About this file

This is a Moisture and Microbial Remediation Guidelines document prepared by EMS for Halifax Health's Child and Adolescent Behavioral Services facility located at 841 Jimmy Ann Drive, Daytona Beach, Florida. The document, dated December 5, 2025, provides comprehensive specifications for the remediation of the 200 Wing following moisture intrusion and microbial contamination identified during an assessment conducted on November 3, 2025. The project requires a remediation contractor to perform containment installation, drywall and insulation removal along flood cut lines, structural component evaluation and repair, HVAC system cleaning and sanitization, soft goods and hard goods remediation, demolition and disposal of impacted materials, and final surface cleaning and sanitization. The remediation must comply with IICRC S500, OSHA, NIOSH, EPA, and applicable local and state regulations. All work shall utilize specified Bioesque products for disinfection and encapsulation, including Bioesque Botanical Disinfectant, Bioesque Mold Resistant Coating, and Bioesque Protect 90. The project includes secondary containment isolation for eight patient rooms and one therapy room within the primary 200 Wing containment, with negative pressure maintained at minimum 0.02 inches of water column until post-remediation air verification sampling confirms acceptable conditions.

The remediation contractor is solely responsible for worker protection, facility staff safety, project scheduling, work area security, waste material management, and containment integrity throughout the project duration. The contractor must maintain HEPA-filtered negative air scrubbers with documented operational verification a minimum of three times per eight-hour shift, change HEPA filters daily in non-demolition areas and twice daily during dust-generating activities, and perform a 24-hour air recirculation scrub cycle prior to final post-remediation verification sampling. All impacted materials, including drywall, insulation, ceiling tiles, and cleaning wipes, must be bagged in 4-6 mil polyethylene and disposed of appropriately. Final clearance requires spore trap and/or swab sampling analyzed by an NVLAP, AIHA, or A2LA accredited microbiology laboratory, with results demonstrating acceptable air quality before the contained spaces may be released for occupancy. The document includes an attached Impact Map dated November 3, 2025, identifying specific areas of elevated moisture, impacted materials, and the recommended containment location for the 200 Wing.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOISTURE AND MICROBIAL REMEDIATION GUIDELINES

Project Location:

Halifax Health – Child and Adolescent Behavioral Services 200 Wing 841 Jimmy Ann Drive Daytona Beach, Florida 32117

Client:

Mr. Chad Hutchinson Manager, Facility Operations Halifax Health 303 North Clyde Morris Blvd.

Daytona Beach, Florida 32114

Prepared By:

Glenn "Chip" Gruber, CIH, CSP, LAC ABIH Certified Industrial Hygienist (CIH) – 12093CP BCSP Certified Safety Professional (CSP) - 24804 Florida Licensed Asbestos Consultant – AX106 Florida Licensed Mold Assessor – MRSA2853

Date Issued: December 5, 2025

EMS Project No. 25217.00

25217.00 – Halifax Health 200 Wing Remediation Guidance Document Halifax Health Child and Adolescent BHU – Daytona Beach, FL December 5, 2025

These remediation guidelines are based specifically upon the onsite visit and photo documentation collected by EMS on November 3, 2025, and are not intended to take into account the changing conditions within the subject property after this date or conditions in other potentially impacted areas of the facility.

EMS has no firsthand knowledge as to the extent or completeness of any prior building repairs, moisture intrusion, remediation, and/or clean-up efforts that may have taken place at the property or within these target spaces prior to this date. These guidelines are also not intended to address asbestos, lead, or other environmental, health, or safety hazards.

Prior to the implementation of these guidelines, sources of moisture intrusion and/or microbial sources are to be addressed and corrected to prevent further impacts, building material degradation, and microbial amplification. Corrections and repairs are to be made by the appropriate Florida-licensed trade professional(s).

These specifications apply to all individually phased containments. Project phasing for the execution and completion of this project should be defined and agreed upon by the facility, the remediation company, and the consultant. All containment and critical barrier installations should be reviewed by the consultant prior to the commencement of remediation work.

Containment is understood to be the areas where remediation work will be performed, and air clearance activities will take place. The containment is to remain in place and under negative pressure until acceptable post-remediation air verification sampling results have been achieved.

The contained spaces are to remain vacated by the general public, employees, patients, and any personnel who are non-essential to the remediation activities until all remediation activities have been completed and verified through final air verification sampling.

