6. 5015-21-3104 DMAFB Substation Specs 1.19.2024.pdf

PDF 1 MB Posted

Attached to
Repair and Construct Primary Electric Distribution
Solicitation number
FA4877
Issued by

About this file

This pre-solicitation notice is for a firm fixed price contract to design and construct a switch house facility and associated infrastructure at Davis-Monthan Air Force Base in Tucson, Arizona. The project includes installing switches, underground conduits, and 13.8 kV cabling to connect the new switch house to existing switch gear main bus bars. The contractor must coordinate final connections and testing with the base CE project manager and Tucson Electric Power Company.

The contract is set aside for small businesses only. The NAICS code is 238210 with a $19 million size standard. The performance period is 635 calendar days. The solicitation will be issued on or around March 8, 2024 via SAM.gov and bids are due as specified in the solicitation. A bid bond is required. Interested vendors should register through SAM.gov to receive notification. The estimated value is between $2.5-5 million.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DMAFB Subst at i on Swi t chi ng and Di st r i but i on Davi s- Mont han Ai r For ce Base FBNV190002 I nf r ast r uct ur e Engi neer i ng Sol ut i ons JV

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 45 35 SPECI AL I NSPECTI ONS

DI VI SI ON 03 - CONCRETE

03 30 00 CAST- I N- PLACE CONCRETE

DI VI SI ON 26 - ELECTRI CAL

26 05 00. 00 40 COMMON WORK RESULTS FOR ELECTRI CAL

26 35 33. 00 40 POWER FACTOR CORRECTI ON EQUI PMENT

DI VI SI ON 31 - EARTHWORK

31 63 26 DRI LLED CAI SSONS

DI VI SI ON 33 - UTI LI TI ES

33 71 01. 00 40 OVERHEAD TRANSMI SSI ON AND DI STRI BUTI ON

33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

SECTI ON 01 45 35

SPECI AL I NSPECTI ONS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

I NTERNATI ONAL CODE COUNCI L ( I CC)

I CC I BC ( 2021) I nt er nat i onal Bui l di ng Code

U. S. DEPARTMENT OF DEFENSE ( DOD)

UFC 3- 301- 01 ( 2023) St r uct ur al Engi neer i ng

1. 2 GENERAL REQUI REMENTS

Per f or m Speci al I nspect i ons i n accor dance wi t h t he St at ement of Speci al I nspect i ons, Schedul e of Speci al I nspect i ons and Chapt er 17 of I CC I BC.

The St at ement of Speci al I nspect i ons and Schedul e of Speci al I nspect i ons ar e i ncl uded as an at t achment t o t hi s speci f i cat i on. Speci al I nspect i ons ar e t o be per f or med by an i ndependent t hi r d par t y and ar e i nt ended t o ensur e t hat t he wor k of t he Pr i me Cont r act or i s i n accor dance wi t h t he Cont r act Document s and appl i cabl e bui l di ng codes. Speci al i nspect i ons do not t ake t he pl ace of t he t hr ee phases of cont r ol i nspect i ons per f or med by t he Cont r act or ' s QC Manager or any t est i ng and i nspect i ons r equi r ed by ot her sect i ons of t he speci f i cat i ons.

1. 3 DEFI NI TI ONS

1. 3. 1 Cont i nuous Speci al I nspect i ons

Cont i nuous Speci al I nspect i ons i s t he const ant moni t or i ng of speci f i c t asks by a speci al i nspect or . These i nspect i ons must be car r i ed out cont i nuousl y over t he dur at i on of t he par t i cul ar t asks.

1. 3. 2 Per f or m

Per f or m t hese Speci al I nspect i ons t asks f or each wel ded j oi nt or member .

1. 3. 3 Obser ve

Obser ve t hese Speci al I nspect i ons i t ems on a per i odi c dai l y basi s.

Oper at i ons need not be del ayed pendi ng t hese i nspect i ons.

1. 3. 4 Speci al I nspect or ( SI )

A qual i f i ed per son r et ai ned by t he Cont r act or and appr oved by t he Cont r act i ng Of f i cer as havi ng t he compet ence necessar y t o i nspect a par t i cul ar t ype of const r uct i on r equi r i ng Speci al I nspect i ons. The SI must be an i ndependent t hi r d par t y hi r ed di r ect l y by t he Pr i me Cont r act or .

SECTI ON 01 45 35 Page 1

1. 3. 5 Associ at e Speci al I nspect or ( ASI )

A qual i f i ed per son who assi st s t he SI i n per f or mi ng Speci al I nspect i ons but must per f or m i nspect i on under t he di r ect super vi s i on of t he SI and cannot per f or m i nspect i ons wi t hout t he SI on si t e.

1. 3. 6 Thi r d Par t y

A Speci al i nspect or must not be an empl oyee of t he Cont r act or or of any Sub- Cont r act or per f or mi ng t he wor k t o be i nspect ed.

1. 3. 7 Speci al I nspect or of Recor d ( SI OR)

A l i censed engi neer i n r esponsi bl e char ge of super vi s i on of al l speci al i nspect or s f or t he pr oj ect and appr oved by t he Cont r act i ng Of f i cer . The SI OR must be an i ndependent t hi r d par t y ent i t y hi r ed di r ect l y by t he Pr i me Cont r act or .

1. 3. 8 Cont r act i ng Of f i cer

The Gover nment of f i c i al havi ng over al l aut hor i t y f or admi ni st r at i ve cont r act i ng act i ons. Cer t ai n cont r act i ng act i ons may be del egat ed t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) .

1. 3. 9 Cont r act or ' s Qual i t y Cont r ol ( QC) Manager

An i ndi v i dual r et ai ned by t he Pr i me Cont r act or and qual i f i ed i n accor dance wi t h t he Sect i on 01 45 00 QUALI TY CONTROL havi ng t he over al l r esponsi bi l i t y f or t he Cont r act or ' s QC or gani zat i on.

1. 3. 10 St r uct ur al Engi neer of Recor d ( SER)

A r egi st er ed desi gn pr of essi onal cont r act ed by t he Gover nment as an A/ E r et ai ned by t he Pr i me Cont r act or r esponsi bl e f or t he over al l desi gn and r evi ew of submi t t al document s pr epar ed by ot her s. The SER i s r egi st er ed or l i censed t o pr act i ce t hei r r espect i ve desi gn pr of essi on as def i ned by t he st at ut or y r equi r ement s of t he pr of essi onal r egi st r at i on l aws i n t he st at e i n whi ch t he desi gn pr of essi onal wor ks. The SER i s al so r ef er r ed t o as t he Engi neer of Recor d ( EOR) i n desi gn code document s.

1. 3. 11 St at ement of Speci al I nspect i ons ( SSI )

A document devel oped by t he SER i dent i f y i ng t he mat er i al , syst ems, component s and wor k r equi r ed t o have Speci al I nspect i ons. Thi s st at ement i s i ncl uded at t he end of t hi s speci f i cat i on.

1. 3. 12 Schedul e of Speci al I nspect i ons ( SSI )

A schedul e whi ch l i s t s each of t he r equi r ed Speci al I nspect i ons, t he ext ent t o whi ch each Speci al I nspect i on i s t o be per f or med, and t he r equi r ed f r equency f or each i n accor dance wi t h I CC I BC Chapt er 17. Thi s schedul e i s i ncl uded at t he end of t hi s speci f i cat i on.

1. 3. 13 Def i nabl e Feat ur e of Wor k ( DFOW)

An i nspect i on gr oup t hat i s separ at e and di st i nct f r om ot her i nspect i on gr oups, havi ng i nspect i on r equi r ement s or i nspect or s t hat ar e uni que.

