This document presents bid results for the Fenimore Woods Parking, Accessibility, and Site Improvements project (#B-26-003) in Radnor Township, Pennsylvania, with bids due on October 21, 2026, at 10:00 AM EST. The project encompasses repaving existing asphalt and gravel parking lots, constructing new pedestrian trails, installing utilities, signage, and site furnishings, and completing grading, topsoil placement, and site restoration at the facility located at 1194 Eagle Road. The bid tabulation includes 30 line items with quantities ranging from 1 to 2,160 square yards, representing various construction tasks including mobilization, pavement milling and removal, material installation, concrete work, and site restoration through hydroseeding.

Three contractors submitted bids for the project: DAVIS Construction at $662,737.40, Delaware Environmental Construction Services at $244,078.88, and Mayfield Site at $288,060.00. Pricing varies significantly among bidders across individual line items, with notable differences in unit prices for major work categories such as the porous pavement installation (ranging from $98 to $165 per square yard) and topsoil/hydroseed work (ranging from $4.40 to $176.26 per square yard). Delaware Environmental Construction Services submitted the lowest total bid, while DAVIS Construction submitted the highest bid at substantially more than double the low bid amount, suggesting significant variation in contractor approach and cost estimation for this accessibility and site improvement project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fenimore Woods Parking, Accessibility, and Site Improvements (#B-26-003) Bids Due: 10/21/26 10 AM EST

Total Cost

# Items

Unit of Measure

Quantity Required UnitPrice TotalCost UnitPrice TotalCost UnitPrice TotalCost

#1-1 Mobilization/Demobilization LS 1 $8,774.41 $8,774.41 $9,800.88 $9,800.88 $12,000.00 $12,000.00 #1-2 Layout LS 1 $9,664.04 $9,664.04 $3,500.00 $3,500.00 $2,100.00 $2,100.00 #1-3 Erosion and Sedimentation Controls LS 1 $10,023.55 $10,023.55 $3,500.00 $3,500.00 $13,000.00 $13,000.00 #1-4 Mill Existing Pavement to 2" Depth SY 1110 $8.53 $9,469.05 $17 $18,870.00 $12 $13,320.00 #1-5 Remove Existing Pavement Structure to 6" Depth SY 400 $12.80 $5,118.41 $44 $17,600.00 $9 $3,600.00 #1-6 Scarify Existing Gravel to 4" Depth SY 950 $5.48 $5,209.81 $3.50 $3,325.00 $13 $12,350.00 #1-7 Remove Existing Gravel to 4" Depth SY 270 $9.44 $2,550.06 $1.70 $459.00 $8 $2,160.00 #1-8 Remove Existing Concrete Curb LF 205 $18.28 $3,747.40 $35 $7,175.00 $23 $4,715.00 #1-9 Remove Existing Asphalt Curb LF 275 $18.28 $5,027.01 $35 $9,625.00 $18 $4,950.00 #1-10 Remove Existing Concrete Wheel Stops from Site EA 60 $54.84 $3,290.40 $35 $2,100.00 $22 $1,320.00 #1-11 Remove Existing 7'X5'X6" Concrete Slabs with Concrete Picnic Tables EA 7 $1,127.27 $7,890.88 $44 $308 $450 $3,150.00 #1-12 Legally Dispose of Spoils Offsite LS 1 $24,903.49 $24,903.49 $4,400.00 $4,400.00 $9,500.00 $9,500.00 #1-13 Install 9.5mm Compacted Leveling Course TON 20 $194.99 $3,899.74 $8 $160 $160 $3,200.00 #1-14 Install 2" 9.5mm Compacted Wearing Course SY 1280 $24.37 $31,197.91 $30.50 $39,040.00 $16 $20,480.00 #1-15 Install 25mm Compacted Base Course SY 70 $54.84 $3,838.81 $44 $3,080.00 $40 $2,800.00 #1-16 Install 6" Compacted 2A Material SY 70 $35.04 $2,452.57 $35 $2,450.00 $55 $3,850.00 #1-17 Install 4" Compacted 2A Material SY 1060 $14.01 $14,855.57 $10.70 $11,342.00 $24 $25,440.00 #1-18 Install 3" Compacted Porous Pavement on 22" Uniformly Graded Course Aggregate, AASHTO No. 3 SY 320 $179.75 $57,521.14 $98 $31,360.00 $165 $52,800.00 #1-19 Install Swale Lined with Large (3"-8") River Rock to an 18" Depth SY 45 $188.89 $8,500.21 $107 $4,815.00 $100 $4,500.00 #1-20 Install 4,000 PSI Concrete Curb with 18" Depth, 6" Top Width, 8" Bottom Width, 6" Reveal, on 4" AASHTO #57 Clean Crushed Grave LF 72 $47.89 $3,448.34 $80 $5,760.00 $170 $12,240.00 #1-21 Install 4,000 PSI Concrete Sidewalk to a Depth of 4" on Min. 6" AASHTO #57 Clean Crushed Grave SY 40 $213.88 $8,555.05 $314 $12,560.00 $100 $4,000.00 #1-22 Install Red Brick Detectable Warning Strips for ADA Ramps EA 1 $1,035.87 $1,035.87 $800 $800 $7,000.00 $7,000.00 #1-23 Install 2-2" PVC Direct Bury Conduit and Pull Tape LF 415 $37.90 $15,728.62 $35 $14,525.00 $23 $9,545.00 #1-24 Install Thermoplastic Pavement Markings for ADA Parking Spaces EA 2 $987.12 $1,974.24 $1,520.00 $3,040.00 $1,500.00 $3,000.00 #1-25 Install Mounted R7-8 and R7-8P Handicap Parking Signs EA 1 $1,614.74 $1,614.74 $1,520.00 $1,520.00 $4,000.00 $4,000.00 #1-26 Install New Concrete Wheel Stops EA 38 $182.80 $6,946.41 $170 $6,460.00 $200 $7,600.00 #1-27 Install Two (2) Sloped Aluminum Gutters Along Pavilion Roof with Debris Guards, Downspouts, and Downspout Extensions EA 2 $1,218.67 $2,437.34 $2,800.00 $5,600.00 $4,200.00 $8,400.00 #1-28 Install Water Fountain on 4'x4' Concrete Pad and Connect Existing Water LS 1 $13,819.70 $13,819.70 $8,000.00 $8,000.00 $13,000.00 $13,000.00 #1-29 Install ADA-Accessible Double-Leaf Swing Post and Rail Gate EA 2 $4,265.34 $8,530.68 $1,700.00 $3,400.00 $5,000.00 $10,000.00 #1-30 Rake/Loosen Soil and Install 4" Topsoil with Hydroseed SY 2160 $176.26 $380,711.97 $4.40 $9,504.00 $6.50 $14,040.00

DAVIS Construction Delaware Environmental

Construction Services Mayfield Site $662,737.40 $244,078.88 $288,060.00