This document contains a bid schedule template and solicitation for an initial outfitting project at Marine Corps Air Station New River in North Carolina. The bid schedule template requires pricing for various furniture, fixtures and equipment items identified by Joint Service Number (JSN) in the Project Room Contents List (PRCL) provided. Pricing is to be provided for the initial quantity specified as well as any changes in subsequent design submissions. The solicitation seeks quotes for commercial items per Simplified Acquisition Procedures and Part 12 of the FAR. It is a total set-aside for Service-Disabled Veteran-Owned Small Businesses, with a NAICS code of 337127 and size standard of 500 employees. Quotes are due by June 1, 2020 at 2:00pm Central Time. Interested offerors must contact the specified individual for access to all solicitation attachments.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Bid Schedule Overall CLIN Pricing Summary MCAS New River, Camp Lejeune, NC Contract: #
| CLIN0001 | EQUIPMENT SERVICES | $0.00 |
| CLIN0002 | TRANSITION SERVICES | $0.00 |
| CLIN0003 (Option) | PROCUREMENT SERVICES AND EQUIPMENT | $0.00 |
| CLIN0004 (Option) | EQUIPMENT (FFE-LVS) | $0.00 |
| Total Offeror Price: | $0.00 |
Instructions:
See instruction to offerors document in solicitation package for requirements filling out this document.
EQUIPMENT SERVICES CLIN0001
| Bid Schedule - Equipment Services | |||||||
| CLIN | SOW Reference | Name | Hours | Rate | Price | Instructions for bidding | Notes from Offeror |
| 0001 | 2.X | Example | 10 | Labor Rate #1 | |||
| 20 | Labor Rate #2 | ||||||
| 0001 | 2.2 | Existing FFE-LVS | 30 | Labor Rate #3 | |||
| 0001 | 2.3.1 | Furniture, Fixture & Casework Services | |||||
| 001 | 2.3.1.1 | Quality Standards: Furniture, Fixture & Casework | |||||
| 001 | 2.3.1.2 | Quantity: Furniture, Fixture & Casework | |||||
| 001 | 2.3.1.3 | Location: Furniture, Fixture & Casework | |||||
| 001 | 2.3.1.4 | Configuration & Utility Interface: Furniture, Fixture & Casework | |||||
| 0001 | 2.3.2 | Artwork Services | |||||
| 001 | 2.3.2.1 | Quality Standards: Artwork | |||||
| 001 | 2.3.2.2 | Quantity & Location: Artwork | |||||
| 001 | 2.3.2.3 | Configuration & Utility Interface: Artwork | |||||
| 0001 | 2.3.3 | Medical & Other Equipment Services | |||||
| 001 | 2.3.3.1 | Quality Standards: Medical & Other Equipment | |||||
| 001 | 2.3.3.2 | Quantity: Medical & Other equipment | |||||
| 001 | 2.3.3.3 | Location: Medical & Other Equipment | |||||
| 001 | 2.3.3.4 | Configuration & Utility Interface: Medical & Other Equipment | |||||
| 001 | 2.3.4 | Low Voltage System Services | |||||
| 001 | 2.3.4.1 | Quality Standards: Low Voltage Systems | |||||
| 001 | 2.3.4.2 | Quantity: Low Voltage Systems | |||||
| 001 | 2.3.4.3 | Location: Low Voltage Systems | |||||
| 001 | 2.3.4.4 | Configuration & Utility Interface: Low Voltage Systems | |||||
| 0001 | 2.3.4.4 | Electronic Security System | |||||
| 0001 | 2.3.4.4 | Refrigerator Temperature Monitoring System | |||||
| 0001 | 2.3.4.4 | Telephone Instruments | |||||
| 0001 | 2.3.4.4 | Telemedicine Systems | |||||
| 0001 | 2.3.4.4 | Uninterruptable Power Supply | |||||
| 0001 | 2.3.4.4 | Audio-Video | |||||
| 0001 | 2.3.4.4 | EUDs, Printers, Copiers | |||||
| 0001 | 2.3.4.4 | LAN WLAN Equipment | |||||
| 0001 | 2.3.4.4 | Server Room and Telecommunications Room | |||||
| 0001 | 2.3.4.4 | TV and Antenna System | |||||
| 0001 | 2.3.4.4 | Patient Queing and Clinical Workflow Management | |||||
| 0001 | 2.3.4.5 | LVS Matrix | |||||
| 0001 | 2.3.5 | Incidental Signage Services | |||||
| 0001 | 2.3.5.1 | Quality Standards: Incidental Signage | |||||
| 0001 | 2.3.5.2 | Quantity, Configuration & Utility Interface: Incidental Signage | |||||
| 0001 | 2.3.5.3 | Location: Incidental Signage | |||||
| 0001 | 2.4 | Submittals | |||||
| 0001 | 2.4.1 | Submittal 1: Draft/DoR VALIDATION | |||||
| 0001 | 2.4.1.1 | Project Binder | |||||
| 0001 | 2.4.1.1.1 | Integrated Project Schedule | |||||
| 0001 | 2.4.1.1.2 | Price Information | |||||
| 0001 | 2.4.1.1.3 | Project Room Contents (PRC) | |||||
| 0001 | 2.4.1.1.4 | Existing Inventory | |||||
| 0001 | 2.4.1.1.5 | MTF Supplied FFE-LVS List | |||||
| 0001 | 2.4.1.1.6 | Attic Stock & Spare Parts List | |||||
| 0001 | 2.4.1.1.7 | Criteria | |||||
| 0001 | 2.4.1.1.8 | Narrative-Interior Design | |||||
| 0001 | 2.4.1.1.9 | Narrative-Low Voltage Systems (LVS) | |||||
| 0001 | 2.4.1.1.10 | Narrative-Medical Device Equipment (MDE) | |||||
| 0001 | 2.4.1.2 | MTF and Departmental Binders | |||||
| 0001 | 2.4.1.3 | Drawings | |||||
| 0001 | 2.4.1.4 | Specifications | |||||
| 0001 | 2.4.2 | Submittal 2: Final | |||||
| 0001 | 2.4.2.1 | Project Binder | |||||
| 0001 | 2.4.2.1.1 | Integrated Project Schedule | |||||
| 0001 | 2.4.2.1.2 | Price Information | |||||
| 0001 | 2.4.2.1.3 | Project Room Contents (PRC) | |||||
| 0001 | 2.4.2.1.4 | Existing Inventory | |||||
| 0001 | 2.4.2.1.5 | MTF Supplied FFE-LVS List | |||||
| 0001 | 2.4.2.1.6 | Criteria | |||||
| 0001 | 2.4.2.1.7 | Narrative-Interior Design | |||||
| 0001 | 2.4.2.1.8 | Narrative-Low Voltage Systems (LVS) and IM/IT Systems/Devices | |||||
| 0001 | 2.4.2.2 | MTF & Departmental Binders | |||||
| 0001 | 2.4.2.3 | Drawings | |||||
| 0001 | 2.4.2.3.1 | Floor Plans | |||||
| 0001 | 2.4.2.3.2 | Room Typicals/Room Placement Plans | |||||
| 0001 | 2.4.2.4 | Specifications | |||||
| 0001 | 2.4.3 | Submittal 3: Corrected Final | |||||
| 0001 | 2.4.3.1 | Project Binder | |||||
| 0001 | 2.4.3.2 | MTF and Departmental Binders | |||||
| 0001 | 2.4.3.3 | Drawings | |||||
| 0001 | 2.4.3.4 | Specifications | |||||
| 0001 | 2.4.3.5 | Color Boards | |||||
| 0001 | 2.4.4 | Closeout Submittals | |||||
| 0001 | 2.4.4.1 | Closeout Schedule | |||||
| 0001 | 2.4.4.2 | O&M Data | |||||
| 0001 | 2.4.4.3 | Cybersecurity Requirements for LVS and MDE | |||||
| 0001 | 2.4.4.4 | Final Record Documents | |||||
| 0001 | 2.4.4.5 | Transfer of Property Documents | |||||
| 0001 | 2.4.4.6 | DMLSS Data Information | |||||
| 0001 | 2.4.4.7 | Final payment | |||||
| 0001 | 2.5 | Meetings | |||||
| 0001 | 2.5.1 | Meeting Logistics | |||||
| 0001 | 2.5.2 | Monthly Progress Meetings | |||||
| 0001 | 2.5.3 | Documenting Potential Changes | |||||
| 0001 | 2.5.4 | Project Kick Off | |||||
| 0001 | 2.5.5 | Site Investigation Meetings & Surveys | |||||
| 0001 | 2.5.6 | Existing Inventory Meetings & Surveys | |||||
| 0001 | 2.5.7 | Pre-planning (Requirements Validation) | |||||
| 0001 | 2.5.8 | DHA Subject Matter Experts (SMEs) User Meetings | |||||
| 0001 | 2.5.9 | Resolution Conferences | |||||
| 001 | 2.6 | IO&T Contractor Team & Qualifications | |||||
| 001 | 2.6.1 | Project Manager | |||||
| 001 | 2.6.2 | Quality Control Representative | |||||
| 001 | 2.6.3 | Medical Equipment Planner | |||||
| 001 | 2.6.4 | Biomedical Equipment Technicians | |||||
| 001 | 2.6.5 | Communication Systems Engineer | |||||