EMS recommends the following products be used, as applicable, for the execution of this remediation guidance:

Bioesque Botanical Disinfectant - to clean and disinfect all surfaces. No rinse is required on food-contact surfaces. It kills mold, viruses, and bacteria (including tuberculosis). EPA-approved to be used with ULV foggers and electrostatic sprayers. EPA-approved to be used in HVAC systems, including ductwork.

Bioesque Mold Resistant Coating - to encapsulate. This product has four EPA-approved ingredients added to help prevent future mold growth and is Lubrizol certified.

Bioesque Protect 90 - to fog. It is safe to use on hard and soft surfaces to protect from mold, fungus, algae, bacteria, and odor-causing bacteria growth. EPA-approved to be used with ULV foggers and electrostatic sprayers as a final step to remediation before clearance testing. EPA-approved to be used in HVAC systems.

Halifax Health Child and Adolescent BHU – Daytona Beach, FL

MICROBIAL REMEDIATION GUIDANCE DOCUMENT

Applicable Standards

All remediation work shall be conducted in accordance with applicable IICRC S500, Occupational Safety and Health Administration (OSHA), National Institute of Occupational Safety and Health (NIOSH), and Environmental Protection Agency (EPA) requirements, as well as any applicable state and local requirements.

All remediation activities shall comply with local, state, and federal guidelines associated with the demolition and remediation of moisture-compromised building materials. This includes, but is not limited to, the following:

• City of Daytona Beach

• Volusia County

• State of Florida

• Environmental Protection Agency (EPA)

• Occupational Health and Safety Administration (OSHA)

The Remediation Company (RC) shall follow regulations established by OSHA or recommendations by the National Institute of Occupational Safety and Health (NIOSH), the EPA, and state agencies for the protection of their employees during all remediation work. Personal protective equipment (PPE) is to conform to applicable standards set forth by both NIOSH and the American National Standards Institute (ANSI). The supply of PPE equipment and associated training of employees in the use, maintenance and limitations of the equipment is the sole responsibility of the remediation contractor.

If any requirements, notifications, and/or regulations overlap among or between the above references, the most stringent provisions shall apply.

Containment(s) and Critical Barriers

Based upon the data collected during the on-site assessment, it is recommended that the entirety of the 200 wing be placed under a negative pressure containment. Additionally, it is recommended that each patient room and the therapy room be placed under secondary containments that isolate these spaces from the rest of the wing.

Containments are to remain under negative pressure throughout the duration of the project until post-remediation verification testing confirms that the spaces are safe, containments can be removed, and the spaces can be released for continued occupancy.

Containment

• Containment walls are to be constructed of fire-retardant 6 mil. polyethylene sheeting or edge guard hard panels.

• Using fire-retardant 6 mil. polyethylene sheeting, erect a floor-to-ceiling containment anteroom.

Due to the special security considerations specific to this facility, the anteroom may be located immediately inside the double door entry to the wing from the main corridor.

• A zip door is to be installed at the entry to the wing from the anteroom. Additionally, a zip door is to be installed at the entry to each patient room and therapy room.

• All containment and anteroom doors and barriers, as applicable, are to be sealed tightly at the ceiling and floor.

The RC shall use fire-retardant 6 mil. polyethylene sheeting to install critical barriers to isolate the entirety of each target space from possible contamination sources. These include:

Halifax Health Child and Adolescent BHU – Daytona Beach, FL

• Adjacent spaces

• HVAC supplies/returns

• Pass-through wall vents

• Outlets and switches

• Breaches in the exterior wall envelope

• Open drains

• Above-ceiling spaces

• Exterior windows

Zip doors, edge guard panels, containment barriers, and critical barriers should be inspected regularly to ensure integrity is maintained.

Foot Traffic

The RC shall restrict traffic entering and exiting the contained area to only the necessary remediation personnel during all remediation activities and will ensure that all travel paths for materials and waste debris remain clear for the duration of the project.

The RC shall utilize sticky walk-off mats inside the entry to the containment from the anteroom to control footwear dust and dirt tracking. Walk-off mats are to be inspected regularly for dirt loading and changed as they become laden with dirt. Mat edges are to be secured to the floor to prevent a tripping hazard.

• New shoe coverings are to be donned upon each entry into the main containment and are to be removed and discarded upon each exit.

Negative Pressure Specifications

HEPA-filtered negative air/scrubber machines equipped with GFCI overcurrent protection shall be used to provide negative pressure to the contained spaces. The effluent air shall be exhausted to the exterior of the building.

• A minimum of -.02 inches of water column pressure differential relative to outside pressure is to be maintained within the negative pressure containment(s).

• A differential pressure recorder with data-logging capability is recommended. If unavailable, a number of negative air machines are to be used that ensure a minimum of 6 air exchanges per hour by calculation. Visual verification that all scrubbers are operational is to be documented a minimum of three (3) times per eight (8)-hour shift and spaced at least two (2) hours apart.

• During demolition or dust-generating activities inside containment(s), HEPA filters and pre-filters should be changed a minimum of twice daily.

• In areas where non-demolition or dust-generating activities are taking place, HEPA filters and pre-filters are to be changed daily.

• Negative air/scrubber machines are to be cleaned by vacuuming and antimicrobial wet wiping before new filter installation.

HVAC System

The HVAC system servicing the unit is to undergo cleaning and sanitization. This should include spiral fans, drip pans, interior air handling units, coils, gasketing, and supply/return grills. Additionally, any interior-lined ducts or duct board is to be encapsulated. Once complete, the system(s) should be isolated from areas undergoing remediation until remediation has been completed.

This work shall be completed as per the National Air Duct Cleaners Association (NADCA) cleaning standard ACR 2013 - Assessment, Cleaning, and Restoration 2013.

Halifax Health Child and Adolescent BHU – Daytona Beach, FL

Soft Goods

All soft goods materials, such as clothing and textile furniture that lend themselves to professional cleaning, should be bagged and removed from the contained areas for cleaning. Bags are to be HEPA vacuumed and antimicrobial wet-wiped prior to removal from containment.

Multi-layer textiles that do not lend themselves to cleaning, such as mattresses, are to be completely wrapped in poly, the poly secured with duct tape and removed from containment for disposal. Poly is to be HEPA vacuumed and antimicrobial wet-wiped prior to removal from containment.

Hard Goods

All non-porous hard goods, fixturing, and furniture shall be HEPA vacuumed and wet-wiped, using Bioesque or an equivalent EPA-approved antimicrobial, and re-vacuumed. After cleaning, mobile hard goods are to be completely wrapped in poly, the poly secured with duct tape, and removed from containment. These items should not be returned to the wing until post-remediation air verification sampling has been performed and acceptable air quality results have been achieved.

Wet wipes are to be changed frequently.

All used wipes are to be bagged and disposed of as microbial contaminated debris, or, if applicable, bagged and sent for professional cleaning.

Demolition, Cleaning, and Sanitization

Patient Rooms and Therapy Room

• As indicated on the attached impact map, chalk and score the walls along the flood cut lines in preparation for drywall removal.

• Make clean cuts along the detail lines to remove the impacted drywall walls along with any associated impacted insulative materials, and bag them for disposal.

• With the wall cavities open, any source(s) of moisture are to be identified and corrected, and the wall cavity is to be inspected for any additionally impacted materials that may need to be removed.

• Perform structural drying as required and verify that all materials are dry prior to proceeding.

• Impacted structural components such as studding and sill plates are to be evaluated for deterioration and repair or replacement.

• All exposed structural members are to be cleaned, sanitized, and encapsulated using a Lubrizol-certified anti-microbial encapsulant.

• Gross cleaning is to be accomplished through the use of wire brushes, scrapers, nylon brushes, rags, etc. Upon completion of gross cleaning, structural members are to be HEPA vacuumed, followed by wet wiping using Bioesque antimicrobial, and re-vacuumed.

• Build back as required. At the conclusion of build-back, all new drywall is to be encapsulated using Lubrizol-certified Bioesque Mold Resistant Coating to prevent future microbial amplification.

• Foggers utilizing Bioesque Botanical Disinfectant are to be placed above ceiling access hatches within the patient rooms and the therapy room as applicable.

o Bioesque Botanical Disinfectant is to be fog-applied in a concentration of 1-1.25 gallons per 1,500 sqft. of space in the above-ceiling spaces.

• Upon completion of the initial fogging, the above-ceiling space is to receive a second fogging using Bioesque Protect 90.

o Bioesque Protect 90 is also to be fog applied in a concentration of 1-1.25 gallons per

Halifax Health Child and Adolescent BHU – Daytona Beach, FL

1,500 sqft of space in the above-ceiling spaces.

• All even-numbered patient room bathroom ceilings and walls are to be HEPA vacuumed, wet-wiped using Bioesque antimicrobial, and re-vacuumed. All drywall is to be encapsulated using Lubrizol-certified Bioesque Mold Resistant Coating to prevent future microbial amplification.

• Upon completion of build-back and encapsulating, each room is to undergo a top-down, surface-by-surface final cleaning and sanitization. This is to be accomplished by HEPA vacuuming, followed by wet wiping using Bioesque antimicrobial, and re-vacuuming.

• The flooring throughout the contained spaces is to be cleaned and sanitized using high-heat cleaning of not less than 160 degrees Fahrenheit using Bioesque antimicrobial. Cleaning is to be performed in a “back out” manner to avoid cross-contaminating cleaned and sanitized flooring.

• Dust control and debris cleanup are to be performed throughout the duration of the project. This is to be accomplished through the use of HEPA vacuums, airless sprayers, wet wiping, and point-of-operation dust control tooling.

NO DRY SWEEPING, BRUSHING, OR EQUIPMENT WHICH IS NOT EQUIPPED WITH A POINT

OF OPERATION DUST COLLECTION IS ALLOWED INSIDE OF THE CONTAINMENTS.

Remaining Areas of the 200 Wing

• Remove and replace water-impacted ceiling tiles. Impacted tiles are to be bagged and removed from containment for disposal.

• Foggers utilizing Bioesque Botanical Disinfectant are to be placed above ceiling access hatches and drop ceilings as applicable.

o Bioesque Botanical Disinfectant is to be fog-applied in a concentration of 1-1.25 gallons per 1,500 sqft. of space in the above-ceiling spaces.

• Upon completion of the initial fogging, the above-ceiling space is to receive a second fogging using Bioesque Protect 90.

o Bioesque Protect 90 is also to be fog applied in a concentration of 1-1.25 gallons per 1,500 sqft of space in the above-ceiling spaces.

• Remaining spaces are to undergo a top-down, surface-by-surface final cleaning and sanitization.

This is to be accomplished by HEPA vacuuming, followed by wet wiping using Bioesque antimicrobial, and re-vacuuming.

• The flooring throughout the remaining contained spaces is to be cleaned and sanitized using high-heat cleaning of not less than 160 degrees Fahrenheit using Bioesque antimicrobial.

Cleaning is to be performed in a “back out” manner to avoid cross-contaminating cleaned and sanitized flooring.

Removal of Impacted Materials

• All spent wipes, HEPA filters, and pre-filters, along with removed drywall and insulation materials are to be discarded. Materials are to be placed into a 4-6 mil polyethylene disposal bags, sealed by “goose necking,” and secured with duct tape or an equivalent.

• Bags are to be HEPA vacuumed and wet-wiped prior to removal from containment.

• All bagged material removed from the contained areas shall be placed in a covered tub or cart for transport to an exterior location for disposal.

• Covered carts are to be HEPA vacuumed and wet-wiped prior to removal from containment.

• Covered cartwheels are to be taped prior to transport out of main containment and retaped prior to re-entry into the facility. New tape is to be applied prior to each cart exiting from containment

Halifax Health Child and Adolescent BHU – Daytona Beach, FL and re-entry into the building from the exterior.

Air Scrubbing and Final Post-Remediation Air Verification

At the conclusion of build-back and a final top-down detail cleaning and sanitization of the contained space(s), the HEPA-filtered air scrubbers inside the containment(s) are to be switched from negative pressure exhaust mode to recirculating mode.

• HEPA filters and pre-filters are to be changed prior to starting the air recirculating (scrub) cycle.

• HEPA air scrubbers are to recirculate containment air for a minimum of twenty-four (24) hours (scrub cycle) prior to final inspection and post-remediation verification sampling.

• At the conclusion of the air scrub cycle, a final visual inspection and post-remediation verification sampling are to be performed to verify all project remediation activities have been properly completed, and the spaces are safe for re-occupancy.

• Spore trap and/or swab sampling media are to be used.

• Samples are to be representative of remediated spaces.

• Samples are to be analyzed by a NVLAP, AIHA, or A2LA accredited microbiology laboratory.

Upon receipt of passing post-remediation air verification air clearance sampling results, the containment(s) may be removed, and the space may be released for occupancy.

Remediation Contractor Responsibility

The Remediation Company (RC) is solely responsible for the protection of their workers, the health, safety, and general working environment of facility staff, employees, and the public in close and/or general proximity to the work areas associated with this project. The RC is solely responsible for all required training and licensure related to any work covered by these specifications.

