6-2-MP27001-27041370 Approved Plans.pdf
PDF 18 MB Posted
- Solicitation number
- MP27001
- Issued by
- Utah
About this file
This is an Approved Plans document for the Division of Facilities Construction and Management (DFCM) in Utah, specifically for the Deseret Building Roof Replacement project at the Utah State Fairpark (Project #27041370). The project involves roof replacement for the Deseret Building with a construction cost estimate of $225,000.00. This is a Stage II Invitation to Bid, meaning only contractors who have been prequalified under the Stage I Prequalification for Contractors process and are currently listed on the respective DFCM Prequalified Contractors list as of the solicitation date are eligible to submit bids. The document contains the approved construction plans and specifications necessary for contractors to prepare accurate bid proposals.
The approved plans provide the technical details and design specifications required for the roof replacement work. Contractors must review these plans thoroughly to understand the scope of work, materials, methods, and performance standards for the project. As a prequalified bidders-only solicitation, the competitive process is limited to qualified firms, which streamlines the bidding process while ensuring contractor capability and experience in roofing work. Prospective bidders should obtain copies of all approved plans and specifications from DFCM to ensure they have complete project documentation before preparing their bids.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OF E UT TA AT H
S
CHAD HANSEN
No. 14186346
SH
EE
T
TI
TL
E:
SHEET NUMBER:
PR
OJ
EC
T:
7-
Fa irp ar k -
D es er et
R R2
5 W as at ch
R oo f R ep lac em en t
DO NOT SCALE DRAWING
SE
AL
CO
VE
R
PA
GE
G001
5 1
0 W
Sa lt L ak e C ity, U T
DF
CM
P
RO
JE
CT
#2
Ro of Re pla ce me nt
Fo r:
Ut ah
S ta te F air pa rk De se re t B ui ld in g
AH
J A
PP
RO
VA
L:
Owner/Architect: Chad Hansen Phone: 801-499-2787
Email: chad@chadpllc.pro
RE
V
DA
TE
DE
SC
RI
PT
IO
N
6- 1-
PE
RM
IT
S
ET
6-1-26
GENERAL
G001
G002
G003
COVER PAGE
DFCM FORMS
DFCM FORMS
Map data ©2026 Google 1 mi
Utah State Fairpark
SL
CL
A.9
Detail Title
SCALE: 1/8"=1'-0"1
ARCHITECTURAL
A101
A102
PEDESTRIAN PROTECTION PLAN
ROOF PLAN
A201
A202
A301
EXTERIOR ELEVATIONS
EXTERIOR ELEVATIONS
ROOF DETAILS
A302
DRAWING INDEX
PROJECT LOCATION FAIR PARK ENTRANCE
VICINITY PLAN
DFCM PROJECT #27041370
Roof Replacement For:
Utah State Fairpark Deseret Building
155 1000 W, Salt Lake City, UT 84116
ARCHITECTURAL:
Chad Hansen Architectural Design Clinton, UT 84015 CONTACT: Chad Hansen
PHONE: 801-499-2787
E-MAIL: chad@chadpllc.pro
A/E/C TEAM:
ABBREVIATIONS
A.R.F. ABOVE RAISED FLOOR
B.O. BOTTOM OF
B.O.B. BOTTOM OF BEAM
CENTERLINE
COL COLUMN
EL ELEVATION
E.O.S. EDGE OF STUD
E.W.C. ELECTRIC WATER COOLER
F.F. FINISHED FLOOR
F.F. EL FINISHED FLOOR ELEVATION
F.H.G.B. FUL HEIGHT GYP BOARD
F.R.P. FIRE RESISTANT PANEL
GA GAUGE
G.C. GENERAL CONTRACTOR
GYP GYPSUM BOARD
HORIZ HORIZONTAL
INSUL INSULATION
MBM METAL BUILDING MANUFACTURE
MAX MAXIMUM
MDP MAIN DISTRIBUTION PANEL
MFR MANUFACTURER
MIN MINIMUM
N.T.S. NOT TO SCALE
O/ OVER
O.C. ON CENTER
REF REFERENCE
SIM SIMILAR
SLAB LINE
T.O. TOP OF
T.O.B. TOP OF BEAM
T.O.F.F. TOP OF FINISHED FLOOR
T.O.S. TOP OF SLAB
T.S. TUBE STEEL
TYP TYPICAL
VERT VERTICAL
W.C. WATER CLOSET
W/ WITH
W/O WITHOUT
GENERAL NOTES
1. Verification of Existing Conditions: The Contractor and all Subcontractors are responsible for verifying all existing site and building conditions prior to submitting bids, ordering materials, or commencing work. Any discrepancies or conflicts shall be reported to the Architect immediately for resolution.
2. Subcontractor Coordination: The Contractor shall meet with each Subcontractor on-site to review the scope of their work before commencement. Additionally, the Architect will schedule a walkthrough for all prospective bidders to ensure clarity of project requirements.
3. Utility Verification: Utility information shown in the documents is approximate. The Contractor shall field-verify the exact locations of all utilities, whether shown or not, before starting work. Any utilities discovered that are not depicted on the drawings must be reported to the Architect for further instructions.
4. Scope Clarifications: By submitting a bid, the Contractor acknowledges that the construction documents provide a general scoping design of the project. The Contractor is responsible for coordinating all systems, materials, fixtures, and equipment, both new and existing, to ensure compliance with applicable codes and the Owner’s approval.
5. Compliance with Laws and Regulations: All work shall be performed in a safe and workmanlike manner in strict compliance with local and state building codes, the National Electrical Code (NEC), ADA/ANSI accessibility standards, and OSHA requirements.
