This is a geotechnical engineering report prepared by Terracon for Shive Hattery, Inc. Architecture & Engineering regarding subsurface conditions at the WINN970905C Wetland (Bouska Site) located in Calmar Township, Winneshiek County, Iowa. The project involves construction of a 5.89-acre nutrient reduction wetland with a sheet pile weir approximately 120 feet north of Conover Road, featuring a 76-foot width, 6.5-foot drop height, and approximately 5-foot maximum water depth. The geotechnical investigation included subsurface exploration through test borings, laboratory testing, and engineering analysis to characterize soil conditions, groundwater levels, and suitability of on-site borrow materials for embankment construction. The report identifies four primary model layers: surface topsoil/root zone, glacial drift sandy lean clay, alluvial deposits (clayey sand and sand with silt), and highly weathered limestone bedrock. The site is located in a potential karst area according to the Iowa Department of Natural Resources, though no mapped sinkholes were identified within the exploration area.
The report provides detailed recommendations for earthwork, fill material selection, and compaction requirements essential for successful wetland construction. Suitable fill materials are limited on-site due to the presence of partly organic soils, requiring selective sorting and potential importation of materials meeting specified USCS classifications (CL, CL/CH, CH with 15 < PI < 30). Site preparation mandates subgrade evaluation, scarification to four inches depth, placement on slopes no steeper than 5H:1V, and strict moisture and compaction control during fill placement. The report notes that although groundwater was not observed during boring operations, conditions indicate that groundwater could be encountered during construction, potentially requiring dewatering measures such as ditches, french drains, sump pits, or well points. Recommendations address potential karst risk mitigation through additional borings, geophysical evaluation, and possible grouting programs to fill voids and improve support conditions for long-term structure functionality.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report Cover PageWINN970905C Wetland
- Bouska Site Geotechnical Engineering Report
Calmar Township, Winneshiek County, Iowa
April 25, 2025 | Terracon Project No. 13245113
Prepared for:
Shive Hattery, Inc. Architecture & Engineering 4125 Westown Parkway, Suite 100 West Des Moines, Iowa 50266
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
_________________________ April 25, 2025__
Theresa Stromberg-Murphy, P.E. Date My license renewal date is December 31, 2025.
3105 Capital Way, Suite 5 Cedar Falls, IA 50613
P (319) 277-4016 Terracon.com
Facilities | Environmental | Geotechnical | Materials
Report Cover Letter to Sign
April 25, 2025
Shive Hattery, Inc. Architecture & Engineering 4125 Westown Parkway, Suite 100 West Des Moines, Iowa 50266
Attn: Daniel Jensen, P.E.
P: (515) 223-8104 E: djensen@shive-hattery.com
Re: Geotechnical Engineering Report WINN970905C Wetland - Bouska Site Conover Road Calmar Township, Winneshiek County, Iowa Terracon Project No. 13245113
Dear Mr. Jensen:
We have completed the scope of Geotechnical Engineering services for the above referenced project in general accordance with Terracon Proposal No. P13245113 dated January 28, 2025. This report presents the findings of the subsurface exploration and provides geotechnical recommendations concerning earthwork, soil parameters for use in sheet pile design, and geotechnical discussion regarding use of borrow area soils in an embankment for the proposed project.
We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report or if we may be of further service, please contact us.
Terracon
Kurt A. Drilling Senior Staff Geologist
Theresa Stromberg-Murphy, P.E.
Senior Engineer
Geotechnical Engineering Report WINN970905C Wetland - Bouska Site | Calmar Township, Winneshiek County, Iowa April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials i
Table of Contents Introduction Project Description Site Conditions Geotechnical Characterization
Groundwater Observations Geologic Hazards Geotechnical Overview Earthwork
Site Preparation and Subgrade Evaluations Fill Material Types Fill Placement and Compaction Requirements General Earthwork Considerations
Sheet Pile Design Parameters General Comments
Figures GeoModel
Attachments
Exploration and Testing Procedures Site Location and Exploration Plans Exploration and Laboratory Results Supporting Information
Note: This report was originally delivered in a web-based format. Blue Bold text in the report indicates a referenced section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the logo will bring you back to this page. For more interactive features, please view your project online at client.terracon.com.
Refer to each individual Attachment for a listing of contents.
http://client.terracon.com/ http://client.terracon.com/
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials 1
Introduction
This report presents the results of our subsurface exploration and Geotechnical Engineering services performed for the proposed Wetland WINN970905C located north of Conover Road and west of 270th Street in Calmar Township, Winneshiek County, Iowa.
The purpose of these services was to provide information and geotechnical engineering recommendations related to:
■ Subsurface soil conditions
■ Groundwater conditions
■ Borrow for embankment construction
■ Soil parameters for sheet pile design
The geotechnical engineering Scope of Services for this project included the advancement of test borings, laboratory testing, engineering analysis, and preparation of this report. Drawings showing the site and boring locations are shown on the Site Location and Exploration Plan, respectively. The results of the laboratory testing performed on soil samples obtained from the site during our field exploration are included on the boring logs in the Exploration and Laboratory Results section.
Project Description
Item Description
Proposed Construction
A 5.89 acres wetland site is planned. The wetland conceptual plan includes a sheet pile weir in the southeast corner of the wetland, about 120 feet north of Conover Road. The sheet pile weir is planned to have a width of about 76 feet. A drop height of 6.5 feet and a maximum water depth of about 5 feet are planned for the weir and permanent pool. The borrow source is planned in the pool area of the site.
