6-Attachment B-Scope of Work.docx
DOCX document 2 MB Posted
- Attached to
- AM27-113 Wood West II Herbicide
- Solicitation number
- AM27-113
- Issued by
- Grand County, Utah
About this file
This is a Scope of Work document for the State of Utah Division of Wildlife Resources Wood West II Herbicide project, a multispectral survey and herbicide treatment contract managed by the Cedar City Field Office, Bureau of Land Management. The project requires contractors to conduct a multispectral survey of approximately 1,200 acres located 7 miles west of Lund, Utah in Iron County to identify and map cholla cactus, followed by individual-plant herbicide treatment on an estimated 300 to 800 acres using picloram (Tordon 22K). The survey must be delivered within five business days of completion with georeferenced imagery and spatial data identifying cholla locations. The contract period runs from September 28th through November 20th, with a two-calendar-day mobilization window from the Notice-to-Proceed. No site visit is required prior to bidding, though potential bidders are strongly encouraged to inspect the project area. Bidders must submit detailed specifications for equipment including make, model, and type of multispectral imagery collection systems and herbicide application equipment as part of their bid. Award will be made to the lowest responsive and responsible bidder meeting all experience and equipment requirements.
Pricing is established on a per-acre basis separately for the multispectral survey and herbicide treatment, with payment based on actual acres completed as verified by GPS-recorded data and application records. The contractor shall furnish all personnel, equipment, herbicides, water, mixing equipment, vehicles, and materials required to complete the work. Contractors must maintain a designated on-site English-literate supervisor during operating hours and are responsible for all equipment protection, transportation, hazardous materials compliance, and disposal of waste materials according to state and federal regulations. Work hours are limited to one-half hour before sunrise to one-half hour after sunset, with work prohibited when wind velocity exceeds 6 miles per hour, ground is frozen, or freezing temperatures are forecast within 24 hours post-treatment. The contract may be suspended at the state's discretion due to winter conditions, with provisions for contract cancellation or resumption based on weather. Minor change orders of up to 10 percent of the original project area may be issued without price adjustment, while major change orders exceeding 10 percent may be negotiated for equitable adjustments capped at 10 percent of the bid price multiplied by remaining untreated acreage.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B SCOPE OF WORK
#AM27-113 Wood West II Herbicide LOCATION: 7 miles west of Lund, UT Introduction: The Cedar City Field Office, Bureau of Land Management (CCFO), is acquiring services under this contract to conduct a multispectral survey of approximately 1,200 acres to identify and map cholla cactus within the project area. The survey will produce georeferenced imagery and/or spatial data identifying the location and distribution of cholla cactus to support subsequent treatment activities.
As a secondary component, the contract will procure services for individual-plant herbicide treatment of identified cholla cactus using picloram (Tordon 22K or an approved equivalent) on an estimated minimum of 300 and a maximum of 800 acres within the 1200 acres project area. Individual cholla plants shall be thoroughly wetted, including stems and exposed plant surfaces, while minimizing excessive runoff. Good coverage of target plants is required. Treatment acreage will be based on the results of the multispectral survey and field verification, as applicable.
SECTION I – PROJECT REQUIREMENTS
SITE SPECIFICS:
Location and Description: The work under this contract is located 7 miles W of Lund within Iron County. Elevations range from 5,350 feet to 5,570 feet within the project site. The treatment boundaries will not be flagged and must be located by GPS. The work location is shown on the general location and site maps
Acreage: 1200 acres Inventory. Herbicide treatment is anticipated on a minimum of 300 acres and a maximum of 800 acres, as determined by the multispectral inventory and field verification.
Access to the site: Access to the project site is provided by a combination of paved highways, county dirt surface roads, and jeep trails. Four (4) wheel drive vehicles are recommended in and around the project area. It will be the contractor’s responsibility to get the equipment to the work site.
SPECIFIC TASKS:
Work Limits: Only areas identified on the Project Map will be treated. Project area boundaries will be provided electronically, and the Contractor shall be responsible for providing a GPS unit capable of loading and displaying the project area boundaries.
