPRINKLER COVERAGE FOR BUILDING AREA SHOWN
ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM SHALL BE
DESIGNED IN ACCORDANCE WITH LOCAL BUILDING CODES, NFPA 13
AND OWNER INSURANCE REQUIREMENTS.
2. THE FIRE SUPPRESSION SYSTEM, AS SHOWN ON THE CONTRACT
DOCUMENTS, IS SCHEMATIC IN NATURE AND INDICATES THE AREAS TO
BE COVERED BY THE SUPPRESSION SYSTEMS. THE FINAL DESIGN OF
THE SYSTEM SHALL BE PERFORMED BY A LICENSED INDIVIDUAL
CERTIFIED TO A MINIMUM NICET LEVEL IV, IN THE FIELD OF WATER-
BASED SYSTEM LAYOUT.
3. PIPE SIZES SHOWN ARE SUBJECT TO CHANGE BASED ON HYDRAULIC
CALCULATIONS PERFORMED BY FIRE PROTECTION CONTRACTOR. FINAL
PIPING LAY-OUT & SIZE SHALL BE DETERMINED BY FIRE PROTECTION
CONTRACTOR.
4.
COORDINATE WORK WITH ALL OTHER TRADES.
5.
6. ROUTE PIPING CONCEALED THROUGHOUT EXCEPT WHERE INDICATED.
7.
FIRE PROTECTION SYSTEM COMPONENTS MUST BE LISTED AND
APPROVED FOR ITS USE WITH UL AND/OR FM. DESIGN AND
INSTALLATION MUST COMPLY WITH THE LISTING LIMITATIONS AND THE
MANUFACTURER'S INSTRUCTIONS.
8. WHERE SPRINKLERS ARE NOT SHOWN, CONTRACTOR SHALL
DETERMINE LOCATION, CENTER IN CEILING TILES IN LAY-IN CEILING
AREAS, ALIGN WITH LIGHTS AND OTHER CEILING ELEMENTS IN HARD
CEILING AREAS. COORDINATE EXACT LOCATION WITH ARCHITECT
DURING SHOP DRAWING SUBMITTAL PROCESS.
9.
10.
11.
12.
FIRE PROTECTION
APPLICABLE CODES &
STANDARDS
VA REQUIREMENTS
VA FIRE PROTECTION DESIGN MANUAL (7th ed.)
NFPA CODES AND STANDARDS
NFPA 13 (2013 ed.)
NFPA 14 (2013 ed.)
NFPA 20 (2015 ed.)
NFPA 82 (2014 ed.)
ICC CODES AND STANDARDS
INTERNATIONAL BUILDING CODE (2015 ed.)
SYSTEM DESCRIPTION
THE NEW BED TOWER IS A FULLY SPRINKLERED BUILDING. THE WATER SUPPLY FOR THE NEW BED TOWER IS A CONNECTION TO THE EXISTING SITE FIRE WATER MAIN. THE BUILDING HAS A NEW FIRE PUMP, LOCATED IN THE LEVEL G FIRE PUMP ROOM GA106-100, WHICH WILL BE FED FROM THE SITE FIRE WATER MAIN.
THE BUILDING IS CLASSIFIED AS A HEALTHCARE FACILITY, AND HAS THREE LEVELS CLASSIFIED AS HEALTHCARE USE:
LEVEL 2, LEVEL 3 AND LEVEL 4. THESE LEVELS ARE EACH SEPERATED INTO THREE SMOKE ZONES: SMOKE ZONE A, SMOKE ZONE B, AND SMOKE ZONE C. EACH SMOKE ZONE IS SERVED FROM A SEPERATE SPRINKLER ZONE. THE REST OF THE BUILDING IS SERVED BY ONE SPRINKLER ZONE PER LEVEL. THE SPRINKLER ZONES WILL BE AS FOLLOWS:
LEVEL G: ZONE G
LEVEL 1: ZONE 1
LEVEL 2: ZONE 2A, ZONE 2B, ZONE 2C
LEVEL 2 INTERSTITIAL: ZONE 2I
LEVEL 3: ZONE 3A, ZONE 3B, ZONE 3C
LEVEL 4: ZONE 4A, ZONE 4B, ZONE 4C
MECHANICAL PENTHOUSE LEVEL: ZONE 5
LEVEL 2 INTERSTITIAL WILL NOT BE SPRINKLERED IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL.
THE ENCLOSED MECHANICAL ROOM LOCATED ON LEVEL 2 INTERSTITIAL WILL BE SPRINKLERED.
ELEVATOR HOISTWAYS AND MACHINE ROOMS WILL NOT BE SPRINKLERED PER NFPA 13 EXEMPTION.
THE BUILDING CONTAINS THREE STAIRWELLS. ALL THREE STAIRWELLS CONTAIN A COMBINED SPRINKLER/STANDPIPE SYSTEM, AS WELL AS AN EXPRESS DRAIN. THE FLOOR CONTROL VALVE ASSEMBLY FOR THE SPRINKLER SYSTEM IS LOCATED AT THE MAIN LANDING OF STAIR 2 ON EACH LEVEL. ADDITIONAL CONTROL VALVE ASSEMBLIES ARE LOCATED IN STAIR 1 AND STAIR 3 TO SERVE THE ADDITIONAL SPRINKLER ZONES ON LEVEL 2, LEVEL 3, AND LEVEL 4.
ALL STANDPIPES HAVE A FIRE HOSE VALVE AT EACH LEVEL.
ONLY PIPING SERVING SPRINKLERS WITHIN ELECTRICAL ROOMS SHALL
BE ROUTED THROUGH SUCH ROOMS. PIPING WITHIN SHALL NOT SERVE
SPRINKLERS OUTSIDE OF THESE ROOMS.
WHERE NOT SHOWN, PIPING LAYOUT AND SIZE SHALL BE DETERMINED
BY FIRE PROTECTION CONTRACTOR.
SHOW ALL DUCTWORK AND OTHER OBSTRUCTIONS IN ROOMS THAT
ARE WITHOUT CEILINGS ON SHOP DRAWINGS. PROVIDE COVERAGE
AROUND AND UNDER ALL OBSTRUCTIONS AS REQUIRED BY NFPA 13,
INCLUDING BUT NOT LIMITED TO COVERAGE UNDER DUCTWORK 48" AND
WIDER. SPRINKLERS THAT ARE BELOW OBSTRUCTIONS SHALL BE
PROVIDED WITH CAGE PROTECTORS.
CONTRACTOR SHALL VERIFY LOCATION OF ANY PIPING/DUCTWORK
THAT MAY CONFLICT WITH ROUTING OF FIRE PROTECTION PIPING
PRIOR TO COMMENCEMENT OF WORK. CONTRACTOR SHALL SUBMIT
REPORT OF CONFLICT DIRECTLY TO ENGINEER.
NOTIFY AND COORDINATE WITH OWNERS REPRESENTATIVE PRIOR TO
SHUTDOWN OF ANY FIRE PROTECTION UTILITY. SHUTDOWN TIME TO BE
MINIMUM. NOTIFICATION SHALL BE IN WRITING A MINIMUM OF 48 HOURS
PRIOR TO SHUTDOWN.
PENDANT SPRINKLER HEAD PLAN
PRE-ACTION VALVE RELEASE CONTROL PANEL
FLOW SWITCH
PREACTION/DELUGE VALVE
SUPERVISED CONTROL VALVE
GATE VALVE
PIPE CAP
PIPE DOWN
PIPE UP
F
FIRE STANDPIPE RISER
FH
FIRE PROTECTION DRY PIPE HEADER RISER
UPRIGHT SPRINKLER HEAD
2 1/2" FIRE VALVE (AT STANDPIPES)
CHECK VALVE
SUPERVISED BUTTERFLY VALVE
S
SUPERVISED BALL VALVE
S
THE SYMBOLS BELOW ARE FOR SCHEMATIC USE ONLY
FIRE PROTECTION
SHEET LIST
FLOW METER
F
PRESSURE RELEIF VALVE
WATER SUPPLY INFORMATION
13. ALL WET-PIPE SPRINKLER ZONES SHALL BE EQUIPPED WITH AN
AUTOMATIC AIR VENTING VALVE AT THE HIGH-POINT OF THE PIPING.
