6-5-CR27020-27343730 Geotech Report.pdf
PDF 4 MB Posted
- Solicitation number
- CR27020
- Issued by
- Utah
About this file
This Geotechnical Report document supports the Southern Utah University New Ticket & Concession Building project under the State of Utah's Division of Facilities Construction and Management (DFCM). The project involves construction of a new concession and ticket building at Southern Utah University, with a construction cost estimate of $487,956.00. This is a Stage II Invitation to Bid, meaning only contractors who have been prequalified under DFCM's Stage I Prequalification process and appear on the current DFCM Prequalified Contractors list as of the solicitation date are eligible to submit bids. The geotechnical report provides subsurface investigation findings and soil analysis necessary for the foundation design and construction planning of the proposed building.
The report serves as a supporting exhibit containing critical geotechnical data including soil composition, bearing capacity analysis, and site-specific recommendations for foundation design and construction methodology. This document is essential for bidders to understand site conditions, potential construction challenges, and soil-related requirements that will inform their bid preparation and cost estimates. The geotechnical findings allow prequalified contractors to accurately assess site-specific risks and develop appropriate construction approaches and budgets for the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
472 N. 2150 W. Suite 7 | Cedar City, Utah 84721 Office: 435.586.3004 Fax: 435.586.7480 Web: www.wecinc.com
March 31, 2025
Scott Jensen
DFCM
4315 S 2700 W FL3
Taylorsville, UT 84129
Dear Scott, Watson Engineering Company, Inc. (Watson) has completed the geotechnical investigation for the above referenced project. Enclosed you will find the geotechnical report including the results of our field and laboratory investigation, engineering analysis, and recommendations for this property. The following table presents a summary of our findings.
Parameter Result Liquefaction Hazard None Landslide Hazard The site is not located in a landslide hazard area
Overexcavation Requirement Over-excavate minor structure foundations to three feet (3’) below all footings; two feet (2’) below slabs. No over-excavation required below foundations when gravel piers are used
Expansive Soils Minor Soil Salt Solubility Negligible
Concrete Placement Do not place concrete in freezing weather and blanket all concrete in cold weather
Compaction Required 95% Relative compaction Final Grade Required 5% (6 inches in 10 feet) Structural Fill Import granular structural fill
As always, if you have any questions or concerns regarding our testing, results, or recommendations please feel free to contact us.
Subject: Geotechnical Investigation SUU West Campus Upgrades 1150 West Center Street Cedar City, UT Project Number: 25-7431
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
09/14/2026
REVIEWED FOR CODE
COMPLIANCE
TABLE OF CONTENTS
1 INTRODUCTION
1.1 General Project Information
1.2 Site Description
1.3 Geologic Conditions
1.4 Seismic Conditions
1.5 Subsoil Conditions
2 ENGINEERING ANALYSIS AND RECOMMENDATIONS
2.1 Analysis
2.2 Site Preparation
2.3 Foundations
2.4 Lateral Pressures
2.5 Fill and Backfill
2.6 Slab on Grade
3 GENERAL DISCUSSION
4 ADDITIONAL SERVICES
APPENDIX
Geotechnical Report #25-7431
Page | 1
1 INTRODUCTION
1.1 General Project Information
This report provides our findings as well as our analysis and recommendations with regards to the proposed improvements to the West Campus at Southern Utah University. The improvements will be located at the sports complex, located at the southeast corner of 1150 West and Center Street in Cedar City, Utah. It is understood that the improvements will consist of a 3-story CMU block structure adjacent to the existing football stadium bleachers, and one story structures and a synthetic surface at the softball field area. Foundation loads are expected to be moderate and no special considerations regarding settlement tolerances are needed. This report is prepared assuming that the structure will be designed in accordance with the 2021 International Building Code (IBC).
1.2 Site Description
The improvements consist of two areas, one is a replacement of the existing concession stand located north of the west bleachers with a new 3-story block building; this area is bounded on the north by the track access road, on the south by the bleachers, on the east by the track and football field and on the west by 1150 West Street. This area is currently developed with concrete sidewalks, and the existing single story block building. There is likely some fill associated with the existing improvements. Only one (1) boring was performed in this area due to the significant amount of utilities and the limited access around the existing facilities.
The other area will consist of a new dugout building located adjacent to the softball field, the new softball field will replace the grass with artificial playing surface; this area is bounded on the north by Center Street, on the south by the soccer fields, on the east by 800 West Street and on the west by the parking lot. This area is currently vegetated with sod and some medium sized trees. The area is raised above the adjacent road and parking lots, and a sewer manhole was located near the north end of the property. There was no visual indications of former structures or mass fill onsite, although there may be some fills adjacent to the adjoining elements and in the sewer backfill. It is not known if the fill placement was tested and documented, based on the location and current use, it is likely that it was not. Based on aerial photography, it appears that former structures were located near the north end of the property, consisting of baseball field dugouts and backstop.
1.3 Geologic Conditions
Liquefaction may occur when water-saturated sandy soils are subjected to earthquake ground shaking. When soil liquefies, it loses strength and behaves as a viscous liquid (like quicksand) rather than as a solid. This can cause buildings to sink into the ground
Page | 2 or tilt, empty buried tanks to rise to the ground surface, slope failures, nearly level ground to shift laterally tens of feet (lateral spreading), surface subsidence, ground cracking, and sand blows. Liquefaction is not a concern due to groundwater levels being more than fifty feet (50’) below the surface.
