6.7_BidSchedule_NewRiver.xlsx

XLSX spreadsheet 126 KB Posted

Attached to
New River Initial Outfitting Project Federal contract opportunity
Solicitation number
W9127S20Q6004
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

About this file

This document contains a bid schedule template and solicitation for an initial outfitting project at Marine Corps Air Station New River in North Carolina. The bid schedule template requires pricing for various furniture, fixtures and equipment items identified by Joint Service Number (JSN) in the Project Room Contents List (PRCL) provided. Pricing is to be provided for the initial quantity specified as well as any changes in subsequent design submissions. The solicitation seeks quotes for commercial items per Simplified Acquisition Procedures and Part 12 of the FAR. It is a total set-aside for Service-Disabled Veteran-Owned Small Businesses, with a NAICS code of 337127 and size standard of 500 employees. Quotes are due by June 1, 2020 at 2:00pm Central Time. Interested offerors must contact the specified individual for access to all solicitation attachments.

View the file

Other files for this federal contract opportunity

Other files attached to New River Initial Outfitting Project, newest first.
File Type Posted
Amendment 0004 - P-9838_03_100-Final_Drawings_190626.pdf PDF
Appendix 7.6 - REVISED Bid Schedule W9127S20Q6004.xlsx XLSX spreadsheet
W9127S20Q6004 ProjNet Report.pdf PDF
W9127S20Q6004 REVISED Solicitation.docx DOCX document
W9127S20Q6004 AMENDMENT 0004.pdf PDF
W9127S20Q6004 AMENDMENT 0003.pdf PDF
Past Performance Questionnaire.pdf PDF
W9127S20Q6004 AMENDMENT 0002.pdf PDF
W9127S20Q6004 Amendment 0001.pdf PDF
W9127S20Q6004 Revised Solicitation - New River IO Project.pdf PDF
P-9838_F2_100-Final_StructuralInteriorDesign_190626.pdf PDF
P-9838_F1_100-Final_StructuralInteriorDesign_190626.pdf PDF
W9127S20Q6004 Solicitation - New River IO Project.pdf PDF
AS100 EQUIPMENT LIST Dental.pdf PDF
P-9838_G1_100-Final_FurnitureFixturesEquipment_190626_Edited ATS.pdf PDF
P-9838_04_100-Final_Drawings_190626.pdf PDF
7.1 DHA FE Glossary of Terms v5 RG.docx DOCX document
P-9838_E2_100-Final_Equipment_190626.pdf PDF
7.4 SUBMITTAL EXAMPLES.docx DOCX document
7.2 WEEKLY RISK REPORT TEMPLATE.xlsx XLSX spreadsheet
7.2 MONTHLY RISK REPORT TEMPLATE.xlsx XLSX spreadsheet
P-9838_G2_100-Final_FurnitureFixturesEquipment_190626.pdf PDF
P-9838_E1_100-Final_Equipment_190626.pdf PDF
AS100 EQUIPMENT LIST Medical.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Bid Schedule Overall CLIN Pricing Summary MCAS New River, Camp Lejeune, NC Contract: #

CLIN0001EQUIPMENT SERVICES$0.00
CLIN0002TRANSITION SERVICES$0.00
CLIN0003 (Option)PROCUREMENT SERVICES AND EQUIPMENT$0.00
CLIN0004 (Option)EQUIPMENT (FFE-LVS)$0.00
Total Offeror Price:$0.00

Instructions:

See instruction to offerors document in solicitation package for requirements filling out this document.

