This document appears to be a draft of road maintenance drawings and specifications for the Spitz Hill Integrated Resource Timber Contract (IRTC) on the Kaibab National Forest in Arizona. The key details are:
The document contains detailed road maintenance requirements including specifications for surface blading, opening and maintaining roads, surface repair, and closing roads. It includes a road length tabulation, maintenance summary, and maintenance estimates. The total road maintenance cost is estimated at $25,167.63 or $1.66 per CCF of hauled timber volume. The document also includes typical road details and drawings. Overall, this appears to be a technical specification document related to the pre-solicitation for the Sunflower G-Z Stewardship IRSC contract on the Kaibab National Forest.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE REGION 3
Kaibab National Forest Coconino County, Arizona
Spitz Hill Integrated Resource Timber Contract Road Maintenance Drawings and Specifications
SHEET NO. DESCRIPTION
1 Title Sheet
2 Table of Contents
3 General Notes
4 Road Length Tabulation
5-7 Road Maintenance Summary
8 Road Maintenance Appraisal
9-13 Road Work Descriptions
14-18 Drawing Details and Maps
19 Road Maintenance Estimate
20-25 Network2000 Reports and Summaries
26-48 Road Maintenance T-Specs
49-61 Best Management Practices
Prepared By: _____________________________________________
Project Engineer Date
Technical Review By: _____________________________________________
Project Team Leader Date Project Satisfactorily Meets
Management Area Direction: _____________________________________________
District Ranger Date Reviewed and Approved
For Technical Adequacy: _____________________________________________
Forest Engineer Date Project Approval for Inclusion In
Program of Work & Funding Availability: _____________________________________________
Forest Supervisor Date
SPITZ HILL IRTC
5.0 TRANSPORTATION FACILITIES
TABLE OF CONTENTS
5.4 Road Maintenance
1. Title Sheet 1 Page(s)
2. General Notes 1 Page(s)
3. Road Length Tabulation 1 Page(s)
4. Road Maintenance Summary 3 Page(s)
5. Road Maintenance Appraisal 1 Page(s)
6. Road Work Descriptions 5 Page(s)
7. Drawing Details and Maps 5 Page(s)
8. Road Maintenance Estimate 1 Page(s)
9. Network2000 Reports and Summaries 6 Page(s)
10. Road Maintenance T-Specs 23 Page(s)
11. Best Management Practices 13 Page(s)
General Notes:
1. All roads specified for surface blading shall conform to timber sale road maintenance standards.
Purchaser shall maintain all out-sloped drains and lead out ditches per specifications.
2. Additional drainage features may be required if road haul and conditions should change.
3. Berms of materials or other obstructions caused by maintenance operations shall be removed prior to the end of each day’s operations and are not to remain overnight, weekends and holidays. If, due to weather conditions or equipment breakdowns, berms or obstructions cannot be removed, they shall be signed as a hazard and visibly illuminated at night, per the Manual on Uniform Traffic Control Devices (MUTCD) requirements.
4. Contractor's equipment provided for the performance of the work shall be of the appropriate size, type, and number and the Contractor's equipment shall be in good working condition and suitable for the work required. Operators shall be competent and experienced in the operation of the equipment. Equipment shall have safety signing and appurtenances required by OSHA, such as Rollover Protection Structures (ROPS), fire suppression devices, lights and slow-moving vehicle signs. The equipment used for blading shall be a diesel, tandem drive motor patrol of at least 150 horsepower. Grading equipment must be capable of cutting, crowning, and shaping operations necessary to successfully perform the tasks.
ACRONYMS:
AGG – Aggregate Surfacing AASHTO – American Association of State and Highway Transportation Officials CWFS – Cooperative Work Forest Service EX – Existing FSH – Forest Service Handbook FSR – Forest System Road IRTC – Integrated Resource Timber Contract IMP – Improved Surfacing ML – Maintenance Level MP – Mile Post MTC – Maintenance MUTCD – Manual on Uniform Traffic Control Devices NAT – Native Surfacing OSHA – Occupational Safety and Health Administration PAV – Paved Surfacing ROPS – Rollover Protection Structure SRR – Surface Rock Repair
ROAD LENGTH TABULATION
ROAD NO. MAINTENANCE
LEVEL TERMINUS TO TERMINUS MILES
FSR 76 2 Old Rte 66 FSR 9534G 1.77 FSR 9203K 2 Old Rte 66 FSR 9534G 1.49 FSR 9534E 2 Old Rte 66 MP 0.50 0.50 FSR 9534 1 Old Rte 66 MP 1.21 1.21
FSR 9534G 1 FSR 9203K FSR 76 0.72
FSR 9209K 1 FSR 141 FSR 9203K 1.49
FSR 9209KB 1 FSR 9209K MP 0.70 0.70
FSR 143A 1 FSR 76 MP 0.56 0.56
TOTAL 8.44
Pre-Haul Road Maintenance Requirements Summary – Spitz Hill IRTC
Road
Termini Miles Road ML
Applicable Road Maintenance Specifications Remarks
From To T-803 T-804 T-805 T-806 T-809 T-810 T-811 FSR 76 Old Rte 66 FSR 9534G 1.77 2 P
FSR 9203K Old Rte 66 FSR 9534G 1.49 2 P P P T-803 from MP 0.00 to 0.20 and 0.85 to 1.49.
T-804 from MP 0.20 to 0.85.
FSR 9534E Old Rte 66 MP 0.50 0.50 2 P P FSR 9534 Old Rte 66 MP 1.21 1.21 1 P
FSR 9534G FSR 9203K FSR 76 0.72 1 P
FSR 9209K FSR 141 FSR 9203K 1.49 1 P P P
T-803 from MP 0.00 to 0.98 and 1.28 to 1.49.
T-804 from MP 0.98 to 1.28.
FSR
9209KB FSR 9209K MP 0.70 0.70 1 P
FSR 143A FSR 76 MP 0.56 0.56 1 P
P = Purchaser Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party
During-Haul Road Maintenance Requirements Summary – Spitz Hill IRTC
Specifications Remarks
From To T-803 T-804 T-805 T-806 T-809 T-810 T-811 FSR 76 Old Rte 66 FSR 9534G 1.77 2 P
FSR 9203K Old Rte 66 FSR 9534G 1.49 2 P T-803 from MP 0.00 to 0.20 FSR 9534E Old Rte 66 MP 0.50 0.50 2 P FSR 9534 Old Rte 66 MP 1.21 1.21 1
FSR 9534G FSR 9203K FSR 76 0.72 1
FSR 9209K FSR 141 FSR 9203K 1.49 1
FSR
9209KB
FSR 9209K MP 0.70 0.70 1
FSR 143A FSR 76 MP 0.56 0.56 1
Post-Haul Road Maintenance Requirements Summary – Spitz Hill IRTC
Specifications Remarks
From To T-803 T-804 T-805 T-806 T-809 T-810 T-811 FSR 76 Old Rte 66 FSR 9534G 1.77 2 P
FSR 9203K Old Rte 66 FSR 9534G 1.49 2 P FSR 9534E Old Rte 66 MP 0.50 0.50 2 P FSR 9534 Old Rte 66 MP 1.21 1.21 1 P
FSR 9534G FSR 9203K FSR 76 0.72 1 P
FSR 9209K FSR 141 FSR 9203K 1.49 1 P
FSR
9209KB FSR 9209K MP 0.70 0.70 1 P
FSR 143A FSR 76 MP 0.56 0.56 1 P
TIMBER SALE: Spitz Hill IRTC
DISTRICT: WRD
ROAD MAINTENANCE APPRAISAL
(REF: FSH 2409.18)
TIMBER SALE Spitz Hill IRTC VOLUME: 15186
CWFS-FS MTC ($) PURCHASER MAINTENANCE DOLLARS
R O
AD
N
U M
BE
R
M
IL
ES
SU
R
FA
C
E
TY
PE
VO
LU
M E
C C
F
SU
R
FA
C
E
SR
R
.2
6/ C
C F-
M
IL
E
SU
BT
O
TA
L
O
VE
R F
AC
TO
R
1.