Contractor will work with contract representative to determine best area to start and progress through the project area. Payment will be based on actual acres treated and mapped. Actual acres as evidenced by the GIS data and tracking provided by the contractor, with option to add acres at the quoted price per acre at any point prior to contract completion (if within treatment window) based on funding availability and if it fits with in the contractors work time frame.
Delivery of multispectral data shall be submitted within five (5) days of survey. Data produced must have georeferenced imagery and/or spatial data identifying the location and distribution of cholla cactus to support subsequent treatment activities.
Acreage Tracking and Verification: The Contractor shall use GPS-enabled drone/UAS technology to document acres inventoried through the multispectral survey and acres receiving herbicide treatment. Survey data shall identify the area inventoried and the locations of cholla detected within the project area.
Herbicide treatment acreage shall be reported as actual wet acres treated, based on GPS-recorded treatment data and the documented volume of herbicide solution applied at the specified application rate.
The Contractor shall maintain records of the total gallons applied and provide GPS treatment data, application records, and final acreage calculations to UDWR within five (5) business days following treatment.
Payment will be based separately on actual acres inventoried through the multispectral survey and actual wet acres receiving herbicide treatment, as verified by the submitted GPS/UAS data and application records.
Chemical treatments shall only be applied when weather conditions are suitable and in accordance with all herbicide label requirements.
Herbicide:
1. All herbicide applications will be in accordance with the product label, Use of Hazardous Materials and/or petroleum products requires that all appropriate State and Federal Regulations be complied with including, but not limited to, Materials Safety Data Sheets (MSDS) on hand and use of necessary Personal Protective Clothing (PPE).
2. Tordon 22K shall be applied as an individual-plant high-volume foliar spot treatment at a concentration of 4 quarts of Tordon 22K per 100 gallons of finished spray solution (1% v/v). Water shall be used as the carrier and an approved surfactant shall be added at the surfactant manufacturer's labeled rate. Individual cholla plants shall be thoroughly wetted, including stems and exposed plant surfaces, while minimizing excessive runoff. Good coverage of target plants is required.
3. Adjuvants: MSM may be used with chemicals requiring adjuvants and in conjunction with label directions. Other products may be approved, added and presented during pre-work meeting.
4. Product substitutions: No substitutions or replacements of herbicides, adjuvants, or dyes are allowed without prior written approval.
5. Equipment/Spray Nozzles: Spray rigs shall be equipped with nozzles capable of uniform distribution at the specified rate. Mixing Equipment: Contractor shall furnish the agitator and mixing tank for mixing treatment material. The treatment material shall be mixed according to the label and in a safe and knowledgeable manner. It can be mixed on site as needed. Water sources will be arranged for by the Contractor.
6. Environmental Conditions: Application of treatment chemicals shall not be done when the wind velocity exceeds 6 miles per hour. Herbicides shall not be applied when ground is frozen. Spraying operations will be permitted only during daylight hours. The contractor is responsible for ensuring that the application of herbicide meets all label specifications. The contractor shall be responsible for cleanup of accidental spills, following proper handling and storage precautions, and ensuring proper exposure control and personal protection is proved as defined by the herbicide label and Safety Data Sheets.
7. Transportation of Herbicide: The Contractor shall load and transport herbicide from the Contractor's home base to the work site and between sites according to all applicable laws and regulations. The contractor is responsible for the transportation and storage of the supplies (including water) and equipment used for the project. Upon completion of the work or termination of the contract. Disposal of all used containers and other materials shall be done according to the label and local laws and regulations.
CONTRACTOR FURNISHED EQUIPMENT:
Equipment Requirements: The Contractor shall furnish all personnel, aircraft, materials, and equipment required to complete the project. This includes Tordon 22K, MSO, water, mixing and loading equipment, aircraft, GPS technology, vehicles, fuel, and all other associated tools and equipment. The Contractor is responsible for supplying all mixing equipment and water, as well as the chemicals and MSO.
