6.0 Section E - Special Conditions~1.pdf
PDF 318 KB Posted
- Solicitation number
- SPD126-SPDAD-6225
- Issued by
- San Bernardino County, California
About this file
This is a Special Conditions document for a construction project under the jurisdiction of San Bernardino County Department of Public Works, specifically for County Service Area (CSA) 70 GH located in Glen Helen, San Bernardino, California. The project involves the installation of a rotor assembly and scum skimmer at the Lytle Creek North facility (Project No. 30.30.0197). The contractor is responsible for providing all necessary supervision, labor, equipment, materials, and tools to complete the work in accordance with the contract plans, specifications, and bid documents. Prior to construction, the contractor must attend a pre-construction conference with the owner and major subcontractors, and must provide written notification to the Project Manager at least seven days before beginning work. A field superintendent from the contractor's organization must be present during construction activities, with a 24-hour emergency contact number provided to the owner.
The contractor bears sole responsibility for all jobsite safety, including oversight of the contractor's workforce, subcontractors, and public access, and must comply with all California Occupational Safety and Health Program (CAL/OSHA) regulations. The contractor must procure all required permits, certificates, and licenses at their own expense, including encroachment permits and storm water pollution control permits, and must satisfy all San Bernardino County Department of Public Works requirements. Additional requirements include supplying construction water and sanitary facilities, implementing comprehensive dust control and environmental measures consistent with South Coast Air Quality Management District Rule 403, maintaining traffic control during any road impacts with 72-hour resident notification, submitting a detailed shoring plan signed by a licensed structural engineer for any trenches five feet or deeper, maintaining an as-built record set documenting deviations from plans, and removing all trash and debris. Emergency vehicle access must be maintained throughout the project, and the contractor is responsible for all costs associated with emergency agency access requirements.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION E
SPECIAL CONDITIONS
CSA 70 GH LYTLE CREEK
NORTH ROTOR ASSEMBLY &
SCUM SKIMMER
FOR
COUNTY SERVICE AREA (CSA) 70 GH
SAN BERNARDINO, CALIFORNIA
PROJECT NO.: 30.30.0197
CSA 70 GH LYTLE CREEK NORTH ROTOR ASSEMBLY & SCUM SKIMMER
TABLE OF CONTENTS
Special Conditions Page
1. The Requirement............................................................................................... SC-1
2. Location of Contract Work Site ....................................................................... SC-1
3. Job Site Safety................................................................................................... SC-1
4. Miscellaneous Special Conditions ................................................................... SC-2
5. Sanitary Facilities.............................................................................................. SC-2
6. Permits, Certificated, Laws, and Ordinances ................................................... SC-2
7. Construction Water .......................................................................................... SC-3
8. Trash and Debris Removal ............................................................................... SC-3
9. Plan Set ............................................................................................................ SC-3
10. Notifications ..................................................................................................... SC-4
11. Compliance with Contract Documents ............................................................ SC-4
13. Survey Monuments and Benchmarks .............................................................. SC-4
14. Emergency Vehicle and Response Access ...................................................... SC-4
15. Geotechnical Investigation ............................................................................... SC-5
16. Data to be Submitted by Contractor ................................................................. SC-5
17. Exploratory Excavation (Potholing) ................................................................ SC-5
18. Excavation, Bedding, and Backfill ................................................................ .. SC-6
19. Excess Excavated Materials ........................................................................... SC-6
20. General Environmental Measure .................................................................... SC-6
SC - i
SPECIAL CONDITIONS FOR
COUNTY SERVICE AREA (CSA) 70 GH
LYTLE CREEK NORTH ROTOR ASSEMBLY & SCUM SKIMMER
1. THE REQUIREMENT
The work includes, but is not limited to, providing all necessary supervision, labor, equipment, materials, and tools to satisfactorily perform the work. Work to be performed in accordance with plans, specifications, and bid documents.
2. LOCATION OF CONTRACT WORK SITE
The contract work site is located on CSA 70 GH – Glen Helen, San Bernardino County, State of California.
3. JOB SITE SAFETY
a. Responsibility
Jobsite safety is the sole exclusive responsibility of the Contractor. This responsibility covers his own work force, all subcontractors, visiting personnel and officials, and the public which may have access to the jobsite. The Contractor shall exercise complete control over who has access to the jobsite to ensure jobsite safety. The Owner does not assume any responsibility for job site safety expressed or implied. The Owner relies on the experience, knowledge, and innovative skills of the Contractor to deliver the most effective construction system to the Owner in a safe and responsible manner.
The Contractor acknowledges responsibility for jobsite safety and acknowledges that the
Owner will not have such responsibility.
b. Construction Safety Orders
Construction of this project must comply with all safety orders of the California
Occupational Safety and Health Program (CAL/OSHA) as published by the Department of
Industrial Relations. The Contractor’s safety officer shall maintain at the jobsite a complete copy of the California Administrative Code, Title 8 – Industrial Relations, latest edition.
When applicable, the Contractor’s operation shall also comply with General Industry
Safety Orders.
The jobsite safety officer shall be thoroughly familiar with the safety orders and shall so instruct, inform, or notify all personnel on the jobsite to ensure safety at all times. The safety officer shall also be responsible for all record keeping and reporting requirements, specified in Record Keeping and Reporting Requirements Under the California
c. Occupational Safety and Health Act, available from the California Division of Labor
Statistics and Research.
The Contractor shall comply with the accident prevention program which includes instructions to workers in safe working practices as well as scheduled periodic safety inspection of all work areas on the jobsite.
Contractor shall provide and perform necessary traffic control during periods of road and street impacts while engaged in his operations. Sufficient signage, message boards, detour signs and flagmen will be employed during any impacts. Contractor will use the State
WATCH manual for traffic control implementation and compliance. Temporary DAILY road closures may be allowed provided proper detours are provided and residents receive at least 72 hours prior notification. All impacted roads will be made available immediately to any emergency vehicle traffic if warranted. Road closures will be opened at the end of each day and made safe for residents to include any transition ramping, steel plating for open trenches, etc. Contractor at all times (within reason) will work with the residents regarding property ingress and egress.
4. MISCELLANEOUS SPECIAL CONDITIONS
a. Pre-Construction Conference
The Contractor, together with is major subcontractors, will be required to attend a pre-construction conference prior to beginning construction. The Owner will set up this conference shortly after execution of the contract.
b. Contractor’s Field Superintendent
The Contractor shall be required to have a field superintendent, from his organization, on the jobsite during construction activities, to receive directions or instruction from the Owner or Engineer. Contractor shall provide the Owner with a
24-hour emergency phone number for field superintendent prior to beginning of construction.
c. Final Inspection
The Contractor shall schedule a final inspection with the appropriate District staff to ensure that all work as identified in these documents are completed to the satisfaction to the District.
5. SANITARY FACILITIES
Contractor shall supply appropriate and in sufficient number, temporary sanitary facilities for his workmen to use during the course of the project, Contractor shall be responsible for the regular maintenance, cleaning and pumping of such facility(ies).
6. PERMITS, CERTIFICATES, LAWS, AND ORDINANCES
Contractor shall, at his own expense, procure all permits, certificates and licenses required of him by law for the execution of the work. Contractor shall comply with all Federal, State, and local laws, ordinances or rules and regulations relating to the performance of said work.
The following agencies have jurisdiction with the project.
A. San Bernardino County Department of Public Works
In the event of any conflict between the Contract Documents and the San
Bernardino County Department of Public Works encroachment permit requirements, the most stringent requirement shall prevail. All permit requirements shall be satisfied by Contractor and accepted by the District and Owner before the project is accepted and a Notice of Completion is recorded.
B. General
Contractor shall, at his own expense, procure any additional permits, certificates, and/or licenses required of him by law for the execution of the work, including all permits required for storm water pollution control. He shall comply with all federal, state, and local laws, ordinance, and/or rules and regulations relating to the performance of said work.
All the permit requirements shall be satisfied by Contractor and accepted by all issuing agencies and Owner before a notice of completion will be recorded for the project. In the event of conflict between said permit requirements and the other contract documents, the most stringent requirements shall prevail.
7. CONSTRUCTION WATER
Water for the work, dust control, testing, cleaning, curing, and compaction or as required will be furnished by the Contractor, and will adhere to all regulations of appropriate Water and Fire agencies for the usage, disposal and connection to fire hydrants or standpipes.
Contractor shall control water run-off and comply with NPDES discharge requirements.
8. TRASH AND DEBRIS REMOVAL
Contractor shall be responsible in removing and hauling off all trash and/or debris created by him during the construction process. Debris materials (trash, washed out or over spilled concrete, material spoils, etc.) shall be hauled off and disposed of in a manner acceptable and to approved facilities that will dispose of those materials.
9. PLAN SET
Contractor will maintain a field “as-built” set and will turn a legible copy of the “as- builts” over to the Project Manager at the conclusion of the project. As-builts will document any deviations to include accurate dimensions and locations of any work not accomplished per plans. Any deviations to the plans must first receive Project Manager review and District approval as stated in the General Conditions.
10. NOTIFICATIONS
Contractor shall provide written notification to Project Manager of the work of impending work at least seven (7) days prior to beginning construction. Said notices shall first be approved by Project Manager and shall contain a general description of the work, dates work will be performed, descriptions of areas where travel and parking will be restricted, and access roads which will be closed to through traffic or where traffic will be restricted.