TO
TA
L C
W
FS
T-
T8
T-
T-
T-
T-
T-
T-
T-
T-
T-
T-
T-
TO
TA
L
PU
R C
H
AS
ER
M
TC
TO
TA
L M
TC
E
76 1.77 IMP 2441 390.56$ 691.29$ 145.17$ 836.46$ 2,389.50$ -$ -$ -$ 2,389.50$ 3,225.96$
9203K 1.49 NAT -$ -$ -$ -$ 1,138.50$ 780.00$ -$ 690.00$ -$ 2,608.50$ 2,608.50$
9534E 0.50 NAT -$ -$ -$ -$ 675.00$ -$ 6,922.67$ -$ 7,597.67$ 7,597.67$
9534G 0.72 NAT -$ -$ -$ -$ -$ 864.00$ -$ 1,424.00$ 2,288.00$ 2,288.00$
9534 1.21 NAT -$ -$ -$ -$ -$ 1,452.00$ -$ 1,094.50$ 2,546.50$ 2,546.50$
9209K 1.49 NAT -$ -$ -$ -$ 535.50$ 360.00$ 1,056.00$ 1,770.50$ 3,722.00$ 3,722.00$
9209KB 0.70 NAT -$ -$ -$ -$ 840.00$ -$ 865.00$ 1,705.00$ 1,705.00$
143A 0.56 NAT -$ -$ -$ -$ 672.00$ -$ 802.00$ 1,474.00$ 1,474.00$
Subtotal $/CCF PREPARED Utley (1) CWFS MTC 836.46$ 0.06
APPROVED (2) TOTAL 24,331.17$ 1.60
(3) TOTAL + CWFS MTC 25,167.63$ 1.66 R3-FS-2400-110
USDA - FOREST SERVICE
$0.26/CCF-mile for AGG CWFS Deposits $0.18/CCF-mile for PAV CWFS Deposits $0.16/CCF-mile for IMP CWFS Deposits
Road Work Descriptions
Spitz Hill IRTC
NOTES:
1. In addition to the Specifications noted below, Road Maintenance Specification T-GEN is required for all road work on the Road Package. The T-GEN Specification addresses Equipment Specifications, Noxious Weeds, Traffic Control, and Bridge Maintenance.
2. All road maintenance work shall be done in accordance with attached Best Management
Practices for Road Maintenance.
3. Maintenance Specification T-806 SURFACE REPAIR shall be performed using government material source (Moonset Pit).
4. Maintenance Specification T-811 CLOSING ROADS shall be performed post haul by first blading and shaping the length of the road to be closed, then applying entrance treatments by spreading slash to the end of the line of site from the road entrance. Entrance treatments should be applied at junctions with roads that are not designated for closure.
Road # FSR 76 Maintenance Level 2 Traveled-Way 14’ minimum, or existing width Road Length 1.77 mi.
Mile Post Work Description
0.00 Maintain existing junction with Old Rte 66. Begin T-803 SURFACE BLADING pre-, during-, and post-haul. Maintain all existing drainage features and structures and existing road junctions, including those not listed. Protect in place all existing cattle guards, fences, route markers, signs, or other structures from MP 0.00 to 1.77.
0.02 Maintain existing 24” culvert.
0.03 Maintain existing cattle guard.
0.18 Maintain existing 18” culvert.
0.34 Maintain existing 18” culvert.
0.38 Caution: Overhead Powerline.
0.45 Maintain existing 18” culvert.
0.52 Maintain existing 18” squash culvert.
0.65 Maintain existing 18” squash culvert.
0.73 Maintain existing 18” squash culvert.
0.81 Maintain existing 18” squash culvert.
0.97 Maintain existing lead out on the left. Suitable material to be brought back onto the road.
1.30 Maintain existing lead out on the right. Suitable material to be brought back onto the road.
1.36 Maintain existing lead out on the left. Suitable material to be brought back onto the road.
1.52 Maintain existing 18” squash culvert.
1.54 Maintain existing junction with FSR 9534A on the left.
1.58 Maintain existing 18” squash culvert.
1.64 Junction with FSR 9534G on the right.
1.66 Maintain existing 18” squash culvert.
1.72 Maintain existing lead out on the right. Suitable material to be brought back onto the road.
1.77 Maintain existing lead outs on both sides. Suitable material to be brought back onto the road. End T-803 SURFACE BLADING pre-, during-, and post-haul.
Road # 9203K Maintenance Level 2 Traveled-Way 12’ minimum, or existing width Road Length 1.49 mi.
Mile Post Work Description
0.00 Maintain existing junction with Old Rte 66. Begin T-803 SURFACE BLADING pre-, during-, and post-haul. Maintain all existing drainage features and structures and existing road junctions, including those not listed. Protect in place all existing cattle guards, fences, route markers, signs, or other structures from MP 0.00 to 1.49.
0.03 Maintain existing gate and cattle guard.
0.04 Maintain existing turn out on the right.
0.20 Caution: Overhead Powerline. End T-803 SURFACE BLADING pre- and during-haul Begin T-804 OPENING ROADS.
0.73 Maintain existing gate.
0.84 Maintain existing gate.
0.85 Junction with FSR 9209K on the right. End T-804 OPENING ROADS. Begin T-
803 SURFACE BLADING pre-haul.
1.43 Fallen tree blocking road, remove per T-810 ROADWAY VEGETATION.
1.49 Junction with FSR 9534G. End T-803 SURFACE BLADING pre- and post-haul.
Road # 9534E Maintenance Level 2 Traveled-Way 12’ minimum, or existing width Road Length 0.50 mi.
Mile Post Work Description
0.00 Maintain existing junction with Old Rte 66. Begin T-803 SURFACE BLADING pre-, during-, and post-haul and T-806 SURFACE REPAIR Section 2.1.a, placing material in a 6” lift (compacted depth). Maintain all existing drainage features and structures and existing road junctions, including those not listed. Protect in place all existing cattle guards, fences, route markers, signs, or other structures from MP 0.00 to 0.50.
0.04 Maintain existing gate.
0.16 Caution: Overhead Powerline. End T-806 SURFACE REPAIR.
0.23 Begin T-806 SURFACE REPAIR Section 2.1.a, placing material in a 3” lift
(compacted depth).
0.50 End T-803 SURFACE BLADING pre-, during-, and post-haul and T-806
SURFACE REPAIR.
Road # 9534 Maintenance Level 1 Traveled-Way 12’ minimum, or existing width Road Length 1.21 mi.
Mile Post Work Description
0.00 Junction with Old Rte 66. Begin T-804 OPENING ROADS pre-haul and T-811 CLOSING ROADS post-haul. Maintain all existing drainage features and structures and existing road junctions, including those not listed. Protect in place all existing cattle guards, fences, route markers, signs, or other structures from MP 0.00 to 1.21.
0.13 Caution: Overhead Powerline.
1.21 End T-804 OPENING ROADS pre-haul and T-811 CLOSING ROADS post-haul.
Road # 9534G Maintenance Level 1 Traveled-Way 12’ minimum, or existing width Road Length 0.72 mi.
Mile Post Work Description
0.00 Junction with FSR 9203K. Begin T-804 OPENING ROADS pre-haul and T-811 CLOSING ROADS post-haul. Maintain all existing drainage features and structures and existing road junctions, including those not listed. Protect in place all existing cattle guards, fences, route markers, signs, or other structures from MP 0.00 to 0.72.
0.62 Maintain existing gate and cattle tank.
0.72 Junction with FSR 76. End T-804 OPENING ROADS pre-haul and T-811
CLOSING ROADS post-haul.
Road # 9209K Maintenance Level 1 Traveled-Way 12’ minimum, or existing width Road Length 1.49 mi.
Mile Post Work Description
0.00 Junction with FSR 141. Begin T-803 SURFACE BLADING pre-haul and T-811 CLOSING ROADS post-haul. Maintain all existing drainage features and structures and existing road junctions, including those not listed. Protect in place all existing cattle guards, fences, route markers, signs, or other structures from MP 0.00 to 1.49.
0.01 Maintain existing gate.
0.06 Caution: Protected site on the right. No work outside road prism.
0.27 Maintain existing lead out on the left. Suitable material to be brought back onto the road. Begin T-806 SURFACE REPAIR Section 2.1.a, placing material in a 3” lift (compacted depth).
0.29 End T-806 SURFACE REPAIR.
0.35 Begin T-806 SURFACE REPAIR Section 2.1.a, placing material in a 3” lift
(compacted depth).
0.37 End T-806 SURFACE REPAIR.
0.50 Maintain existing lead out on the left. Suitable material to be brought back onto the road.
0.75 Begin T-806 SURFACE REPAIR Section 2.1.a, placing material in a 3” lift
(compacted depth).
0.80 End T-806 SURFACE REPAIR.
0.98 End T-803 SURFACE BLADING pre-haul. Begin T-804 OPENING ROADS pre-haul.
1.28 Junction with FSR 9209KB on the right. End T-804 OPENING ROADS pre-haul.
Begin T-803 SURFACE BLADING pre-haul.
