6-25.1218 FWCC Arena Abatement Phasing.pdf

PDF 49 KB Posted

Attached to
RFP ENV Asbestos Third-Party Monitoring and Consulting Services (FWCC)
Solicitation number
26-0060
Issued by
Tarrant County, Texas

About this file

This file is an abatement phasing diagram for the Fort Worth Convention Center (FWCC) prepared for the City of Fort Worth's Environmental Services Department. The diagram illustrates a floor plan of the convention center with designated areas and room numbers, indicating the phased availability of spaces for asbestos abatement work. The document identifies three key phases with availability dates: June 1, 2026, August 18, 2026, and October 1, 2026. The diagram maps out various functional areas including entrances (Houston Street and Commerce Street), concession areas, dressing rooms, mechanical spaces, storage areas, restrooms, and support facilities throughout the building. Room designations and numbered sections are clearly marked to facilitate coordination of abatement activities across different zones of the facility.

The phasing diagram serves as a planning tool for the third-party monitoring and consulting services solicitation, enabling contractors to understand the temporal and spatial constraints of asbestos abatement operations at the convention center. The staggered availability of areas across multiple months suggests that abatement work will be conducted in phases to maintain operational continuity of the facility. This document provides essential reference information for qualified firms responding to the City of Fort Worth's request for proposals for asbestos third-party monitoring and consulting services, allowing bidders to assess project scope, logistics, and resource requirements based on the specific areas and timelines outlined in the phasing plan.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STAIR

RAMP

STAIR TO

TUNNEL

BREAK ROOM

STORAGE

SECURITY

Houston Street Entrance

Commerce Street Entrance rampramp

Freezer

Refrigerator

First Aid

Mechanical Air Handler

Storage Jan.

WRR

MRR

MRR

WRR

Dress

Team

Dress

Concessions

Make Up

RR

Concessions

Concessions

Mechanical Air Handler

Storage

Storage

DressingWRR

MRR

tu nn el

WRR

WRR

MRR

Coats/Stor.Concessions First Aid

Dress Dress MRR Ele. Mech

Stor.

Tickets

Dress

RR

RRRR

Ramp

Shower Team Room

Team Storage

Utility/ Air return tunnel

Utility/ Air return tunnel

Shower Team Room Team Storage

RR

Dress

Stage Hands

Concessions

Concessions

Concessions

Concessions

Mechanical Air Handler tunnel

WRR

Storage

Storage electrical panels

MRR

RR RR

Press Room

Mechanical

Mechanical

Concessions

Concessions

Concessions

Concessions

MRR

WRR

MRR

WRR

Coats/ Storage

Mechanical

Storage tu nn el

Mechanical Storage

Storage

Mechanical

WRR

Jan

WRR

MRR

MRR

WRR

Jan

Storage

Mechanical

Mechanical

Storage

110A

110B

107109

MRRWRR

Mechanical 113

113B

113A

Tickets

Office

Office

Office

Office

121A

121B

121C

121D

121E

121F

Colmmerce Street Entrance

27 28

33 32 33

44a

65 66

67 68

93 94

95 96

Houston Street Entrance

1032 1033

1008b

A155

A103

A309

A288

A214 A213

1008C

1053 cove

1030b

1030c

78 closet

77 elevator

1519 Door 6

1513a

1045.1

1045.2

1045.1 1045.2

108B 108A

1030a

Old ARA office

MorganJ2 Text Box

HBS FWCC

Abatement Phasing Diagram Dec. 18, 2025

MorganJ2 Callout Available Jun. 1, 2026

MorganJ2 Callout Available Aug. 18, 2026

MorganJ2 Callout Available Jun. 1, 2026

MorganJ2 Callout Available Oct. 1, 2026

File details come from the government source that posted it. Updated .