6. Dust and Containment Measures: The Contractor shall prevent dust migration into adjacent spaces by installing appropriate barriers and evaluating mechanical systems to mitigate dust spread. All measures must be coordinated with the Architect and Owner.
7. Building Security: The Contractor shall ensure the integrity of the building’s security throughout construction. Access plans for customers and staff must be coordinated with the Owner and approved prior to implementation.
8. Cleanliness and Fire Safety: The Contractor shall maintain a clean work area, free of debris and flammable materials. Smoking is prohibited on the site at all times.
9. Modification of Existing Systems: The Contractor is responsible for repairing, rerouting, and extending existing services, piping, and conduits to achieve a complete and compliant installation, even for items not explicitly shown on the drawings but necessary for functionality.
10. Repair and Finish Matching: Where existing finishes are to remain, the Contractor shall paint, patch, and repair surfaces to ensure seamless blending with new work. All existing surfaces must be protected from damage.
11. Schedule Coordination: The Owner is responsible for establishing and adhering to a mutually agreed project schedule with the Contractor. Material ordering and delivery must align with this schedule to avoid delays.
12. Special Inspections: The Contractor shall coordinate and schedule all special inspections as required by Chapter 17 of the International Building Code (IBC), including but not limited to the items outlined in Section 1704.3.1.
13. Document Management: The Architect's project manual, along with these drawings, is part of the contract documents. The Contractor shall ensure that the latest approved plans, specifications, addenda, review comments, change orders, RFIs, and utility directives are available both administratively and on-site.
14. Subcontractor Compliance: All Subcontractors must comply with current applicable building codes and requirements of all enforcement authorities, including building departments and fire marshals.
15. Responsibility for Changes: The Contractor assumes full responsibility for any modifications required in architectural, structural, electrical, or plumbing systems resulting from substitutions or changes in equipment.
NORTH ARROW
ELEVATION ID
DETAIL LABEL
DETAIL ID
MATCH LINE
KEYED NOTE
ADDENDUM/REVISION ID
ROOM ID
WINDOW TYPE
DOOR ID
WALL TYPE
GRID ID
SECTION ID W/CUT LINE
SYMBOL LEGEND
SEE XX/X-XXX
MATCH LINE
A301
A201
W2
101A
1A1
ROOFING PROGRAM MANAGER:
Utah Department of Government Operations Division of Facilities Construction & Management CONTACT: Brandon Stokes, RPM
PHONE: (801) 540-3724
E-MAIL: bdstokes@utah.gov
ICC-A117.1.2017
A-3
X X
D 90
0 0 0 0
NO
YES YES
EXISTING UNCHANGED
24,000
28'-3" EXISTING UNCHANGED
8,017 SF. EXISTING UNCHANGED
N.A.
X
EXISTING UNCHANGED
N.A.
N.A.
N.A.
N.A.
N.A. (EXISTING UNCHANGED)
N.A. N.A.
N.A. (EXISTING UNCHANGED)
THERE ARE NO SPECIAL
INSPECTIONS REQUIRED
NORTH TEMPLE
W
ES
T
FAIRPARK MAP
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
THOMAS PETERSON
06/24/2026
S
CHAD HANSEN
No. 14186346
SH
EE
T
TI
TL
E:
SHEET NUMBER:
PR
OJ
EC
T:
7-
Fa irp ar k -
D es er et
R R2
5 W as at ch
R oo f R ep lac em en t
DO NOT SCALE DRAWING
SE
AL
PE
DE
ST
RI
AN
PR
OT
EC
TI
ON
P
LA
N
A101
5 1
0 W
Sa lt L ak e C ity, U T
DF
CM
P
RO
JE
CT
#2
Ro of Re pla ce me nt
Fo r:
Ut ah
S ta te F air pa rk De se re t B ui ld in g
AH
J A
PP
RO
VA
L:
Owner/Architect: Chad Hansen Phone: 801-499-2787
Email: chad@chadpllc.pro
RE
V
DA
TE
DE
SC
RI
PT
IO
N
6- 1-
PE
RM
IT
S
ET
6-1-26
(E) PARKING LOT
(E) SIDEWALK(E) SIDEWALK
(E ) S
ID
EW
AL
K
(E) SIDEWALK
(E) ASPHALT PAVING
(E) ASPHALT PAVING
ADA EXIT
ADA EXIT
ADA EXIT
(E) SIDEWALK
(E) LANDSCAPING
(E) LANDSCAPING
(E) LANDSCAPING(E) LANDSCAPING
(E) LANDSCAPING
(E) LANDSCAPING
5'- 0"
MI
N.
EXTEND FENCE TO
EXISTING FENCE
PROTECT ANY
GROUND EQUIPMENT
X X X X X X X X X X X X X X X X
X X X X X X X X X XXX X X XXX X X X XXX X X XX
DESERET BUILDING
NORTH TEMPLE
2X6 BOTTOM PLATE-CONTINUOUS
3/4" WOOD SHEATHING
2X4 FRAMING AT 24" O.C.
BETWEEN POSTS
2X6 POST @ 12' O.C. MAX.
2X4 KNEE BRACE - BOTH
DIRECTIONS (AT EACH POST)
* 2X8 JOISTS @ 24" O.C. OR AS
REQ'D. TO MEET SPAN
4X12 CONTINUOUS STRINGER
3/4" CDX PLYWOOD
2X4 CURB
NOTE:
THIS DETAIL REPRESENTS MINIMUM
REQUIREMENTS, HOWEVER A DEFERRED
SUBMITTAL IS REQUIRED FOR "*" ITEMS
NOTE:
* CONTRACTOR TO PROVIDE ANCHORAGE OR
SAND BAGS AS REQ'D. TO STABILIZE STRUCTURE
NOTE:
REFER TO PLAN FOR OPENINGS IN
STRUCTURE TO ALLOW ACCESS WHERE
DOUBLE ARROWS ARE SHOWN.
