This file comprises technical specifications and an asbestos survey report for the Ogden-Weber Applied Technology College Construction Trades Building roof replacement project in Ogden, Utah, prepared by Prior & Associates Architects LLC for the State of Utah Division of Facilities Construction and Management (DFCM). The project, identified as DFCM Project Number 27042240, involves the replacement of the built-up roof (BUR) system with a single-ply thermoplastic polyolefin (TPO) membrane on the Construction Trades Building at 200 North Washington Boulevard. The scope of work encompasses comprehensive roof replacement including thermal insulation, high-temperature underlayments, sheet metal flashings and trim, roof accessories, joint sealants, and associated structural repairs. The technical specifications, prepared by P&A Architects and reviewed for code compliance on June 24, 2026, detail requirements across multiple divisions including general requirements, site work, metals, woods and plastics, thermal and moisture protection, doors and windows, finishes, plumbing, and electrical systems. The specifications establish detailed submittal procedures, quality requirements, construction progress documentation, photographic documentation, construction waste management protocols, and closeout procedures for contractor execution.
The limited asbestos survey and assessment, conducted on February 28, 2025, by R&R Environmental, Inc. and reviewed by accredited inspectors, encompassed eighteen bulk samples collected from the roof system covering approximately 41,661 square feet, as well as samples from caulking, siding, and wall systems. All analytical results, analyzed via Polarized Light Microscopy by Eurofins Reservoirs Environmental, Inc., returned no asbestos detected across all samples, permitting the project to proceed without asbestos abatement requirements. The project carries a construction cost estimate of $1,000,000 and is a Stage II invitation to bid restricted to contractors prequalified under the DFCM Stage I Prequalification process. The specifications include a DFCM 30-year manufacturer's single-ply warranty and contractor roofing warranty provisions, establishing performance and maintenance standards for the completed roof system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
prior & associates architects llc architecture planning design
Technical Specifications For:
Ogden/Weber Technology College Roof Replacement-Construction Trades Building
200 North Washington Blvd., Ogden, Utah 84404
D.F.C.M. Project Number 27042240
Prepared By:
p&a architects
821 East Kensington Avenue Salt Lake City, Utah 84105
22ND June 2026
06/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
THOMAS PETERSON
06/24/2026
Ogden Weber Applied Technology College
Construction Trades Building Roof Replacements
SPECIFICATION INDEX 1
TABLE OF CONTENTS
• TABLE OF CONTENTS
• HAZMAT REPORT
• BID PROPOSAL FORM
• SPECIFICATIONS
ARCHITECTURAL SPECIFICATIONS
DIVISION 01 GENERAL REQUIREMENTS
Section 011000 SUMMARY OF WORK Section 012600 CONTRACT MODIFICATION PROCEDURES Section 013100 PROJECT MANAGEMENT AND COORDINATION Section 013117 CONTRACTORS REQUEST FOR INTERPRETATION Section 013200 CONSTRUCTION PROGRESS DOCUMENTATION Section 013233 PHOTOGRAPHIC DOCUMENTATION Section 013300 SUBMITTAL PROCEDURES Section 014000 QUALITY REQUIREMENTS Section 014216 DEFINITIONS Section 015000 TEMPORARY FACILITES AND CONTROLS Section 015721 INDOOR AIR QUALITY CONTROL Section 016000 PRODUCT REQUIREMENTS Section 017300 EXECUTION Section 017419 CONSTRUCTION WASTE MANAGEMENT Section 017700 CLOSEOUT PROCEDURES Section 017823 OPERATION AND MAINTENANCE DATA Section 017839 PROJECT RECORD DOCUMENTS Section 017900 DEMONSTRATION AND TRAINING
DIVISION 02 SITE WORK
NOT USED
DIVISION 03 CONCRETE
DIVISION 04 MASONRY
DIVISION 05 METALS
Section 055000 METAL FABRICATIONS Section 055213 PIPE RAILING
SPECIFICATION INDEX 2
DIVISION 06 WOODS AND PLASTICS
Section 061053 MISCELLANOUR ROUGH CARPENTRY Section 061600 SHEATHING
DIVISION 07 THERMAL AND MOISTURE PROTECTION
Section 070150.19 PERARATIONS FOR RE-ROOFING
Section 072100 THERMAL INSULATION Section 073010 HIGH TEMPERATURE UNDERLAYMENTS Section 075423 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
D.F.C.M. ROOF SIGNAGE
D.F.C.M. CONTRACTORS ROOFING WARRANTY
D.F.C.M. 30 YEAR MANUFACTURER’S SIINGLE PLY WARRANTY
Section 076200 SHEET METAL FLASHINGS AND TRIM Section 077119.1 MANUFACTURED SNAP-ON METAL FASCIA Section 077200 ROOF ACCESSORIES Section 079200 JOINT SEALANTS
DIVISION 08 DOORS AND WINDOWS
Section 084523 INSULATED TRANSLUCENT FIBERGLASS SANDWICH PANEL WALL
& SKYLIGHT SYSTEMS
DIVISION 09 FINISHES
Section 099100 PAINTING
DIVISION 10 SPECIALITIES
DIVISION 22 PLUMBING
Section 220100 GENERAL PLUMBING REQUIREMENTS Section 220523 GENMERAL DUTY VALVES FOR PLUMBING PIPING Section 221116 DOMESTIC WATER PIPING Section 221413 FACILITIES STORM DRAIN PIPING Section 221423 STORM DRAINAGE PIPING SPECIALTIES
DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING
DIVISION 26 ELECTRICAL
A LIMITED ASBESTOS
INSPECTION, SURVEY AND ASSESSMENT
FOR THE ROOF OF THE
OGDEN WEBER TECH CONSTRUCTION TRADES
200 NORTH WASHINGTON BLVD
OGDEN, UTAH 84404
March 23, 2025
Prepared for:
Mrs. Aubrey Stapel
Project Manager
State of Utah
Department of Administrative Services
Division of Facilities Construction and Management (DFCM)
State Office Building Room 4110
Salt Lake City, Utah 84114
PH: (801) 641-0964
Prepared by:
R & R Environmental, Inc. (R & R)
47 West 9000 South, Suite #2
Sandy, Utah 84070 dave@rrenviro.com
Phone (801) 541-1035
Table of Contents
ASBESTOS
1.0 INTRODUCTION
2.0 EXECUTIVE SUMMARY
3.0 SAMPLING METHODS
4.0 SURVEY RESULTS
5.0 CONCLUSIONS
6.0 LIMITATIONS AND EXCLUSION OF WARRANTY.……………………………………………………8
List of Appendices
Appendix A Sample Log
Appendix B Laboratory Report
Appendix C Photo Log
Appendix D Certifications
Limited Asbestos Survey Report Page 1 Ogden Weber tech Construction Trades
1.0 INTRODUCTION
R & R Environmental, Inc. (R & R) was contacted to conduct a limited asbestos survey for the Ogden Weber tech
Construction Trades located at 200 North Washington Blvd in Ogden, Utah. The survey consisted of a visual assessment of the exterior of building for suspect asbestos containing materials (ACM) and bulk sampling of the materials. The fieldwork component of this survey was conducted by Mr. George Latu who is a Utah Accredited
Asbestos Building Inspector.
This report presents the conditions and observations noted on the visit dates.
The following general information is included in this survey report:
• Executive Summary (Section 2.0)
• Sampling Methods (Section 3.0)
• Analytical Results (Section 4.0)
• Conclusions (5.0)
Limited Asbestos Survey Report Page 2
2.0 EXECUTIVE SUMMARY
No asbestos containing materials were identified in the affected area of the building.
Limited Asbestos Survey Report Page 3
OGDEN WEBER TECH CONSTRUCTION TRADES
OGDEN, UTAH 84404
DATE OF SURVEY: FEBRAURY 28, 2025
NESHAP - REGULATED
ASBESTOS-CONTAINING MATERIALS (R-ACM)
1. Friable asbestos material (>1% asbestos and can be crumbled, pulverized or reduced to powder by hand pressure)
Thermal system insulation (TSI)*
Textured ceiling material (TCM)*
Spray-on insulation or fireproofing*
Blown-in insulation*
Ceiling tiles/panels*
Plaster, gypsum board, gypsum board joint compound*
Cloth materials* (Boiler Flue Gasket)
Paper materials* (HVAC Paper Tape and Insulating Board)
Electrical wiring insulation*
Sink undercoating (loose)*
Other*
2. Category I ACM which has become friable
Packings
Gaskets
Resilient floor coverings (floor tile and sheet vinyl)
Asphalt roofing products (Dust Debris, Roofing Underlayment Debris, Flashing Material)
3. Category I ACM that will be or has been subjected to sanding, grinding, cutting or abrading
Packings
Gaskets
Resilient floor coverings (floor tile and sheet vinyl)
Asphalt roofing products
4. Category II ACM that has a high probability of becoming or has become friable in the course of demolition or renovation operations
Asbestos cement materials (transite)*
Asphalt, tar and rubber-base ACM products other than roofing products*
Non-asphalt and non-paper roofing products*
Paint*
Fire brick and/or mortar*
Stainless steel sink undercoating (solid)*
Encapsulated TCM*
Encapsulated TSI*
Mastic for floor tile, ceiling tile, cove molding, etc.*
Other
Limited Asbestos Survey Report Page 4
DATE OF SURVEY: FEBRAURY 28, 2025
NESHAP NON-REGULATED
ASBESTOS-CONTAINING MATERIAL (N-R-ACM)
1. > 1% asbestos
2. Category I Non-friable (cannot be crumbled, pulverized, or reduced to powder by hand pressure) ACM with >1% asbestos by new PLM procedure
Packings
_ Gaskets (Door/Window Caulking)
Resilient floor coverings (floor tile)
_Asphalt roofing products
3. Category II Non-friable ACM with >1% asbestos by new PLM procedure (Category includes items meeting Category I definition but not specifically listed in that category)
Asbestos cement materials (transite)* (Fume hoods, counter tops, and window panels)
Asphalt, tar and rubber-base ACM products other than roofing products*
Non-asphalt and non-paper roofing products*
Paint* (Silver Paint Sealant)
Fire brick and/or mortar*
Sink undercoating (solid)*
Mastic for floor tile, ceiling tile, cove molding, etc.*
Other* (Window Glaze)
Notes:
1. (*) denotes R & R’s interpretation of materials included in this category.
2. New PLM procedure is outlined in Appendix A, Subpart F, 40 CFR, Part 783, Section 1, Polarized Light
Microscopy.
3. The Environmental Protection Agency (EPA) National Emission Standard for Hazardous Air Pollutants
(NESHAP) asbestos revision as outlined in 40 CFR, Part 61, became effective November 20, 1990. The asbestos classification system outlined in the revision and included in this section is dynamic in nature.
Asbestos materials classified as “NON-REGULATED” at the time of the survey may become
“REGULATED” due to ongoing or planned maintenance, renovation, or demolition actions, which can transform a material containing greater than 1% asbestos from a “non-friable” and NON-REGULATED to a friable and REGULATED condition. Classification of ACM in this section and in the executive summary of this report is, therefore, based on the observations of the surveyor at the time of the survey and may or may not be appropriate at later dates.
4. Maintenance, renovation, demolition, weathering, normal wear, water or other damage can alter the “NON-
REGULATED” status of materials, and necessitate precautions required for handling them as
“REGULATED” asbestos-materials.
Limited Asbestos Survey Report Page 5
3.0 SAMPLING METHODS
Survey procedures were based on those outlined in Title 40 Code of Federal Regulation (CFR) Part 763, USEPA
Asbestos Hazard Emergency Response Act, and the Asbestos Model Accreditation Plan (effective April 4, 1994). The procedures included visual observation, physical inspection, bulk sample collection, and condition assessment of suspect ACM. The number of samples collected was based on the amount and accessibility of each homogeneous material, with consideration given for the type, age, and condition.
