6-CJC Chiller Plant Upate 100%CDs 2025.12.18 - Reduced Size.pdf
PDF 11 MB Posted
- Attached to
- 26RFCSP23 Justice Complex Chiller Plant Upgrade
- Solicitation number
- 26RFCSP23
- Issued by
- Williamson County, Texas
About this file
This document is a 100% Construction Document (CD) set for the Justice Complex Chiller Plant Upgrade project prepared for Williamson County, Texas. The project encompasses a comprehensive chiller plant modernization at the Justice Complex, with design documents detailing mechanical, electrical, and control system upgrades. The scope includes replacement and optimization of existing chiller equipment, associated piping systems, cooling tower modifications, and Building Management System (BMS) integration. The construction documents provide detailed specifications, equipment schedules, and technical requirements necessary for qualified contractors to submit competitive sealed proposals. The project involves coordination across multiple building systems and infrastructure components to ensure seamless integration with existing Justice Complex operations.
The construction documents establish the technical baseline for competitive bidding and include detailed drawings, specifications, and performance requirements that bidders must address in their proposals. The project will be procured through a competitive sealed proposal process under Texas Government Code Chapter 2269 Subchapter D, allowing Williamson County to evaluate proposals based on established criteria beyond price alone. These 100% CDs represent the complete design development stage, providing contractors with sufficient detail to prepare accurate cost estimates and implementation schedules. The documents serve as the contractual basis for construction execution, establishing equipment standards, installation methodologies, and system performance expectations for the chiller plant upgrade work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR TO WRECK OUT ALL EXISTING HOUSEKEEPING PADS FOR BOILER AND
PUMPS AS REQUIRED WHERE EQUIPMENT 15 BEING REPLACED. PATCH AND REFINISH
CONCRETE. NEW BASE MOUNTED PUMPS ARE TO GET NEW 5 1/2" REINFORCED
CONCRETE HOUSEKEEPING PADS. PROVIDE NEW 3 1/2" REINFORCED CONCRETE
HOUSE KEEPING PAD FOR NEW BOILERS. PAD TO EXTEND 3" BEYOND EACH SIDE OF
BOILERS AND PUMPS. DO NOT BLOCK ANY CURRENT FLOOR DRAINS.
DO NOT SCALE FROM DRAWINGS. FIELD MEASURE AND VERIFY ALL EXISTING
CONDITIONS, MATERIALS, ELEVATIONS, EXACT LOCATIONS, ETC PRIOR TO BIDDING.
LAYOUT 15 APPROXIMATE. CONTRACTOR 15 TO FIELD VERIFY ALL EXISTING
CONDITIONS. SUBMISSION OF BIDS INDICATES WILLINGNESS TO WORK WITH
CONDITIONS AS THEY EXIST. CONTRACTOR 15 TO MODIFY EQUIPMENT LAYOUT,
ROUTING OF PIPING, CONDUIT ROUTING ETC., AS REQUIRED TO FIT NEW EQUIPMENT,
PIPING, CONDUIT ETC. INTO THE EXISTING SPACE. REROUTE EXISTING CONDUITS AND
PIPING, ETC., THAT ARE TO REMAIN AS REQUIRED.
ON REVISED PLAN DASHED OR DOTTED LINES INDICATE EXISTING ITEMS TO REMAIN AND
SOLID LINES INDICATE NEW WORK.8 INDICATES CONNECTION FROM OLD TO NEW.
CONTRACTOR 15 TO MOVE AND THEN REPLACE ANY ITEMS THAT ARE IN THE WAY OF
REMOVAL OR PROPER INSTALLATION OF EQUIPMENT THAT 15 TO BE REPLACED. FIELD
VERIFY ALL EXISTING CONDITIONS. SEE SHEET M2.02
® CONlROL PANEL j
LOCATION DISCONNECT (TYP )'.7
COORD. W/ELEC. ��
I I I �m I e--- --------------------01 le---- --\c-----,- - - - - - - - -��,.,_
---11- -l--1 - - - - - - - --1
C_- 1 I
I/
EWiRIC ROOM ,-7 I I I I I I I I I co I I iJil I I u I I I I I I I I I L _J r--:::;"-: r--:::;"i""'=-----.J .,_.:; _____ .J
EACH CHILLED PUMP IS RATED FOR 475 GPM, 100% LOOP FLOW.
ONE IS 100% BACKUP. CHWP-1 JUST REBUILT IS TO REMAIN.
EXISTING HEATING LOOP PUMPS WERE EACH RATED FOR 120 GPM
OR 50% FLOW OF THE ORIGINAL BOILER AND HEATING LOOP.
,------------7 I I I I I I I I I I
I TRANSFORMER I
I I I I I I I I I I L ____________ J c::= ____ =::] ,7 ,7
I s..
I I
0.
I ;;, I I
I I
'L_j 'L_J
I 0.