CONSTRUCT WIDTH PER SHOWN ON PLAN
3'- 0"
8'- 0"
M
IN
6"
1/4" SLOPE
5'-0" CLEAR MIN.
SCALE: 3/32" = 1'-0"1 PEDESTRIAN PROTECTION PLAN
SCALE: 3/4" = 1'-0"2 COVERED WALKWAY
LEGEND
EXIT/ENTRANCE OF COVERED WALKWAY
COVERED WALKWAY - REFER TO DETAIL & NOTES
PEDESTRIAN PROTECTION NOTES:
1. COVERED WALKWAY TO BE CONSTRUCTED PER SECTION 3306.7 OF THE 2021 IBC - COVERED WALKWAYS SHALL BE DESIGNED TO
SUPPORT ALL IMPOSED LOADS - IN NO CASE SHALL THE DESIGN LIVE LOAD BE LESS THAN 150 PSF FOR THE ENTIRE STRUCTURE - PROVIDE ADEQUATE LIGHTING AT ALL TIMES - INSTALL IN AREAS WHERE OVERHEAD WORK IS OCCURRING - COORDINATE HEIGHT OF COVERED WALKWAYS WITH EXTG. EXTERIOR DOOR / STAIR / LANDING (ETC.) - REFER TO TYPICAL COVERED WALKWAY DETAIL - PROVIDE OPENINGS / ACCESS INTO WALKWAY WHERE INDICATED ON PLAN - CONTRACTOR CAN USE SCAFFOLDING AS THEIR COVERED WALKWAY PROTECTION IF IT MEETS ALL CODE REQUIREMENTS AS CALLED FOR PER SECTION 3306.7 OF THE 2021 IBC - FIELD VERIFY EXISTING CONDITIONS WHERE COVERED WALKWAY IS INDICATED TO BE PROVIDED AND WORK AROUND AS REQUIRED.
2. TYPICAL 6' HIGH TEMPORARY CHAIN LINK FENCE WITH NO GAPS LARGER THAN 4" - FENCED AREA IS TO PREVENT ACCESS TO THE AREA ADJACENT TO THE BUILDING DURING THE ENTIRE CONSTRUCTION PROJECT - FIELD VERIFY ALL EXISTING CONDITIONS AS REQUIRED TO
PROPERLY INSTALL ENCLOSURE FENCING.
3. INSTALLATION OF COVERED WALKWAYS, BARRIERS & OTHER STAGING - SHALL BE COORDINATE WITH OWNER & FIRE MARSHAL.
4. CONTRACTOR SHALL COMPLY WITH SAFETY REQUIREMENTS CONTAINED IN THE GENERAL CONDITIONS. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE PROTECTION OF PEDESTRIANS AS REQUIRED IN 2018 IBC, CHAPTER 33, SECTION 3306. A SUBMITTAL FOR THIS SHALL BE REQUIRED INCLUDING DRAWINGS; STRUCTURAL CALCULATIONS FOR COVERED WALKWAYS, ETC. THIS MAY INCLUDE WALKWAYS, DIRECTIONAL BARRICADES, CONSTRUCTION RAILINGS, BARRIERS, COVERED WALKWAYS AND PROCEDURES FOR REPAIR, MAINTENANCE AND REMOVAL OF PROTECTION ELEMENTS.
5. CONTRACTOR SHALL MAINTAIN SITE IN A MANNER THAT WILL NOT POSE A HAZARD TO EMPLOYEES, CONTRACTORS, VISITORS TO THE
SITE, OR NEIGHBORING OFF SITE PROPERTY.
6. ALL EXTG. SPACES AND PROPERTIES ADJACENT TO DEMOLITION / CONSTRUCTION / STORAGE AREAS SHALL REMAIN CLEAN. ANY DEBRIS SHALL BE REMOVED FROM WORK AREAS DAILY. IF REQUIRED, CLOSE OFF EXTG. MECHANICAL SUPPLY/RETURN TO PREVENT DUST/DEBRIS FROM ENTERING/EXITING CONSTRUCTION AREA. COORDINATE W/ BUILDING MAINTENANCE STAFF.
7. CONTRACTOR TO REMOVE, STORE AND PROTECT EXISTING MOVEABLE ITEMS (TYP.). COORDINATE WITH OWNER FOR RELOCATION OR RE-USE. CONTRACTOR TO REPAIR AND/OR REPLACE ANY ITEMS IN OR ON THE BUILDING, OR WITHIN PROJECT SITE THAT ARE DAMAGED
BY CONSTRUCTION ACTIVITIES DURING THE CONSTRUCTION PROCESS.
TYP. CHAIN LINK FENCE BARRIER - REFER TO NOTES
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
S
CHAD HANSEN
No. 14186346
SH
EE
T
TI
TL
E:
SHEET NUMBER:
PR
OJ
EC
T:
7-
Fa irp ar k -
D es er et
R R2
5 W as at ch
R oo f R ep lac em en t
DO NOT SCALE DRAWING
SE
AL
RO
OF
P
LA
N
A102
5 1
0 W
Sa lt L ak e C ity, U T
DF
CM
P
RO
JE
CT
#2
Ro of Re pla ce me nt
Fo r:
Ut ah
S ta te F air pa rk De se re t B ui ld in g
AH
J A
PP
RO
VA
L:
Owner/Architect: Chad Hansen Phone: 801-499-2787
Email: chad@chadpllc.pro
RE
V
DA
TE
DE
SC
RI
PT
IO
N
6- 1-
PE
RM
IT
S
ET
6-1-26
F F
E E
D D
C C
B B
A A
A301
A301
A301
A301
A301
A301
A301
A301
18'-0" 18'-0"15'-6" 18'-0" 18'-0" 18'-0" 15'-6"
'-4
'-0
'-0
9'-
8"
'-0
121'-0"
'-0
01 02
03030303
06 06 06 06 06
04 03030303
06 06 06 06 06
01 02
01 02 01 02
181818
TYP.
TYP.
DFCM GENERAL REQUIREMENTS FOR STEEP SLOPE ROOFING:
1. Any product used in steep slope roofing should have a proven history and be recognized by the NRCA.
2. All eves should are to overhang the wall a minimum of 16".
3. Provide Ice and water shield on entire shingled roof area. Refer to details for further extent.
4. Valleys and gutters should be designed so ice dams will not be created. Designs should not allow for moisture to pond on the roof or drainage system. All designs are to have a clear drainage channel off of the roof -i.e. no dead valleys.
5. All roof slopes 4/12 and below are to have a full ice and water shield dry-in with a felt dry-in over the top of the ice & water shield. Roof slopes 5/12 to 8/12 are to have a felt dry -in with a minimum of 18" side laps & 12" end laps. Roof slopes 9/12 and higher will require a dry-in with a minimum of 3" side laps & 12" end laps.
6. Synthetic underlayment to be used in lieu of a #30 felt provided it is an acceptable substitute to the roofing manufacturer. The primary underlayment is to cover the secondary underlayment on all steep slope roofing systems.
7. Internal rain gutters are not allowed without written approval from the DFCM Roofing Manager.
8. All rain gutters, downspouts and internal drain systems are required to have high quality heat cable that is thermostatically controlled. All fasteners for heat cable shall be concealed within the roof system.
9. Only concealed fasteners will be acceptable in metal roofing. No exposed fasteners will be allowed.
10. Minimum of a 10 year leak free manufactures warranty is required on all steep slope roof systems.
11. Three tab shingles are not allowed. A minimum of a 270lb per square laminated shingles should be used that provides a 10 year 130 mph wind warranty. The nailing surface must be fully laminated and 1" minimum width. 6 nails per shingle.
12. All material and details should meet the requirements of ASTM, NRCA, SMACNA, UL and FM.
13. Roofing systems that have a history of snow sliding off the roof must have an appropriate snow retention system that will protect the building occupants and pedestrians traffic around the building.
14. Minimum Contractor workmanship Warranty period should be 5 years on DFCM contractor Warranty.
15. A DFCM history record is required on all roofing systems.
16. Wood framed crickets filled with insulation should be installed on the up slope side of all curbs, units, chimneys, etc.
17. All application procedures should comply at minimum with the NRCA's standards & requirements, unless written specifications from a manufacturer's specific product requirements contradict NRCA's standards.
In such instances, written permission must be obtained from the DFCM Roof Manager.
18. No asbestos containing material (ACM) is to be used.
ROOF PLAN KEYNOTES
INSTALL NEW ARCHITECTURAL GRADE ASPHALT SHINGLES EQUAL TO "CERTAINTEED"
PRESIDENTIAL SHAKE IR OVER SLIP SHEET OVER SYNTHETIC(NON-ASPHALTIC) ICE & WATER
SHIELD EQUAL TO "SKARKSKIN ULTRA SA"
COMPLETELY REMOVE ALL ASPHALT SHINGLES, UNDERLAYMENT, LOOSE ICE & WATER SHIELD
AND ANY OTHER ACCESSORIES LEAVING A CLEAN SUBSTRATE FOR REINSTALLATION
EXISTING SKYLIGHT TO REMAIN - PROTECT DURING CONSTRUCTION
ASPHALT SHINGLE HIP CAP - REFER TO MANUFACTURER'S SPECS
ASPHALT SHINGLE RIDGE CAP - REFER TO MANUFACTURER'S SPECS
EXISTING SHEET METAL CRICKET OVER PLYWOOD FRAMING TO REMAIN - PROTECT DURING
CONSTRUCTION
ASPHALT SHINGLE VALLEY - REFER TO MANUFACTURER'S SPECS
EXISTING PRECAST CONCRETE CAP - PROTECT DURING CONSTRUCTION
TYP. THROUGHOUT. COMPLETELY REMOVE EXISTING COUNTER FLASHING & ALL ACCESSORIES
AND RE-INSTALL NEW COLORED METAL REGLET & COUNTER FLASHING ALONG ENTIRE ROOF
EDGE - REFER TO DETAILS 3/A301 - COLOR TO MATCH FASCIA
REMOVE & REPLACE EXISTING SINGLE PLY ROOFING MEMBRANE ONLY - EXISTING INSULATION
SYSTEM TO REMAIN - PROTECT FROM DAMAGE DURING CONSTRUCTION. PROVIDE NEW
TERMINATION BAR & CAULKING - REFER TO DETAIL 2/A301
EXISTING CONCRETE CANOPY TO REMAIN - PROTECT DURING CONSTRUCTION
COMPLETELY REMOVE EXISTING METAL DRIP EDGE AND INSTALL NEW METAL DRIP EDGE. COLOR
TO MATCH FASCIA. EXISTING METAL FASCIA TO REMAIN - PROTECT DURING CONSTRUCTION
EXISTING WINDOW TO REMAIN - PROTECT DURING CONSTRUCTION
EXISTING BRICK TO REMAIN - PROTECT DURING CONSTRUCTION
EXISTING LOUVER TO REMAIN - PROTECT DURING CONSTRUCTION
EXISTING ROOF DRAIN REMOVE, SALVAGE AND REINSTALL. REFER TO DETAIL 4/A301 SIM.
EXISTING PHOTOCELL TO BE REMOVE, SALVAGE AND REINSTALL 8" HIGHER ON CMU WALL.
RECONFIGURE CONDUIT & WIRE TO ACCOMIDATE CHANGE IN HEIGHT. FLASH CONDUIT THROUGH
ROOF PER DFCM STANDARDS. SEE DETAIL 5/A301
PIPE VENT ROOF JACK FLASHING PER DFCM STANDARDS
SCALE: 3/16" = 1'-0"1 ROOF PLAN
GENERAL ROOF PLAN NOTES:
1. THE REPLACEMENT OF THE ROOF SHALL BE CONDUCTED IN SUCH A MANNER AS TO PROTECT THE EXISTING BUILDING AND ALL OF ITS CONTENTS IN THEIR ENTIRETY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE CAUSED DURING THE PERFORMANCE OF THEIR CONTRACTED WORK.
2. FIELD VERIFY SIZE AND LOCATION OF ALL MECHANICAL EQUIPMENT, ROOF CURBS, ROOF DRAINS, VENTS, SKYLIGHTS AS WELL AS ANY AND ALL OTHER PENETRATIONS OR ROOF ACCESSORIES AND INSTALL NEW ROOF AS REQUIRED TO ACCOMMODATE ACCESSORIES AND CREATE A WATER TIGHT SEAL OVER ENTIRE ROOF.
INSTALL PER MANUFACTURER'S RECOMMENDATIONS. COORDINATE WITH FRAMING CONTRACTOR FOR
LOCATIONS AND BLOCKING.
3. LOCATIONS OF NEW ROOFING AND CRICKETING ARE SHOWN FOR DESIGN INTENT ONLY. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE PRECISE LOCATION AND PROVIDE THESE ELEMENTS AS REQUIRED TO PROVIDE A PROPERLY SLOPED AND WATER TIGHT SYSTEM IN WHICH WATER IS NOT RETAINED ON THE ROOF.
4. ROOFING CONTRACTOR RESPONSIBLE FOR ALL METAL CAPS, FLASHING, DRIP EDGES AND ALL
ACCESSORIES TO CREATE A WATER TIGHT SEAL OVER ENTIRE ROOF.
5. CONTRACTOR TO COORDINATE ALL ASPECTS OF THE ROOF WITH ROOFING MANUFACTURER INCLUDING DECKING, SKINGLES, AND FASTENING PER CODE REQUIREMENTS FOR WIND LIFT UPLIFT RATING.
6. AFTER DEMOLITION AND BEFORE START OF INSTALLATION, CONTRACTOR SHALL INSPECT ROOFING
SUBSTRATE FOR ANY DAMAGE AND REPORT THESE ISSUES TO THE ARCHITECT.
NOTE: CONTRACTOR TO ADD AN
ALLOWANCE FOR REPLACING 10% OF
SHEATHING DUE TO EXISTING DAMAGE
DEMOLITION NOTES:
1. DEMO SUBCONTRACTOR TO COORDINATE WITH ALL OTHER TRADES AND G.C. TO ENSURE THE REMOVAL OF MATERIALS ARE THE EXACT QUANTITIES AND LOCATIONS.
2. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNATED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPONSIBILITY OF THE CONTRACTOR. VERIFY WITH DFCM, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF
SALVAGEABLE VALUE.
3. VERIFY MATCH OF NEW FINISH MATERIALS TO EXISTING IN COLOR, TEXTURE, THICKNESS, CUT, ETC… TO SATISFACTION OF DFCM PRIOR TO INSTALLATIONS. PROVIDE OTHER MATERIALS TO MATCH EXISTING WHEN REQUIRED. TO BE APPROVED BY DFCM REMOVE ENTIRE EXISTING METAL ROOF, BUILDING PAPER, FASCIA AND ALL
ACCESSORIES.
4. ALL DEMOLITION TO BE COORDINATED WITH FACILITY'S ACTIVITIES AND SCHEDULE.
5. COMPLETELY REMOVE EXISTING ROOF, METAL DRIP EDGE & ALL ACCESSORIES (INCLUDING ROOFING PAPER) TO BE REPLACED WITH NEW. CONTRACTOR IS RESPONSIBLE
FOR MAINTAINING WATER TIGHTNESS OF ROOF DURING DEMO AND REPLACEMENT.
6. EVALUATE THE FEASIBILITY OF USING EXISTING INSULATION, SHEET METAL AND OTHER EXISTING ROOF SYSTEM COMPONENTS IF THEY ARE IN LIKE NEW CONDITION AND WILL NOT HAVE AN ADVERSE EFFECT ON THE NEW ROOF SYSTEM. COORDINATE AND GAIN APPROVAL REUSED ITEMS WITH DFCM AND ARCHITECT.
7. EXISTING SHEATHING SHALL BE VERIFIED FOR STRUCTURAL SOUNDNESS OR DAMAGE. REPORT TO DFCM PM AND ARCHITECT IF ANY DETECTION.
8. WHEN NEW ROOFING SYSTEMS WILL INCREASE THE ROOF LOAD ON A BUILDING, THEN THE ROOF DECK STRUCTURE SHOULD BE EVALUATED BY A STRUCTURAL ENGINEER TO DETERMINE THE EXISTING DEAD AND LIVE LOAD CAPACITY AS REQUIRED BY CURRENT STATE BUILDING CODE.
9. REFER TO SPEC'S FOR MORE DEMOLITION REQUIREMENTS.
10. BEFORE THE START OF ANY DEMOLITION CONTRACTOR TO VERIFY THROUGH THE HAZMAT REPORT ANY MATERIALS REQUIRED TO BE ABATED HAS BEEN COMPLETED.
SILVER CAULKING & BLACK FIBROUS TAR MUST BE HANDLED APPROPRIATELY. DFCM TO COORDINATE THE ABATEMENT.
