6. Davis Bacon WD - CA20250021 07.04.2025.pdf
PDF 7 MB Posted
- Solicitation number
- 127EAW25R0030
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Davis-Bacon Wage Determination for construction work in California, effective 07/04/2025. The wage determination covers Heavy (Heavy and Dredging) and Highway construction types in Tulare County, with detailed wage rates for multiple job classifications including:
Key wage rates include Asbestos Removal workers at $34.56/hour, Boilermakers at $45.60/hour, Marble Finishers at $42.06/hour, Tile Finishers at $32.68/hour, Terrazzo Finishers at $44.93/hour, Bricklayers at $45.53/hour, and Electricians at $49.00/hour. The document specifies that contractors must pay at least $17.75 per hour for contracts entered into on or after January 30, 2022, with additional area-specific provisions for different California counties. The wage determination includes fringe benefits rates for each classification and provides detailed guidance on wage rate calculations, union identifiers, and the appeals process for wage determinations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3. Drawings.pdf | ||
| 4. Fire Plan.pdf | ||
| Solicitation 127EAW25R0030 - Disaster. Bush Loop Accessible Paved Trail Reconstruction.pdf | ||
| 1. SOW.pdf | ||
| 2. Schedule of Items .docx | DOCX document | |
| 7. RFI Form - Disaster, Bush Loop Accessible Paved Trail Reconstruction.docx | DOCX document | |
| 5. FP-14 Supplement Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .