This is a Statement of Work (SOW) for solicitation 444710-CC-25 issued by Mission Support and Test Services, LLC for the Department of Energy, requiring two on-site geologists to support a continuous core drilling campaign at the Nevada National Security Site (NNSS). The geologists will work 13-hour shifts providing 24/7 coverage during drilling operations for a core boring that will reach approximately 6,930 feet below ground surface at the Rock Valley Direct Comparison Project site in NNSS Area 27.

The geologists' key responsibilities include placing and orienting core samples in boxes, preserving approximately 15% of core samples through wax preservation, maintaining lithologic logs, documenting drilling activities, and providing weekly status reports. Required qualifications include a bachelor's degree in geology or related field and minimum 2 years relevant experience. No security clearance is required. The drilling will start with PQ size (4.83-inch outer diameter) and reduce to HQ size (3.77-inch outer diameter) when needed. The contractor must submit various deliverables including an Environmental Safety & Health Plan, staffing plan, medical releases, and insurance certificates within 10 days of award. Geological work is expected to encounter formations including alluvium, Pavits Springs Formation, Winapi Wash rocks, Goodwin Limestone, and other documented geological units down to the total depth.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit B (Ver May 2023) Solicitation Number: 444710-CC-25 Date: 11-27-2024 Subcontract Number: TBD

MISSION SUPPORT AND TEST SERVICES, LLC

FIRM-FIXED-PRICE SERVICES SUBCONTRACT

EXHIBIT B

STATEMENT OF WORK, SPECIFICATIONS AND DRAWINGS

TABLE OF CONTENTS

NO. TITLE PAGE

B-1 Scope/Background 2 B-2 Requirements 2 B-3 Technical Specifications 4 B-4 Drawings 4 B-5 Delivery & Work Location 7 B-6 Clearance Requirements 7 B-7 Specialized Experience/Specific Training/Specific Certifications 7 B-8 Environmentally Preferable Products 8 B-9 Attachments 8 B-10 Submittals 9

B-1 SCOPE/BACKGROUND

1. Scope: This Statement of Work (SOW) presents the general minimum requirements for the

SUBCONTRACTOR to provide on-site Geologist personnel to assist the CONTRACTOR with the duties required to conduct a continuous core drilling campaign at the Nevada National Security Site (NNSS). The SUBCONTRACTOR shall provide personnel coverage that ensure two (2) geologists will be on site at all times during 24/7 drilling operations. Specific functions of the Geologists will include placing the core samples in core boxes, orienting the core samples consistent with the alignment when retrieved from the drill rig, and preserving the core samples. The Geologist personnel shall also be responsible for keeping records and documenting all drilling subcontractor activities related to drilling and coring as well as maintaining lithologic logs of the continuous core boring.

2. Project Background: The planned drilling work on site (by others) consists of drilling a vertical continuous core boring to support the Rock Valley Direct Comparison (RV/DC) Project. This core boring (also referred to as the Corehole (CH) in this document) is intended to provide the RV/DC Project with geologic and geophysical data necessary to characterize the underground setting and monitor future underground activities conducted by the Project. Total depth of the CH will be approximately 6,930 feet (ft) below ground surface (bgs). The CH drilling will start at the surface with a PQ™ size (4.83-inch outer diameter) and reduce to HQ™ (3.77-inch outer diameter) when required.

3. General Site Information:

3.1. The Nevada National Security Site (NNSS) is a U.S. Department of Energy, National Nuclear Security Administration (NNSA) installation, operated by Mission Support and Test Services, LLC (CONTRACTOR), comprising approximately 3,561 square kilometers (1,375 square miles) of federally owned land located in southeastern Nye County, Nevada. Located approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada, the NNSS is accessed from U.S. Highway 95, which roughly forms the southern boundary of the site.

3.2. The CONTRACTOR also operates the North Las Vegas Facility (NLV); the Remote Sensing Lab at Nellis AFB, North Las Vegas, NV (RSLN); the Remote Sensing Lab at Andrews AFB, Maryland (RSLA); Special Technologies Lab at Santa Barbara, CA (STL); Livermore Operations at Livermore, CA (LO); and Los Alamos Operations at Los Alamos, NM (LAO).