| 001 | 2.6.6 | Interior Designer | |||||
| 001 | 2.6.7 | Wayfinding/Signage Consultant | |||||
| 001 | 2.6.8 | Artwork Consultant | |||||
| 001 | 2.6.9 | Public Relations Consultant | |||||
| 001 | 2.6.10 | On-Site Personnel | |||||
| SUB TOTAL | $0.00 | ||||||
| Overhead | 0.00% | $0.00 | |||||
| Profit | 0.00% | $0.00 | |||||
| TOTAL PRICE - EQUIPMENT SERVICES | $0.00 | ||||||
| Instructions: |
Provide cost by labor and effort for each SOW referenced item within this category. If KTR does not feel they need to identify labor for a specific row or if that labor is captured in another row, leave blank. If multiple labor rates are accounted for in each SOW referenced item, please break out by row as shown on the first item. If KTR feels need to further specify efforts for each item listed OR chooses to provide further clarification of efforts not listed, please provide that documentation in the notes from offeror column and/or show new rows with headings detailing that effort.
TRANSITION SERVICES CLIN0002
| Bid Schedule - Transition Services | |||||||
| CLIN | SOW Reference | Name | Hours | Rate | Price | Instructions for bidding | Notes from Offeror |
| 0002 | 3.X | Example | 10 | Labor Rate #1 | |||
| 20 | Labor Rate #2 | ||||||
| 30 | Labor Rate #3 | ||||||
| 001 | 3.1 | General | |||||
| 0002 | 3.2 | Transition Services | |||||
| 0002 | 3.2.1 | Existing Warranties | |||||
| 0002 | 3.2.2 | Transition Schedules | |||||
| 0002 | 3.2.3 | Public Relations | |||||
| 0002 | 3.2.4 | Coordination | |||||
| 0002 | 3.2.5 | Existing Inventory & Reuse | |||||
| 0002 | 3.2.6 | Warehousing & Staging | |||||
| 0002 | 3.2.7 | Security | |||||
| 0002 | 3.2.8 | Protection Of Areas | |||||
| 0002 | 3.2.9 | Excessing & Disposition | |||||
| 0002 | 3.2.10 | Staff Orientation | |||||
| 0002 | 3.2.11 | Housekeeping | |||||
| 0002 | 3.2.12 | Temporary Facilities/SPACE | |||||
| 0002 | 3.2.12.1 | Infrastructure Requirements | |||||
| 0002 | 3.2.12.2 | Government Field Office | |||||
| 0002 | 3.2.12.3 | Temporary [Swing] Space | |||||
| 0002 | 3.2.12.4 | Temporary Phasing Facilities | |||||
| 0002 | 3.2.12.5 | Shared and Sole Use of Space | |||||
| 0002 | 3.2.13 | Temporary Signage | |||||
| 0002 | 3.3 | Transition Submittals | |||||
| 0002 | 3.3.1 | Submittal 1: Draft Transition Plan | |||||
| 0002 | 3.3.1.1 | Plans | |||||
| 0002 | 3.3.1.2 | Schedules | |||||
| 0002 | 3.3.1.2.1 | Department Activity Schedule | |||||
| 0002 | 3.3.1.2.2 | Master Move Schedule | |||||
| 0002 | 3.3.1.2.3 | FFE-LVS Training Schedule | |||||
| 0002 | 3.3.1.2.4 | FFE-LVS Testing & Certification Schedule | |||||
| 0002 | 3.3.1.3 | Presentation Slides | |||||
| 0002 | 3.3.1.4 | Transition: Lessons Learned Survey | |||||
| 0002 | 3.3.2 | Submittal 2: Pre-Final Transition Plan | |||||
| 0002 | 3.3.2.1 | Plans | |||||
| 0002 | 3.3.2.2 | Schedules | |||||
| 0002 | 3.3.2.2.1 | Department Activity Schedule | |||||
| 0002 | 3.3.2.2.2 | Master Move Schedule | |||||
| 0002 | 3.3.2.2.3 | FFE-LVS Training Schedule | |||||
| 0002 | 3.3.2.2.4 | FFE-LVS Testing & Certification Schedule | |||||
| 0002 | 3.3.2.3 | Presentation Slides | |||||
| 0002 | 3.3.2.4 | Transition: Lessons Learned Survey | |||||
| 0002 | 3.3.3 | Submittal 3: Final Transition Plan | |||||
| 0002 | 3.3.3.1 | Inspection, Acceptance and Closeout Plan | |||||
| 0002 | 3.3.3.2 | DMLSS Data Information | |||||
| 0002 | 3.4 | Transition Meetings | |||||