EQUIPMENT SERVICES CLIN0001

Bid Schedule - Equipment Services
CLINSOW ReferenceNameHoursRatePriceInstructions for biddingNotes from Offeror
00012.XExample10Labor Rate #1
20Labor Rate #2
00012.2Existing FFE-LVS30Labor Rate #3
00012.3.1Furniture, Fixture & Casework Services
0012.3.1.1Quality Standards: Furniture, Fixture & Casework
0012.3.1.2Quantity: Furniture, Fixture & Casework
0012.3.1.3Location: Furniture, Fixture & Casework
0012.3.1.4Configuration & Utility Interface: Furniture, Fixture & Casework
00012.3.2Artwork Services
0012.3.2.1Quality Standards: Artwork
0012.3.2.2Quantity & Location: Artwork
0012.3.2.3Configuration & Utility Interface: Artwork
00012.3.3Medical & Other Equipment Services
0012.3.3.1Quality Standards: Medical & Other Equipment
0012.3.3.2Quantity: Medical & Other equipment
0012.3.3.3Location: Medical & Other Equipment
0012.3.3.4Configuration & Utility Interface: Medical & Other Equipment
0012.3.4Low Voltage System Services
0012.3.4.1Quality Standards: Low Voltage Systems
0012.3.4.2Quantity: Low Voltage Systems
0012.3.4.3Location: Low Voltage Systems
0012.3.4.4Configuration & Utility Interface: Low Voltage Systems
00012.3.4.4Electronic Security System
00012.3.4.4Refrigerator Temperature Monitoring System
00012.3.4.4Telephone Instruments
00012.3.4.4Telemedicine Systems
00012.3.4.4Uninterruptable Power Supply
00012.3.4.4Audio-Video
00012.3.4.4EUDs, Printers, Copiers
00012.3.4.4LAN WLAN Equipment
00012.3.4.4Server Room and Telecommunications Room
00012.3.4.4TV and Antenna System
00012.3.4.4Patient Queing and Clinical Workflow Management
00012.3.4.5LVS Matrix
00012.3.5Incidental Signage Services
00012.3.5.1Quality Standards: Incidental Signage
00012.3.5.2Quantity, Configuration & Utility Interface: Incidental Signage
00012.3.5.3Location: Incidental Signage
00012.4Submittals
00012.4.1Submittal 1: Draft/DoR VALIDATION
00012.4.1.1Project Binder
00012.4.1.1.1Integrated Project Schedule
00012.4.1.1.2Price Information
00012.4.1.1.3Project Room Contents (PRC)
00012.4.1.1.4Existing Inventory
00012.4.1.1.5MTF Supplied FFE-LVS List
00012.4.1.1.6Attic Stock & Spare Parts List
00012.4.1.1.7Criteria
00012.4.1.1.8Narrative-Interior Design
00012.4.1.1.9Narrative-Low Voltage Systems (LVS)
00012.4.1.1.10Narrative-Medical Device Equipment (MDE)
00012.4.1.2MTF and Departmental Binders
00012.4.1.3Drawings
00012.4.1.4Specifications
00012.4.2Submittal 2: Final
00012.4.2.1Project Binder
00012.4.2.1.1Integrated Project Schedule
00012.4.2.1.2Price Information
00012.4.2.1.3Project Room Contents (PRC)
00012.4.2.1.4Existing Inventory
00012.4.2.1.5MTF Supplied FFE-LVS List
00012.4.2.1.6Criteria
00012.4.2.1.7Narrative-Interior Design
00012.4.2.1.8Narrative-Low Voltage Systems (LVS) and IM/IT Systems/Devices
00012.4.2.2MTF & Departmental Binders
00012.4.2.3Drawings
00012.4.2.3.1Floor Plans
00012.4.2.3.2Room Typicals/Room Placement Plans
00012.4.2.4Specifications
00012.4.3Submittal 3: Corrected Final
00012.4.3.1Project Binder
00012.4.3.2MTF and Departmental Binders
00012.4.3.3Drawings
00012.4.3.4Specifications
00012.4.3.5Color Boards
00012.4.4Closeout Submittals
00012.4.4.1Closeout Schedule
00012.4.4.2O&M Data
00012.4.4.3Cybersecurity Requirements for LVS and MDE
00012.4.4.4Final Record Documents
00012.4.4.5Transfer of Property Documents
00012.4.4.6DMLSS Data Information
00012.4.4.7Final payment
00012.5Meetings
00012.5.1Meeting Logistics
00012.5.2Monthly Progress Meetings
00012.5.3Documenting Potential Changes
00012.5.4Project Kick Off
00012.5.5Site Investigation Meetings & Surveys
00012.5.6Existing Inventory Meetings & Surveys
00012.5.7Pre-planning (Requirements Validation)
00012.5.8DHA Subject Matter Experts (SMEs) User Meetings
00012.5.9Resolution Conferences
0012.6IO&T Contractor Team & Qualifications
0012.6.1Project Manager
0012.6.2Quality Control Representative
0012.6.3Medical Equipment Planner
0012.6.4Biomedical Equipment Technicians
0012.6.5Communication Systems Engineer
0012.6.6Interior Designer
0012.6.7Wayfinding/Signage Consultant
0012.6.8Artwork Consultant
0012.6.9Public Relations Consultant
0012.6.10On-Site Personnel
SUB TOTAL$0.00
Overhead0.00%$0.00
Profit0.00%$0.00
TOTAL PRICE - EQUIPMENT SERVICES$0.00
Instructions:

Provide cost by labor and effort for each SOW referenced item within this category. If KTR does not feel they need to identify labor for a specific row or if that labor is captured in another row, leave blank. If multiple labor rates are accounted for in each SOW referenced item, please break out by row as shown on the first item. If KTR feels need to further specify efforts for each item listed OR chooses to provide further clarification of efforts not listed, please provide that documentation in the notes from offeror column and/or show new rows with headings detailing that effort.

TRANSITION SERVICES CLIN0002

Bid Schedule - Transition Services
CLINSOW ReferenceNameHoursRatePriceInstructions for biddingNotes from Offeror
00023.XExample10Labor Rate #1
20Labor Rate #2
30Labor Rate #3
0013.1General
00023.2Transition Services
00023.2.1Existing Warranties
00023.2.2Transition Schedules
00023.2.3Public Relations
00023.2.4Coordination
00023.2.5Existing Inventory & Reuse
00023.2.6Warehousing & Staging
00023.2.7Security
00023.2.8Protection Of Areas
00023.2.9Excessing & Disposition
00023.2.10Staff Orientation
00023.2.11Housekeeping
00023.2.12Temporary Facilities/SPACE
00023.2.12.1Infrastructure Requirements
00023.2.12.2Government Field Office
00023.2.12.3Temporary [Swing] Space
00023.2.12.4Temporary Phasing Facilities
00023.2.12.5Shared and Sole Use of Space
00023.2.13Temporary Signage
00023.3Transition Submittals
00023.3.1Submittal 1: Draft Transition Plan
00023.3.1.1Plans
00023.3.1.2Schedules
00023.3.1.2.1Department Activity Schedule
00023.3.1.2.2Master Move Schedule
00023.3.1.2.3FFE-LVS Training Schedule
00023.3.1.2.4FFE-LVS Testing & Certification Schedule
00023.3.1.3Presentation Slides
00023.3.1.4Transition: Lessons Learned Survey
00023.3.2Submittal 2: Pre-Final Transition Plan
00023.3.2.1Plans
00023.3.2.2Schedules
00023.3.2.2.1Department Activity Schedule
00023.3.2.2.2Master Move Schedule
00023.3.2.2.3FFE-LVS Training Schedule
00023.3.2.2.4FFE-LVS Testing & Certification Schedule
00023.3.2.3Presentation Slides
00023.3.2.4Transition: Lessons Learned Survey
00023.3.3Submittal 3: Final Transition Plan
00023.3.3.1Inspection, Acceptance and Closeout Plan
00023.3.3.2DMLSS Data Information
00023.4Transition Meetings
0013.5Transition Team & Qualifications
0013.5.1Transition Planner
0013.5.2Public Relations & Media Support Specialist
0013.5.3Contractor IO&T Team
0013.5.4On-Site Personnel

Sub Total: $0.00

Overhead0.00%$0.00
Profit0.00%$0.00

TOTAL PRICE - TRANSISTION SERVICES $0.00

Instructions:

Provide cost by labor and effort for each SOW referenced item within this category. If KTR does not feel they need to identify labor for a specific row or if that labor is captured in another row, leave blank. If multiple labor rates are accounted for in each SOW referenced item, please break out by row as shown on the first item. If KTR feels need to further specify efforts for each item listed OR chooses to provide further clarification of efforts not listed, please provide that documentation in the notes from Offeror column and/or show new rows with headings detailing that effort.

PROC REQUIREMENTS CLIN0003

Bid Schedule - Equipment Requirements
CLINSOW ReferenceNameHoursRatePriceInstructions for biddingNotes from Offeror
00034.XExample10Labor Rate #1
20Labor Rate #2
30Labor Rate #3
14.1Temporary Facilities
14.2Equipment Procurement
00034.2.1Furniture, Fixtures, Furnishings, and Casework
00034.2.2Medical and Other Equipment
00034.2.3Artwork
00034.2.4Incidental Signage
00034.3Shipping & Delivery
00034.4interim storage
00034.5Installation
00034.6Testing & Certifying
00034.6.1Testing List
00034.6.2Equipment Testing
00034.6.3Coordination
00034.6.4Systems Testing
00034.6.5Industry Standards
00034.6.6Documentation
00034.7Inspection & Acceptance
00034.7.1General
00034.7.2Project Acceptance
00034.7.3Contractor Identified Punch list & Inspections
00034.7.4Pre-IO Inspection – Facility
00034.7.5Pre-Final Inspection
00034.7.6Final Inspection
00034.7.7Final Acceptance
00034.7.8Inspection & Acceptance Documentation
00034.8Training
00034.9Cleaning
00034.1Warranty
00034.11Meetings
00034.12O&M Manuals & Database
00034.12.1Changes to O&M Data Submittals
00034.13Transfer and Acceptance of Property
14.13.1DMLSS Support
Sub Total:$0.00
Overhead0.00%$0.00
Profit0.00%$0.00
TOTAL PRICE - EQUIPMENT REQUIREMENTS$0.00
Instructions:

Provide cost by labor and effort for each SOW referenced item within this category. If KTR does not feel they need to identify labor for a specific row or if that labor is captured in another row, leave blank. If multiple labor rates are accounted for in each SOW referenced item, please break out by row as shown on the first item. If KTR feels need to further specify efforts for each item listed OR chooses to provide further clarification of efforts not listed, please provide that documentation in the notes from Offeror column and/or show new rows with headings detailing that effort.

