6. DRAFT_Sunflower G-Z_Contract Area Map Example.pdf

PDF 5 MB Posted

Attached to
Sunflower G-Z Stewardship IRSC, Kaibab National Forest, Arizona
Solicitation number
12363N24R4008
Issued by

About this file

This document appears to be a draft Contract Area Map and related information for the Sunflower G-Z Stewardship Integrated Resource Service Contract (IRSC) on the Kaibab National Forest in Arizona.

The key details are:

  • This is a pre-solicitation for a full and open competition stewardship contract under the authority of Section 604 of Public Law 108-148, as amended by the Agricultural Act of 2014. The objective is for the contractor to complete the end-results from NEPA handoff through final completion of the project area, including heritage and botany surveys, silvicultural prescriptions, timber removal, and other on-the-ground work activities.
  • The contract area is located in the Kaibab National Forest, Williams Ranger District, covering multiple sections across Townships 20 and 21 North, Ranges 2 and 3 East. The period of performance is through December 31, 2029.
  • Estimated timber volume and treatment acres are unknown, to be determined after completion of the initial planning tasks. This will be a commercial services contract with requirements for timber removal.
  • A pre-solicitation site visit has not yet been scheduled. Interested parties should follow the notice on SAM.gov for updates.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I-40E

I-40W

US-66

COC-73

9187E

1A

AZ

-64

WC

124Y

1G

140A

9183XA

9112A

9181D

15B

9224J

9197B

51C

9223JA

RAILROAD AVE

X

CO

C-

9221AD

51B

0A

I-40 RAMPS

1242C

9183W

EDISON AVENUE

9181DA

3018B

124YA

9221AB

16A

9216L

1742A

4TH STREET

9221AC

49A

160BA160BB

4Y

E

103A

49B

9216LA

103B

D

124YB

124YH

CO

UN

TY

YA

RD

9221AA

124YC

15C

EDISON AVENUE

!(2

!(97

!(47

!(49

!(17

!(35

!(5

!(24

!(40

!(32

!(7

!(33

!(29

!(46

!(41

!(6

!(23

!(16

!(28

!(26

!(99

!(4

!(22

!(37

!(99

!(34

!(96

!(48

!(1

!(13

!(3

!(18

!(31

!(25

!(100

!(27

!(20

!(8

!(21

!(19

!(36

!(101

Williams, AZ

I-40

Vicinity Map

Disclaimer Statement the USDA Forest Service uses the most current and complete data available. GIS data and product accuracy may vary. Using GIS products for purposes other that those for which they were intended may yield inaccurate or misleading results. The USDA forest Service reserves the right to correct, update, modify, or replace GIS poroducts without notification. This map is not a legal landline or ownership document. Public Lands are subject to change and leasing, and may have access restrictions; check with local offices. Obtain permissions before entering private land. Land lines are approximate.

Alex Lundquist/ Joseph H Smith 06/22/2022

0 0.25 0.5 0.75 10.125 Miles

Kaibab National Forest Williams Ranger District

Holden IRSC Contract Area Map q Gila and Salt River Meridian

Purchaser Slash Responsibilities B6.7 Fell Damage Stems (Fell) All Units

Machine Pile (Mpile) All Units

* Do not pile pre-existing logs > 12" DBH.

No hauling allowed on any roads during holiday weekends or weekdays

(calendar year dependent) for the following holidays: Memorial Day, Fourth of July, and Labor Day. C6.313#, C5.12#

When optional units are awarded for trees cut that measure less than 5 inches DBH, stumps must be cut horizontally to less than 6 inches in height.

Within the following units, for all trees cut, stumps must be cut to less than 6 inches in height per B.1.(k), Division A, Stump Heights:

G.4.1.2 2, 3,5,6,7,8,13, 16, 17,18,21,22, 23,24,25, 26,28, 29, 31,33,34, 36, 37, 40, 41, 46, 47, 48, 49,96,97, 99, 100,101, Within the contract area all improvements including, but not limited to culverts, cattle gaurds, range transects and gates will be protected per B.1(i), K-G.4# Condcuct of Activity

(Protect Improvements).

Keep all roads open.

SZ

SZ

SZ

SZ

SZ

Legend Contract Area Boundary -B1.0

Cutting Unit Boundary - B1.1

Optional Units

NOGO Timing Restrictions - C6.313#, Clause 24.

Existing Road - B1.1, B6.841, C5.12#, C6.313#

X X X Hauling Prohibited - B1.1, C5.12#, C6.313#, H.7

R R Hauling Restricted - B1.1, C5.12#, C6.313#, H.7

Limited Disturbance Botany Concerns - Clause 24.

f Protected Streamcourse - Clause 34.

Protected Improvement - Railroad - C6.24#, Clause 27.

Protected Improvement - Waterline - C6.4#, Clause 27.

d d Protected Improvement - Powerline - C6.4#, Clause 27.

x x x x x Protected Improvement - Fence - C6.24#, Clause 27.

!( Historic Route 66 Box Culvert - C6.24#, Clause 27.

ã Protected Improvement - Cattleguard - C6.4#, Clause 27.

─● ● Protected Improvement - Gate - C6.4#, Clause 27.

Private Ownership

!(1

SZ Safety Zone - C6.43, Clause 39.

File details come from the government source that posted it. Updated .