6-26-132 - Addendum 1 - Climbing Walls and High Ropes Course Inspection, Maintenance Certification.pdf

PDF 96 KB Posted

Attached to
Climbing Walls and High Ropes Course Inspection, Maintenance & Certification
Solicitation number
26-132
Issued by
Missouri

About this file

This addendum modifies the original bidding specifications for Parkway School District's climbing walls and high ropes course inspection, maintenance, and certification contract in Missouri. Bid No. 26-132 is soliciting qualified vendors to provide these services under a three-year agreement beginning September 1, 2026 and ending August 31, 2029, with options for vendors to propose additional contract years. The bid opening is scheduled for May 13, 2026 at 2:00 PM CST. Addendum 1, dated May 7, 2026, adds detailed specifications to Section 1.9 regarding the process for inspecting climbing wall structures, including visual inspections of anchors, connections, beams, girders, primary and secondary supports, panel integrity, frame and bracing, t-nuts, wall texture, expansion bolts, handholds, boulders, sheathing, plywood, and landing surfaces with surrounding safety areas.

The addendum clarifies the inspection and maintenance requirements that bidders must address in their proposals, establishing the technical standards expected for climbing wall and high ropes course safety and structural integrity. All other terms and conditions of the original bid remain unchanged. No pricing information, set-asides, incumbent contractor details, or specific funding amounts are detailed in this addendum document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM DATED:

ADDENDUM NO:

BID NO:

BID NAME:

BID OPENING:

May 7, 2026

ONE (1)

26-132

Climbing Walls and High Ropes Course Inspection, Maintenance & Certification

May 13, 2026 at 2:00 PM CST

This Addendum is issued to modify, explain, or correct the original specifications and is hereby made part of the bidding document.

Addedhighlightedverbiage to Section 1.9:

Process for Inspecting Climbing Wall Structure

● Visual inspection of all anchors, connections, beams, & girders and primary/secondary supports for structural integrity.See specifics below:

○ Panel Integrity (cracks, delamination, or "soft spots" in the plywood or GRP)

○ Frame & Bracing (loose bolts on the steel or wood sub-structure behind the wall)

○ T-Nuts (Stripped threads, spinning t-nuts, or t-nuts popping out of the back)

○ Wall Texture (excessive polish, slickness, or peeling texture/paint)

○ Expansion Bolts (ensure floor/ceiling anchors are tight and show no signs of shifting)

● Inspect all handholds/boulders on the climbing surface and tighten as necessary.

● Inspect all sheathing, plywood on walls for structural integrity and safety hazards.

● Review of climbing wall landing surface and surrounding area to assure proper safety.

All other terms and conditions of Bid 26-132 remain the same.

END ADDENDUM NUMBER ONE

(This Addendum consists of 1 page)

Addendum 1 Bid # 26-132