B-2 REQUIREMENTS

1. General: The SUBCONTRACTOR shall provide Geologists with the experience and capabilities to perform the duties listed in the Detailed Requirements (Section 2 below) during 24/7 continuous drilling operations.

All activities shall be conducted in accordance with the requirements included in Exhibit E, Environmental, Safety & Health. The SUBCONTRACTOR shall provide personnel coverage that ensures two (2) geologists will be on site at all times on a 13 hour shift schedule for 24/7 drilling operations.

2. Detailed Requirements:

2.1. STAFFING PLAN - SUBCONTRACTOR shall provide a Geological Support Staffing Plan to include the SUBCONTRACTOR’s information and technical approach. The Plan shall provide, at a minimum, the following information:

2.1.1. Names and resumes of Geologists assigned to the project

2.1.2. Provisions to provide backup Geologists with the availability to be on-site within 24 hours

2.1.3. Geologist work rotation schedule

2.1.4. Lodging plan

2.1.5. Communication plan

2.1.6. Transportation plan

2.1.7. Affidavit from the SUBCONTRACTOR stating that all SUBCONTRACTOR’s personnel will adhere to the CONTRACTOR’s Operating Procedures listed in section B-3, Technical Procedures.

2.1.8. Site Safety Plan, including emergency preparedness plan, emergency contact list, personal protective equipment.

2.2. Technical Services - The duties of the Geologists will include adhering to the Operational Procedures included in B-3, Technical Procedures, namely: OP-2152.203 Rock Descriptions, OP-2152.204 Handling and Documenting Geologic Samples, and OP-2152.209 Geologic Well Site Support and, at a minimum, the following tasks:

2.2.1. Box and Orient core samples

2.2.1.1. Measure and record core lengths (in English units) on the cardboard boxes and run blocks. Record the run number, length drilled and amount of core recovered. All markings on core boxes shall be made with indelible ink (e.g., Sharpie™).

2.2.1.2. Orient core sample in the core box consistent with the orientation observed in the core barrel retrieved from the drill rig and mark core according to NNSS standards.

2.2.2. Create accurate description of core samples (logs)

2.2.2.1. Core sample run number, drilled interval, length of recovered core sample, estimated amount of lost core sample, color of core sample and Rock Quality Designation (RQD) evaluation to provide an estimate of rock quality. RQD shall be estimated as a percentage of sound rock in the retrieved sample. Refer to OP-2152.203, Appendix D-5 for detailed procedures.

2.2.2.2. Record of major and minor lithology changes observed in the core sample, under direction from CONTRACTOR geologists.

2.2.2.3. Core logging data shall be recorded on CONTRACTOR-provided, network-access computers or paper logs.

2.2.2.4. Create, re-name, organize and fill out computer documents to project-specific data management conventions.

2.2.2.5. Check the quality of previously logged core samples and adjust run blocks.

2.2.3. Wax preservation

2.2.3.1. Apply wax preservation to core samples using the sample preservation methods described in OP-2152.204, Appendix A.

2.2.3.2. Approximately 15 percent of all core samples will be selected for wax preservation.

2.2.3.3. Record description of the waxed sample as described in subsection 2.2.2.1

2.2.4. Field Logbook

2.2.4.1. Record all field activities in a field logbook. Logbook entries shall be made in accordance with OP-2152.209

2.2.4.2. In addition to the requirements included in OP-2152.209, logbook entries shall include project name, project number, date, time (in 24-hour format), personnel on site (including names and affiliations), details of core sample collection activities, core run reference number, and all other relevant activities on site.

2.2.5. Completion of CONTRACTOR-provided field forms.

2.2.6. Perform housekeeping duties to keep workspace clean and safe

2.2.7. Photo records of all cores placed in core boxes. Include all markings (orientation, depth, etc.) in photos. A government-owned camera will be provided.

2.3. Schedule Delays

2.3.1. Downhole Geophysical Logging

2.3.1.1. During drilling operations, there will be between 3-5 callouts for a geophysical downhole logging subcontractor. During said time, the SUBCONTRACTOR personnel shall remain on location, completing duties such as cleaning and organizing their work area, until drilling resumes.

2.3.2. Unforeseen Stoppage in Drilling Operations

2.3.2.1. If, due to unforeseen delays related to the core drilling subcontractor, there is a projected need to pause the drilling work for more than three consecutive days (more than 72 hours), the SUBCONTRACTOR, at the direction of the CONTRACTOR, shall temporarily demobilize their staff. The SUBCONTRACTOR, at the direction of the CONTRACTOR, shall remobilize when the work resumes. The CONTRACTOR will provide notice of remobilization at least 24 hours in advance.

2.4. Weekly Status Report: Report on work done in previous week, issues found and how solved, near-term work planned and any help needed.

B-3 TECHNICAL SPECIFICATIONS

SPEC NUMBER TITLE REV PAGES

OP-2152.203 Rock Descriptions 5 55

OP-2152.204 Handling and Documenting Geologic Samples 5 31

OP-2125.209 Geological Well-Site Support 4 10

B-4 DRAWINGS

DRAWING NUMBER TITLE REV PAGES

Table 1 Predicted Geology 1

Figure 1 Location of NNSS and Las Vegas, NV 1

Figure 2 Location of RV/DC Site, NNSS Area 27, Mercury 1

Table 1: Predicted Geology

Depth interval, ft bgs Geologic Unit

0–50 ALLUVIUM (QA): Poorly sorted sand and gravel, unconsolidated to loosely consolidated.

50–2,000 PAVITS SPRINGS FORMATION (Tpa): Interbedded sandstone, tuff, conglomerate, mudstone, and limestone.

2,000–2,900*

ROCKS OF THE WINAPI WASH (Tgw): Formerly Horse Springs Formation (Ths). Interbedded siltstone (30%), limestone (30%), claystone (20%), sandstone (10%), tuff (5%), conglomerates (5%); fairly to moderately indurated, tuffaceous beds tend to be zeolitized; thin claystone beds may contain swelling clay.

2,900–3,700 GOODWIN LIMESTONE (Og): Thick-bedded limestone. May be thin or absent.

3,700–4,700 SMOKY MEMBER OF THE NOPAH FORMATION (Cns): Thick-bedded, blocky limestone and silty limestone.

Depth interval, ft bgs Geologic Unit

4,700–4,900 HALFPINT MEMBER OF THE NOPAH FORMATION (Cnh):

Thin-bedded limestone and silty limestone; irregular dark-colored chert common throughout.

4,900–5,000

DUNDERBERG SHALE MEMBER OF THE NOPAH

FORMATION (Cnd): Thinly laminated shale and calcareous shale. May be thin or absent.

5,000–7,400 BONANZA KING FORMATION (Cb): Interbedded limestone and dolomite.

7,400– UNKNOWN: Paleozoic carbonates or quartzite. Could be a granitic intrusion present.

*Paleozoic contact estimated between 2,700–2,940 ft. Faults in the rock are anticipated in the RV/DC area.

Figure 1 Location of NNSS (brown outline with Mercury near the SE corner) and Las Vegas, NV

Figure 2 Location of RV/DC Site, NNSS Area 27, Mercury

B-5 DELIVERY & WORK LOCATION

Delivery Location:

N/A

Work Location:

Nevada National Security Site - Area __27___ Building ____ Mercury, NV 89023

Additional Delivery/Work Locations: Work location is in RVDC testbed within Area 27.

B-6 CLEARANCE REQUIREMENTS

1. Check all that apply:

☒ No security clearance; unclassified work

☐ DOE L

☐ DOE Q

☐ HSPD-12 PIV Credential

2. If applicable, add any or all parts of the following statement security qualifications:

☐ The SUBCONTRACTOR shall have the ability to obtain a U.S. Department of Energy (DOE) facility security clearance and have personnel capable of obtaining a Q-type or L-type security clearance.

☐ Q- or L-type security clearance is required for all SUBCONTRACTOR personnel having access to classified information or special nuclear material when performing such work.

☐ A corresponding level of security clearance from another federal agency may be applicable if approved by the CONTRACTOR and DOE.

☒ N/A

3. Security Misc.:

3.1. N/A

B-7 SPECIALIZED EXPERIENCE/SPECIFIC TRAINING/SPECIFIC CERTIFICATIONS

1. Experience – SUBCONTRACTOR shall be regularly commercially engaged in providing products and/or services required herein for a minimum of five (5) years.

1.1. Geologists shall have a minimum of two (2) years experience performing the requirements specified in B-2.

2. Training – SUBCONTRACTOR shall have the following job-specific training:

2.1. Geologists shall have at a minimum a bachelor’s degree in Geology, Geoscience, or similar field of study (e.g., Engineering Geology, Environmental Geology)

3. Certifications – SUBCONTRACTOR shall have the following job-specific certifications:

3.1. N/A

B-8 ENVIRONMENTALLY PREFERABLE PRODUCTS

NOTE TO SUBCONTRACTORS: Federal Contractors such as MSTS are required by the U.S. Department of Energy to purchase Environmentally Preferable Products (EPP) (also known as green or sustainable purchasing) and are also required to flow those procurement requirements to their Subcontractors. When designing materials and/or supplying materials to be used onsite as part of a subcontract scope-of-work, those materials must meet these same requirements.

The following is a list of EPP types that must be used if they are available:

• Products with Recycled Content. U.S. Environmental Protection Agency (EPA) list

• Water Efficient Plumbing Products. EPA WaterSense® list

• Non-Toxic or Less Toxic Alternatives

• Green Certified Products. (e.g., Design for Environment, Green Seal)

• Bio-Based Products. U.S. Department of Agriculture list

• Energy Efficient Products. EPA Energy Star® or Federal Energy Management Program designated products

• Energy Efficient Electronics. EPEAT®-silver-rated or higher rated desktop computers, laptops and monitors, televisions, multifunction devices and printers

• Non-Ozone Depleting Alternative Products

B-9 ATTACHMENTS

Attachment Number TITLE REV PAGES

N/A

B-10 SUBMITTALS

(ADM = Subcontract Administrator; STR = Subcontract Technical Representative; NLT = No Later Than;

NTP = Notice to Proceed; TLO = Transmittal Letter Only)

Description Reference Copies Received By Due Date Comments

PROCUREMENT RELATED SUBMITTALS

Environmental, Safety, and Health Plan

Exhibit E 1 STR

ADM

(TLO)

NLT 10 calendar days from award/Prior to start of work

Site-Specific Plan

Safety and Personnel Report

Exhibit E 1 STR

(TLO)

Monthly, NLT 28th day of the new month

Provided using CONTRACTOR Form FRM-1253, “SUBCONTRACTOR Hours”

Insurance Certificates Exhibit D 1 ADM NLT 10 calendar days from award/Prior to start of work

Subcontractor Medical Release

Exhibit E

1 STR Due prior to the start of work.

Required when subcontractor employee is on-site more than 30-days or enrolled in a Medical Surveillance Program while working on M&O site, Provided using CONTRACTOR Form FRM-2026, “Subcontractor Medical Release”

Hazard Communication Program, if chemicals will be used for work.

Exhibit E 1 STR

ADM

TLO

No later than 10 calendar days from Notice to Proceed prior to start of Work

Prior to start of Work

Timesheets/Field Tickets Progress Report/Employee Count

Exhibit D 1 ADM Monthly, NLT 5th day of new month

Subcontract Release Statement – FRM-

Exhibit C Exhibit D

1 ADM Following completion of work prior to final payment for each Task Order

SUBCONTRACTOR shall submit a Subcontract Release Statement FRM-2206. The Subcontract Release Statement shall include a certification that states the following: "All GOVERNMENT and CONTRACTOR-furnished property has been returned, consumed, delivered or otherwise disposed of as instructed by CONTRACTOR."

SUBCONTRACTOR’s Authorized Representative

Exhibit C 1 ADM Prior to the start of work

Also, when changes occur

PROJECT SPECIFIC AND TECHNICAL SUBMITTALS/DELIVERABLES (documentation only)

Description Reference Copies Received By

Due Date Comments

Status Report Exhibit B 1 STR Monday for the previous week’s work

B-1 Scope/Background
B-2 Requirements
B-3 Technical Specifications
B-4 Drawings
B-5 Delivery & Work Location
B-6 Clearance Requirements
B-7 Specialized Experience/Specific Training/Specific Certifications
B-8 Environmentally Preferable Products
B-9 Attachments
B-10 Submittals