4-2525.05 Baseball Softball Complex Transportation CD Project Manual Volume 2.pdf
PDF 11 MB Posted
- Solicitation number
- CSP-MD-2627-P4
- Issued by
- Hidalgo County, Texas
About this file
This is a Project Manual Volume 2 for the Wimberley ISD Baseball/Softball Complex & Transportation project (Project No. 2525.05) in Wimberley, Texas, issued for contract documents as of August 12, 2026. The manual contains detailed specifications for plumbing, hangers and supports, and identification requirements for the construction project. The specifications establish standards for all plumbing materials, equipment installation, and system requirements, including provisions for water distribution, sanitary sewerage, domestic water heaters, and plumbing fixtures. The document includes comprehensive requirements for pipe hangers and supports covering materials, design, and installation practices, with specific spacing and sizing requirements for various pipe materials and diameters. Additionally, the manual specifies requirements for identification of plumbing piping and equipment, including pipe markers, valve tags, valve schedules, and equipment markers in accordance with ASME A13.1 standards. The specifications address coordination among trades, temporary facilities, existing conditions removal, testing and inspection procedures, and closeout documentation requirements.
The specifications establish quality assurance standards requiring all materials to meet or exceed applicable ASTM, UL, NSF, and ASME standards, with emphasis on lead-free components for potable water systems and proper firestopping of penetrations through rated assemblies. All hangers, supports, and anchors must comply with MSS SP-58, MSS SP-69, and MSS SP-89 standards, with ferrous hangers receiving zinc chromate primer or galvanizing and stainless steel or galvanized materials required for exposed areas and crawlspaces. The contractor bears responsibility for all permits, inspections, coordination with utility companies, temporary piping and equipment, excavation and backfilling according to OSHA requirements, and final testing including pressure tests, disinfection tests, and backflow prevention certifications. The specifications require coordination submittals for overhead systems, observation points at key construction phases, and comprehensive project record documents and operation and maintenance data at project closeout.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wimberley ISD Baseball | Softball
Complex & Transportation
Wimberley ISD
Wimberley, Texas
Project Manual
Issued For
Contract Documents
Volume 2 of 2
Project Number: 2525.05 08.12.26
CONTRACT DOCUMENTS WIMBERLEY ISD BASEBALL | SOFTBALL
AUGUST 12, 2026 COMPLEX & TRANSPORTATION
PROJECT NO. 2525.05
TABLE OF CONTENTS 00 10 00 - 1/5
TABLE OF CONTENTS
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 07 Seals Page 00 10 00 Table of Contents 00 31 32 Geotechnical Data 00 31 32a Geotechnical Report
DIVISION 01 GENERAL REQUIREMENTS
01 10 00 Summary 01 25 00 Substitution Procedures Substitution Request Form-Bidding Phase Substitution Request Form-Executed Contract 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 32 33 Photographic Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 43 39 Mockups 01 45 23 Concrete In-Situ Relative Humidity and Ph Testing 01 45 29 Testing Laboratory Services 01 50 00 Temporary Facilities and Controls 01 50 10 Temporary Project Identification Signage 01 60 00 Product Requirements 01 73 00 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents 01 79 00 Demonstration and Training 01 91 00 Commissioning
DIVISION 02 EXISTING CONDITIONS
02 41 13.13 Removal of Existing Concrete
DIVISION 03 CONCRETE
03 10 00 Concrete Forming and Accessories 03 20 00 Concrete Reinforcing 03 30 00 Cast-in-place Concrete 03 35 43 Polished Concrete Finishing
DIVISION 04 MASONRY
04 20 00 Unit Masonry 04 20 10 Structural Unit Masonry
TABLE OF CONTENTS 00 10 00 - 2/5
DIVISION 05 METALS
05 12 00 Structural Steel Framing 05 21 00 Steel Joist Framing 05 31 23 Steel Roof Decking 05 50 00 Metal Fabrications
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry 06 41 16 Plastic-laminate-faced Architectural Cabinets
DIVISION 07 THERMAL AND MOISTURE PREVENTION
07 14 16 Cold Fluid-applied Waterproofing 07 21 00 Thermal Insulation 07 26 00 Under Slab Vapor Barriers 07 27 26 Fluid-Applied Membrane Air Barriers 07 41 13.16 Standing-Seam Metal Roof Panels 07 42 13.13 Formed Metal Soffit Panels 07 62 00 Sheet Metal Flashing and Trim 07 72 00 Roof Accessories 07 84 00 Firestopping Systems 07 84 00a Firestopping Systems Schedule 07 92 00 Joint Sealants
DIVISION 08 OPENINGS
08 11 13 Standard Steel Doors and Frames 08 14 16 Flush Wood Doors 08 31 13 Access Doors and Frames 08 41 13 Aluminum-Framed Entrances and Storefronts 08 71 00 Door Hardware 08 80 00 Glazing
DIVISION 09 FINISHES
09 22 16 Non-Structural Metal Framing 09 29 00 Gypsum Board 09 30 00 Tiling 09 51 13 Acoustical Panel Ceilings 09 65 13 Resilient Base and Accessories 09 67 23.19 Resinous Flooring (Toilet Room, Shower) 09 91 13 Exterior Painting 09 91 23 Interior Painting 09 96 00 High-Performance Coatings – Thermal Coating
DIVISION 10 SPECIALTIES
10 11 00 Visual Display Units 10 14 19 Dimensional Letter Signage 10 14 23 Panel Signage 10 21 13.19 Plastic Toilet Compartments 10 28 00 Toilet and Bath Accessories 10 44 13 Fire Protection Cabinets
TABLE OF CONTENTS 00 10 00 - 3/5
DIVISION 10 SPECIALTIES – CONTINUED
10 44 16 Fire Extinguishers 10 45 00 Automated External Defibrillator Cabinets 10 51 29 Phenolic Lockers 10 73 43 Manufactured Aluminum Canopies
(DIVISION 11 EQUIPMENT – NOT USED)
DIVISION 12 FURNISHINGS
12 24 13 Roller Window Shades 12 36 61.16 Solid Surfacing Countertops
(DIVISION 13 THROUGH DIVISION 14 – NOT USED)
(DIVISION 21 FIRE SUPPRESSION – NOT USED)
DIVISION 22 PLUMBING
22 00 01 Basic Plumbing Requirements 22 05 29 Hangers and Supports for Plumbing Piping and Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 07 00 Plumbing Insulation 22 11 00 Facility Water Distribution 22 13 00 Facility Sanitary Sewerage 22 33 00 Electric Domestic Water Heaters 22 40 00 Plumbing Fixtures
DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING
23 00 01 Basic HVAC Requirements 23 05 13 Common Motor Requirements for HVAC Equipment 23 05 29 Hangers and Supports for HVAC 23 05 48 Vibration Controls for HVAC Piping and Equipment 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting and Balancing for HVAC 23 07 00 HVAC Insulation 23 09 23 Building Automation Systems for HVAC 23 21 13 Hydronic Piping and Valves 23 23 00 Refrigerant Piping 23 31 00 HVAC Ducts and Casings 23 33 00 Air Duct Accessories 23 34 00 HVAC Fans 23 37 00 Air Outlets and Inlets 23 40 00 HVAC Air Cleaning Devices 23 81 26 Split-System Air Conditioners and Heat Pumps
(DIVISION 25 INTEGRATED AUTOMATION – NOT USED)
DIVISION 26 ELECTRICAL
26 00 01 Basic Electrical Requirements 26 05 03 Equipment Wiring Connections 26 05 19 600-Volt Building Wire and Cable
TABLE OF CONTENTS 00 10 00 - 4/5
DIVISION 26 ELECTRICAL – CONTINUED
26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceway Systems 26 05 43 Underground Ducts and Raceways for Electrical Systems 26 05 53 Identification for Electrical Systems 26 05 73 Short Circuit/Coordination Study and Arc Flash Hazard Study 26 08 00 Commissioning of Electrical 26 22 13 Low-Voltage Transformers 26 24 16 Panelboards 26 27 13 250- & 600-Volt Fuses 26 27 26 Wiring Devices 26 28 16 Enclosed Switches and Circuit Breakers 26 29 16 Enclosed Contactors 26 43 13 Surge Protective Devices 26 51 16 Interior Lighting 26 56 16 Exterior Lighting
DIVISION 27 COMMUNICATIONS
27 00 00 General Technology Requirements 27 05 00 Communications General Requirements 27 05 26 Grounding and Bonding for Communications Systems 27 05 28 Pathways for Technology Systems 27 05 37 Firestopping for Technology Systems 27 11 00 Communications Equipment Rooms 27 13 00 Communications Backbone Cabling 27 13 23 Interbuilding OSP Pathways 27 15 00 Communications Horizontal Cabling 27 40 00 AV Multimedia General Requirements 27 41 00 Audio Visual Systems 27 51 13 Paging System 27 53 13 Synchronized Clock Systems 27 60 00 Physical Security General Requirements 27 62 00 Electronic Access Control System 27 64 00 Video Surveillance System
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
28 46 00 Fire Detection and Alarm (NEW)
DIVISION 31 EARTHWORK
31 10 00 Site Clearing 31 20 00 Earth Moving 31 23 00 Excavation Embankment 31 23 33 Excavation Trenching and Backfill 31 25 13 Erosion and Sedimentation Control Erosion
TABLE OF CONTENTS 00 10 00 - 5/5
DIVISION 32 EXTERIOR IMPROVEMENTS
32 11 14 Flexible Base Crushed Limestone 32 11 16 Subgrade Preparation and Compaction 32 11 29.02 Rolling 32 12 16 Hot Mix Asphaltic Concrete Pavement 32 13 00 Site Concrete 32 16 13.01 Concrete Sidewalk 32 17 23 Pavement Markings 32 31 13 Chain Link Fences 32 31 19 Decorative Metal Fences and Gates
DIVISION 33 UTILITIES
33 11 00 Water Utility Distribution 33 16 13 Concrete Curb and Gutter 33 26 30 Polyvinyl Chloride Pipe Storm Drains 33 31 00 Sanitary Utility Sewerage 33 41 00 Storm Utility Drainage
END OF DOCUMENT
CONTRACT DOCUMENTS
AUGUST 12, 2026
WIMBERLEY ISD BASEBALL | SOFTBALL
COMPLEX & TRANSPORTATION
BASIC PLUMBING REQUIREMENTS 22 00 01 - 1/15
SECTION 22 00 01 - BASIC PLUMBING REQUIREMENTS
PART 1 GENERAL
1.1 SUMMARY
A. Basic Plumbing Requirements specifically applicable to each Division 22 Section, in addition to
Division 01 - General Requirements.
1.2 REFERENCES
A. All references in Division 22 to codes, standards or other publications shall be the latest edition/version, unless noted otherwise.
1.3 PLANS
A. These specifications are accompanied by plans indicating typical layouts, pipe and equipment location, etc. The plans and these specifications are complimentary each to the other and what is called for by one shall be as binding as if called for by both. Should there be a conflict between drawings and specifications regarding a material shown of work described or detailed then the material of work having the greater value shall be provided.
B. The plans as prepared are in general diagrammatic. The contractor shall carefully lay out his work at the site to conform to the architectural, mechanical, electrical and structural conditions to provide grading of piping, to avoid all obstructions and to conform to details of installation as shown on the plans and supplied by the manufacturers of the equipment to be installed, and thereby to provide an integrated satisfactorily operating installation. The General Contractor must coordinate the work of all trades. All necessary offsets in piping, fittings, ductwork, etc. required to avoid interferences between piping, equipment, structural and architectural work are not shown but shall be furnished and installed by the contractor without additional expense to the Owner.
C. These specifications and plans accompanying same are intended to cover systems which will not interfere with the design of the building, which will fit into the available spaces, and which will insure complete and satisfactory systems. Each contractor shall, therefore, carefully examine the plans and the building and shall be responsible for the proper fitting of his material and apparatus into the building.
D. The size of plumbing equipment indicated on the plans is based on the dimensions of a particular manufacturer. While other manufacturers may be acceptable, it is the responsibility of the Contractor to determine if the equipment he proposes to furnish will fit in the space with the manufacturer’s recommended clearances allocated for same on the plans. It shall be the Contractor’s responsibility to furnish data to evidence that sufficient space can be provided for the installation of proposed equipment and that adequate access will exist for servicing and maintenance of equipment. Should changes become necessary during construction, the contractor shall make such necessary changes at his (the Contractor's) own expense.
E. Exceptions and inconsistencies in plans and specifications shall be brought to the Architect’s attention no later than ten (10) days prior to the bid date, unless specified otherwise in Division 1.
Otherwise, the Contractor shall be responsible for any and all changes and additions that may be necessary to accommodate his particular apparatus or equipment.
1.4 CHANGES
A. Any changes from the plans necessary to make this work conform to the building as it is constructed, to make this work fit the work of other trades or to make this work conform to the rules of city and municipal bodies having jurisdiction shall be made by this contractor at no additional cost to the Owner. However, no changes shall be made from the work described on the plans and these specifications except on written order from the Architect.
WIMBERLEY ISD BASEBALL | SOFTBALL
BASIC PLUMBING REQUIREMENTS 22 00 01 - 2/15
B. If any changes are required other than those mentioned above and the changes involve extra work on the part of the contractor, no charges for this extra work shall be allowed unless authorized in advance of the work by a written order from the Owner and/or Architect stating the charges to be made for the work.
C. Proposed use of item or equipment other than that specified or indicated may require redesign of structure, partitions, foundations, piping, wiring, or other parts of mechanical, electrical, or architectural layout. Redesign, new drawings, and detailing required shall be prepared and submitted to Architect/Engineer for approval.
D. Where approved deviation requires different quantity, size and arrangement of wiring, conduit, equipment, etc. from that specified or indicated; provide such items and all other additional equipment required by system at no additional cost to the Owner.
1.5 DELIVERY, STORAGE AND HANDLING
A. Protection:
1. All work, equipment and materials shall be protected at all times to prevent damage or breakage either in transit, storage, installation or testing. All openings shall be closed with caps or plugs during installation.
2. Equipment and material placed on the job site shall remain in the custody of the Contractor until phased acceptance, whether or not the owner has reimbursed the Contractor for the equipment and material. The Contractor is solely responsible for the protection of such equipment and material against any damage.
3. Damaged equipment or material shall be replaced with new as determined and directed by the Architect or Engineer. In particular, piping insulation which becomes saturated will be rejected and must be removed from the job site. Such repair or replacement shall be at no additional cost to the Owner.
4. Protect interiors of new equipment and piping systems against entry of foreign matter. Clean both inside and outside before painting or placing equipment in operation.
5. Existing equipment and piping being worked on by the Contractor shall be under the custody and responsibility of the Contractor and shall be protected as required for new work.
B. Cleanliness of Piping and Equipment Systems:
1. Exercise care in storage and handling of equipment and piping material to be incorporated in the work. Remove debris arising from cutting, threading and welding of piping.
2. Piping systems shall be flushed, blown or pigged as necessary to deliver clean systems.
3. Clean interior of all tanks prior to delivery for beneficial use by the Owner.
4. Boilers shall be left clean following final internal inspection by the inspector.
5. Contractor shall be fully responsible for all costs, damage, and delay arising from failure to provide clean systems.
1.6 SUBSTITUTIONS
A. The materials, products and equipment described and specified establish a standard of quality, function, dimension and appearance to be met by any proposed substitutions.
B. Reference Division 01 – Product Requirements.
C. Substitution requests are only required where specific manufacturers are listed or scheduled.
1.7 SUBMITTALS
A. Submit under provisions of Division 01.
WIMBERLEY ISD BASEBALL | SOFTBALL
BASIC PLUMBING REQUIREMENTS 22 00 01 - 3/15
B. The Contractor shall furnish copies of the manufacturer's literature and drawings describing all proposed equipment and materials indicated in the specifications. The proposed use of the exact equipment and materials specified shall not change this requirement of including literature describing the proposed equipment. Manufactured items proposed for use, whether specified or proposed for substitution, shall be the current, catalogued product of the manufacturer, and replacement parts shall be available.
C. Manufacturer's regular catalog sheets will not be acceptable under this requirement unless they indicate completely all of the specification requirements. Where drawings cover several sizes or types of construction they shall clearly indicate the size or type of construction to be used on the project. In cases where several sizes of the same type of equipment are required to be furnished, the submittal shall include a schedule identifying each piece of equipment, complete with all capacity information needed to compare every submitted item with its respective specified item.
Annotate all submittal data to indicate exact model, size, and type submitted.
D. Brochures shall contain a certification that the equipment or materials are suitable for conditions shown and specified; that the equipment or materials are believed to be in conformity with the plans and specifications, except as may be specifically described and that approval is recommended. The certification shall be signed by the Contractor. Brochures received not in conformity with these requirements will be returned for required actions. Any deviation from the requirements of the specifications shall be clearly noted and marked for the Engineer's consideration.
