This is an Energy Permit Compliance Certificate issued by the Division of Facilities Construction and Management (DFCM) for Southern Utah University's new Ticketing and Concessions Building (Project #136440) located in Cedar City, Utah. The 827 square foot nonresidential dining facility is designed to comply with the 2021 International Energy Conservation Code (IECC) for Climate Zone 5b new construction. The project includes a single-zone packaged terminal heat pump HVAC system with a heating capacity of 36,700 kBtu/h and cooling capacity of 39,700 kBtu/h, an electric storage water heater with 30-gallon capacity, and comprehensive lighting systems for interior and exterior spaces. The envelope design incorporates insulated roof assemblies, masonry walls with metal furring, insulated metal doors, and windows with thermal breaks. The building achieved design ratings substantially exceeding code requirements: 23% better than code for envelope compliance, 45% better than code for interior lighting, and 74% better than code for exterior lighting.
The project has earned 10.0 energy efficiency credits against a required 15.0 credits through enhanced envelope performance (5.0 credits), enhanced digital lighting controls (3.0 credits), energy monitoring (3.0 credits), 5% cooling efficiency improvement (2.0 credits), and 5% heating efficiency improvement (2.0 credits). Interior lighting design incorporates 370 proposed watts compared to 671 allowed watts across concession, storage, and ticketing areas, utilizing LED fixtures with occupancy sensors and manual controls. Exterior lighting uses 234 proposed watts across tradable zones with daylight shutoff and timeswitch controls. The mechanical, electrical, envelope, and plumbing systems have all been certified as compliant with mandatory 2021 IECC requirements, with comprehensive commissioning, testing, and operations and maintenance documentation required upon project completion. The construction cost estimate is $487,956.00, with bidding limited to contractors prequalified under the Stage I Prequalification for Contractors process as of the solicitation date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:38 AM (PDT) 1 of 11
Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Project No:
All Electric:
Is Renewable:
Has Battery:
Has Charger:
Has Heat Pump
2021 IECC
SUU Ticketing and Concessions Building Cedar City, Utah 5b New Construction 136440 false false false false true
Construction Site: Owner/Agent: Designer/Contractor:
Notes:
Energy Credits
Description Credit
Enhanced envelope performance 5.0
Enhanced digital lighting controls 3.0
Energy monitoring 3.0
5% cooling efficiency improvement 2.0
5% heating efficiency improvement 2.0
Credits: 10.0 Required 15.0 Proposed
Building Area
Description Floor Area
1-Dining: Cafeteria/Fast Food (Dining: Cafeteria/Fast Food) : Nonresidential 827
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
09/14/2026
REVIEWED FOR CODE
COMPLIANCE
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:38 AM (PDT) 2 of 11
Envelope Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Vertical Glazing / Wall Area:
2021 IECC
SUU Ticketing and Concessions Building Cedar City, Utah 5b New Construction 0.009
Construction Site: Owner/Agent: Designer/Contractor:
Envelope Assemblies
Assembly Gross Area or Perimeter
Cavity R- Value
Cont.
R- Value
Proposed U-Factor
Budget U- Factor
Roof:Roof, Insulation Entirely Above Deck, [Bldg. Use 1 - Dining:
Cafeteria/Fast Food]
751 --- 30.00 0.032 0.032
Floor:Floor, Unheated Slab-On-Grade, Horizontal with vertical 2 ft., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (c)
116 --- 15.00 0.690 0.520
NORTH
Ext Wall:Ext Wall - NORTH, Masonry, Light Density, Furring: Metal, [Bldg. Use 1 - Dining: Cafeteria/Fast Food]
345 0.00 16.30 0.051 0.090
EAST
Ext Wall:Ext Wall - EAST, Masonry, Light Density, Furring: Metal, [Bldg.
Use 1 - Dining: Cafeteria/Fast Food]
667 0.00 16.30 0.051 0.090
Door:Door - EAST - ROLL-UP, Insulated Metal, Garage door < 14% glazing, [Bldg. Use 1 - Dining: Cafeteria/Fast Food]
105 --- --- 0.150 0.310
SOUTH
Ext Wall:Ext Wall - SOUTH, Masonry, Light Density, Furring: Metal, [Bldg. Use 1 - Dining: Cafeteria/Fast Food]
345 0.00 16.30 0.051 0.090
Window:Window - SOUTH - TICKETING, Metal Frame with Thermal Break, Perf. Specs.: Product ID , SHGC 0.36, PF 0.47, VT 0.70, [Bldg.
Use 1 - Dining: Cafeteria/Fast Food] (b)
18 --- --- 0.290 0.450
WEST
Ext Wall:Ext Wall - WEST, Masonry, Light Density, Furring: Metal, [Bldg.
Use 1 - Dining: Cafeteria/Fast Food]
667 0.00 16.30 0.051 0.090
Door:Door - WEST - HM, Insulated Metal, Swinging, [Bldg. Use 1 - Dining: Cafeteria/Fast Food]
61 --- --- 0.360 0.370
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(c) Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Envelope PASSES: Design 23% better than code
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2021 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:38 AM (PDT) 3 of 11
Name - Title Signature Date
Kyle Borchert - PM 7.21.2026
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:38 AM (PDT) 4 of 11
Inspection Checklist
Energy Code: 2021 IECC
Requirements: 0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Plan Review
Section
& Req.ID Plan Review Complies? Comments/Assumptions
C103.2
[PR1]1
Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.4.2
[PR14]1
In enclosed spaces > 2,500 ft2 directly under a roof with ceiling heights >15 ft. and used as an office, lobby, atrium, concourse, corridor, storage, gymnasium/exercise center, convention center, automotive service, manufacturing, non-refrigerated warehouse, retail store, distribution/sorting area, transportation, or workshop, the following requirements apply: (a) the daylight zone under skylights is >= half the floor area; (b) the skylight area to daylight zone is >= 3 percent with a skylight VT >= 0.40; or a minimum skylight effective aperture >= 1 percent.
Complies
Does Not Comply
Not Observable
Not Applicable
C406
[PR9]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.4.1
[PR10]1
The vertical fenestration area <= 30 percent of the gross above-grade wall area.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.4.1
[PR11]1
The skylight area <= 3 percent of the gross roof area.
Complies
Does Not Comply
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:38 AM (PDT) 5 of 11
Footing / Foundation Inspection
Section
& Req.ID Footing / Foundation Inspection Complies? Comments/Assumptions
C303.2
[FO4]2
Slab edge insulation installed per manufacturer’s instructions.
Complies
Does Not Comply
Not Observable
Not Applicable
C303.2.1
[FO6]1
Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities.
Complies
Does Not Comply
Not Observable
Not Applicable
C105
[FO3]2
Installed slab-on-grade insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.2.4
[FO7]2
Slab edge insulation depth/length. Slab insulation extending away from building is covered by pavement or >= 10 inches of soil.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:38 AM (PDT) 6 of 11
Framing / Rough-In Inspection
Section # & Req.ID Framing / Rough-In Inspection Complies? Comments/Assumptions
C303.1.3
[FR12]2
Fenestration products rated in accordance with NFRC certified and as to performance labels or certificates provided.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.5.4
[FR18]3
Factory-built fenestration and doors are labeled as meeting air leakage requirements.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.5.9
[FR17]3
Vestibules are installed on all building entrances. Doors have self-closing devices.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.4.3
[FR10]1
Vertical fenestration SHGC value. Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.4.3, C402.4.3.4
[FR8]1
Installed vertical fenestration U-factor and SHGC consistent with label specifications and as reported in plans and COMcheck reports.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.4.5
[FR14]2
U-factor of opaque swinging and nonswinging doors associated with the building thermal envelope meets requirements.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.5.1.3
[FR19]1
The building envelope contains a continuous air barrier that is sealed in an approved manner and material permeability <= 0.004 dfm/ft2. Air barrier penetrations are sealed in an approved manner.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:38 AM (PDT) 7 of 11
Mechanical Rough-In Inspection
Section # & Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions
C402.5.7, C403.7.7
[ME3]3
Stair and elevator shaft vents have motorized dampers that automatically close. Reference section C403.7.7 for operational details.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.7
[ME58]3
Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed.
Reference section language for operational details.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:38 AM (PDT) 8 of 11
Rough-In Electrical Inspection
Section # & Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions
C405.7
[EL26]2
Low-voltage dry-type distribution electric transformers meet the minimum efficiency requirements of Table C405.6.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.8
[EL27]2
Electric motors meet the minimum efficiency requirements of Tables C405.7(1) through C405.7(4). Efficiency verified through certification under an approved certification program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist).
