6-EXHIBIT A.pdf

PDF 1 MB Posted

Attached to
LEAD, ASBESTOS, MOLD TESTING AND ABATEMENT & PARTIAL DEMOLITION AND RENOVATION OF TEN (10) LOW RENTAL UNITS
Solicitation number
IFB-0646-DCH-REBID
Issued by
Gila County, Arizona

About this file

This document is a Schedule of Values exhibit for the Gila River Indian Community, containing detailed line-item bid templates for the lead, asbestos, mold testing and abatement, partial demolition, and renovation of ten low-rental residential units across Arizona. The project encompasses ten separate properties with varying bedroom counts: three three-bedroom units and seven four-bedroom units located in Laveen and Chandler, Arizona. The Schedule of Values serves as the bidding framework that general contractors must complete to submit proposals, with all applicable line items requiring dollar amounts. The contract covers comprehensive construction activities including site preparation, architectural and engineering services, environmental services, construction work, administration and insurance costs, and company profit. The scope encompasses demolition, foundation work, structural construction, mechanical and plumbing installations, electrical work, HVAC systems, roofing, interior finishes, kitchen and bathroom fixtures, landscaping, and final site cleaning.

The document establishes a standardized bidding structure with pre-determined allowances and fee waivers for certain work categories. Lead and asbestos testing, abatement, and reporting carries an $8,000 allowance for each unit, while numerous other line items are designated as "No fee," indicating these costs are to be absorbed or pre-negotiated by the contractor. Contractors must itemize costs across multiple work classifications and identify profit margins separately. The document references revised schedules dated April 8, 2026, suggesting this is an active bidding process with potential amendments. The structure indicates the Gila River Indian Community is using a detailed Schedule of Values approach to ensure transparent cost breakdowns and facilitate fair comparison of bids across all ten residential units in this federally-funded housing renovation program.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date:

Bid Number:

Company Name:

Company Address

Schedule of Values

AZ Number: HUD AZ 15-6 #113 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Three (3)

Physical Address:

4644 W. Sundust Circle Laveen, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services $ No fee noted at #8 site preparation $

EXHIBIT A

2 Lead and Asbestos Testing $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No fee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet paper holders Mirrors and Hardware. $ $

27 Bathroom Handicap Grab Bars $ $

28 Washer $No fee $ 29 Dryer $No fee $ 30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ No fee $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

65 Final Cleaning of unit (Include pressure wash sidewalks, driveway, patio and carport) $ $

66 Stove $ $ 67 Refrigerator $ $ 68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $ $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Company Name:

Company Address

Schedule of Values

AZ Number: HUD AZ 15-6 #114 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Four (4)

Physical Address:

4631 W. Sundust Circle Laveen, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No fee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet paper holders Mirrors and Hardware. $ $

30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ No fee $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

65 Final Cleaning of unit (Include pressure wash

68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $ $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

AZ Number: HUD AZ 15-6 #118 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Four (4)

Physical Address:

4641 W. Sundust Circle Laveen, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No fee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet paper holders Mirrors and Hardware. $ $

30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ No fee $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

65 Final Cleaning of unit (Include pressure wash

68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $ $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

AZ Number: HUD AZ 15-33 #217 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Three (3)

Physical Address:

2332 N. Gila Butte Circle Chandler, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No fee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet paper holders Mirrors and Hardware. $ $

30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ No fee $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

65 Final Cleaning of unit (Include pressure wash

68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $No fee $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

AZ Number: HUD AZ 15-33 #218 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Four (4)

Physical Address:

2481 W. Gila Butte Circle Chandler, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No fee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet paper holders Mirrors and Hardware. $ $

30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $ $ 38 Roofing underlayment and Valley flashing $ $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $ $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ No fee $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

65 Final Cleaning of unit (Include pressure wash

68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $No fee $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

AZ Number: HUD AZ 15-33 #230 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Four (4)

Physical Address:

2431 W. Gila Butte Circle Chandler, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No fee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet paper holders Mirrors and Hardware. $ $

30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ No fee $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

65 Final Cleaning of unit (Include pressure wash

68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $No fee $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

AZ Number: HUD AZ 15-33 #245 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Four (4)

Physical Address:

2428 W. Gila Butte Circle Chandler, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No fee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet paper holders Mirrors and Hardware. $ $

30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ No fee $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

65 Final Cleaning of unit (Include pressure wash

68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $No fee $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

AZ Number: HUD AZ 15-33 #246 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Four (4)

Physical Address:

2420 W. Gila Butte Circle Chandler, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No fee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet paper holders Mirrors and Hardware. $ $

30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ No fee $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

65 Final Cleaning of unit (Include pressure wash

68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $No fee $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

AZ Number: HUD AZ 15-16 #301 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Three (3)

Physical Address: 16630 S. Lewis Drive Laveen, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No fee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet paper holders Mirrors and Hardware. $ $

30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ No fee $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

65 Final Cleaning of unit (Include pressure wash

68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $ $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

AZ Number: HUD AZ 15-16 #328 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Three (3)

Physical Address: 16697 S. Lewis Drive Laveen, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No fee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet paper holders Mirrors and Hardware. $ $

30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ No fee $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

65 Final Cleaning of unit (Include pressure wash

68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $ $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

Schedule of Values #113-REVISED 4-8-2026.pdf
Schedule of Values #114-REVISED 4-8-2026
Schedule of Values #118-REVISED 4-8-2026
Schedule of Values #217-REVISED 4-8-2026
Schedule of Values #218-REVISED 4-8-2026
Schedule of Values #230-REVISED 4-8-2026
Schedule of Values #245-REVISED 4-8-2026
Schedule of Values #246-REVISED 4-8-2026
Schedule of Values #301-REVISED 4-8-2026
Schedule of Values #328-REVISED 4-8-2026

File details come from the government source that posted it. Updated .