Site Conditions
Item Description
Parcel Information
The project is located north of Conover Road and west of 270th
Avenue in Calmar Township, Winneshiek County, Iowa.
Latitude/Longitude 43.2417, -91.9423 See Site Location
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials 2
Item Description
Existing Improvements
None known
Current Ground Cover
Various vegetation
Existing Topography
Based on the topographic site plan provided, surface elevations range from about 1,160 feet in the east and west sides of the proposed wetland area to 1,150 feet near the proposed weir.
Geotechnical Characterization
We have developed a general characterization of the subsurface conditions based on our review of the subsurface exploration, laboratory data, geologic setting, and our understanding of the project. This characterization, termed GeoModel, forms the basis of our evaluation of the site. Conditions observed at the boring locations are indicated on logs in the Exploration and Laboratory Results. The GeoModel can be found in the Figures of this report.
As part of our evaluation, we identified the following model layers within the subsurface profile.
Model Layer
Layer Name General Description
1 Surface ■ Topsoil / root zone
2 Glacial Drift ■ Sandy Lean Clay, with clayey sand layers, stiff
3 Alluvial
■ Clayey Sand, fine to medium grained, loose
■ Sand, with silt, trace clay, fine to medium grained, loose
■ Clayey Sand, with limestone gravel, fine to coarse grained, loose
4 Bedrock
■ Limestone, highly weathered and broken, with occasional silt and clay layers
Groundwater Observations
Groundwater was not observed in borings while and after sampling. Groundwater observations made in cohesive soils require a relatively long period for a groundwater
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials 3 level to develop and stabilize in a borehole. While groundwater level observations made within granular soils are usually a reliable indication of the current groundwater conditions. Long-term observations in piezometers or groundwater observation wells, sealed from the influence of surface water, would be required to provide a better evaluation of groundwater levels in materials of this type. Groundwater level fluctuations should be anticipated during the life of the structure due to variations in the amount of precipitation, and other potential factors not evident at the time the borings were performed.
A review of the Winneshiek County, Iowa Soil Survey provided online on the ‘Web Soil Survey’ by the United States Department of Agriculture/Soil Conservation Service mapped the Marlean Loam (512D2), Rockton Loam (814C), and Lawon-Ossian Complex (1489B) at the site. The information in the following table for groundwater, drainage class, and flooding frequency was indicated on the Web Soil Survey.
Map Unit Name Seasonally High
Groundwater Depths (feet)
Drainage Class Flooding
Frequency
Marlean Loam (512D2) >6 Well drained None
Rockton Loam (814C) >6 Well drained None
Lawson-Ossian Complex (1489B)
12 Somewhat poorly drained None
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials 4
Geologic Hazards
Based on the site plan provided, and the Iowa Department of Natural Resources (IDNR) Geological Survey maps of known sinkholes, karst areas, and potential karst areas in the State of Iowa, and USDA/SCS Soil Survey mapping of the site, we are not aware that a sinkhole has been mapped within the area. The IDNR indicates that the site is located in a ‘potential karst area’. Based on the conditions encountered in the borings, certain evidence of a karst condition that poses an immediate threat of a sinkhole or significant subsidence developing was not apparent. It is important to note however, that the boreholes explored an insignificant portion of the site overall. The following paragraphs provide discussion of karst for the owner and a design philosophy associated with construction at karst sites. We would be pleased to provide additional consultation regarding our experience with karst in the vicinity of this site upon request.
Karst topography results from the solution and weathering of a bedrock formation (e.g., limestone) in which a porous media (cavities) and/or conveying channels are created in the bedrock over a relatively long period. A resulting surface subsidence can occur following an advanced state of soil erosion or raveling of overburden (soil) in which soil particles migrate into the underlying porous media or cavities under the influence of a hydraulic gradient. This process results in a gradual loss of overburden that may be recognized as a “sinkhole”. In some instances, voids are filled with overburden because the erosional process is not complete.
The risk associated with constructing wetlands would include the loss of ground and loss of water detention. The risk associated with karst can initially by controlled by the identification of the karst feature and further controlled by detailed evaluation of the subsurface conditions and the development and implementation of a design concept and construction quality assurance practices that meet the expectations of functionality and the design life of the wetland proposed. The risk that karst would affect a structure can be further evaluated, and hence reduced, by performing additional borings and/or geophysical evaluation. Greater reduction of risk would involve the implementation of a rigorous grouting program in an attempt to fill the majority of voids in the karst feature and improve support conditions.
Geotechnical Overview
Based on the project information and the results of the subsurface exploration, laboratory testing, and our limited evaluation, geotechnical considerations for this project include:
■ The presence of relatively thick layers of partly organic soils
■ The presence of granular soils
■ The presence of relatively shallow and potentially karstic bedrock
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials 5
Materials encountered in the proposed outlet area, Borings 1 and 2, consisted of topsoil over partly organic clay to depths of about 3.5 to 4 feet. Below the partly organic clay, Boring 1 encountered sandy lean clay to a depth of about 9 feet below existing grade.
Boring 3, within the pool area, encountered about 2.3 feet of topsoil over granular soils to the boring’s termination depth of about 10.5 feet. Based on the provided information and the results of the subsurface exploration and laboratory testing, it does not appear that a significant source of non-organic clay is present in the proposed borrow areas.
Zones of unsuitable, partly organic soil, sand, and clayey sand are present at the project site. Where encountered in a borrow area, thorough mixing of the material with lean clay or sandy lean clay, or wasting of the material, will be necessary for a suitable borrow source for embankment fill.
Construction of a relatively uniform embankment will require proper fill placement and compaction operations. Fill placement and compaction operations ultimately affect whether the in-place strength and hydraulic conductivity meet the project design requirements. Control of fill moisture content and thorough discing and mixing will be required during construction. The moisture content of each previous lift must be maintained prior to placement of each subsequent lift of fill. This will require that watering, moisture conditioning, and protection of working subgrades be provided throughout construction. The sizes of the fill material pieces, or clod sizes, affects the hydraulic conductivity of the compacted element. Discing, pulverizing, or tining will therefore be required during construction. The contractor must select appropriate equipment with sufficient weight or force capable of breaking each lift of fill into an acceptable clod size prior to and during moisture conditioning. Each lift of fill should be placed and compacted under strict moisture and compaction/density control and each lift of fill should be tested. In addition to in-place moisture and compaction testing, undisturbed samples of in-place fill should be obtained and tested for hydraulic conductivity throughout embankment construction.
Although groundwater was not encountered at the site, based on the results of the subsurface exploration, it appears that groundwater could be encountered. The amount of groundwater requiring removal to facilitate construction will depend on the actual extent of granular seams and layers, prevailing weather conditions during construction, and depths and method of borrow removal. The use of ditches or “french drains” to intercept and convey water may be a satisfactory means to drain borrow and excavation areas. Where extensive areas of water-bearing granular deposits are present, or if it is not possible to gravity drain an area, it would be necessary to utilize sump pits and pumps or well points to maintain groundwater levels below the working construction grade.
The recommendations contained in this report are based upon the results of field and laboratory testing (presented in the Exploration Results), engineering analyses, and our current understanding of the proposed project. The General Comments section provides an understanding of the report limitations.
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials 6
Earthwork
Site Preparation and Subgrade Evaluations
The subgrade for the embankment and any berms should be evaluated by Terracon personnel. Unstable, soft, or disturbed subgrade areas for the embankment and berms should be undercut or improved in-place prior to fill placement. Excessively wet or dry material should also be undercut or scarified, moisture conditioned, and compacted.
Prior to the placement of each lift of fill, the surface should be scarified/disced to a depth of about 4 inches.
We recommend that lifts of fill be placed on slopes no steeper than 5H:1V. The excavation of a maximum 5H:1V slope will help provide a positive bond between the fill and existing soils/materials and reduce the possibility of failure along the interface of existing soil/material and new fill. Faces of slopes should be compacted as construction proceeds. Consideration should be given to overfilling new fill slopes and subsequently cutting the slope to the plan section.
Fill Material Types
For the purposes of this report, fill required to construct the embankment and any berms is referred to as structural fill. Requirements for structural fill material types follow.
Reuse of On-Site Soil: Excavated on-site soil may be selectively reused as fill. Due to the presence of partly organic material, sorting of suitable and unsuitable materials should be expected. Some moisture conditioning (e.g., drying) should also be expected to achieve compaction requirements for on-site, fine-grained materials used for the embankment and berm fill. It should be noted that clayey and silty soils (CL, ML, SC, and SM) can be difficult to compact during cool or cold weather, in relatively small areas, and over lower strength/density and marginally stable subgrades.
Borrow Materials: Based on the subsurface conditions encountered below the topsoil and near the site surface in Borings 1 and 2, it appears that suitable clay borrow is present in limited quantities at the site. However, Borings 1 and 2 encountered zones of clayey sand at depths of about 6 to 9 feet below existing grade and should be selectively sorted.
Material Property Requirements: Material property requirements for soil/material used as fill to construct the embankment and any berms are presented in the following table.
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials 7
Fill Type1
USCS
Classification Acceptable Locations for Placement
Imported, Low to Medium
Plasticity, Fine-grained Soil
CL, CL/CH, CH
15 < PI < 30
LL <60
Embankment, berms, and general site grading
Imported or
On-site, Granular2
SP, SW, SC, SM,
GP, GW, GM, ML
General site grading
On-site, Fine-grained Soil3
CL
15 < PI < 30, LL <60
Embankment, berms, and general site grading
1. Based on the results of the subsurface exploration and laboratory testing. By our definition, low plasticity material would have a liquid limit (LL) of 45 or less, and a plasticity index (PI) of 23 or less. Low plasticity fill should be used in areas where movements related to shrinking and swelling may adversely impact an improvement. Actual material suitability should be evaluated during construction.
2. Interlayering of fine-grained and coarse-grained materials should be avoided.
3. Based on the construction planned and the results of the borings and laboratory testing, it appears that the non-organic, on-site, fine-grained soils could be reused.
Moisture conditioning should be expected to achieve compaction requirements.
Fill Placement and Compaction Requirements
Construction of a relatively uniform embankment will require proper fill placement and compaction operations. Fill placement and compaction operations ultimately affect whether the in-place strength and hydraulic conductivity meet the project design requirements. Control of fill moisture content and thorough discing and mixing will be required during construction. The moisture content of each previous lift must be maintained prior to placement of each subsequent lift of fill. This will require that watering, moisture conditioning, and protection of working subgrades be provided throughout construction. The sizes of the fill material pieces, or clod sizes, affects the hydraulic conductivity of the compacted element. Discing, pulverizing, or tining will therefore be required during construction. The contractor must select appropriate equipment with sufficient weight or force capable of breaking each lift of fill into an acceptable clod size prior to and during moisture conditioning. Each lift of fill should be placed and compacted under strict moisture and compaction/density control and each lift of fill should be tested. In addition to in-place moisture and compaction testing, April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials 8 undisturbed samples of in-place fill should be obtained and tested for hydraulic conductivity throughout embankment construction.
Structural fill should be placed and compacted in accordance with the following requirements.
Item Requirement
Maximum Lift Thickness
■ 9 inches in loose thickness when heavy, self-propelled compaction equipment is used
■ 4 inches in loose thickness when hand-guided equipment (i.e., jumping jack or plate compactor) is used
Minimum Compaction Requirements 1, 2
■ Granular material: 95%
■ Fine-grained material: 95%
Water Content Range from Optimum 1, 3
■ Fine-grained/Cohesive material: 0% to +4%
■ Granular material: -3% to +3%
1. The minimum compaction requirements are in reference to the maximum dry density value and optimum water content determined by the ‘standard Proctor’ test (ASTM D698). Should the results of the in-place density tests indicate the specified water content or compaction limits have not been met, the area represented by the test should be reworked and retested, as required, until the specified water content and compaction requirements are achieved.
2. If the granular material is a coarse sand or gravel, or of a uniform size, or has a low fines content, compaction comparison to relative density may be more appropriate. In this case, granular materials should be compacted to at least 70% relative density (ASTM D4253 and D4254).
3. The gradation of a granular material affects its stability and the water content required for proper compaction. The water content of granular material should be maintained at levels satisfactory for compaction to be achieved without the granular material bulking during placement or pumping when proofrolled.
General Earthwork Considerations
The on-site, fine-grained soils are frost-susceptible and will be sensitive to changes in moisture conditions. Upon completion of filling and grading, care should be taken to maintain the subgrade water content. Construction traffic over completed subgrades should be avoided. If the subgrade freezes or becomes desiccated, saturated, or disturbed, the affected material should be removed, or the materials should be scarified, moisture conditioned, and recompacted.
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials 9
As a minimum, excavations should be performed in accordance with OSHA 29 CFR, Part 1926, Subpart P, “Excavations” and its appendices, and in accordance with any applicable local, and/or state regulations. Construction site safety is the sole responsibility of the contractor who controls the means, methods, and sequencing of construction operations.
Under no circumstances shall the information provided herein be interpreted to mean Terracon is assuming responsibility for construction site safety, or the contractor's activities; such responsibility shall neither be implied nor inferred.
Sheet Pile Design Parameters
The following soil parameters were estimated based on the results of the subsurface exploration and laboratory testing and may be used in the sheet pile design. Please note that recommendations for design and construction of the embankment and sheet pile are beyond our scope of services for this project.
Recommended Sheet Pile Parameters
Soil Classification Topsoil Model Layer 2 Glacial Drift
Model Layer 3 Alluvial Soil
Total ‘Saturated’ Density (pcf) 105 120 120
Submerged Density (pcf) 40 55 55
Effective friction angle (degrees) 18 22 30
Cohesion (psf) 0 1,500 0
Steel-soil interface friction angle --- --- 14
Active Pressure coefficient (Ka) 0.53 0.46 0.33
Passive Pressure coefficient (Kp) 1.89 2.19 3.00
General Comments
Our analysis and opinions are based upon our understanding of the project, the geotechnical conditions in the area, and the data obtained from our site exploration.
Variations will occur between exploration point locations or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. Terracon should be retained as the Geotechnical Engineer, where noted in this report, to provide observation and testing
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials 10 services during pertinent construction phases. If variations appear, we can provide further evaluation and supplemental recommendations. If variations are noted in the absence of our observation and testing services on-site, we should be immediately notified so that we can provide evaluation and supplemental recommendations.
Our Scope of Services does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken.
Our services and any correspondence are intended for the sole benefit and exclusive use of our client for specific application to the project discussed and are accomplished in accordance with generally accepted geotechnical engineering practices with no third-party beneficiaries intended. Any third-party access to services or correspondence is solely for information purposes to support the services provided by Terracon to our client. Reliance upon the services and any work product is limited to our client and is not intended for third parties. Any use or reliance of the provided information by third parties is done solely at their own risk. No warranties, either express or implied, are intended or made.
Site characteristics as provided are for design purposes and not to estimate excavation cost. Any use of our report in that regard is done at the sole risk of the excavating cost estimator as there may be variations on the site that are not apparent in the data that could significantly effect excavation cost. Any parties charged with estimating excavation costs should seek their own site characterization for specific purposes to obtain the specific level of detail necessary for costing. Site safety and cost estimating including excavation support and dewatering requirements/design are the responsibility of others.
Construction and site development have the potential to affect adjacent properties. Such impacts can include damages due to vibration, modification of groundwater/surface water flow during construction, foundation movement due to undermining or subsidence from excavation, as well as noise or air quality concerns. Evaluation of these items on nearby properties are commonly associated with contractor means and methods and are not addressed in this report. The owner and contractor should consider a preconstruction/precondition survey of surrounding development. If changes in the nature, design, or location of the project are planned, our conclusions and recommendations shall not be considered valid unless we review the changes and either verify or modify our conclusions in writing.
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials
Figures
Contents:
GeoModel
1,130
1,135
1,140
1,145
1,150
1,155
1,160
E L E
V A
T
IO
N
M S
L
(f e e t)
Layering shown on this figure has been developed by the geotechnical engineer for purposes of modeling the subsurface conditions as required for the subsequent geotechnical engineering for this project.
Numbers adjacent to soil column indicate depth below ground surface.
NOTES:
Legend
This is not a cross section. This is intended to display the Geotechnical Model only. See individual logs for more detailed conditions.
GeoModel
Conover Road | Calmar Township, IA
Terracon Project No. 13245113
WINN970905C Wetland - Bouska Site
3105 Capital Way, Ste 5
Cedar Falls, IA
Topsoil Sandy Lean Clay
Clayey Sand with Gravel
Weathered Limestone
Clayey Sand Poorly-graded Sand with Silt
Poorly-graded Sand with Gravel
Model Layer Layer Name General Description
1 Topsoil / root zone
Clayey Sand, fine to medium grained, loose Sand, with silt, trace clay, fine to medium grained, loose Clayey Sand, with limestone gravel, fine to coarse grained, loose
4 Limestone, highly weathered and broken, with occasional silt and clay layers
2 Sandy Lean Clay, with clayey sand layers, stiff
Surface
Alluvial
Bedrock
Glacial Drift
4.5
19.2
3.5
19.2
2.33
10.5
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials
Attachments
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials
Exploration and Testing Procedures
Field Exploration
Number of Borings Approximate Boring
Depth (feet) Location
2 19.2 Sheet Pile Weir
1 10.5 Borrow Area
Boring Layout and Elevations: Shive-Hattery personnel determined the boring locations and staked the locations in the field. Approximate elevations were also determined by Shive-Hattery personnel. The surface elevations on the boring logs were rounded to the nearest ½-foot. The locations and elevations of the borings should be considered accurate to the degree implied by the methods used to define them.
Subsurface Exploration Procedures: We advanced the borings with an ATV-mounted, rotary drill rig using continuous flight, solid-stem augers. Soil sampling was performed using thin-wall tube and split-barrel sampling procedures. In the split-barrel sampling procedure, the number of blows required to advance a standard 2-inch O.D. split barrel sampler the last 12 inches of the typical total 18-inch penetration by means of a hammer with a free fall of 30 inches, is the standard penetration resistance value (N). A CME automatic SPT hammer was used to estimate the relative density of granular soils, and to a lesser extent, the consistency of fine-grained soils. In the thin-walled tube sampling procedure a thin-walled, seamless steel tube with a sharp cutting edge was pushed hydraulically into the soil to obtain a relatively undisturbed sample.
Our exploration team prepared field boring logs as part of the drilling operations. These field logs include visual classifications of the materials encountered during drilling and the exploration team’s interpretation of the subsurface conditions between samples. The sampling interval depths, penetration resistances, recoveries, and other sampling information are recorded on the field boring logs. The samples were containerized and transported to our laboratory for further testing and classification.
Laboratory Testing
The project engineer reviewed the field data and assigned laboratory tests. The laboratory testing program included the following types of tests:
■ Moisture Content
■ Dry Unit Weight
■ Unconfined Compression
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials
■ Grain size analysis
■ Atterberg limits
The laboratory testing program included examination of soil samples by geologists.
Based on the results of our field and laboratory programs, we described and classified the soil samples in general accordance with the Unified Soil Classification System.
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials
Site Location and Exploration Plans
Contents:
Site Location Plan Exploration Plan
Note: All attachments are one page unless noted above.
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials
Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image.
When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table.
Site Location
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY MICROSOFT BING MAPS
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials
Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image.
When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table.
Exploration Plan
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY SHIVE HATTERY.
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials
Exploration and Laboratory Results
Contents:
Boring Logs (B-1 through B-3) Grain Size Distribution
1149.67
1145.5
1130.8
ROOT ZONE
TOPSOIL
SANDY LEAN CLAY (CL), with clayey sand layers, brown and dark brown, stiff
CLAYEY SAND (SC), with limestone gravel, fine to coarse grained, brown, loose
LIMESTONE, highly weathered and broken, with clay layers, light brown
LIMESTONE, highly weathered, light brown
Practical Auger Refusal at 19.2 Feet
Boring Log No. 1
W at er L ev el
O bs er va tio ns
D ep th
Ft
Facilities | Environmental | Geotechnical | Materials
Elevation: 1150.0 (Ft.)
G ra p h ic
L o g
M o d el
L ay er
27.4
15.3
15.7
13.6
11.4
8.4
8-6-4 N=10
3000 (HP)
2-4-4 N=8
2-4-4 N=8
50/2"
30-14-16
0.3
4.5
9.0
12.0
17.0
19.2
Advancement Method Solid Stem Auger
Notes
Water Level Observations
None observed after drilling
None observed while drilling
See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).
See Supporting Information for explanation of symbols and abbreviations.
Classification of rock estimated from disturbed samples. Core samples and petrographic analysis may reveal other rock types.
WINN970905C Wetland - Bouska Site
Hammer Type Automatic
Conover Road | Calmar Township, IA
Terracon Project No. 13245113 Cedar Falls, IA
3105 Capital Way, Ste 5
Drill Rig
Driller
CL
Logged by
CR
Boring Started 02-27-2025
Boring Completed 02-27-2025
Abandonment Method Boring backfilled with soil cuttings upon completion.
S am pl e
T yp e
Pe rc en t
Fi n es
W at er C o n te n t
D ry
U n it
W ei g h t
(p cf
H P
(p sf
Fi el d T es t
R e su lt s
Atterberg Limits
LL-PL-PI
See Exploration PlanLocation:
Latitude: 43.2418° Longitude: -91.9421°
Depth (Ft.)
S tr ai n
C o m p re ss iv e S tr en g th
(p sf
T es t T yp e
R e co ve ry
In
.) Strength Test
1149.17
1137.5
1130.3
TOPSOIL
TOPSOIL
CLAYEY SAND (SC), fine to medium grained, brown, loose
CLAYEY SAND (SC), with limestone gravel, fine to coarse grained, brown, loose
LIMESTONE, highly weathered and broken, with occasional silt layers, light brown
Practical Auger Refusal at 19.2 Feet
Boring Log No. 2
W at er L ev el
O bs er va tio ns
D ep th
Ft
Facilities | Environmental | Geotechnical | Materials
Elevation: 1149.5 (Ft.)
G ra p h ic
L o g
M o d el
L ay er
15.2
30.4
6.9
17.0
13.3 13.0
11.8
11.2
5-2-3 N=5
3-2-3 N=5
4-4-5 N=9
3-3-5 N=8
3-8-11 N=19
50/2"
0.3
3.5
9.5
12.0
19.2
Advancement Method Solid Stem Auger
Notes
Water Level Observations None observed while drilling
See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).
See Supporting Information for explanation of symbols and abbreviations.
Classification of rock estimated from disturbed samples. Core samples and petrographic analysis may reveal other rock types.
WINN970905C Wetland - Bouska Site
Hammer Type Automatic
Conover Road | Calmar Township, IA
Terracon Project No. 13245113 Cedar Falls, IA
3105 Capital Way, Ste 5
Drill Rig
Driller
CL
Logged by
CR
Boring Started 02-27-2025
Boring Completed 02-27-2025
Abandonment Method Boring backfilled with soil cuttings upon completion.
S am pl e
T yp e
Pe rc en t
Fi n es
W at er C o n te n t
D ry
U n it
W ei g h t
(p cf
H P
(p sf
Fi el d T es t
R e su lt s
Atterberg Limits
LL-PL-PI
See Exploration PlanLocation:
Latitude: 43.2417° Longitude: -91.9423°
Depth (Ft.)
S tr ai n
C o m p re ss iv e S tr en g th
(p sf
T es t T yp e
R e co ve ry
In
.) Strength Test
1158.17
1156.17
1149.5
ROOT ZONE
TOPSOIL
CLAYEY SAND (SC), fine to medium grained, dark brown to brown, loose SAND (SP-SM), with silt, trace clay, fine to medium grained, brown, loose
SAND (SP), with limestone gravel, fine to medium grained, brown, medium dense
Boring Terminated at 10.5 Feet
Boring Log No. 3
W at er L ev el
O bs er va tio ns
D ep th
Ft
Facilities | Environmental | Geotechnical | Materials
Elevation: 1158.5 (Ft.)
G ra p h ic
L o g
M o d el
L ay er
16.5
4.7
6.6
7.5
25006-4-4 N=8
4-4-4 N=8
2-3-3 N=6
8-11-12 N=23
0.3
2.3
3.5
9.0
10.5
Advancement Method Solid Stem Auger
Notes
Water Level ObservationsSee Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).
See Supporting Information for explanation of symbols and abbreviations.
WINN970905C Wetland - Bouska Site
Hammer Type Automatic
Conover Road | Calmar Township, IA
Terracon Project No. 13245113 Cedar Falls, IA
3105 Capital Way, Ste 5
Drill Rig
Driller
CL
Logged by
CR
Boring Started 02-27-2025
Boring Completed 02-27-2025
Abandonment Method
S am pl e
T yp e
Pe rc en t
Fi n es
W at er C o n te n t
D ry
U n it
W ei g h t
(p cf
H P
(p sf
Fi el d T es t
R e su lt s
Atterberg Limits
LL-PL-PI
See Exploration PlanLocation:
Latitude: 43.2428° Longitude: -91.9417°
Depth (Ft.)
S tr ai n
C o m p re ss iv e S tr en g th
(p sf
T es t T yp e
R e co ve ry
In
.) Strength Test
0.0010.010.1110100
1.5 81 140
HydrometerU.S. Sieve Opening in Inches
Grain Size Distribution
3/4 1/23/8
D30 0.159
Pe rc en t
Fi n er b y
W ei g h t
Grain Size (mm)
30 403 60
U.S. Sieve Numbers
16 20
44 10063 2 10 14 506 200
Sand Silt or ClayCobbles coarse fine coarse finemedium
Gravel
Pe rc en t
Fi n er b y
W ei g h t
Percen t C o arser b y W eig h t
ASTM D422 / ASTM C136 / AASHTO T27
Boring ID
Facilities | Environmental | Geotechnical | Materials
30.41
D60 0.242
13.04
CU
Sieve % FinerSieve% Finer
Sieve% Finer
3/8" #4 #8 #10 #16 #30 #50 #100 #200
84.4
% Fines
Grain Size
D10 0.008
Coefficients
CC
Remarks
100.0 99.53 99.38 99.28 99.19 97.16 75.21 26.09 15.17
0.5
% Cobbles % Gravel % Sand % Clay
9.20.0
% Silt
5.9
CLAYEY SAND, fine to medium grained, brown
Description
4 - 5.5
Depth
3105 Capital Way, Ste 5
Cedar Falls, IATerracon Project No. 13245113
Conover Road | Calmar Township, IA
WINN970905C Wetland - Bouska Site
USCS
SC
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials
Supporting Information
Contents:
General Notes Unified Soil Classification System General Notes – Sedimentary Rock Classification
Shelby Tube Split Spoon
Facilities | Environmental | Geotechnical | Materials
> 55.5
28.0 to 55.5
14.0 to 28.0
7.0 to 14.0
3.5 to 7.0 less than 3.50
Unconfined Compressive Strength Qu (psi)
WINN970905C Wetland - Bouska Site
Conover Road | Calmar Township, IA
Terracon Project No. 13245113 3105 Capital Way, Ste 5
Cedar Falls, IA
N
(HP)
(T)
(DCP)
UC
(PID)
(OVA)
Standard Penetration Test Resistance (Blows/Ft.)
Hand Penetrometer
Torvane
Dynamic Cone Penetrometer
Unconfined Compressive Strength
Photo-Ionization Detector
Organic Vapor Analyzer
Water Level After a Specified Period of Time
Water Level After a Specified Period of Time
Cave In Encountered
Water Level Field Tests
Water Initially Encountered
Sampling
Water levels indicated on the soil boring logs are the levels measured in the borehole at the times indicated.
Groundwater level variations will occur over time. In low permeability soils, accurate determination of groundwater levels is not possible with short term water level observations.
General Notes
Location And Elevation Notes
Exploration point locations as shown on the Exploration Plan and as noted on the soil boring logs in the form of Latitude and Longitude are approximate. See Exploration and Testing Procedures in the report for the methods used to locate the exploration points for this project. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area.
Soil classification as noted on the soil boring logs is based Unified Soil Classification System. Where sufficient laboratory data exist to classify the soils consistent with ASTM D2487 "Classification of Soils for Engineering Purposes" this procedure is used. ASTM D2488 "Description and Identification of
Soils (Visual-Manual Procedure)" is also used to classify the soils, particularly where insufficient laboratory data exist to classify the soils in accordance with ASTM D2487. In addition to USCS classification, coarse grained soils are classified on the basis of their in-place relative density, and fine-grained soils are classified on the basis of their consistency. See "Strength Terms" table below for details. The ASTM standards noted above are for reference to methodology in general. In some cases, variations to methods are applied as a result of local practice or professional judgment.
Exploration/field results and/or laboratory test data contained within this document are intended for application to the project as described in this document. Use of such exploration/field results and/or laboratory test data should not be used independently of this document.
Relevance of Exploration and Laboratory Test Results
Descriptive Soil Classification
> 30
15 - 30
8 - 15
4 - 8
2 - 4
Hard
> 50 Very Stiff
Stiff
Medium Stiff
Soft
Very Soft
30 - 50
10 - 29
4 - 9
0 - 3Very Loose
Loose
Medium Dense
Dense
Very Dense
Relative Density of Coarse-Grained Soils
(More than 50% retained on No. 200 sieve.)
Density determined by Standard Penetration
Resistance
Consistency of Fine-Grained Soils
(50% or more passing the No. 200 sieve.)
Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance
0 - 1
Relative Density Consistency Standard Penetration or
N-Value (Blows/Ft.)
Standard Penetration or N-Value
(Blows/Ft.)
Strength Terms
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials
Unified Soil Classification System Criteria for Assigning Group Symbols and Group Names Using
Laboratory Tests A
Soil Classification Group
Symbol Group Name B
Coarse-Grained Soils:
More than 50% retained on No. 200 sieve
Gravels:
More than 50% of coarse fraction retained on No. 4 sieve
Clean Gravels:
Less than 5% fines C
Cu≥4 and 1≤Cc≤3 E GW Well-graded gravel F
Cu<4 and/or [Cc<1 or Cc>3.0] E GP Poorly graded gravel F
Gravels with Fines:
More than 12% fines C
Fines classify as ML or MH GM Silty gravel F, G, H
Fines classify as CL or CH GC Clayey gravel F, G, H
Sands:
50% or more of coarse fraction passes No. 4 sieve
Clean Sands:
Less than 5% fines D
Cu≥6 and 1≤Cc≤3 E SW Well-graded sand I
Cu<6 and/or [Cc<1 or Cc>3.0] E SP Poorly graded sand I
Sands with Fines:
More than 12% fines D
Fines classify as ML or MH SM Silty sand G, H, I
Fines classify as CL or CH SC Clayey sand G, H, I
Fine-Grained Soils:
50% or more passes the
No. 200 sieve
Silts and Clays:
Liquid limit less than
Inorganic:
PI > 7 and plots above “A” line J CL Lean clay K, L, M
PI < 4 or plots below “A” line J ML Silt K, L, M
Organic:
𝐿𝐿 𝑜𝑣𝑒𝑛 𝑑𝑟𝑖𝑒𝑑
𝐿𝐿 𝑛𝑜𝑡 𝑑𝑟𝑖𝑒𝑑
< 0.75 OL
Organic clay K, L, M, N
Organic silt K, L, M, O
Silts and Clays:
Liquid limit 50 or more
Inorganic:
PI plots on or above “A” line CH Fat clay K, L, M
PI plots below “A” line MH Elastic silt K, L, M
Organic:
𝐿𝐿 𝑜𝑣𝑒𝑛 𝑑𝑟𝑖𝑒𝑑
𝐿𝐿 𝑛𝑜𝑡 𝑑𝑟𝑖𝑒𝑑
< 0.75 OH
Organic clay K, L, M, P
Organic silt K, L, M, Q
Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat A Based on the material passing the 3-inch (75-mm) sieve.
B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay.
E Cu = D60/D10 Cc =
F If soil contains ≥ 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
H If fines are organic, add “with organic fines” to group name.
I If soil contains ≥ 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or
“with gravel,” whichever is predominant.
L If soil contains ≥ 30% plus No. 200 predominantly sand, add
“sandy” to group name.
M If soil contains ≥ 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI ≥ 4 and plots on or above “A” line.
O PI < 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
DxD
)(D
April 25, 2025 | Terracon Project No. 13245113
Facilities | Environmental | Geotechnical | Materials
General Notes – Sedimentary Rock Classification
DESCRIPTIVE ROCK CLASSIFICATION:
Sedimentary rocks are composed of cemented clay, silt and sand sized particles. The most common minerals are clay, quartz and calcite. Rock composed primarily of calcite is called limestone; rock of sand size grains is called sandstone, and rock of clay and silt size grains is called mudstone or claystone, siltstone, or shale. Modifiers such as shaly, sandy, dolomitic, calcareous, carbonaceous, etc. are used to describe various constituents. Examples: sandy shale; calcareous sandstone.
LIMESTONE Light to dark colored, crystalline to fine-grained texture, composed of CaCo3, reacts readily with HCI.
DOLOMITE Light to dark colored, crystalline to fine-grained texture, composed of CaMg(CO3)2, harder than limestone, reacts with HCI when powdered.
CHERT Light to dark colored, very fine-grained texture, composed of micro-crystalline quartz (SiO2), brittle, breaks into angular fragments, will scratch glass.
SHALE Very fine-grained texture, composed of consolidated silt or clay, bedded in thin layers. The unlaminated equivalent is frequently referred to as siltstone, claystone or mudstone.
SANDSTONE Usually light colored, coarse to fine texture, composed of cemented sand size grains of quartz, feldspar, etc. Cement usually is silica but may be such minerals as calcite, iron-oxide, or some other carbonate.
CONGLOMERATE Rounded rock fragments of variable mineralogy varying in size from near sand to boulder size but usually pebble to cobble size (1/2 inch to 6 inches). Cemented together with various cementing agents. Breccia is similar but composed of angular, fractured rock particles cemented together.
DEGREE OF WEATHERING:
SLIGHT Slight decomposition of parent material on joints. May be color change.
MODERATE Some decomposition and color change throughout.
HIGH Rock highly decomposed, may be extremely broken.
Classification of rock materials has been estimated from disturbed samples.
Core samples and petrographic analysis may reveal other rock types.
| Report Cover Page |
| Report Cover Letter to Sign |
| Table of Contents |
| Introduction |
| Project Description |
| Site Conditions |
| Geotechnical Characterization |
| Groundwater Observations |
| Geologic Hazards |
| Geotechnical Overview |
| Earthwork |
| Site Preparation and Subgrade Evaluations |
| Fill Material Types |
| Fill Placement and Compaction Requirements |
| General Earthwork Considerations |
| Sheet Pile Design Parameters |
| General Comments |
| Figures |
| Attachments |
| Exploration and Testing Procedures |
| Field Exploration |
| Laboratory Testing |
| Site Location and Exploration Plans |
| Site Location |
| Site Location (11x17 Portrait) |
| Site Location |
| Site Location (11x17 Landscape) |
| Exploration Plan |
| Exploration Plan (11x17 Portrait) |
| Exploration Plan |
| Exploration Plan (11x17 Landscape) |
| Exploration and Laboratory Results |
| Supporting Information |
| Unified Soil Classification System |
| General Notes – Sedimentary Rock Classification |
| Signature 1: Signed | |
| Signature 2: Signed | |
| Theresa.Stromberg-Murphy@terracon.com | |
| 2025-04-28T08:28:27-0700 | |
| Theresa Stromberg-Murphy | |
| Seal Uploaded |
| Signature 3: Signed | |
| 2025-04-28T15:49:42+0000 | |
| Certified by Adobe Acrobat Sign |
| 2025-04-28T15:49:43+0000 | |
| Certified by Adobe Acrobat Sign |
File details come from the government source that posted it. Updated .