GOVERNMENT FURNISHED PROPERTY:
No Government property shall be furnished on this project.
EQUIPMENT AND WORKMANSHIP:
All equipment and/or materials incorporated into the work covered by this contract shall be of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. All work under this contract shall be performed in a skillful and workmanlike manner. The State may require, in writing, that the contractor remove from the work any employee deemed by the State to be incompetent, careless, or otherwise objectionable.
Surface Conditions: Application of treatment chemicals shall not be done when the wind velocity exceeds 6 miles per hour. Contractor shall be responsible for timing herbicide application to ensure application adequate moisture is present for herbicide activation. Herbicides shall not be applied when ground is frozen. Treatments with chemical shall only be applied on those days when weather permits as per label instructions. Application shall only occur when ambient air temperatures are above 32°F (0°C) and the wood surface is free of ice, frost, or standing moisture. Application is strictly prohibited if freezing temperatures are forecast within 24 hours post-treatment.
Surface Disturbance: Public or private access roads damaged by the Contractor shall be restored at the Contractors expense to the same condition they were in at the commencement of work. Staging sites are at the discretion of the contractor if within 30 ft of existing motorized travel routes. If other sites are requested approval is required by the Project Manager.
CONTRACT TIME –September 28th – November 20th or if ground is frozen or weather has resulted in snow that will not melt off.
Project Performance Time: 2 calendar days from the official Notice-to-Proceed (NTP)
SECTION II – BID REQUIREMENTS/INFORMATION
SITE VISIT:
A site visit will NOT be held prior to bidding. It is strongly recommended that each potential bidder inspect the site where services are to be performed and satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
MAPS/FILES
Wood West II Herbicide Project Map Wood West II Vicinity Map Wood West II Shapefile
QUESTIONS:
Only questions specific to the site should be asked at the site visit (if held). Questions related to this solicitation, specifications, or bidding procedures MUST be asked in writing on the Q&A board within the solicitation to keep the process fair and transparent. There are no exceptions to this. Questions asked at the site visit and subsequent answers will be recorded and posted in the solicitation so that all potential bidders can review questions and answers.
BIDDING:
This contract will be bid on a per-acre basis for the multispectral survey and a separate per-acre basis for herbicide treatment. The multispectral survey price will be based on the actual acres surveyed and verified through GPS/UAS data.
Herbicide treatment will be bid on a per-treatment-acre basis. Actual treatment acres will be documented and verified using GPS-recorded treatment data in conjunction with application records showing the total gallons of finished spray solution applied, quantity of Tordon 22K used, and quantity and type of adjuvant used. Only authorized acres where individual-plant cholla treatment is completed will be eligible for payment.
The per-acre unit prices will be extended based on the actual number of acres completed to determine the total project price. The Contractor's herbicide treatment unit price shall account for individual-plant spot treatment and variability in cholla density within the authorized treatment areas.
The total price shall include all labor, equipment, herbicide, adjuvant, water, materials, mobilization, transportation, operating costs, and other incidentals necessary to complete the work specified in this contract. There will be no fuel surcharges or other price adjustments negotiated after award.
EQUIPMENT:
Bidders must provide the make, model, and type of equipment proposed for both the multispectral imagery collection and herbicide application, including the type of sprayer to be used, as part of the bid SUBMITTAL. This requirement allows the project manager to determine if it meets the requirements of the project.
CONTRACT AWARD:
A contract will be awarded to the lowest responsive/responsible bidder who meets any experience and equipment requirements noted elsewhere in this solicitation.
USE OF SUBCONTRACTORS:
The Project Manager must approve the use of all subcontractors in writing prior to their performance of any work on the project. Any company or individual who submitted a bid on the project, was offered the project as the low bidder, and declined that award, or who defaulted on project after being awarded the contract, is ineligible to be a subcontractor for, or an employee of, the successful bidder.
SECTION III – ADDITIONAL REQUIREMENTS
ENVIRONMENTAL CONSIDERATIONS:
Project sites shall be cleaned up, and all refuse removed by the Contractor. The Contractor shall be responsible for the disposal of materials in a manner consistent with State, Federal, and local laws and for all expenses incurred with the disposal. Public or private access roads damaged by the Contractor shall be restored at the contractor's expense to the same condition they were in at the commencement of work.
Use of 2-wheel and 4-wheel vehicles is permitted in the project areas. Off-road driving will be prohibited when soils are wet and rutting may occur.
Hazardous Materials:
1. Use of Hazardous Materials and/or petroleum products requires that all appropriate State and Federal Regulations be complied with including, but not limited to, Materials Safety Data Sheets (MSDS) on hand and use of necessary Personal Protective Clothing (PPE).
2. On-site disposal of Hazardous Materials or Waste including hydrocarbons is not authorized. On-site disposal will subject the contractor to at least the cost of reclamation and the appropriate disposal of contaminated soil.
3. Incidental (de minimus) leaks from fittings, gaskets, or ruptured hoses will not subject the contractor to remedial requirements. They will be considered to be normal and unavoidable losses. Continual leaks will be noted on inspection reports and correction through maintenance is required.
4. Maintenance and repair operations that require the draining of engines or hydraulic systems may be conducted on-site only if the fluids are captured, containerized, and removed from public lands for proper disposal.
PUBLIC ACCESS:
Access into and through the project site shall remain open to the public at all times. The Contractor shall maintain roadways free of vehicles, tools, and debris.
SECURITY OF EQUIPMENT AND PROPERTY:
The Contractor may leave equipment at the work site, however, the Contractor shall be solely responsible for the protection of equipment and is solely responsible if the equipment is lost, stolen, or damaged.
CREW SUPERVISION:
1. The contractor shall designate one English-literate supervisor who will be on site during operation hours. Supervisors shall be identified during the pre-work conference. Any changes in supervisory designations must be submitted in writing to the Project manager at least 24 hours before the change takes effect.
2. The person designated by the Contractor, as supervisor must remain with and effectively direct the crew by (1) making periodic inspections of the crew’s work, (2) advising them as to improper work methods, (3) providing instructions for correcting any improper work methods encountered.
3. Emergency transportation will be provided by the Contractor at all times.
WORK CAMPS:
Work camps may be established only in locations authorized in advance by the Project Manager in coordination with the Government. Should such a camp be authorized, the Contractor shall maintain the camp in an orderly and sanitary manner. Upon vacating a camp and before final payment, the Contractor shall remove all refuse and other signs of occupancy to the satisfaction of the Project Manager.
WORK HOURS:
Work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. Work hours may extend into darkness only when the contractor’s equipment is suitably outfitted with exterior lighting sufficient to allow safe operation; AND only when mutually agreed upon between the contractor and the project manager. Work may be done on Saturday, Sunday, and legal national holidays as mutually agreed between the Contractor and the Project Manager.
WORK SCHEDULE:
The work schedule shall be submitted at the pre-work conference.
DELAYS:
The contractor is expected to complete all contract performance in a timely manner, regardless of the contractor or subcontractor's other workload, including any work being performed under other state contracts. A delay or failure to perform may be considered excusable when the delay or failure arises from causes beyond the control and without the fault or negligence of the Contractor or subcontractor. Examples of these causes are (1) acts of God or of the public enemy, (2) acts of the State in either its sovereign or contractual capacity, (3) fires, (4) floods, (5) epidemics, (6) quarantine restrictions, (7) strikes, (8) freight embargoes, and (9) unusually severe weather. In each instance, the failure to perform must be beyond the control and without the fault or negligence of the Contractor or subcontractor.
Upon request of the Contractor, the Contracting Officer shall ascertain the facts and extent of the failure. If the Contracting Officer determines that any failure to perform results from one or more of the causes above, the delivery schedule may be revised, subject to the State’s contract termination rights under the contract.
Note: “Unusually severe weather” means weather that is outside the normal weather patterns for a specific area at a specific time of the year. For example, strong wind and snow storms in fall and winter, or strong wind, rain or hail storms in spring and summer are not considered unusually severe. An unusually severe snow, wind or rain storm is one that is worse than even the harshest normal conditions during a season.
PROJECT MEETINGS:
Pre-work Conference:
Location: Meetings shall be held at the project site, or as determined by the Project Manager.
Notification: A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of the meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the contract.
Attendance: The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.
Presentation: The Contractor shall be prepared to summarize and explain procedures planned for each project and present the work schedule requested in the specifications.
Progress Meetings:
Location: Meetings shall be held at the project site, or as determined by the Project Manager.
Notification: Meetings may be called by either the Project Manager or the Contractor. Request shall state who should attend.
PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA:
The Contractor agrees that should he or any of his employees in the performance of this contract discover evidence of possible scientific, pre-historical, historical, or archeological data he will notify the Project Manager immediately giving the location and nature of the findings.
Where appropriate by reason of discovery, the Project Manager may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted.
The Contractor agrees to insert this paragraph in all subcontracts, which involve the performance of work on the terrain of the site.
PROTECTION OF CULTURAL RESOURCES:
Location of known historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology, and culture, such as settler or Indian artifacts, protected by American Antiquities Act of 1906 (16 U.S.C. 431-433), National Historic Preservation Act of 1966 (16 U.S.C. 470) and the Archaeological Resources Protection Act of 1979 (16 U.S.C. 470aa-ll) (36 CFR 296.4 and 36 CFR 261.9(g)), shall be identified on the ground by the Government. The Government may unilaterally modify or cancel this contract to protect an area, object of antiquity, artifact, or similar object that is or may be entitled to protection under these Acts regardless of when the area, object, or artifact is discovered or identified. Discovery of such areas by either party shall be promptly reported to the other party and operations will be suspended at that location until the significance or potential significance of the site is determined.
The contractor shall protect all known and identified historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology, and culture against destruction, obliteration, removal, or damage during the Contractor's operations. The contractor shall immediately notify the Government if disturbance occurs to any known site, and shall immediately halt operations in the vicinity of the site until the Government authorizes the Contractor to proceed. The contractor shall bear costs of evaluation and restoration in accordance with 36 CFR 296.14(c), provided that such payment shall not relieve the Contractor from civil or criminal remedies otherwise provided by law.
NOTICE TO PROCEED:
Unless notified by the project manager that notice-to-proceed will be delayed, receipt of the contract or purchase order by email shall constitute a Notice to Proceed. The Project Manager may issue a separate delayed notice-to-proceed for any reason including adverse soil, vegetative, climatologic, or other environmental conditions.
CONTRACT PERFORMANCE:
The Contractor shall begin work within seven (7) calendar days from the effective date of the notice to proceed. The Contractor shall continue the performance of the work under the contract without delay or interruption except by causes beyond his control identified in the Delays clause. While an extended performance window is provided in this statement of work, this extended window is designed for contractors who may have multiple contracts to complete for the State of Utah at the same time as this contract. The extended performance window is not to be construed as a full performance time window just for this project unless approved in advance in writing by the State’s project manager. Once the contractor is on site working, the contractor shall work diligently and complete all work within the project performance time in the Contract Time clause below.
It is the contractor’s sole responsibility to complete contract performance regardless of the contractor’s current workload, including other state contracts. If necessary, the contractor will be expected to take whatever means are necessary to ensure timely contract performance. At the discretion of the contractor, this may include sub-contracting, additional equipment/manpower, and/or any other necessary action. Any necessary action taken by the contractor to ensure timely completion shall be at no additional expense to the State of Utah beyond the original contract price.
INSPECTION:
Surveillance Plan: The Government will inspect completed acres and provide recommendations to improve work quality while work is in progress. The Contractor is responsible for providing quality control to ensure that work complies with the contract specifications.
Final Inspection:
Location: Meeting shall be held at the project sites, or as determined by the Project Manager.
Notification: The Contractor shall notify the Project Manager at least three (3) working days before the completion date so the Government can schedule the final inspection.
Deficiencies: The Contractor shall correct deficiencies and project areas will be re-inspected by the Project Manager.
ACCEPTANCE:
Based on inspection results, if the quality level falls below contract specifications, the Project Manager will immediately notify the Contractor in writing and instruct the Contractor to improve the quality of work. If the quality of the work is not raised to an acceptable level after written notification, the Project Manager may issue a suspension work order to resolve the problem, during which time contract time will continue to run.
If untreated or unsatisfactorily treated areas are the primary reason for unsatisfactory work, the Contractor shall rework acres designated by the Government until satisfactory work quality is obtained.
PAYMENT:
One lump-sum final payment will be made for the actual number of acres completed following a final inspection of the completed project, and consistent with the payment clause in the State’s standard terms and conditions. Normally, requests for partial payments will not be considered. However, if a partial payment request is considered, approval of said request shall be at the total discretion of the State. The contractor must get a partial payment request approved in writing before submitting an invoice for partial payment. Partial payment invoices received without prior approval will be returned to the contractor as not proper for payment.
WINTER STOPPAGE:
At the sole discretion of the State and or the Federal Partner this contract may be stopped at any time due to frozen soil or other winter conditions. Once the contract work is stopped for winter, the state may pay the contractor and cancel the remaining portion of the contract, or issue a resumption of work order when spring weather permits. The contractor must proceed diligently with all work as weather permits until a stop-work order is issued.
CHANGE ORDERS:
Minor Change Order- If the State determines that a change in the Scope of Work is necessary, they may modify acreage totals or parcel configuration by up to 10% of the originally proposed Project Area by providing written notice to the Contractor (“Minor Change Order”). Issuance of a Minor Change Order does not excuse the Contractor from their obligation to perform the work under their original per-acre bid price, nor does it excuse the State from paying Contractor for work completed to project specifications. Changes in acreage or parcel configuration will add or exchange work areas with characteristics similar to those in the original Project Area. When possible, a Minor Change Order should be implemented so as to leave a consolidated and contiguous project area having similar access to that originally described in the Scope of Work.
Major Change Order- If the State determines that a change in the Scope of Work is necessary, and that change does not qualify as a Minor Change Order, the State and the Contractor may negotiate a Major Change Order as an amendment to the original contract. Examples of Major Change Orders include: (1) a reduction or cancellation of acreage that is greater than 10% of the original Project Area or (2) a change in the Project Area such that the new project characteristics are not comparable to those described in the original Scope of Work. Major Change Orders may authorize an increase in the unit price of per-acre bid submitted by the Contractor, payment of part or all of equipment mobilization costs incurred by the Contractor, or a combination of both. Any Major Change Order shall be supported by documentation supporting the equitable adjustment in contract terms and is subject to approval by the State of Utah Division of Purchasing.
Change Order Limitations- The sum of all payments made under one or more Change Orders on a single contract may not exceed the liability cap for the contract, calculated by identifying the per-acre bid price, and multiplying that figure by 10% of the acreage within the Project Area that remains untreated. For example, the maximum payment authorized under a Major Change Order would be calculated as follows:
$50 per acre bid price x (10% of 500 acres left untreated) = $2,500 Maximum or $250 per acre bid price x (10% of 1250 acres left untreated) = $31,250 Maximum
Nothing in this Section relieves the Contractor from their obligation to perform as described in Section 1, unless the State determines that a change order is appropriate. Under no circumstances may a Change Order exceed the total approved contract price. In most cases, the actual Change Order amount will be substantially less than the maximum liability cap for the contract. Nothing herein shall be construed as eliminating or modifying a Contractor’s obligation to mitigate damages they may incur due to the circumstances necessitating a Major Change Order, or the State’s right to terminate an Agreement in lieu of issuing a Change Order.
File details come from the government source that posted it. Updated .