I
L - - - -
- - - - - - CHR - - - - - - - - - -
I I � CHS I
I I I
I I I "' I 5
,--------7 I I I I I f-+-� I I I I I I
I 5 I I I I
I 238 GPM I I
,--------7 I
I I L-0 I I
238 GPM
I
CONSTANT FLOW I
N COOL OR FREEZE MOD�
I I I
I I I
I I I
I
CONSTANT FLOW � I N COOL OR FREEZE MOD9- I
I I I I
: :--0 I I I I I I
I EXISTING CHILLER I
I TO REMAIN I
I I I I I I
L ___ CH-1C ___ J
I I I
IEXISllNG CHILLER I ITo REMAIN I I I I I I I
L ___ CH-2C ___ J
Q 1 ;!l�J-1�9" FLOOR PLAN - SOUTH MECHANICAL ROOM - MECHANICAL
I/�, KEYED NOTES
0 MAIN ELECTRIC ROOM. DO NOT ROUTE ANY PIPING ABOVE THIS AREA.
2 CURRENT BOILER HAS A BUILT IN 209 GPM CIRCULATING PUMP AND BOILER IS NOW
TIED INTO HEATING LOOP AS PRIMARY/SECONDARY.
3 REMOVE EXISTING BOILER, BOILER PUMP PUMP AND ALL PIPING AND
ACCESSORIES. REMOVE EXISTING HOUSEKEEPING PAD. PATCH AND REFINISH
FLOOR.
4 REMOVE EXISTING END SUCTION LOOP PUMPS AND PIPING AS REQUIRED FOR
INSTALLATION OF NEW. REMOVE EXISTING HOUSEKEEPING PADS. PATCH AND
REFINISH FLOOR.
5 EXISTING DOUBLE WALL FLUE PIPING OFF SINGLE EXISTING BOILER IS CAT IV
RATED 88 JEREMIAS DWGV10 WITHIN THE MECHANICAL ROOM. FLUE UP IS 10"
DIAMETER. REMOVE EXISTING FLUE PIPING CONNECTED TO EXISTING BOILER AS
REQUIRED TO APPROXIMATELY 3' ABOVE EXISTING BOILER AND CAP EXISTING FLUE
WHICH WILL BE ABANDONED IN PLACE.
6 REMOVE EXISTING SUPPLY FAN AND DUCT SECTIONS AS SHOWN FOR
REPLACEMENT ON M2.02.
7 EXISTING DOMESTIC WATER HEATER TO REMAIN.
8 EXISTING ALC DDC CABINET TO REMAIN. IT WILL BE REWORKED AS REQUIRED.
9 FILL SYSTEM RACK WITH RPZ'S TO REMAIN.
10 EXISTING SUSPENDED AIR ELIMINATOR TO BE REPLACED WITH NEW. SEE DETAILS
FOR CONNECTIONS REQUIREMENTS.
11 EXISTING SUSPENDED EXPANSION TANK TO BE REMOVED AND REPLACED WITH
NEW FLOOR MOUNTED MODEL. SEE MODIFIED PLANS FOR LOCATION.
12 EXISTING CHEMICAL FEEDER TO BE REPLACED WITH NEW. SEE MODIFIED PLANS
FOR LOCATION.
13 THIS EXISTING CHILLED WATER PUMP WAS RECENTLY REBUILT WITH NEW PUMP
HEAD. IT IS TO REMAIN. IT WILL BE UP FITTED WITH VFD TO MATCH OTHER PUMPS
THAT WILL BE REPLACED. SEE ADD ALTERNATE TO REPLACE THIS PUMP, DROPS
AND ALL SPECIALTIES CONNECTED TO IT AS IN KEYED NOTE 6 ON SHEET M2.02. IF
REPLACED TURN THIS COMPLETE PUMP ASSEMBLY OVER TO OWNER AT
MAINTENANCE FACILITY FOR SPARE.
HENDRI
CONSUL TIN
ENGINEER
This document, the ideas and designs incorporated herein are and shall remain the property of Hendrix Consulting Engineers. These documents are not to be used or altered, in whole or in part, for other than the original intended use, nor are they to be assigned to any third party without written permission from Hendrix Consulting Engineers. © F - 4095
TIE S!'.M. � ON 1115 00CtllENI' WM NJTH0AIZED Ir a.,. HENDRIX,, P.E. ND: 1411� ON: 12/17/2025
405 MARTIN LUTHER KING ST.
GEORGETOWN, TEXAS
78626
HCE Project Number: 25-001
Drawing Date: DECEMBER 17, 2025
Drawn:
Checked:
CH
BJH
WILCO CJC - CHILLER
BOILER PLANT
PARTIAL
REPLACEMENT AND
UPGRADES
Revisions:
Pl.AN_N0RTH TRUE_N0RTH
Sheet Title:
SOUTH BASEMENT
EXISTING FLOOR
PLAN - MECHANICAL
M2.01
| 01CS.1.pdf |
| 01E1.01 SCHEDULES NOTES AND LEGENDS - ELECTRICAL.pdf |
| 01E2.01 SOUTH BASEMENT FLOOR PLAN - ELECTRICAL.pdf |
| 01E2.02 NORTH BASEMENT FLOOR PLAN - ELECTRICAL.pdf |
| 01M1.01 SCHEDULES NOTES AND LEGENDS - MECHANICAL.pdf |
| 01M1.02 SCHEDULES NOTES AND LEGENDS - MECHANICAL.pdf |
| 01M1.03 DETAILS - MECHANICAL.pdf |
| 01M1.04 EXISTING CONDITIONS PICTURES.pdf |
| 01M2.01 SOUTH EXISTING BASEMENT FLOOR PLAN - MECHANICAL.pdf |
| 01M2.02 SOUTH MODIFIED BASEMENT FLOOR PLAN - MECHANICAL.pdf |
| 01M2.03 NORTH BASEMENT FLOOR PLAN - MECHANICAL.pdf |
File details come from the government source that posted it. Updated .