SECTI ON 01 45 35 Page 2

1. 4 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

SI OR Let t er of Accept ance; G

Speci al I nspect i ons Pr oj ect Manual ; G

Speci al I nspect i ons Agency' s Wr i t t en NDT Pr act i ces wi t h met hod and evi dence of r egul ar equi pment cal i br at i on wher e appl i cabl e

SD- 06 Test Repor t s

Speci al I nspect i ons Dai l y Repor t s

Speci al I nspect i ons Bi weekl y Repor t s

SD- 07 Cer t i f i cat es

AI SC Cer t i f i ed St eel Fabr i cat or

Cer t i f i cat e of Compl i ance

Speci al I nspect or of Recor d Qual i f i cat i ons; G

Speci al I nspect or Qual i f i cat i ons; G

Qual i f i cat i on Recor ds f or NDT t echni c i ans

SD- 11 Cl oseout Submi t t al s

I nt er i m Repor t of Speci al I nspect i ons f or Each DFOW; G

Compr ehensi ve Fi nal Repor t of Speci al I nspect i ons; G

1. 5 SPECI AL I NSPECTOR QUALI FI CATI ONS

Submi t qual i f i cat i ons f or each speci al i nspect or and t he speci al i nspect or of r ecor d.

1. 5. 1 St eel Const r uct i on and Hi gh St r engt h Bol t i ng

1. 5. 1. 1 Speci al I nspect or

a. I CC St r uct ur al St eel and Bol t i ng Speci al I nspect or cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. Regi st er ed Pr of essi onal Engi neer wi t h t hr ee year s of r el at ed exper i ence

1. 5. 1. 2 Associ at e Speci al I nspect or

Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence.

SECTI ON 01 45 35 Page 3

1. 5. 2 Wel di ng St r uct ur al St eel

1. 5. 2. 1 Speci al I nspect or

a. I CC St r uct ur al Wel di ng Speci al I nspect or cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. AWS Cer t i f i ed Wel di ng I nspect or

1. 5. 2. 2 Associ at e Speci al I nspect or

AWS Cer t i f i ed Associ at e Wel di ng I nspect or

1. 5. 3 Nondest r uct i ve Test i ng of Wel ds

1. 5. 3. 1 Speci al I nspect or

NDT Level I I I Cer t i f i cat e

1. 5. 3. 2 Associ at e Speci al I nspect or

NDT Level I I Cer t i f i cat e pl us one year of r el at ed exper i ence

1. 5. 4 Concr et e Const r uct i on

1. 5. 4. 1 Speci al I nspect or

a. I CC Rei nf or ced Concr et e Speci al I nspect or Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. ACI Concr et e Const r uct i on Speci al I nspect or , or

c. Regi st er ed Pr of essi onal Engi neer wi t h t hr ee year s of r el at ed exper i ence

1. 5. 4. 2 Associ at e Speci al I nspect or

a. ACI Concr et e Const r uct i on Speci al I nspect or i n Tr ai ni ng, or

b. Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence

1. 5. 5 Ver i f i cat i on of Si t e Soi l Condi t i on, Fi l l Pl acement and Load- Bear i ng Requi r ement s

1. 5. 5. 1 Speci al I nspect or

a. I CC Soi l s Speci al I nspect or Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

b. NI CET Soi l s Techni c i an Level I I Cer t i f i cat e i n Const r uct i on Mat er i al Test i ng, or

c. Geol ogi st - I n- Tr ai ni ng wi t h t hr ee year s of r el at ed exper i ence, or

d. Regi st er ed Pr of essi onal Engi neer wi t h t hr ee year s of r el at ed exper i ence

1. 5. 5. 2 Associ at e Speci al I nspect or

a. NI CET Soi l s Techni c i an Level I Cer t i f i cat e i n Const r uct i on Mat er i al

SECTI ON 01 45 35 Page 4

Test i ng wi t h one year of r el at ed exper i ence, or

b. Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence

1. 5. 6 Deep Foundat i ons

1. 5. 6. 1 Speci al I nspect or

a. NI CET Soi l s Techni c i an Level I I Cer t i f i cat e i n Const r uct i on Mat er i al Test i ng, or

b. Geol ogi st - I n- Tr ai ni ng wi t h t hr ee year s of r el at ed exper i ence, or

c. Regi st er ed Pr of essi onal Engi neer wi t h t hr ee year s of r el at ed exper i ence

1. 5. 6. 2 Associ at e Speci al I nspect or

a. NI CET Soi l s Techni c i an Level I Cer t i f i cat e i n Const r uct i on Mat er i al Test i ng wi t h one year of r el at ed exper i ence, or

b. NI CET Geot echni cal Engi neer i ng Techni c i an Level I Const r uct i on or Gener al i st Cer t i f i cat e wi t h one year of r el at ed exper i ence, or

c. Engi neer - I n- Tr ai ni ng wi t h one year of r el at ed exper i ence

1. 5. 7 Speci al I nspect or of Recor d ( SI OR)

Regi st er ed Pr of essi onal Engi neer wi t h f i ve year s of r el at ed exper i ence.

PART 2 PRODUCTS

2. 1 FABRI CATOR SPECI AL I NSPECTI ONS

Speci al I nspect i ons of f abr i cat or ' s wor k per f or med i n t he f abr i cat or ' s shop i s r equi r ed t o be i nspect ed i n accor dance wi t h t he St at ement of Speci al I nspect i ons and t he Schedul e of Speci al I nspect i ons unl ess t he f abr i cat or i s cer t i f i ed by t he appr oved agency t o per f or m such wor k wi t hout Speci al I nspect i ons. Submi t t he f ol l owi ng cer t i f i cat i on( s) t o t he Cont r act i ng Of f i cer f or i nf or mat i on t o al l ow wor k per f or med i n t he f abr i cat or ' s shop t o not be subj ect ed t o Speci al I nspect i ons.

AI SC Cer t i f i ed St eel Fabr i cat or .

At t he compl et i on of f abr i cat i on, submi t a cer t i f i cat e of compl i ance, t o be i ncl uded wi t h t he compr ehensi ve f i nal r epor t of Speci al I nspect i ons, st at i ng t hat t he mat er i al s suppl i ed and wor k per f or med by t he f abr i cat or ar e i n accor dance wi t h t he const r uct i on document s.

PART 3 EXECUTI ON

3. 1 RESPONSI BI LI TI ES

3. 1. 1 Speci al I nspect or of Recor d

a. Super vi se al l Speci al I nspect or s r equi r ed by t he Cont r act Document s and t he I BC.

b. Submi t a SI OR Let t er of Accept ance t o t he Cont r act i ng Of f i cer at t est i ng t o accept ance of t he dut i es of SI OR, s i gned and seal ed by

SECTI ON 01 45 35 Page 5 t he SI OR.

c. Ver i f y t he qual i f i cat i ons of al l of t he Speci al I nspect or s.

d. Ver i f y t he qual i f i cat i ons of f abr i cat or s.

e. Submi t Speci al I nspect i ons agency' s wr i t t en NDT pr act i ces f or t he moni t or i ng and cont r ol of t he agency' s oper at i ons t o i ncl ude t he f ol l owi ng:

( 1) The agency' s pr ocedur es f or t he sel ect i on and admi ni st r at i on of i nspect i on per sonnel , descr i bi ng t he t r ai ni ng, exper i ence and exami nat i on r equi r ement s f or qual i f i cat i ons and cer t i f i cat i on of i nspect i on per sonnel .

( 2) The agency' s i nspect i on pr ocedur es, i ncl udi ng gener al i nspect i on, mat er i al cont r ol s, and vi sual wel di ng i nspect i on.

f . Submi t qual i f i cat i on r ecor ds f or nondest r uct i ve t est i ng ( NDT) t echni c i ans desi gnat ed f or t he pr oj ect .

g. Submi t NDT pr ocedur es and equi pment cal i br at i on r ecor ds f or NDT t o be per f or med and equi pment t o be used f or t he pr oj ect .

h. Pr epar e a Speci al I nspect i ons Pr oj ect Manual , whi ch must cover t he f ol l owi ng:

( 1) Rol es and r esponsi bi l i t i es of t he f ol l owi ng i ndi v i dual s dur i ng Speci al I nspect i ons: SI OR, SI , ASI , Gener al Cont r act or ' s QC Manager and SER.

( 2) Or gani zat i onal char t or communi cat i on pl an, i ndi cat i ng l i nes of communi cat i on.

( 3) Cont r act or ' s i nt er nal pl an f or schedul i ng i nspect i ons. Addr ess i t ems such as t i mel i ness of i nspect i on r equest s, who t o cont act f or i nspect i on r equest s, and avai l abi l i t y of al t er nat e i nspect or s.

( 4) I ndi cat e t he Gover nment r epor t i ng r equi r ement s.

( 5) Pr opose f or ms or t empl at es t o be used by SI and SI OR t o document i nspect i ons.

( 6) I ndi cat e pr ocedur es f or t r acki ng nonconf or mi ng wor k and ver i f i cat i on t hat cor r ect i ve wor k i s compl et e.

( 7) I ndi cat e how t he SI OR and SI wi l l par t i c i pat e i n weekl y QC meet i ngs.

( 8) I ndi cat e how Speci al I nspect i ons of shop f abr i cat ed i t ems wi l l be handl ed when t he f abr i cat or ' s shop i s not cer t i f i ed i n accor dance wi t h par agr aph FABRI CATOR SPECI AL I NSPECTI ONS.

( 9) I ncl ude a sect i on i n t he manual t hat cover s each speci f i c i t em r equi r i ng Speci al I nspect i ons t hat i s i ndi cat ed on t he Schedul e of Speci al I nspect i ons. Pr ovi de names and qual i f i cat i ons of each speci al i nspect or who wi l l be per f or mi ng t he Speci al I nspect i ons f or each speci f i c i t em. Pr ovi de det ai l on how t he Speci al I nspect i ons ar e t o be car r i ed out f or each i t em so t hat t he

SECTI ON 01 45 35 Page 6 expect at i ons ar e c l ear f or t he Gener al Cont r act or and t he Subcont r act or per f or mi ng t he wor k.

Make a copy of t he Speci al I nspect i ons Pr oj ect Manual avai l abl e on t he j ob s i t e dur i ng const r uct i on. Submi t a copy of t he Speci al I nspect i ons Pr oj ect Manual f or appr oval .

i . At t end coor di nat i on and mut ual under st andi ng meet i ng wher e t he i nf or mat i on i n t he Speci al I nspect i ons Pr oj ect Manual wi l l be r evi ewed t o ver i f y t hat al l par t i es have a c l ear under st andi ng of t he Speci al I nspect i ons pr ovi s i ons and t he i ndi v i dual dut i es and r esponsi bi l i t i es of each par t y.

j . Mai nt ai n a 3- r i ng bi nder f or t he Speci al I nspect or ' s dai l y and bi weekl y r epor t s and t he Speci al I nspect i ons Pr oj ect Manual . Thi s f i l e must be l ocat ed i n a conspi cuous pl ace i n t he pr oj ect t r ai l er / of f i ce t o al l ow r evi ew by t he Cont r act i ng Of f i cer and t he SER.

k. Submi t a copy of t he Speci al I nspect or ' s dai l y r epor t s t o t he QC Manager .

l . Di scr epanci es t hat ar e obser ved dur i ng Speci al I nspect i ons must be r epor t ed t o t he QC Manager f or cor r ect i on. I f di scr epanci es ar e not cor r ect ed bef or e t he speci al i nspect or l eaves t he si t e t he obser ved di scr epanci es must be document ed i n t he dai l y r epor t .

m. Submi t a bi weekl y Speci al I nspect i ons r epor t unt i l al l wor k r equi r i ng Speci al I nspect i ons i s compl et e. A r epor t i s r equi r ed f or each bi weekl y per i od i n whi ch Speci al I nspect i ons act i v i t y occur s, and must i ncl ude t he f ol l owi ng:

( 1) A br i ef summar y of t he wor k per f or med dur i ng t he r epor t i ng t i me f r ame.

( 2) Changes and di scr epanci es wi t h t he dr awi ngs, speci f i cat i ons t hat wer e obser ved dur i ng t he r epor t i ng per i od.

( 3) Di scr epanci es whi ch wer e r esol ved or cor r ect ed.

( 4) A l i s t of nonconf or mi ng i t ems r equi r i ng r esol ut i on.

( 5) Al l appl i cabl e t est r esul t s i ncl udi ng nondest r uct i ve t est i ng r epor t s.

n. At t he compl et i on of each Def i nabl e Feat ur e of Wor k ( DFOW) r equi r i ng Speci al I nspect i ons, submi t an i nt er i m r epor t t hat document s t he Speci al I nspect i ons compl et ed f or t hat DFOW i ncl udi ng cor r ect i ons of al l di scr epanci es not ed i n t he dai l y r epor t s. I nt er i m r epor t s of Speci al I nspect i ons must be si gned and dat ed by t he SI OR.

o. At t he compl et i on of t he pr oj ect submi t a compr ehensi ve f i nal r epor t of Speci al I nspect i ons t hat document s t he Speci al I nspect i ons compl et ed f or t he pr oj ect i ncl udi ng cor r ect i ons of al l di scr epanci es not ed i n t he dai l y r epor t s. The compr ehensi ve f i nal r epor t of Speci al I nspect i ons must be si gned, dat ed and bear t he seal of t he SI OR.

3. 1. 2 Qual i t y Cont r ol Manager

a. Mai nt ai n a r ewor k i t ems l i s t t hat i ncl udes di scr epanci es not ed on t he

SECTI ON 01 45 35 Page 7

Speci al I nspect or s dai l y r epor t .

3. 1. 3 Speci al I nspect or s

a. I nspect al l el ement s of t he pr oj ect f or whi ch t he speci al i nspect or i s qual i f i ed t o i nspect and ar e i dent i f i ed i n t he Schedul e of Speci al I nspect i ons.

b. At t end pr epar at or y phase meet i ngs r el at ed t o t he Def i nabl e Feat ur e of Wor k ( DFOW) f or whi ch t he speci al i nspect or i s qual i f i ed t o i nspect .

c. Submi t dai l y r epor t s t o t he SI OR.

3. 1. 4 St r uct ur al Engi neer of Recor d ( SER)

a. Devel op t he St at ement of Speci al I nspect i ons and t he Schedul e of Speci al I nspect i ons as def i ned i n Chapt er 17 of I CC I BC. Submi t t he St at ement of Speci al I nspect i ons and t he Schedul e of Speci al I nspect i ons f or appr oval by t he Cont r act i ng Of f i cer .

The St at ement of Speci al I nspect i on must i ncl ude t he f ol l owi ng i nf or mat i on:

( 1) Li st of Ar chi t ect ur al Desi gnat ed Sei smi c Syst ems.

( 2) Li st of Mechani cal Desi gnat ed Sei smi c Syst ems.

( 3) Li st of t he El ect r i cal Desi gnat ed Sei smi c Syst ems.

( 4) Def i ne t he per i odi c wal k- down i nspect i ons r equi r ed by UFC 3- 301- 01.

( 5) Li st of el ement s t hat ar e par t of t he pr ogr essi ve col l apse r esi st ance syst em.

Devel op Schedul e of Speci al I nspect i on usi ng t he t empl at e l ocat ed on t he Whol e Bui l di ng Desi gn Gui de websi t e at : www. wbdg. or g/ f f c/ dod/ uni f i ed- f aci l i t i es- gui de- speci f i cat i ons- uf gs/ uf gs- 01- 45- 35

b. Pr i or t o t he st ar t of st r uct ur al obser vat i ons submi t a wr i t t en st at ement i dent i f y i ng t he f r equency and del i neat i on wi nd/ sei smi c f or ce r esi st i ng syst em r equi r i ng st r uct ur al obser vat i ons.

3. 2 DEFECTI VE WORK

Check wor k as i t pr ogr esses, but f ai l ur e t o det ect any def ect i ve wor k or mat er i al s must i n no way pr event l at er r ej ect i on i f def ect i ve wor k or mat er i al s ar e di scover ed, nor obl i gat e t he Cont r act i ng Of f i cer t o accept such wor k.

- - End of Sect i on - -

SECTI ON 01 45 35 Page 8

SECTI ON 03 30 00

CAST- I N- PLACE CONCRETE

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN CONCRETE I NSTI TUTE ( ACI )

ACI 117 ( 2010; Er r at a 2011) Speci f i cat i ons f or Tol er ances f or Concr et e Const r uct i on and Mat er i al s and Comment ar y

ACI 121R ( 2008) Gui de f or Concr et e Const r uct i on Qual i t y Syst ems i n Conf or mance wi t h I SO

ACI 301 ( 2016) Speci f i cat i ons f or St r uct ur al Concr et e

ACI 302. 1R ( 2015) Gui de f or Concr et e Fl oor and Sl ab Const r uct i on

ACI 304. 2R ( 2017) Gui de t o Pl aci ng Concr et e by Pumpi ng Met hods

ACI 304R ( 2000; R 2009) Gui de f or Measur i ng, Mi xi ng, Tr anspor t i ng, and Pl aci ng Concr et e

ACI 305. 1 ( 2014) Speci f i cat i on f or Hot Weat her Concr et i ng

ACI 305R ( 2020) Gui de t o Hot Weat her Concr et i ng

ACI 306. 1 ( 1990; R 2002) St andar d Speci f i cat i on f or Col d Weat her Concr et i ng

ACI 306R ( 2016) Gui de t o Col d Weat her Concr et i ng

ACI 308. 1 ( 2011) Speci f i cat i on f or Cur i ng Concr et e

ACI SP- 2 ( 2007; Abst r act : 10t h Edi t i on) ACI Manual of Concr et e I nspect i on

ACI SP- 15 ( 2011) Fi el d Ref er ence Manual : St andar d Speci f i cat i ons f or St r uct ur al Concr et e ACI 301- 05 wi t h Sel ect ed ACI Ref er ences

AMERI CAN HARDBOARD ASSOCI ATI ON ( AHA)

AHA A135. 4 ( 1995; R 2004) Basi c Har dboar d

SECTI ON 03 30 00 Page 1

AMERI CAN WELDI NG SOCI ETY ( AWS)

AWS D1. 4/ D1. 4M ( 2011) St r uct ur al Wel di ng Code - Rei nf or ci ng St eel

ASTM I NTERNATI ONAL ( ASTM)

ASTM A615/ A615M ( 2022) St andar d Speci f i cat i on f or Def or med and Pl ai n Car bon- St eel Bar s f or Concr et e Rei nf or cement

ASTM A934/ A934M ( 2022) St andar d Speci f i cat i on f or Epoxy- Coat ed Pr ef abr i cat ed St eel Rei nf or ci ng Bar s

ASTM C31/ C31M ( 2022) St andar d Pr act i ce f or Maki ng and Cur i ng Concr et e Test Speci mens i n t he Fi el d

ASTM C33/ C33M ( 2018) St andar d Speci f i cat i on f or Concr et e Aggr egat es

ASTM C39/ C39M ( 2021) St andar d Test Met hod f or Compr essi ve St r engt h of Cyl i ndr i cal Concr et e Speci mens

ASTM C42/ C42M ( 2020) St andar d Test Met hod f or Obt ai ni ng and Test i ng Dr i l l ed Cor es and Sawed Beams of Concr et e

ASTM C78/ C78M ( 2022) St andar d Test Met hod f or Fl exur al St r engt h of Concr et e ( Usi ng Si mpl e Beam wi t h Thi r d- Poi nt Loadi ng)

ASTM C94/ C94M ( 2022a) St andar d Speci f i cat i on f or Ready- Mi xed Concr et e

ASTM C136/ C136M ( 2019) St andar d Test Met hod f or Si eve Anal ysi s of Fi ne and Coar se Aggr egat es

ASTM C138/ C138M ( 2017a) St andar d Test Met hod f or Densi t y ( Uni t Wei ght ) , Yi el d, and Ai r Cont ent ( Gr avi met r i c) of Concr et e

ASTM C143/ C143M ( 2020) St andar d Test Met hod f or Sl ump of Hydr aul i c- Cement Concr et e

ASTM C150/ C150M ( 2022) St andar d Speci f i cat i on f or Por t l and Cement

ASTM C172/ C172M ( 2017) St andar d Pr act i ce f or Sampl i ng Fr eshl y Mi xed Concr et e

ASTM C173/ C173M ( 2016) St andar d Test Met hod f or Ai r Cont ent of Fr eshl y Mi xed Concr et e by t he Vol umet r i c Met hod

ASTM C231/ C231M ( 2022) St andar d Test Met hod f or Ai r Cont ent of Fr eshl y Mi xed Concr et e by t he Pr essur e Met hod

SECTI ON 03 30 00 Page 2

ASTM C260/ C260M ( 2010a; R 2016) St andar d Speci f i cat i on f or Ai r - Ent r ai ni ng Admi xt ur es f or Concr et e

ASTM C311/ C311M ( 2022) St andar d Test Met hods f or Sampl i ng and Test i ng Fl y Ash or Nat ur al Pozzol ans f or Use i n Por t l and- Cement Concr et e

ASTM C330/ C330M ( 2017a) St andar d Speci f i cat i on f or Li ght wei ght Aggr egat es f or St r uct ur al Concr et e

ASTM C494/ C494M ( 2019; E 2022) St andar d Speci f i cat i on f or Chemi cal Admi xt ur es f or Concr et e

ASTM C567/ C567M ( 2019) Det er mi ni ng Densi t y of St r uct ur al Li ght wei ght Concr et e

ASTM C618 ( 2023) St andar d Speci f i cat i on f or Coal Fl y Ash and Raw or Cal c i ned Nat ur al Pozzol an f or Use i n Concr et e

ASTM C803/ C803M ( 2018) St andar d Test Met hod f or Penet r at i on Resi st ance of Har dened Concr et e

ASTM C873/ C873M ( 2015) St andar d Test Met hod f or Compr essi ve St r engt h of Concr et e Cyl i nder s Cast i n Pl ace i n Cyl i ndr i cal Mol ds

ASTM C900 ( 2015) St andar d Test Met hod f or Pul l out St r engt h of Har dened Concr et e

ASTM C920 ( 2018) St andar d Speci f i cat i on f or El ast omer i c Joi nt Seal ant s

ASTM C989/ C989M ( 2022) St andar d Speci f i cat i on f or Sl ag Cement f or Use i n Concr et e and Mor t ar s

ASTM C1017/ C1017M ( 2013; E 2015) St andar d Speci f i cat i on f or Chemi cal Admi xt ur es f or Use i n Pr oduci ng Fl owi ng Concr et e

ASTM C1074 ( 2019) St andar d Pr act i ce f or Est i mat i ng Concr et e St r engt h by t he Mat ur i t y Met hod

ASTM C1077 ( 2017) St andar d Pr act i ce f or Agenci es Test i ng Concr et e and Concr et e Aggr egat es f or Use i n Const r uct i on and Cr i t er i a f or Test i ng Agency Eval uat i on

ASTM C1107/ C1107M ( 2020) St andar d Speci f i cat i on f or Packaged Dr y, Hydr aul i c- Cement Gr out ( Nonshr i nk)

ASTM C1218/ C1218M ( 2020c) St andar d Test Met hod f or Wat er - Sol ubl e Chl or i de i n Mor t ar and Concr et e

ASTM C1240 ( 2020) St andar d Speci f i cat i on f or Si l i ca Fume Used i n Cement i t i ous Mi xt ur es

SECTI ON 03 30 00 Page 3

ASTM C1260 ( 2021) St andar d Test Met hod f or Pot ent i al Al kal i React i v i t y of Aggr egat es ( Mor t ar - Bar Met hod)

ASTM C1293 ( 2008; R 2015) St andar d Test Met hod f or Det er mi nat i on of Lengt h Change of Concr et e Due t o Al kal i - Si l i ca React i on

ASTM C1567 ( 2022) St andar d Test Met hod f or Pot ent i al Al kal i - Si l i ca React i v i t y of Combi nat i ons of Cement i t i ous Mat er i al s and Aggr egat e ( Accel er at ed Mor t ar - Bar Met hod)

ASTM C1602/ C1602M ( 2022) St andar d Speci f i cat i on f or Mi xi ng Wat er Used i n Pr oduct i on of Hydr aul i c Cement Concr et e

ASTM C1778 ( 2016) St andar d Gui de f or Reduci ng t he Ri sk of Del et er i ous Al kal i - Aggr egat e React i on i n Concr et e

ASTM D2628 ( 1991; R 2016) St andar d Speci f i cat i on f or Pr ef or med Pol ychl or opr ene El ast omer i c Joi nt Seal s f or Concr et e Pavement s

ASTM D2835 ( 1989; R 2017) St andar d Speci f i cat i on f or Lubr i cant f or I nst al l at i on of Pr ef or med Compr essi on Seal s i n Concr et e Pavement s

ASTM D3042 ( 2017) St andar d Test Met hod f or I nsol ubl e Resi due i n Car bonat e Aggr egat es

ASTM D5759 ( 2012; R 2020) Char act er i zat i on of Coal Fl y Ash and Cl ean Coal Combust i on Fl y Ash f or Pot ent i al Uses

ASTM D6690 ( 2015) St andar d Speci f i cat i on f or Joi nt and Cr ack Seal ant s, Hot Appl i ed, f or Concr et e and Asphal t Pavement s

ASTM E96/ E96M ( 2022a; E 2023) St andar d Test Met hods f or Gr avi met r i c Det er mi nat i on of Wat er Vapor Tr ansmi ssi on Rat e of Mat er i al s

ASTM E329 ( 2021) St andar d Speci f i cat i on f or Agenci es Engaged i n Const r uct i on I nspect i on, Test i ng, or Speci al I nspect i on

ASTM E1643 ( 2018a) St andar d Pr act i ce f or Sel ect i on, Desi gn, I nst al l at i on, and I nspect i on of Wat er Vapor Ret ar der s Used i n Cont act wi t h Ear t h or Gr anul ar Fi l l Under Concr et e Sl abs

ASTM E1745 ( 2017) St andar d Speci f i cat i on f or Wat er Vapor Ret ar der s Used i n Cont act wi t h Soi l or Gr anul ar Fi l l under Concr et e Sl abs

SECTI ON 03 30 00 Page 4

CONCRETE REI NFORCI NG STEEL I NSTI TUTE ( CRSI )

CRSI 10MSP ( 2018) Manual of St andar d Pr act i ce

CRSI RB4. 1 ( 2016) Suppor t s f or Rei nf or cement Used i n Concr et e

NATI ONAL I NSTI TUTE OF STANDARDS AND TECHNOLOGY ( NI ST)

NI ST PS 1 ( 2009) DOC Vol unt ar y Pr oduct St andar d PS 1- 07, St r uct ur al Pl ywood

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

COE CRD- C 104 ( 1980) Met hod of Cal cul at i on of t he Fi neness Modul us of Aggr egat e

U. S. GREEN BUI LDI NG COUNCI L ( USGBC)

LEED NC ( 2013) Leader shi p i n Ener gy and Envi r onment al Desi gn( t m) New Const r uct i on Rat i ng Syst em

1. 2 DEFI NI TI ONS

a. " Cement i t i ous mat er i al " as used her ei n must i ncl ude al l por t l and cement , pozzol an, f l y ash, s l ag cement , and si l i ca f ume.

b. " Exposed t o publ i c v i ew" means si t uat ed so t hat i t can be seen f r om eye l evel f r om a publ i c l ocat i on af t er compl et i on of t he bui l di ng. A publ i c l ocat i on i s accessi bl e t o per sons not r esponsi bl e f or oper at i on or mai nt enance of t he bui l di ng.

c. " Chemi cal admi xt ur es" ar e mat er i al s i n t he f or m of powder or f l ui ds t hat ar e added t o t he concr et e t o gi ve i t cer t ai n char act er i st i cs not obt ai nabl e wi t h pl ai n concr et e mi xes.

d. " Suppl ement ar y cement i ng mat er i al s" ( SCM) i ncl ude coal f l y ash, s i l i ca f ume, s l ag cement , nat ur al or cal c i ned pozzol ans, and ul t r a- f i ne coal ash when used i n such pr opor t i ons t o r epl ace t he por t l and cement t hat r esul t i n i mpr ovement t o sust ai nabi l i t y and dur abi l i t y and r educed cost .

e. " Desi gn st r engt h" ( f ' c) i s t he speci f i ed compr essi ve st r engt h of concr et e at t i me( s) speci f i ed i n t hi s sect i on t o meet st r uct ur al desi gn cr i t er i a.

f . " Mass Concr et e" i s any concr et e syst em t hat appr oaches a maxi mum t emper at ur e of 158 degr ees F wi t hi n t he f i r st 72 hour s of pl acement .

I n addi t i on, i t i ncl udes al l concr et e el ement s wi t h a sect i on t hi ckness of 3 f eet or mor e r egar dl ess of t emper at ur e.

g. " Mi xt ur e pr opor t i oni ng" i s t he pr ocess of desi gni ng concr et e mi xt ur e pr opor t i ons t o enabl e i t t o meet t he st r engt h, ser vi ce l i f e and const r uct abi l i t y r equi r ement s of t he pr oj ect whi l e mi ni mi zi ng t he i ni t i al and l i f e- cycl e cost .

h. " Mi xt ur e pr opor t i ons" ar e t he masses or vol umes of i ndi v i dual i ngr edi ent s used t o make a uni t measur e ( cubi c met er or cubi c yar d) of

SECTI ON 03 30 00 Page 5 concr et e.

i . " Pozzol an" i s a s i l i ceous or s i l i ceous and al umi nous mat er i al , whi ch i n i t sel f possesses l i t t l e or no cement i t i ous val ue but wi l l , i n f i nel y di v i ded f or m and i n t he pr esence of moi st ur e, chemi cal l y r eact wi t h cal c i um hydr oxi de at or di nar y t emper at ur es t o f or m compounds possessi ng cement i t i ous pr oper t i es.

j . " Wor kabi l i t y ( or consi st ence) " i s t he abi l i t y of a f r esh ( pl ast i c) concr et e mi x t o f i l l t he f or m/ moul d pr oper l y wi t h t he desi r ed wor k ( v i br at i on) and wi t hout r educi ng t he concr et e' s qual i t y. Wor kabi l i t y depends on wat er cont ent , chemi cal admi xt ur es, aggr egat e ( shape and si ze di st r i but i on) , cement i t i ous cont ent and age ( l evel of hydr at i on) .

1. 3 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Concr et e Cur i ng Pl an

Qual i t y Cont r ol Pl an; G

Qual i t y Cont r ol Per sonnel Cer t i f i cat i ons; G

Qual i t y Cont r ol Or gani zat i onal Char t

Labor at or y Accr edi t at i on; G

SD- 02 Shop Dr awi ngs

Rei nf or ci ng St eel ; G

SD- 03 Pr oduct Dat a

Joi nt Seal ant s; ( LEED NC)

For mwor k Mat er i al s

Recycl ed Aggr egat e Mat er i al s; ( LEED NC)

Cement i t i ous Mat er i al s; ( LEED NC)

Vapor Ret ar der and Vapor Bar r i er

Concr et e Cur i ng Mat er i al s

Rei nf or cement ; ( LEED NC)

Admi xt ur es

Local / Regi onal Mat er i al s; ( LEED NC)

SECTI ON 03 30 00 Page 6

Bi odegr adabl e For m Rel ease Agent

Nonshr i nk Gr out

SD- 05 Desi gn Dat a

Concr et e Mi x Desi gn; G

SD- 06 Test Repor t s

Concr et e Mi x Desi gn; G

Fl y Ash

Pozzol an

Sl ag Cement

Aggr egat es

Compr essi ve St r engt h Test s; G

Uni t Wei ght of St r uct ur al Concr et e

Ai r Cont ent

Sl ump Test s

Wat er

SD- 07 Cer t i f i cat es

Rei nf or ci ng Bar s

Wel der Qual i f i cat i ons

VOC Cont ent f or For m Rel ease Agent s, Cur i ng Compounds, and Concr et e Penet r at i ng Seal er s

Saf et y Dat a Sheet s

Fi el d Test i ng Techni c i an and Test i ng Agency

SD- 08 Manuf act ur er ' s I nst r uct i ons

Cur i ng Compound

1. 4 MODI FI CATI ON OF REFERENCES

Accompl i sh wor k i n accor dance wi t h ACI publ i cat i ons except as modi f i ed her ei n. Consi der t he advi sor y or r ecommended pr ovi s i ons t o be mandat or y.

I nt er pr et r ef er ence t o t he " Bui l di ng Of f i c i al , " t he " St r uct ur al Engi neer , " and t he " Ar chi t ect / Engi neer " t o mean t he Cont r act i ng Of f i cer .

1. 5 DELI VERY, STORAGE, AND HANDLI NG

Fol l ow ACI 301, ACI 304R and ASTM A934/ A934M r equi r ement s and r ecommendat i ons. Do not del i ver concr et e unt i l vapor r et ar der , vapor bar r i er , f or ms, r ei nf or cement , embedded i t ems, and chamf er st r i ps ar e i n

SECTI ON 03 30 00 Page 7 pl ace and r eady f or concr et e pl acement . Do not st or e concr et e cur i ng compounds or seal er s wi t h mat er i al s t hat have a hi gh capaci t y t o adsor b vol at i l e or gani c compound ( VOC) emi ssi ons. Do not st or e concr et e cur i ng compounds or seal er s i n occupi ed spaces.

1. 5. 1 Rei nf or cement

St or e r ei nf or cement of di f f er ent s i zes and shapes i n separ at e pi l es or r acks r ai sed above t he gr ound t o avoi d excessi ve r ust i ng. Pr ot ect f r om cont ami nant s such as gr ease, oi l , and di r t . Ensur e bar s i zes can be accur at el y i dent i f i ed af t er bundl es ar e br oken and t ags r emoved.

1. 6 QUALI TY ASSURANCE

1. 6. 1 Desi gn Dat a

1. 6. 1. 1 Concr et e Mi x Desi gn

Si xt y days mi ni mum pr i or t o concr et e pl acement , submi t a mi x desi gn f or each st r engt h and t ype of concr et e. Submi t a compl et e l i s t of mat er i al s i ncl udi ng t ype; br and; sour ce and amount of cement , suppl ement ar y cement i t i ous mat er i al s, f i ber s, and admi xt ur es; and appl i cabl e r ef er ence speci f i cat i ons. Submi t mi l l t est and al l ot her t est f or cement , suppl ement ar y cement i t i ous mat er i al s, aggr egat es, and admi xt ur es. Pr ovi de document at i on of maxi mum nomi nal aggr egat e s i ze, gr adat i on anal ysi s, per cent age r et ai ned and passi ng si eve, and a gr aph of per cent age r et ai ned ver ses si eve si ze. Pr ovi de mi x pr opor t i on dat a usi ng at l east t hr ee di f f er ent wat er - cement i t i ous mat er i al r at i os f or each t ype of mi xt ur e, whi ch pr oduce a r ange of st r engt h encompassi ng t hose r equi r ed f or each t ype of concr et e r equi r ed. I f sour ce mat er i al changes, r esubmi t mi x pr opor t i on dat a usi ng r evi sed sour ce mat er i al . Pr ovi de onl y mat er i al s t hat have been pr oven by t r i al mi x st udi es t o meet t he r equi r ement s of t hi s speci f i cat i on, unl ess ot her wi se appr oved i n wr i t i ng by t he Cont r act i ng Of f i cer . I ndi cat e c l ear l y i n t he submi t t al wher e each mi x desi gn i s used when mor e t han one mi x desi gn i s submi t t ed. Resubmi t dat a on concr et e component s i f t he qual i t i es or sour ce of component s changes.

Requi r ed aver age st r engt h can be document ed by f i el d exper i ence i f f i el d st r engt h t est dat a ar e avai l abl e and r epr esent a s i ngl e gr oup of at l east 10 consecut i ve st r engt h t est s f or one mi xt ur e, usi ng mat er i al s and condi t i ons s i mi l ar t o t hose expect ed f or wor k, and encompassi ng a per i od of not l ess t han 45 days. The aver age of f i el d st r engt h t est s shal l equal or exceed f cr ' . Changes i n mat er i al s, condi t i ons, and pr opor t i ons wi t hi n t he t est r ecor d shal l not have been mor e cl osel y r est r i ct ed t han t hose f or t he pr oposed wor k. Test r ecor ds shal l not be mor e t han 24 mont hs ol d.

Obt ai n mi x desi gn appr oval f r om t he cont r act i ng of f i cer pr i or t o concr et e pl acement .

1. 6. 2 Shop Dr awi ngs

1. 6. 2. 1 Rei nf or ci ng St eel

I ndi cat e bendi ng di agr ams, assembl y di agr ams, spl i c i ng and l aps of bar s, shapes, di mensi ons, and det ai l s of bar r ei nf or ci ng, accessor i es, and concr et e cover . Do not scal e di mensi ons f r om st r uct ur al dr awi ngs t o det er mi ne l engt hs of r ei nf or ci ng bar s. Repr oduct i ons of cont r act dr awi ngs ar e unaccept abl e.

SECTI ON 03 30 00 Page 8

1. 6. 3 Cont r ol Submi t t al s

1. 6. 3. 1 Concr et e Cur i ng Pl an

Submi t pr oposed mat er i al s, met hods and dur at i on f or cur i ng concr et e el ement s i n accor dance wi t h ACI 308. 1.

1. 6. 3. 2 Pumpi ng Concr et e

Submi t pr oposed mat er i al s and met hods f or pumpi ng concr et e. Submi t t al must i ncl ude mi x desi gns, pumpi ng equi pment i ncl udi ng t ype of pump and si ze and mat er i al f or pi pe, and maxi mum l engt h and hei ght concr et e i s t o be pumped.

1. 6. 3. 3 Fi ni shi ng Pl an

Submi t pr oposed mat er i al and pr ocedur es t o be used i n obt ai ni ng t he f i ni sh f or t he f l oor s. I ncl ude qual i f i cat i on of per son t o be used f or obt ai ni ng f l oor t ol er ance measur ement , descr i pt i on of measur i ng equi pment t o be used, and a sket ch showi ng l i nes and l ocat i ons t he measur i ng equi pment wi l l f ol l ow.

1. 6. 3. 4 VOC Cont ent f or f or m r el ease agent s, cur i ng compounds, and concr et e penet r at i ng seal er s

Submi t cer t i f i cat i on f or t he f or m r el ease agent , cur i ng compounds, and concr et e penet r at i ng seal er s t hat i ndi cat e t he VOC cont ent of each pr oduct .

1. 6. 3. 5 Saf et y Dat a Sheet s

Submi t Saf et y Dat a Sheet s ( SDS) f or al l mat er i al s t hat ar e r egul at ed f or hazar dous heal t h ef f ect s. SDS must be r eadi l y accessi bl e dur i ng each wor k shi f t t o empl oyees when t hey ar e at t he const r uct i on s i t e.

1. 6. 4 Test Repor t s

1. 6. 4. 1 Fl y Ash and Pozzol an

Submi t t est r esul t s i n accor dance wi t h ASTM C618 f or f l y ash and pozzol an. Submi t t est r esul t s per f or med wi t hi n 6 mont hs of submi t t al dat e.

1. 6. 4. 2 Sl ag Cement

Submi t t est r esul t s i n accor dance wi t h ASTM C989/ C989M f or s l ag cement .

Submi t t est r esul t s per f or med wi t hi n 6 mont hs of submi t t al dat e.

1. 6. 4. 3 Aggr egat es

Submi t t est r esul t s i n accor dance wi t h ASTM C33/ C33M, or ASTM C330/ C330M f or l i ght wei ght aggr egat e, and ASTM C1293 or ASTM C1567 as r equi r ed i n t he par agr aph t i t l ed ALKALI - AGGREGATE REACTI ON.

1. 6. 5 Qual i t y Cont r ol Pl an

Devel op and submi t f or appr oval a concr et e qual i t y cont r ol pr ogr am i n accor dance wi t h t he gui del i nes of ACI 121R and as speci f i ed her ei n. The pl an must i ncl ude appr oved l abor at or i es. Pr ovi de di r ect over si ght f or t he concr et e qual i f i cat i on pr ogr am i ncl usi ve of associ at ed sampl i ng and t est i ng. Al l qual i t y cont r ol r epor t s must be pr ovi ded t o t he Cont r act i ng

SECTI ON 03 30 00 Page 9

Of f i cer , Qual i t y Manager and Concr et e Suppl i er . Mai nt ai n a copy of ACI SP- 15 and CRSI 10MSP at pr oj ect s i t e.

1. 6. 6 Qual i t y Cont r ol Per sonnel Cer t i f i cat i ons

The Cont r act or must submi t f or appr oval t he r esponsi bi l i t i es of t he var i ous qual i t y cont r ol per sonnel , i ncl udi ng t he names and qual i f i cat i ons of t he i ndi v i dual s i n t hose posi t i ons and a qual i t y cont r ol or gani zat i onal char t def i ni ng t he qual i t y cont r ol hi er ar chy and t he r esponsi bi l i t y of t he var i ous posi t i ons. Qual i t y cont r ol per sonnel must be empl oyed by t he Cont r act or .

Submi t Amer i can Concr et e I nst i t ut e cer t i f i cat i on f or t he f ol l owi ng:

a. CQC per sonnel r esponsi bl e f or i nspect i on of concr et e oper at i ons.

b. Lead For eman or Jour neyman of t he Concr et e Pl aci ng, Fi ni shi ng, and Cur i ng Cr ews.

c. Fi el d Test i ng Techni c i ans: ACI Concr et e Fi el d Test i ng Techni c i an, Gr ade I .

1. 6. 6. 1 Qual i t y Manager Qual i f i cat i ons

The qual i t y manager must hol d a cur r ent l i cense as a pr of essi onal engi neer i n a U. S. st at e or t er r i t or y wi t h exper i ence on at l east f i ve s i mi l ar pr oj ect s. Evi dence of ext r aor di nar y pr oven exper i ence may be consi der ed by t he Cont r act i ng Of f i cer as suf f i c i ent t o act as t he Qual i t y Manager .

1. 6. 6. 2 Fi el d Test i ng Techni c i an and Test i ng Agency

Submi t dat a on qual i f i cat i ons of pr oposed t est i ng agency and t echni c i ans f or appr oval by t he Cont r act i ng Of f i cer pr i or t o per f or mi ng t est i ng on concr et e.

a. Wor k on concr et e under t hi s cont r act must be per f or med by an ACI Concr et e Fi el d Test i ng Techni c i an Gr ade 1 qual i f i ed i n accor dance wi t h ACI SP- 2 or equi val ent . Equi val ent cer t i f i cat i on pr ogr ams must i ncl ude r equi r ement s f or wr i t t en and per f or mance exami nat i ons as st i pul at ed i n ACI SP- 2.

b. Test i ng agenci es t hat per f or m t est i ng ser vi ces on r ei nf or ci ng st eel must meet t he r equi r ement s of ASTM E329.

c. Test i ng agenci es t hat per f or m t est i ng ser vi ces on concr et e mat er i al s must meet t he r equi r ement s of ASTM C1077.

1. 6. 7 Labor at or y Qual i f i cat i ons f or Concr et e Qual i f i cat i on Test i ng

The concr et e t est i ng l abor at or y must have t he necessar y equi pment and exper i ence t o accompl i sh r equi r ed t est i ng. The l abor at or y must meet t he r equi r ement s of ASTM C1077 and be Cement and Concr et e Ref er ence Labor at or y ( CCRL) i nspect ed.

1. 6. 8 Labor at or y Accr edi t at i on

Labor at or y and t est i ng f aci l i t i es must be pr ovi ded by and at t he expense of t he Cont r act or . The l abor at or i es per f or mi ng t he t est s must be accr edi t ed i n accor dance wi t h ASTM C1077, i ncl udi ng ASTM C78/ C78M and

SECTI ON 03 30 00 Page 10

ASTM C1260. The accr edi t at i on must be cur r ent and must i ncl ude t he r equi r ed t est met hods, as speci f i ed. Fur t her mor e, t he t est i ng must compl y wi t h t he f ol l owi ng r equi r ement s:

a. Aggr egat e Test i ng and Mi x Pr opor t i oni ng: Aggr egat e t est i ng and mi xt ur e pr opor t i oni ng st udi es must be per f or med by an accr edi t ed l abor at or y and under t he di r ect i on of a r egi st er ed pr of essi onal engi neer i n a U. S. st at e or t er r i t or y compet ent i n concr et e mat er i al s and must s i gn al l r epor t s and desi gns.

b. Accept ance Test i ng: Fur ni sh al l mat er i al s, l abor , and f aci l i t i es r equi r ed f or mol di ng, cur i ng, t est i ng, and pr ot ect i ng t est speci mens at t he s i t e and i n t he l abor at or y. Fur ni sh and mai nt ai n boxes or ot her f aci l i t i es sui t abl e f or st or i ng and cur i ng t he speci mens at t he s i t e whi l e i n t he mol d wi t hi n t he t emper at ur e r ange st i pul at ed by

ASTM C31/ C31M.

c. Cont r act or Qual i t y Cont r ol : Al l sampl i ng and t est i ng must be per f or med by an appr oved, onsi t e, i ndependent , accr edi t ed l abor at or y.

1. 7 ENVI RONMENTAL REQUI REMENTS

Pr ovi de space vent i l at i on accor di ng t o mat er i al manuf act ur er r ecommendat i ons, at a mi ni mum, dur i ng and f ol l owi ng i nst al l at i on of concr et e cur i ng compound and seal er . Mai nt ai n one of t he f ol l owi ng vent i l at i on condi t i ons dur i ng t he cur i ng per i od or f or 72 hour s af t er i nst al l at i on:

a. Suppl y 100 per cent out si de ai r 24 hour s a day.

b. Suppl y ai r f l ow at a r at e of 6 ai r changes per hour , when out si de t emper at ur es ar e bet ween 55 degr ees F and 84 degr ees F and humi di t y i s bet ween 30 per cent and 60 per cent .

c. Suppl y ai r f l ow at a r at e of 1. 5 ai r changes per hour , when out si de ai r condi t i ons ar e not wi t hi n t he r ange st i pul at ed above.

1. 7. 1 Submi t t al s f or Envi r onment al Per f or mance

a. Pr ovi de dat a i ndi cat i on t he per cent age of post - i ndust r i al pozzol an ( f l y ash, s l ag cement ) cement subst i t ut i on as a per cent age of t he f ul l pr oduct composi t e by wei ght .

b. Pr ovi de dat a i ndi cat i ng t he per cent age of post - i ndust r i al and post - consumer r ecycl ed cont ent aggr egat e.

c. Pr ovi de pr oduct dat a i ndi cat i ng t he per cent age of post - consumer r ecycl ed st eel cont ent i n each t ype of st eel r ei nf or cement as a per cent age of t he f ul l pr oduct composi t e by wei ght .

d. Pr ovi de pr oduct dat a st at i ng t he l ocat i on wher e al l pr oduct s wer e manuf act ur ed

e. For pr oj ect s usi ng FSC cer t i f i ed f or mwor k, pr ovi de chai n- of - cust ody document at i on f or al l cer t i f i ed wood pr oduct s.

f . For pr oj ect s usi ng r eusabl e f or mwor k, pr ovi de dat a showi ng how f or mwor k i s r eused.

SECTI ON 03 30 00 Page 11

g. Pr ovi de SDS pr oduct i nf or mat i on dat a showi ng t hat f or m r el ease agent s meet any envi r onment al per f or mance goal s such as usi ng veget abl e and soy based pr oduct s.

h. Pr ovi de SDS pr oduct i nf or mat i on dat a showi ng t hat concr et e adhesi ves meet any envi r onment al per f or mance goal s i ncl udi ng l ow emi t t i ng, l ow vol at i l e or gani c compound pr oduct s.

1. 8 SUSTAI NABLE DESI GN REQUI REMENTS

1. 8. 1 Local / Regi onal Mat er i al s

Submi t document at i on i ndi cat i ng di st ance bet ween manuf act ur i ng f aci l i t y and t he pr oj ect s i t e. I ndi cat e di st ance of r aw mat er i al or i gi n f r om t he pr oj ect s i t e. I ndi cat e r el at i ve dol l ar val ue of l ocal / r egi onal mat er i al s t o t ot al dol l ar val ue of pr oduct s i ncl uded i n pr oj ect .

1. 9 QUALI FI CATI ONS FOR WELDI NG WORK

Wel di ng pr ocedur es must be i n accor dance wi t h AWS D1. 4/ D1. 4M.

Ver i f y t hat Wel der qual i f i cat i ons ar e i n accor dance wi t h AWS D1. 4/ D1. 4M f or wel di ng of r ei nf or cement or under an equi val ent qual i f i cat i on t est appr oved i n advance. Wel der s ar e per mi t t ed t o do onl y t he t ype of wel di ng f or whi ch each i s speci f i cal l y qual i f i ed.

PART 2 PRODUCTS

2. 1 FORMWORK MATERI ALS

a. For m- f aci ng mat er i al i n cont act wi t h concr et e must be pl ywood, t emper ed concr et e- f or m- gr ade har dboar d, met al , pl ast i c, . Submi t pr oduct i nf or mat i on on pr oposed f or m- f aci ng mat er i al s i f di f f er ent f r om t hat speci f i ed her ei n.

b. Desi gn f or mwor k, shor es, r eshor es, and backshor es t o suppor t l oads t r ansmi t t ed t o t hem and t o compl y wi t h appl i cabl e bui l di ng code r equi r ement s.

c. Desi gn f or mwor k and shor i ng f or l oad r edi st r i but i on r esul t i ng f r om st r essi ng of post - t ensi oned r ei nf or cement . Ensur e t hat f or mwor k al l ows movement r esul t i ng f r om appl i cat i on of pr est r essi ng f or ce.

d. Desi gn f or mwor k t o wi t hst and pr essur e r esul t i ng f r om pl acement and vi br at i on of concr et e and t o mai nt ai n speci f i ed t ol er ances.

e. Desi gn f or mwor k t o accommodat e wat er st op mat er i al s i n j oi nt s at l ocat i ons i ndi cat ed i n Cont r act Document s.

f . Pr ovi de t empor ar y openi ngs i n f or mwor k i f needed t o f aci l i t at e c l eani ng and i nspect i on.

g. Desi gn f or mwor k j oi nt s t o i nhi bi t l eakage of mor t ar .

h. Li mi t def l ect i on of f aci ng mat er i al s f or concr et e sur f aces exposed t o v i ew t o 1/ 240 of cent er - t o- cent er spaci ng of f aci ng suppor t s.

i . Do not use ear t h cut s as f or ms f or ver t i cal or s l opi ng sur f aces.

SECTI ON 03 30 00 Page 12 j . Submi t pr oduct i nf or mat i on on pr oposed f or m- f aci ng mat er i al s i f di f f er ent f r om t hat speci f i ed her ei n.

k. Submi t manuf act ur er ' s pr oduct dat a on f or m l i ner pr oposed f or use wi t h each f or med sur f ace.

2. 1. 1 Wood For ms

Pr ovi de pl ywood t hat compl i es wi t h NI ST PS 1, B- B concr et e f or m panel s or bet t er or AHA A135. 4, har dboar d f or smoot h f or m l i ni ng. Submi t dat a ver i f y i ng t hat composi t e wood pr oduct s cont ai n no ur ea f or mal dehyde r esi ns.

2. 1. 1. 1 Concr et e For m Pl ywood ( St andar d Rough)

Pr ovi de pl ywood t hat conf or ms t o NI ST PS 1, B- B, concr et e f or m, not l ess t han 5/ 8- i nch t hi ck.

2. 1. 1. 2 Over l ai d Concr et e For m Pl ywood ( St andar d Smoot h)

Pr ovi de pl ywood t hat conf or ms t o NI ST PS 1, B- B, hi gh densi t y f or m over l ay, not l ess t han 5/ 8- i nch t hi ck.

2. 1. 2 Pl ast i c For ms

Pl ast i c l umber as speci f i ed. Pr ovi de pl ast i c f or ms t hat cont ai n a mi ni mum of 50 per cent post - consumer r ecycl ed cont ent , or a mi ni mum of 50 per cent post - i ndust r i al r ecycl ed cont ent .

2. 1. 3 St eel For ms

Pr ovi de st eel f or m sur f aces t hat do not cont ai n i r r egul ar i t i es, dent s, or sags.

2. 2 FORMWORK ACCESSORI ES

a. Use commer ci al l y manuf act ur ed f or mwor k accessor i es, i ncl udi ng t i es and hanger s.

b. For m t i es and accessor i es must not r educe t he ef f ect i ve cover of t he r ei nf or cement .

2. 2. 1 For m Ti es

a. Use f or m t i es wi t h ends or end f ast ener s t hat can be r emoved wi t hout damage t o concr et e.

b. Wher e i ndi cat ed i n Cont r act Document s, use f or m t i es wi t h i nt egr al wat er bar r i er pl at es or ot her accept abl e posi t i ve wat er bar r i er s…