Landslides are common natural hazards in Utah. They often strike without warning and can be destructive and costly. Common types of landslides in Utah are debris flows, slides, and rock falls. Many landslides are associated with rising ground-water levels due to rainfall, snowmelt, and landscape irrigation. Therefore, landslides in Utah typically move during the months of March, April, and May, although debris flows associated with intense thunderstorm rainfall are common in July. Since the site lies in the broad plane of the Cedar Valley floor, this project site does NOT appear to be located atop a Landslide, Debris Flow, or Rockfall hazard.
1.4 Seismic Conditions
From the available maps and USGS interactive GIS database, the site appears to be located within 500 feet of the Hurricane fault zone to the west. Foundations should be designed by a qualified, registered structural engineer. Based on local geology and experience in the area, a site classification of “C” should be used for the design of structures.
The seismic design parameters may be found in the following table. These values were calculated using ASCE 7-16.
Table 1.4 Spectral Response Design Parameters
SS 0.770 g S1 0.248 g SMS 0.923 g SM1 0.372 g SDS 0.616 g SD1 0.248 g
1.5 Subsoil Conditions
The subsoils at the site consist of interbedded layers of lean clay and clayey sand supported on silty sand and clayey gravel to the termination of the borings at a depth of 11.5 feet to 31.5 feet below grade. The soil was visually classified as ‘dry to moist’ to ‘moist’. Groundwater was not encountered.
Undisturbed samples were collected as well as bulk samples throughout the expected depths of earthwork impact. Testing indicates that in-situ densities are on the order of 94 to 111 pcf. Moisture contents of the upper native soils are approximately 7 to 16 percent. Atterberg Limit tests indicate the soil has a liquid limit of 20 to 28, plasticity
Page | 3 indices ranged from 3 to 11. Response to wetting tests experienced eleven (11) percent collapse due to saturation at expected foundation loads. Swell testing indicated an expansion of three percent (3%) on material compacted to 91 percent of the maximum dry density at a moisture content at one percent (1%) above optimum.
Modified proctor testing (ASTM D1557) indicates a maximum dry density of 126.2 pcf at a moisture content of 10.3 percent.
The liquid limit is the moisture content at which a soil begins to flow like a liquid. The plastic limit is the moisture content at which a soil can be deformed without crumbling. The plasticity index is the difference between the liquid limit and the plastic limit. It is a measure of the percentage and type of clay that is in the soil.
2 ENGINEERING ANALYSIS AND RECOMMENDATIONS
2.1 Analysis
The soil is sufficient to support the smaller proposed structures on shallow spread footings with a slab on grade subject to remedial earthwork. Larger buildings with heavier loads will require soil improvement in order to adequately support the loading of the structure.
Field and laboratory testing indicates that the native material is of very low density and will likely collapse if subjected to moisture infiltration. It is recommended that the spread footings be supported by structural fill. Depending on access and the size of the structure and equipment, it may be easier to over-excavate the entire footprint of the structure. Structural fill shall extend at least three feet (3’) below the bottom of footing elevation (both exterior and interior footings), or three feet (3’) below existing grades, whichever is deeper. Structural fill should extend horizontally at least five feet (5’) beyond the edge of the foundations. Structural fill shall consist of imported pit-run or road base material. Placing structural fill below the footings is an option for lighter loaded structures, but the foundation sizes are limited, which will reduce the allowable loads on the soils. See the Foundations section (2.3) for maximum sizing and loading information.
Buildings requiring higher load resistance capacities should be founded on improved soils or deep foundations. This report assumes that rammed aggregate piers will be used to improve the soils to an adequate depth to support the proposed heavier loaded structures. The design of the aggregate piers is performed by the installation contractor. While they will also determine the allowable bearing capacities, typically a bearing capacity of 5,000 psf is allowed.
Structures should be supported on a single foundation system. If a structure has any foundations that require the soil improvement, the improvement shall be performed
Page | 4 for the entire structure. Placing a portion of a single structure on improved soils, and a portion of the same structure on structural fill is not permitted. This will significantly increase the risk of differential settlement and structural damage.
The native silty soils are capable of significant amounts of hydro-collapse. It will be imperative that the site be graded to remove water away from the structures and pavement. If onsite storm water management is used, the infiltration area should be far enough away from structures and pavement so as to reduce the likelihood of increasing the moisture content of the subgrade soils. Pavement should bear on at least two feet (2’) of re-compacted native material, two feet (2’) of non-collapsible import fill, or a combination of both. Collapse requires both increase in moisture and load; two feet (2’) will provide sufficient load reduction in the native soils so as to reduce collapse potential under the pavement to reasonable levels, with expected moisture contents in the soil.
It is understood that artificial turf may be installed as part of this project. Typically the manufacturer has specifications which must be met concerning the subgrade material;
Watson has not been provided the specifications. It is recommended that after excavation for the turf, sand, and drainage system, the subgrade be scarified eight inches (8”), moisture conditioned to slightly above optimum, and recompacted to 90 percent of the maximum dry density. Once the turf specifications have been provided to Watson, an addendum may be provided to this report if necessary.
Groundwater was not encountered during the investigation. It is expected that excavation operations will be able to utilize standard equipment, however the excavation contractor should make his own conclusions.
The native soils are low in density; as such, shrinkage on the order of 35% may be expected. Generally, 25% to 30% shrinkage loss is expected in this area, and overall, this may be a more realistic estimate.
2.2 Site Preparation
The existing vegetation should be cleared along with large root systems. Any debris and loose soils should be removed in their entirety. As the fields slope to the west, the subgrade soils at TP-1 (the western most test pit) had a significant amount of moisture.
This may dry out naturally prior to construction. If not it may require processing to dry the soil to a workable moisture content. Footing excavations should be deepened to account for the over-excavation requirement.
Precautions should be taken during and after construction to eliminate saturation of foundation soils. All drainage and grading next to the structure foundation shall be constructed in accordance with the requirements of section 1804.3 of the 2021 IBC.
Over-wetting the soils prior to or during construction may result in softening and pumping causing equipment mobility problems and difficulty in achieving compaction. Saturation of the soils after construction may cause distress to the
Page | 5 foundations and flatwork. Positive drainage should be established away from the exterior walls of the structures. Positive grade is defined by having a minimum drainage slope in landscaped areas of six inches (6”) for a minimum distance of ten feet (10’) away from the foundation of the structure (five percent (5%)) and in hard surface pavement areas, two inches (2”) for a minimum distance of eight feet (8’) away from the structure (two percent (2%)). This positive grade shall be maintained throughout the life of the structure to minimize the amount of moisture infiltrating the soils against the concrete foundation wall, and that a minimum of six inches (6”) of separation from the top of the concrete foundation wall to any landscaping be maintained. Watering adjacent to the structure should be eliminated and properly maintained to prevent over-watering. Roof runoff and other sources of moisture should not be allowed to infiltrate the soils in the vicinity of, or upslope from the structure. Special care should be taken to properly channel roof runoff and other sources of moisture. This may require other solutions than just site grading.
Prior to placing fills, the excavation bottoms should be scarified to a depth of eight inches (8”), moisture conditioned to within two percent (2%) of optimum, and recompacted to at least 90 percent of the maximum dry density as determined by ASTM D1557 (Modified Proctor). Backfill should be placed as specified in the Fill and Backfill section (2.5) of this report. Once excavation is complete and prior to backfilling, it is recommended that a representative of Watson visit the site and ensure that the subgrade meets the requirements set forth herein.
Pavement areas should be compacted in a similar manner. Any import fill should comply with the requirements as specified in the Fill and Backfill section (2.5) of this report. Any offsite paving should meet city minimum pavement thickness and aggregate base thickness. The excavation bottom should be scarified, moisture conditioned, and re-compacted as recommended above.
2.3 Foundations
It is recommended that foundations bear on structural fill or improved soils. The foundation should bear at least 10 inches below the bottom of slab, and at least 30 inches below grade for frost protection. If site preparation is carried out as specified herein an allowable bearing capacity of 2,000 psf may be used for design. This bearing capacity may be increased 1/3 for wind, seismic, and other transient loads of a short duration. Footings should be a minimum of 20 inches wide. In order to limit settlement, isolated and continuous footings should be limited in width to six feet (6’), and three feet (3’), respectively.
It is recommended that a representative of Watson observe the excavations, once complete to ensure adequate bearing stratum. Re-compacted materials should be tested to ensure they meet the requirements herein. Total settlement is estimated to
Page | 6 be on the order of ½ to 1 inch with differential settlement less than half of the total settlement for shallow spread footings.
These bearing capacities rely on the dry strength of the native soils. Increased moisture could cause the foundations to settle. It is therefore imperative that proper grades be established and runoff controlled to limit moisture infiltration within ten feet (10’) of the structure. The roof drains should discharge at least ten feet (10’) away from the structure. Irrigation should be kept at a minimum within ten feet (10’) of the structure in order to prevent additional moisture increases to the supporting soils.
2.4 Lateral Pressures
The following lateral pressures may be utilized for the proposed construction:
o Active Pressures (Unrestrained walls) 35 psf/ft o At-Rest Pressures (Restrained walls) 60 psf/ft o Passive Pressures
Continuous Footings 300 psf/ft
Spread Footings or Drilled Piers 350 psf/ft o Coefficient of Friction with passive pressure 0.35 without passive pressure 0.45
All backfill must be compacted to at least 95 percent (ASTM D1557) to mobilize these passive pressures at low strain. Expansive soils should not be used as retaining wall or basement wall backfill, except as a surface seal to limit moisture infiltration.
The expansive pressures could greatly increase the active pressures.
2.5 Fill and Backfill
Native material is suitable for use as general grading and structural fill below slabs and pavement. Structural fill below foundations shall consist of imported pit-run or road base material.
All fill placed for the support of footings shall consist of at least three feet (3’) of structural fill, depending on the foundation option selected. Fill placed for slabs-on-grade and exterior concrete flatwork should consist of at least two feet (2’) of structural fill. Pavement (concrete, asphalt, gravel roads, drives, and parking areas) should consist of two feet (2’) of structural fill. Structural fill shall consist of native material or approved imported low plasticity soils (having a remolded swell potential less than 4% under a 60 psf surcharge). Structural fill should have a solubility of less than 3%, be free of vegetation and debris, and contain no inert materials larger than four inches (4”) in nominal size, and at least 20% passing the #200 sieve. Structural fill below footings shall consist of imported pit-run or road base material.
Page | 7
Structural fill should be placed in maximum eight inch (8”) loose lifts and be compacted on a horizontal plane, unless otherwise approved by the Geotechnical Engineer. Structural fills shall be compacted to at least 95 percent of the maximum dry density, as determined by ASTM D1557. The moisture content should be within ±2% of optimum for granular soils and 0% to 2% above optimum for fine grained soils, however this is only a guide to assist earth work contractors. Any pumping areas of soil shall be excavated and removed from the excavation. Any imported fill materials should be approved prior to importing. Prior to placing any fill, the excavations should be observed by the Geotechnical Engineer to observe that unsuitable materials have been removed and that it has been compacted to a suitable density. During earthwork placement the soils shall be inspected according to the requirements contained in IBC 1705.6.
2.6 Slab on Grade
All exterior slabs adjacent to the structure should be tied into the structural foundation with #4 rebar extending from the foundation into the exterior slab at least twelve inches (12”). Stem walls should be tied into interior slabs on grade with #4 rebar placed so that it extends fully into the stem wall and a minimum of approximately 40 bar diameters into the slab. Type 1L concrete should be used for all footings or wherever concrete will come into direct contact with the onsite soils.
Concrete slabs-on-grade and exterior concrete flatwork shall be supported by a four inch (4”) layer of compacted gravel overlying a zone of properly placed and compacted structural fill. The layer of compacted gravel shall consist of Type II Aggregate Base or Type I pit-run gravel.
All concrete slabs should be designed to minimize cracking as a result of shrinkage.
Additionally, all concrete slabs should be reinforced and poured with Type 1L concrete. The steel reinforcement in floor slabs should be doweled into the foundation to aid in resistance of the contraction/expansion potential. We recommend that concrete floor slabs be reinforced as recommended by the Structural Engineer. Reinforcement should be installed at mid-height in the slab unless directed otherwise by the Structural Engineer.
Special precautions must be taken during the placement and curing of all concrete slabs. Excessive slump (greater than 4”) of the concrete and/or improper curing procedures used during either hot or cold weather conditions could lead to excessive shrinkage, cracking, or curling in the slabs. We recommend that all concrete placement and curing operations be performed in accordance with the American Concrete Institute (ACI) Manual R318-19. In addition, we recommend concrete placement be in accordance with ACI standard 306.1: Standard Specification for Cold Weather Concreting; ACI standard 306R: Cold Weather Concreting; ACI standard 305.1:
Specification for Hot Weather Concreting; and, ACI standard 305R: Hot Weather Concreting.
Page | 8
3 GENERAL DISCUSSION
This report has been prepared for the exclusive use of the addressee and their authorized agents. This report is not intended for use by others and the information contained herein is not applicable to other sites not named herein. This report is valid only until the governing jurisdiction recognizes a new building code. If this occurs prior to construction, then Watson should be consulted for updated recommendations.
Watson structures our services to meet the specific needs of our clientele; each study and prepared report is unique and prepared solely for the specific client project site(s).
No other party may rely on our products or services unless Watson agrees, in writing, to allow such use. Within the limitations of scope, schedule and budget, our services have been executed in accordance with our Agreement with the Client and generally accepted geotechnical practices in the area the work was performed at the time this report was prepared.
You may NOT rely on this report if such report was:
Not prepared for you Not prepared for your project Not prepared for the specific site explored Completed before important project changes were made Function of proposed structure has changed Evaluation, configuration, location, orientation or weight of the proposed structure has changed Composition of the design team has changed Project ownership has changed Not paid for in full
No warranty is implied or can be expected with this report. Our interpretations of subsurface conditions are based on a limited number of field and subsurface observations. Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Watson’s professional judgment was applied to a limited number of field observations and laboratory analyses. The recommendations put forward in this report result from a very limited number of observations; such limited observations were constrained by budget.
Watson’s conclusions and interpretations should not be construed as a warranty of the subsurface conditions. A greater degree of accuracy for those observations, interpretations, and conclusions offered may be increased by increasing the number of observation points for comparative analysis.
Hazardous materials or environmental contamination discovered at the site during or as a result of field observations or subsurface exploration do not fall within the scope
Page | 9 of services for this investigation. Watson Engineering Company, Inc., cannot, and will not, be held liable for any such discovery or the spoils left by such discovery. Such hazardous materials are and remain the liability of the property owner.
Do not over-rely on the preliminary construction recommendations included herein;
these recommendations are not final as they were formed, as explained above, from a limited number of observation points and a limited number of laboratory tests.
Watson’s recommendations may only be ‘finalized’ by our personnel directly observing actual subsurface conditions revealed during construction. Watson cannot and will not assume responsibility or liability for the recommendations contained herein if Watson does not perform construction observation and testing services.
The recommendations contained in this report are based on the field explorations, laboratory tests, and our understanding of the proposed construction. The subsurface data used in the preparation of this report were obtained from the explorations made for this investigation. It is possible that variations in the soil and groundwater conditions could exist between the points explored. The nature and extent of variations may not be evident until construction occurs. If any conditions are encountered at this site which are different from those described in this report, our firm should be immediately notified so that we may make any necessary revisions to recommendations contained in this report. In addition, if the scope of the proposed construction changes from that described in this report, our firm should also be notified.
It is the Client's responsibility to see that all parties to the project, including the Designer, Contractor, Subcontractors, etc., are made aware of this report in its entirety.
The use of information contained in this report for bidding purposes should be done at the Contractor's option and risk.
This report is valid for 18 months from the below signed date, or the next code change, whichever comes first. If construction has not commenced prior to expiration of this report, Watson should be contacted to review and provide an update addendum to this report.
4 ADDITIONAL SERVICES
The recommendations made in this report are based on the assumption that an adequate program of tests and observations will be made during the construction to verify compliance with these recommendations. These tests and observations should include, but not necessarily be limited to, the following:
Page | 10
Observations and testing during site preparation, earthwork and structural fill placement.
Observation of footing excavations.
Consultation as may be required during construction.
We also recommend that project plans and specifications be reviewed by us to verify compatibility with our conclusions and recommendations. Additional information concerning the scope and cost of these services can be obtained from our office.
Respectfully Submitted, Brian J. Amos, P.E. Tim G. Watson, P.E.