1.45 Protect in place existing fence on the left.
1.49 Junction with FSR 9203K. End T-803 SURFACE BLADING pre-haul and T-811
CLOSING ROADS post-haul.
Road # 9209KB Maintenance Level 1 Traveled-Way 12’ minimum, or existing width Road Length 0.70 mi.
Mile Post Work Description
0.00 Junction with FSR 9209K. Begin T-804 OPENING ROADS pre-haul and T-811 CLOSING ROADS post-haul. Maintain all existing drainage features and structures and existing road junctions, including those not listed. Protect in place all existing cattle guards, fences, route markers, signs, or other structures from MP 0.00 to 0.70.
0.50 Caution: Overhead Powerline
0.70 Protect in place existing gate. End T-804 OPENING ROADS pre-haul and T-811
CLOSING ROADS post-haul.
Road # 143A Maintenance Level 1 Traveled-Way 12’ minimum, or existing width Road Length 0.56 mi.
Mile Post Work Description
0.00 Junction with FSR 76. Begin T-804 OPENING ROADS pre-haul and T-811 CLOSING ROADS post-haul. Caution: Overhead Powerline. Maintain all existing drainage features and structures and existing road junctions, including those not listed. Protect in place all existing cattle guards, fences, route markers, signs, or other structures from MP 0.00 to 0.56.
0.56 End T-804 OPENING ROADS pre-haul and T-811 CLOSING ROADS post-haul.
NATURAL GROUND
ROAD TEMPLATE
TRAVELED WAY
12' MIN - 16' MAX
TYPICAL CROSS-SECTION WITH AGGREGATE SURFACING
AND WITHOUT ROADWAY DITCH
CLEARING WIDTH*
*CLEARING LIMITS WILL BE WHICHEVER IS
GREATER: SHOULDER +6 FT OR HEEL/TOE OF
SLOPE +3 FT.
M
I N
4" MIN. COMPACTED DEPTH
MAX 3
O U
T S
L O
P E
TYPICAL CROSS-SECTION WITH AGGREGATE SURFACING
AND ROADWAY DITCH
NATURAL GROUND
4" MIN. COMPACTED DEPTH
ROAD TEMPLATE
M
IN 3%
INSLOPE
TRAVELED WAY
12' MIN - 16' MAX
3'
M
I N
TYPICAL CROSS-SECTION WITH AGGREGATE SURFACING,
CROWN, AND ROADWAY DITCH
CLEARING WIDTH*
M
I N
TRAVELED WAY
12' MIN - 16' MAX
MIN 3% MIN 3%
NATURAL GROUND
ROAD TEMPLATE
4" MIN. COMPACTED DEPTH
3'
M
A
X
*CLEARING LIMITS WILL BE WHICHEVER IS
GREATER: SHOULDER +6 FT OR HEEL/TOE OF
SLOPE +3 FT.
TYPICAL ROADWAY
DITCH
CLEARING WIDTH*
TYPICAL ROADWAY
DITCH
*CLEARING LIMITS WILL BE WHICHEVER IS
GREATER: SHOULDER +6 FT OR HEEL/TOE OF
SLOPE +3 FT.
INTERSECTION GRADING AND SHAPING
INTERSECTING ROAD
4" AGGREGATE SURFACE
DITCH FLOW LINE
C
L
MAINTAIN EXISTING DITCH FLOW LINES
TO ENSURE POSITIVE DRAINAGE AWAY
FROM THE EXISTING INTERSECTING
ROAD.
R O
A D
W I D
T H
X
X
X
X
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/2 4/2
3 1 2:
S
AM
UE
LU
TL
EY
2 C
:\U
SE
RS
\S
AM
UE
LU
TL
EY
2\B
OX
\77
T
RA
VE
L
MG
MT
K
AI
BA
B\
T
RA
NS
PO
RT
AT
IO
N
SY
ST
EM
D
EV
EL
OP
ME
NT
\R
OA
D
PR
EC
ON
ST
RU
CT
IO
N\
TI
MB
ER
S
AL
ES
\4-
FR
I_T
S\
\S
PI
TZ
H
IL
L\
CA
D\
TY
PI
CA
L
DR
AW
IN
GS
.D
W G; R3
SOUTHWESTERN REGION
SPITZ HILL
IRTC
KAIBAB
NATIONAL FOREST
WILLIAMS RANGER DISTRICT
TYPICAL ROADWAY
DETAILS
08/24/2023
S. UTLEY
S. UTLEY
S. UNTALAN
C-01
* DITCH
TOP OF CUT
L
E
D
O
U
T
I
T
C
H
C
U
L
V
E
R
L
E
T
C
H
GRADE
B L O
C K
D I T
C H
L
E
T
D
I
T
C
H
F L O
W
T
F
L
L
GRADE
GRADE
E X
I S
T I N
G
D
R A
I N
T
L
L
T
P
C
T
F
L
O
W
25' TRANSITION
EX. SHOULDER
SHOULDER
3:1
SLOPE
2' MIN
INLET BASIN AS SHOWN
IN DITCH BLOCK DETAIL
G
R
A
R
A
I N
INSTALL DITCH BLOCK
(IF NECESSARY)
NATURAL GROUND
CLEARING 15' (TYP.)
ROADBED
CLEARING
10'
WIDTH
12"
MIN
EXCAVATED
MATERIAL
CLEARING
12"
8"
24"
MIN
24" MIN
OR 6"+D
ROADBED EDGE
COMPACTED
TO 95%±
CULVERT LEAD OUT DITCH
FLAT BOTTOM DITCH
LEAD OUT DITCH
DITCH BLOCK
SAMPLE DITCH TYPICAL
NOTES:
1. THE SLOPE OF LEAD OUT DITCHES SHALL BE CONSTRUCTED TO A MINIMUM OF -2% SLOPE WITHIN THE PREVIOUSLY
EXISTING DISTURBED SOIL.
2. DITCH BLOCK WILL NOT BE REQUIRED WHEN INLET BASIN IS IN A SAG.
3. DITCH BLOCK ELEVATION SHALL BE 4" LOWER THAN THE ADJACENT SUBGRADE ELEVATION.
12" MIN
24" MIN
OR 6"+D
12"
D
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/2 4/2
3 1 2:
S
AM
UE
LU
TL
EY
2 C
:\U
SE
RS
\S
AM
UE
LU
TL
EY
2\B
OX
\77
T
RA
VE
L
MG
MT
K
AI
BA
B\
T
RA
NS
PO
RT
AT
IO
N
SY
ST
EM
D
EV
EL
OP
ME
NT
\R
OA
D
PR
EC
ON
ST
RU
CT
IO
N\
TI
MB
ER
S
AL
ES
\4-
FR
I_T
S\
\S
PI
TZ
H
IL
L\
CA
D\
TY
PI
CA
L
DR
AW
IN
GS
.D
W G; R3
SOUTHWESTERN REGION
SPITZ HILL
IRTC
KAIBAB
NATIONAL FOREST
WILLIAMS RANGER DISTRICT
TYPICAL DITCH
AND TURNOUT
DETAILS
08/24/2023
S. UTLEY
S. UTLEY
S. UNTALAN
C-02
EXTRA WIDENING
TURNOUT
50' MIN.
TURNOUT AND CURVE WIDENING
N
T
Y
P
M
I N
P
C
P
T
C
L
R
O
A
D
W
I
D
T
H
C
L
X
X
X
ROAD GRADE LINE
SUBGRADE
0.5-2.5'
NOT TO SCALE
GRAVEL SURFACE
AB B
A
TOE
(H) INSIDE
10'
10'
START
DIP
END
DIP
CREST
DITCH/BOTTOM
MIDPOINT
DRAIN LINE
0-10% ANGLE
(H) OUTSIDE
L
STATIONED ON PLANS
P
D
O
W
N
G
R
A
D
E
ROLLING DIP NOTES:
1. THE CROSS SLOPE OF THE ROADBED SHALL BE MAINTAINED
THROUGH THE DIP.
2. THE DRAIN LINE SHALL BE SKEWED OFF OF THE ROADBED TO
ALLOW POSITIVE DRAINAGE, UNLESS OTHERWISE FLAGGED.
3. FOR DIPS ON AGGREGATE SURFACE ROADS, ADD DEPTH OF
COMPACTED SURFACE TO DIMENSION (H).