Eighteen (18) samples were collected from the suspect materials to assess the presence of asbestos (or lack thereof) in building materials/systems. Each sample collected was placed into a sealable plastic bag or tub, marked with a unique sample identification code, and packaged for subsequent shipment to the laboratory for analysis. Individual sample identification consisted of a numeric code denoting the sampling media/location.
Subsequent to packaging and labeling, samples were submitted under proper chain-of-custody to Reservoirs
Environmental, Inc., Denver, Colorado. The National Voluntary Laboratory Accreditation Program (NVLAP), Lab
Code 101896 accredits Reservoirs for asbestos analysis. Samples were analyzed via Polarized Light Microscopy
(PLM) utilizing EPA Method 600/M4-82-020. Please note that USEPA and OSHA regulations define an ACM as a material containing more than one (1) percent asbestos, by volume, as determined by PLM analysis. In the case of multi-layer systems (e.g., floor tile/mastic layers), the laboratory analyzed and reported each layer separately.
4.0 SURVEY RESULTS
Eighteen (18) representative samples collected were submitted for analytical determination. A summary of analytical results for samples collected and analyzed for this survey are in Appendix B (Laboratory Results) and are discussed below by building material/system type. Photographs of the buildings where samples were taken are included as
Appendix C. Floor Plans of the building where samples were taken are included in Appendix D
Limited Asbestos Survey Report Page 6
5.0 CONCLUSIONS
Asbestos-containing materials were not identified in the building. See executive summary for details.
6.0 LIMITATIONS AND EXCLUSION OF WARRANTY
This limited asbestos survey and assessment was performed using procedures and a level of diligence typically exercised by professional consultants performing similar services. However, asbestos-containing material
(ACM) can be present in a structure but not identified using ordinary investigative procedures.
No asbestos survey can completely, eliminate uncertainty regarding the presence of ACM. R & R
Environmental, Inc.’s level of diligence and investigative procedures are intended to reduce, but not eliminate, potential uncertainty regarding the presence of ACM. The procedures used for this survey attempt to establish a balance between the competing goals of limiting investigative costs, time, and building damage, and reducing the uncertainty about unknown conditions. Therefore, the determinations in this report should not be construed as a guarantee that all ACM present in the subject property has been included in this report.
This report presents R & R Environmental, Inc.’s professional determinations, which are dependent upon information obtained during performance of consulting services. R & R Environmental, Inc. assumes no responsibility for omissions or errors resulting from inaccurate information provided by sources outside of R &
R Environmental, Inc.
No warranty or guarantee, expressed or implied, is made regarding the findings, conclusions, or recommendations contained in this report. The limitations presented above supersede the requirements or provisions of all other contracts or scopes of work, implied, or otherwise, except stated or acknowledged herein.
Limited Asbestos Survey Report Page 7
A LIMITED ASBESTOS SURVEY AND ASSESSMENT
OF THE
OGDEN WEBER TECH CONSTRUCTION TRADES
OGDEN, UTAH 84404
On February 28, 2025, R & R Environmental, Inc. (R & R) of Sandy, Utah, conducted a limited asbestos survey and assessment of the Ogden Weber tech Construction Trades located at 200 North Washington Blvd in Ogden, Utah.
Bulk samples of suspect asbestos-containing materials were collected and analyzed. The condition of all friable and non-friable asbestos-containing materials was, assessed. The following accredited inspector conducted the survey and assessment.
Inspected by:
March 23, 2025
George Latu Date
State of Utah, Division of Air Quality Inspector
Certification Number: ASB-7670
State of Utah Company Certification: ASBC-237
This report was reviewed by:
March 23, 2025
David C. Roskelley, MSPH, CIH, CSP Date
State of Utah, Division of Air Quality Inspector
Certification Number: ASB-1370
AHERA Inspector #5 PSI 65451 I
Certified Safety Professional #15774
Certified Industrial Hygienist #8529
State of Utah Company Certification: ASBC-237
Appendix A
Sample Log
SAMPLE LOG
Sample #
Material/
Homogenous Area
Sample Location
Quantity
Lab Result
(%/Type)
Assessment
CT-01 Roofing Roof 41,661 Ft2 None Detected Undamaged
CT-02 Roofing Roof 41,661 Ft2 None Detected Undamaged
CT-03 Roofing Roof 41,661 Ft2 None Detected Undamaged
CT-04 Roofing Roof 41,661 Ft2 None Detected Undamaged
CT-05 Roofing Roof 41,661 Ft2 None Detected Undamaged
CT-06 Roofing Roof 41,661 Ft2 None Detected Undamaged
CT-07 Roofing Roof 41,661 Ft2 None Detected Undamaged
CT-08 Roofing Roof 41,661 Ft2 None Detected Undamaged
CT-09 Roofing Roof 41,661 Ft2 None Detected Undamaged
CT-10 Silver Caulking Roof 150 Ft2 None Detected Undamaged
CT-11 Silver Caulking Roof 150 Ft2 None Detected Undamaged
CT-12 White Caulking Roof 320 Ft2 None Detected Undamaged
CT-13 White Caulking Roof 320 Ft2 None Detected Undamaged
CT-14 Black Roof Siding Roof 40 Ft2 None Detected Undamaged
CT-15 Black Roof Siding Roof 40 Ft2 None Detected Undamaged
CT-16 Wall System Workshop 2 30 Ft2 None Detected Undamaged
CT-17 Wall System Workshop 2 30 Ft2 None Detected Undamaged
CT-18 Wall System Workshop 2 30 Ft2 None Detected Undamaged
Appendix B
Laboratory Report
March 07, 2025
Sincerely, Jeanne Spencer President
Subcontractor Number:
Laboratory Report: RES 639862-1
Project #/P.O. #: None Given
Project Description: OGDEN WEBER TECH ROOF
George Latu R & R Environmental 47 West 9000 South #2 Sandy UT 84070
Dear George, Eurofins Reservoirs is an analytical laboratory accredited for the analysis of Industrial Hygiene and Environmental matrices by the National Voluntary Laboratory Accreditation Program (NVLAP), Lab Code 101896-0 for Transmission Electron Microscopy (TEM) and Polarized Light Microscopy (PLM) analysis and the American Industrial Hygiene Association (AIHA LAP, LLC), Lab ID 101533 for Phase Contrast Microscopy (PCM) analysis. This laboratory is currently proficient in both Proficiency Testing and PAT programs respectively.