E. Approval of the brochures, or any part of the contents therein, shall not eliminate responsibility for compliance with the plans and specifications, unless specific attention has been called in writing to proposed deviations at the time of transmittal of the brochures and such deviations have been approved, nor shall it eliminate the requirements or the responsibilities, if there are errors of any sort in the data submitted.
1.8 INTERFERENCES AND COOPERATION
A. The plans are generally diagrammatic and the Contractor shall coordinate the work of the different trades so that interferences between piping, equipment, structural and architectural work will be avoided. Not all offsets in piping, ductwork, etc., are shown. The Contractor shall cooperate with the General Contractor and all other contractors to coordinate their work to avoid interferences and delays and arrange all parts of the work to harmonize in service and appearance with all other parts.
B. Provide an overhead coordination submittal per Division 01 The submittal shall include all structural, plumbing, mechanical, electrical, and fire protection components.
1.9 MATERIALS AND WORKMANSHIP
A. All materials shall be new, of the quality specified and free of any defects. Manufacturer's names are listed to establish a standard of quality and construction.
B. The Contractor will be responsible for transportation of his materials to the job and for their storage and protection until the final acceptance of the job.
C. Contractor shall furnish all necessary scaffolding, tackle, tools and appurtenances of all kinds and all labor required for the safe and expeditious execution of his contract.
WIMBERLEY ISD BASEBALL | SOFTBALL
BASIC PLUMBING REQUIREMENTS 22 00 01 - 4/15
1.10 PERMITS AND INSPECTIONS
A. The Contractor will be responsible for all permits and inspections required by law for the completion of his work. Cost of all permits and inspections shall be paid for by the Contractor.
The Contractor shall obtain and pay for all certificates of approval which must be delivered to the Architect before final acceptance of the job. All materials and labor furnished by the Contractor shall be in strict accordance with the rules and requirements of the National Board of Fire Underwriters, state and municipal regulations and other authorities who may have lawful jurisdiction over the work being done.
B. Each contractor shall be responsible for coordinating their work with the General Contractor and scheduling AHJ required inspections through the General Contractor to allow inspections to be performed without impeding the progress of construction. Generally, the Contractor shall plan for inspections to occur two (2) weeks prior to the scheduled concealment of work in the area of inspection.
1.11 ENGINEERING DESIGN TEAM OBSERVATIONS
A. Each contractor shall be responsible for coordinating their work with the General Contractor and scheduling progress observations through the General Contractor to allow for the following observations to be performed without impeding the progress of construction. Generally the Contractor shall plan for observations to occur two (2) weeks prior to the scheduled concealment of work in the area of observation.
B. In general, observations for this project shall include but not be limited to:
1. Exterior Below Grade: Site utilities and services.
2. Interior Below Grade: Utilities, services and systems.
3. Rough Wall: All utilities, services and systems in-place including wall studs, cross bracing, supports, etc. (No sheetrock or insulation).
4. Corrected Rough Wall: (Before Sheetrock).
5. Above Ceiling: All utilities, services and systems in place, labeling on exposed piping (No insulation on piping systems. Ceiling grid/channels may be installed but no sheetrock or ceiling tile).
6. Above Ceiling Final: All utilities, services and systems complete including hangers, insulation, and labeling (ceiling grid and/or channel may be in place but no sheetrock or ceiling tile shall be installed).
7. Substantial Completion: All surfaces complete, fixtures installed and trim-out complete.
8. Final: Cleaned and ready for occupancy.
1.12 EXAMINATION OF SITE
A. All Contractors submitting proposals for this work shall first examine the site and all conditions thereon and therein. All proposals shall take into consideration conditions as may affect the work under this contract. They shall satisfy themselves as to existing grades and the actual formation, and soil conditions.
B. Contractors shall verify all service locations, depths, sizes, etc. No information given on the plans shall relieve the Contractor of this responsibility.
C. Before starting work, the Contractor shall verify all associated existing systems, pipe sizes, locations, and dimensions so that the new systems can be properly connected as indicated on the documents.
WIMBERLEY ISD BASEBALL | SOFTBALL
BASIC PLUMBING REQUIREMENTS 22 00 01 - 5/15
1.13 QUALITY ASSURANCE
A. Perform Work in accordance with all codes listed on the drawing sheets, the local authority having jurisdiction (AHJ), and the Architect/Engineer. As the minimum standard for the level of quality, in all cases the greater quantity or better quality shall be the first consideration for the basis of an acceptable product or process. The local authority having jurisdiction, the Architect and the Engineer shall have the final authority on the approval and/or use of any product or process specified or submitted for substitution. The greater quality and/or value specified herein for the system(s) and various components and installation procedures shall take precedence over the minimum requirements of the herein before mentioned codes.
B. Equipment and Components: Bear UL, ASME, ANSI and/or NSF label or marking, as specified in appropriate Section.
C. Valves: Provide manufacturer’s name and pressure rating marked on valve body.
D. Piping: All piping installed on this project shall bear the complete ASTM and Manufacturer’s marking. Labeling and identification requirements as required by ASTM. All installed piping 5’-0” or greater in length shall be readily identifiable per ASTM labeling criteria. Piping not bearing this identification upon installation shall be removed and replaced by the correctly labeled piping.
Piping shall not be re-stenciled after it is installed, to meet this requirement.
E. Lead free components: All wetted surfaces of piping, fittings, valves and other products in contact with the potable water system shall be certified as lead free, as per current requirements of NSF/ANSI 61 and/or NSF/ANSI 372.
F. Welding Materials and Procedures: Perform to ASME Code.
1.14 AUTOMATIC CONTROLS ALLOWANCE
A. Where “automatic controls” are called for in the plans and specifications, all the control instruments, such as motorized valves, etc., shall be provided by the Contractor. The Drawings may show some power connections to controls equipment; however, if more power is required, then the Contractor shall provide this power.