| 001 | 3.5 | Transition Team & Qualifications | |||||
| 001 | 3.5.1 | Transition Planner | |||||
| 001 | 3.5.2 | Public Relations & Media Support Specialist | |||||
| 001 | 3.5.3 | Contractor IO&T Team | |||||
| 001 | 3.5.4 | On-Site Personnel |
Sub Total: $0.00
| Overhead | 0.00% | $0.00 |
| Profit | 0.00% | $0.00 |
TOTAL PRICE - TRANSISTION SERVICES $0.00
Instructions:
Provide cost by labor and effort for each SOW referenced item within this category. If KTR does not feel they need to identify labor for a specific row or if that labor is captured in another row, leave blank. If multiple labor rates are accounted for in each SOW referenced item, please break out by row as shown on the first item. If KTR feels need to further specify efforts for each item listed OR chooses to provide further clarification of efforts not listed, please provide that documentation in the notes from Offeror column and/or show new rows with headings detailing that effort.
PROC REQUIREMENTS CLIN0003
| Bid Schedule - Equipment Requirements | |||||||
| CLIN | SOW Reference | Name | Hours | Rate | Price | Instructions for bidding | Notes from Offeror |
| 0003 | 4.X | Example | 10 | Labor Rate #1 | |||
| 20 | Labor Rate #2 | ||||||
| 30 | Labor Rate #3 | ||||||
| 1 | 4.1 | Temporary Facilities | |||||
| 1 | 4.2 | Equipment Procurement | |||||
| 0003 | 4.2.1 | Furniture, Fixtures, Furnishings, and Casework | |||||
| 0003 | 4.2.2 | Medical and Other Equipment | |||||
| 0003 | 4.2.3 | Artwork | |||||
| 0003 | 4.2.4 | Incidental Signage | |||||
| 0003 | 4.3 | Shipping & Delivery | |||||
| 0003 | 4.4 | interim storage | |||||
| 0003 | 4.5 | Installation | |||||
| 0003 | 4.6 | Testing & Certifying | |||||
| 0003 | 4.6.1 | Testing List | |||||
| 0003 | 4.6.2 | Equipment Testing | |||||
| 0003 | 4.6.3 | Coordination | |||||
| 0003 | 4.6.4 | Systems Testing | |||||
| 0003 | 4.6.5 | Industry Standards | |||||
| 0003 | 4.6.6 | Documentation | |||||
| 0003 | 4.7 | Inspection & Acceptance | |||||
| 0003 | 4.7.1 | General | |||||
| 0003 | 4.7.2 | Project Acceptance | |||||
| 0003 | 4.7.3 | Contractor Identified Punch list & Inspections | |||||
| 0003 | 4.7.4 | Pre-IO Inspection – Facility | |||||
| 0003 | 4.7.5 | Pre-Final Inspection | |||||
| 0003 | 4.7.6 | Final Inspection | |||||
| 0003 | 4.7.7 | Final Acceptance | |||||
| 0003 | 4.7.8 | Inspection & Acceptance Documentation | |||||
| 0003 | 4.8 | Training | |||||
| 0003 | 4.9 | Cleaning | |||||
| 0003 | 4.1 | Warranty | |||||
| 0003 | 4.11 | Meetings | |||||
| 0003 | 4.12 | O&M Manuals & Database | |||||
| 0003 | 4.12.1 | Changes to O&M Data Submittals | |||||
| 0003 | 4.13 | Transfer and Acceptance of Property | |||||
| 1 | 4.13.1 | DMLSS Support |
| Sub Total: | $0.00 | |||
| Overhead | 0.00% | $0.00 | ||
| Profit | 0.00% | $0.00 | ||
| TOTAL PRICE - EQUIPMENT REQUIREMENTS | $0.00 | |||
| Instructions: |
Provide cost by labor and effort for each SOW referenced item within this category. If KTR does not feel they need to identify labor for a specific row or if that labor is captured in another row, leave blank. If multiple labor rates are accounted for in each SOW referenced item, please break out by row as shown on the first item. If KTR feels need to further specify efforts for each item listed OR chooses to provide further clarification of efforts not listed, please provide that documentation in the notes from Offeror column and/or show new rows with headings detailing that effort.
EQUIPMENT (FFE-LVS) CLIN004
| PRICE SCHEDULE - FFE JSN SUMMARY | PRCL REPORT DATE: 19 Jun 19 | ||||||||||||||||||||||||
| GENERAL INSTRUCTIONS: Provide pricing for all FFE, for one (1) each JSN listed below. Include raw, extended, taxes, general conditions, and total. In addition, provide total project quantity per JSN and total cost based on the PRCL provided at time of proposal. Do not leave any cell blank. This list only includes new FFE and does not include all reuse items. NOTE: The Government is not responsible for the accuracy of formulas in this spreadsheet. Information in this tab is for support of the bid schedule. The bid schedule is the basis for pricing. | |||||||||||||||||||||||||
| JSN | NOMENCLATURE | FUNDING CODE RPIE/PP | A. CONTRACTOR'S PROPOSAL PRICE | B. SUBMITTAL 1 UPDATES | C. SUBMITTAL 2 UPDATES | D. ACCEPTED DESIGN UPDATES | |||||||||||||||||||
| RAW COST | EXTEND COST | TAXES | GC | TOTAL ($) per EACH JSN | Orig QTY | TOTAL ($) COST | Lead-Time | Date Price | |||||||||||||||||
| Expires | S1 QTY | RAW COST | EXTEND COST | TAXES | GC | TOTAL ($) per Each JSN | TOTAL ($) COST | Comments | S2 QTY | RAW COST | EXTEND COST | TAXES | GC | TOTAL ($) per Each JSN | TOTAL ($) COST | Comments | CF QTY | RAW COST | EXTEND COST | TAXES | GC | TOTAL ($) per Each JSN | TOTAL ($) COST | Comments | |
| A5025 | Bench, Locker Room, Portable | 6 | |||||||||||||||||||||||
| E0042 | Workcenter, Computer, Free Standing 48”x24” | 48 | |||||||||||||||||||||||
| E0048 | Workstation, Straight, Free Standing, 72”x24” | 2 | |||||||||||||||||||||||
| E0063 | Workstation, L-Shaped w/ Peninsula, Wall Mounted, 72”x72” | 4 | |||||||||||||||||||||||
| E0078 | Workstation, L-Shaped w/ Peninsula, Free Standing, 78”x72” | 9 | |||||||||||||||||||||||
| E0096 | Workstation, L-Transaction 72, Free Standing, 72x96 | 1 | |||||||||||||||||||||||
| E0117 | Workstation, Straight, Free Standing, 48”x24” | 8 | |||||||||||||||||||||||
| E0123A | Workstation, Straight, Free Standing, 80”W, Overhead Bins | 4 | |||||||||||||||||||||||
| E0123B | Workstation, Straight, Free Standing, 72”W, Overhead Bins | 2 | |||||||||||||||||||||||
| E0820 | Bookcase, 3 Shelf with 3H Lateral File | 12 | |||||||||||||||||||||||
| E0945 | Cart, Computer, Mobile | 2 | |||||||||||||||||||||||
| F0102 | Cabinet, Distribution, Mail | 1 | |||||||||||||||||||||||
| F0205 | Chair, Side with Arms | 50 | |||||||||||||||||||||||
| F0210 | Chair, Side without Arms | 2 | |||||||||||||||||||||||
| F0220 | Chair, Conference | 39 | |||||||||||||||||||||||
| F0225 | Chair, Dining | 32 | |||||||||||||||||||||||
| F0230 | Chair, Task, Counter Height | 4 | |||||||||||||||||||||||
| F0255 | Chair, Office, Guest | 7 | |||||||||||||||||||||||
| F0275 | Chair, Task, Swivel, High Back | 90 | |||||||||||||||||||||||
| F0305A | Chair, Waiting Room, Single | 11 | |||||||||||||||||||||||
| F0305A-EA | Chair, Waiting Room, Single, Easy Access | 2 | |||||||||||||||||||||||
| F0305B | Chair, Waiting Room, Single | 20 | |||||||||||||||||||||||
| F0305C | Chair, Waiting Room, Single | 9 | |||||||||||||||||||||||
| F0305D | Chair, Waiting Room, Single | 8 | |||||||||||||||||||||||
| F0305E | Chair, Waiting Room, Single | 9 | |||||||||||||||||||||||
| F0305F | Chair, Waiting Room, Single | 22 | |||||||||||||||||||||||
| F0305G | Chair, Waiting Room, Single | 3 | |||||||||||||||||||||||
| F0305H | Chair, Waiting Room, Single | 25 | |||||||||||||||||||||||
| F0305I | Chair, Waiting Room, Single | 22 | |||||||||||||||||||||||
| F0306A | Chair, Waiting Room, Bariatric, With Arms | 7 | |||||||||||||||||||||||
| F0306B | Chair, Waiting Room, Bariatric, With Arms | 2 | |||||||||||||||||||||||
| F0306C | Chair, Waiting Room, Bariatric, With Arms | 1 | |||||||||||||||||||||||
| F0306D | Chair, Waiting Room, Bariatric, With Arms | 1 | |||||||||||||||||||||||
| F0306E | Chair, Waiting Room, Bariatric, With Arms | 1 | |||||||||||||||||||||||
| F0306F | Chair, Waiting Room, Bariatric, With Arms | 1 | |||||||||||||||||||||||
| F0306G | Chair, Waiting Room, Bariatric, With Arms | 2 | |||||||||||||||||||||||
| F0340 | Stool, Self-Adjusting | 48 | |||||||||||||||||||||||
| F0355 | Footstool, Straight | 7 | |||||||||||||||||||||||
| F0420 | Cabinet, Filing, Lateral, Half Height | 13 | |||||||||||||||||||||||
| F0465 | Cabinet, Storage, 2 Door, 5 Shelf | 4 | |||||||||||||||||||||||
| F0690 | Workstation, Enclosed with Lock | 3 | |||||||||||||||||||||||
| F0736A | Table, Occasional | 33 | |||||||||||||||||||||||
| F0736B | Table, Coffee | 4 | |||||||||||||||||||||||
| F0755A | Table, Conference 60”x24” | 5 | |||||||||||||||||||||||
| F0755B | Table, Conference 72”x24” | 3 | |||||||||||||||||||||||
| F0755C | Table, Conference 144”x48” | 1 | |||||||||||||||||||||||
| F0755D | Table, Conference 60”x30” | 4 | |||||||||||||||||||||||
| F0775 | Table, Work, 2 Drawer | 4 | |||||||||||||||||||||||
| F0795A | Table, Dining, Square 42”x42” | 3 | |||||||||||||||||||||||
| F0795B | Table, Dining, Round 48” Dia. | 2 | |||||||||||||||||||||||
| F0795C | Table, Dining, Round 42” Dia. | 2 | |||||||||||||||||||||||
| F2000 | Basket, Wastepaper | 101 | |||||||||||||||||||||||
| F2010 | Basket, Wastepaper, Step-On | 99 | |||||||||||||||||||||||
| F2015 | Basket, Wastepaper, Public | 11 | |||||||||||||||||||||||
| F2020 | Can, Trash, 44 Gallon | 4 | |||||||||||||||||||||||
| F2100 | Lectern, Mobile with Reading Light | 1 | |||||||||||||||||||||||
| F3065 | Whiteboard/Bulletin Board, Combination | 5 | |||||||||||||||||||||||
| F3070 | Case, Display | 2 | |||||||||||||||||||||||
| F3200 | Clock, Battery, 12” Diameter | 86 | |||||||||||||||||||||||
| M1400 | Chair, Blood Donor, Recliner, Manual or Pneumatic | 3 |
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Difference between DS1 Review & Original Pricing $0.00 Difference between DS2 Review & Original Pricing $0.00 Difference between CF Review & Original Pricing $0.00
&"-,Bold"PROJECT: MCAS New River ACC Replacement &"-,Bold"TAB 3: FFE JSN SUMMARY DATE: 24 February 2020
&F &P
All Labor Rates
| LABOR PRICING TO SUPPORT INITIAL OUTFITTING TASKS (This is "Other than Certified Cost and Pricing Data" IAW FAR 15.403-3) INSTRUCTIONS: For all labor categories bid in performance of this contract, put the current, fully burdened labor rate (except for overhead and profit) and proposed hours. | |||
| Labor Category | Fully Burdened Labor Rate | Proposed Hours | Total |
Instructions:
All labor rates should be included in the bid schedule for each section it applies.