The following are the Remediation Company’s (RC) responsibilities for the duration of the project:

• RC shall coordinate all work schedules.

• RC shall make appropriate arrangements regarding the security of the work area(s) and/or building.

• RC shall not unduly encumber the work area(s) with supplies or materials. All waste materials generated during work activities shall be immediately placed in waste bags, placed in a covered tub cart for transport, and removed from the building at the end of each work shift.

• RC shall ensure the integrity of the containment(s) on a daily basis and shall make immediate repairs to any breaches that may occur.

Coordination between EMS and the Remediation Company (RC) is essential to achieving complete remediation and first-time clearance. The RC should immediately contact EMS if any of the following circumstances occur:

1. Additional contamination is encountered that may alter the scope of work.

2. If any suspected damage or deterioration is observed as a possible pre-existing condition (unrelated to this event), these areas should be documented and immediately reported.

3. At any time, there is concern regarding the extent of the demolition and/or the effectiveness of the sanitation procedures.

END OF GUIDANCE DOCUMENT

Halifax Health Child and Adolescent BHU – Daytona Beach, FL

Attachment A

Impact Map

DATE:

PROJECT NUMBER:

DRAWING NUMBER:

SHEET TITLE:

REVISIONS::

CONSULTANTS:

DRAWN BY:

E D C B A

E D C B A

NOTES:

- Field verification required for all measurements.

CG

MM-1.0

Initial Assessment -

Moisture Map - Halifax Health Child and Adolescent BHUNotes

Elevated Moisture - Floor to 2'

Elevated Moisture - Floor to 4'

Impacted Flooring

Impacted Ceiling Tile(s)

Impacted Drywall/Plaster Ceiling

Damaged Casework

Impacted Insulation (above-ceiling) Ductwork / Condensation

D

Origin Point / Source

Moisture Level

No Moisture Detected

Containment

Elevated Moisture - Floor to Ceiling

LEGEND

MOISTURE MAP

Halifax Health Child and Adolescent Behavioral Facility 841 Jimmy Ann Drive Daytona Beach, Florida 32117

Wing 200 Suggested Containment Location

N Halifax Health-BHU - Daytona Bch., FL

H al ifa x

H ea lth C hi ld a nd

A do le sc en t B eh av io ra l H ea lth F ac ili ty

Ji m m y

A nn

D riv e D ay to na B ea ch

, F L chipg Line chipg Line chipg Text Box

THERAPY ROOM

chipg Text Box

STORAGE AND EQUIPMENT

chipg Text Box

QUIET ROOM

chipg Text Box

MULTIPURPOSE ROOM

chipg Text Box

NURSES STATION

chipg Text Box

OFFICE

chipg Text Box

KITCHEN

chipg Text Box

CONFERENCE/LOUNGE

chipg Text Box

MEDS.

chipg Text Box

TV AREA

chipg Text Box

PATIENT ROOM

chipg Text Box

PATIENT ROOM

chipg Text Box

PATIENT ROOM

chipg Text Box

PATIENT ROOM

chipg Text Box

PATIENT ROOM

chipg Text Box

PATIENT ROOM

chipg Text Box

PATIENT ROOM

chipg Text Box

PATIENT ROOM

chipg Text Box 200 Wing chipg Text Box 11.03.25 chipg Text Box 11.03.25 chipg Text Box 25217.00 chipg Text Box 200 Wing chipg Image chipg Rectangle chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Line chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Callout initial 2'flood cut due to microbial growth under cove base -wall cavity inspection to occur chipg Callout initial 2'flood cut due to microbial growth under cove base -wall cavity inspection to occur chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Callout impacted exterior sheathing visible above ceiling access hatch chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Ellipse chipg Text Box chipg Text Box

NOTES:

- questionable sealing of hard ducts and duct insulation

- suspected impacts to exterior sheathing above ceiling

- suspected water entrapment in wall post roof replacement and PTAC replacement chipg Callout water stained ceiling tile directly below hard duct chipg Callout water stained ceiling tile directly below hard duct chipg Arrow chipg Polygon chipg Polygon chipg Rectangle chipg Rectangle chipg Polygon chipg Rectangle chipg Rectangle chipg Polygon chipg Rectangle chipg Rectangle chipg Polygon chipg Rectangle chipg Rectangle chipg Rectangle chipg Rectangle chipg Rectangle chipg Rectangle chipg Callout

ANTEROOM

chipg Rectangle chipg Rectangle chipg Rectangle chipg Rectangle