Eurofins Reservoirs has analyzed the following samples for asbestos content as per your request. The analysis has been completed in general accordance with the appropriate methodology as stated in the attached analysis table. The results have been submitted to your office.
RES 639862-1 is the job number assigned to this study. This report is considered highly confidential and the sole property of the customer. Eurofins Reservoirs will not discuss any part of this study with personnel other than those of the client. The results described in this report only apply to the samples analyzed, as received and with the information provided by the customer. This report must not be used to claim endorsement of products or analytical results by NVLAP or any agency of the U.S. Government. This report shall not be reproduced except in full, without written approval from Eurofins Reservoirs. Samples will be disposed of after sixty days unless longer storage is requested. If you have any questions about this report, please feel free to call 303-964-1986.
by Paul LoScalzo
03/07/202503/07/202503/07/202503/07/2025
Eurofins Reservoirs Environmental, Inc Eurofins Reservoirs QA Manual
Effective September 06, 2023 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf
(303) 964-1986
(866) RES-IENV
https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com
4955 Yarrow St, Suite 100, Arvada, CO 80002
Laboratory Sample IDLaboratory Sample IDLaboratory Sample IDLaboratory Sample ID LLLL Asbestos ContentAsbestos ContentAsbestos ContentAsbestos Content Non-Non-Non-Non- Non-Non-Non-Non- AAAA SubSubSubSub AsbestosAsbestosAsbestosAsbestos FibrousFibrousFibrousFibrous YYYY PhysicalPhysicalPhysicalPhysical PartPartPartPart MineralMineralMineralMineral VisualVisualVisualVisual FibrousFibrousFibrousFibrous ComponentsComponentsComponentsComponents EEEE DescriptionDescriptionDescriptionDescription EstimateEstimateEstimateEstimate ComponentsComponentsComponentsComponents
Client Sample NumberClient Sample NumberClient Sample NumberClient Sample Number RRRR (%) (%) (%) (%) 639862 -639862 -639862 -639862 - CT-01CT-01CT-01CT-01 A Yellow foam 5 NDNDNDND 0 100.0 B Brown fibrous perlitic material 25 NDNDNDND 80 20.0 C Black fibrous tar 35 NDNDNDND 15 85.0 D Black tar w/ brown rock 35 NDNDNDND 0 100.0 639862 -639862 -639862 -639862 - CT-02CT-02CT-02CT-02 A Black tar 20 NDNDNDND 0 100.0 B Brown fibrous perlitic material 30 NDNDNDND 80 20.0 C Black fibrous tar 50 NDNDNDND 20 80.0 639862 -639862 -639862 -639862 - CT-03CT-03CT-03CT-03 A Black tar 15 NDNDNDND 0 100.0 B Yellow foam w/ gray fibrous material 20 NDNDNDND 25 75.0 C Brown fibrous perlitic material 30 NDNDNDND 80 20.0 D Black fibrous tar 35 NDNDNDND 20 80.0 639862 -639862 -639862 -639862 - CT-04CT-04CT-04CT-04 A Yellow foam 5 NDNDNDND 0 100.0 B Black felt 15 NDNDNDND 50 50.0 C Brown fibrous perlitic material 20 NDNDNDND 60 40.0 D Black tar w/ black rock 25 NDNDNDND TR 100.0 E Black fibrous tar 35 NDNDNDND 20 80.0 TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.
Eurofins Reservoirs Environmental, Inc Eurofins Reservoirs QA Manual
Effective September 06, 2023 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf
RES Job Number:
Client:
Client Project/P.O.:
Client Project Description:
Date Samples Received:
Analysis Type:
Turnaround:
Date Samples Analyzed:
RES 639862-1
R & R Environmental None Given
OGDEN WEBER TECH ROOF
February 28, 2025 EPA 600/R-93/116 - Short Report, Bulk Priority March 06 - March 07, 2025
EUROFINS RESERVOIRS ENVIRONMENTAL, INC
NVLAP Lab Code 101896-0
AIHA LAP, LLC. LAB ID 101533
TABLE: I ANALYSIS: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME
NA = Not Analyzed NR = Not Received ND = None Detected TR = Trace; <1 % Visual Estimate Trem-Act = Tremolite-Actinolite
(303) 964-1986
(866) RES-IENV
https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com
Laboratory Sample IDLaboratory Sample IDLaboratory Sample IDLaboratory Sample ID LLLL Asbestos ContentAsbestos ContentAsbestos ContentAsbestos Content Non-Non-Non-Non- Non-Non-Non-Non-
YYYY PhysicalPhysicalPhysicalPhysical PartPartPartPart MineralMineralMineralMineral VisualVisualVisualVisual FibrousFibrousFibrousFibrous ComponentsComponentsComponentsComponents EEEE DescriptionDescriptionDescriptionDescription EstimateEstimateEstimateEstimate ComponentsComponentsComponentsComponents
Client Sample NumberClient Sample NumberClient Sample NumberClient Sample Number RRRR (%) (%) (%) (%) 639862 -639862 -639862 -639862 - CT-05CT-05CT-05CT-05 A Black tar 5 NDNDNDND 0 100.0 B Brown fibrous perlitic material 10 NDNDNDND 70 30.0 C Black fibrous tar 10 NDNDNDND 20 80.0 D Gray fibrous perlitic material 75 NDNDNDND 65 35.0 639862 -639862 -639862 -639862 - CT-06CT-06CT-06CT-06 A Yellow foam 10 NDNDNDND 0 100.0 B Black tar 20 NDNDNDND 0 100.0 C Brown fibrous perlitic material 30 NDNDNDND 65 35.0 D Black fibrous tar 40 NDNDNDND 25 75.0 639862 -639862 -639862 -639862 - CT-07CT-07CT-07CT-07 A Black tar 15 NDNDNDND 0 100.0 B Black fibrous tar 30 NDNDNDND 25 75.0 C Light-gray fibrous perlitic material 55 NDNDNDND 60 40.0 639862 -639862 -639862 -639862 - CT-08CT-08CT-08CT-08 A White foam 3 NDNDNDND 0 100.0 B Brown fibrous perlitic material 5 NDNDNDND 65 35.0 C Black tar w/ black rock 20 NDNDNDND 0 100.0 D Black fibrous tar 72 NDNDNDND 20 80.0 TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.
Eurofins Reservoirs Environmental, Inc Eurofins Reservoirs QA Manual
Effective September 06, 2023 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf
RES Job Number:
Client:
Client Project/P.O.:
Client Project Description:
Date Samples Received:
Analysis Type:
Turnaround:
Date Samples Analyzed:
RES 639862-1
R & R Environmental None Given
OGDEN WEBER TECH ROOF
February 28, 2025 EPA 600/R-93/116 - Short Report, Bulk Priority March 06 - March 07, 2025
EUROFINS RESERVOIRS ENVIRONMENTAL, INC
NVLAP Lab Code 101896-0
AIHA LAP, LLC. LAB ID 101533
TABLE: I ANALYSIS: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME
NA = Not Analyzed NR = Not Received ND = None Detected TR = Trace; <1 % Visual Estimate Trem-Act = Tremolite-Actinolite
(303) 964-1986
(866) RES-IENV
https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com
Laboratory Sample IDLaboratory Sample IDLaboratory Sample IDLaboratory Sample ID LLLL Asbestos ContentAsbestos ContentAsbestos ContentAsbestos Content Non-Non-Non-Non- Non-Non-Non-Non-
YYYY PhysicalPhysicalPhysicalPhysical PartPartPartPart MineralMineralMineralMineral VisualVisualVisualVisual FibrousFibrousFibrousFibrous ComponentsComponentsComponentsComponents EEEE DescriptionDescriptionDescriptionDescription EstimateEstimateEstimateEstimate ComponentsComponentsComponentsComponents
Client Sample NumberClient Sample NumberClient Sample NumberClient Sample Number RRRR (%) (%) (%) (%)
639862 -639862 -639862 -639862 - CT-09CT-09CT-09CT-09 A Black tar w/ light-gray rock 20 NDNDNDND TR 100.0 B Gray fibrous perlitic material 30 NDNDNDND 65 35.0 C Black fibrous tar 50 NDNDNDND 15 85.0 639862 -639862 -639862 -639862 - CT-10CT-10CT-10CT-10 A Gray resinous material 5 NDNDNDND 0 100.0 B White resinous material 95 NDNDNDND 0 100.0 639862 -639862 -639862 -639862 - CT-11CT-11CT-11CT-11 A Gray resinous material 1 NDNDNDND 0 100.0 B White resinous material 99 NDNDNDND 0 100.0 639862 -639862 -639862 -639862 - CT-12CT-12CT-12CT-12 A Black fibrous tar 7 NDNDNDND 10 90.0 B Silver paint w/ black rock 93 NDNDNDND 5 95.0 639862 -639862 -639862 -639862 - CT-13CT-13CT-13CT-13 A Gray cementitious material 1 NDNDNDND 0 100.0 B Black fibrous tar 7 NDNDNDND 10 90.0 C Silver fibrous paint w/ black rock 92 NDNDNDND 3 97.0 639862 -639862 -639862 -639862 - CT-14CT-14CT-14CT-14 A Silver paint TR NDNDNDND 8 92.0 B Black fibrous tar 100 NDNDNDND 25 75.0 639862 -639862 -639862 -639862 - CT-15CT-15CT-15CT-15 A Black fibrous tar 100 NDNDNDND 25 75.0 TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.
Eurofins Reservoirs Environmental, Inc Eurofins Reservoirs QA Manual
Effective September 06, 2023 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf
RES Job Number:
Client:
Client Project/P.O.:
Client Project Description:
Date Samples Received:
Analysis Type:
Turnaround:
Date Samples Analyzed:
RES 639862-1
R & R Environmental None Given
OGDEN WEBER TECH ROOF
February 28, 2025 EPA 600/R-93/116 - Short Report, Bulk Priority March 06 - March 07, 2025
EUROFINS RESERVOIRS ENVIRONMENTAL, INC
NVLAP Lab Code 101896-0
AIHA LAP, LLC. LAB ID 101533
TABLE: I ANALYSIS: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME
NA = Not Analyzed NR = Not Received ND = None Detected TR = Trace; <1 % Visual Estimate Trem-Act = Tremolite-Actinolite
(303) 964-1986
(866) RES-IENV
https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com
Laboratory Sample IDLaboratory Sample IDLaboratory Sample IDLaboratory Sample ID LLLL Asbestos ContentAsbestos ContentAsbestos ContentAsbestos Content Non-Non-Non-Non- Non-Non-Non-Non-
YYYY PhysicalPhysicalPhysicalPhysical PartPartPartPart MineralMineralMineralMineral VisualVisualVisualVisual FibrousFibrousFibrousFibrous ComponentsComponentsComponentsComponents EEEE DescriptionDescriptionDescriptionDescription EstimateEstimateEstimateEstimate ComponentsComponentsComponentsComponents
Client Sample NumberClient Sample NumberClient Sample NumberClient Sample Number RRRR (%) (%) (%) (%) 639862 -639862 -639862 -639862 - CT-16CT-16CT-16CT-16 A White tape 2 NDNDNDND 80 20.0 B White texture w/ white paint 3 NDNDNDND 0 100.0 C White joint compound 3 NDNDNDND 0 100.0 D White/tan drywall 92 NDNDNDND 15 85.0 639862 -639862 -639862 -639862 - CT-17CT-17CT-17CT-17 A White texture w/ white paint 1 NDNDNDND 2 98.0 B White tape 2 NDNDNDND 80 20.0 C White joint compound 3 NDNDNDND 0 100.0 D White/tan drywall 94 NDNDNDND 15 85.0 639862 -639862 -639862 -639862 - CT-18CT-18CT-18CT-18 A White joint compound 8 NDNDNDND 2 98.0 B White tape 12 NDNDNDND 80 20.0 C White texture w/ white paint 15 NDNDNDND 0 100.0 D White/tan drywall 65 NDNDNDND 5 95.0 TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.