11. THE EXISTING ROOFING MUST BE REMOVED FROM THE DECK TO COMPLY WITH IBC CODE 1512.2 BEFORE THE NEW ROOF IS INSTALLED. ICE AND WATER SHIELD
EXCEPTION, NO OTHERS.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
S
CHAD HANSEN
No. 14186346
SH
EE
T
TI
TL
E:
SHEET NUMBER:
PR
OJ
EC
T:
7-
Fa irp ar k -
D es er et
R R2
5 W as at ch
R oo f R ep lac em en t
DO NOT SCALE DRAWING
SE
AL
EX
TE
RI
OR
E
LE
VA
TI
ON
S
A202
5 1
0 W
Sa lt L ak e C ity, U T
DF
CM
P
RO
JE
CT
#2
Ro of Re pla ce me nt
Fo r:
Ut ah
S ta te F air pa rk De se re t B ui ld in g
AH
J A
PP
RO
VA
L:
Owner/Architect: Chad Hansen Phone: 801-499-2787
Email: chad@chadpllc.pro
RE
V
DA
TE
DE
SC
RI
PT
IO
N
6- 1-
PE
RM
IT
S
ET
6-1-26
100'-0"
110'-9"
116'-3"
128'-3"04
01 02
01 02 010201 02
0303030303
12 12
05 05
131313131313131313131313
1414 1414
1 2 3 4 5 6 7 8
FINISH FLOOR
EAVE HEIGHT
RIDGE HEIGHT
RIDGE HEIGHT
100'-0"
110-9"
117'-0"
128'-3"
01 0201 02
06 04
BA C D E F
FINISH FLOOR
EAVE HEIGHT
RIDGE HEIGHT
RIDGE HEIGHT
ROOF PLAN KEYNOTES
INSTALL NEW ARCHITECTURAL GRADE ASPHALT
SHINGLES EQUAL TO "CERTAINTEED" PRESIDENTIAL
SHAKE IR OVER SLIP SHEET OVER SYNTHETIC(NON-
ASPHALTIC) ICE & WATER SHIELD EQUAL TO "SKARKSKIN
ULTRA SA"
COMPLETELY REMOVE ALL ASPHALT SHINGLES,
UNDERLAYMENT, LOOSE ICE & WATER SHIELD AND ANY
OTHER ACCESSORIES LEAVING A CLEAN SUBSTRATE
FOR REINSTALLATION
EXISTING SKYLIGHT TO REMAIN - PROTECT DURING
CONSTRUCTION
ASPHALT SHINGLE HIP CAP - REFER TO
MANUFACTURER'S SPECS
ASPHALT SHINGLE RIDGE CAP - REFER TO
MANUFACTURER'S SPECS
EXISTING SHEET METAL CRICKET OVER PLYWOOD
FRAMING TO REMAIN - PROTECT DURING
CONSTRUCTION
EXISTING PRECAST CONCRETE CAP - PROTECT DURING
CONSTRUCTION
TYP. THROUGHOUT. COMPLETELY REMOVE EXISTING
COUNTER FLASHING & ALL ACCESSORIES AND RE-
INSTALL NEW COLORED METAL REGLET & COUNTER
FLASHING ALONG ENTIRE ROOF EDGE - REFER TO
DETAILS 3/A301 - COLOR TO MATCH FASCIA
EXISTING CONCRETE CANOPY TO REMAIN - PROTECT
DURING CONSTRUCTION
COMPLETELY REMOVE EXISTING METAL DRIP EDGE AND
INSTALL NEW METAL DRIP EDGE. COLOR TO MATCH
FASCIA. EXISTING METAL FASCIA TO REMAIN - PROTECT
DURING CONSTRUCTION
EXISTING WINDOW TO REMAIN - PROTECT DURING
CONSTRUCTION
EXISTING BRICK TO REMAIN - PROTECT DURING
CONSTRUCTION
EXISTING LOUVER TO REMAIN - PROTECT DURING
CONSTRUCTION
EXISTING PHOTOCELL TO BE REMOVE, SALVAGE AND
REINSTALL 8" HIGHER ON CMU WALL. RECONFIGURE
CONDUIT & WIRE TO ACCOMIDATE CHANGE IN HEIGHT.
FLASH CONDUIT THROUGH ROOF PER DFCM
STANDARDS. SEE DETAIL 5/A301
SCALE: 3/16" = 1'-0"1 SOUTH ELEVATION
SCALE: 3/16" = 1'-0"2 EAST ELEVATION
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
S
CHAD HANSEN
No. 14186346
SH
EE
T
TI
TL
E:
SHEET NUMBER:
PR
OJ
EC
T:
7-
Fa irp ar k -
D es er et
R R2
5 W as at ch
R oo f R ep lac em en t
DO NOT SCALE DRAWING
SE
AL
EX
TE
RI
OR
E
LE
VA
TI
ON
S
A201
5 1
0 W
Sa lt L ak e C ity, U T
DF
CM
P
RO
JE
CT
#2
Ro of Re pla ce me nt
Fo r:
Ut ah
S ta te F air pa rk De se re t B ui ld in g
AH
J A
PP
RO
VA
L:
Owner/Architect: Chad Hansen Phone: 801-499-2787
Email: chad@chadpllc.pro
RE
V
DA
TE
DE
SC
RI
PT
IO
N
6- 1-
PE
RM
IT
S
ET
6-1-26 100'-0"
110'-9"
116'-3"
128'-3" 04
01 02 0102
03 03 03 03 03
13 13 13 13 13 13 11 13 13 13 13 13
14141414
8 7 6 5 4 3 2 1
FINISH FLOOR
EAVE HEIGHT
RIDGE HEIGHT
RIDGE HEIGHT
100'-0"
128'-3"
110-9"
117'-0"
0102 0102
01 02
EF D C B A
FINISH FLOOR
EAVE HEIGHT
RIDGE HEIGHT
RIDGE HEIGHT
ROOF PLAN KEYNOTES
INSTALL NEW ARCHITECTURAL GRADE ASPHALT
SHINGLES EQUAL TO "CERTAINTEED" PRESIDENTIAL
SHAKE IR OVER SLIP SHEET OVER SYNTHETIC(NON-
ASPHALTIC) ICE & WATER SHIELD EQUAL TO "SKARKSKIN
ULTRA SA"
COMPLETELY REMOVE ALL ASPHALT SHINGLES,
UNDERLAYMENT, LOOSE ICE & WATER SHIELD AND ANY
OTHER ACCESSORIES LEAVING A CLEAN SUBSTRATE
FOR REINSTALLATION
EXISTING SKYLIGHT TO REMAIN - PROTECT DURING
CONSTRUCTION
ASPHALT SHINGLE HIP CAP - REFER TO
MANUFACTURER'S SPECS
ASPHALT SHINGLE RIDGE CAP - REFER TO
MANUFACTURER'S SPECS
EXISTING SHEET METAL CRICKET OVER PLYWOOD
FRAMING TO REMAIN - PROTECT DURING
CONSTRUCTION
EXISTING PRECAST CONCRETE CAP - PROTECT DURING
CONSTRUCTION
TYP. THROUGHOUT. COMPLETELY REMOVE EXISTING
COUNTER FLASHING & ALL ACCESSORIES AND RE-
INSTALL NEW COLORED METAL REGLET & COUNTER
FLASHING ALONG ENTIRE ROOF EDGE - REFER TO
DETAILS 3/A301 - COLOR TO MATCH FASCIA
EXISTING CONCRETE CANOPY TO REMAIN - PROTECT
DURING CONSTRUCTION
COMPLETELY REMOVE EXISTING METAL DRIP EDGE AND
INSTALL NEW METAL DRIP EDGE. COLOR TO MATCH
FASCIA. EXISTING METAL FASCIA TO REMAIN - PROTECT
DURING CONSTRUCTION
EXISTING WINDOW TO REMAIN - PROTECT DURING
CONSTRUCTION
EXISTING BRICK TO REMAIN - PROTECT DURING
CONSTRUCTION
EXISTING LOUVER TO REMAIN - PROTECT DURING
CONSTRUCTION
SCALE: 3/16" = 1'-0"1 NORTH ELEVATION
SCALE: 3/16" = 1'-0"2 WEST ELEVATION
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
S
CHAD HANSEN
No. 14186346
SH
EE
T
TI
TL
E:
SHEET NUMBER:
PR
OJ
EC
T:
7-
Fa irp ar k -
D es er et
R R2
5 W as at ch
R oo f R ep lac em en t
DO NOT SCALE DRAWING
SE
AL
RO
OF
D
ET
AI
LS
A301
5 1
0 W
Sa lt L ak e C ity, U T
DF
CM
P
RO
JE
CT
#2
Ro of Re pla ce me nt
Fo r:
Ut ah
S ta te F air pa rk De se re t B ui ld in g
AH
J A
PP
RO
VA
L:
Owner/Architect: Chad Hansen Phone: 801-499-2787
Email: chad@chadpllc.pro
RE
V
DA
TE
DE
SC
RI
PT
IO
N
6- 1-
PE
RM
IT
S
ET
6-1-26
REMOVE EXISTING ASPHALT SHINGLE &
UNDERLAYMENT DOWN TO ROOF DECK AND
INSTALL ASPHALT SHINGLE ROOF OVER SLIP
SHEET - REFER TO NOTES AND SPECS.
EXISTING BRICK - PROTECT DURING CONSTRUCTION
EXISTING METAL SOFFIT - PROTECT DURING CONSTRUCTION
EXISTING METAL FASCIA - PROTECT DURING CONSTRUCTIONEXISTING METAL FASCIA - PROTECT DURING CONSTRUCTIONEXISTING METAL FASCIA - PROTECT DURING CONSTRUCTION
REMOVE AND RE-INSTALL NEW PRE-
FINISHED METAL DRIP EDGE METAL -
MATCH EXISTING SIZE, SHAPE AND COLOR
INSTALL NEW SYNTHETIC ICE & WATER
SHIELD EQUAL TO "SKARKSKIN ULTRA SA"
EXISTING WOOD TRUSS SYSTEM -
PROTECT DURING CONSTRUCTION
EXISTING SHEATHING - PROTECT DURING CONSTRUCTION
EXISTING RADIUS CONCRETE BEAM -
PROTECT DURING CONSTRUCTION
EXISTING TERMINATION BAR TO BE
REPLACED WITH NEW BAR. &
CAULK ALONG TOP.
EXISTING ROOF DRAIN TO REMAIN
AND FLASHED PER DETAIL 4/A301 SIM.
EXISTING METAL DECK - PROTECT
DURING CONSTRUCTION
EXISTING CMU - PROTECT DURING CONSTRUCTION
EXISTING BRICK - PROTECT DURING CONSTRUCTION
EXISTING WINDOW - PROTECT DURING CONSTRUCTION
EXISTING GYP. BRD. OVER METAL STUD SOFFIT -
PROTECT DURING CONSTRUCTION
EXISTING DRAIN PIPE TO REMAIN -
PROTECT DURING CONSTRUCTION
EXISTING CMU - PROTECT DURING CONSTRUCTION
EXISTING BRICK - PROTECT DURING CONSTRUCTION
EXISTING WINDOW - PROTECT DURING CONSTRUCTION
NEW FULLY ADHERED SINGLE PLY ROOFING SYSTEM
WITH ALL ACCESSORIES FOR INSTALLATION AS
RECOMMENDED BY SYSTEM MANUFACTURER
NEW FULLY ADHERED SINGLE PLY ROOFING SYSTEM
WITH ALL ACCESSORIES FOR INSTALLATION AS
RECOMMENDED BY SYSTEM MANUFACTURER
PRIMARY ROOF DRAIN W/
NOTCHED RETAINING RING
AND CAST IRON DOME
LINE OF SUMP (BEYOND)
ROOF DECK VARIES BY
PROJECT
NOTES:
ANY EXTG. DRAIN LINES THAT ARE CLOGGED WITH DEBRIS, BALLAST, LEAVES ETC. SHALL BE
CLEANED OUT AND ARE TO BE VERIFIED TO BE IN GOOD WORKING ORDER
USE MANUFACTURER'S TAPERED INSULATION PANELS TO CREATE PRIMARY DRAIN SUMPS - NO
HAND CUT INSULATION WILL BE ALLOWED
WHERE EXISTING PLASTIC DRAIN DOMES OCCUR, REPLACED WITH NEW CAST IRON DOMES
SECONDARY ROOF DRAIN
WITH NON-NOTCHED
RETAINING RING AND CAST
IRON DOME - SET 2" HIGHER
THAN PRIMARY DRAIN
SLOPE IN SUMP
BETWEEN DRAINS
RIGID INSULATION -
VARIES BY PROJECT
MANUFACTURERS
TAPERED INSULATION
SYSTEM
ROOFING MEMBRANE -
VARIES BY PROJECT
6' - 0" MIN. 10' - 0" MAX. (BASED ON SPACING BETWEEN DRAIN BOWLS AS INDICATED BELOW)
SLOPE IN SUMP
BETWEEN DRAINS
(8 P
IP
E
D
IA
M E
T E
R S
M
IN
.O R
P
IP
E
D
IA
M E
T E
R S
M A
X
6' - 0" MIN. 10' - 0" MAX. (BASED ON SPACING BETWEEN DRAIN BOWLS AS INDICATED BELOW)
SECTION
PLAN
EDGE OF SUMP
PRIMARY ROOF DRAIN W/
NOTCHED RETAINING RING
AND CAST IRON DOME
SECONDARY ROOF DRAIN
WITH NON-NOTCHED
RETAINING RING AND CAST
IRON DOME - SET 2" HIGHER
THAN PRIMARY DRAIN
PRESERVATIVE TREATED
NAILERS / SHIMS AS REQ'D
NOTE: WHERE RAISING OF
SECONDARY DRAIN IS REQUIRED TO
ACHIEVE THIS DETAIL, MODIFY
EXISTING PLUMBING AS REQUIRED
2' - 0" (HOLD)
BETWEEN DRAIN BOWLS
2' - 0" MIN. 6' - 0" MAX 2' - 0" (HOLD)
NO SCALE
GENERAL DFCM ROOFING DETAILS DRAIN SUMP DETAIL
EXISTING PLYWOOD SHEATHING TO
REMAIN - PROTECT FROM DAMAGE
DURING CONSTRUCTION
EXISTING STEEL ANGLE
TO REMAINEXISTING TRUSS SYSTEM TO REMAIN
WEAVE NEW ARCHITECTURAL
GRADE SHINGLES WITH FLASHING
UP SLOPE AGAINST BRICK
INSTALL NEW ARCHITECTURAL
GRADE SHINGLES ON ALL
STEEP SLOPED ROOFS
REMOVE AND RE-INSTALL NEW
COLORED METAL COUNTER FLASHING
REMOVE AND RE-INSTALL NEW
COLORED METAL REGLET FLASHING
EXISTING FACE BRICK TO REMAIN -
PROTECT FROM DAMAGE DURING
CONSTRUCTION
INSTALL NEW ICE & WATER SHIELD
EQUAL TO "SHARKSKIN ULTRA SA"
OVER ENTIRE STEEP SLOPED ROOFS
EXISTING CMU BLOCK TO REMAIN -
PROTECT FROM DAMAGE DURING
CONSTRUCTION
NEW SEALANT
EXISTING INSULATION TO REMAIN -
PROTECT FROM DAMAGE DURING
CONSTRUCTION
EXISTING PHOTOCELL TO BE
REMOVE, SALVAGE AND REINSTALL
8" HIGHER ON CMU WALL.
RECONFIGURE CONDUIT & WIRE TO
ACCOMIDATE CHANGE IN HEIGHT.
FLASH CONDUIT THROUGH ROOF
PER DFCM STANDARDS.
COMPLETELY REMOVE EXISTING
COUNTER FLASHING & ALL
ACCESSORIES AND RE-INSTALL NEW
COLORED METAL REGLET & COUNTER
FLASHING ALONG ENTIRE ROOF EDGE
- REFER TO DETAILS 3/A301
COUNTER
FLASHING TO BE
CONTINUOUS
SCALE: 3" = 1'-0"1 TYP. ROOF @ EAVE DETAIL
SCALE: 1 1/2"= 1'-0"2 MEMBRANE ROOF DETAIL @ ENTRY
NOT TO SCALE4 DRAIN SUMP DETAIL
SCALE: 3" = 1'-0"3 TYP. ROOF COUNTER FLASHING DETAIL
SCALE: 1' = 1'-0"5 PHOTOCELL DETAIL
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
| #27041370 Roof Replacement For Utah State Fairpark Deseret Building - Plans |
| G001 COVER PAGE |
| A101 PEDESTRIAN PROTECTION PLAN |
| A102 ROOF PLAN |
| A202 EXTERIOR ELEVATIONS |
| A201 EXTERIOR ELEVATIONS |
| A301 ROOF DETAILS |
File details come from the government source that posted it. Updated .