Complies
Does Not Comply
Not Observable
Not Applicable
C405.9.1, C405.9.2
[EL28]2
Escalators and moving walks comply with ASME A17.1/CSA B44 and have automatic controls configured to reduce speed to the minimum permitted speed in accordance with ASME A17.1/CSA B44 or applicable local code when not conveying passengers.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.10
[EL29]2
Total voltage drop across the combination of feeders and branch circuits <= 5%.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.1.1
[EL30]2
At least 90% of dwelling unit permanently installed lighting shall have lamp efficacy >= 65 lm/W or luminaires with efficacy >= 45 lm/W or comply with C405.2.4 or C405.3.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.11, C405.11.1
[EL31]2
50% of 15/20 amp receptacles installed in enclosed offices, conference rooms, copy rooms, break rooms, classrooms and workstations and > 25% of branch circuit feeders for modular furniture will have automatic receptacle control in accordance with C405.11.1.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:38 AM (PDT) 9 of 11
Insulation Inspection
Section
& Req.ID Insulation Inspection Complies? Comments/Assumptions
C303.1
[IN3]1
Roof insulation installed per manufacturer’s instructions and is labeled with R-value or insulation certificate providing R-value and other relevant data. Blown or poured loose-fill insulation is installed only where the roof slope is <=3 in 12.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.2.1
[IN20]1
Roof assembly meets minimal thermal resistance installed between roof framing or in a continuous fashion on the roof assembly as stipulated in Table C402.1.3. Requirements for above deck insulation, minimum thickness, suspended ceilings, staggered joints and skylight curbs will be met.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.2.3
[IN8]2
Installed floor insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.2.6
[IN18]3
Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5.
Complies
Does Not Comply
Not Observable
Not Applicable
C105 [IN2]1 Installed roof insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. For some ceiling systems, verification may need to occur during Framing Inspection.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.5.1.1
[IN1]1
All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor-permeable wrapping material to minimize air leakage.
Complies
Does Not Comply
Not Observable
Not Applicable
C303.2
[IN7]1
Above-grade wall insulation installed per manufacturer’s instructions.
Complies
Does Not Comply
Not Observable
Not Applicable
C105 [IN6]1 Installed above-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:38 AM (PDT) 10 of 11
Final Inspection
Section
& Req.ID Final Inspection Complies? Comments/Assumptions
C406.2.1
[FI66]1
5% heating efficiency improvement - all HVAC and Plant heating equipment is 5% more efficient than required by 2021 IECC.
Complies
Does Not Comply
Not Observable
Not Applicable
C406.2.2
[FI66]1
5% cooling efficiency improvement - all HVAC and Plant cooling equipment is 5% more efficient than required by 2021 IECC.
Complies
Does Not Comply
Not Observable
Not Applicable
C406.4
[FI54]1
Enhanced Digital Lighting Controls - Interior lighting has the following enhanced lighting controls in accordance with Sections C405.2.1 through C405.2.3, Luminaires capable of continuous dimming and being addressed individually, at least 8 luminaires controlled in combination in a daylight zone, digital control system for fixtures with load shedding or occupancy sensors, Sequence of Operations documentation, and functional testing per Section C408.
Complies
Does Not Comply
Not Observable
Not Applicable
C401.3
[FI58]1
A thermal envelope certificate will be supplied and completed by an approved third party.
Complies
Does Not Comply
Not Observable
Not Applicable
C406.8
[FI68]1
Enhanced envelope performance - the building thermal envelope UA value is >= 15% better than the total UA of the envelope specified by Section C402.1.5.
Complies
Does Not Comply
Not Observable
Not Applicable
C406.10
[FI63]1
Energy Monitoring - the building is equipped with an energy management system to monitor, record, and report energy consumption for electrical energy, by end-use category, contain meters, a data acquisition system and employ graphical reports.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.1.1
[FI57]1
Building operations and maintenance documents will be provided to the owner.
Documents will cover manufacturers' information, specifications, programming procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained, and operated.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.5.10
[FI26]3
Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled.