Mike Scales Analyst
Tyler Hutchinson Analyst
Eurofins Reservoirs Environmental, Inc Eurofins Reservoirs QA Manual
Effective September 06, 2023 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf
RES Job Number:
Client:
Client Project/P.O.:
Client Project Description:
Date Samples Received:
Analysis Type:
Turnaround:
Date Samples Analyzed:
RES 639862-1
R & R Environmental None Given
OGDEN WEBER TECH ROOF
February 28, 2025 EPA 600/R-93/116 - Short Report, Bulk Priority March 06 - March 07, 2025
EUROFINS RESERVOIRS ENVIRONMENTAL, INC
NVLAP Lab Code 101896-0
AIHA LAP, LLC. LAB ID 101533
TABLE: I ANALYSIS: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME
NA = Not Analyzed NR = Not Received ND = None Detected TR = Trace; <1 % Visual Estimate Trem-Act = Tremolite-Actinolite
(303) 964-1986
(866) RES-IENV
https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com
SUBMITTED BY INVOICE TO
Client Sample ID Number
RES Job #: 639862
CONTACT INFORMATION SERIES
ASBESTOS LABORATORY REQUESTED ANALYSIS VALID MATRIX CODES LAB NOTES
CHEMISTRY LABORATORY
MICROBIOLOGY LABORATORY
**Turnaround times establish a laboratory priority, subject to laboratory volume and are not guaranteed. Additional fees apply for afterhours, weekends and holidays.**
Laboratory Analysis Instructions
(Sample ID's must be unique)
Company: R & R Environmental Company: R & R Environmental
Address: 47 West 9000 South #2 Address: 47 West 9000 South #2
Sandy, UT 84070 Sandy, UT 84070
Project Number and/or P.O. #: None Given Project Zip Code:
Project Description/Location: OGDEN WEBER TECH ROOF
Contact: George Latu -1 PLM Priority Phone: (801) 870-3590
Fax:
Cell: (801) 870-3590
Final Data Deliverable Email Address:
george@rrenviro.com (+ 24 ADDNL. CONTACTS)
PLM / PCM / TEM DTL RUSH PRIORITY STANDARD Air = A Bulk = B
Dust = D Food = F
Paint = P Soil = S
Dust RUSH PRIORITY STANDARD
*PRIOR NOTICE REQUIRED FOR SAME DAY TAT
Surface = SU Swab = SW
Tape = T Wipe = W
Metals RUSH PRIORITY STANDARD Drinking Water = DW
Waste Water = WW
Organics* SAME DAY RUSH PRIORITY STANDARD **ASTM E1792 approved wipe media only**
Viable Analysis** PRIORITY STANDARD
**TAT DEPENDENT ON SPEED OF MICROBIAL GROWTH
Medical Device Analysis RUSH STANDARD
Mold Analysis RUSH PRIORITY STANDARD
Special Instructions:
ASBESTOS CHEMISTRY MICROBIOLOGY ICO
1 CT-01 X B
2 CT-02 X B
3 CT-03 X B
4 CT-04 X B
5 CT-05 X B
6 CT-06 X B
7 CT-07 X B
8 CT-08 X B
9 CT-09 X B
10 CT-10 X B
11 CT-11 X B
12 CT-12 X B
13 CT-13 X B
P L
M
P L
M S h o rt R ep o rt (E
PA
/6
/R
-9 3/
6)
T E
M
P C
M
D U
S T
M E
TA
L
S
O R
G A
N
IC
S
V
IA
B L
E S
M E
D
IC
A L
M O
L D
S am pl e
V ol um e
(L
A re a
S am pl e
Te m pe ra tu re
C
Le ng th (o r A liq uo ts
) x W id th
(o r A re a/
A liq uo t)
M at rix C od e of
C on ta in er s
D at e C ol le ct ed m m
/d d/ yy
T im e C ol le ct ed hh :m m
Eurofins Reservoirs Environmental, Inc establishes a unique Lab Sample ID, for each sample, by preceding each unique Client Sample ID with the laboratory RES Job Number.
Eurofins Reservoirs Environmental, Inc will analyze incoming samples based on information received and will not be responsible for errors or omissions in calculations resulting from the inaccuracy of original data. By signing, client/company representative agrees that submission of the following samples for requested analysis as indicated on this Chain of Custody shall consitute an analytical services agreement with payment terms of NET 30 days. Failure to comply with payment terms may result in a 1.5% monthly interest surcharge.