Geotechnical Engineer President/Principal
3/31/2025 Mar. 31, 2025
APPENDIX
BORING LOCATION PLAN
BORING LOGS
SUMMARY OF LABORATORY RESULTS
MOISTURE DENSITY RELATIONS
GRAIN SIZE DISTIBUTION
CONSOLIDATION TEST (RESPONSE TO WETTING)
SWELL TEST DATA
KEY TO SYMBOLS
SOIL CLASSIFICATION CHART
GEOPHYSICAL SURVEY RESULTS
SS
S-1
SS
S-2
SS
S-3
3-4-3 (7)
2-1-2 (3)
1-1-1 (2)
Loose Brown CLAYEY SAND SOD/TOPSOIL (SC-Dry to Moist)
Soft to Firm Brown LEAN CLAY (CL-Dry to Moist)
Soft Brown SANDY LEAN CLAY (CL-Dry to Moist)
Loose Brown CLAYEY SAND (SC-Moist)
BOTTOM OF BOREHOLE AT 11.5 FEET.
NOTES
DRILLING EQUIPMENT CME-75
DRILLING METHOD Hollow Stem Auger
DRILLING CONTRACTOR Geotechnical Drilling Services
DATE BORED 2/5/25 LOGGED BY
S A
M P
LE
T
Y P
E N
U M
B E
R
R E
C O
V E
R Y
(R
Q D
M O
IS
T
U R
E
D R
Y U
N
IT
W T
(p cf
20 40 60 80
PL LLMC
FINES CONTENT (%)
20 40 60 80
D E
P T
H (f t)
G R
A P
H
IC
LO
G
SPT N VALUE
20 40 60 80
B
LO
W C
O U
N T
S (N
V A
LU
E
MATERIAL DESCRIPTION
BORING LOG: B-1
ADDRESS: 1150 West Center Street, Cedar City, UtahPROJECT NUMBER: 25-7431
CLIENT: DFCM PROJECT: SUU West Campus Upgrades
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
T E
S T
P
IT
/2
/2
:5
GB
BS-2
UD
RS-1
SS
S-3
UD
RS-4
SS
S-5
SS
S-6
SS
S-7
SS
S-8
SS
S-9
7.6
4-7-8 (15)
2-2-2 (4)
5-7-8 (15)
5-11-13 (24)
2-2-2 (4)
6-7-10 (17)
3-4-18 (22)
4-7-14 (21)
Loose Brown CLAYEY SAND SOD/TOPSOIL (SC-Dry to Moist)
Stiff Brown SANDY LEAN CLAY (CL-Dry to Moist)
Loose Brown CLAYEY SAND (SC-Moist) w ith Some Gravel
Dry to Moist
Soft Brown SANDY LEAN CLAY (CL-Dry to Moist)
Medium Dense Brown CLAYEY SAND WITH GRAVEL (SC-Dry to Moist)
Soft Brown SANDY LEAN CLAY (CL-Dry to Moist)
Medium Dense Brown SILTY SAND (SM-Dry to Moist) w ith Some Gravel
BOTTOM OF BOREHOLE AT 31.5 FEET.
NOTES
DRILLING EQUIPMENT CME-75
DRILLING METHOD Hollow Stem Auger
DRILLING CONTRACTOR Geotechnical Drilling Services
DATE BORED 2/5/25 LOGGED BY
S A
M P
LE
T
Y P
E N
U M
B E
R
R E
C O
V E
R Y
(R
Q D
M O
IS
T
U R
E
D R
Y U
N
IT
W T
(p cf
20 40 60 80
PL LLMC
FINES CONTENT (%)
20 40 60 80
D E
P T
H (f t)
G R
A P
H
IC
LO
G
SPT N VALUE
20 40 60 80
B
LO
W C
O U
N T
S (N
V A
LU
E
MATERIAL DESCRIPTION
BORING LOG: B-2
ADDRESS: 1150 West Center Street, Cedar City, UtahPROJECT NUMBER: 25-7431
CLIENT: DFCM PROJECT: SUU West Campus Upgrades
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
T E
S T
P
IT
/2
/2
UD
RS-2
SS
S-3
UD
RS-4
SS
S-5
13.1
3-4-4 (8)
3-5-6 (11)
1-3-3 (6)
11-20-14 (34)
50/1"
Loose Brown CLAYEY SAND SOD/TOPSOIL (SC-Dry to Moist)
Firm to Stiff Brown SANDY SILTY CLAY (CL-ML-Dry to Moist)
Dense Brown CLAYEY GRAVEL WITH SAND (GC-Dry) w ith Occasional Cobble
Increasing Cobble
AUGER REFUSAL AT 15.1 FEET.
NOTES
DRILLING EQUIPMENT CME-75
DRILLING METHOD Hollow Stem Auger
DRILLING CONTRACTOR Geotechnical Drilling Services
DATE BORED 2/5/25 LOGGED BY
S A
M P
LE
T
Y P
E N
U M
B E
R
R E
C O
V E
R Y
(R
Q D
M O
IS
T
U R
E
D R
Y U
N
IT
W T
(p cf
20 40 60 80
PL LLMC
FINES CONTENT (%)
20 40 60 80
D E
P T
H (f t)
G R
A P
H
IC
LO
G
SPT N VALUE
20 40 60 80
B
LO
W C
O U
N T
S (N
V A
LU
E
MATERIAL DESCRIPTION
BORING LOG: B-3
ADDRESS: 1150 West Center Street, Cedar City, UtahPROJECT NUMBER: 25-7431
CLIENT: DFCM PROJECT: SUU West Campus Upgrades
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
T E
S T
P
IT
/2
/2
:5
UD
RS-2
SS
S-3
UD
S-4
SS
S-5
SS
S-6
SS
S-7
SS
S-8
16.3
7.5
2-2-3 (5)
1-1-2 (3)
1-1-1 (2)
2-2-4 (6)
3-4-7 (11)
4-4-5 (9)
7-6-7 (13)
6-35-43 (78)
3.5" ASPHALT
12" ROAD BASE
Firm Brown SANDY LEAN CLAY (CL-Dry to Moist)
Soft
Very Soft
Loose Brown SILTY SAND (SM-Dry to Moist)
Stiff Brown SANDY LEAN CLAY (CL-Dry to Moist)
Dry
Medium Dense Brown SILTY SAND (SM-Dry)
Medium Dense Brown CLAYEY SAND (SC-Dry) w ith Lit t le to Some Gravel
Very Dense Brown CLAYEY GRAVEL WITH SAND (GC-Dry to Moist) w ith Occasional Cobble
BOTTOM OF BOREHOLE AT 31.5 FEET.
NOTES
DRILLING EQUIPMENT CME-75
DRILLING METHOD Hollow Stem Auger
DRILLING CONTRACTOR Geotechnical Drilling Services
DATE BORED 2/5/25 LOGGED BY
S A
M P
LE
T
Y P
E N
U M
B E
R
R E
C O
V E
R Y
(R
Q D
M O
IS
T
U R
E
D R
Y U
N
IT
W T
(p cf
20 40 60 80
PL LLMC
FINES CONTENT (%)
20 40 60 80
D E
P T
H (f t)
G R
A P
H
IC
LO
G
SPT N VALUE
20 40 60 80
B
LO
W C
O U
N T
S (N
V A
LU
E
MATERIAL DESCRIPTION
BORING LOG: B-4
ADDRESS: 1150 West Center Street, Cedar City, UtahPROJECT NUMBER: 25-7431
CLIENT: DFCM PROJECT: SUU West Campus Upgrades
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
T E
S T
P
IT
/2
/2
B-2 0.0-5.0 28 17 11 25 67 CL < 1
B-2 2.5-4.0 13.0 101.8 0.625
B-2 7.5-9.0 7.6 95.0 0.741
B-3 5.0-6.5 22 15 7 9.5 63 CL-ML 13.1 111.3 0.486
B-3 10.0-11.5 8.0 98.9 0.673
B-4 5.0-6.5 24 16 8 9.5 70 CL 16.3 94.1 0.758
B-4 10.0-11.5 20 17 3 9.5 9 7.5 100.7 0.643
SUMMARY OF LABORATORY RESULTS
Borehole Depth
Interval (ft)
Liquid Limit
Plastic Limit
Plasticity Index
Maximum Size
(mm)
%<#200 Sieve
Class-ification
Water Content
Dry Density
(pcf)
Solubility
Void Ratio
ADDRESS: 1150 West Center Street, Cedar City, UtahPROJECT NUMBER: 25-7431
CLIENT: DFCM PROJECT: SUU West Campus Upgrades
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
T A
B O
F
LA
B
/2
/2
0 5 10 15 20 25 30 35 40 45
WATER CONTENT, %
D R
Y D
E N
S
IT
Y , p cf
MOISTURE-DENSITY RELATIONSHIP
2.80
2.70
2.60
Curves of 100% Saturat ion for Specific Gravity Equal to:
LL PL PI
ATTERBERG LIMITS
28 17 11
B-2: 0.0 ft. to 5.0 ftSource of Material
Descript ion of Material SANDY LEAN CLAY(CL)
Test Method ASTM D1557 Method B
TEST RESULTS
PCFMaximum Dry Density %Optimum Water Content 10.3
126.2
ADDRESS: 1150 West Center Street, Cedar City, UtahPROJECT NUMBER: 25-7431
CLIENT: DFCM PROJECT: SUU West Campus Upgrades
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
C O
M P
A C
T
IO
N
/2
/2
0.0010.010.1110100
U.S. SIEVE OPENING IN INCHES
COBBLES
GRAVEL SAND
SILT OR CLAY
PL PI Cc Cu
B-2
B-3
B-4
B-4
%Clay
0.0
5.0
5.0
10.0 coarse fine coarse medium fine
BOREHOLE DEPTH Classificat ion LL
0.0
5.0
5.0
10.0
67.2
63.4
70.2
8.9
%Silt%Sand
31.1
36.2
29.7
9.5
%Gravel
1.7
0.3
0.1
0.00.085
D10D30D60D100
9.5
9.5
9.5
BOREHOLE DEPTH
B-2
B-3
B-4
B-4
U.S. SIEVE NUMBERS HYDROMETER
6 3 2 1.5 3/4 3/8 4 6 8 14 20 40 60 140 200
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
GRAIN SIZE DISTRIBUTION
4 1 1/2 3 10 16 30 50 100
GRAIN SIZE IN MILLIMETERS
SANDY LEAN CLAY(CL)
SANDY SILTY CLAY(CL-ML)
LEAN CLAY with SAND(CL)
ADDRESS: 1150 West Center Street, Cedar City, UtahPROJECT NUMBER: 25-7431
CLIENT: DFCM PROJECT: SUU West Campus Upgrades
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
G R
A
IN
S
IZ
E
/2
/2
100 1,000 10,000
S T
R A
IN
95 8
CONSOLIDATION TEST
STRESS, psf
ADDRESS: 1150 West Center Street, Cedar City, UtahPROJECT NUMBER: 25-7431
CLIENT: DFCM PROJECT: SUU West Campus Upgrades
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
C O
N S
O L
S T
R A
IN
S
IN
G
LE
/2
/2
:5
Classificat ionBOREHOLE DEPTH MC%
B-2 7.5
100 1,000 10,000
S T
R A
IN
111 13
CONSOLIDATION TEST
STRESS, psf
ADDRESS: 1150 West Center Street, Cedar City, UtahPROJECT NUMBER: 25-7431
CLIENT: DFCM PROJECT: SUU West Campus Upgrades
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
C O
N S
O L
S T
R A
IN
S
IN
G
LE
/2
/2
:5
B-3 5.0 SANDY SILTY CLAY(CL-ML)
100 1,000 10,000
S T
R A
IN
94 16
CONSOLIDATION TEST
STRESS, psf
ADDRESS: 1150 West Center Street, Cedar City, UtahPROJECT NUMBER: 25-7431
CLIENT: DFCM PROJECT: SUU West Campus Upgrades
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
C O
N S
O L
S T
R A
IN
S
IN
G
LE
/2
/2
:5
B-4 5.0 LEAN CLAY with SAND(CL)
100 1,000 10,000
S T
R A
IN
101 8
CONSOLIDATION TEST
STRESS, psf
ADDRESS: 1150 West Center Street, Cedar City, UtahPROJECT NUMBER: 25-7431
CLIENT: DFCM PROJECT: SUU West Campus Upgrades
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
C O
N S
O L
S T
R A
IN
S
IN
G
LE
/2
/2
:5
B-4 10.0
B-2, BS-2 0.0 - 5.0 126.2 10.3 115.5 11.1 91.5 18 100 3.3
SWELL TEST DATA
SAMPLE
DEPTH, ft
BORING or
TEST PIT No.
MAXIMUM
DRY DENSITY
(pcf)
OPTIMUM
MOISTURE
CONTENT (%)
REMOLDED
DRY DENSITY
(pcf)
INITIAL
MOISTURE
CONTENT (%)
PERCENT
COMPACTION
FINAL
MOISTURE
CONTENT (%)
CONFINING
LOAD
(psf)
TOTAL
SWELL (%)
CLIENT DFCM
PROJECT NUMBER 25-7431
PROJECT NAME SUU West Campus Upgrades
PROJECT LOCATION 1150 West Center Street , Cedar City, Utah
S W
E
LL
T E
S T
/2
/2
:5
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
ADDRESS: 1150 West Center Street, Cedar City, UtahPROJECT NUMBER: 25-7431
CLIENT: DFCM PROJECT: SUU West Campus Upgrades
KEY TO SYMBOLS
SAMPLER SYMBOLSLITHOLOGIC SYMBOLS
(Unified Soil Classification System)
ASPHALT: Asphalt
CL: USCS Low Plast icity Clay
CLS: USCS Low Plast icity Sandy Clay
CLS-MLS: USCS Sandy Silty-Clay
GC: USCS Clayey Gravel
GW: USCS Well-graded Gravel
SC: USCS Clayey Sand
SM: USCS Silty Sand
TOPSOIL: Topsoil
Grab Sample
Split Spoon
Undisturbed Sample
ABBREVIATIONS
LL
PI
W
DD
NP
-200
PP
LIQUID LIMIT (%)
PLASTIC INDEX (%)
MOISTURE CONTENT (%)
DRY DENSITY (PCF)
NON PLASTIC
PERCENT PASSING NO. 200 SIEVE
POCKET PENETROMETER (TSF)
TV
PID
UC
ppm
TORVANE
PHOTOIONIZATION DETECTOR
UNCONFINED COMPRESSION
PARTS PER MILLION
Water Level at Time Drilling, or as Shown
Water Level at End of Drilling, or as Shown
Water Level After 24 Hours, or as Shown
Watson Engineering Company, Inc.
472 N. 2150 W. Ste 7 Cedar City, UT 84721 435-586-3004
G E
N E
R A
L S
Y M
B O
L K
E Y
/2
/2
NOTE: DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS
SYMBOLS TYPICAL
DESCRIPTIONSGRAPH LETTER
WELL-GRADED GRAVELS, GRAVEL -
SAND MIXTURES, LITTLE OR NO FINES
POORLY-GRADED GRAVELS, GRAVEL -
SAND MIXTURES, LITTLE OR NO FINES
SILTY GRAVELS, GRAVEL - SAND - SILT
MIXTURES
CLAYEY GRAVELS, GRAVEL - SAND -
CLAY MIXTURES
WELL-GRADED SANDS, GRAVELLY
SANDS, LITTLE OR NO FINES
POORLY-GRADED SANDS, GRAVELLY
SAND, LITTLE OR NO FINES
SILTY SANDS, SAND - SILT MIXTURES
CLAYEY SANDS, SAND - CLAY
MIXTURES
INORGANIC SILTS AND VERY FINE
SANDS, ROCK FLOUR, SILTY OR CLAYEY
FINE SANDS OR CLAYEY SILTS WITH
SLIGHT PLASTICITY
INORGANIC CLAYS OF LOW TO MEDIUM
PLASTICITY, GRAVELLY CLAYS, SANDY
CLAYS, SILTY CLAYS, LEAN CLAYS
ORGANIC SILTS AND ORGANIC SILTY
CLAYS OF LOW PLASTICITY
INORGANIC SILTS, MICACEOUS OR
DIATOMACEOUS FINE SAND OR SILTY
SOILS
INORGANIC CLAYS OF HIGH PLASTICITY
ORGANIC CLAYS OF MEDIUM TO HIGH
PLASTICITY, ORGANIC SILTS
PEAT, HUMUS, SWAMP SOILS WITH
HIGH ORGANIC CONTENTS
GW
GP
GM
GC
SW
SP
SM
SC
ML
CL
OL
MH
CH
OH
PT
LIQUID LIMIT
LESS THAN 50
MORE THAN 50%
OF MATERIAL IS
SMALLER THAN NO.