Seal between interior finish and luminaire housing.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.5.11
[FI59]1
Operable openings > 40 ft2 will be interlocked with heating and cooling systems to setback setpoint temperatures within 10 minutes of opening.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.5.8
[FI37]1
Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:38 AM (PDT) 11 of 11
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:39 AM (PDT) 1 of 10
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Project No:
All Electric:
Is Renewable:
Has Battery:
Has Charger:
Has Heat Pump
2021 IECC
SUU Ticketing and Concessions Building Cedar City, Utah 5b New Construction 136440 false false false false true
Construction Site: Owner/Agent: Designer/Contractor:
Notes:
Energy Credits
Description Credit
Enhanced envelope performance 5.0
Enhanced digital lighting controls 3.0
Energy monitoring 3.0
5% cooling efficiency improvement 2.0
5% heating efficiency improvement 2.0
Credits: 10.0 Required 15.0 Proposed
Building Area
Description Floor Area
1-Dining: Cafeteria/Fast Food (Dining: Cafeteria/Fast Food) : Nonresidential 827
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:39 AM (PDT) 2 of 10
Interior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
2021 IECC
SUU Ticketing and Concessions Building Cedar City, Utah 5b New Construction
Construction Site: Owner/Agent: Designer/Contractor:
Allowed Interior Lighting Power
A B C D
Area Category Floor Area (ft2) Allowed Watts / ft2 Allowed Watts
1-CONCESSION (Common Space Types:Food Preparation) 530 1.09 578
2-STORAGE (Common Space Types:Storage) 44 0.2 9
3-TICKETING (Retail:Sales Area) 81 1.05 85
Total Allowed Watts: 671
Proposed Interior Lighting Power
A B C D
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
# of Fixture Fixture Watt. (B X C)
1-CONCESSION (Common Space Types:Food Preparation)
T24F: T24F: LED: 10 29 290
2-STORAGE (Common Space Types:Storage)
LS4: LS4: LED: 1 22 22
3-TICKETING (Retail:Sales Area)
T24: T24: LED: 2 29 58
Total Proposed Watts: 370
Proposed Interior Lighting Controls
Fixture Lighting Control
1-CONCESSION (Common Space Types:Food Preparation)
T24F: T24F: LED: Manual Control
2-STORAGE (Common Space Types:Storage)
LS4: LS4: LED: Manual Control
3-TICKETING (Retail:Sales Area)
T24: T24: LED: Occupancy Sensor
Interior Lighting PASSES: Design 45% better than code
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:39 AM (PDT) 3 of 10
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2021 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Mitch Nelson - Electrical Designer Mitch Nelson 07/20/2026
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:39 AM (PDT) 4 of 10
Exterior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Exterior Lighting Zone:
2021 IECC
SUU Ticketing and Concessions Building Cedar City, Utah 5b New Construction Other (LZ3)
Construction Site: Owner/Agent: Designer/Contractor:
Allowed Exterior Lighting Power
A B C D E
Area/Surface Category Quantity Allowed Watts / ft2 Tradable Wattage
Allowed Watts (B X C)
Ext Area (Free standing/attached sales canopy)
175 ft2 0.60 No 105.0
Doors (Pedestrian and vehicular entrances and exits)
6 ft of door width
21.00 No 126.0
Ext Area 1 (Plaza area) 1477 ft2 0.11 No 162.47
Total Tradable Watts (a): 393.47
Base Site Allowance (b): 500
Total Allowed Watts: 893.47
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A base site allowance equal to 400 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
A B C D
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
# of Fixture Fixture Watt. (B X C)
Ext Area (Free standing/attached sales canopy, 175 ft2):
Tradeable Wattage
LR4: LR4: LED: 2 16 32
LR6: LR6: LED: 3 24 72
Doors (Pedestrian and vehicular entrances and exits, 6 ft of door width): Tradeable Wattage
OW1E: OW1E: LED: 2 17 34
Ext Area 1 (Plaza area, 1477 ft2): Tradeable Wattage
B-1: B-1: LED: 4 24 96
Total Tradable Proposed Watts: 234
Proposed Exterior Lighting Controls
Fixture Lighting Control
Ext Area (Free standing/attached sales canopy, 175 ft2)
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:39 AM (PDT) 5 of 10
Fixture Lighting Control
LR4: LR4: LED: Daylight Shutoff, Exterior Timeswitch
LR6: LR6: LED: Daylight Shutoff, Exterior Timeswitch
Doors (Pedestrian and vehicular entrances and exits, 6 ft of door width)
OW1E: OW1E: LED: Daylight Shutoff, Exterior Timeswitch
Ext Area 1 (Plaza area, 1477 ft2)
B-1: B-1: LED: Daylight Shutoff, Exterior Timeswitch
Exterior Lighting PASSES: Design 74% better than code
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2021 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Mitch Nelson - Electrical Designer Mitch Nelson 07/20/2026
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:39 AM (PDT) 6 of 10
Energy Code: 2021 IECC
Requirements: 50% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Plan Review
Section
& Req.ID Plan Review Complies? Comments/Assumptions
C406
[PR9]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options.
Complies
Does Not Comply
Not Observable
Not Applicable
C103.2
[PR4]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: EL101
C103.2
[PR8]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: EL101
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:39 AM (PDT) 7 of 10
Section
& Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions
C405.2.3.1
[EL22]1
Spaces required to have light-reduction controls have a manual control that allows the occupant to reduce the connected lighting load in a reasonably uniform illumination pattern >= 50 percent.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: EL101
C405.2.7
[EL28]1
Automatic lighting controls for exterior lighting installed. Controls will be daylight controlled, set based on business operation time-of-day, or reduce connected lighting > 30%.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: EL101
C405.7
[EL26]2
Low-voltage dry-type distribution electric transformers meet the minimum efficiency requirements of Table C405.6.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.8
[EL27]2
Electric motors meet the minimum efficiency requirements of Tables C405.7(1) through C405.7(4). Efficiency verified through certification under an approved certification program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist).
Complies
Does Not Comply
Not Observable
Not Applicable
C405.9.1, C405.9.2
[EL28]2
Escalators and moving walks comply with ASME A17.1/CSA B44 and have automatic controls configured to reduce speed to the minimum permitted speed in accordance with ASME A17.1/CSA B44 or applicable local code when not conveying passengers.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.10
[EL29]2
Total voltage drop across the combination of feeders and branch circuits <= 5%.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.1.1
[EL30]2
At least 90% of dwelling unit permanently installed lighting shall have lamp efficacy >= 65 lm/W or luminaires with efficacy >= 45 lm/W or comply with C405.2.4 or C405.3.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.11, C405.11.1
[EL31]2
50% of 15/20 amp receptacles installed in enclosed offices, conference rooms, copy rooms, break rooms, classrooms and workstations and > 25% of branch circuit feeders for modular furniture will have automatic receptacle control in accordance with C405.11.1.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.2.1, C405.2.1.1
[EL18]1
Occupancy sensors installed in classrooms/lecture/training rooms, conference/meeting/multipurpose rooms, copy/print rooms, lounges/breakrooms, enclosed offices, open plan office areas, restrooms, storage rooms, locker rooms, corridors, warehouse storage areas, and other spaces <= 300 sqft that are enclosed by floor-to-ceiling height partitions. Reference section language C405.2.1.2 for control function in warehouses and section C405.2.1.3 for open plan office spaces.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C405.2.1.2
[EL19]1
Occupancy sensors control function in warehouses: In warehouses, the lighting in aisleways and open areas is controlled with occupant sensors that automatically reduce lighting power by 50% or more within 20 minutes of when the areas are unoccupied.
The occupant sensors control lighting in each aisleway independently and do not control lighting beyond the aisleway being controlled by the sensor. Lights not turned off by occupant sensors is done so by time-switch.
Complies
Does Not Comply
Not Observable
Exception: Requirement does not apply.
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:39 AM (PDT) 8 of 10
Section
& Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions
C405.2.1.3
[EL20]1
Occupant sensor control function in open plan office areas: Occupant sensor controls in open office spaces >= 300 sq.ft. have controls 1) configured so that general lighting can be controlled separately in control zones with floor areas <= 600 sq.ft. within the space, 2) general lighting in each zone permitted to turn on upon occupancy in control zone, 3) automatically turn off general lighting in all control zones within 20 minutes after all occupants have left the space, 4) are configured so that general lighting power in each control zone is reduced by >= 80% of the full zone general lighting power within 20 minutes of all occupants leaving that control zone.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C405.2.2, C405.2.2.1
[EL21]2
Each area not served by occupancy sensors (per C405.2.1.1) have time-switch controls and functions detailed in sections C405.2.2.1.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: EL101
C405.2.4, C405.2.4.1, C405.2.4.2
[EL23]2
Daylight zones provided with individual controls that control the lights independent of general area lighting. See code section C405.2.3 Daylight-responsive controls for applicable spaces, C405.2.3.1 Daylight responsive control function and section C405.2.3.2 Sidelit zone.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: EL101
C405.2.5
[EL27]1
Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: EL101
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:39 AM (PDT) 9 of 10
Section
& Req.ID Final Inspection Complies? Comments/Assumptions
C303.3, C408.2.5.2
[FI17]3
Furnished O&M instructions for systems and equipment to the building owner or designated representative.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.5.1
[FI19]1
Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Exterior Lighting fixture schedule for values
C406.2.1
[FI66]1
5% heating efficiency improvement - all HVAC and Plant heating equipment is 5% more efficient than required by 2021 IECC.
Complies
Does Not Comply
Not Observable
Not Applicable
C406.2.2
[FI66]1
5% cooling efficiency improvement - all HVAC and Plant cooling equipment is 5% more efficient than required by 2021 IECC.
Complies
Does Not Comply
Not Observable
Not Applicable
C406.4
[FI54]1
Enhanced Digital Lighting Controls - Interior lighting has the following enhanced lighting controls in accordance with Sections C405.2.1 through C405.2.3, Luminaires capable of continuous dimming and being addressed individually, at least 8 luminaires controlled in combination in a daylight zone, digital control system for fixtures with load shedding or occupancy sensors, Sequence of Operations documentation, and functional testing per Section C408.
Complies
Does Not Comply
Not Observable
Not Applicable
C406.8
[FI68]1
Enhanced envelope performance - the building thermal envelope UA value is >= 15% better than the total UA of the envelope specified by Section C402.1.5.
Complies
Does Not Comply
Not Observable
Not Applicable
C406.10
[FI63]1
Energy Monitoring - the building is equipped with an energy management system to monitor, record, and report energy consumption for electrical energy, by end-use category, contain meters, a data acquisition system and employ graphical reports.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.1.1
[FI57]1
Building operations and maintenance documents will be provided to the owner.
Documents will cover manufacturers' information, specifications, programming procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained, and operated.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.5
[FI16]3
Furnished as-built drawings for electric power systems within 90 days of system acceptance.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.3
[FI33]1
Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: EL101
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:39 AM (PDT) 10 of 10
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:02 AM (PDT) 1 of 12
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Project No:
All Electric:
Is Renewable:
Has Battery:
Has Charger:
Has Heat Pump
2021 IECC
SUU Ticketing and Concessions Building Cedar City, Utah 5b New Construction 136440 false false false false true
Construction Site: Owner/Agent: Designer/Contractor:
Notes:
Energy Credits
Description Credit
Enhanced envelope performance 5.0
Enhanced digital lighting controls 3.0
Energy monitoring 3.0
5% cooling efficiency improvement 2.0
5% heating efficiency improvement 2.0
Credits: 10.0 Required 15.0 Proposed
Building Area
Description Floor Area
1-Dining: Cafeteria/Fast Food (Dining: Cafeteria/Fast Food) : Nonresidential 827
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:02 AM (PDT) 2 of 12
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
2021 IECC
SUU Ticketing and Concessions Building Cedar City, Utah 5b New Construction
Construction Site: Owner/Agent: Designer/Contractor:
Mechanical Systems List
Quantity Component Description
HVAC Systems
1 RTU-1 (Single Zone): Packaged Terminal Heat Pump Heating Mode: Capacity = 36700 kBtu/h, Proposed Efficiency = 3.50 COP, Required Efficiency = 2.92 COP Cooling Mode: Capacity = 39700 kBtu/h, , Air Economizer Proposed Efficiency = 13.00 EER, Required Efficiency = 9.50 EER Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00 Fan System: Unspecified
Water Heaters
1 WH-1: Electric Storage Water Heater, Capacity: 30 gallons w/ Circulation Pump No minimum efficiency requirement applies
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2021 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Dan Lee - Mechanical Engineer 07.22.2026
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:02 AM (PDT) 3 of 12
Energy Code: 2021 IECC
Requirements: 63% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Plan Review
Section
& Req.ID Plan Review Complies? Comments/Assumptions
C406
[PR9]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options.
Complies
Does Not Comply
Not Observable
Not Applicable
C103.2
[PR2]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical and service water heating systems and document where exceptions to the standard are claimed.
Load calculations per acceptable engineering standards and handbooks. Hot water system sized per manufacturer's sizing guide.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See mechanical and plumbing schedules
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:02 AM (PDT) 4 of 12
Footing / Foundation Inspection
Section # & Req.ID Footing / Foundation Inspection Complies? Comments/Assumptions
C403.13.2, C403.13.3
[FO9]3
Snow/ice melting system and freeze protection systems have sensors and controls configured to limit service for pavement temperature above 50F and outdoor temperature above 40F.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:02 AM (PDT) 5 of 12
Plumbing Rough-In Inspection
Section # & Req.ID Plumbing Rough-In Inspection Complies? Comments/Assumptions
C404.5, C404.5.1, C404.5.2
[PL6]3
Heated water supply piping conforms to pipe length and volume requirements. Refer to section details.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See drawings
C404.6.1, C404.6.2
[PL3]1
Automatic time switches installed to automatically switch off the recirculating hot-water system or heat trace.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
C404.6.3
[PL7]3
Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C404.6.1, C404.6.1.1
[PL8]3
Demand recirculation water systems have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:02 AM (PDT) 6 of 12
Mechanical Rough-In Inspection
Section # & Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions
C402.2.6
[ME41]3
Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.5.5
[ME113]2
Fault detection and diagnostics installed with air-cooled unitary DX units or VRF units having economizers.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.2.2
[ME59]1
Natural or mechanical ventilation is provided in accordance with International Mechanical Code Chapter 4. Mechanical ventilation has capability to reduce outdoor air supply to minimum per IMC Chapter 4.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Drawings
C403.7.1
[ME59]1
Demand control ventilation provided for spaces >500 ft2 and >15 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
Location on plans/spec: <3000 CFM
C403.7.2
[ME115]3
Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 50% or less of design capacity.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.7.6
[ME141]3
HVAC systems serving guestrooms in Group R-1 buildings with > 50 guestrooms: Each guestroom is provided with controls that automatically manage temperature setpoint and ventilation (see sections C403.7.6.1 and C403.7.6.2).