Relinquished By:
George Latu Date/Time: 02/27/2025 10:03:58 Sample Condition: Acceptable
Received By:
Emily Creasey Date/Time: 02/28/2025 10:37:09 Carrier: Fed-Ex
Eurofins Reservoirs Environmental, Inc Eurofins Reservoirs QA Manual
Effective September 06, 2023 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf
(303) 964-1986
(866) RES-IENV
https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com
Client Sample ID Number
REQUESTED ANALYSIS VALID MATRIX CODES LAB NOTES
Laboratory Analysis Instructions
(Sample ID's must be unique)
Air = A Bulk = B
Dust = D Food = F
Paint = P Soil = S
Surface = SU Swab = SW
Tape = T Wipe = W
Drinking Water = DW
Waste Water = WW
**ASTM E1792 approved wipe media only**
RES Job #: 639862
Submitted By: R & R Environmental
ASBESTOS CHEMISTRY MICROBIOLOGY ICO
14 CT-14 X B
15 CT-15 X B
16 CT-16 X B
17 CT-17 X B
18 CT-18 X B
P L
M
P L
M S h o rt R ep o rt (E
PA
/6
/R
-9 3/
6)
T E
M
P C
M
D U
S T
M E
TA
L
S
O R
G A
N
IC
S
V
IA
B L
E S
M E
D
IC
A L
M O
L D
S am pl e
V ol um e
(L
A re a
S am pl e
Te m pe ra tu re
C
Le ng th (o r A liq uo ts
) x W id th
(o r A re a/
A liq uo t)
M at rix C od e of
C on ta in er s
D at e C ol le ct ed m m
/d d/ yy
T im e C ol le ct ed hh :m m
Eurofins Reservoirs Environmental, Inc Eurofins Reservoirs QA Manual
Effective September 06, 2023 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf
(303) 964-1986
(866) RES-IENV
https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com
Appendix C
Photo Log
PHOTO 1: Ogden Weber tech Construction Trades
R & R Environmental, Inc.
47 West 9000 South, Suite #2, Sandy, Utah 84070
(801) 352-2380 • Fax: (801) 352-2381
SITE PHOTOGRAPHS
A LIMITED ASBESTOS SURVEY AND ASSESSMENT
OF THE
200 NORTH WASHINGTON BLVD
PROJECT NO:
DESIGNED BY:
SCALE:
REVIEWED
BY:
DRAWN BY:
DATE:
4-3-25
FILE:
Appendix D
State of Utah Certifications
Utah Asbestos Certification
State of Utah
SPENCER J. COX
Go,·emor
Depattment of Environmental Quality
Tim Davis lmerim Execlllil'e Director
DIVISION OF AIR QUALITY
Bryce C. Bird
Director
George Latu
ASB-7670 •·•~
Inspector 026) ·~
DEIDRE HENDERSON
Lie111ena111 Gol'emor
.-4t:£.~~ Director, Utah D,v,s,on of Air Quality
March 25, 2025
George Latu R&R Environmental, Inc.
47 West 9000 South, #2 Sandy, UT 84070
Dear Mr. Latu:
Re: Utah Asbestos Program Individual Certification Card
DAQA-001-25
The Utah Division of Air Quality (DAQ) has reviewed your Utah Asbestos Program Certification Application for Individuals and we are pleased to inform you that your application has been approved.
Your new asbestos program individual certification card is enclosed with this letter and this card is the sole method of individual certification documentation that you will receive from the DAQ.
Please check the information on your asbestos program certification card carefully. Please confirm that the photograph, name, and certification discipline(s) are correct. Also, please remember to keep your current asbestos program certification card with you at all times when you are performing regulated asbestos work activities.
Please contact Barbara Perkins at (801) 536-0221 or at bperkins@utah.gov if you have any questions regarding this letter or the enclosed asbestos program certification card.
Sincerely, ';!..J:v~ Leonard Wnght (Mar 25,02510:18 MDT)
Leonard Wright, Manager Air Toxics, Lead-Based Paint, and Asbestos Section
LW:BP:lr
195 North 1950 West, 4th Floor• Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820
Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 536-4414 www.deq.utuli.gov
Printed on 100% recycled paper
Utah Lead-Based Paint Certification
State of Utah
SPENCER J. COX
Go,·tmor
DEIDRE HENDERSON
litutenant Gol'limor
February 11, 2025
Steve Smith
Department of Environmental Quality
Kimberly D. Shelley Exec11tfre Director
DIVISION OF AIR QUALITY
Bryce C Bird
Director
R&R Environmental, Inc.
4 7 West 9000 South, #2 Sandy, UT 84070
Dear Mr. Smith:
Re: Utah Lead-Based Paint Program Individual Certification Card
Inspector l Risk Aue
-4~;_·~
Director, Utah D1v1sion of Air Quality
DAQA-002-25
The Utah Division of Air Quality (DAQ) has reviewed your Utah Lead-Based Paint (LBP)
Program Certification Application for Individuals and we are pleased to inform you that your application has been approved. Your new LBP program individual certification card is enclosed with this letter and this card is the sole method of individual certification documentation that you will receive from the DAQ.
Please check the information on your LBP program certification card carefully. Please confirm that the photograph, name, and certification discipline(s) are correct. Also, please remember to keep your current LBP program certification card with you at all times when you are performing regulated LBP work activities.
Please contact Barbara Perkins at (80 l) 536-0221 or at bperkins@utah.gov if you have any questions regarding this letter or the enclosed LBP program certification card.
Sincerely, ~ Sl1J~ Leonard Wright (Feb 7, 2025 12:09 MST)
Leonard Wright, Manager Air Toxics, Lead-Based Paint, and Asbestos Section
LW:BP:lr
195 Nonh 1950 Wes,, 4~' Hoor • Sall Lake City, Ur Mailing Addrm l' 0 llo"< 144820 • Suh Lnl.c Cny. UT 84114-1820
'I elephone (80 I) 536-4000 • l·a"< (801) 536-4099 ·TDD (80 I) 536-1-11-1 ~• u ,, di:tJ mnh gm•
P11111cd on I00~. 1ccycled papc, SUMMARY 011000 - 1
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Access to site.