1.15 ARRANGEMENT AND INSTALLATION OF EQUIPMENT AND PIPING
A. Coordinate location of piping, sleeves, inserts, hangers, ductwork and equipment. Locate piping, sleeves, inserts, hangers and equipment clear of windows, doors, openings, light outlets, and other services and utilities. Prepare equipment layout drawings to coordinate proper location and personnel access of all facilities. Follow manufacturer's published recommendations for installation methods not otherwise specified.
B. Operating Personnel Access and Observation Provisions: Select and arrange all equipment and systems to provide clear view and easy access, without use of portable ladders, for maintenance and operation of all devices including, but not limited to: all equipment items, valves, filters, strainers, transmitters, sensors, control devices. All gages and indicators shall be clearly visible by personnel standing on the floor or on permanent platforms. Do not reduce or change maintenance and operating space and access provisions that are shown on the drawings.
C. Equipment and Piping Support: Coordinate structural systems necessary for pipe and equipment support with pipe and equipment locations to permit proper installation.
D. Location of pipe sleeves, trenches and chases shall be accurately coordinated with equipment and piping locations.
E. Minor Piping: Generally, small diameter pipe runs from drips and drains, water cooling, and other service are not shown but must be provided.
WIMBERLEY ISD BASEBALL | SOFTBALL
BASIC PLUMBING REQUIREMENTS 22 00 01 - 6/15
F. Electrical and Pneumatic Interconnection of Controls and Instruments: This is generally not shown but must be provided. This includes interconnections of sensors, transmitters, transducers, control devices, control and instrumentation panels, instruments and computer workstations.
Comply with NFPA-70.
G. Install gages, thermometers, valves and other devices with due regard for ease in reading or operating and maintaining said devices. Locate and position thermometers and gages to be easily read by operator or staff standing on floor or walkway provided. Servicing shall not require dismantling adjacent equipment or pipe work.
H. Work in Existing Building: Cut required openings through existing masonry and reinforced concrete using diamond core drills. Use of pneumatic hammer type drills, impact type electric drills, and hand or manual hammer type drills, will be permitted only with approval of the Owner.
Locate openings that will least effect structural slabs, columns, ribs or beams. Refer to Cutting and Patching article in Part 3 of this section.
1.16 TEMPORARY PIPING AND EQUIPMENT
A. Continuity of operation of existing facilities may require temporary installation or relocation of equipment and piping. Temporary equipment or pipe installation or relocation shall be provided to maintain continuity of operation of existing facilities, when required by the phasing or called for specifically on the plans.
1.17 PLUMBING DEMOLITION
A. Rigging access, other than indicated on the drawings, shall be provided by the Contractor. Such access shall be provided without additional cost or time to the Owner. Where work is in an operating facility, provide approved protection from dust and debris at all times for the safety of plant personnel and maintenance of plant operation and environment of the facility.
1.18 UTILITIES
A. The Contractor shall coordinate work and arrange and pay for any necessary revisions to existing utility services, including meter deposits and connection fees to all serving utility companies and shall install utilities, where applicable.
B. The Contractor shall be responsible for all costs associated with the extension of utilities to the Building, including but not limited to natural gas, domestic water, sanitary sewage and storm drain piping.
C. The Contractor shall be responsible for gathering all information required by the connecting utility service provider (i.e. drawings, load information, completing and submitting required forms, etc.)
The contractor may utilize the design team to obtain information, however, the contractor is responsible for submitting all required documentation to the utility provider. This includes, but is not limited to, new gas service, medium pressure gas request forms, water meter sizing forms, etc.).
D. The Contractor shall provide the utility service provider a date that the utility connection is needed. This date shall be coordinated with the utility service provider to take into consideration the design time and mobilization.
1.19 INDOOR AIR QUALITY CONTROL:
A. All Adhesives, sealants, paints, coatings applied within the weatherproofed interior of the building shall comply with applicable VOC thresholds of SCAQMD 1113 and 1168.
WIMBERLEY ISD BASEBALL | SOFTBALL
BASIC PLUMBING REQUIREMENTS 22 00 01 - 7/15
PART 2 PRODUCTS
2.1 FACTORY-ASSEMBLED PRODUCTS
A. Provide maximum standardization of components to reduce spare part requirements.
B. Manufacturers of equipment assemblies that include components made by others shall assume complete responsibility for final assembled unit.
1. All components of an assembled unit need not be products of same manufacturer.
2. Constituent parts that are alike shall be products of a single manufacturer.
3. Components shall be compatible with each other and with the total assembly for intended service.
4. Contractor shall guarantee performance of assemblies of components, and shall repair or replace elements of the assemblies as required to deliver specified performance of the complete assembly.
C. Components of equipment shall bear manufacturer's name and trademark, model number, serial number and performance data on a name plate securely affixed in a conspicuous place, or cast integral with, stamped or otherwise permanently marked upon the components of the equipment.
D. Major items of equipment, which serve the same function, must be the same make and model.
Exceptions will be permitted if performance requirements cannot be met.
2.2 COMPATIBILITY OF RELATED EQUIPMENT
A. Equipment and materials installed shall be compatible in all respects with other items being furnished and with existing items so that the result will be a complete and fully operational system that conforms to contract requirements.
2.3 ESCUTCHEONS AND PLATES
A. Solid plates, 316 Stainless Steel with set screws shall be used where the sectional plates will not stay in place or are not available in the required size, or where other individual specification section(s) require one piece or greater quality escutcheons or plates. All escutcheons shall be triple nickel-chromium plated brass, or type 316L stainless steel.
2.4 INSULATION
A. All insulation materials used inside the building on this project, including finishes and adhesives on the exterior surfaces of ducts, pipes and equipment shall have a flame spread rating of 25 or less and a smoke developed rating of 50 or less as determined by an independent testing laboratory in accordance with NFPA 255 as required by NFPA 90A, unless noted otherwise acceptable.
2.5 SOLENOID VALVES
A. All solenoid valves used in piping systems shall be the slow acting type.
2.6 ASBESTOS
A. Materials containing asbestos are not permitted.
B. If any asbestos-containing material is discovered or suspected, the contractor shall immediately cease any and all work in that area. Cover the exposed material in plastic containment without disturbing the exposed material and notify the Architect and the Owner’s representative.
C. Certify in writing that neither the Contractor nor any of Contractor’s subcontractors or suppliers will supply any materials that contain any asbestos in any form for this Project.
WIMBERLEY ISD BASEBALL | SOFTBALL
BASIC PLUMBING REQUIREMENTS 22 00 01 - 8/15
PART 3 EXECUTION
3.1 EXISTING FACILITIES
A. All piping, valves, fittings, switches, starters, conduit boxes and/or any other items of plumbing, mechanical or electrical equipment which are not in service at the completion of this contract shall be removed, unless otherwise noted.
B. Where an existing service to existing building requires disconnection to facilitate installation of this work, this Contractor shall include in his bid the cost of such disconnecting, re-routing and re-connecting. Where any existing facilities, which are to remain occupied, are affected by disconnection, re-routing or re-connection, then such disconnecting, re-connecting and re-routing shall be done in such a manner so as not to interrupt any service to the building. Satisfactory arrangements shall be made with local authorities and/or the various utility companies involved.
The method of disconnecting, re-routing and re-connecting shall be as shown on the Drawings, or if not shown on the drawings, subject to the approval of the Architect and Owner.
C. Unless noted otherwise, all equipment and material indicated or specified to be removed shall become the property of the Contractor.
D. This Contractor shall carefully coordinate work in and around existing services and equipment and adjoining rooms to remodel areas. Coordinate shut-down, removal, capping, and turn-on of existing services with the Owner’s facilities' department and general contractor to provide continuous (uninterrupted) service throughout the construction period. This Contractor shall refer to the architectural plans and specifications and thoroughly familiarize himself with the construction phasing in remodel areas before beginning work.
E. Building Working Environment: Maintain the architectural and structural integrity of the building and the working environment at all times. Limit the opening of doors, windows or other access openings to brief periods as necessary for rigging purposes. No storm water or ground water leakage permitted. Provide daily clean up of construction and demolition debris on all floor surfaces and on all equipment being operated by the Owner.
3.2 INTERFERENCES AND COOPERATION
A. The plans are generally diagrammatic and the Contractor shall coordinate the work of the different trades so that interferences between piping, equipment, structural and architectural work will be avoided. Not all offsets in piping, ductwork, etc., are shown. The Contractor shall cooperate with the General Contractor and all other contractors to coordinate their work to avoid interferences and delays and arrange all parts of the work to harmonize in service and appearance with all other parts.
B. The General Contractor shall coordinate the work of all trades. The various systems to be installed shall follow the normal, common sense priority of systems installation with the highest system to lowest system installation as follows:
1. HVAC ductwork shall be installed up and against building (floor/roof) structural members.
2. Sanitary waste and storm drainage piping system shall begin horizontal routing as high as possible between structural members, offsetting vertically only to avoid conflict with structure or to drop below HVAC ductwork where offset is unavoidable.
3. Electrical conduit shall be installed up, and against building structure, running parallel with HVAC ductwork and offsetting up into structural bay (void) or below HVAC ductwork to obtain a change in direction or branch take-off. Electrical conduit installation shall not control or dictate the routing or installation of the HVAC ductwork storm drain piping or sanitary waste and vent piping.
WIMBERLEY ISD BASEBALL | SOFTBALL
BASIC PLUMBING REQUIREMENTS 22 00 01 - 9/15
4. Domestic water piping (hot water, cold water and hot water return), medical gas piping and HVAC piping shall be installed beside and below the HVAC ductwork and electrical conduit.
Preferred installation shall be on trapeze, wall brackets, or racked on vertical channel on the wall above the ceiling line. The completed installation shall not conflict with the installation or removal of ceiling system components of tile. All main and branch take-off isolation valves, strainers, sensors and other plumbing equipment shall be readily identifiable and accessible from a standing position on a step ladder, no more than 18 inches above ceilings.
5. Fire sprinkler piping system shall be installed below all other systems and components, unless noted otherwise or as coordinated with all other trades. The fire sprinkler piping shall not conflict with the installation or removal of ceiling system components or tile. The fire sprinkler system piping layout and installation shall be coordinated by the fire sprinkler contractor and the General Contractor with all other trades performing work in the affected area, to avoid conflict with the installation or removal of any other systems components, or to prevent ready access to valves, equipment of the other trades. Do not install sprinkler piping until ductwork mains are in place.
C. Provide an overhead coordination submittal per Division 01 The submittal shall include all structural, plumbing, mechanical, electrical, and fire protection components.
3.3 TEMPORARY PIPING AND EQUIPMENT
A. The Contractor shall provide all required facilities in accordance with the requirements of phased construction and maintenance of service.
B. All piping and equipment shall be properly supported, sloped to drain, operate without excessive stress, and shall be insulated where injury can occur to personnel by contact with operating facilities.
C. When construction is complete, temporary facilities and piping shall be completely removed back to the nearest active distribution branch or main pipe line and any openings in structures sealed.
Dead legs in potable water systems will not be allowed. Provide necessary blind flanges and caps to seal open piping remaining in service.
3.4 UNIONS
A. No unions are to be placed in any pipe in a location which will be concealed or inaccessible after completion of the building unless furnished with an access panel either as shown on the drawings or as specified herein. Unions must be installed on each side of all pieces of equipment such as water heaters, water softeners, thermostatic mixing valves, flow regulators, pumps, etc., so that such equipment may be readily disconnected in location that equipment can be disconnected and removed.
3.5 ACCESS PANELS
A. All valves, traps, drains, cleanouts, equipment, etc., must be accessible. The Contractor shall, wherever required to service his installation, coordinate size and location of access panels with General Contractor. Refer to Section 08 31 13 – Access Doors and Frames.
3.6 FIRESTOPPING
A. Firestopping: Unused slots, sleeves and other penetrations in floors, walls or other general construction shall be closed and sealed with an approved firestopping material.
1. Reference Section 07 84 00 – Firestopping for appropriate firestopping material and method of installation required for each wall rating and penetration size and type to comply with the appropriate UL listing.
WIMBERLEY ISD BASEBALL | SOFTBALL
BASIC PLUMBING REQUIREMENTS 22 00 01 - 10/15
2. Floor slots and openings shall be closed with 16 gauge galvanized steel sheet supported on 1-inch by 1-inch by 1/8-inch structural angle drilled or supported with powder-driven studs into the building structure. Firestop with a layer of silicone elastomer not less than 1-inch thick which completely fills the opening. The top surface of the silicone elastomer shall be approximately 1-inch below the finished floor slab.
3. Openings in walls shall be closed with 16 gauge galvanized steel sheet securely attached at the midpoint of the wall thickness and firestopped on both sides of the steel sheet with not less than 1/8-inch thick layer of non-sagging silicone elastomer to fully cover the opening.
4. Single or multiple pipes passing through walls and floors shall have the annular space between pipes or between pipes and structure filled with silicone elastomer to provide a rated firestop (rated to match the assembly) for floors and walls.
B. The annulus between exposed pipe and walls or floors in finished spaces shall be refilled, sealed and painted to match adjacent surfaces.
C. Future Slots: Cap ends of sleeve and mark as future.
3.7 SEALING PENETRATIONS
A. The annulus between exposed pipe, sleeves and walls or floors in finished spaces shall be refilled, sealed and painted to match adjacent surfaces. For Rated walls (Fire or smoke) provide the correct UL/FM listed sealing assembly for that application.
3.8 CUTTING AND PATCHING
A. All cutting and patching of floors, walls and ceilings for installation of work covered in these sections will be done by the General Contractor.
B. Where it becomes necessary to drill into or cut through any existing or completed floors, walls or ceilings to permit the installation of any work under this contract or to repair any defects that may appear up to the expiration of the guarantee, such cutting and patching shall be done by the General Contractor under the supervision of the Architect.
C. No joists, beams, girders or columns shall be cut without first obtaining written permission from the Architect or Structural Engineer.
D. Methods of cutting: Openings cut through concrete and masonry shall be made with masonry saws and/or core drills and at such locations approved by the Architect/Engineer. Impact type equipment shall not be used except where specifically approved by the Architect/Engineer.
Openings in precast concrete slabs for pipes, etc., shall be core drilled to exact size.
E. Where core drilling or saw cutting of concrete floor or wall penetrations is required, work shall be performed in accordance with Division 03 Specifications. Where applicable Division 03 Specifications are not included in the Project, core drilling shall be in accordance with generally accepted standards and be performed by licensed personnel where applicable.
F. Contractor shall use ground penetrating radar (GPR) to scan areas of concrete prior to core drilling or saw cutting for embedments. Contractor shall clearly mark locations of embedments for review by Structural Engineer or owner’s construction representative before core drilling or saw cutting.
G. Masonry: Where openings are cut through masonry walls, provide and install lintels or other structural supports to protect the remaining masonry. Adequate supports shall be provided during the cutting operation to prevent any damage to the masonry occasioned by the operation.
All structural members, supports, etc., shall be of the proper size and shape, and shall be installed in a manner approved by the Architect/Engineer.
H. Plaster: All mechanical work in areas containing plaster shall be completed prior to the application of the finish plaster coat. Cutting of finish plaster coat will not be permitted.
WIMBERLEY ISD BASEBALL | SOFTBALL
BASIC PLUMBING REQUIREMENTS 22 00 01 - 11/15
I. All drilling methods for expansion bolts, hangers and other supports shall be done subject to be approval of the Architect or Structural Engineer. Labor and materials required to replace or rebuild parts or injured portions shall be furnished at the Contractor's expense, subject to the satisfaction of the Architect.
J. Restoration: All openings shall be restored to "as new" condition under the appropriate Specification Section for the materials involved, and shall match remaining surrounding materials and/or finishes.
K. Opening and Closing Pavement and/or Concrete Flatwork: Cut and patch existing pavement, concrete flatwork, etc. as required to perform work in the contract, satisfactory to the Architect/Engineer. Existing construction shall be machine-cut on straight lines. Unless otherwise described in "Excavating and Backfill", sub-base, base course and paving materials shall be equal to existing materials as required by other Divisions of these specifications or as required to match existing conditions. Materials shall be thoroughly compacted to required (or adjacent) densities and thicknesses and shall be finished level with adjacent surfaces.
3.9 PAINTING
A. Types of paint shall be as specified in the Architectural specifications. Surfaces to be painted are identified in Division 09 and on the drawings. All exposed gas piping shall be painted as noted in Section 22 11 23.
B. All surfaces to be painted shall be thoroughly cleaned, all rust scraped off and all oil and grease removed before any paint is applied.
C. Finishing paint coats shall not be applied until all the work is completed. Cloths shall be spread where necessary to prevent drops of paint, oil, etc. from defacing walls, floors, etc., and the Contractor shall be held responsible for all damage by neglect of such precautions. The finished conditions of the painting shall be subject to the approval of the
D. Architect, who may require retouching or repainting of surfaces not properly finished.
3.10 SLEEVES, ESCUTCHEONS AND PLATES
A. Where pipes pass through ceilings (any type: i.e. lay-in, gypsum, etc.), floors and/or walls in ALL spaces, install sleeves.
B. Where pipes pass through ceilings or walls in finished spaces, install sectional plates or escutcheons to cover the annular opening between pipe and sleeve.
C. The annulus between pipe and walls or floors, shall be filled with A One-component, elastomeric, gun-grade polyurethane sealant; Sonolastic NP or equal; unless fire wall or barrier then the approved UL listed fire assembly shall be used.
D. Inside diameter of escutcheons shall fit around insulation and around pipe when not insulated;
outside diameter shall cover sleeve. Secure escutcheons or plates to pipe or sleeve but not to insulation. All escutcheons shall be triple nickel-chromium plated brass, or Type 316L stainless steel.
3.11 PRODUCTS NOT FURNISHED BUT INSTALLED UNDER DIVISION 22.
A. Rough-in for and make final connection to Owner furnished fixtures and equipment requiring plumbing services.
B. Rough-in for and make final connection to fixtures and equipment furnished under other divisions of these Contract Specifications requiring plumbing services.
WIMBERLEY ISD BASEBALL | SOFTBALL
BASIC PLUMBING REQUIREMENTS 22 00 01 - 12/15
3.12 EXCAVATING AND BACKFILLING
A. The Contractor shall do all excavating and backfilling necessary for the installation of the work, including shoring, bailing and pumping to maintain his trenches and keep them in dry condition until the work in question has been tested and approved.
B. Care shall be taken that piping is properly and uniformly graded and that trench beds are well rammed and that ground under pipelines is firm and secure before piping is laid. All trenches must be backfilled with clean sand, four inches under pipe, rammed down, soaked with water and made solid. All surplus material shall be removed and carted away.
C. The Contractors will be responsible for resurfacing all areas after trenches have been backfilled.
D. The Contractor is directed to comply with all OSHA Requirements and State Requirements regarding trench safety.
E. Perform all work with the highest regard to safety and in accordance with U.S. 29 CFR 1926
“Safety and Health Regulations for Construction”. Special attention shall be directed to Subpart P
– Excavations. Refer also to 230010.1.12 – Safety.
1. Safety Precautions and Programs
a. In excavations that are four (4) feet or more in depth, means of egress shall be provided by stairway, ladder, ramp or other safe means so as to require no more than twenty-five
(25) feet of lateral travel for employees.
b. In addition, on projects in which trench excavation will have a depth of five feet or more, the Contractor, and all of their subcontractors, shall comply with all requirements of 29 CFR 1926 Subpart P 652 “Safety and Health Regulations for Construction – Excavations” and all Appendices related thereto.
c. Before commencing any trench excavation that will be five (5) feet deep or deeper, provide Owner, through A/E, with detailed plans and specifications regarding the safety systems to be utilized. Said plans and specifications shall include a certification from a registered professional engineer indicating full compliance with the 29 CFR 1926 Subpart P -- Excavations.
d. Contractor shall ascertain, prior to proposal, whether or not such conditions prevail and services are needed, and shall include cost of same in proposal.
2. All shoring and bracing shall be designed so that it is effective to the bottom of the excavation. Sheeting, sheet piling, bracing, shoring, trench boxes, and other methods of protection, including sloping, shall be based upon the condition and nature of the materials to be retained, and by loads (including surcharge) imparted to the sides of excavation by equipment and stored materials.
3. Store excavated or other materials a minimum of two feet (2') from the edge of any excavation. Retain such materials to prevent their falling or sliding into the excavation, and to prevent excessive pressure on the sides of the excavation.
4. Maintain sides and slopes of excavations in a safe condition by scaling, benching or barricading.
5. Take other precautions via shoring and bracing to prevent slides or cave-ins. Take special precautions when trenches are located adjacent to backfilled excavations, or subjected to vibrations from railroads, highway traffic, operation of machines, etc.
F. Verify locations of all existing utilities in the area prior to start of excavation (gas, electrical, water, sanitary, storm, telephone, cable TV, optical cable, etc.). Coordinate with utility companies as required.
1. Excavation within four feet (4') of existing utilities shall be done by hand digging only.
WIMBERLEY ISD BASEBALL | SOFTBALL
BASIC PLUMBING REQUIREMENTS 22 00 01 - 13/15
G. Where conditions require concrete or other materials to be placed against undisturbed earth surfaces, any loosened or disturbed materials shall be removed from such surfaces.
H. Trenching
1. Trenches shall be large enough to permit handling of pipe and accessories and making connections. Trench bottom width shall exceed bell or coupling diameters by at least twelve inches (12").
2. Trenches in rock, soil containing rocks larger than two (2) inches in any dimension, and other non-uniform materials, shall be four (4) inches minimum and twelve inches (12") maximum below the bottom of the pipe to provide for a bedding course.
I. Preparation of Trench Bottom
1. If the excavation is carried below the finished flow line grade of the pipe in order to remove unsuitable material or for any other reason, the trench shall be course bedded to within six inches (6") of the finished flow line grade of the pipe bottom with compacted load-bearing backfill. A bedding course as specified below shall then be placed over the load-bearing backfill.
2. Trenches shall be dry when the trench bottom is prepared. A continuous trough with compacted bedding course shall be prepared to receive the bottom quadrant of the pipe barrel. Remove loose or disturbed material and bring the trench bottom up to grade with bedding material as follows:
a. Washed pea gravel with material no larger than 1/2 inch in largest dimension shall be utilized. Provide a minimum of 8” of bedding under all the pipe, fittings and valves.
b. Provide a Bentonite plug in the trench at the building perimeter where site drainage or other conditions could permit water intrusion into the trench under…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .