2. Schedule of Items .docx
DOCX document 24 KB Posted
- Solicitation number
- 127EAW25R0030
- Issued by
-
Department of Agriculture Forest Service
About this file
The document is a Schedule of Items for a Forest Service project involving the Disaster, Bush Loop Accessible Paved Trail Reconstruction in Sequoia National Forest. The solicitation (Number 127EAW25R0030) is a total small business set-aside with a project magnitude between $250,000 and $500,000. Key administrative details include that all Requests for Information (RFIs) must be submitted to Contract Specialist Tanya Torres by 10:00 AM PDT on August 5th, 2025, using the attached RFI form. While no organized site visit will be conducted, contractors are encouraged to independently visit the site and submit any information requests before the specified due date, with the understanding that failure to inspect the site will not constitute grounds for a claim after contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS
Disaster, Bush Loop Accessible Paved Trail Reconstruction
Sequoia National Forest
PAY ITEM NO.
ITEM DESCRIPTION
| PAY UNIT |
| QTY |
UNIT PRICE
AMOUNT
| 151 (01) |
| Mobilization (includes bonding costs) |
| L.S. |
| 1 |
203 (01) Remove and Dispose 1"x6" plastic edge board with wood stakes from both sides of the full length of the trail. Remove geogrid NaturalPave reinforcement from 50' section of trail tread.
L.S.
204 (01) Reconstruct 5' wide trail to 6' wide on existing alignment and grade. Grind/Pulverize existing fine aggregate NaturalPave surface material 3" thick; place and recompact 3" thick as base for new paved trail.
Mile
0.458
| 406 (03) |
| Polymer Modified Asphalt Seal Coat with Sand (2 coat application per Manufacturer's Instructions) |
| S.Y. |
| 1960 |
418 (01) Asphalt Pavement Full Depth Patch using State Asphalt Concrete Pavement, Class 3/8 inch Max‐Medium (3” compacted in place). Repair and compact subgrade as needed.
TON
| 418 (02) |
| Hot Asphalt Concrete Berm, Class 3/8 inch Mix |
| L.F. |
| 4980 |
602 (01A) Corrugated Metal Pipe Arch 24" W x 18" H x 8' L, 12 gauge, Furnish and Install, Compaction Method 2. Remove and Dispose of existing burned/melted 24" W x 12" H plastic arch is incidental to new Pipe Arch installation. Remove and reconstruct rock head walls at inlet and outlet of Pipe Arch is incidental to New Pipe Arch installation.
602 (01B) Corrugated Metal Pipe Arch 42" W x 29" H x 8' L, 12 gauge, Furnish and Install, Compaction Method 2. Remove and Dispose of existing burned/melted 48" W x 24" H plastic arch is incidental to new Pipe Arch installation. Remove and reconstruct rock head walls at inlet and outlet of Pipe Arch is incidental to New Pipe Arch installation.
633 (01) Furnish and Install Accessible Parking Sign with 2" dia galvanized steel post set in concrete, and 4' L concrete wheel stop.
LS
| Contract Total . |
| $ |
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
* One award will be made from this solicitation, contractors must submit pricing for all items.
* Bid Bond/Guarantee. REQUIRED for proposals exceeding $150,000 IAW FAR 52.228-1 Bid Guarantee.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
The contractor shall complete the table below and include the information with their proposal.
| Company Name: |
| POC & Title: |
| Email: |
| Phone Number: |
| UEI Number: |
| Tax ID: |
File details come from the government source that posted it. Updated .