4. ALL DITCHES ASSOCIATED WITH ROLLING DIP STRUCTURES SHALL
BE MAINTAINED WITHIN THE PROJECT SITE.
5. DIRECTION OF EXISTING WATER FLOW SHALL BE MAINTAINED.
NOT TO SCALE
ROLLING DIP CONSTRUCTION DIMENSIONS
TYPE "1"
%GRADE
LENGTH
DEPTH (H)
A B
OUTSIDE
EDGE
INSIDE
EDGE
0-4% 18 55 0.9' 0.4'
5-8% 16 85 0.8' 0.3'
9-12% 15 110 0.7' 0.3'
ROLLING DRAINAGE DIP
PERSPECTIVE
ROLLING DRAINAGE DIP
PROFILE
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/2 4/2
3 1 2:
S
AM
UE
LU
TL
EY
2 C
:\U
SE
RS
\S
AM
UE
LU
TL
EY
2\B
OX
\77
T
RA
VE
L
MG
MT
K
AI
BA
B\
T
RA
NS
PO
RT
AT
IO
N
SY
ST
EM
D
EV
EL
OP
ME
NT
\R
OA
D
PR
EC
ON
ST
RU
CT
IO
N\
TI
MB
ER
S
AL
ES
\4-
FR
I_T
S\
\S
PI
TZ
H
IL
L\
CA
D\
TY
PI
CA
L
DR
AW
IN
GS
.D
W G; R3
SOUTHWESTERN REGION
SPITZ HILL
IRTC
KAIBAB
NATIONAL FOREST
WILLIAMS RANGER DISTRICT
TYPICAL ROLLING DIP
DETAILS
08/24/2023
S. UTLEY
S. UTLEY
S. UNTALAN
C-03
This product is reproduced from geospatial information prepared by the Kaibab National Forest. Geospatial information and GIS product accuracy may vary. Using GIS products for purposes other than those for which they were created may yield inaccurate or misleading results. Kaibab National Forest reserves the right to correct, update, modify or replace GIS products without notification.
Date Saved: 8/17/2023 Document Path: T:\FS\NFS\Coconino\Program\7100Engineering\GIS\Sam Utley\Timber\Spitz Hill\Spitz Hill.aprx
SPITZ HILL IRTC VICINTY MAP
Williams Ranger District
KAIBAB NATIONAL FOREST
SOUTHWEST REGION 3
Williams, AZ
AZ-64 N to Tusayan
I-40 E to Flagstaff
I-40 W to Ash Fork
¯ 0 4 82 Miles
Spitz Hill IRTC
Sale Roads Maintenance Level
1 - BASIC CUSTODIAL CARE (CLOSED)
2 - HIGH CLEARANCE VEHICLES
Timber Cut Units
Other Roads and Boundaries
Kaibab Roads Maintenance Level
3 - SUITABLE FOR PASSENGER CARS
4 - MODERATE DEGREE OF USER COMFORT
5 - HIGH DEGREE OF USER COMFORT
I-40W
I-40 RAMPSI-40 RAMPS I-40E
I-40W
US-66
9203K
9209K
143A
9209K
9534E
9534G
9209KB
9203K
This product is reproduced from geospatial information prepared by the Kaibab National Forest. Geospatial information and GIS product accuracy may vary. Using GIS products for purposes other than those for which they were created may yield inaccurate or misleading results. Kaibab National Forest reserves the right to correct, update, modify or replace GIS products without notification.
Date Saved: 8/17/2023 Document Path: T:\FS\NFS\Coconino\Program\7100Engineering\GIS\Sam Utley\Timber\Spitz Hill\Spitz Hill.aprx
SPITZ HILL IRTC SALE MAP
Williams Ranger District
KAIBAB NATIONAL FOREST
SOUTHWEST REGION 3
¯ 0 0.6 1.20.3 Miles
Spitz Hill IRTC
Sale Roads Maintenance Level
1 - BASIC CUSTODIAL CARE (CLOSED)
2 - HIGH CLEARANCE VEHICLES
Timber Cut Units
Other Roads and Boundaries
Kaibab Roads Maintenance Level
2 - HIGH CLEARANCE VEHICLES
3 - SUITABLE FOR PASSENGER CARS
4 - MODERATE DEGREE OF USER COMFORT
5 - HIGH DEGREE OF USER COMFORT
Spitz Hill IRTC Cost Justifications
Estimated Temporary Roads:
System roads used as temporary roads and obliterated by purchaser = 0.00 miles
Non-system road used as temporary roads and obliterated by purchaser = 1.38 miles
New temporary roads constructed by, and obliterated by the purchaser = 5.40 miles
Total = 6.59 miles
Estimated Cost used for Road Maintenance Work Items:
• $550 per mile each blading for level 3 T-803 Surface Blading.
• $450 per mile each blading for level 2 T-803 Surface Blading.
• $1200 per mile for T-804 Opening Roads.
• $20 per CY for Spot Fill T-806 Surface Repair using Cinders.
• $690 per tree for T-810 Roadway Vegetation.
• $450 per mile and $550 per entrance treatment for level 1 T-811 Close Road.
• $2000 per mile for temporary road cost.
Total Volume Truck Load Volume Total distance Weighted Miles Weighted RTM’s Standby Total RTM’s
Saw Timber:
= 8,908 CCF
= 8.00 CCF/load = 166.65 miles = 152.10 miles = 307.96 minutes = 45.00 minutes = 352.96 minutes
Non-Saw Timber
= 6,723 CCF
= 8.00 CCF/load = 26.05 miles = 11.50 miles = 47.65 minutes = 45.00 minutes = 92.65 minutes
Biomass
= 1,177 CCF
= 8.00 CCF/load = 176.55 miles = 162.01 miles = 326.53 minutes = 45.00 minutes = 371.53 minutes
Costs:
Surface rock cost Purchaser Maintenance Total Maintenance Truck cost Haul cost
= $836.46 or $0.06/CCF = $24,331.17 or $1.60/CCF = $25,167.63 or $1.66/CCF = $126.00/Hour = $779,148 or $87.47/CCF (Saw) = $128,513 or $19.12/CCF (Non-Saw) = $108,628 or $92.33/CCF (Biomass)
Road Report (Optimal Route) - Traveling Round Trip Minutes and Haul Road Maintenance Version 8.0
Sale name Volume unit of measure Purchaser haul road maint. rate, $/CCF Total distance in miles
FS haul road maint rate, $/CCF Total weighted miles Other haul road maint rate, $/CCF Total weighted RTM's (traveling) Total haul road maint rate, $/CCF Total hauled timber volume
Total haul road maint, $'s (rounded) Total haul sale cost, $'s (rounded)
Road Number
Node From Node To From
Milepost To
Milepost Volume Passed
% Total Volume
Total Miles
Weight Miles
Weight RTM's
Total Maint Maint Class Fixed
Cost Variable
Cost Maint By select I-40 10 9 0.00 106.30 8,908 100.0% 106.30 106.30 196.25 0.00 0 0 458,945 141 11 10 5.50 5.63 8,908 100.0% 0.13 0.13 0.62 0.00 0 0 1,425
US-66 12 11 4.94 5.50 8,908 100.0% 0.56 0.56 2.24 0.00 0 0 5,256
141 13 12 3.07 3.54 1,566 17.6% 0.47 0.08 0.40 0.00 0 0 924
Temp-NonSystem 14 13 0.00 0.19 127 1.4% 0.19 0.00 0.06 0.00 0 0 152 141 15 13 2.97 3.07 1,440 16.2% 0.10 0.02 0.08 0.00 0 0 187
9209K 16 15 2.66 2.97 1,440 16.2% 0.31 0.05 1.20 0.00 0 0 2,807 Temp 17 16 0.00 0.41 133 1.5% 0.41 0.01 0.15 0.00 0 0 342 9209K 18 16 2.54 2.66 1,175 13.2% 0.12 0.02 0.38 0.00 0 0 893 Temp 19 18 0.00 0.26 103 1.2% 0.26 0.00 0.07 0.00 0 0 169 9209K 20 18 2.38 2.54 902 10.1% 0.16 0.02 0.39 0.00 0 0 911 Temp 21 20 0.55 0.68 472 5.3% 0.13 0.01 0.17 0.00 0 0 387 Temp 22 21 0.00 0.55 248 2.8% 0.55 0.02 0.37 0.00 0 0 860 9209K 23 20 1.96 2.38 270 3.0% 0.42 0.01 0.31 0.00 0 0 716 9209K 24 29 1.42 1.64 916 10.3% 0.22 0.02 0.54 0.00 0 0 1,274 Temp 25 24 0.00 0.13 192 2.2% 0.13 0.00 0.07 0.00 0 0 158
9209KB 26 24 0.18 0.72 523 5.9% 0.54 0.03 0.76 0.00 0 0 1,777
9209KB 27 26 0.00 0.18 76 0.9% 0.18 0.00 0.04 0.00 0 0 86
Temp 28 26 0.00 0.25 76 0.9% 0.25 0.00 0.05 0.00 0 0 121 9203K 29 59 0.00 0.58 2,670 30.0% 0.58 0.17 2.09 0.00 0 0 4,886 9203K 30 29 0.73 1.42 1,453 16.3% 0.69 0.11 1.35 0.00 0 0 3,153 Temp 31 30 0.21 0.60 726 8.1% 0.39 0.03 0.76 0.00 0 0 1,786 Temp 32 31 0.00 0.21 345 3.9% 0.21 0.01 0.19 0.00 0 0 455 9534G 33 30 0.35 0.73 487 5.5% 0.38 0.02 0.50 0.00 0 0 1,164 Temp 34 33 0.00 0.24 167 1.9% 0.24 0.00 0.11 0.00 0 0 252
76 35 37 0.14 0.53 395 4.4% 0.39 0.02 0.21 0.00 0 0 486 76 36 35 0.00 0.14 225 2.5% 0.14 0.00 0.04 0.00 0 0 99 76 37 38 0.53 0.93 597 6.7% 0.40 0.03 0.32 0.00 0 0 753 76 38 40 0.93 1.22 907 10.2% 0.29 0.03 0.35 0.00 0 0 825
Temp 39 38 0.00 0.30 310 3.5% 0.30 0.01 0.25 0.00 0 0 585 76 40 42 1.22 1.40 1,294 14.5% 0.18 0.03 0.31 0.00 0 0 737
Temp 41 40 0.00 0.44 258 2.9% 0.44 0.01 0.31 0.00 0 0 714 76 42 61 1.40 1.77 1,294 14.5% 0.37 0.05 0.64 0.00 0 0 1,513
Temp-NonSystem 43 47 0.25 1.08 737 8.3% 0.83 0.07 1.65 0.00 0 0 3,853 Temp 44 43 0.15 0.22 608 6.8% 0.07 0.00 0.11 0.00 0 0 267 Temp 45 44 0.00 0.15 129 1.4% 0.15 0.00 0.05 0.00 0 0 122 Temp 46 44 0.00 0.35 350 3.9% 0.35 0.01 0.33 0.00 0 0 774 Temp 47 62 0.00 0.13 2,316 26.0% 0.13 0.03 0.81 0.00 0 0 1,899
Temp-NonSystem 48 47 1.08 1.17 1,487 16.7% 0.09 0.02 0.36 0.00 0 0 847 9534 49 48 0.94 1.08 1,227 13.8% 0.14 0.02 0.46 0.00 0 0 1,080
9887C 5 1 148.60 148.70 8,908 100.0% 0.10 0.10 1.20 0.00 0 0 2,851 Temp 50 49 0.00 0.47 258 2.9% 0.47 0.01 0.33 0.00 0 0 763 9534 51 49 0.62 0.94 877 9.8% 0.32 0.03 0.76 0.00 0 0 1,772 Temp 52 51 0.00 0.19 185 2.1% 0.19 0.00 0.09 0.00 0 0 222 9534 53 51 0.33 0.62 508 5.7% 0.29 0.02 0.40 0.00 0 0 929 Temp 54 53 0.00 0.23 334 3.7% 0.23 0.01 0.21 0.00 0 0 484 9534 55 53 0.00 0.33 174 2.0% 0.33 0.01 0.15 0.00 0 0 362
9534E 56 63 0.62 0.80 852 9.6% 0.18 0.02 0.21 0.00 0 0 486 9534E 57 56 0.29 0.62 519 5.8% 0.33 0.02 0.23 0.00 0 0 539 Temp 58 57 0.00 0.29 334 3.7% 0.29 0.01 0.26 0.00 0 0 611
Temp-NonSystem 59 60 1.71 1.76 2,713 30.5% 0.05 0.02 0.37 0.00 0 0 868
AZ-277 6 5 143.90 148.60 8,908 100.0% 4.70 4.70 8.68 0.00 0 0 20,310
Temp 60 64 0.00 0.21 2,713 30.5% 0.21 0.06 1.54 0.00 0 0 3,582
US-66 61 62 1.77 3.00 1,294 14.5% 1.23 0.18 2.14 0.00 0 0 5,006
US-66 62 63 3.00 3.44 3,609 40.5% 0.44 0.18 0.71 0.00 0 0 1,660
US-66 63 64 3.44 3.64 4,462 50.1% 0.20 0.10 0.40 0.00 0 0 937
US-66 64 12 3.64 4.94 7,342 82.4% 1.30 1.07 4.29 0.00 0 0 10,058
AZ-377 7 6 110.10 143.90 8,908 100.0% 33.80 33.80 62.40 0.00 0 0 145,915
AZ-77 8 7 107.80 110.10 8,908 100.0% 2.30 2.30 4.25 0.00 0 0 9,977
WHopiDr 9 8 106.30 107.80 8,908 100.0% 1.50 1.50 4.00 0.00 0 0 9,354
$720,327$0.00
Spitz Hill
307.96 $0.00
CCF
166.65 152.10
8,908
$0.00 $0.00 $0.00
Forest
Resource Enterprises
FForestorest
RResourceesource EEnterprisesnterprises
Forest
Resource Enterprises
FForestorest
RResourceesource EEnterprisesnterprises get network link report sort by road number goto individual road print erase tablerefresh data
8/17/2023 1 network_input80-Spitz Hill-Saw.xlsm
Other Road Maintenance Items and Summary
Sale name: Spitz Hill
Pre-Haul Maintenance Post-Haul Maintenance
Type Mtce By select Total Cost Type Mtce By select Total Cost
Miscellaneous Road Maintenance Items Data and Cost Summary
Type Mtce By select Total Cost Data & Cost Summary Item
Appraisal point (mill or sort yard) District or Forest Sale termination date Analyst name Total hauled timber volume - CCF Distance: appraisal point - sale area (miles)
Maintenance Summary (all items) Total $'s Per CCF Traveling (haul) round trip minutes - RTM's Required rd maint deposits, FS (CT5.32) $0.00 $0.00 Standing RTM's (load, unload, scale, delay) Purchaser maintenance $0.00 $0.00 Total RTM's (traveling + standing) Other maintenance (CT5.32) $0.00 $0.00 Total sale variable costs Subtotal FS & other (CT5.32) $0.00 $0.00 Haul cost per CCF (based on RTM's only) Total for appraisal - Road Maintenance (all) $0.00 $0.00 Rd maint cost per CCF (all maintenance)
Total variable costs per CCF Approval Total sale fixed costs (const, reconst, etc.)
Title Total fixed cost per CCF Prepared By Road Management
Title Reviewed By Project Engineer
Title Reviewed By Systems Manager
(Damage to roads from logging or landings, dust abatement, etc.)
(Open roads, blading, brushing, small slide removal, etc.) (Road closures, seeding, barriers, etc.)
$0.00 $0
$87.47
$779,148
(Traveling RTM's, haul maintenance, and fixed costs included from Road Report)
Total sale costs per CCF $87.47
Value
Heber
166.65
Kaibab WRD
Utley
45.00 352.96
8,908
$87.47
307.96
Total sale costs (includes traveling rtm's, standing rtm's, all maint., & fixed costs) $779,148
$0.00
Forest
Resource Enterprises
FForestorest
RResourceesource EEnterprisesnterprises
Forest
Resource Enterprises
FForestorest
RResourceesource EEnterprisesnterprises print erase table
8/17/2023 network_input80-Spitz Hill-Saw.xlsm
Sale name Volume unit of measure Purchaser haul road maint. rate, $/CCF Total distance in miles
FS haul road maint rate, $/CCF Total weighted miles Other haul road maint rate, $/CCF Total weighted RTM's (traveling) Total haul road maint rate, $/CCF Total hauled timber volume
Total haul road maint, $'s (rounded) Total haul sale cost, $'s (rounded)
Road Number
Node From Node To From
Milepost To
Milepost Volume Passed
% Total Volume
Total Miles
Weight Miles
Weight RTM's
Total Maint Maint Class Fixed
Cost Variable
Cost Maint By select I-40 10 9 0.00 6.90 6,723 100.0% 6.90 6.90 12.74 0.00 0 0 22,455 141 11 10 5.50 5.63 6,723 100.0% 0.13 0.13 0.62 0.00 0 0 1,076
US-66 12 11 4.94 5.50 6,723 100.0% 0.56 0.56 2.24 0.00 0 0 3,967
141 13 12 3.07 3.54 1,182 17.6% 0.47 0.08 0.40 0.00 0 0 697
Temp-NonSystem 14 13 0.00 0.19 96 1.4% 0.19 0.00 0.06 0.00 0 0 115 141 15 13 2.97 3.07 1,087 16.2% 0.10 0.02 0.08 0.00 0 0 141
9209K 16 15 2.66 2.97 1,087 16.2% 0.31 0.05 1.20 0.00 0 0 2,119 Temp 17 16 0.00 0.41 100 1.5% 0.41 0.01 0.15 0.00 0 0 258 9209K 18 16 2.54 2.66 887 13.2% 0.12 0.02 0.38 0.00 0 0 674 Temp 19 18 0.00 0.26 78 1.2% 0.26 0.00 0.07 0.00 0 0 128 9209K 20 18 2.38 2.54 681 10.1% 0.16 0.02 0.39 0.00 0 0 688 Temp 21 20 0.55 0.68 357 5.3% 0.13 0.01 0.17 0.00 0 0 292 Temp 22 21 0.00 0.55 187 2.8% 0.55 0.02 0.37 0.00 0 0 649 9209K 23 20 1.96 2.38 204 3.0% 0.42 0.01 0.31 0.00 0 0 540 9209K 24 29 1.42 1.64 692 10.3% 0.22 0.02 0.54 0.00 0 0 961 Temp 25 24 0.00 0.13 145 2.2% 0.13 0.00 0.07 0.00 0 0 119
9209KB 26 24 0.18 0.72 395 5.9% 0.54 0.03 0.76 0.00 0 0 1,341
9209KB 27 26 0.00 0.18 58 0.9% 0.18 0.00 0.04 0.00 0 0 65
Temp 28 26 0.00 0.25 58 0.9% 0.25 0.00 0.05 0.00 0 0 91 9203K 29 59 0.00 0.58 2,015 30.0% 0.58 0.17 2.09 0.00 0 0 3,687 9203K 30 29 0.73 1.42 1,097 16.3% 0.69 0.11 1.35 0.00 0 0 2,380 Temp 31 30 0.21 0.60 548 8.1% 0.39 0.03 0.76 0.00 0 0 1,348 Temp 32 31 0.00 0.21 260 3.9% 0.21 0.01 0.19 0.00 0 0 343 9534G 33 30 0.35 0.73 368 5.5% 0.38 0.02 0.50 0.00 0 0 878 Temp 34 33 0.00 0.24 126 1.9% 0.24 0.00 0.11 0.00 0 0 190
76 35 37 0.14 0.53 298 4.4% 0.39 0.02 0.21 0.00 0 0 367 76 36 35 0.00 0.14 170 2.5% 0.14 0.00 0.04 0.00 0 0 75 76 37 38 0.53 0.93 451 6.7% 0.40 0.03 0.32 0.00 0 0 568 76 38 40 0.93 1.22 684 10.2% 0.29 0.03 0.35 0.00 0 0 623
Temp 39 38 0.00 0.30 234 3.5% 0.30 0.01 0.25 0.00 0 0 442 76 40 42 1.22 1.40 976 14.5% 0.18 0.03 0.31 0.00 0 0 556
Temp 41 40 0.00 0.44 195 2.9% 0.44 0.01 0.31 0.00 0 0 539 76 42 61 1.40 1.77 976 14.5% 0.37 0.05 0.64 0.00 0 0 1,142
Temp-NonSystem 43 47 0.25 1.08 556 8.3% 0.83 0.07 1.65 0.00 0 0 2,908 Temp 44 43 0.15 0.22 459 6.8% 0.07 0.00 0.11 0.00 0 0 202 Temp 45 44 0.00 0.15 97 1.4% 0.15 0.00 0.05 0.00 0 0 92 Temp 46 44 0.00 0.35 264 3.9% 0.35 0.01 0.33 0.00 0 0 584 Temp 47 62 0.00 0.13 1,748 26.0% 0.13 0.03 0.81 0.00 0 0 1,433
Temp-NonSystem 48 47 1.08 1.17 1,122 16.7% 0.09 0.02 0.36 0.00 0 0 640 9534 49 48 0.94 1.08 926 13.8% 0.14 0.02 0.46 0.00 0 0 815 Temp 50 49 0.00 0.47 195 2.9% 0.47 0.01 0.33 0.00 0 0 576 9534 51 49 0.62 0.94 662 9.8% 0.32 0.03 0.76 0.00 0 0 1,337 Temp 52 51 0.00 0.19 140 2.1% 0.19 0.00 0.09 0.00 0 0 167 9534 53 51 0.33 0.62 383 5.7% 0.29 0.02 0.40 0.00 0 0 701 Temp 54 53 0.00 0.23 252 3.7% 0.23 0.01 0.21 0.00 0 0 365 9534 55 53 0.00 0.33 131 2.0% 0.33 0.01 0.15 0.00 0 0 273
9534E 56 63 0.62 0.80 643 9.6% 0.18 0.02 0.21 0.00 0 0 367 9534E 57 56 0.29 0.62 391 5.8% 0.33 0.02 0.23 0.00 0 0 407 Temp 58 57 0.00 0.29 252 3.7% 0.29 0.01 0.26 0.00 0 0 461
Temp-NonSystem 59 60 1.71 1.76 2,048 30.5% 0.05 0.02 0.37 0.00 0 0 655 Temp 60 64 0.00 0.21 2,048 30.5% 0.21 0.06 1.54 0.00 0 0 2,703
US-66 61 62 1.77 3.00 976 14.5% 1.23 0.18 2.14 0.00 0 0 3,778
US-66 62 63 3.00 3.44 2,724 40.5% 0.44 0.18 0.71 0.00 0 0 1,253
US-66 63 64 3.44 3.64 3,367 50.1% 0.20 0.10 0.40 0.00 0 0 707
US-66 64 12 3.64 4.94 5,541 82.4% 1.30 1.07 4.29 0.00 0 0 7,591
TrucksOnly 7 1 8.00 8.10 6,723 100.0% 0.10 0.10 0.80 0.00 0 0 1,412 OldRte66 8 7 7.10 8.00 6,723 100.0% 0.90 0.90 2.40 0.00 0 0 4,236
HughesAve 9 8 6.90 7.10 6,723 100.0% 0.20 0.20 0.53 0.00 0 0 941
$84,119$0.00
Spitz Hill
47.65 $0.00
CCF
26.05 11.50
6,723
$0.00 $0.00 $0.00
Forest
Resource Enterprises
FForestorest
RResourceesource EEnterprisesnterprises
Forest
Resource Enterprises
FForestorest
RResourceesource EEnterprisesnterprises
8/17/2023 1 network_input80-Spitz Hill-NonSaw.xlsm
Sale name: Spitz Hill
Pre-Haul Maintenance Post-Haul Maintenance
Type Mtce By select Total Cost Type Mtce By select Total Cost
Miscellaneous Road Maintenance Items Data and Cost Summary
Type Mtce By select Total Cost Data & Cost Summary Item
Appraisal point (mill or sort yard) District or Forest Sale termination date Analyst name Total hauled timber volume - CCF Distance: appraisal point - sale area (miles)
Maintenance Summary (all items) Total $'s Per CCF Traveling (haul) round trip minutes - RTM's Required rd maint deposits, FS (CT5.32) $0.00 $0.00 Standing RTM's (load, unload, scale, delay) Purchaser maintenance $0.00 $0.00 Total RTM's (traveling + standing) Other maintenance (CT5.32) $0.00 $0.00 Total sale variable costs Subtotal FS & other (CT5.32) $0.00 $0.00 Haul cost per CCF (based on RTM's only) Total for appraisal - Road Maintenance (all) $0.00 $0.00 Rd maint cost per CCF (all maintenance)
Total variable costs per CCF Approval Total sale fixed costs (const, reconst, etc.)
Title Total fixed cost per CCF Prepared By Road Management
Title Reviewed By Project Engineer
Title Reviewed By Systems Manager
Total sale costs per CCF $19.12
Value
Bellemont
26.05
Kaibab WRD
Utley
45.00 92.65
6,723
$19.12
47.65
Total sale costs (includes traveling rtm's, standing rtm's, all maint., & fixed costs) $128,513
$0.00
(Damage to roads from logging or landings, dust abatement, etc.)
(Open roads, blading, brushing, small slide removal, etc.) (Road closures, seeding, barriers, etc.)
$0.00 $0
$19.12
$128,513
(Traveling RTM's, haul maintenance, and fixed costs included from Road Report)
Forest
Resource Enterprises
FForestorest
RResourceesource EEnterprisesnterprises
Forest
Resource Enterprises
FForestorest
RResourceesource EEnterprisesnterprises print
8/17/2023 network_input80-Spitz Hill-NonSaw.xlsm
Sale name Volume unit of measure Purchaser haul road maint. rate, $/CCF Total distance in miles
FS haul road maint rate, $/CCF Total weighted miles Other haul road maint rate, $/CCF Total weighted RTM's (traveling) Total haul road maint rate, $/CCF Total hauled timber volume
Total haul road maint, $'s (rounded) Total haul sale cost, $'s (rounded)
Road Number
Node From Node To From
Milepost To
Milepost Volume Passed
% Total Volume
Total Miles
Weight Miles
Weight RTM's
Total Maint Maint Class Fixed
Cost Variable
Cost Maint By select I-40 10 9 0.00 16.40 1,177 100.0% 16.40 16.40 30.28 0.00 0 0 9,354 141 11 10 5.50 5.63 1,177 100.0% 0.13 0.13 0.62 0.00 0 0 188
US-66 12 11 4.94 5.50 1,177 100.0% 0.56 0.56 2.24 0.00 0 0 694
141 13 12 3.07 3.54 207 17.6% 0.47 0.08 0.40 0.00 0 0 122
Temp-NonSystem 14 13 0.00 0.19 17 1.4% 0.19 0.00 0.06 0.00 0 0 20 141 15 13 2.97 3.07 190 16.2% 0.10 0.02 0.08 0.00 0 0 25
9209K 16 15 2.66 2.97 190 16.2% 0.31 0.05 1.20 0.00 0 0 371 Temp 17 16 0.00 0.41 18 1.5% 0.41 0.01 0.15 0.00 0 0 45 9209K 18 16 2.54 2.66 155 13.2% 0.12 0.02 0.38 0.00 0 0 118 Temp 19 18 0.00 0.26 14 1.2% 0.26 0.00 0.07 0.00 0 0 22 9209K 20 18 2.38 2.54 119 10.1% 0.16 0.02 0.39 0.00 0 0 120 Temp 21 20 0.55 0.68 62 5.3% 0.13 0.01 0.17 0.00 0 0 51 Temp 22 21 0.00 0.55 33 2.8% 0.55 0.02 0.37 0.00 0 0 113 9209K 23 20 1.96 2.38 36 3.0% 0.42 0.01 0.31 0.00 0 0 95 9209K 24 29 1.42 1.64 121 10.3% 0.22 0.02 0.54 0.00 0 0 168 Temp 25 24 0.00 0.13 25 2.2% 0.13 0.00 0.07 0.00 0 0 21
9209KB 26 24 0.18 0.72 69 5.9% 0.54 0.03 0.76 0.00 0 0 235
9209KB 27 26 0.00 0.18 10 0.9% 0.18 0.00 0.04 0.00 0 0 11
Temp 28 26 0.00 0.25 10 0.9% 0.25 0.00 0.05 0.00 0 0 16 9203K 29 59 0.00 0.58 353 30.0% 0.58 0.17 2.09 0.00 0 0 645 9203K 30 29 0.73 1.42 192 16.3% 0.69 0.11 1.35 0.00 0 0 416 Temp 31 30 0.21 0.60 96 8.2% 0.39 0.03 0.76 0.00 0 0 236 Temp 32 31 0.00 0.21 46 3.9% 0.21 0.01 0.19 0.00 0 0 60 9534G 33 30 0.35 0.73 64 5.5% 0.38 0.02 0.50 0.00 0 0 154 Temp 34 33 0.00 0.24 22 1.9% 0.24 0.00 0.11 0.00 0 0 33
76 35 37 0.14 0.53 52 4.4% 0.39 0.02 0.21 0.00 0 0 64 76 36 35 0.00 0.14 30 2.5% 0.14 0.00 0.04 0.00 0 0 13 76 37 38 0.53 0.93 79 6.7% 0.40 0.03 0.32 0.00 0 0 99 76 38 40 0.93 1.22 120 10.2% 0.29 0.03 0.35 0.00 0 0 109
Temp 39 38 0.00 0.30 41 3.5% 0.30 0.01 0.25 0.00 0 0 77 76 40 42 1.22 1.40 171 14.5% 0.18 0.03 0.31 0.00 0 0 97
Temp 41 40 0.00 0.44 34 2.9% 0.44 0.01 0.31 0.00 0 0 94 76 42 61 1.40 1.77 171 14.5% 0.37 0.05 0.64 0.00 0 0 200
Temp-NonSystem 43 47 0.25 1.08 97 8.3% 0.83 0.07 1.65 0.00 0 0 509 Temp 44 43 0.15 0.22 80 6.8% 0.07 0.00 0.11 0.00 0 0 35 Temp 45 44 0.00 0.15 17 1.4% 0.15 0.00 0.05 0.00 0 0 16 Temp 46 44 0.00 0.35 46 3.9% 0.35 0.01 0.33 0.00 0 0 102 Temp 47 62 0.00 0.13 306 26.0% 0.13 0.03 0.81 0.00 0 0 251
Temp-NonSystem 48 47 1.08 1.17 196 16.7% 0.09 0.02 0.36 0.00 0 0 112 9534 49 48 0.94 1.08 162 13.8% 0.14 0.02 0.46 0.00 0 0 143 Temp 50 49 0.00 0.47 34 2.9% 0.47 0.01 0.33 0.00 0 0 101 9534 51 49 0.62 0.94 116 9.9% 0.32 0.03 0.76 0.00 0 0 234 Temp 52 51 0.00 0.19 24 2.1% 0.19 0.00 0.09 0.00 0 0 29 9534 53 51 0.33 0.62 67 5.7% 0.29 0.02 0.40 0.00 0 0 123 Temp 54 53 0.00 0.23 44 3.7% 0.23 0.01 0.21 0.00 0 0 64 9534 55 53 0.00 0.33 23 2.0% 0.33 0.01 0.15 0.00 0 0 48
9534E 56 63 0.62 0.80 113 9.6% 0.18 0.02 0.21 0.00 0 0 64 9534E 57 56 0.29 0.62 69 5.8% 0.33 0.02 0.23 0.00 0 0 71 Temp 58 57 0.00 0.29 44 3.7% 0.29 0.01 0.26 0.00 0 0 81
Temp-NonSystem 59 60 1.71 1.76 358 30.5% 0.05 0.02 0.37 0.00 0 0 115 27th 6 1 158.00 158.60 1,177 100.0% 0.60 0.60 2.06 0.00 0 0 635
Temp 60 64 0.00 0.21 358 30.5% 0.21 0.06 1.54 0.00 0 0 473
US-66 61 62 1.77 3.00 171 14.5% 1.23 0.18 2.14 0.00 0 0 661
US-66 62 63 3.00 3.44 477 40.5% 0.44 0.18 0.71 0.00 0 0 219
US-66 63 64 3.44 3.64 589 50.1% 0.20 0.10 0.40 0.00 0 0 124
US-66 64 12 3.64 4.94 970 82.4% 1.30 1.07 4.29 0.00 0 0 1,328
Durango 7 6 157.50 158.00 1,177 100.0% 0.50 0.50 1.71 0.00 0 0 529 23rd 8 7 157.00 157.50 1,177 100.0% 0.50 0.50 1.71 0.00 0 0 529 I-17 9 8 16.40 157.00 1,177 100.0% 140.60 140.61 259.58 0.00 0 0 80,174
$100,860$0.00
Spitz Hill
326.53 $0.00
CCF
176.55 162.01
1,177
$0.00 $0.00 $0.00
Forest
Resource Enterprises
FForestorest
RResourceesource EEnterprisesnterprises
Forest
Resource Enterprises
FForestorest
RResourceesource EEnterprisesnterprises
8/17/2023 1 network_input80-Spitz Hill-Biomass.xlsm
Sale name: Spitz Hill
Pre-Haul Maintenance Post-Haul Maintenance
Type Mtce By select Total Cost Type Mtce By select Total Cost
Miscellaneous Road Maintenance Items Data and Cost Summary
Type Mtce By select Total Cost Data & Cost Summary Item
Appraisal point (mill or sort yard) District or Forest Sale termination date Analyst name Total hauled timber volume - CCF Distance: appraisal point - sale area (miles)
Maintenance Summary (all items) Total $'s Per CCF Traveling (haul) round trip minutes - RTM's Required rd maint deposits, FS (CT5.32) $0.00 $0.00 Standing RTM's (load, unload, scale, delay) Purchaser maintenance $0.00 $0.00 Total RTM's (traveling + standing) Other maintenance (CT5.32) $0.00 $0.00 Total sale variable costs Subtotal FS & other (CT5.32) $0.00 $0.00 Haul cost per CCF (based on RTM's only) Total for appraisal - Road Maintenance (all) $0.00 $0.00 Rd maint cost per CCF (all maintenance)
Total variable costs per CCF Approval Total sale fixed costs (const, reconst, etc.)
Title Total fixed cost per CCF Prepared By Road Management
Title Reviewed By Project Engineer
Title Reviewed By Systems Manager
Total sale costs per CCF $92.33
Value
Phx
176.55
Kaibab WRD
Utley
45.00 371.53
1,177
$92.33
326.53
Total sale costs (includes traveling rtm's, standing rtm's, all maint., & fixed costs) $108,628
$0.00
(Damage to roads from logging or landings, dust abatement, etc.)
(Open roads, blading, brushing, small slide removal, etc.) (Road closures, seeding, barriers, etc.)
$0.00 $0
$92.33
$108,628
(Traveling RTM's, haul maintenance, and fixed costs included from Road Report)
Forest
Resource Enterprises
FForestorest
RResourceesource EEnterprisesnterprises
Forest
Resource Enterprises
FForestorest
RResourceesource EEnterprisesnterprises print
8/17/2023 network_input80-Spitz Hill-Biomass.xlsm
Rev. April 2019
SOUTHWESTERN REGION
Road Maintenance T-Specifications for
Timber Sale/Stewardship Contracts
ROAD MAINTENANCE REQUIREMENTS:
The Contractor shall maintain roads in accordance with road maintenance requirements in C/CT5.31# or K/KT-F/FT.3.1# and the following road maintenance specifications.
Specification Specification Title
T-800 Definitions
T-801 Slide and Slump Repair
T-802 Ditch Cleaning
T-803 Surface Blading
T-804 Opening & Maintaining Roads
T-805 Opening & Maintaining Roads (High Blading)
T-806 Surface Repair
T-807 Surface Stabilization (Water)
T-808 Obsolete
T-808-1 Surface Stabilization (Other Materials)
T-809 Minor Drainage Structures
T-810 Roadway Vegetation
T-811 Closing Roads
T-812 Miscellaneous Structures
T-813 Treatment and Disposal of Hazard Trees
T-GEN General Requirements
SOUTHWESTERN REGION
Road Maintenance T-Specifications for
Timber Sale/Stewardship Contracts
ROAD MAINTENANCE REQUIREMENTS:
The Contractor shall maintain roads in accordance with road maintenance requirements in C/CT5.31# or K/KT-F/FT.3.1# and the following road maintenance specifications.
Specification
T-800
T-801
T-802
T-803
T-804
T-805
T-806
T-807
T-808
T-808—1
T-809
T-810
T-811
T-812
T-813
T-GEN
Specification Title
Definitions
Slide and Slump Repair
Ditch Cleaning
Surface Blading
Opening & Maintaining Roads
Opening & Maintaining Roads (High Blading)
Surface Repair
Surface Stabilization (Water)
Obsolete
Surface Stabilization (Other Materials)
Minor Drainage Structures
Roadway Vegetation
Closing Roads
Miscellaneous Structures
Treatment and Disposal of Hazard Trees
General Requirements
SPECIFICATION T-800 DEFINITIONS
Wherever the following terms or pronouns are used in Specifications T-801 through T-GEN, the intent and meaning shall be interpreted as follows:
800-1.1 - Agreement. Maintenance projects require a mutually acceptable method to resolve the problems, which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.
These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.
It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.
800-1.2 - Annual Road Maintenance Plan. A plan prepared by various users of one or several roads. The plan is an Agreement on maintenance responsibilities to be performed for the coming year.
800-1.3 - Base Course. Material used to reinforce Subgrade or, as shown on drawings, placed on Subgrade to distribute wheel loads.
800-1.4 - Berm. Curb or dike constructed to prevent uncontrolled Roadway runoff water from discharging onto embankment slope.
800-1.5 - Borrow. Select Material taken from designated borrow sites.
800-1.6 - Crown, Inslope, and Outslope. The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.
800-1.7 - Culverts. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.
800-1.8 - Drainage Dip. A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled Way. A Drainage Dip does not block the movement of traffic.
800-1.9 - Drainage Structures. Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, downdrains, downpipes, culverts, and the like.
800-1.10 - Dust Abatement Plan. A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.
800-1.11 - Lead-off Ditches. A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area.
800-1.12 - Material. Any substances specified for use in the performance of the work.
800-1.13 – Pre-haul Maintenance. Road maintenance work which must be accomplished to maintain the roads to a satisfactory condition commensurate with the Purchaser's use, provided Purchaser's Operations do not damage improvements under B/BT6.22 or G/GT.2.2, or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in C/CT5.31# or K/T-F/T3.1#. Pre-haul Maintenance work
T-800-1
Wherever the following terms or pronouns are used in Specifications T-801 through T-GEN, the intent and meaning shall be interpreted as follows:
800-1.1 - Agreement. Maintenance projects require a mutually acceptable method to resolve the problems, which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.
These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.
It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.
800-12 - Annual Road Maintenance Plan. A plan prepared by various users of one or several roads. The plan is an Agreement on maintenance responsibilities to be performed for the coming year.
800-1.3 - Base Course. Material used to reinforce Subgrade or, as shown on drawings, placed on Subgrade to distribute wheel loads.
800-1.4 - Berm. Curb or dike constructed to prevent uncontrolled Roadway runoff water from discharging onto embankment slope.
800-1.5 - Borrow. Select Material taken from designated borrow sites.
800-1.6 - Crown, lnslope, and Outslope. The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.
800-1.? - Culverts. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.
800-1.8 - Drainage Dip. A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled Way. A Drainage Dip does not block the movement of traffic.
800-1.9 - Drainaqe Structures. Manufactured structures which control the runoff of water from the Roadway including lnslope, overside drains, aprons, flumes, downdrains, downpipes, culverts, and the like.
800-1.10 - Dust Abatement Plan. A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.
800-1.11 - Lead-off Ditches. A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area.
800-1.12 - Material. Any substances specified for use in the performance of the work.
800-1.13 —Pre-haul Maintenance. Road maintenance work which must be accomplished to maintain the roads to a satisfactory condition commensurate with the Purchaser's use, provided Purchaser's Operations do not damage improvements under B/BT6.22 or G/GT.2.2, or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in C/CT5.31# or K/T-F/T3.1#. Pre-haul Maintenance work
T-800-1 the Purchaser elects to perform will be in compliance with the Road Maintenance T-Specifications.
800-1.14 - Roadbed. The portion of a road between the intersection of Subgrade and sideslopes, excluding that portion of the ditch below Subgrade.
800-1.15 - Road Maintenance Plan. A table which shows applicable road maintenance specifications to be performed by Purchaser on specific roads.
800-1.16 - Roadside. A general term denoting the area adjoining the outer edge of the Roadway.
800-1.17 - Roadway. The portion of a road within the limits of excavation and embankment.
800-1.18 - Shoulder. That portion of Roadway contiguous with Traveled Way for accommodation of stopped vehicles, for emergency use, and lateral support of base and Surface Course, if any.
800-1.19 - Slide. A concentrated deposit of Materials from above or on backslope extending onto the Traveled Way or Shoulders, whether caused by mass land movements or accumulated ravelling.
800-1.20 - Slough. Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the Traveled Way so as to block passage of traffic.
800-1.21 - Slump. A localized portion of the Roadbed which has slipped or otherwise become lower than that of the adjacent Roadbed and constitutes a hazard to traffic.
800-1.22 - Special Project Specifications. Specifications which detail conditions and requirements peculiar to the individual project.
800-1.23 - Subgrade. Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.
800-1.24 - Surface Course. The Material placed on Base Course or Subgrade primarily to resist abrasion and the effects of climate. Surface Course may be referred to as surfacing.
800-1.25 - Surface Treatment Plan. A table which lists the roads and surface treatments to be…