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.7.4
[ME57]1
Exhaust air energy recovery on systems meeting Table C403.7.4(1) and C403.7.4(2).
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.5
[ME116]3
Kitchen exhaust systems comply with replacement air and conditioned supply air limitations, and satisfy hood rating requirements and maximum exhaust rate criteria.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs and drawings
C403.12.1, C403.12.2
[ME60]2
HVAC ducts and plenums insulated in accordance with C403.11.1 and constructed in accordance with C403.11.2, verification may need to occur during Foundation Inspection.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
C403.5, C403.5.1, C403.5.2
[ME62]1
Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs and drawings
C403.5.2
[ME16]1
Economizer operation will not increase heating energy use during normal operation.
Complies
Does Not Comply
Not Observable
Location on plans/spec: See Specs
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:02 AM (PDT) 7 of 12
Section # & Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions
C403.5.3.3
[ME124]1
Air economizers automatically reduce outdoor air intake to the design minimum outdoor air quantity when outdoor air intake will not reduce cooling energy usage. See Table C403.5.3.3 for applicable device types and climate zones.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
C403.5.3.4
[ME125]1
System capable of relieving excess outdoor air during air economizer operation to prevent over pressurizing the building. The relief air outlet located to avoid recirculation into the building.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
C403.5.3.5
[ME126]1
Return, exhaust/relief and outdoor air dampers used in economizers have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Reference section C403.7.7 for details.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
C403.4.1.4
[ME63]2
Heating for vestibules and air curtains with integral heating include automatic controls that shut off the heating system when outdoor air temperatures > 45F. Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <= 60F and cooling setpoint >= 80F.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.8.1
[ME65]3
HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Individual exhaust fans with motor nameplate horsepower less than 1 hp.
See the Mechanical Systems list for values
C408.2.2.1
[ME53]3
Air outlets and zone terminal devices have means for air balancing.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See drawings for requiring balancing dampers on all branches
C403.11.3, C403.11.3.1, C403.11.3.2
[ME123]3
Refrigerated display cases, walk-in coolers or walk-in freezers served by remote compressors and remote condensers not located in a condensing unit, have fan-powered condensers that comply with Sections C403.11.3.1 and refrigeration compressor systems that comply with C403.11.3.2..
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.8.3
[ME117]2
Fans have a fan energy index (FEI) >=
1.00. Variable volume fans will have an
FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Single fans with motor nameplate horsepower of <= 1 hp or 0.89 kW.
C403.9
[ME144]2
Large diameter fans where installed shall be tested and labeled in accordance with
AMCA 230.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.13.1
[ME71]2
Systems that heat outside the building envelope are radiant heat systems controlled by an occupancy sensing device or timer switch.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.3 [ME55]2 HVAC equipment efficiency verified. Complies
Does Not Comply
Not Observable
Not Applicable
See the Mechanical Systems list for values
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:02 AM (PDT) 8 of 12
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:02 AM (PDT) 9 of 12
Section # & Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions
C405.7
[EL26]2
Low-voltage dry-type distribution electric transformers meet the minimum efficiency requirements of Table C405.6.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.8
[EL27]2
Electric motors meet the minimum efficiency requirements of Tables C405.7(1) through C405.7(4). Efficiency verified through certification under an approved certification program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist).
Complies
Does Not Comply
Not Observable
Not Applicable
C405.9.1, C405.9.2
[EL28]2
Escalators and moving walks comply with ASME A17.1/CSA B44 and have automatic controls configured to reduce speed to the minimum permitted speed in accordance with ASME A17.1/CSA B44 or applicable local code when not conveying passengers.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.10
[EL29]2
Total voltage drop across the combination of feeders and branch circuits <= 5%.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.1.1
[EL30]2
At least 90% of dwelling unit permanently installed lighting shall have lamp efficacy >= 65 lm/W or luminaires with efficacy >= 45 lm/W or comply with C405.2.4 or C405.3.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.11, C405.11.1
[EL31]2
50% of 15/20 amp receptacles installed in enclosed offices, conference rooms, copy rooms, break rooms, classrooms and workstations and > 25% of branch circuit feeders for modular furniture will have automatic receptacle control in accordance with C405.11.1.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:02 AM (PDT) 10 of 12
Section
& Req.ID Final Inspection Complies? Comments/Assumptions
C403.4.1
[FI47]3
Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See drawings
C403.4.1.1
[FI42]3
Heat pump controls prevent supplemental electric resistance heat from coming on when not needed.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: Manufacturer specs
C403.4.1.2
[FI38]3
Thermostatic controls have a 5 °F deadband. Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
C403.4.1.3
[FI20]3
Temperature controls have setpoint overlap restrictions.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
C403.4.2
[FI39]3
Each zone equipped with setback controls using automatic time clock or programmable control system.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
C403.4.2.1, C403.4.2.2
[FI40]3
Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2-hour occupant override, 10-hour backup
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
C404.3
[FI11]3
Heat traps installed on supply and discharge piping of non-circulating systems.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
C404.4
[FI25]2
All piping insulated in accordance with section details and Table C403.12.3.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
C404.6.1
[FI12]3
Controls are installed that limit the operation of a recirculation pump installed to maintain temperature of a storage tank. System return pipe is a dedicated return pipe or a cold water supply pipe.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See Specs
C303.3, C408.2.5.3
[FI8]3
Furnished O&M manuals for HVAC systems within 90 days of system acceptance.
Complies
Does Not Comply
Not Observable
Not Applicable
C406.2.1
[FI66]1
5% heating efficiency improvement - all HVAC and Plant heating equipment is 5% more efficient than required by 2021 IECC.
Complies
Does Not Comply
Not Observable
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:02 AM (PDT) 11 of 12
& Req.ID Final Inspection Complies? Comments/Assumptions
C406.2.2
[FI66]1
5% cooling efficiency improvement - all HVAC and Plant cooling equipment is 5% more efficient than required by 2021 IECC.
Complies
Does Not Comply
Not Observable
Not Applicable
C406.4
[FI54]1
Enhanced Digital Lighting Controls - Interior lighting has the following enhanced lighting controls in accordance with Sections C405.2.1 through C405.2.3, Luminaires capable of continuous dimming and being addressed individually, at least 8 luminaires controlled in combination in a daylight zone, digital control system for fixtures with load shedding or occupancy sensors, Sequence of Operations documentation, and functional testing per Section C408.
Complies
Does Not Comply
Not Observable
Not Applicable
C406.8
[FI68]1
Enhanced envelope performance - the building thermal envelope UA value is >= 15% better than the total UA of the envelope specified by Section C402.1.5.
Complies
Does Not Comply
Not Observable
Not Applicable
C406.10
[FI63]1
Energy Monitoring - the building is equipped with an energy management system to monitor, record, and report energy consumption for electrical energy, by end-use category, contain meters, a data acquisition system and employ graphical reports.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.1.1
[FI57]1
Building operations and maintenance documents will be provided to the owner.
Documents will cover manufacturers' information, specifications, programming procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained, and operated.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.1
[FI28]1
Commissioning plan developed by registered design professional or approved agency.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.3.1
[FI31]1
HVAC equipment, systems and system-to-system relationships have been tested to ensure proper operation.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.3.2
[FI10]1
HVAC and service water heating control systems have been tested to ensure proper operation, calibration and adjustment of controls.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.3.3
[FI32]1
Economizers have been tested to ensure proper operation.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.4
[FI29]1
Preliminary commissioning report completed and certified by registered design professional or approved agency.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.5
[FI7]3
Furnished HVAC as-built drawings submitted within 90 days of system acceptance.
Complies
Does Not Comply
Not Observable
Report Title: SUU Ticketing and Concessions Building Report Date: Jul 20, 2026, 08:02 AM (PDT) 12 of 12
& Req.ID Final Inspection Complies? Comments/Assumptions
C408.2.5.1
[FI43]1
An air and/or hydronic system balancing report is provided for HVAC systems.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.5.2
[FI30]1
Final commissioning report due to building owner within 90 days of receipt of certificate of occupancy.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.1.1
[FI50]3
HVAC systems and equipment design loads calculated in accordance with ANSI/ASHRAE/ACCA Standard 183 or by an approved equivalent computational procedure