This document is an AIA Document A101-2017 Standard Form of Agreement between Wimberley Independent School District (Owner) and an unidentified Contractor for the Wimberley ISD Softball Complex & Transportation project. The agreement is drafted for procurement as of 2026 and incorporates AIA Document A201-2017 General Conditions of the Contract for Construction by reference. The Work encompasses improvements and construction activities at the Baseball/Softball and Transportation Complex. The contract includes provisions for a date of commencement to be established, with Substantial Completion required by a date to be specified in a future draft, followed by Final Completion thirty (30) calendar days thereafter. The Contractor must provide all required payment and performance bonds and proof of insurance before commencing construction. No specific response due date, site visit requirements, or bidders' conference details are indicated in this draft agreement, as multiple provisions remain to be completed during the procurement process.
The Contract Sum is to be determined and specified in a future draft, subject to additions and deductions per the Contract Documents. Progress payments will be made monthly based on Applications for Payment submitted on AIA Form G702, with the Architect having seven business days to approve and submit Certificates for Payment. The Owner will pay certified undisputed amounts within 30 days if the Board meets twice monthly or 45 days if it meets only once monthly. A five percent (5%) retainage will be withheld from each progress payment prior to Substantial Completion, with retainage release permitted at the Owner's discretion following Substantial Completion acceptance and Board approval. Liquidated damages are set at five hundred dollars ($500.00) per day for failure to achieve Substantial Completion within Contract Time. The agreement incorporates Texas-specific requirements including compliance with the Texas Prompt Payment Act, prevailing wage rates, criminal history clearance through the FACT Clearinghouse, and various boycott and non-discrimination certifications applicable to contracts valued at $100,000 or more with ten or more full-time employees.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document A101® – 2017 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d)
ADDITIONS AND DELETIONS:
The author of this document may have revised the text of the original AIA standard form. An Additions and Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
The parties should complete A101®–2017, Exhibit A, Insurance and Bonds, contemporaneously with this Agreement. AIA Document A201®–2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified.
ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.
ADDITIONS AND DELETIONS:
The author of this document may have revised the text of the original AIA standard form. An Additions and Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
The parties should complete A101®–2017, Exhibit A, Insurance and Bonds, contemporaneously with this Agreement. AIA Document A201®–2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified.
AGREEMENT made as of the ____________ day of _________ in the year TWO
THOUSAND TWENTY-SIX (2026)
(In words, indicate day, month and year.)
BETWEEN the Owner:
(Name, legal status, address and other information)
Wimberley Independent School District, a political subdivision and public school district of the State of Texas
951 FM 2325
Wimberley, TX 78676 Phone: (512) 847-2414 and the Contractor:
(Name, legal status, address and other information)
[DRAFT FOR PROCUREMENT]
[Address] [Address continued] Phone: _____________________ Fax: _______________________ E-mail: ____________________ for the following Project:
(Name, location and detailed description)
Wimberley ISD - Softball Complex & Transportation
The Architect:
(Name, legal status, address and other information)
[Address] [Address continued] Phone: _____________________
The Owner and Contractor agree as follows.
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d)
ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.
TABLE OF ARTICLES
1 THE CONTRACT DOCUMENTS
2 THE WORK OF THIS CONTRACT
3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
4 CONTRACT SUM
5 PAYMENTS
6 DISPUTE RESOLUTION
7 TERMINATION OR SUSPENSION
8 MISCELLANEOUS PROVISIONS
9 ENUMERATION OF CONTRACT DOCUMENTS
NOTE: Any reference hereinafter this one, to an AIA™ Document or any AIA Documents included in the Contract Documents shall refer to such document “as modified for this Project”. In addition, any reference to AIA Documents shall all be considered to have included the Trademark “™” after the AIA reference, whether or not included in the text. The AIA Documents are registered intellectual property of the American Institute of Architects and use and amendment of such forms is permitted under license granted to Walsh Gallegos Trevino Kyle & Robinson P.C. for this Project. No use may be made of this AIA document other than as Contract Documents for this Project.
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d)
ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.
ARTICLE 1 THE CONTRACT DOCUMENTS
§ 1.1 The Contract Documents consist of this Agreement, General Conditions of the Contract, Supplementary Conditions and other Conditions and Project Manual to the extent they are consistent with other portions of the Contract Documents), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. The order of precedence of the Contract Documents shall be as set out in Section
1.2.4 of the AIA Document A201-2017.
§ 1.2 The Board of Trustees, by majority vote, is the only representative of the Owner, an independent school district, having the power to enter into or amend a contract, to approve changes in the scope of the Work, to approve and execute a Change Order or construction Change Directive modifying the Contract Sum, or to agree to an extension to the date of Substantial or Final Completion or to terminate a contract. The Owner designates the following as the individual authorities to sign documents on behalf of the Board of Trustees, following appropriate Board action: ________________________________ or other Board designee.
§ 1.3 The Board designates the authorized representatives identified in Paragraph 8.3 to act on its behalf in other respects.
ARTICLE 2 THE WORK OF THIS CONTRACT
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others.
ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
§ 3.1 The date of commencement of the Work shall be:
(Check one of the following boxes.)
[ ] The date of this Agreement.
[ ] A date set forth in a notice to proceed issued by the Owner.
[ X ] Established as follows:
(Insert a date or a means to determine the date of commencement of the Work.)
[DRAFT FOR PROCUREMENT]
Please note that prior to commencing construction, the Contractor must provide Owner and Architect all required payment and performance bonds and proof of insurance, in compliance with Article 11 of the AIA document A201- 2017.
If a date of commencement of the Work is not selected, then the date of commencement shall be the date of this Agreement.
§ 3.2 The Contract Time shall be measured from the date of commencement of the Work.
§ 3.3 Substantial Completion § 3.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Contractor shall achieve Substantial Completion of the entire Work:
(Check one of the following boxes and complete the necessary information.)
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d)
[ ] Not later than _____ (____) calendar days from the date of commencement of the Work.
[ X ] By the following date: [DRAFT FOR PROCUREMENT] Final Completion shall be thirty (30) calendar days after the date of Substantial Completion, subject to adjustments of the Contract Time as provided in the Contract Documents.
§ 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Contractor shall achieve Substantial Completion of such portions by the following dates:
Portion of Work Substantial Completion Date None.
§ 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, if any, shall be assessed as set forth in Section 4.5.
ARTICLE 4 CONTRACT SUM
§ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor’s performance of the Contract. The Contract Sum shall be [DRAFT FOR PROCUREMENT] ($), subject to additions and deductions as provided in the Contract Documents.
§ 4.2 Alternates § 4.2.1 Alternates, if any, included in the Contract Sum:
Item Price
[DRAFT FOR PROCUREMENT]
§ 4.2.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Agreement. Upon acceptance, the Owner shall issue a Modification to this Agreement.
(Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.)
Item Price Conditions for Acceptance
[DRAFT FOR PROCUREMENT]
§ 4.3 Allowances, if any, included in the Contract Sum:
(Identify each allowance.)
Item Price
[DRAFT FOR PROCUREMENT]
§ 4.4 Unit prices, if any:
(Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.)
Item Units and Limitations Price per Unit ($0.00)
[DRAFT FOR PROCUREMENT]
§ 4.5 Liquidated damages, if any:
(Insert terms and conditions for liquidated damages, if any.)
If the Contractor fails to achieve Substantial Completion of the Work within the Contract Time, the Owner shall be entitled to retain or recover from the Contractor and the Contractor’s surety, as liquidated damages and not as a penalty, the following per diem amounts commencing upon the first day following expiration of the Contract Time
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d) and continuing until the actual Date of Substantial Completion. Such liquidated damages are hereby agreed to be a reasonable estimate of damages the Owner will incur as a result of delayed completion of the Work: FIVE
HUNDRED DOLLARS AND 00/100 CENT ($500.00).
§ 4.6 Other:
(Insert provisions for bonus or other incentives, if any, that might result in a change to the Contract Sum.)
None.
ARTICLE 5 PAYMENTS
§ 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.
§ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month.
§ 5.1.3 The Contractor shall submit monthly Applications for Payment to the Architect not later than the last day of each month, on AIA Form G702 for approval. Continuation sheets shall be submitted on AIA Form G703. The Architect will have seven business days to approve the Contractor’s Application and submit its Certificate for Payment to the Owner. The Architect may require from the Contractor any additional information required by the Contract Documents and deemed necessary to substantiate the Application for Payment. The Owner shall pay to the Contractor, the certified undisputed amounts in the Payment Application to the Contractor not later than 30 days from the Owner’s receipt of the Certificate of Payment from the Architect if the Owner’s Board meets twice a month or more, and 45 days from the Owner’s receipt of the Certificate of Payment from the Architect if the Owner’s Board meets only once per month.
§ 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form, and supported by such data to substantiate its accuracy, as the Architect may require. This schedule of values shall be used as a basis for reviewing the Contractor’s Applications for Payment.
§ 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment.
§ 5.1.6 In accordance with AIA Document A201™–2017, General Conditions of the Contract for Construction, and subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows:
§ 5.1.6.1 The amount of each progress payment shall first include:
.1 That portion of the Contract Sum properly allocable to completed Work, as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values;
.2 If approved in advance by the Owner, that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction, or, suitably stored off the site at a location agreed upon in writing; and
.3 That portion of Construction Change Directives that the Architect determines, in the Architect’s professional judgment, to be reasonably justified.
§ 5.1.6.2 The amount of each progress payment shall then be reduced by:
.1 The aggregate of any amounts previously paid by the Owner;
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d)
.2 The amount, if any, for Work that remains uncorrected and for which the Architect has previously withheld a Certificate for Payment as provided in Article 9 of AIA Document A201–2017;
.3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier, unless the Work has been performed by others the Contractor intends to pay;
.4 For Work performed or defects discovered since the last payment application, any amount for which the Architect may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article 9 of AIA Document A201–2017, or amounts certified by the Architect and disputed by the Owner; and
.5 Retainage withheld pursuant to Section 5.1.7.
§ 5.1.7 Retainage § 5.1.7.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the following amount, as retainage, from the payment otherwise due:
(Insert a percentage or amount to be withheld as retainage from each Application for Payment. The amount of retainage may be limited by governing law.)
Five Percent (5%)
§ 5.1.7.1.1 The following items are not subject to retainage:
(Insert any items not subject to the withholding of retainage, such as general conditions, insurance, etc.)
N/A
§ 5.1.7.2 Reduction or limitation of retainage, if any, shall be as follows:
(If the retainage established in Section 5.1.7.1 is to be modified prior to Substantial Completion of the entire Work, including modifications for Substantial Completion of portions of the Work as provided in Section 3.3.2, insert provisions for such modifications.)
After the Certificate of Substantial Completion is accepted by the Owner, the Owner may, in its sole discretion and upon approval of its Board of Trustees and acceptance and consent of surety, make payment of retainage on all or a part of the Work accepted.
§ 5.1.7.3 Retainage is not due to the Contractor until thirty-one (31) days after Final Payment for the Work as set out in Section 9.10 of AIA Document A201-2017.
§ 5.1.8 [Paragraph Deleted.]
§ 5.1.9 Except with the Owner’s prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site.
§ 5.2 Final Payment § 5.2.1 Final payment, shall not be made by the Owner to the Contractor until:
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment;
.2 all conditions precedent to final payment have been fulfilled including those listed in Section 9.10.2 of the AIA Document A201–2017;
.3 Contractor has submitted a signed document indicating consent of its Surety to Final Payment; and
.4 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than thirty-one (31) days after the issuance of the Architect’s final Certificate for Payment.
§ 5.3 Interest Undisputed payments remaining unpaid under the Contract on the 31st day after the date the Owner receives a properly documented Certificate of Payment from the Architect are considered overdue and in accordance with the
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d)
Texas Prompt Payment Act, Texas Government Code Chapter 2251, shall bear interest from that date until the date that the Owner mails or electronically transmits payment, including accrued interest to that date.
ARTICLE 6 DISPUTE RESOLUTION
§ 6.1 Initial Decision Maker The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201–2017.
§ 6.2 Binding Dispute Resolution For any Claim not resolved by, mediation pursuant to Article 15 of AIA Document A201–2017, the method of binding dispute resolution shall be as follows:
(Check the appropriate box.)
[ ] Arbitration pursuant to Section 15.4 of AIA Document A201–2017
[ X ] Litigation in a court of competent jurisdiction
[ ] Other (Specify)
If the Owner and Contractor do not select a method of binding dispute resolution, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.
§ 6.3 When Owner has an applicable claim for construction defects, Owner shall comply with the provisions of Texas Government Code Chapter 2272 related to the provision of notice of defects and the Contractor’s or Architect’s opportunity to cure.
ARTICLE 7 TERMINATION OR SUSPENSION
§ 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201–2017.
§ 7.1.1 [Paragraph Deleted.]
§ 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201–2017.
ARTICLE 8 MISCELLANEOUS PROVISIONS
§ 8.1 Where reference is made in this Agreement to a provision of AIA Document A201–2017 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents.
§ 8.2 The Owner’s representative:
(Name, address, email address, and other information)
Dr. Greg Bonewald, Superintendent Wimberley Independent School District
951 FM 2325
Wimberley, TX 78676
Email: greg.bonewald@wimberleyisd.net
§ 8.3 The Contractor’s representative:
(Name, address, email address, and other information)
[DRAFT FOR PROCUREMENT]
Name: ______________________________ Title: _________________________ [Address]
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d)
[Address continued] Phone: _____________________
§ 8.4 Neither the Owner’s nor the Contractor’s representative shall be changed without ten (10) days’ prior notice to the other party.
§ 8.5 Insurance and Bonds § 8.5.1 The Owner and the Contractor shall purchase and maintain insurance as set forth in AIA Document A201™– 2017, General Conditions of the Contract for Construction, and elsewhere in the Contract Documents.
§ 8.5.2 The Contractor shall provide bonds as set forth in Article 11 of the AIA Document A201™–2017, General Conditions of the Contract of Construction, and elsewhere in the Contract Documents.
§ 8.6 Notice in electronic format, pursuant to Article 1 of AIA Document A201–2017, may be given in accordance with AIA Document E203™–2013, Building Information Modeling and Digital Data Exhibit, if completed, or in any other format agreed to by the Owner, Contractor and Architect in writing.
§ 8.7 Other provisions:
§ 8.7.1 Pursuant to Texas Government Code Chapter 2271, as amended, if this contract is valued at $100,000 or more and if the Contractor has at least ten (10) full time employees, then the Contractor, by its execution of this Agreement represents and warrants to the Owner that the Contractor does not boycott Israel and will not boycott Israel during the term of this Agreement. This section does not apply to a sole proprietorship.
§ 8.7.2 By signing this Agreement, the undersigned certifies as follows: Under Section 231.006 of the Texas Family Code, the Contractor certifies that the individual or business entity named in this Contract is not ineligible to receive the specified payments and acknowledges that this Contract may be terminated and payment withheld if this certification is inaccurate.
§ 8.7.3 Contractor verifies and affirms that it is not a foreign terrorist organization as identified on the list prepared and maintained by the Texas Comptroller of Public Accounts. If Contractor has misrepresented its inclusion on the Comptroller’s list such omission or misrepresentation will void this Agreement.
§ 8.7.4 The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Contract and the Contractor agrees that the contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter. Therefore, if the value of this Project is One Million Dollars ($1,000,000.00) or more, the Contractor agrees to : (1) preserve all contracting information related to the contract as provided by the records retention requirements applicable to the Owner for the duration of the contract; (2) promptly provide to the governmental body any contracting information related to the contract that is in the custody or possession of the entity on request of the Owner; and (3) on completion of the contract, either: (a) provide at no cost to the Owner all contracting information related to the contract that is in the custody or possession of the entity; or (b) preserve the contracting information related to the contract as provided by the records retention requirements applicable to the Owner.
§ 8.7.5 Contractor shall take all actions and shall comply with all federal, state, and local legal requirements, and shall also comply with all recommendations of the Centers for Disease Control.
§ 8.7.6 Pursuant to Texas Education Code §22.08341, Contractor shall provide all information needed by Owner to obtain criminal history record information through the Fingerprint-Based Applicant Clearinghouse of Texas ("FACT Clearinghouse"), for all of Construction Manager’s Covered Employee in accordance with the requirements of Section 3.4.5 of the AIA Document A201™–2017, General Conditions of the Contract for Construction.
§ 8.7.7 Pursuant to Texas Government Code Chapters 2274 and 809, if this contract is valued at $100,000 or more
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d) and if Contractor has at least ten (10) full-time employees, then Contractor represents and warrants to the Owner that the Contractor does not boycott energy companies and will not boycott energy companies during the term of this Agreement. This provision does not apply to sole proprietorships.
§ 8.7.8 Pursuant to Texas Government Code Chapter 2274, if this contract is valued at $100,000 or more and if Contractor has at least ten (10) full-time employees, then Contractor represents and warrants to the Owner that the Contractor does not discriminate against firearm entities or firearm trade associations and will not discriminate against firearm entities or firearm trade associations during the term of this Agreement. This provision does not apply to sole proprietorships.
§ 8.7.9 Pursuant to Texas Government Code Chapter 2273, Construction Manager represents and warrants to Owner that Construction Manager is not an abortion provider or affiliate of an abortion provider.
ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS
§ 9.1 This Agreement is comprised of the following documents:
.1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor
.2 [Intentionally Deleted.]
.3 AIA Document A201™–2017, General Conditions of the Contract for Construction
.4 [Intentionally Deleted.]
.5 Drawings. The Drawings are those prepared by ___________________dated ____________and which are listed in the Index of Drawings attached hereto as Exhibit A, which are incorporated herein by reference.
Number Title Date
.6 Specifications. The Specifications are those prepared by ___________________dated ____________ and which are listed in the Table of Contents attached hereto as Exhibit B, which are incorporated herein by reference.
Section Title Date Pages
.7 Addenda, if any:
Number Date Pages
Portions of Addenda relating to bidding or proposal requirements are not part of the Contract Documents unless the bidding or proposal requirements are also enumerated in this Article 9.
.8 Other Exhibits:
(Check all boxes that apply and include appropriate information identifying the exhibit where required.)
[ ] AIA Document E204™–2017, Sustainable Projects Exhibit, dated as indicated below:
(Insert the date of the E204-2017 incorporated into this Agreement.)
[ ] The Sustainability Plan:
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d)
Title Date Pages Not applicable.
[ ] Supplementary and other Conditions of the Contract:
Document Title Date Pages Not Applicable
NOTE: Any Supplementary Conditions or other Conditions of this Contract listed above, the Project Manual or other terms or conditions attempted to be incorporated into this Contract, which contradict or conflict with the terms of this document or the terms and conditions set out in the AIA Document A201™–2017, General Conditions of the Contract for Construction shall be void and subordinate to the terms set out in the AIA Document A201™–2017, General Conditions of the Contract for Construction.
.9 Other documents, if any, listed below:
(List here any additional documents that are intended to form part of the Contract Documents. AIA Document A201™–2017 provides that the advertisement or invitation to bid, Instructions to Bidders, sample forms, the Contractor’s bid or proposal, portions of Addenda relating to bidding or proposal requirements, and other information furnished by the Owner in anticipation of receiving bids or proposals, are not part of the Contract Documents unless enumerated in this Agreement. Any such documents should be listed here only if intended to be part of the Contract Documents.)
Exhibit A – Index of Drawings Exhibit B – Table of Contents for Specifications Exhibit C – Prevailing Wage Rate Schedule
This Agreement entered into as of the day and year first written above.
Signature
OWNER (Signature)
BY:
(Printed name and title)
Signature
CONTRACTOR (Signature)
BY:
(Printed name and title)
[Address] [Address continued] Phone: _____________________
Additions and Deletions Report for AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d)
Additions and Deletions Report for AIA® Document A101® – 2017
This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text.
Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 14:03:04 CDT on 10/14/2026.
PAGE 1:
AGREEMENT made as of the ____________ day of _________ in the year TWO THOUSAND TWENTY-SIX (2026)
Wimberley Independent School District, a political subdivision and public school district of the State of Texas
951 FM 2325
Wimberley, TX 78676
[DRAFT FOR PROCUREMENT]
[Address continued] Phone: _____________________
Wimberley ISD - Softball Complex & Transportation
[Address continued] Phone: _____________________
PAGE 2:
EXHIBIT A INSURANCE AND BONDS
ARTICLE 1 THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary, and other Conditions
NOTE: Any reference hereinafter this one, to an AIA™ Document or any AIA Documents included in the Contract Documents shall refer to such document “as modified for this Project”. In addition, any reference to AIA Documents shall all be considered to have included the Trademark “™” after the AIA reference, whether or not included in the text. The AIA Documents are registered intellectual property of the American Institute of Architects and use and amendment of such
Additions and Deletions Report for AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d) forms is permitted under license granted to Walsh Gallegos Trevino Kyle & Robinson P.C. for this Project. No use may be made of this AIA document other than as Contract Documents for this Project.
PAGE 3:
ARTICLE 1 THE CONTRACT DOCUMENTS
§ 1.1 The Contract Documents consist of this Agreement, General Conditions of the Contract, Supplementary Conditions and other Conditions and Project Manual to the extent they are consistent with other portions of the Contract Documents), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. The order of precedence of the Contract Documents shall be as set out in Section 1.2.4 of the AIA Document A201-2017.
§ 1.2 The Board of Trustees, by majority vote, is the only representative of the Owner, an independent school district, having the power to enter into or amend a contract, to approve changes in the scope of the Work, to approve and execute a Change Order or construction Change Directive modifying the Contract Sum, or to agree to an extension to the date of Substantial or Final Completion or to terminate a contract. The Owner designates the following as the individual authorities to sign documents on behalf of the Board of Trustees, following appropriate Board action: ________________________________ or other Board designee.
§ 1.3 The Board designates the authorized representatives identified in Paragraph 8.3 to act on its behalf in other respects.
[ x ] Established as follows:
[DRAFT FOR PROCUREMENT]
Please note that prior to commencing construction, the Contractor must provide Owner and Architect all required payment and performance bonds and proof of insurance, in compliance with Article 11 of the AIA document A201-2017.
[ ] Not later than _____ (____) calendar days from the date of commencement of the Work.
[ X ] By the following date: [DRAFT FOR PROCUREMENT]
PAGE 4:
Final Completion shall be thirty (30) calendar days after the date of Substantial Completion, subject to adjustments of the Contract Time as provided in the Contract Documents.
None.
§ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor’s performance of the Contract. The Contract Sum shall be [DRAFT FOR PROCUREMENT] ($), subject to additions and deductions as provided in the Contract Documents.
[DRAFT FOR PROCUREMENT]
[DRAFT FOR PROCUREMENT]
Additions and Deletions Report for AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d)
If the Contractor fails to achieve Substantial Completion of the Work within the Contract Time, the Owner shall be entitled to retain or recover from the Contractor and the Contractor’s surety, as liquidated damages and not as a penalty, the following per diem amounts commencing upon the first day following expiration of the Contract Time and continuing until the actual Date of Substantial Completion. Such liquidated damages are hereby agreed to be a reasonable estimate of damages the Owner will incur as a result of delayed completion of the Work: FIVE HUNDRED DOLLARS AND 00/100 CENT ($500.00).
PAGE 5:
.4For Work performed or defects discovered since the last payment application, any amount for which the Architect may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article 9 of AIA Document A201– 2017, or amounts certified by the Architect and disputed by the Owner; and
None.
§ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows:.
§ 5.1.3 Provided that an ApplicationThe Contractor shall submit monthly Applications for Payment is received byto the Architect not later than the last day of aeach month, the Owner shall make payment of the amount certified to the Contractor not later than the day of the month. If an Application for Payment is received by the Architect after the application date fixed above, payment of the amount certified shall be made by the Owner not later than ( ) days after the Architect receives the Application for Payment.
(Federal, state or local laws may require payment within a certain period of time.)on AIA Form G702 for approval.
Continuation sheets shall be submitted on AIA Form G703. The Architect will have seven business days to approve the Contractor’s Application and submit its Certificate for Payment to the Owner. The Architect may require from the Contractor any additional information required by the Contract Documents and deemed necessary to substantiate the Application for Payment. The Owner shall pay to the Contractor, the certified undisputed amounts in the Payment Application to the Contractor not later than 30 days from the Owner’s receipt of the Certificate of Payment from the Architect if the Owner’s Board meets twice a month or more, and 45 days from the Owner’s receipt of the Certificate of Payment from the Architect if the Owner’s Board meets only once per month.
.1That portion of the Contract Sum properly allocable to completed Work, as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values;
.2ThatIf approved in advance by the Owner, that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction, or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing; and
PAGE 6:
Five Percent (5%)
N/A
After the Certificate of Substantial Completion is accepted by the Owner, the Owner may, in its sole discretion and upon approval of its Board of Trustees and acceptance and consent of surety, make payment of retainage on all or a part of the Work accepted.
§ 5.1.7.3 Except as set forth in this Section 5.1.7.3, upon Substantial Completion of the Work, the Contractor may submit an Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant to this Section
5.1.7. The Application for Payment submitted at Substantial Completion shall not include retainage as follows:
(Insert any other conditions for release of retainage upon Substantial Completion.)
Additions and Deletions Report for AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d)
§ 5.1.8 If final completion of the Work is materially delayed through no fault of the Contractor, the Owner shall pay the Contractor any additional amounts in accordance with Article 9 of AIA Document A201–2017.Retainage is not due to the Contractor until thirty-one (31) days after Final Payment for the Work as set out in Section 9.10 of AIA Document A201- 2017.
§ 5.1.8 [Paragraph Deleted.]
§ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shallshall not be made by the Owner to the Contractor whenuntil:
.1the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2all conditions precedent to final payment have been fulfilled including those listed in Section 9.10.2 of the AIA Document A201–2017;
.3 Contractor has submitted a signed document indicating consent of its Surety to Final Payment; and
.24 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30thirty-one (31) days after the issuance of the Architect’s final Certificate for Payment, or as follows:.
Payments due andUndisputed payments remaining unpaid under the Contract shall bear interest fromon the 31st day after the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located.
(Insert rate of interest agreed upon, if any.)
PAGE 7:
%the Owner receives a properly documented Certificate of Payment from the Architect are considered overdue and in accordance with the Texas Prompt Payment Act, Texas Government Code Chapter 2251, shall bear interest from that date until the date that the Owner mails or electronically transmits payment, including accrued interest to that date.
The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201–2017, unless the parties appoint below another individual, not a party to this Agreement, to serve as the Initial Decision Maker..
(If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.)
For any Claim subject to, but not resolved by, mediation pursuant to Article 15 of AIA Document A201–2017, the method of binding dispute resolution shall be as follows:
[ x ] Litigation in a court of competent jurisdiction
§ 6.3 When Owner has an applicable claim for construction defects, Owner shall comply with the provisions of Texas Government Code Chapter 2272 related to the provision of notice of defects and the Contractor’s or Architect’s opportunity to cure.
§ 7.1.1 If the Contract is terminated for the Owner’s convenience in accordance with Article 14 of AIA Document A201– 2017, then the Owner shall pay the Contractor a termination fee as follows:
(Insert the amount of, or method for determining, the fee, if any, payable to the Contractor following a termination for the Owner’s convenience.)
Additions and Deletions Report for AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:03:04 CDT on 10/14/2026 under Subscription No.20250116623 which expires on 04/25/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6acfd0e5d97d09022d30cc7d)
[Paragraph Deleted.]
Dr. Greg Bonewald, Superintendent Wimberley Independent School District
951 FM 2325
Wimberley, TX 78676
Email: greg.bonewald@wimberleyisd.net
PAGE 8:
Name: ______________________________ Title: _________________________ [Address] [Address continued] Phone: _____________________
§ 8.4 Neither the Owner’s nor the Contractor’s representative shall be changed without ten (10) days’ prior notice to the other party.
§ 8.5.1 The Owner and the Contractor shall purchase and maintain insurance as set forth in AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum, Exhibit A, Insurance and BondsA201™–2017, General Conditions of the Contract for Construction, and elsewhere in the Contract Documents.
§ 8.5.2 The Contractor shall provide bonds as set forth in Article 11 of the AIA Document A101™–2017 Exhibit AA201™– 2017, General Conditions of the Contract of Construction, and elsewhere in the Contract Documents.
§ 8.7.1 Pursuant to Texas Government Code Chapter 2271, as amended, if this contract is valued at $100,000 or more and if the Contractor has at least ten (10) full time employees, then the Contractor, by its execution of this Agreement represents and warrants to the Owner that the Contractor does not boycott Israel and will not boycott Israel during the term of this Agreement. This section does not apply to a sole proprietorship.
§ 8.7.2 By signing this Agreement, the undersigned certifies as follows: Under Section 231.006 of the Texas Family Code, the Contractor…