4. Coordination with occupants.
5. Work restrictions.
6. Specification and drawing conventions.
7. Miscellaneous provisions.
B. Related Requirements:
1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
1.2 PROJECT INFORMATION
A. Project Identification: Ogden/Weber Applied Technology College, Construction Trades
Building Roof Replacement
1. Project Location: 200 North Washington Blvd., Ogden, Utah 84404.
B. Owner: Bridgerland Technical College and Regional Center
1. Owner's Representative: Brandon Stokes - D.F.C.M.
C. Architect: Prior and Associates Architects
1. Architects Representative: Scott Prior
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of the Project is defined by the Contract Documents and specifications and consists of the following:
This project consists of replacing the existing gravel ballast & 4-ply asphalt roof system at the
Construction Trades Building located on the Ogden/Weber Applied Technology Campus. The work will include site safety preparation, demolition of the existing gravel ballast, 4-ply asphalt
SUMMARY 011000 - 2
roof, cover board, metal cap and flashings, roof drains, roof hatch, ladders, mechanical curbs, skylights, and translucent clerestory window system. A new TPO roofing membrane system including new cover board and new insulation will be installed. The new roofing work will include installation of a new TPO roofing membrane. cover board, insulation, roof drains, walkway pads, metal cap and fascia, counter flashing, elevated mechanical stands, curbs, roof hatch, steel ladders, steel bridge, safety railing, new skylights, and new translucent clerestory window system.
The buildings will be occupied and used during the course of construction & the roofing contractor will be required to provide and maintain life safety protection for the general public.
B. Type of Contract.
1. Project will be constructed under a single prime contract.
1.4 ACCESS TO SITE
A. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.
B. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is to take place in.
1. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times.
Do not use these areas for parking or storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances by construction operations.
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
1.5 COORDINATION WITH OCCUPANTS
A. Full Owner Occupancy: Owner will occupy site and existing building during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.
2. Notify Owner not less than 72 hours in advance of activities that will affect Owner's operations.
SUMMARY 011000 - 3
1.6 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of
Monday through Friday, unless otherwise indicated.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
1. Notify Owner not less than three days in advance of proposed utility interruptions.
2. Obtain Owner's written permission before proceeding with utility interruptions.
D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.
1. Notify Owner not less than two days in advance of proposed disruptive operations.
2. Obtain Owner's written permission before proceeding with disruptive operations.
E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor-air intakes.
1.7 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
SUMMARY 011000 - 4
2. Keynoting: Materials and products are identified by reference keynotes referencing
Specification Section numbers found in this Project Manual.
END OF SECTION 011000
CONTRACT MODIFICATION PROCEDURES 012600 - 1
SECTION 012600 - CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for handling and processing
Contract modifications.
1.2 MINOR CHANGES IN THE WORK
A. Architect will issue through Construction Manager supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time with
RFI or ASI.
1.3 PROPOSAL REQUESTS
A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.
1. Work Change Proposal Requests issued by Architect and Construction Manager are not instructions either to stop work in progress or to execute the proposed change.
2. Within time specified in Proposal Request after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.
a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
c. Include costs of labor and supervision directly attributable to the change.
d. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
B. Contractor-Initiated Work Change Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to Architect and Construction Manager.
CONTRACT MODIFICATION PROCEDURES 012600 - 2
1. Include a statement outlining reasons for the change and the effect of the change on the
Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.
2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
3. Indicate applicable taxes, equipment rental, and amounts of trade discounts.
4. Include costs of labor and supervision directly attributable to the change.
5. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the
Contract Time.
6. Comply with requirements in Section 012500 "Substitution Procedures" if the proposed change requires substitution of one product or system for product or system specified.
7. Work Change Proposal Request Form: All forms to be DFCM forms available on DFCM web site
1.4 CHANGE ORDER PROCEDURES
A. On Owner's approval of a Work Changes Proposal Request, the General Contractor will issue a
Change Order for signatures of Owner and Contractor on DFCM forms.
1.5 CONSTRUCTION CHANGE DIRECTIVE
A. Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.
1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the
Contract Time.
B. Documentation: Maintain detailed records on a time and material basis of work required by the
Construction Change Directive.
1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 012600
PROJECT MANAGEMENT AND COORDINATION 013100 - 1
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Coordination drawings.
2. Requests for Information (RFIs).
3. Project meetings.
B. Related Requirements:
1. Section 017300 "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
1.2 DEFINITIONS
A. RFI: Request for Information, Construction Manager or Contractor seeking information required by or clarifications of the Contract Documents.
1.3 INFORMATIONAL SUBMITTALS
A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. RFI Include the following information in tabular form:
1. Name, address, and telephone number of entity performing subcontract or supplying products.
2. Number and title of related Specification Section(s) covered by subcontract.
3. Drawing number and detail references, as appropriate, covered by subcontract.
1.4 GENERAL COORDINATION PROCEDURES
A. Coordination: Coordinate construction operations included in different Sections of the
Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, that depend on each other for proper installation, connection, and operation.
PROJECT MANAGEMENT AND COORDINATION 013100 - 2
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
1. Prepare similar memoranda for Owner and separate contractors if coordination of their
Work is required.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's construction schedule.
2. Preparation of the schedule of values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Preinstallation conferences.
7. Project closeout activities.
8. Startup and adjustment of systems.
1.5 COORDINATION DRAWINGS
A. Coordination Drawings, General: Prepare coordination drawings according to requirements in individual Sections, where installation is not completely shown on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity.
1. Content: Project-specific information, drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information, as applicable:
a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.
b. Indicate dimensions shown on the Drawings. Specifically note dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Architect indicating proposed resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.
B. Coordination Drawing Organization: Organize coordination drawings as follows:
PROJECT MANAGEMENT AND COORDINATION 013100 - 3
1. Roof Plans: Show architectural and structural elements, and mechanical, plumbing, fire-protection, fire-alarm, and electrical Work.
2. Structural Penetrations: Indicate penetrations and openings required for all disciplines.
3. Review: Architect will review coordination drawings to confirm that the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility.
1.6 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.
1. Architect will return RFIs submitted to Architect by other entities controlled by
Contractor with no response.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
1. Project name.
2. Project number.
3. Date.
4. Name of Contractor.
5. Name of Architect and Contracting Company
6. RFI number, numbered sequentially.
7. RFI subject.
8. Specification Section number and title and related paragraphs, as appropriate.
9. Drawing number and detail references, as appropriate.
10. Field dimensions and conditions, as appropriate.
11. Contractor's suggested resolution. If Contractor's solution(s) impacts the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
12. Contractor's signature.
13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
C. RFI Forms: Use DFCM Forms.
D. Architect's and Construction…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .