This is a Scope of Work document for the City of Arlington, Texas, establishing an annual requirements contract for high-performance cold patch asphalt material. The contract seeks bituminous patching material suitable for pothole repair, with known acceptable brands including UPM, Sakrete, E-Z Street, and SPM. The City reserves the right to award to a single vendor or multiple vendors, designating primary and secondary vendors or joint awards as deemed most advantageous. The material must be capable of application in air temperatures ranging from -15°F to 100°F while maintaining flexibility and cohesiveness, and must perform effectively in damp or wet conditions. The specification requires aggregate consisting of crushed limestone with a maximum particle size of 12.5 millimeters, combined with liquid asphalt blended from AC-5, AC-10, or AC-20 base stock. The final mixture composition must be 93.5 to 95.0 percent aggregate and 5.0 to 6.5 percent bituminous material.
The supplier must guarantee that the patching material remains workable in uncovered stockpiles for 12 months and that repaired potholes show no significant shoving, rutting, tracking, or unraveling within 12 months of repair. Should the material fail to meet specifications regardless of weather conditions or application methods, the City reserves the right to require replacement or reimbursement for unused unsatisfactory material. The supplier must remove and replace any deficient mix within 15 days of written notification and must provide contact information for the point of contact responsible for performance guarantee administration. The Scope of Work references detailed material testing requirements under various ASTM standards, including soundness loss, abrasion loss, absorption rates, and bituminous material viscosity, penetration, and distillation specifications to ensure product quality and durability.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
26-0225 Annual Requirements Contract for Cold Patch Asphalt
1. INTENT
The purpose of this specification is to establish an annual requirement contract for the purchases of high-performance cold patch material. Known acceptable high-performance cold patch materials are the following: UPM, Sakrete, E-Z Street, and SPM. The City reserves the right to request samples of products being bid prior to award of the bid.
The City reserves the right to make a bid award to either one vendor or to multiple vendors, whichever is in the best interest of the City. If the award is made to multiple vendors, it will be either as one vendor being the primary vendor and the other vendor the secondary vendor, or both vendors awarded jointly.
2. PRODUCT SPECIFICATIONS
A. General Description:
The bituminous patching material shall consist of crushed stone, asphaltic concrete with asphalt additives.
Temperature Range: The mix must be capable of being placed in air temperature ranging from –
15° F to 100° F and shall maintain its flexibility and cohesiveness.
Weather Conditions: The mix must be capable of being placed in areas, which are damp or wet at the time of application.
B. Materials:
a. Aggregate
i. Aggregate will consist of a crushed limestone or City of Arlington approved equal, complying with requirements of ASTM C-136.
ii. Aggregate gradation shall have a maximum particle size of 12.5 millimeters (½ inch).
Sieve Size #9 #89
% Passing % Passing
A 100 90-100
#4 85-100 20-55
#8 10-40 5-30
#16 0-10 0-10
#50 0-5 0-5
ASTM-88 Soundness loss (sodium –5 cycles) 12% Maximum ASTM C-131 Los Angeles Abrasion Loss 40% Maximum ASTM C-117 200 sieve (by Wash) 2% Maximum
ASTM C-127, 128 Absorption 1% - 3% ASTM C-127, 128 Specific Gravity 2.45 – 2.85
Other Deleterious Matter ASTM C-123 Soft pieces 3% Maximum 7ASTM C-295 Coal and Lignite 1% Maximum ASTM C-142 Shale, Cherk, Shady Material, etc. 2.5% Maximum
b. Bituminous Material: The material shall be a liquid asphalt blend prepared from a base asphalt stock of either AC-5, AC-10, or AC-20 with an approved blending formula and shall meet the following requirements.
Liquid Asphalt:
ASTM D-2171 Kinematic Viscosity @140°F (60°C) 350 to 500 CST ASTM D-1310 Flash Point (Tag Open Cup) 200° F (93°C) ASTM D-95 Water Less than 0.2% ASTM D-402 Distillation See values below
Volume % total Distillate Volume 5 Original Sample
Temperature Minimum Maximum Minimum Maximum To 437°F (225°C) 0 0 0 0 To 500°F (260°C) 0 0.5 0 0 To 600°F (316°C) 10 65 0 18
Residue from distillation to 680°F (360° C) % Volume by Difference
Tests on Residue from Distillation
ASTM D-2171 Absolute Viscosity @ 140°F (60°C) 125-425 Poises ASTM D-5 Penetration, Modified with Cone 180 Minimum ASTM D-113 Ductility, 39°F (4°C), 1 cm/minute 100 Minimum ASTM D-2042 Solubility in Trichorethylene 99.0% Minimum
This test shall be performed in accordance with ASTM D-5, except that a penetration cone conforming to ASTM D217 shall be used in place of the standard penetration needle. The total moving weight of the cone and attachments shall be 150=0.1 grams. The transfer dish water level shall be lowered to less than the height of sample, and then water from the top of the sample shall be decanted before transferring from the bath to the penetrometer.
C. Composition of Mixture
The mixture shall consist of an aggregate conforming to Section 2(A), and a bituminous material conforming to Section 2(B) mixed in the following portions.
Aggregate 93.5% to 95.0% Bituminous 5.0% to 6.5%
The patching mix shall meet the following requirements:
ASTM D-1664 Coating and Stripping Above 95% ASTM D-2172 Extraction of Bituminous Material 3.5% to 9% Shelf Life Visual 1 Year
3. PERFORMANCE GUARANTEE
The supplier of the material shall guarantee the performance of the patching mix to meet the following requirements:
A. The material shall remain workable in an uncovered stockpile, if applicable, for a period of 12 months.
B. Repaired potholes shall not show any significant signs of shoving, rutting, tracking, or unraveling within a period of 12 months from the time of repair.
C. In the event the material furnished does not meet all of the above requirements (regardless of weather, test’s acceptability, methods of repair, or other condition), the City of Arlington reserves the right to require the material supplier to replace or to reimburse the City of Arlington for the unused portion of material found to be unsatisfactory.
D. The supplier shall remove and replace unsatisfactory mix within 15 days of written notification.
E. The supplier shall provide the address and telephone number of the point of contact responsible for the performance guarantee.