This Addendum No. 1 document, dated October 29, 2026, provides modifications to the construction contract documents for the Wimberley Independent School District (WISD) Baseball/Softball Complex and Transportation project located in Wimberley, Texas. The addendum updates specifications and drawings across multiple divisions including civil, landscape, and architectural work. Key modifications include revised limits of construction, addition of four parking stalls, a concrete sidewalk ramp with handrail, removal of bus parking striping, revised grading plans, updated landscape plant schedule quantities, removal of five lockers in one area with revised layout of remaining lockers, and revised interior elevations. The project scope encompasses a 3,250-square-foot building with associated site improvements including parking, sidewalks, storm drainage, landscaping, and utilities. Competitive sealed proposals are due December 17, 2026, at 2:00 PM, with a non-mandatory pre-proposal meeting scheduled for November 19, 2026, at 2:00 PM at the Wimberley ISD Administration Building. The anticipated substantial completion date is February 1, 2028, with a start date of May 1, 2027. All inquiries must be submitted in writing by December 1, 2026, at 4:00 PM, and only questions answered through formal written addenda will be considered official and binding.
The estimated total project budget is $2,300,000 in 2026 dollars. Proposers will be evaluated based on six criteria: pricing proposal (50 points), firm's experience and reputation as a contractor (15 points), experience on similar projects (10 points), proposed personnel and team experience (15 points), financial capability (5 points), and safety record and claims/litigation history (5 points). Proposals must include a proposal security in the form of a certified check, cashier's check, or proposal bond equal to not less than ten percent of the greatest amount proposed. The selected contractor will be required to provide performance bonds and payment bonds, each equal to 100 percent of the contract sum, with prevailing wage rates applicable per Texas Government Code Chapter 2258. The project is funded through the District's 2025 Bond Program. Proposers must submit proposals through the District's Procurement Portal at https://wimberleyisd.bonfirehub.com/portal/?tab=openOpportunities, with hard copy submissions directed to the Wimberley ISD Central Administration Building. The design professional is O'Connell Robertson, with project manager Rachel Toronjo.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum
Wimberley ISD Baseball | Softball Complex & Transportation Addendum No. 1
Wimberley, TX Page 1 of 3
O’Connell Robertson Project No. 2525.05
Addendum No. 1
Date: 10/29/2026
Wimberley ISD Baseball | Softball
Complex & Transportation
Wimberley, Texas
Notice To Bidders
A. This Addendum shall be considered part of the Contract Documents dated August 12, 2026, for the above-mentioned project, as though it had been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original Construction Documents, this Addendum shall govern and take precedence.
B. Bidders are hereby notified that they shall make necessary adjustments in their estimates on account of this Addendum. It will be construed that each bidder’s proposal is submitted with full knowledge of all modifications and supplemental data specified herein. Please staple in the back of your specification book.
REMINDER: All inquiries are due in writing by December 1st, 2026 at 4:00 PM.
11/09/2026
Wimberley, TX Page 2 of 3
SPECIFICATIONS
Sections itemized below are attached to this Addendum.
Replace previously issued sections in entirety with those issued herewith.
*Indicates new specification section
ITEM 1 Section 00 10 00 – Table of Contents
ITEM 2 *Bid Package 4 – Request for Competitive Sealed Proposals for Bid Package 4
Baseball | Softball Complex and Transportation
ITEM 3 *Bid Package 4 – Attachment A – Wimberley ISD – SB Complex &
Transportation - A101-2017
ITEM 4 *Bid Package 4 – Attachment B – Wimberley ISD – SB Complex &
Transportation - AIA A201
DRAWINGS
Drawing Sheets itemized below are attached to this Addendum.
Replace previously issued Drawing Sheet in entirety with those issued herewith.
*Indicates new Drawing Sheet.
LIFE SAFETY:
ITEM LS1 Sheet LS1.1 - CODE INFORMATION
A. UPDATED TABS number.
CIVIL:
ITEM C1 Sheet C1.01 – EXISTING CONDITIONS AND DEMOLITION PLAN A. ADD: Demo existing sidewalk and curb
ITEM C2 Sheet C2.00 – OVERALL SITE AND PAVING PLAN
A. REVISE limits of construction B. REVISE limits and layout of pavement C. ADD: 4 parking stalls D. ADD: Concrete sidewalk ramp with handrail.
E. REVISE: bus parking striping removed.
Wimberley, TX Page 3 of 3
ITEM C3 Sheet C3.00 – EROSION CONTROL PLAN A. REVISE limits of construction
ITEM C4 Sheet C4.00 – STORM AND GRADING PLAN
A. REVISE Grading of North pavement addition B. ADD: Grading for new sidewalk ramp to existing building
LANDSCAPE:
ITEM L1 Sheet LA0.01 – LANDSCAPE NOTES, DETAILS, & SCHEDULES
A. REVISED plant schedule quantities.
ITEM L2 Sheet LA1.00 – LANDSCAPE PLAN
A. REVISED backgrounds capturing civil revisions.
B. REVISED sod/ seed in disturbed areas.
ARCHITECTURAL:
ITEM A1 Sheet A1.1 - ARCHITECTURAL SITE PLAN
A. REVISED background capturing CIVIL revisions.
ITEM A2 Sheet A3.0 - BASEBALL SOFTBALL FLOOR PLAN
A. REMOVED five (5) lockers in 02A.
B. REVISED layout of remaining lockers in 02A.
C. REVISED location of bench.
ITEM A3 Sheet A10.1 - ROOM FINISH PLAN/INTERIOR ELEVATIONS
A. REVISED layout per A3.0.
B. REVISED interior elevation per layout changes.
ATTACHMENTS
• Drawings and specifications listed above o Attachments A & B are separate files
END OF ADDENDUM NO. 1
ADD01 WIMBERLEY ISD BASEBALL | SOFTBALL
OCTOBER 29, 2026 COMPLEX & TRANSPORTATION
PROJECT NO. 2525.05
TABLE OF CONTENTS 00 10 00 - 1/5
TABLE OF CONTENTS
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 07 Seals Page 00 10 00 Table of Contents 00 31 32 Geotechnical Data 00 31 32a Geotechnical Report Bid Package 4 Request for Competitive Sealed Proposals for Bid Package 4 Baseball | Softball Complex and Transportation Attachment A – Wimberley ISD – SB Complex & Transportation - A101-2017 Attachment B – Wimberley ISD – SB Complex & Transportation - AIA A201
DIVISION 01 GENERAL REQUIREMENTS
01 10 00 Summary 01 25 00 Substitution Procedures Substitution Request Form-Bidding Phase Substitution Request Form-Executed Contract 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 32 33 Photographic Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 43 39 Mockups 01 45 23 Concrete In-Situ Relative Humidity and Ph Testing 01 45 29 Testing Laboratory Services 01 50 00 Temporary Facilities and Controls 01 50 10 Temporary Project Identification Signage 01 60 00 Product Requirements 01 73 00 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents 01 79 00 Demonstration and Training 01 91 00 Commissioning
DIVISION 02 EXISTING CONDITIONS
02 41 13.13 Removal of Existing Concrete
DIVISION 03 CONCRETE
03 10 00 Concrete Forming and Accessories 03 20 00 Concrete Reinforcing 03 30 00 Cast-in-place Concrete 03 35 43 Polished Concrete Finishing
DIVISION 04 MASONRY
04 20 00 Unit Masonry
TABLE OF CONTENTS 00 10 00 - 2/5
04 20 10 Structural Unit Masonry
DIVISION 05 METALS
05 12 00 Structural Steel Framing 05 21 00 Steel Joist Framing 05 31 23 Steel Roof Decking 05 50 00 Metal Fabrications
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry 06 41 16 Plastic-laminate-faced Architectural Cabinets
DIVISION 07 THERMAL AND MOISTURE PREVENTION
07 14 16 Cold Fluid-applied Waterproofing 07 21 00 Thermal Insulation 07 26 00 Under Slab Vapor Barriers 07 27 26 Fluid-Applied Membrane Air Barriers 07 41 13.16 Standing-Seam Metal Roof Panels 07 42 13.13 Formed Metal Soffit Panels 07 62 00 Sheet Metal Flashing and Trim 07 72 00 Roof Accessories 07 84 00 Firestopping Systems 07 84 00a Firestopping Systems Schedule 07 92 00 Joint Sealants
DIVISION 08 OPENINGS
08 11 13 Standard Steel Doors and Frames 08 14 16 Flush Wood Doors 08 31 13 Access Doors and Frames 08 41 13 Aluminum-Framed Entrances and Storefronts 08 71 00 Door Hardware 08 80 00 Glazing
DIVISION 09 FINISHES
09 22 16 Non-Structural Metal Framing 09 29 00 Gypsum Board 09 30 00 Tiling 09 51 13 Acoustical Panel Ceilings 09 65 13 Resilient Base and Accessories 09 67 23.19 Resinous Flooring (Toilet Room, Shower) 09 91 13 Exterior Painting 09 91 23 Interior Painting 09 96 00 High-Performance Coatings – Thermal Coating
TABLE OF CONTENTS 00 10 00 - 3/5
DIVISION 10 SPECIALTIES
10 11 00 Visual Display Units 10 14 19 Dimensional Letter Signage 10 14 23 Panel Signage 10 21 13.19 Plastic Toilet Compartments 10 28 00 Toilet and Bath Accessories 10 44 13 Fire Protection Cabinets 10 44 16 Fire Extinguishers 10 45 00 Automated External Defibrillator Cabinets 10 51 29 Phenolic Lockers 10 73 43 Manufactured Aluminum Canopies
(DIVISION 11 EQUIPMENT – NOT USED)
DIVISION 12 FURNISHINGS
12 24 13 Roller Window Shades 12 36 61.16 Solid Surfacing Countertops
(DIVISION 13 THROUGH DIVISION 14 – NOT USED)
(DIVISION 21 FIRE SUPPRESSION – NOT USED)
DIVISION 22 PLUMBING
22 00 01 Basic Plumbing Requirements 22 05 29 Hangers and Supports for Plumbing Piping and Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 07 00 Plumbing Insulation 22 11 00 Facility Water Distribution 22 13 00 Facility Sanitary Sewerage 22 33 00 Electric Domestic Water Heaters 22 40 00 Plumbing Fixtures
DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING
23 00 01 Basic HVAC Requirements 23 05 13 Common Motor Requirements for HVAC Equipment 23 05 29 Hangers and Supports for HVAC 23 05 48 Vibration Controls for HVAC Piping and Equipment 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting and Balancing for HVAC 23 07 00 HVAC Insulation 23 09 23 Building Automation Systems for HVAC 23 21 13 Hydronic Piping and Valves 23 23 00 Refrigerant Piping 23 31 00 HVAC Ducts and Casings 23 33 00 Air Duct Accessories 23 34 00 HVAC Fans 23 37 00 Air Outlets and Inlets 23 40 00 HVAC Air Cleaning Devices 23 81 26 Split-System Air Conditioners and Heat Pumps
TABLE OF CONTENTS 00 10 00 - 4/5
(DIVISION 25 INTEGRATED AUTOMATION – NOT USED)
DIVISION 26 ELECTRICAL
26 00 01 Basic Electrical Requirements 26 05 03 Equipment Wiring Connections 26 05 19 600-Volt Building Wire and Cable
DIVISION 26 ELECTRICAL – CONTINUED
26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceway Systems 26 05 43 Underground Ducts and Raceways for Electrical Systems 26 05 53 Identification for Electrical Systems 26 05 73 Short Circuit/Coordination Study and Arc Flash Hazard Study 26 08 00 Commissioning of Electrical 26 22 13 Low-Voltage Transformers 26 24 16 Panelboards 26 27 13 250- & 600-Volt Fuses 26 27 26 Wiring Devices 26 28 16 Enclosed Switches and Circuit Breakers 26 29 16 Enclosed Contactors 26 43 13 Surge Protective Devices 26 51 16 Interior Lighting 26 56 16 Exterior Lighting
DIVISION 27 COMMUNICATIONS
27 00 00 General Technology Requirements 27 05 00 Communications General Requirements 27 05 26 Grounding and Bonding for Communications Systems 27 05 28 Pathways for Technology Systems 27 05 37 Firestopping for Technology Systems 27 11 00 Communications Equipment Rooms 27 13 00 Communications Backbone Cabling 27 13 23 Interbuilding OSP Pathways 27 15 00 Communications Horizontal Cabling 27 40 00 AV Multimedia General Requirements 27 41 00 Audio Visual Systems 27 51 13 Paging System 27 53 13 Synchronized Clock Systems 27 60 00 Physical Security General Requirements 27 62 00 Electronic Access Control System 27 64 00 Video Surveillance System
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
28 46 00 Fire Detection and Alarm (NEW)
TABLE OF CONTENTS 00 10 00 - 5/5
DIVISION 31 EARTHWORK
31 10 00 Site Clearing 31 20 00 Earth Moving 31 23 00 Excavation Embankment 31 23 33 Excavation Trenching and Backfill 31 25 13 Erosion and Sedimentation Control Erosion
DIVISION 32 EXTERIOR IMPROVEMENTS
32 11 14 Flexible Base Crushed Limestone 32 11 16 Subgrade Preparation and Compaction 32 11 29.02 Rolling 32 12 16 Hot Mix Asphaltic Concrete Pavement 32 13 00 Site Concrete 32 16 13.01 Concrete Sidewalk 32 17 23 Pavement Markings 32 31 13 Chain Link Fences 32 31 19 Decorative Metal Fences and Gates
DIVISION 33 UTILITIES
33 11 00 Water Utility Distribution 33 16 13 Concrete Curb and Gutter 33 26 30 Polyvinyl Chloride Pipe Storm Drains 33 31 00 Sanitary Utility Sewerage 33 41 00 Storm Utility Drainage
END OF DOCUMENT
REQUEST FOR COMPETITIVE SEALED
PROPOSALS FOR
BID PACKAGE 4 – BASEBALL | SOFTBALL
COMPLEX & TRANSPORTATION
CSP# CSP-MD-2627-P4
WIMBERLEY INDEPENDENT SCHOOL DISTRICT
Dr. Greg Bonewald, Superintendent of Schools
WISD –CSP Bid Package
WIMBERLEY INDEPENDENT SCHOOL DISTRICT
REQUEST FOR COMPETITIVE SEALED PROPOSALS
BID PACKAGE 4 BASEBALL / SOFTBALL AND TRANSPORTATION
PROJECTS NO.: CSP# CSP-MD-2627-P4
Date: November 10, 2026
NOTICE TO PROPOSERS:
The Wimberley Independent School District (“District” or “WISD” or “Owner”) is seeking general contractors and requesting proposals (“Proposal”) through a Competitive Sealed Proposal procurement method (“CSP”) pursuant to Texas Government Code Chapter 2269, Subchapter D, Sec. 2269.152, et. seq. for the following project(s):
Bid Package 4 – Baseball | Softball Complex & Transportation
Hereinafter referred to as “Project(s).”
Information regarding this procurement and the Project is described further below.
General Information:
PROPOSALS DUE: 2:00 PM CST on December 17, 2026
COMPETITIVE SEALED PROPOSALS FOR:
Bid Package 4 – Baseball | Softball Complex & Transportation
The evaluation criteria specified herein will be used to determine which Proposal represents the best value for the District. The District reserves the right to request additional information. The
District reserves the right to accept or reject any or all responses, to waive all technicalities, and to accept the proposal(s) that are determined to represent the best value for the District.
By providing a Proposal, each firm agrees to waive any claim it has or may have against the
District, its Trustees, agents and employees, and any reference sources, arising out of or in connection with the administration, evaluation, or recommendation of any Proposal; waiver of any requirements in the Proposal package, acceptance or rejection of any Proposal and award of a contract. The ranking/selection of the proposed Proposal(s) will be presented to the Board, and the Board may delegate authority to Administration to negotiate, finalize, and execute a contract.
Proposals and the pricing therein must be held open for ninety (90) days following the deadline for receipt of the Proposals.
INSTRUCTION TO PROPOSERS
I. General Information
1. Pursuant to the provisions of the Texas Government Code Ch. 2269 it is the intent of the District to select a contractor through a Competitive Sealed Proposal method for the Project described above.
2. This Project is part of the District’s 2025 Bond Program. The District will evaluate and provide an advisory ranking to the Board for consideration and approval based on the criteria set out herein.
3. The estimated construction budget for the Project scope is described in the preliminary project description in Attachment 1. The plans and specifications for this project will also be provided in a separate file due to file size. The construction budget presented is approximate and is presented in 2026 dollars.
4. ANTICIPATED SELECTION SCHEDULE
Item Date
1st Advertisement November 10, 2026
2nd Advertisement November 17, 2026
Non-Mandatory Pre-Proposal Meeting November 19, 2026 at 2:00 PM
Request for Information/Clarification from
Proposers
December 1, 2026 at 4:00 PM
Addenda to Respond to RFIs to Proposers December 9, 2026
Proposals Due (Proposal Opening shortly thereafter) December 17, 2026 at 2:00 PM
Proposal Tabulation & Recommendation of Award January 5, 2027
Board Meeting January 11, 2027 at 6:00 PM
4. Design Professional. The design professional for the project(s) is:
Oconnell Robertson
Project Manager-Rachel Toronjo
811 Barton Springs Rd, Suite 900
Austin, TX 78704
Phone: 512-478-7286
Email: rtoronjo@oconnellrobertson.com
5. Scope of Work: As part of the required services, the selected Contractor will construct the project(s) herein described. Please refer to form of agreement included in
Attachment 2 regarding services for the project.
6. Pre-Proposal Meeting: There will be a non-mandatory Pre-Proposal Meeting on
November 19, 2026 at 2:00 PM; however, attendance is strongly encouraged.
Interested parties will meet at the following location:
Wimberley ISD Administration Building
951 FM 2325
Wimberley, Texas 78676.
Verbal questions or inquiries will not be accepted or considered binding. Only information provided through a formal addendum issued by the District shall be considered official and binding. Representatives of the Architect/Engineer and possible
Owner will be present at this meeting. All Proposers are strongly encouraged to attend.
7. Questions/Request for Clarification: It is strongly encouraged that all questions be submitted through the District’s Procurement Portal
(https://wimberleyisd.bonfirehub.com/portal/?tab=openOpportunities). Questions regarding this invitation can also be submitted in writing to:
Wimberley ISD Administration Building
Attn: Mike Doyle, CFO
WISD Administration Building, 951 FM 2325, Wimberley, TX. 78676
Phone: 512-847-2414 EXT. 2013
Email: michael.doyle@wimberleyisd.net
Requests for information/interpretation must be received by December 1, 2026 at 4:00
PM. Only questions answered by formal written addenda will be posted on the District
Procurement Portal
(https://wimberleyisd.bonfirehub.com/portal/?tab=openOpportunities).
It is the responsibility of each Proposer to obtain all addenda that pertains to this
Proposal package. Failure to receive such addenda does not relieve Proposer from any obligation under any proposal submitted. All formal written addenda become a part of the procurement documents.
8. Deadline, Location, and Form: Proposals must be received no later than December
17, 2026 at 2:00 PM. Late responses will not be considered. It is strongly encouraged that all questions be submitted through the District’s Procurement Portal
(https://wimberleyisd.bonfirehub.com/portal/?tab=openOpportunities). In-person submissions can also be made to the District’s administrative offices at:
Wimberley ISD, Central Administration Building, 951 Farm to Market Rd 2325, Wimberley, TX 78676.
The Owner will not acknowledge or receive Proposals that are delivered by telephone, mail, hardcopy, or facsimile (fax). It is the sole responsibility of submitting firms to ensure timely receipt of the Proposal package response and to properly label the documents.
https://wimberleyisd.bonfirehub.com/portal/?tab=openOpportunities
Proposals should be labeled as follows:
CSP NO: CSP-MD-2627-P4
WIMBERLEY ISD - REQUEST FOR COMPETITIVE SEALED
PROPOSALS FOR BID PACKAGE 4 – Baseball | Softball Complex &
Transportation
DO NOT OPEN UNTIL December 17, 2026 at 2:00 PM.
Proposals submitted prior to the above deadline may be modified provided such modifications are sealed and received at the designated location, prior to the time and date set for Proposals. Proposals received after the deadline will NOT be accepted and will be returned unopened to the Proposer. Proposals will not be returned to Proposer.
Information submitted by Proposers in response to this Proposal package shall become the property of the Owner.
A proposal may be withdrawn only upon request by the Proposer or duly authorized representative, provided such request is received by the Owner at the place designated for receipt of proposals and prior to the time fixed for the opening of Proposals.
Proposals will be publicly opened and read immediately following the deadline for receiving the Proposal at Wimberley ISD Administration Building, 951 FM 2325, Wimberley, Texas 78676. It is strongly encouraged that questions about the procedure be submitted through the District’s Procurement Portal
(https://wimberleyisd.bonfirehub.com/portal/?tab=openOpportunities). Questions can also be submitted in writing to: Mr. Mike Doyle, CFO, michael.doyle@wimberleyisd.net, 512-847-2414. Any Proposal received later than the specified time shall be disqualified.
9. District Point-of-Contact. Point of Contact/Restrictions on Communication. The District designates the following person as its representative and Point-of-Contact for this CSP:
Mr. Mike Doyle
Chief Financial Officer, WISD
Wimberley ISD Administration Building
Business Office
951 FM 2325
Wimberley, TX 78676
Phone: 512-847-2414 ext. 2013
Email: michael.doyle@wimberleyisd.net
In order to ensure the integrity of the selection process, Proposer’s employees, officers, agents, or other representatives shall not lobby or attempt to influence a vote or recommendation related to the Proposer’s response, directly or indirectly, through any contact with school board members, other District officials or employees from the date this
Proposal package is released until a contract is executed. This Proposal package is subject to cancellation by the District if any person significantly involved in initiating, negotiating, securing, drafting, or creating the offer on behalf of District, is at any time while the https://wimberleyisd.bonfirehub.com/portal/?tab=openOpportunities mailto:michael.doyle@wimberleyisd.net mailto:michael.doyle@wimberleyisd.net
Proposal package is in effect, an employee of any other party to the Proposal package in any capacity or a consultant to any other party of the Proposal package with respect to the subject matter of the Proposal package.
10. Public Information. The District fully complies with the Texas Public Information Act.
During the course of the selection process any Proposal is exempt from disclosure to the public under the Texas Public Information Act. The submitted Proposals will, upon the award of the contract, become a public record; and therefore, subject to disclosure to any person who makes a proper request for review of the documents. Some of the information you may provide in your submitted Proposal may contain commercial or financial information which you consider privileged or confidential or may be of a nature which you feel may cause substantial competitive harm to your business if disclosed by the District to a third-party even after the award. You may be entitled to protect this information at the time a request is made for disclosure; however, you will need to consult your legal counsel to assure that this kind of information, if included in your Proposal, is properly marked as confidential prior to submission of your Proposal. Wholesale marking of your entire
Proposal “Confidential” or “Proprietary” will not be effective. The District fully complies with the Texas Public Information Act. In the event information from your Proposal is requested, the District will use its best efforts to notify the Proposer of such request but will have no duty to assert any claim to the Attorney General regarding that the Proposal or any parts of the Proposal are not subject to disclosure under the Act.
11. Owner’s Reservation of Rights. The Owner reserves the right to divide the Project into multiple parts, to reject any and all Proposals and re-solicit for new Proposals, or to reject any and all Proposals and temporarily or permanently abandon the Project. Owner makes no representations, written or oral, that it will enter into any form of agreement with any
Proposer to this CSP Proposal package for any project and no such representation is intended or should be construed by the issuance of this CSP Proposal package.
12. Proposers are expected to examine this CSP Proposal package carefully, understand the terms and conditions for providing the services listed herein and respond completely.
FAILURE TO COMPLETE AND PROVIDE ANY OF THE REQUIRED
INFORMATION AND/OR FORMS MAY RESULT IN THE PROPOSER’S PROPOSAL
BEING DEEMED NON-RESPONSIVE AND THEREFORE DISQUALIFIED FROM
CONSIDERATION.
II. Contents of Proposal
Please refer to Exhibits A – H, attached hereto for the full Proposal and required forms.
Proposers are required to submit all required forms attached as Exhibits A-H and submit those with their Proposal by the deadline.
III. Method of Selection.
The Proposals will be evaluated and ranked on the basis of the following criteria:
1. Firm’s Pricing Proposal (50 points)
2. Firm’s Experience and Reputation as a Contractor – (15 points)
3. Firm’s Experience on Projects of Similar Size and Scope – (10 points)
4. Firm’s Proposed Personnel and Team Experience – (15 points)
5. Firm’s Financial capability is appropriate to the size and scope of the project (5 points)
6. Firm’s Safety Record and Claims/Litigation (5 points)
Total Points: (100 points/100 points)
By submitting its Proposals in response to this Request, the Proposer accepts the evaluation process and methodology, and further, acknowledges and accepts that determination of the “best value” offeror will require subjective judgments by the District.
All properly submitted Proposals will be reviewed, evaluated, and ranked by an advisory
Evaluation Committee. The evaluation of the Proposals shall be based on the criteria and weight of the criteria provided above. An advisory ranking will then be presented to the Board of Trustees at the next possible Board Meeting after completion of the evaluation for approval, and if approved, the Board is anticipated to delegate the negotiation and execution of the Contract to
Administration.
Proposer acknowledges and accepts that any costs incurred from the Proposer’s participation in this CSP process shall be at the sole risk and responsibility of the Proposer.
IV. Form of Agreement
The District intends to use a form of AIA Document, as modified by Owner. Copies of the form of agreement are included with this CSP in a separate file for review (See Attachment 2). Proposers are strongly encouraged to review the contract in detail before providing their Proposal.
Please note that a Payment Bond and Performance Bond, each in an amount equal to 100% of the
Contract Sum conditioned upon the faithful performance of the Contract, will be required. Please note that all bonding companies presented must be acceptable to the owner.
Proposers are advised that the Texas Prevailing Wage Law will be administered in accordance with the General Conditions provided. A copy of the Prevailing Wage Rates for this project are included in Attachment 2. The construction of this Project is subject to Chapter 2258 of the Texas
Government Code. Among other things, this Chapter provides that it shall be mandatory for a
Contractor and upon any subcontractor under him to pay not less than the prevailing rates of per diem wages in the locality at the time of construction to all laborers, workmen, and mechanics employed by them in the execution of the contract.
V. SUBSTITUTIONS OF MATERIALS AND EQUIPMENT
The materials, products and equipment described in the Construction Documents establish a standard of required function, dimension, appearance and quality to be met by any proposed substitution. The materials and equipment named in, and the procedures covered by these specifications have been selected as a standard because of quality, particular suitability or record of satisfactory performance. It is not intended to preclude the use of equal or better materials or equipment provided that same meets the requirements of the particular project and is approved in an addendum as a substitution prior to the submission of proposals. Each such request shall include the name of the material or equipment for which it is to be substituted and a complete description of the proposed substitute including drawings, cuts, performance and test data and any other information necessary for an evaluation. The Architect/Engineer’s decision of approval or disapproval of a proposed substitution shall be final. If the Architect/Engineer approves any proposed substitution prior to receipt of proposals, such approval will be set forth in an Addendum. Proposers shall not rely upon approvals made in any other manner.
VI. PROPOSAL SECURITY
No proposal will be considered unless it is accompanied by a Certified or Cashier's Check or
Proposal/Proposal Bond executed on the form attached. In either case the amount shall be not less than ten percent (10%) of the greatest amount proposed (considering alternates, if any). The proposal security shall insure the execution of the contract and the furnishing of an acceptable
Performance Bond and Payment Bond by the successful Offeror within ten (10) days after notification of award to such Offeror and that this proposal will not be withdrawn within ninety
(90) days after date of opening of proposals without the consent of the Owner. Proposal Bond shall be prepared in the identical form of AIA Document A310-2010 Proposal Bond.
ATTACHMENT 1
PROJECT SCOPE AND DETAILS
WIMBERLEY INDEPENDENT SCHOOL DISTRICT
BID PACKAGE 4 – Baseball | Softball Complex & Transportation
CSP-MD-2627-P4
A copy of the Project Manual prepared by the Architect/Engineer of record is also provided with this CSP bid package as a separate file. Please refer to the Project Manual for project specifics. Drawings and specifications have been prepared by the Design Professional listed above. General project information is provided below.
Project 1: BID PACKAGE 4 – Baseball | Softball Complex & Transportation
General Information on Project Site and Scope:
• Location: Wimberley, Texas
• Campus/Facility Name: Baseball / Softball Complex
• Project Description: Baseball / Softball Locker Rooms and Transportation Building /
Parking Lot Upgrades
• Estimated total project budget: $2,300,000
Anticipated Project Schedule/Key Project Milestones:
Start Date: May 1, 2027
Substantial Completion: February 1, 2028
The District reserves the right to adjust the schedule as needed.
ATTACHMENT 2
FORM OF AGREEMENT AND PREVAILING WAGE RATE SCHEDULE
WIMBERLEY INDEPENDENT SCHOOL DISTRICT
Please refer to AIA® Document A105® – 2017, Standard Short Form of Agreement Between Owner and Contractor OR AIA® Document A101® – 2017
Standard Form of Agreement Between Owner and Contractor where the basis of payment is a
Stipulated Sum (As modified by Owner) AND AIA® Document A201® – 2017
General Conditions of the Contract for Construction (As modified by Owner)
By responding to this CSP, the Proposer agrees to the contract provisions contained in the attached form of agreement unless specific modifications are requested, which may or may not be accepted at the District’s discretion. Any comments, objects or requested changes to the form of agreement shall be submitted in writing with the Proposer’s Proposal, otherwise
Proposer will be deemed to have accepted the form of the agreement included with this CSP.
The final contract is subject to review and approval of the District’s Board of Trustees and review by the District’s legal counsel.
[INSERT MOST RECENT PWR PRIOR TO POST – ASK LEGAL COUNSEL TO PROVIDE]
EXHIBIT A
REQUIRED FORM - PROPOSAL FORM
WIMBERLEY INDEPENDENT SCHOOL DISTRICT
It is strongly encouraged that all questions be submitted through the District’s Procurement Portal
(https://wimberleyisd.bonfirehub.com/portal/?tab=openOpportunities). The Proposal shall be concise and complete. If submitting hard copies, Sealed Proposals shall be clearly tabbed for each part of the requirements listed below in (8 ½” x 11”), vertical format, single-sided, minimum of three-quarter (3/4”) inch margins and no less than 11-point font. The District will require an original and four (4) copies of the Proposal from all interested firms as well as a jump drive with an electronic copy of the Proposal. The total pages may not exceed fifteen (15) pages; however, the Required Forms in Exhibits B-H do not count towards the maximum page requirement. The
Proposal should include the information set out below.
GENERAL INFORMATION
a. Legal name of the company:
b. Authorized point of contact for the company:
Name:_____________________________ Cell phone:_________________________
c. Address of office that would be providing services:
d. Telephone number: ___________________
e. Email: ________________________
f. Number of years in Business: __________
g. Type of Operation: Individual _______ Partnership _______ Corporation _______
Limited Liability Company ______ Other _______ (explain: ___________________)
h. Number of Employees: _________
i. Is your company currently for sale or involved in any transaction to expand or to become acquired by another business entity? If yes, please explain the impact both in organizational and directional terms.
j. Does any relationship exist between your company and any of District’s officers, employees whether by relative, business associate, capital funding agreement or any other such kinship? If yes, please explain.
CRITERIA 1: Pricing Proposal
1. Please complete the form in Exhibit B. Proposer will be evaluated based on the responses provided there for this criteria.
CRITERIA 2: Firm’s Experience and Reputation as a General Contractor
1. Provide references for no less than three (3) public entities with which Proposer currently has contracts and / or has previously provided construction management services of equal type and scope within the past five (5) years. DO NOT USE REFERENCES FROM WIMBERLEY
ISD’S OFFICIALS.
2. Describe your firm’s past performance on other contracts for the District (if any) or other
District’s (e.g. cost control, cost savings, schedule control) and your firm’s demonstrated technical competence and management qualifications with construction projects, particularly those that are similar to the proposed project type.
3. Provide details regarding any special services, management characteristics or other benefits / advantages offered for the District in selecting your company.
4. Describe your company’s quality assurance program, what are your company’s requirements, and how are they measured? In particular, describe the way your firm maintains quality control during the pre-construction and construction phases.
CRITERIA 3: Firm’s Experience on Projects of Similar Size and Scope
5. Provide a minimum of three (3) and a maximum of five (5) projects with photos for which your firm has provided/is providing construction management or construction services which are most related to this project. In determining which projects are most related, consider: same or related use of facilities related size and complexity; whether the project consisted of an expansion of an existing facility or new construction; how many members of the proposed team (and their role) worked on the listed project; and, how recently the project was completed.
List the projects in priority order, with the most related projects listed first.
6. For each of the listed projects in response to Item #6, above, provide the following information:
construction cost (original Budget and final construction cost), current phase of development, estimated (or past) completion date, type of construction services provided (CM-at-risk with
GMP, CM-agency, design/build, General Contractor-low Proposal, General Contractor through sealed Submittals), owner’s contact person and telephone number, and the name and telephone number of the project architect.
CRITERIA 4: Firm’s Proposed Personnel and Team Experience
7. Provide a project organization chart along with resumes of key personnel; Project Manager and Superintendent, that lists experience with projects of similar size (including cost), complexity and scope. Include in your response the length of experience with the firm and within the industry. Include information on the following Subcontractors as applicable: Office location and years in business for Mechanical, Electrical, Plumbing and Sitework
Subcontractor.
CRITERIA 5: Firm’s Financial capability is appropriate to the size and scope of the project
8. Is your company currently in default on any loan agreement or financing agreement with any bank, financial institution, or other entity? If yes, specify date(s), details, circumstances, and prospects for resolution.
9. Provide a financial rating of your company and any documentation (e.g. a Dunn & Bradstreet analysis), which indicates the financial stability of the company.
10. State whether you will provide a copy of your company's financial statements for the past two
(2) years, if requested by the District.
11. The District requires all contractors to carry general liability, auto liability and worker’s compensation/employer’s liability insurance coverage. All insurance coverages should remain in force during the term of contract. Please state the carrier, agent, amount, expiration date and length of time you have maintained coverage for general liability, auto liability and worker’s compensation/employer’s liability insurance coverage. Please confirm that you can carry insurance in the limits set out in proposed AIA contract template included with this Proposal package.
CRITERIA 6: Firm’s Safety Record and Claims/Litigation
12. Provide any details of all past or pending litigation or claims filed against your company arising out of or in connection with your company's performance under a contract for construction management and / or construction services. Describe how such suit or claims were resolved.
13. Provide your company’s safety Experience Modifier Rate (EMR), Recordable Incident Rate
(RIR) and your Loss Indicator Rate (LIR).
EXHIBIT B
REQUIRED FORM – PRICE PROPOSAL FORM
WIMBERLEY INDEPENDENT SCHOOL DISTRICT
(Note: Pricing evaluation will be evaluated as CRITERIA 1 in the CSP.)
Having examined Proposal and Contract Documents, the undersigned hereby declares that the undersigned has had the opportunity to visit the site, has had sufficient time to make all tests and investigations to arrive at an intelligent estimate of the cost of doing work, and has carefully examined the plans, specifications, and contract documents relating to the work covered by this proposal, and the undersigned agrees to do the work, and that no representations made by the Owner are in any sense a warranty, but are mere estimates for guidance of the contractor.
In submitting this Proposal, the undersigned agrees to the following:
2. Hold proposal open for acceptance for ninety (90) days following the deadline for Submissions.
3. Accept right of Owner to reject any or all proposals, to waive formalities and to accept proposal which Owner considers most advantageous.
4. Enter into and execute the proposed form of contract included with the Proposal package, if awarded, for the
Base Proposal and accepted Alternate Proposals (if any).
5. Complete work in accordance with the Contract Documents within the stipulated contract time.
6. The undersigned proposer does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons proposing for the same work, and that it is made in pursuance of and subject to all the terms and conditions of the advertisements, proposal requirements, the proposed construction contract, and the contract documents, including the plans pertaining to the work to be done, all of which have been examined by the undersigned.
7. The undersigned further agrees that the undersigned will provide all necessary tools and apparatus, do all work, furnish all materials, and do everything required to carry out the work covered by this proposal, in strict accordance with the contract documents, and the requirements pertaining thereto, for the sum of sums set forth.
8. That the undersigned is authorized to enter into contractual relationship on behalf of the responding company indicated below.
9. The accuracy of all certifications required which accompany this proposal.
10. That the organization has not been a party to any collusion among Proposer in restraint of freedom of competition by agreement to offer at a fixed price or to refrain from offering; or with any of Owner’s employees, Board of Trustees, or consultants as to quantity, quality, or price in the prospective contract, or in any terms of the prospective contract except in any authorized discussion(s) with the District’s Purchasing personnel; or in any discussions or actions between Proposer and any District employee, Board Trustee, or consultant concerning exchange of money or other things of value for special consideration in the award of this contract.
11. That neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency.
12. By submitting a Proposal, Proposer agrees to waive any claim it has or may have against the District, its trustees, agents and employees, and any reference sources, arising out of or in connection with the administration, evaluation, or recommendation of any Proposal; waiver of any requirements under the
Proposal documents; acceptance or rejection of any Proposal; and award of the Proposal. The District shall have no contractual obligation to any Proposer, nor will any Proposer have any property interest or other right in the Proposal or contract being proposed unless and until the contract is unconditionally executed and delivered by all parties, and all conditions to be fulfilled by the Proposer have been fulfilled by the Proposer.
I. BASE PROPOSAL
Undersigned agrees to complete the Work for the lump sum amount of:
Dollars ($ )
(Amount written in words governs) (Amount in figures)
Please also complete the Schedule of Values form on the attached page. This is also available as a separate Excel document.
II. ALTERNATES/UNIT PRICES (if applicable)
Alternate No. 1 : $_________________________________
Alternate No. 2 : $_________________________________
Alternate No. 3 : $_________________________________
III. ALLOWANCES/CONTINGENCIES (if applicable)
Undersigned certifies that the specified allowances are included in the Base Proposal and agrees that unexpended balance of allowance sums will revert to Owner in the final settlement of the contract.
Owner’s Contingency: $_____ [insert amount]
IV. CONTRACT TIME
Undersigned agrees to begin Work upon Notice to Proceed and be Substantially Complete by date as indicated on Contract.
All Work shall be completed by: February 1, 2028
Number of proposed days : ____________________________________________
(Calendar Days)
V. ADDENDA
Undersigned acknowledges receipt of Addenda (if any):
No. dated
VI. CHANGES IN THE WORK
Undersigned understands that changes in the work shall be performed in accordance with the form of agreement included in the CSP package.
It is understood that the right is reserved by the Owner to reject any or all proposals, or waive any informalities in the proposal process.
VII. FORM OF AGREEMENT AND CONTRACT EXCEPTIONS
Proposer has reviewed the form of agreement included with this Proposal package. Proposer is directed to pay special attention to the terms and conditions in this proposed form of agreement. Proposer may submit proposed revisions or modifications to this form of agreement for the Owner’s consideration; although, Owner is not obligated to accept any proposed revisions. Any revisions not requested with this Proposal may not be considered or rejected by Owner. Provide any comments or requested changes to the AIA
Document as amended by the Owner with your submission.
VIII. ACKNOWLEDGEMENT
By signing below, the individual represents and warrants on behalf of the Proposer that he/she has authority to submit this Proposal and that all the information contained herein is true to the best of his/her knowledge.
Authorized Signature
Printed Name of Authorized Representative
Title of Authorized Representative
Full Legal Name of Company
Company Address
Company Phone
Email Address of Authorized Representative
Phone # of Authorized Representative
Date
EXHIBIT C
REQUIRED FORM - FELONY CONVICTION NOTICE FORM
WIMBERLEY INDEPENDENT SCHOOL DISTRICT
BID PACKAGE 4 – Baseball | Softball Complex & Transportation
CSP-MD-2627-P4
State of Texas Legislative Senate Bill No. 1, Section 44.034, Notification of Criminal History, Subsection (a), states, “a person or business entity that enters into a contract with a school district must give advance notice to the District if the person or owner or operator of the business entity has been convicted of a felony.” The notice must include a general description of the conduct resulting in the conviction of a felony.
Subsection (b) states “a school district may terminate a contract with a person or business entity if the district determines that the person or business entity failed to give notice as required by Subsection (a) or misrepresented the conduct resulting in the conviction. The district must compensate the person or business entity for services performed before the termination of the contact”.
THIS NOTICE IS NOT REQUIRED OF A PUBLICLY-HELD CORPORATION.
I, the undersigned agent for the firm named below, certify that the information concerning notification of felony convictions has been reviewed by me and the following information furnished is true to the best of my knowledge.
Proposer’s Name:
(Legal/Official Company Name)
Proposer’s Authorized Official’s Name:
(Please print clearly or type)
A. My firm is a publicly-held corporation; therefore, this reporting requirement is not applicable:
Signature of Proposer’s Official Name:
Date:
B. My firm is not owned or operated by anyone who has been convicted of a felony.
Signature of Proposer’s Official Name:
C. My firm is owned or operated by the following individual(s) who has/have been convicted of a felony:
Name of Felon(s):
Detail of Conviction(s):
Signature of Proposal’s Official Name:
NOTE: Name and signature of company official should be the same as on the affidavit (Proposal Response
Form.
Vendor is responsible for the performance of the persons, employees and/or sub-contractors assigned to provide services for the District pursuant to this CSP on any and all District campuses of facilities. Vendor will not assign individuals to provide services at District campus or facility who have a history of violent, unacceptable, or grossly negligent behavior or who have a felony conviction.
EXHIBIT D
REQUIRED FORM - CERTIFICATE OF RESIDENCY
WIMBERLEY INDEPENDENT SCHOOL DISTRICT
CERTIFICATE OF RESIDENCY
The State of Texas has passed a law concerning non-resident contractors. This law can be found in Texas
Government Code under Chapter 2252, Subchapter A. http://www.capitol.state.tx.us/statutes.gv.toc.htm.
This law makes it necessary for the District to determine the residency of tis bidders. In part, this law reads as follows:
“Section: 2252.001
(3) ‘Non-resident bidder’ refers to a person who is not a resident.
(4) ‘Resident bidder’ refers to a person whose principal place of business is in this state, including a contractor whose ultimate parent company or majority owner has its principal place of business in this state.
Section 2252.002
A governmental entity may not award a governmental contract to a nonresident bidder unless that nonresident underbids the lowest Proposal submitted by a responsible resident bidder by an amount that is not less than the amount by which a resident bidder would be required to underbid the nonresident bidder to obtain a comparable contract in the state in which the nonresident’s principal place of business is located.”
I certify that (Proposer’s Legal/Official Company Name) is, under Section: 2252.001 (3) and (4), a Resident Bidder Non-resident Bidder.
My or Our principal place of business under Section: 2252.001 (3) and (4), is in the city of in the state of .
If not Texas, does the state have preferential treatment on bids? Yes No
If yes, what percentage: %
Name of Proposer’s Authorized Official:
(Type or Print)
Title of Proposer’s Authorized Official:
Signature of Proposer’s Authorized Official:
Date Signed:
http://www.capitol.state.tx.us/statutes.gv.toc.htm
EXHIBIT E
REQUIRED FORM - CONFLICT OF INTEREST QUESTIONNAIRE
WIMBERLEY INDEPENDENT SCHOOL DISTRICT
NOTE: THIS FORM MUST BE COMPLETED WITH COMPANY NAME,
SIGNATURE AND DATE EVEN IF COMPANY HAS NO CONFLICT OF INTEREST
EXHIBIT F
REQUIRED FORM - DEBARMENT OR SUSPENCION CERTIFICATION FORM
WIMBERLEY INDEPENDENT SCHOOL DISTRICT
DEBARMENT OR SUSPENSION CERTIFICATION FORM
FEDERAL/NON-FEDERAL FUNDS
As the awarded vendor on this contract, you are required to provide disbarment/suspension certification indicating that you are in compliance with the below Federal Executive Order
Certification by completing and signing this form.
Debarment:
Federal Executive Order (E.O.) 12549 “Debarment and Suspension “requires that all contractors receiving individual awards, using federal funds, and all sub-recipients certify that the organization and its principals are not debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded by any Federal department or agency from doing business with the Federal Government.
Your signature certifies that neither your nor your principal is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency.
Proposer’s Name:
Address:
City/State/Zip:
Telephone:
Title of Proposer’s Authorized Official:
(Type of Print)
EXHIBIT G
REQUIRED FORM - NON-COLLUSION STATEMENT
WIMBERLEY INDEPENDENT SCHOOL DISTRICT
NON-COLLUSION STATEMENT
“The undersigned affirms that he/she is duly authorized to execute this Proposal, that this company, corporation, firm, partnership or individual has not prepared this Proposal in collusion with any other Proposal, and that the contents of this Proposal as to prices, terms or conditions of said
Proposal have not been communicated by the undersigned nor by any employee or agent to any other person engaged in this type of business prior to the official opening of this Proposal.”
Proposal’s Name:
Address:
City/State/Zip:
Telephone #: Fax #:
Title of Proposal’s Authorized Official:
EXHIBIT H
REQUIRED FORM – CERTIFICATE OF INTERESTED PARTIES
WIMBERLEY INDEPENDENT SCHOOL DISTRICT
In 2015, the Texas Legislature adopted House Bill 1295, which added section 2252.908 of the Government
Code. The law states that a governmental entity or state agency may not enter into certain contracts with a business entity unless the business entity submits a disclosure of interested parties to the governmental entity or state agency at the time the business entity submits the signed contract to the governmental entity or state agency.
The disclosure requirement applies to a contract entered into on or after January 1, 2016.
The requirement above applies only to a contract of a district that:
1. Requires an action or vote by the board before the contract may be signed;
2. Has a value of at least $1 million; or
3. Is for services that would require a person to register as a lobbyist under Government Code Chapter
305.
Tex. Gov't Code 2252.908
The disclosure requirement does not apply to a contract with:
1. A publicly traded business entity, including a wholly owned subsidiary of the entity;
2. An electric utility, as defined by Utilities Code 31.002; or
3. A gas utility, as defined by Utilities Code 121.001.
Tex. Gov't Code 2252.908(c)(4)–(6)
Filing Process: The commission has made available on its website a new filing application that must be used to file Form 1295. A business entity must use the application to enter the required information on Form
1295 and print a copy of the completed form, which will include a certification of filing that will contain a unique certification number. An authorized agent of the business entity must sign the printed copy of the form and have the form notarized. The completed Form 1295 with the certification of filing must be filed with the District.
Form Availability: Certificate of Interested Parties Form is available from the Texas Ethics Commission website at the following address: https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm. For questions regarding and assistance in filling out this form, please contact the Texas Ethics Commission at
512-463-5800. A sample is attached hereto but must be submitted only.
The contractor certifies that:
____ Form 1295 filing is required and a certification of…