EQUIPMENT (FFE-LVS) CLIN004

PRICE SCHEDULE - FFE JSN SUMMARYPRCL REPORT DATE: 19 Jun 19
GENERAL INSTRUCTIONS: Provide pricing for all FFE, for one (1) each JSN listed below. Include raw, extended, taxes, general conditions, and total. In addition, provide total project quantity per JSN and total cost based on the PRCL provided at time of proposal. Do not leave any cell blank. This list only includes new FFE and does not include all reuse items. NOTE: The Government is not responsible for the accuracy of formulas in this spreadsheet. Information in this tab is for support of the bid schedule. The bid schedule is the basis for pricing.
JSNNOMENCLATUREFUNDING CODE RPIE/PPA. CONTRACTOR'S PROPOSAL PRICEB. SUBMITTAL 1 UPDATESC. SUBMITTAL 2 UPDATESD. ACCEPTED DESIGN UPDATES
RAW COSTEXTEND COSTTAXESGCTOTAL ($) per EACH JSNOrig QTYTOTAL ($) COSTLead-TimeDate Price
ExpiresS1 QTYRAW COSTEXTEND COSTTAXESGCTOTAL ($) per Each JSNTOTAL ($) COSTCommentsS2 QTYRAW COSTEXTEND COSTTAXESGCTOTAL ($) per Each JSNTOTAL ($) COSTCommentsCF QTYRAW COSTEXTEND COSTTAXESGCTOTAL ($) per Each JSNTOTAL ($) COSTComments
A5025Bench, Locker Room, Portable6
E0042Workcenter, Computer, Free Standing 48”x24”48
E0048Workstation, Straight, Free Standing, 72”x24”2
E0063Workstation, L-Shaped w/ Peninsula, Wall Mounted, 72”x72”4
E0078Workstation, L-Shaped w/ Peninsula, Free Standing, 78”x72”9
E0096Workstation, L-Transaction 72, Free Standing, 72x961
E0117Workstation, Straight, Free Standing, 48”x24”8
E0123AWorkstation, Straight, Free Standing, 80”W, Overhead Bins4
E0123BWorkstation, Straight, Free Standing, 72”W, Overhead Bins2
E0820Bookcase, 3 Shelf with 3H Lateral File12
E0945Cart, Computer, Mobile2
F0102Cabinet, Distribution, Mail1
F0205Chair, Side with Arms50
F0210Chair, Side without Arms2
F0220Chair, Conference39
F0225Chair, Dining32
F0230Chair, Task, Counter Height4
F0255Chair, Office, Guest7
F0275Chair, Task, Swivel, High Back90
F0305AChair, Waiting Room, Single11
F0305A-EAChair, Waiting Room, Single, Easy Access2
F0305BChair, Waiting Room, Single20
F0305CChair, Waiting Room, Single9
F0305DChair, Waiting Room, Single8
F0305EChair, Waiting Room, Single9
F0305FChair, Waiting Room, Single22
F0305GChair, Waiting Room, Single3
F0305HChair, Waiting Room, Single25
F0305IChair, Waiting Room, Single22
F0306AChair, Waiting Room, Bariatric, With Arms7
F0306BChair, Waiting Room, Bariatric, With Arms2
F0306CChair, Waiting Room, Bariatric, With Arms1
F0306DChair, Waiting Room, Bariatric, With Arms1
F0306EChair, Waiting Room, Bariatric, With Arms1
F0306FChair, Waiting Room, Bariatric, With Arms1
F0306GChair, Waiting Room, Bariatric, With Arms2
F0340Stool, Self-Adjusting48
F0355Footstool, Straight7
F0420Cabinet, Filing, Lateral, Half Height13
F0465Cabinet, Storage, 2 Door, 5 Shelf4
F0690Workstation, Enclosed with Lock3
F0736ATable, Occasional33
F0736BTable, Coffee4
F0755ATable, Conference 60”x24”5
F0755BTable, Conference 72”x24”3
F0755CTable, Conference 144”x48”1
F0755DTable, Conference 60”x30”4
F0775Table, Work, 2 Drawer4
F0795ATable, Dining, Square 42”x42”3
F0795BTable, Dining, Round 48” Dia.2
F0795CTable, Dining, Round 42” Dia.2
F2000Basket, Wastepaper101
F2010Basket, Wastepaper, Step-On99
F2015Basket, Wastepaper, Public11
F2020Can, Trash, 44 Gallon4
F2100Lectern, Mobile with Reading Light1
F3065Whiteboard/Bulletin Board, Combination5
F3070Case, Display2
F3200Clock, Battery, 12” Diameter86
M1400Chair, Blood Donor, Recliner, Manual or Pneumatic3

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Difference between DS1 Review & Original Pricing $0.00 Difference between DS2 Review & Original Pricing $0.00 Difference between CF Review & Original Pricing $0.00

&"-,Bold"PROJECT: MCAS New River ACC Replacement &"-,Bold"TAB 3: FFE JSN SUMMARY DATE: 24 February 2020

&F &P

All Labor Rates

LABOR PRICING TO SUPPORT INITIAL OUTFITTING TASKS (This is "Other than Certified Cost and Pricing Data" IAW FAR 15.403-3) INSTRUCTIONS: For all labor categories bid in performance of this contract, put the current, fully burdened labor rate (except for overhead and profit) and proposed hours.
Labor CategoryFully Burdened Labor RateProposed HoursTotal

Instructions:

All labor rates should be included in the bid schedule for each section it applies.