Contractor shall maintain, as a minimum, one (1) access location to each treatment facility at all times.
11. COMPLIANCE WITH CONTRACT DOCUMENTS
Contractor shall comply with the Contract Documents, including timely completion of work each day, backfilling and securing trenches each day, placement of concrete, work site cleanup, control of traffic, placement of signs, placement of barricades, and use of flashing lights. If Contractor does not comply with the Contract Documents, then Owner shall provide the required labor, materials, and equipment to perform same and shall deduct the cost from monies otherwise due Contractor under the contract.
12. SURVEY MONUMENTS AND BENCHMARKS
The Contractor shall not disturb existing survey monuments or benchmarks. Upon
Contractor’s request, owner shall locate, mark, reference and prepare a Corner Record prior to construction, for all monuments that might be disturbed pursuant to Business and
Professions Code, Sections 8700 to 8805 of the Land Surveyor's Act, specifically Section
8771(b). Contractor shall notify Owner at least 72 hours prior to working near any monuments or benchmarks. Should these monuments be destroyed or disturbed, Contractor shall have a
Licensed Land Surveyor registered in the State of California reset the monuments and file a
Corner Record or a Record of Survey with the County Surveyor prior to Owner recording a
Certificate of Completion for the project.
13. EMERGENCY VEHICLE AND RESPONSE ACCESS
Access for emergency vehicle response shall be provided as required throughout the project. All conditions imposed by emergency agencies (police, fire, or ambulance) due to access limitations shall be the responsibility of the Contractor, including costs of same.
14. DATA TO BE SUBMITTED BY CONTRACTOR
Contractor shall furnish Owner the following data and said data shall be approved by Owner prior to ordering materials. Data (two copies) shall be submitted to Owner for approval.
Contractor shall then submit three copies of all approved data to Owner for use during construction.
A. All data required by the Contract Documents including but not limited to trench protection, construction schedule, encroachment and excavation permits, and emergency telephone numbers.
B. Site specific Injury and Illness Prevention Plan, Safety Plan and Confined Space
Program.
C. A detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during excavation of any trenches five feet or more in depth. Said plan shall be signed and stamped by a registered civil or structural engineer licensed in the State of
California. Contractor will not be allowed to excavate until the executed and approved shoring plan has been submitted.
15. GENERAL ENVIRONMENTAL MEASURES
A-1: The Contractor shall comply with the following mitigation measures to reduce impacts from construction equipment:
a) Construction equipment shall be maintained in proper tune.
b) Gasoline, CNG or electrical powered equipment instead of diesel powered equipment shall be used whenever possible;
c) Use of heavy equipment shall be suspended during first stage smog alerts.
d) All construction equipment shall be prohibited from excessive idling; and
e) The use of “clean diesel” equipment if modified engines (catalyst equipped, or newer Moyer Program retrofit) are available at reasonable cost shall be encouraged.
A-2: To reduce fugitive dust emissions during construction, the use of best available control measures (BACMs) consistent with Rule 403 for control of fugitive dust
(South Coast Air Quality Management District 2005) shall be implemented during grading. These measures include the following:
a) Prior to moving any soil, apply water to the surface of the soil not more than 15 minutes prior to moving soil.
b) For any stockpiled soils, either cover soils or apply water twice per hour.
c) Water all active construction areas at least three times daily when active earthwork is occurring or as needed to minimize dust emissions. If evidence of dust is observed, increase to a minimum of four times per day.
d) Cover all haul trucks or maintain at least two feet of freeboard in trucks used to transport soil to the site.
e) Pave or apply water twice per hour to all unpaved parking or staging areas during active operations.
f) Reduce speed on unpaved roads to less than 15 miles per hour.
g) Sweep or wash any site access points within 30 minutes of any visible dirt deposition on any public roadway.
h) Cover or water twice daily any on-site stockpiles of debris, dirt, or other dusty materials.
i) Suspend all operations on any unpaved surface if winds exceed 25 miles per hour.
j) Limit daily disturbance areas to 5 acres or less.
k) Move no more than 5,000 cubic yards of soil daily.
l) Encourage carpooling for construction workers.
m) Park construction vehicles off traveled roadways.
n) Wet down or cover dirt hauled off-site.
o) Wash or sweep access points daily.
p) Encourage receipt of materials during non-peak traffic hours; and
q) Sandbag the construction site for erosion control.
16. EMERGENCY VEHICLE AND RESPONSE ACCESS
Access for emergency vehicle response shall be provided as required throughout the project. All conditions imposed by emergency agencies (police, fire, or ambulance) due to access limitations shall be the responsibility of the Contractor, including costs of same.
END OF SPECIAL CONDITIONS