200 SIEVE SIZE
FINE
GRAINED
SOILS
(APPRECIABLE AMOUNT
OF FINES)
SANDS WITH
FINESMORE THAN 50%
OF COARSE
FRACTION PASSING
ON NO. 4 SIEVE
(LITTLE OR NO FINES)
CLEAN SANDS
(APPRECIABLE AMOUNT
OF FINES)
GRAVELS WITH
FINES
(LITTLE OR NO FINES)
CLEAN GRAVELSGRAVEL
AND
GRAVELLY
SOILS
MORE THAN 50%
OF COARSE
FRACTION
RETAINED ON NO. 4
SIEVE
SAND
AND
SANDY
SOILS
MORE THAN 50%
OF MATERIAL IS
LARGER THAN NO.
200 SIEVE SIZE
MAJOR DIVISIONS
HIGHLY ORGANIC SOILS
LIQUID LIMIT
GREATER THAN 50
SILTS
AND
CLAYS
SILTS
AND
CLAYS
SOIL CLASSIFICATION CHART
COARSE
GRAINED
SOILS
14425 S. Center Point Way, Bluffdale, Utah 84065 ~ T: (801) 501-0583 ~ F: (801) 501-0584
February 10, 2025
Brian J. Amos, P.E.
Watson Engineering Company, Inc.
472 N 2150 W
Cedar City, UT 84721
SUU Geophysical Survey
Mr. Amos, This letter is in regard to the geophysical survey that was conducted at a site in Cedar City at a location for future construction at the Southern Utah University (SUU). It is our understanding that a Site Classification based on shear wave velocity was needed for the site as part of the geotechnical evaluation. This letter includes a summary of the fieldwork performed and the results of our survey.
A multi-channel analysis of surface waves (MASW) survey was performed by GeoStrata at the subject site on January 30, 2025. The survey included as requested a total of 2 locations across the Subject Site as shown on Plate 1. It is our understanding during the meeting on site that the survey lines are located near the future building area. Data from the surveys were used to generate a one-dimensional (1D) depth profile of the seismic shear wave velocity of the subsurface at each survey location.
Field Survey Summary
Each MASW survey location was set up by placing 24 geophones 10 feet apart in a line and were located using the provided location data. GeoStrata used 4.5 Hertz vertical geophones which are typically used for surface wave surveys. The geophones were connected to the GEODE seismograph by use of a spread cable. A 10-pound(lb) sledgehammer was used to generate seismic energy or shots by hitting a strike plate. Shots were conducted off both ends of the geophone spread at distances of 10 ft, 60 ft, and 120 ft. Three shots were collected and compiled at each location to improve signal strength.
Data Processing and Evaluation
The MASW data collected at the subject site was processed using ParkSEIS software. To generate the 1D shear wave profiles and to estimate the Shear Velocity (Vs) value for the site, data from the shots of each survey line were imported into ParkSEIS. A dispersion curve was generated by summing up the various amplitude displays of phase velocity versus frequency. The dispersion curve was then used to conduct an inversion to calculate a ten-layer, 1D model of velocity layering for the survey line. This modeling generated 1D shear wave profiles to a depth of over 100 feet (30 Meters).
Plates 2 and 3 show the 1D Vs 100 profile generated for each MASW line using the energy source points off the ends of the survey line. The 1D shear-wave velocity profile is an estimate of the Vs 100 for each survey location that was performed at the subject site. The calculations were based on formulas in accordance with the International Building Code. Shear-velocity ranges are provided on Plate 4. The following table is a summary of the Vs 100 results at each survey location and the Site Class based on the International Building Code (IBC) Minimum Design
Loads for Buildings and Other Structures (ASCE 7-02 and ASCE 7-05). Line 1 and line 2 are classified as “C” which corresponds with dense soil and or soft rock.
Shear Wave Velocity Results
Location Vs100
(ft/sec) Site Class
Line 1 2079 C
Very Dense Soil and Soft Rock
Line 2 2050 C
Very Dense Soil and Soft Rock
Thank you for taking the time to review our summary of the survey conducted at the subject site.
Please feel free to contact Jon Peaden or Mike Vorkink at 801-501-0583 with any questions that you might have.
Regards, Jon Peaden Mike Vorkink P.G.
Environmental Scientist Senior Geologist
GeoStrata
14425 S. Center Point Way
Bluffdale, UT 84065
P: (801) 501-0583
F: (801) 501-0584
E: jonp@geostrata-llc.com
0 100 200 300 40050 Feet
1:2,400
±Watson Engineering
SUU
Project Number: 1737-002
Exploration Location Map
Plate 1Legend
MASW Line
Copyright GeoStrata, 2025
Line 1 Line 2
Copyright GeoStrata , 2025
Inversion Model and Interpretation
Plate
SUU Geophysical Study
Geophysical Study
Project Number: 1737-002
SUU Vs 100 Line 1a) Line 1 Final Model
Site Class ‘C’ Very Dense Soil and
Soft Rock Vs (100ft) = 2079 ft/sec
Plate
SUU Geophysical Study
Geophysical Study
Project Number: 1737-002
SUU Vs 100 Line 2a) Line 2 Final Model
Site Class ‘C’ Very Dense Soil and
Soft Rock Vs (100ft) = 2050 ft/sec
Plate
SUU Geophysical Study
Geophysical Study
Project Number: 1737-002
SUU Vs 100