200 400 600 800 1000 1200 1400
FLOW — GPM
1600 1800 2000
N1.85
P R
E S
S U
R E
P
S I)
N1.85
FLOW TEST DATE: 11/14/18
LOCATION:
RESIDUAL HYDRANT - HYDRANT #3 - NEAR PATIENT DROP OFF EAST OF BUILDING 1
FLOW HYDRANT - HYDRANT #10 - NORTHEAST CORNER OF BUILDING 1
STATIC: 60 PSI
RESIDUAL: 45 PSI
OPENING SIZE: 2.5"
COEFFICIENT: 0.9
PITOT READING: 26
FLOW: 856 GPM
RESULTS AT 20 PSI: 1453 GPM
RESULTS AT 0 PSI: 1809 GPM
DURATION OF FLOW: 5 MINUTES
WATER CONSUMPTION ESTIMATE: 4278 GALLONS
ADJUSTED SUPPLY
INCLUDING 250 GPM HOSE
DEMAND
FLOW TEST SUPPLY CURVE
PUMP + ADJUSTED
SUPPLY CURVE
SPRINKLER
DEMAND POINT 100.FP-001 FIRE PROTECTION - LEGEND AND NOTES
100.FP-002 FIRE PROTECTION - RISER DIAGRAM
100.FP-100 FIRE PROTECTION - OVERALL FLOOR PLAN - LEVEL G
100.FP-101 FIRE PROTECTION - OVERALL FLOOR PLAN - LEVEL 01
100.FP-102 FIRE PROTECTION - OVERALL FLOOR PLAN - LEVEL 02
100.FP-102I FIRE PROTECTION - OVERALL FLOOR PLAN - LEVEL 2I
100.FP-103 FIRE PROTECTION - OVERALL FLOOR PLAN - LEVEL 03
100.FP-104 FIRE PROTECTION - OVERALL FLOOR PLAN - LEVEL 04
100.FP-105 FIRE PROTECTION - OVERALL FLOOR PLAN - PENTHOUSE
100.FP-301 FIRE PROTECTION - STAIR SECTIONS
100.FP-401 FIRE PROTECTION - ENLARGED FIRE PUMP ROOM
100.FP-402 FIRE PROTECTION - ENLARGED FLOOR PLANS
100.FP-501 FIRE PROTECTION DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
RECORD DOCUMENTS
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
F
P -R
-C
E N
T R
A L .r v t
/2 /2
:0
:4
P M
100.FP-001
FIRE PROTECTION - LEGEND AND NOTES
RSK JDR
FINAL AS-BUILT SUBMISSION
03 JAN 2023Revision Number
Revisions: Date:
LEVEL 1
LEVEL 2
6" COMBINED
SPRINKLER/STANDPIPE
LEVEL 2
INTERSTITIAL
LEVEL 1
6" COMBINED
SPRINKLER/STANDPIPE
STAIR 3
LEVEL 1
6" COMBINED
SPRINKLER/STANDPIPE
STAIR 2STAIR 1
SPRINKLERS SERVING
SMOKE ZONE 2B
SPRINKLERS SERVING
SMOKE ZONE 5
SPRINKLERS SERVING
SMOKE ZONE 3B
SPRINKLERS SERVING
SMOKE ZONE 1
LEVEL 3
SPRINKLERS SERVING
SMOKE ZONE 4B
LEVEL 4
SPRINKLERS SERVING
SMOKE ZONE 2I
SPRINKLERS SERVING
SMOKE ZONE G
LEVEL G
ROUTE DRAIN TO EXTERIOR
FIRE DEPARTMENT
CONNECTION
2" DRAIN
ROUTE DRAIN TO EXTERIOR
2" DRAIN
ROUTE DRAIN TO DRAIN
2" DRAIN
6"
6"
LEVEL 2
LEVEL 2
INTERSTITIAL
SPRINKLERS SERVING
SMOKE ZONE 2A
SPRINKLERS SERVING
SMOKE ZONE 3A
LEVEL 3
SPRINKLERS SERVING
SMOKE ZONE 4A
LEVEL 4
PENTHOUSE
LEVEL 2
LEVEL 2
INTERSTITIAL
SPRINKLERS SERVING
SMOKE ZONE 2C
SPRINKLERS SERVING
SMOKE ZONE 3C
LEVEL 3
SPRINKLERS SERVING
SMOKE ZONE 4C
LEVEL 4
FIRE DEPARTMENT
CONNECTION
PENTHOUSE
FROM EXTERIOR SITE
WATER SUPPLY
FIRE PUMP TEST
HEADER
DOUBLE BACKFLOW PREVENTER
& REDUCED PRESSURE
DETECTOR ASSEMBLY
FIRE PUMP (FP)
F
JOCKEY PUMP (JP)
8"
8" 8"
8"
6"
1 1/4"
8"
8"
HOSE CONNECTIONS AT EITHER
SIDE OF HORIZONTAL EXIT
FROM INTERIOR
WATER SUPPLY
ROOF HOSE
CONNECTIONS
ROOF - OPENT TO
ATMOSPHERE
ROOF HOSE
CONNECTIONS
PIPING ROUTES
THROUGH MECH ROOM
8"
GENERAL NOTES:
1.
2.
PROVIDE FULL SPRINKLER COVERAGE FOR BUILDING AREA
SHOWN ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM
SHALL BE DESIGNED IN ACCORDANCE WITH VA DESIGN MANUAL
AND NFPA 13.
REFER TO SHEET FP-001 FOR SYMBOL LEGEND, ABBREVIATIONS,
AND GENERAL NOTES.
3.
ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS
OTHERWISE NOTED.
4.
ROUTE SPRINKLER PIPING TO PROVIDE COMPLETE SYSTEM
DRAINAGE BACK TO SYSTEM VALVE TO THE EXTENT POSSIBLE.
PROVIDE AUXILIARY DRAINS AS NECESSARY. MEET NFPA 13
REQUIREMENTS FOR AREAS OF SPRINKLER PIPING WITH
TRAPPED WATER.
5.
COORDINATE WORK WITH ALL OTHER TRADES.
THIS DRAWING IS INTENDED TO DESCRIBE THE GENERAL DESIGN
INTENT BY WHICH THE SPRINKLER PLANNER CAN CORRECTLY
PLAN THE SYSTEM(S). SOME PARTS OF THE SYSTEM MAY NOT BE
DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER
TO SPECIFICATION SECTIONS 21 1313 AND 21 3013 FOR COMPLETE
PERFORMANCE REQUIREMENTS.
PROVIDE COVERAGE AROUND ALL CEILING OBSTRUCTIONS,
INCLUDING MECHANICAL DUCTWORK, AS REQUIRED BY NFPA 13.
6.
7.
KEYED NOTES:
FIRE DEPARTMENT CONNECTION TO BE 5 INCH STORZ TYPE WITH 30
DEGREE DOWNTURN
DRAIN LOCATED IN MECHANICAL ROOM GB005-100, DIRECTLY ADJACENT
TO STAIR 2. REFER TO PLUMBING FLOOR PLANS AND RISER DIAGRAMS
FOR DRAIN INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
RECORD DOCUMENTS
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
F
P -R
-C
E N
T R
A L .r v t
/2 /2
:0
:4
P M
100.FP-002
FIRE PROTECTION - RISER DIAGRAM
RSK JDR
FINAL AS-BUILT SUBMISSION
03 JAN 2023
SCALE: NONE1 FIRE PROTECTION - RISER
Revision
B C.5 D.5 E.5 F.5 H J K L M
3.5
4.5
5.5
4.2
7.5
A B.3 C D E F
F
H.5 J.5 K.5 L.5
B.6 G
E.8
7.8
5.3
6.6
F.3 F.8
2.5
5.8
7.4
8.5
9.3
9.6
6.5
1.5
0.7
AAABACAD
0.2
3.2
ZONE G
GB001-100
COMPUTER
TERMINAL
SERVER
GB003-100
COMMAND
SERVER
GB002-100
TLT/ SHWR,
STAFF
GA060-100
ELEC
V0-04-100
SERVICE
ELEV
GA012-100
DISPOSAL
CHUTE ROOM,
TRASH
GA011-100
DISPOSAL
CHUTE ROOM,
LINEN GA010-100
HAC
GA009-100
RECEIVING
FOOD COURT/
SERVICE
GB000-100
ESSENTIAL
ELECTRICAL
ROOM
GB004-100
ELECTRICAL
SUBSTATION
ROOM
GA006-100
FIRE PUMP
GA005-100
PATIENT
TRAY
ASSEMBLY
GA009C-100
SANITATION &
RECYCLING
GA007-100
MED AIR/VAC
GA054-100
OI&T
GA009A-100
ELEV
MACHINE
ROOM
GA004-100
EQUIPMENT
DISTRIBUTION
GA013-100
TUG /
STORAGE
GA014-100
WASTE
PUMPER
SYSTEM
GA005A-100
HAC
C0-04-100
CORRIDOR
ELEVATOR
MH 8
ELEVATOR
MH 7
C0-01-100
CORRIDOR
ELEVATOR
CS1
C0-02-100
CORRIDOR
C0-03-100
CORRIDOR
SG-02-100
STAIR 2
LEVEL G
GA009B-100
RECEIVING
AREA
C0-06-100
CONNECTOR
CORRIDOR
GA058-100
SIGNAL
GB006-100
MECHANICAL
ROOM
GB005-100
MECHANICAL
ROOM
100.FP-401
100.FP-301
100.FP-301
100.FP-401
100.FP-402
100.FP-402
100.FP-402
GB007-100
ELEVATOR
PIT
GB008-100
ELEVATOR
PIT
GA-011
UNFINISHED
ROOM /
EXISTING
POOL ROOM
GENERAL NOTES:
1.
2.
PROVIDE FULL SPRINKLER COVERAGE FOR BUILDING AREA
SHOWN ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM
SHALL BE DESIGNED IN ACCORDANCE WITH VA DESIGN MANUAL
AND NFPA 13.
REFER TO SHEET FP-001 FOR SYMBOL LEGEND, ABBREVIATIONS,
AND GENERAL NOTES.
3.
ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS
OTHERWISE NOTED.
4.
ROUTE SPRINKLER PIPING TO PROVIDE COMPLETE SYSTEM
DRAINAGE BACK TO SYSTEM VALVE TO THE EXTENT POSSIBLE.
PROVIDE AUXILIARY DRAINS AS NECESSARY. MEET NFPA 13
REQUIREMENTS FOR AREAS OF SPRINKLER PIPING WITH
TRAPPED WATER.
5.
COORDINATE WORK WITH ALL OTHER TRADES.
THIS DRAWING IS INTENDED TO DESCRIBE THE GENERAL DESIGN
INTENT BY WHICH THE SPRINKLER PLANNER CAN CORRECTLY
PLAN THE SYSTEM(S). SOME PARTS OF THE SYSTEM MAY NOT BE
DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER
TO SPECIFICATION SECTIONS 21 1313 AND 21 3013 FOR COMPLETE
PERFORMANCE REQUIREMENTS.
PROVIDE COVERAGE AROUND ALL CEILING OBSTRUCTIONS,
INCLUDING MECHANICAL DUCTWORK, AS REQUIRED BY NFPA 13.
6.
7.
KEYED NOTES:
SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER
STANDPIPE IN STAIR 2
PROVIDE STANDARD RESPONSE SIDEWALL SPRINKLER AT BOTTOM OF
ELEVATOR HOISTWAY IN ACCORDANCE WITH NFPA 13 8.15.5 AND VA FIRE
PROTECTION DESIGN MANUAL SECTION 6.1.
EXTEND SPRINKLER COVERAGE OVER THE FILLED-IN PULL AREA TO
PROVIDE COMPLETE SPRINKLER COVERAGE IN ROOM.
LEGEND
SPRINKLER ZONE BOUNDARY
ORDINARY HAZARD 1
ORDINARY HAZARD 2
HYDRAULIC DESIGN CRITERIA
ZONE G - GROUND LEVEL
OCCUPANCY CLASSIFICATION
DENSITY AND COVERAGE AREA
TOTAL HOSE STREAM
K-FACTOR
SAFETY MARGIN
ORDINARY HAZARD - GROUP 1
0.15 GPM/FT2 OVER 1,500FT2
250 GPM
8.0
GREATER OF 10 PSI OR 10% REQUIRED
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B
A
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
RECORD DOCUMENTS
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
F
P -R
-C
E N
T R
A L .r v t
/2 /2
:0
:5
P M
100.FP-100
FIRE PROTECTION - OVERALL FLOOR PLAN -
LEVEL G
RSK JDR
FINAL AS-BUILT SUBMISSION
03 JAN 2023
SCALE: 1/16" = 1'-0"1 FIRE PROTECTION OVERALL PLAN - LEVEL G
16' 32'8'0-8'
Revision
3.5
4.5
5.5
4.2
7.5
A B.3 C D E F H.5 J.5 K.5 L.5
B.6 G
E.8
7.8
5.3
6.6
F.3 F.8
2.5
5.8
7.4
8.5
9.3
9.6
6.5
1.5
0.7
AAABACAD
0.2
3.2
ZONE 1
1A128-100
SERVING
AREA
1A162-100
RETAIL
DISPLAY &
STORAGE
1B100-100
RETAIL AREA
1A187-100
STORAGE,
REF/ FRZ
1A161-100
FEMALE
TOILET,
MULTIPLE
1A163-100
MALE TOILET,
MULTIPLE
1A160-100
ELEC
1A158-100
SIGNAL
1A154-100
OI&T
1A169A-100
OFFICE,
SECURE
MONEY
1B110-100
VETERAN
MEMORIAL
1B111-100
FEMALE
TOILET,
MULTIPLE
1B113-100
MALE TOILET,
MULTIPLE
1A137-100
RETAIL AREA
(COFFEE)
1A104-100
SECURITY
SCREENING
ROOM
1A106-100
WHEELCHAIR
STORAGE
1A125A-100
INFO DESK
1B121-100
RECEPTION
1B121A-100
CALL CENTER
1B158-100
SIGNAL 1B156-100
ELEC
1B121B-100
OFFICE
1B121C-100
OFFICE
1B121D-100
CUBICLE 9
1B121E-100
CUBICLE 8
1B121F-100
CUBICLE 7
1B121G-100
CUBICLE 6
1B121H-100
CUBICLE 5
1B121I-100
CUBICLE 4
1B121J-100
CUBICLE 3
1B121K-100
CUBICLE 2
1B121L-100
CUBICLE 1
1B121M-100
COPIER &
STORAGE
ROOM
1B121N-100
OFFICE,
SUPER
1B121O-100
OFFICE,
ENROL COOR
1B142-100
VIDEO
CONFERENCE 1B143-100
CLASSROOM
1B137-100
COMPUTER
LAB
1B138C-100
OFFICE, AO
CASE
MANAGER
1B138B-100
OFFICE, AO
CASE
MANAGER
1B136-100
CONFERENCE
ROOM,
ADMINISTRATIVE
1B138D-100
OFFICE,
CHIEF
1B138A-100
OFFICE,
STAFFING
ANALYST
1B138E-100
OFFICE,
ASSISTANT
CHIEF NURSE
V1-01-100
PATIENT ELEV
V1-04-100
SERVICE
ELEV
1B100B-100
REMOTE
STORAGE,
RECV
V1-00-100
VESTIBULE
1A100-100
ENTRY
V1-03-100
PUBLIC ELEV
1B120-100
WAITING
1A184-100
FOOD PREP &
PRODUCTION
S1-03-100
STAIR 3
LEVEL 1
1A137A-100
STORAGE
ROOM
1A169B-100
OFFICE, VCS
CHIEF
1A169D-100
OFFICE, VCS
ASST CHIEF
1A169C-100
OFFICE, VCS
ASST CHIEF
1A169E-100
CUBICLE,
CLERK
1A173-100
LOCKER
ROOM STAFF
1A171-100
LOCKER
ROOM STAFF
1A175-100
LOUNGE,
STAFF
1A177-100
TOILET,
STAFF
1A179-100
TOILET,
STAFF
1B115-100
VENDING
MACHINE
AREA
1B138-100
OFFICE,
SECRETARY
1A185-100
STORAGE,
REF/ FRZ
1A178-100
STORAGE,
RETAIL
1A128A-100
STORAGE,
NON-FOOD
1A170-100
VENDING
MACHINE
MASTER
1A191-100
HAC
1B115A-100
RSA
STORAGE
1A186-100
STORAGE,
REF/ FRZ
1A183-100
STORAGE,
REF/ FRZ
C1-11-100
CORRIDOR
C1-08-100
CORRIDOR
1A180-100
REMOTE
STORAGE,
RECV
C1-01-100
CORRIDOR
1A110-100
STORAGE
C1-05-100
CORRIDOR
C1-06-100
CORRIDOR
C1-15-100
CORRIDOR
C1-16-100
CORRIDOR
C1-13-100
CORRIDOR
C1-03-100
CORRIDOR
C1-02-100
CORRIDOR
1A194B-100
HAC
1A176-100
STORAGE,
DRY FOOD
1B144-100
PASSAGE
ELEVATOR P
ELEVATOR P
ELEVATOR P
ELEVATOR P
S1-02-100
STAIR 2
LEVEL 1
C1-04-100
CORRIDOR
C1-10-100
CORRIDOR
C1-07-100
CORRIDOR
1A110A-100
HAC
1A128B-100
SODA
SYSTEM
C1-14-100
CORRIDOR
1A152-100
DINING AREA
1A125-100
LOBBY/WAITING
1A134-100
DINING AREA
C1-09-100
CORRIDOR
1A125B-100
CUBICLE,
VOLUNTEER
1A194-100
POT WASH
AREA
C1-17-100
CORRIDOR
1A152-100
DINING AREA
1A152-100
DINING AREA
1A125C-100
TELEPHONE
PUBLIC
1A194A-100
DISH WASH
AREA
C1-12-100
CORRIDOR
1B112-100
WATER
FOUNTAIN
C1-09-100
CORRIDOR
1B162-100
OI&T
HEALING
GARDEN
100.FP-301
100.FP-301
100.FP-301
100.FP-301
100.FP-301
100.FP-301
S1-01-100
STAIR 1
LEVEL 1
C1-08-100
CORRIDOR
ELEVATOR S
ELEVATOR S
C2-25-100
CORRIDOR
1A100-100
ENTRY
S1-03-100B
STAIR 3
LEVEL 1
PASSAGE
GB004-100
ELECTRICAL
SUBSTATION
ROOM
C1-18-100
CORRIDOR
1B100A-100
RETAIL AREA
C1-20-100
CORRIDOR
1A194C-100
CLEAN
STORAGE
C1-21-100
CORRIDOR
1B141-100
CENTRAL
STORAGE
ROOM,
MEDIUM
STORAGE
2 2
1A139-100
STORAGE
ROOM
ELEVATOR
CS1
ELEVATOR
MH 7
ELEVATOR
MH 8
GENERAL NOTES:
1.
2.
PROVIDE FULL SPRINKLER COVERAGE FOR BUILDING AREA
SHOWN ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM
SHALL BE DESIGNED IN ACCORDANCE WITH VA DESIGN MANUAL
AND NFPA 13.
REFER TO SHEET FP-001 FOR SYMBOL LEGEND, ABBREVIATIONS,
AND GENERAL NOTES.
3.
ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS
OTHERWISE NOTED.
4.
ROUTE SPRINKLER PIPING TO PROVIDE COMPLETE SYSTEM
DRAINAGE BACK TO SYSTEM VALVE TO THE EXTENT POSSIBLE.
PROVIDE AUXILIARY DRAINS AS NECESSARY. MEET NFPA 13
REQUIREMENTS FOR AREAS OF SPRINKLER PIPING WITH
TRAPPED WATER.
5.
COORDINATE WORK WITH ALL OTHER TRADES.
THIS DRAWING IS INTENDED TO DESCRIBE THE GENERAL DESIGN
INTENT BY WHICH THE SPRINKLER PLANNER CAN CORRECTLY
PLAN THE SYSTEM(S). SOME PARTS OF THE SYSTEM MAY NOT BE
DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER
TO SPECIFICATION SECTIONS 21 1313 AND 21 3013 FOR COMPLETE
PERFORMANCE REQUIREMENTS.
PROVIDE COVERAGE AROUND ALL CEILING OBSTRUCTIONS,
INCLUDING MECHANICAL DUCTWORK, AS REQUIRED BY NFPA 13.
6.
7.
KEYED NOTES:
SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER
STANDPIPE IN STAIR 2
PROVIDE STANDARD RESPONSE SIDEWALL SPRINKLER AT BOTTOM OF
ELEVATOR HOISTWAY IN ACCORDANCE WITH NFPA 13 8.15.5 AND VA FIRE
PROTECTION DESIGN MANUAL SECTION 6.1.
CONTRACTOR TO MODIFY EXISTING BUILDING 1 SPRINKLER SYSTEM TO
ACCOMODATE ARCHITECTURAL CHANGES AT BUILDING CONNECTOR
CONTRACTOR TO PROVIDE 1 1/2" WATER CONNECTION FROM SPRINKLER
SYSTEM TO KITCHEN HOOD WET-CHEM SYSTEMS. COORDINATE WITH
SPECIFICATION 21 21 03 FOR KITCHEN EQUIPMENT FIRE SUPPRESSION
DETAILS. PROVIDE A LOCKED-OPEN BALL VALVE AT EACH CONNECTION
POINT.
LEGEND
SPRINKLER ZONE BOUNDARY
ORDINARY HAZARD 1
ORDINARY HAZARD 2
HYDRAULIC DESIGN CRITERIA
ZONE 1 - LEVEL 1
OCCUPANCY CLASSIFICATION
DENSITY AND COVERAGE AREA
TOTAL HOSE STREAM
K-FACTOR
SAFETY MARGIN
ORDINARY HAZARD 2
0.2 GPM/FT2 OVER 1,500FT2
100 GPM
5.6
GREATER OF 10 PSI OR 10% REQUIRED
SHEET NOTES:
1. REFER TO FOOD SERVICE DRAWINGS AND SPECIFICATIONS FOR DETAILS
ON WET CHEMICAL EXTINGUISHING EQUIPMENT INTEGRAL TO KITCHEN
EQUIPMENT.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B
A
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
RECORD DOCUMENTS
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
F
P -R
-C
E N
T R
A L .r v t
/2 /2
:0
:0
P M
100.FP-101
FIRE PROTECTION - OVERALL FLOOR PLAN -
LEVEL 01
RSK JDR
FINAL AS-BUILT SUBMISSION
03 JAN 2023
SCALE: 1/16" = 1'-0"1 FIRE PROTECTION OVERALL PLAN - LEVEL 1
16' 32'8'0-8'
Revision
M A
O
OMA
2 2
2 2
2 2
B C.5 D.5 E.5 F.5 H J K L M
3.5
4.5
5.5
4.2
7.5
A B.3 C D E F H.5 J.5 K.5 L.5
B.6 G
E.8
7.8
5.3
6.6
F.3 F.8
2.5
5.8
7.4
8.5
9.3
9.6
6.5
1.5
0.7
AAABACAD
0.2
3.2
ZONE 2C
ZONE 2B
ZONE 2A
2A251-100
SICU PATIENT
ROOM 9
2A263-100
SICU PATIENT
ROOM 13
2B261-100
MICU PATIENT
ROOM 9
2B241-100
MICU PATIENT
ROOM 3
2B247-100
MICU PATIENT
ROOM 4, NEG
ISOLATION
2A257-100
SICU PATIENT
ROOM 11
2A241-100
SICU PATIENT
ROOM 5, NEG
ISOLATION
2A247-100
SICU PATIENT
ROOM 7
2B253-100
MICU PATIENT
ROOM 6
2A259-100
SICU PATIENT
ROOM 12
2B239-100
MICU PATIENT
ROOM 2
2A231-100
SICU PATIENT
ROOM 1
2B259-100
MICU PATIENT
ROOM 8
2B249-100
MICU PATIENT
ROOM 5, NEG
ISOLATION
2A243-100
SICU PATIENT
ROOM 6, NEG
ISOLATION
2A265-100
SICU PATIENT
ROOM 14
2A233-100
SICU PATIENT
ROOM 2
2A249-100
SICU PATIENT
ROOM 8
2B269-100
MICU PATIENT
ROOM 12
2B221-100
CICU PATIENT
ROOM 7
2B229-100
CICU PATIENT
ROOM 10,
NEG
ISOLATION
2A267-100
SICU PATIENT
ROOM 15
2B223-100
CICU PATIENT
ROOM 82B215-100
CICU PATIENT
ROOM 5
2B265-100
MICU PATIENT
ROOM 10
2A237-100
SICU PATIENT
ROOM 4
2B203-100
CICU PATIENT
ROOM 1
2B211-100
CICU PATIENT
ROOM 4
2A269-100
SICU PATIENT
ROOM 16
2B267-100
MICU PATIENT
ROOM 11
2B209-100
CICU PATIENT
ROOM 3
2A253-100
SICU PATIENT
ROOM 10
2B227-100
CICU PATIENT
ROOM 9
2B205-100
CICU PATIENT
ROOM 2
2B249B-100
ANTEROOM
2B231B-100
ANTEROOM
2B247B-100
ANTEROOM
2B229B-100
ANTEROOM
S2-03-100
STAIR 3
LEVEL 2
S2-01-100
STAIR 1
LEVEL 2
2B241A-100
BATHROOM,
PATIENT
2B269A-100
BATHROOM,
PATIENT
2B247A-100
BATHROOM,
PATIENT
2A269A-100
BATHROOM,
PATIENT
2A241A-100
BATHROOM,
PATIENT
2A235A-100
BATHROOM,
PATIENT
2B265A-100
BATHROOM,
PATIENT
2A237A-100
BATHROOM,
PATIENT
2A263A-100
BATHROOM,
PATIENT
2B249A-100
BATHROOM,
PATIENT
2B203A-100
BATHROOM,
PATIENT
2A267A-100
BATHROOM,
PATIENT
2A243A-100
BATHROOM,
PATIENT
2A253A-100
BATHROOM,
PATIENT
2B267A-100
BATHROOM,
PATIENT
2B223A-100
BATHROOM,
PATIENT
2A265A-100
BATHROOM,
PATIENT
2A233A-100
BATHROOM,
PATIENT
2B227A-100
BATHROOM,
PATIENT
2B205A-100
BATHROOM,
PATIENT
2A247A-100
BATHROOM,
PATIENT
2B215A-100
BATHROOM,
PATIENT
2A259A-100
BATHROOM,
PATIENT
2A249A-100
BATHROOM,
PATIENT
2B235A-100
BATHROOM,
PATIENT
2B221A-100
BATHROOM,
PATIENT
2B209A-100
BATHROOM,
PATIENT
2B229A-100
BATHROOM,
PATIENT
2A231A-100
BATHROOM,
PATIENT
2B217A-100
BATHROOM,
PATIENT
2B237A-100
BATHROOM,
PATIENT
2A257A-100
BATHROOM,
PATIENT
2B239A-100
BATHROOM,
PATIENT
2A251A-100
BATHROOM,
PATIENT
2B211A-100
BATHROOM,
PATIENT
N2B-69-100
NURSE
SUB-STATION
N2B-65-100
NURSE
SUB-STATION
N2B-47-100
NURSE
SUB-STATION
N2B-39-100
NURSE
SUB-STATION
N2B-35-100
NURSE
SUB-STATION
N2B-29-100
NURSE
SUB-STATION
N2B-03-100
NURSE
SUB-STATION
2A243B-100
ANTEROOM
2A241B-100
ANTEROOM
2A238B-100
NURSE
WORKROOM
N2B-21-100
NURSE
SUB-STATION
N2B-15-100
NURSE
SUB-STATION
N2B-09-100
NURSE
SUB-STATION
N2A-67-100
NURSE
SUB-STATION
N2A-63-100
NURSE
SUB-STATION
N2A-57-100
NURSE
SUB-STATION
N2A-51-100
NURSE
SUB-STATION
N2A-41-100
NURSE
SUB-STATION
N2A-47-100
NURSE
SUB-STATION
N2A-35-100
NURSE
SUB-STATION
N2A-31-100
NURSE
SUB-STATION
2A276A-100
MOBILE
X-RAY
ALCOVE
2A276-100
BLOOD GAS
LAB
2A236-100
UTILITY
ROOM,
CLEAN, LINEN
2A238C-100
CONFERENCE/
REPORT
ROOM
2A260-100
ELEC
2A226-100
EMPL
WELLNESS
2A286A-100
FS CART
STORAGE
2A258-100
SIGNAL
2A282-100
DISPOSAL
CHUTE ROOM,
LINEN
2A239-100
MEDICATION
ROOM
2A234-100
NOURISHMENT
STATION
2A254-100
OI&T
2A280-100
STORAGE,
EQUIPMENT
2A272-100
LOUNGE,
STAFF
2A274-100
TOILET,
STAFF
2A264-100
TEAM ROOM
2A284-100
DISPOSAL
CHUTE ROOM,
TRASH
V2-04-100
SERVICE
ELEV
2A238D-100
CC ALCOVE
2A238A-100
WARD CLERK
2A262-100
LOCKER
ROOM STAFF
2A238-100
NURSE
STATION, ICU
2A227-100
CONSULTATION
ROOM
2A223-100
CONSULTATION
ROOM
2A224-100
TOILET,
STAFF
2A229-100
VENDING
MACHINE
AREA
2A286B-100
WC ALCOVE
2A289-100
STORAGE,
EMS
2A281-100
STORAGE,
EQUIPMENT
2A212D-100
TOILET,
PUBLIC
2A204C-100
OFFICE
2A204D-100
OFFICE
2A288-100
HAC
2A287-100
UTILITY,
SOILED
2A214-100
TEAM ROOM
2A208-100
CONFERENCE
2A286-100
STORAGE,
MEDICAL GAS
2A204B-100
OFFICE
2A204A-100
OFFICE
2A212A-100
TOILET,
PUBLIC
2A212C-100
TOILET,
FAMILY
ASSIST
2A212B-100
TOILET,
FAMILY
ASSIST
2B200-100
TOILET,
FAMILY
ASSIST
2B281-100
STORAGE,
MEDICAL GAS
2B212-100
MEDICATION
ROOM
2B214-100
NOURISHMENT
STATION
2B287-100
UTILITY,
SOILED
2B202-100
TOILET,
STAFF
V2-03-100
PUBLIC ELEV S2-02-100
STAIR 2
LEVEL 2
2B216C-100
CONFERENCE/
REPORT
ROOM
2B216-100
NURSE
STATION, ICU
2B216D-100
CC ALCOVE
2B204-100
PATIENT
SHOWER
2B285-100
TOILET,
STAFF
2B283-100
HAC
2B214A-100
FS CART
STORAGE
2B216B-100
WARD CLERK
2B208-100
TOUCHDOWN
SPACE
2B290-100
UTILITY
ROOM,
CLEAN, LINEN
2B240C-100
CONFERENCE/
REPORT
ROOM
2B256-100
ELEC
2B280-100
STORAGE,
EQUIPMENT
2B258-100
SIGNAL
2B284-100
NOURISHMENT
STATION
2B240-100
NURSE
STATION, ICU
2B262-100
OI&T
2B260-100
TEAM ROOM
2B275-100
GREETER
2B240D-100
CC ALCOVE
2B240B-100
WARD CLERK
2B282-100
BLOOD GAS
LAB
2B272-100
OFFICE
2B270-100
OFFICE
2B288-100
TOILET,
STAFF
2B286-100
TOILET,
STAFF
2B254-100
MEDICATION
ROOM
2B271-100
CONSULTATION
ROOM
2B273-100
CONSULTATION
ROOM
2A207-100
VISITOR
KITCHENETTE
2A205-100
KIOSK,
PATIENT
EDUC/ RESRC
2B268-100
LOUNGE,
STAFF
2B274-100
TOILET,
PUBLIC
2A206-100
KIOSK,
PATIENT
EDUC/ RESRC
2A203-100
WAITING/
LOUNGE
2A225A-100
KIOSK,
PATIENT
EDUC/ RESRC 2A225-100
WAITING/
LOUNGE
2B237-100
MICU PATIENT
ROOM 1
C2-12-100
CORRIDOR
N2-27-100
NURSE
SUB-STATION
C2-05-100
CORRIDOR
C2-04-100
CORRIDOR
C2-09-100
CORRIDOR
V2-01-100
PATIENT ELEV
C2-07-100
CORRIDOR
C2-01-100
CORRIDOR
C2-17-100
CORRIDOR
C2-18-100
CORRIDOR
C2-06-100
CORRIDOR
C2-19-100
CORRIDOR
C2-02-100
CORRIDOR
C2-10-100
CORRIDOR
2B216e-100
ALCOVE
2A282A-100
ALCOVE
2B240A-100
NURSE
WORKROOM
2B216A-100
NURSE
WORKROOM
2B231A-100
BATHROOM,
PATIENT
C2-16-100
CORRIDOR
C2-13-100
CORRIDOR
C2-11-100
CORRIDOR
C2-08-100
CORRIDOR
C2-03-100
CORRIDOR
C2-14-100
CORRIDOR
C2-20-100
CORRIDOR
C2-15-100
CORRIDOR
2B217-100
CICU PATIENT
ROOM 6
2B261A-100
BATHROOM,
PATIENT
2B259A-100
BATHROOM,
PATIENT
2B255A-100
BATHROOM,
PATIENT
N2B-53-100
NURSE
SUB-STATION
N2B-59-100
NURSE
SUB-STATION
2B235-100
CICU PATIENT
ROOM 12
2B231-100
CICU PATIENT
ROOM 11,
NEG
ISOLATION
2A215-100
WAITING/
LOUNGE
C2-24-100
CORRIDOR
C2-22-100
CORRIDOR
2B200A-100
ALCOVE
C2-23-100
CORRIDOR
2A281A-100
ALCOVE
100.FP-301
100.FP-301
100.FP-301
100.FP-301
100.FP-301
100.FP-301
2B255-100
MICU PATIENT
ROOM 7
2B253A-100
BATHROOM,
PATIENT
ELEVATOR P
ELEVATOR P
ELEVATOR P
ELEVATOR P
ELEVATOR S
ELEVATOR S
ELEVATOR
MH 8
ELEVATOR
MH 7
GENERAL NOTES:
1.
2.
PROVIDE FULL SPRINKLER COVERAGE FOR BUILDING AREA
SHOWN ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM
SHALL BE DESIGNED IN ACCORDANCE WITH VA DESIGN MANUAL
AND NFPA 13.
REFER TO SHEET FP-001 FOR SYMBOL LEGEND, ABBREVIATIONS,
AND GENERAL NOTES.
3.
ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS
OTHERWISE NOTED.
4.
ROUTE SPRINKLER PIPING TO PROVIDE COMPLETE SYSTEM
DRAINAGE BACK TO SYSTEM VALVE TO THE EXTENT POSSIBLE.
PROVIDE AUXILIARY DRAINS AS NECESSARY. MEET NFPA 13
REQUIREMENTS FOR AREAS OF SPRINKLER PIPING WITH
TRAPPED WATER.
5.
COORDINATE WORK WITH ALL OTHER TRADES.
THIS DRAWING IS INTENDED TO DESCRIBE THE GENERAL DESIGN
INTENT BY WHICH THE SPRINKLER PLANNER CAN CORRECTLY
PLAN THE SYSTEM(S). SOME PARTS OF THE SYSTEM MAY NOT BE
DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER
TO SPECIFICATION SECTIONS 21 1313 AND 21 3013 FOR COMPLETE
PERFORMANCE REQUIREMENTS.
PROVIDE COVERAGE AROUND ALL CEILING OBSTRUCTIONS,
INCLUDING MECHANICAL DUCTWORK, AS REQUIRED BY NFPA 13.
6.
7.
KEYED NOTES:
SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER
STANDPIPE IN STAIR 1
2 SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER
STANDPIPE IN STAIR 2
SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER
STANDPIPE IN STAIR 3
HOSE CONNECTIONS ON EITHER SIDE OF HORIZONTAL EXIT.4
PROVIDE SPRINKLER AT LINEN/TRASH CHUTE. SEE FIRE PROTECTION
DETAILS FOR INSTALLATION DETAIL.
CONTRACTOR TO MODIFY EXISTING BUILDING 1 SPRINKLER SYSTEM TO
ACCOMODATE ARCHITECTURAL CHANGES AT BUILDING CONNECTOR
LEGEND
SPRINKLER ZONE BOUNDARY
ORDINARY HAZARD 1
ORDINARY HAZARD 2
SMOKE ZONE KEYPLAN
SMOKE ZONE A
SMOKE ZONE B
SMOKE ZONE C
HYDRAULIC DESIGN CRITERIA
ZONE 2A - LEVEL 2
OCCUPANCY CLASSIFICATION
DENSITY AND COVERAGE AREA
TOTAL HOSE STREAM
K-FACTOR
SAFETY MARGIN
LIGHT HAZARD
0.1 GPM/FT2 OVER 1,500FT2
100 GPM
5.6
GREATER OF 10 PSI OR 10% REQUIRED
HYDRAULIC DESIGN CRITERIA
ZONE 2B - LEVEL 2
OCCUPANCY CLASSIFICATION
DENSITY AND COVERAGE AREA
TOTAL HOSE STREAM
K-FACTOR
SAFETY MARGIN
LIGHT HAZARD
0.1 GPM/FT2 OVER 1,500FT2
100 GPM
5.6
GREATER OF 10 PSI OR 10% REQUIRED
HYDRAULIC DESIGN CRITERIA
ZONE 2C - LEVEL 2
OCCUPANCY CLASSIFICATION
DENSITY AND COVERAGE AREA
TOTAL HOSE STREAM
K-FACTOR
SAFETY MARGIN
ORDINARY HAZARD 2
0.2 GPM/FT2 OVER 1,500FT2
100 GPM
5.6
GREATER OF 10 PSI OR 10% REQUIRED
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B
A
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
RECORD DOCUMENTS
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
F
P -R
-C
E N
T R
A L .r v t
/2 /2
:0
:1
P M
100.FP-102
FIRE PROTECTION - OVERALL FLOOR PLAN -
LEVEL 02
RSK JDR
FINAL AS-BUILT SUBMISSION
03 JAN 2023
SCALE: 1/16" = 1'-0"1 FIRE PROTECTION OVERALL PLAN - LEVEL 2
16' 32'8'0-8'
Revision
3.5
4.5
5.5
4.2
7.5
A B.3 C D E F
F
H.5 J.5 K.5 L.5
B.6 G
E.8
7.8
5.3
6.6
F.3 F.8
2.5
5.8
7.4
8.5
9.3
9.6
6.5
1.5
0.7
AAABACAD
0.2
3.2
ZONE 2I
S2I-01-100
STAIR 1
LEVEL 2I
S2I-02-100
STAIR 2
LEVEL 2I
S2I-03-100
STAIR 3
LEVEL 2I
100.FP-301
100.FP-301
100.FP-301
100.FP-301
100.FP-301
100.FP-301
2IA180-100
MECHANICAL
ROOM
V2I-02-100
VESTIBULE
V2I-03-100
VESTIBULE
V2I-01-100
VESTIBULE
ELEVATOR
MH 8
GENERAL NOTES:
1.
2.
PROVIDE FULL SPRINKLER COVERAGE FOR BUILDING AREA
SHOWN ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM
SHALL BE DESIGNED IN ACCORDANCE WITH VA DESIGN MANUAL
AND NFPA 13.
REFER TO SHEET FP-001 FOR SYMBOL LEGEND, ABBREVIATIONS,
AND GENERAL NOTES.
3.
ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS
OTHERWISE NOTED.
4.
ROUTE SPRINKLER PIPING TO PROVIDE COMPLETE SYSTEM
DRAINAGE BACK TO SYSTEM VALVE TO THE EXTENT POSSIBLE.
PROVIDE AUXILIARY DRAINS AS NECESSARY. MEET NFPA 13
REQUIREMENTS FOR AREAS OF SPRINKLER PIPING WITH
TRAPPED WATER.
5.
COORDINATE WORK WITH ALL OTHER TRADES.
THIS DRAWING IS INTENDED TO DESCRIBE THE GENERAL DESIGN
INTENT BY WHICH THE SPRINKLER PLANNER CAN CORRECTLY
PLAN THE SYSTEM(S). SOME PARTS OF THE SYSTEM MAY NOT BE
DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER
TO SPECIFICATION SECTIONS 21 1313 AND 21 3013 FOR COMPLETE
PERFORMANCE REQUIREMENTS.
PROVIDE COVERAGE AROUND ALL CEILING OBSTRUCTIONS,
INCLUDING MECHANICAL DUCTWORK, AS REQUIRED BY NFPA 13.
6.
7.
KEYED NOTES:
SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER
STANDPIPE IN STAIR 2
LEGEND
SPRINKLER ZONE BOUNDARY
ORDINARY HAZARD 1
ORDINARY HAZARD 2
HYDRAULIC DESIGN CRITERIA
ZONE 2I - LEVEL 2I
OCCUPANCY CLASSIFICATION
DENSITY AND COVERAGE AREA
TOTAL HOSE STREAM
K-FACTOR
SAFETY MARGIN
ORDINARY HAZARD - GROUP 2
0.2GPM/FT2 OVER 1,500FT2
250 GPM
8.0
GREATER OF 10 PSI OR 10% REQUIRED
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B
A
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
RECORD DOCUMENTS
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
F
P -R
-C
E N
T R
A L .r v t
/2 /2
:0
:2
P M
100.FP-102I
FIRE PROTECTION - OVERALL FLOOR PLAN -
LEVEL 2I
RSK JDR
FINAL AS-BUILT SUBMISSION
03 JAN 2023
SCALE: 1/16" = 1'-0"1 FIRE PROTECTION OVERALL PLAN - LEVEL 2 INTERSTITAL
16' 32'8'0-8'
Revision
2 2
2 2
2 2 2
B C.5 D.5 E.5 F.5 H J K L M
3.5
4.5
5.5
4.2
7.5
A B.3 C D E F H.5 J.5 K.5 L.5
B.6 G
E.8
7.8
5.3
6.6
F.3
F.3
F.8
2.5
5.8
7.4
8.5
9.3
9.6
6.5
1.5
0.7
AAABACAD
0.2
3.2
ZONE 3C
ZONE 3B
ZONE 3A
3A358-100
SIGNAL
3A317-100
PATIENT
ROOM 5
3A327-100
PATIENT
ROOM 8, POS
ISOLATION
3A307-100
PATIENT
ROOM 2 3A305-100
BARIATRIC
PATIENT
ROOM 1
3A367-100
PATIENT
ROOM 23
3A337-100
PATIENT
ROOM 12
3B367-100
PATIENT
ROOM 23
3A347-100
BARIATRIC
PATIENT
ROOM 15
3B369-100
BARIATRIC
PATIENT
ROOM 24
3A325-100
PATIENT
ROOM 7, POS
ISOLATION
3B329-100
PATIENT
ROOM 10,
NEG
ISOLATION
3B331-100
PATIENT
ROOM 11,
NEG
ISOLATION
3B349-100
PATIENT
ROOM 17, POS
ISOLATION
3B365-100
PATIENT
ROOM 22
3A349-100
PATIENT
ROOM 16
3A357-100
PATIENT
ROOM 19
3A343-100
PATIENT
ROOM 14,
NEG
ISOLATION
3A359-100
PATIENT
ROOM 20
3A369-100
BARIATRIC
PATIENT
ROOM 24
3A341-100
PATIENT
ROOM 13,
NEG
ISOLATION
3A351-100
PATIENT
ROOM 17
3A335-100
PATIENT
ROOM 11
3A333-100
PATIENT
ROOM 10
3A353-100
PATIENT
ROOM 18
3A331-100
PATIENT
ROOM 9, POS
ISOLATION
3A365-100
PATIENT
ROOM 22
3B303-100
PATIENT
ROOM 1
3B325-100
BARIATRIC
PATIENT
ROOM 9, NEG
ISOLATION
3A363-100
PATIENT
ROOM 21
3B309-100
PATIENT
ROOM 3
3A357A-100
TLT/ SHWR,
PATIENT
3A351A-100
TLT/ SHWR,
PATIENT
3A359A-100
TLT/ SHWR,
PATIENT
3B331A-100
TLT/ SHWR,
PATIENT
3A343A-100
TLT/ SHWR,
PATIENT
3A353A-100
TLT/ SHWR,
PATIENT
3A365A-100
TLT/ SHWR,
PATIENT
3A331A-100
TLT/ SHWR,
PATIENT
3B317A-100
TLT/ SHWR,
PATIENT
3A341A-100
TLT/ SHWR,
PATIENT
3B337A-100
TLT/ SHWR,
PATIENT
3A333A-100
TLT/ SHWR,
PATIENT
3B321A-100
TLT/ SHWR,
PATIENT
3B315A-100
TLT/ SHWR,
PATIENT
3B339A-100
TLT/ SHWR,
PATIENT
3B323A-100
TLT/ SHWR,
PATIENT
3B335A-100
TLT/ SHWR,
PATIENT
3B341A-100
TLT/ SHWR,
PATIENT
3B347A-100
TLT/ SHWR,
PATIENT
3B349A-100
TLT/ SHWR,
PATIENT
3B353A-100
TLT/ SHWR,
PATIENT
3B355A-100
TLT/ SHWR,
PATIENT
3B359A-100
TLT/ SHWR,
PATIENT
3B361A-100
TLT/ SHWR,
PATIENT
3B365A-100
TLT/ SHWR,
PATIENT
3A327A-100
TLT/ SHWR,
PATIENT
3A317A-100
TLT/ SHWR,
PATIENT
3B329A-100
TLT/ SHWR,
PATIENT
3A313A-100
TLT/ SHWR,
PATIENT
3B325A-100
TLT/ SHWR,
BARIATRIC
3B369A-100
TLT/ SHWR,
BARIATRIC
3B367A-100
TLT/ SHWR,
PATIENT
3A307A-100
TLT/ SHWR,
PATIENT
3A305A-100
TLT/ SHWR,
BARIATRIC
3A319A-100
TLT/ SHWR,
PATIENT
3A325A-100
TLT/ SHWR,
PATIENT
3A327B-100
ANTEROOM
3A325B-100
ANTEROOM
3B329B-100
ANTEROOM
3B331B-100
ANTEROOM
3A331B-100
ANTEROOM
3A319-100
PATIENT
ROOM 6
S3-03-100
STAIR 3
LEVEL 3
S3-01-100
STAIR 1
LEVEL 3
3B347-100
PATIENT
ROOM 16, POS
ISOLATION
3A343B-100
ANTEROOM
3A341B-100
ANTEROOM
3B349B-100
ANTEROOM
N3B-29-100
NURSE
SUB-STATION
N3B-35-100
NURSE
SUB-STATION
N3B-23-100
NURSE
SUB-STATION
N3B-39-100
NURSE
SUB-STATION
N3B-47-100
NURSE
SUB-STATION
3B325B-100
ANTEROOM
3B347B-100
ANTEROOM
N3A-51-100
NURSE
SUB-STATION
N3A-57-100
NURSE
SUB-STATION
N3A-41-100
NURSE
SUB-STATION
N3A-31-100
NURSE
SUB-STATION
N3A-17-100
NURSE
SUB-STATION
N3A-25-100
NURSE
SUB-STATION
N3B-53-100
NURSE
SUB-STATION
N3B-59-100
NURSE
SUB-STATION
N3B-65-100
NURSE
SUB-STATION
3A338B-100
WARD CLERK
3B374-100
PATIENT
KIOSK
3A375E-100
COPIER/
PRINTER
ROOM
3A384-100
STORAGE,
MEDICAL GAS
3A375C-100
OFFICE
3A377-100
MOBILE
X-RAY
ALCOVE
3A338E-100
UTILITY
ROOM,
CLEAN, LINEN
3A338C-100
CONFERENCE/
REPORT
ROOM
3A314-100
CONFERENCE
3A360-100
ELEC
3A324-100
EMPL
WELLNESS
3A380-100
STORAGE,
EMS
3A370-100
STORAGE,
EQUIPMENT
3A378-100
TOILET,
STAFF
3A387-100
HAC
3A382-100
DISPOSAL
CHUTE ROOM,
LINEN
3A362-100
MEDICATION
ROOM
3A336-100
NOURISHMENT
STATION
3A338-100
NURSE
STATION
3A354-100
OI&T
3A381B-100
ON CALL
3A381C-100
ON CALL
3A381A-100
ON CALL
3A381D-100
ON CALL
SHOWER
3A381E-100
ON CALL
SHOWER
3A308-100
TOILET,
PUBLIC
3A388-100
UTILITY,
SOILED
3A368A-100
LOCKER
ROOM STAFF
3A368-100
LOUNGE,
STAFF
3A389-100
TEAM ROOM
3A386-100
DISPOSAL
CHUTE ROOM,
TRASH
V3-04-100
SERVICE
ELEV
3A338D-100
CC ALCOVE
3A385-100
TOILET,
STAFF
3A332-100
FS CART
STORAGE
3A334-100
MEDICATION
ROOM
3A338A-100
NURSE
WORKROOM
3A389A-100
COPIER/
PRINTER
ROOM
3A375B-100
OFFICE
3A375A-100
OFFICE
3A375D-100
OFFICE
3A326-100
WC ALCOVE
3A332A-100
CC ALCOVE
3B383-100
TOILET,
STAFF
3B381-100
HAC
3B385-100
STORAGE,
MEDICAL GAS
3B312-100
MEDICATION
ROOM
3B314-100
NOURISHMENT
STATION
3B387-100
UTILITY,
SOILED
3B316-100
TEAM ROOM
V3-03-100
PUBLIC ELEV
S3-02-100
STAIR 2
LEVEL 3
3B308-100
HOT OFFICE
3B316A-100
COPIER/
PRINTER
ROOM
3B314A-100
FS CART
STORAGE
3B300-100
TOILET,
FAMILY
ASSIST
3B302-100
HOT OFFICE
3B304-100
HOT OFFICE
3B352-100
MEDICATION
ROOM
3B334-100
UTILITY
ROOM,
CLEAN, LINEN
3B356-100
ELEC
3B380-100
STORAGE,
EQUIPMENT
3B378-100
TOILET,
FAMILY
ASSIST
3B358-100
SIGNAL
3B362-100
OI&T
3B371a-100
VENDING
MACHINE
AREA
3B336-100
TOILET,
PUBLIC
3B384-100
TOILET,
STAFF
3B371-100
WAITING/
LOUNGE
3B340C-100
CONFERENCE/
REPORT
ROOM
3B340A-100
WARD CLERK
3B340-100
NURSE
STATION
3B386-100
NOURISHMENT
STATION
3B371b-100
VISITOR
KITCHENETTE
3B340D-100
CC ALCOVE
3B382-100
STORAGE,
EMS
3B360-100
TEAM ROOM
3B354-100
FS CART
STORAGE
3B375-100
GREETER
3B315-100
PATIENT
ROOM 5
3B321-100
PATIENT
ROOM 7
3B323-100
PATIENT
ROOM 8
3B361-100
PATIENT
ROOM 21
3B359-100
PATIENT
ROOM 20
3B355-100
PATIENT
ROOM 19
3B353-100
PATIENT
ROOM 18
3B341-100
PATIENT
ROOM 15
3B339-100
PATIENT
ROOM 14
3B337-100
PATIENT
ROOM 13
3B335-100
PATIENT
ROOM 12
C3-10-100
CORRIDOR
C3-14-100
CORRIDOR
C3-15-100
CORRIDOR
C3-11-100
CORRIDOR
C3-07-100
CORRIDOR
C3-01-100
CORRIDOR
C3-13-100
CORRIDOR
C3-08-100
CORRIDOR
V3-01-100
PATIENT ELEV
C3-06-100
CORRIDOR
C3-02-100
CORRIDOR
C3-03-100
CORRIDOR
C3-16-100
CORRIDOR
3A347A-100
TLT/ SHWR,
BARIATRIC
3A381-100
CORRIDOR
C3-17-100
CORRIDOR
3B314B-100
CC ALCOVE
3B368-100
CONSULTATION
ROOM
3B366-100
CONSULTATION
ROOM
3B340B-100
NURSE
WORKROOM
3A380A-100
ALCOVE
3B354A-100
ALCOVE
3A369A-100
TLT/ SHWR,
BARIATRIC
C3-05-100
CORRIDOR
3A313-100
PATIENT
ROOM 4
N3A-63-100
NURSE
SUB-STATION
3A363A-100
TLT/ SHWR,
PATIENT
3A367A-100
TLT/ SHWR,
PATIENT
3A311-100
PATIENT
ROOM 3
3B305-100
PATIENT
ROOM 2
3B311-100
PATIENT
ROOM 4
3B317-100
PATIENT
ROOM 6
N3A-11-100
NURSE
SUB-STATION
3A311A-100
TLT/ SHWR,
PATIENT
3A335A-100
TLT/ SHWR,
PATIENT
N3A-35-100
NURSE
SUB-STATION
3A337A-100
TLT/ SHWR,
PATIENT
C3-04-100
CORRIDOR
3A349A-100
TLT/ SHWR,
PATIENT
C3-09-100
CORRIDOR
3B303A-100
TLT/ SHWR,
PATIENT
N3B-03-100
NURSE
SUB-STATION
3B305A-100
TLT/ SHWR,
PATIENT
3B309A-100
TLT/ SHWR,
PATIENT
N3B-09-100
NURSE
SUB-STATION
3B311A-100
TLT/ SHWR,
PATIENT
N3B-15-100
NURSE
SUB-STATION
3B352A-100
ALCOVE
3B352B-100
ALCOVE
3B340E-100
ALCOVE
C3-12-100
CORRIDOR
3B360a-100
COPIER/
PRINTER
ROOM
100.FP-301
100.FP-301
100.FP-301
100.FP-301
100.FP-301
100.FP-301
ELEVATOR P
ELEVATOR P
ELEVATOR P
ELEVATOR P
ELEVATOR
MH 8
ELEVATOR
MH 7
ELEVATOR S
ELEVATOR S
GENERAL NOTES:
1.
2.
PROVIDE FULL SPRINKLER COVERAGE FOR BUILDING AREA
SHOWN ON CONTRACT DOCUMENTS. FIRE SPRINKLER SYSTEM
SHALL BE DESIGNED IN ACCORDANCE WITH VA DESIGN MANUAL
AND NFPA 13.
REFER TO SHEET FP-001 FOR SYMBOL LEGEND, ABBREVIATIONS,
AND GENERAL NOTES.
3.
ALL AREAS ARE CONSIDERED LIGHT HAZARD UNLESS
OTHERWISE NOTED.
4.
ROUTE SPRINKLER PIPING TO PROVIDE COMPLETE SYSTEM
DRAINAGE BACK TO SYSTEM VALVE TO THE EXTENT POSSIBLE.
PROVIDE AUXILIARY DRAINS AS NECESSARY. MEET NFPA 13
REQUIREMENTS FOR AREAS OF SPRINKLER PIPING WITH
TRAPPED WATER.
5.
COORDINATE WORK WITH ALL OTHER TRADES.
THIS DRAWING IS INTENDED TO DESCRIBE THE GENERAL DESIGN
INTENT BY WHICH THE SPRINKLER PLANNER CAN CORRECTLY
PLAN THE SYSTEM(S). SOME PARTS OF THE SYSTEM MAY NOT BE
DEPICTED, AND ADDITIONAL DEVICES MAY BE REQUIRED. REFER
TO SPECIFICATION SECTIONS 21 1313 AND 21 3013 FOR COMPLETE
PERFORMANCE REQUIREMENTS.
PROVIDE COVERAGE AROUND ALL CEILING OBSTRUCTIONS,
INCLUDING MECHANICAL DUCTWORK, AS REQUIRED BY NFPA 13.
6.
7.
KEYED NOTES:
SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER
STANDPIPE IN STAIR 1
2 SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER
STANDPIPE IN STAIR 2
SPRINKLER ZONE CONTROL VALVE LOCATED AT COMBINATION SPRINKLER
STANDPIPE IN STAIR 3
PROVIDE SPRINKLER AT LINEN/TRASH CHUTE. SEE FIRE PROTECTION DETAILS
FOR INSTALLATION DETAIL.
LEGEND
SPRINKLER ZONE BOUNDARY
ORDINARY HAZARD 1
ORDINARY HAZARD 2
SMOKE ZONE KEYPLAN
SMOKE ZONE A
SMOKE ZONE B
SMOKE ZONE C
HYDRAULIC DESIGN CRITERIA
ZONE 3A - LEVEL 3
OCCUPANCY CLASSIFICATION
DENSITY AND COVERAGE AREA
TOTAL HOSE STREAM
K-FACTOR
SAFETY MARGIN
LIGHT HAZARD
0.1 GPM/FT2 OVER 1,500FT2
100 GPM
5.6
GREATER OF 10 PSI OR 10% REQUIRED
HYDRAULIC DESIGN CRITERIA
ZONE 3B - LEVEL 3
OCCUPANCY CLASSIFICATION
DENSITY AND COVERAGE AREA
TOTAL HOSE STREAM
K-FACTOR
SAFETY MARGIN
100 GPM
5.6
GREATER OF 10 PSI OR 10% REQUIRED
LIGHT HAZARD
0.1 GPM/FT2 OVER 1,500FT2
HYDRAULIC DESIGN CRITERIA
ZONE 3C - LEVEL 3
OCCUPANCY CLASSIFICATION
DENSITY AND COVERAGE AREA
TOTAL HOSE STREAM
K-FACTOR
SAFETY MARGIN
100 GPM
5.6
GREATER OF 10 PSI OR 10% REQUIRED
ORDINARY HAZARD 2
0.2 GPM/FT2 OVER 1,500FT2
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved Project Director:
VA FORM 08 - 6231
A
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGN BUILD TEAM
321 4 5 6 7 8 9 10
Key Plan
Page Southerland Page, Inc.
pagethink.com
TEL
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Austin / Dallas / Denver / Houston / San Francisco / Washington DC /
International Affiliate Offices
400 W. Cesar Chavez Street Fifth Floor
Austin, TX 78701 512 472 6721
512 477 3211
VA-0007-2016JAMES A. HALEY VETERANS'
HOSPITAL - NEW BED TOWER
Project Abbreviation:
13000 BRUCE B DOWNS BLVD, TAMPA, FL 33612
US ARMY CORPS OF ENGINEERS
STAMP
JAHVHNBT
135 W Central Blvd. Suite 950
Orlando, FL 32801
Turner Construction turnerconstruction.com
TEL
FAX
407 210 2500
TC 180221 | PSP 117265
CONTRACTOR:
DESIGNER:
B
A
THESE RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON
INFORMATION PROVIDED BY OTHERS.
PAGE SOUTHERLAND PAGE, INC. HAS
NOT VERIFIED THE ACCURACY AND/OR
COMPLETENESS OF THIS INFORMATION
AND SHALL NOT BE RESPONSIBLE FOR
ANY ERRORS OR OMISSIONS THAT MAY
BE INCORPORATED AS A RESULT OF
ERRONEOUS INFORMATION PROVIDED
BY OTHERS.
RECORD DOCUMENTS
B
IM
/1
-V A
T a m p a N e w
B e d to w e r/
B
F
P -R
-C
E N
T R
A L .r v t
/2 /2
:0
:3
P M
100.FP-103
FIRE PROTECTION - OVERALL FLOOR PLAN -
LEVEL 03
RSK JDR
FINAL AS-BUILT SUBMISSION
03 JAN 2023
SCALE: 1/16" = 1'-0"1 FIRE PROTECTION OVERALL PLAN - LEVEL 3
16' 32'8'0-8'
Revision
2 2
2 2
2 2 2
2 2
B C.5 D.5 E.5 F.5 H J K L M
3.5
4.5
5.5
4.2
7.5
A B.3 C D E F H.5 J.5 K.5 L.5
B.6 G
E.8
7.8
5.3
6.6
F.3 F.8
2.5
5.8
7.4
8.5
9.3
9.6
6.5
1.5
0.7
AAABACAD
0.2
3.2
ZONE 4C
ZONE 4B
ZONE 4A
4A471-100
STORAGE,
EQUIPMENT
4A411-100
PATIENT
ROOM 3
4B474-100
PATIENT
KIOSK
4B425B-100
ANTEROOM
V4-01-100
PATIENT ELEV
S4-01-100
STAIR 1
LEVEL 4
4A441B-100
ANTEROOM
4A431B-100
ANTEROOM
4A479-100
CONFERENCE
4A481-100
TELEMETRY
4A424-100
EMPL
WELLNESS
4A426-100
WC ALCOVE
4B471A-100
VISITOR
KITCHENETTE
4B468-100
CONSULTATION
ROOM
A4-480A-100
ALCOVE
4A451-100
PATIENT
ROOM 17
4A453-100
PATIENT
ROOM 18
4A457-100
PATIENT
ROOM 19
4A459-100
PATIENT
ROOM 20
4A463-100
PATIENT
ROOM 21
4A465-100
PATIENT
ROOM 22
4A467-100
PATIENT
ROOM 23
4A467A-100
TLT/ SHWR,
PATIENT
4A465A-100
TLT/ SHWR,
PATIENT
4A463A-100
TLT/ SHWR,
PATIENT
4A459A-100
TLT/ SHWR,
PATIENT
4A457A-100
TLT/ SHWR,
PATIENT
4A451A-100
TLT/ SHWR,
PATIENT
N4A-63-100
NURSE
SUB-STATION
N4A-57-100
NURSE
SUB-STATION
N4A-51-100
NURSE
SUB-STATION
4A449-100
RADIATION
PATIENT
ROOM 16
4A443-100
PATIENT
ROOM 14,
NEG
ISOLATION
4A441-100
PATIENT
ROOM 13,
NEG
ISOLATION
4A437-100
PATIENT
ROOM 12
4A435-100
PATIENT
ROOM 11
4A431-100
PATIENT
ROOM 9, POS
ISOLATION
4A433-100
PATIENT
ROOM 10
4A437A-100
TLT/ SHWR,
PATIENT
4A441A-100
TLT/ SHWR,
PATIENT
4A443A-100
TLT/ SHWR,
PATIENT
4A443B-100
ANTEROOM
4A427B-100
ANTEROOM
4A435A-100
TLT/ SHWR,
PATIENT
4A425B-100
ANTEROOM
N4A-31-100
NURSE
SUB-STATION
4A431A-100
TLT/ SHWR,
PATIENT
N4A-41-100
NURSE
SUB-STATION
N4A-35-100
NURSE
SUB-STATION
N4A-25-100
NURSE
SUB-STATION
4A427-100
PATIENT
ROOM 13, POS
ISOLATION
4A425-100
PATIENT
ROOM 12, POS
ISOLATION 4A419-100
PATIENT
ROOM 11
4A413-100
PATIENT
ROOM 4
4A417-100
PATIENT
ROOM 5
4A407-100
PATIENT
ROOM 2 4A405-100
BARIATRIC
PATIENT
ROOM 1
4A427A-100
TLT/ SHWR,
PATIENT 4A425A-100
TLT/ SHWR,
PATIENT
4A419A-100
TLT/ SHWR,
PATIENT
4A417A-100
TLT/ SHWR,
PATIENT
4A413A-100
TLT/ SHWR,
PATIENT
4A411A-100
TLT/ SHWR,
PATIENT
N4A-17-100
NURSE
SUB-STATION
N4A-11-100
NURSE
SUB-STATION
4A433A-100
TLT/ SHWR,
PATIENT
C4-06-100
CORRIDOR
C4-11-100
CORRIDOR
4B466-100
CONSULTATION
ROOM
4B467-100
PATIENT
ROOM 23
4B469-100
BARIATRIC
PATIENT
ROOM 24
4B429-100
PATIENT
ROOM 10,
NEG
ISOLATION
4B431-100
PATIENT
ROOM 11,
NEG
ISOLATION
4B449-100
PATIENT
ROOM 17, POS
ISOLATION4B465-100
PATIENT
ROOM 22
4B403-100
PATIENT
ROOM 1
4B425-100
BARIATRIC
PATIENT
ROOM 9, NEG
ISOLATION
4B409-100
PATIENT
ROOM 3
4B405-100
PATIENT
ROOM 2
4B403A-100
TLT/ SHWR,
PATIENT
4B431A-100
TLT/ SHWR,
PATIENT
4B417A-100
TLT/ SHWR,
PATIENT
4B437A-100
TLT/ SHWR,
PATIENT
4B405A-100
TLT/ SHWR,
PATIENT
4B421A-100
TLT/ SHWR,
PATIENT
4B409A-100
TLT/ SHWR,
PATIENT
4B411A-100
TLT/ SHWR,
PATIENT
4B415A-100
TLT/ SHWR,
PATIENT
4B439A-100
TLT/ SHWR,
PATIENT
4B435A-100
TLT/ SHWR,
PATIENT
4B441A-100
TLT/ SHWR,
PATIENT
4B447A-100
TLT/ SHWR,
PATIENT
4B449A-100
TLT/ SHWR,
PATIENT
4B453A-100
TLT/ SHWR,
PATIENT
4B455A-100
TLT/ SHWR,
PATIENT
4B459A-100
TLT/ SHWR,
PATIENT
4B461A-100
TLT/ SHWR,
PATIENT
4B465A-100
TLT/ SHWR,
PATIENT
4B429A-100
TLT/ SHWR,
PATIENT
4B469A-100
TLT/ SHWR,
BARIATRIC
4B467A-100
TLT/ SHWR,
PATIENT
4B429B-100
ANTEROOM
4B431B-100
ANTEROOM
S4-03-100
STAIR 3
LEVEL 4
4B447-100
PATIENT
ROOM 16, POS
ISOLATION
4B449B-100
ANTEROOM
N4B-29-100
NURSE
SUB-STATION
N4B-35-100
NURSE
SUB-STATION
N4B-09-100
NURSE
SUB-STATION
N4B-15-100
NURSE
SUB-STATION N4B-23-100
NURSE
SUB-STATION
N4B-39-100
NURSE
SUB-STATION
N4B-47-100
NURSE
SUB-STATION
4B447B-100
ANTEROOM
N4B-03-100
NURSE
SUB-STATION
N4B-53-100
NURSE
SUB-STATION
N4B-59-100
NURSE
SUB-STATION
N4B-65-100
NURSE
SUB-STATION
4B483-100
TOILET,
STAFF
4B481-100
HAC
4B485-100
STORAGE,
MEDICAL GAS
4B412-100
MEDICATION
ROOM
4B414-100
NOURISHMENT
STATION
4B487-100
UTILITY,
SOILED
4B416-100
TEAM ROOM
V4-03-100
PUBLIC ELEV
S4-02-100
STAIR 2
LEVEL 4
4B408-100
HOT OFFICE
4B416A-100
COPIER/
PRINTER
ROOM
4B414B-100
FS CART
STORAGE
4B400-100
TOILET,
FAMILY
ASSIST 4B402-100
HOT OFFICE
4B404-100
HOT OFFICE
4B452-100
MEDICATION
ROOM
4B434-100
UTILITY
ROOM,
CLEAN, LINEN
4B456-100
ELEC
4B478-100
TOILET,
FAMILY
ASSIST
4B458-100
SIGNAL
4B462-100
OI&T
4B436-100
TOILET,
PUBLIC
4B484-100
TOILET,
STAFF
4B460-100
TEAM ROOM
4B440C-100
CONFERENCE/
REPORT
ROOM
4B440A-100
WARD CLERK
4B440-100
NURSE
STATION
4B486-100
NOURISHMENT
STATION
4B440D-100
CC ALCOVE
4B482-100
STORAGE,
EMS
4B460A-100
COPIER/
PRINTER
ROOM
4B486A-100
FS CART
STORAGE
4B411-100
PATIENT
ROOM 4
4B415-100
PATIENT
ROOM 5
4B417-100
PATIENT
ROOM 6
4B421-100
PATIENT
ROOM 7
4B461-100
PATIENT
ROOM 21
4B459-100
PATIENT
ROOM 20
4B455-100
PATIENT
ROOM 19
4B453-100
PATIENT
ROOM 18
4B441-100
PATIENT
ROOM 15
4B439-100
PATIENT
ROOM 14
4B437-100
PATIENT
ROOM 13
4B435-100
PATIENT
ROOM 12
C4-14-100
CORRIDOR
C4-15-100
CORRIDOR
C4-01-100
CORRIDOR
C4-13-100
CORRIDOR
4A438B-100
WARD CLERK
4A484-100
STORAGE,
MEDICAL GAS
4A475C-100
OFFICE
4A477-100
MOBILE
X-RAY
ALCOVE
4A438E-100
UTILITY
ROOM,
CLEAN, LINEN
4A438C-100
CONFERENCE/
REPORT
ROOM
4A414-100
CONFERENCE
4A460-100
ELEC
4A480-100
STORAGE,
EMS
4A478-100
TOILET,
STAFF
4A487-100
HAC
4A458-100
SIGNAL
4A482-100
DISPOSAL
CHUTE ROOM,
LINEN
4A462-100
MEDICATION
ROOM
4A436-100
NOURISHMENT
STATION
4A438-100
NURSE
STATION
4A454-100
OI&T
4A408-100
TOILET,
PUBLIC
4A488-100
UTILITY,
SOILED
4A468A-100
LOCKER
ROOM STAFF
4A468-100
LOUNGE,
STAFF
4A489-100
TEAM ROOM
4A486-100
DISPOSAL
CHUTE ROOM,
TRASH
V4-04-100
SERVICE
ELEV
4A438D-100
CC ALCOVE
4A485-100
TOILET,
STAFF
4A432A-100
FS CART
STORAGE
4A434-100
MEDICATION
ROOM
4A489A-100
COPIER/
PRINTER
ROOM
4A475B-100
OFFICE
4A475A-100
OFFICE
4A475D-100
OFFICE
4A432B-100
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .