About this file
Summary of Approved Plans for USDC Steam Condensate Line Repair Phase 2
This is an approved mechanical construction plan document for the State of Utah's Division of Facilities Construction and Management (DFCM) for the Utah State Developmental Center (USDC) located at 898 North 900 East, American Fork, Utah. The project, designated DFCM #27338410, involves the removal and replacement of a direct buried 4-inch gravity feed condensate return line between two concrete vaults, with construction work estimated at $490,000. The scope includes providing correct slope (1/8 inch per foot) on the new condensate piping, installing new field wrap insulation on existing exposed steam and new condensate lines, providing new asphalt paving for removed parking lot and road areas, installing new concrete curbing and gutters, repairing sod where applicable, and providing temporary fencing to protect the work site from facility residents. The project requires a 72-hour notice coordination for any steam and condensate line shutdown time with the facility, and all on-site workers must obtain BCI background checks and HIPAA agreements prior to beginning work.
The plans specify that all piping materials shall be new and domestically manufactured unless otherwise authorized in writing prior to bidding, with new 4-inch Schedule 80 domestic ASTM A-106 seamless pipe specified for condensate return lines. The contractor is responsible for field verification of all existing mechanical, structural, electrical, and architectural conditions; coordination of all subcontractors; lawful disposal of all removed materials including asphalt, concrete, piping, and soil; and securing the entire worksite from resident entry or disturbance at all times. Construction must comply with 2024 editions of the International Mechanical Code and International Plumbing Code with Utah annotations and local authority requirements. The contractor must provide daily jobsite sweeps to secure any tools or construction materials that could be used as weapons by facility residents. All mechanical work is subject to state-appointed code inspector approval before final acceptance, with special attention to compliance with drawings, specifications, and applicable codes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G001
898 North 900 East, American Fork, UT
GENERAL:
G001--- TITLE SHEET
G002--- SPECIAL INSPECTIONS AND TESTING
MECHANICAL:
MG001 - MECHANICAL GENERAL NOTES AND LEGEND
MS101 - MECHANICAL SITE PLAN
MD401 - LARGE SCALE MECHANICAL PIPING DEMOLITION PLAN
ME401 - LARGE SCALE MECHANICAL PIPING PLAN
ME402 - LARGE SCALE MECHANICAL PIPING PLAN
ME501 - MECHANICAL DETAILS
ME502 - MECHANICAL DETAILS
ME503 - MECHANICAL DETAILS
ME504 - MECHANICAL DETAILS
ME505 - MECHANICAL DETAILS
ME506 - MECHANICAL DETAILS
ME507 - MECHANICAL DETAILS
ME508 - MECHANICAL DETAILS
ME509 - MECHANICAL DETAILS
DRAWING INDEX:
DEFERRED SUBMITTALS : NOT REQUIRED
SPECIAL INSPECTIONS:
1. SEE SHEET DRAWING G002.
DESIGN CRITERIA:
THESE DOCUMENTS - DRAWINGS AND SPECIFICATIONS
COMPLY WITH ALL THE
REQUIREMENTS OF THE DFCM STANDARDS FOR MECHANICAL
UPGRADES OF
EXISTING BUILDING.
CODE INSPECTION REQUIREMENTS:
1. BEFORE A FINAL ACCEPTANCE CAN BE ISSUED, THE STATE
APPOINTED CODE
INSPECTOR SHALL PROVIDE A FINAL REPORT
RECOMMENDING THAT THE NEW
MECHANICAL WORK IS IN COMPLIANCE WITH THE
DRAWINGS, SPECIFICATIONS
AND APPLICABLE CODES ESPECIALLY FOR THE FOLLOWING
ITEMS.
2. SEE ALSO SHEET G002.
CODE REVIEW STAMP
USDC - STEAM CONDESNSATE LINE
REPAIR PHASE 2
DFCM #27338410
SCOPE:
THIS PROJECT INCLUDES REMOVING
AND REPLACEMENT OF A DIRECT
BURIED CONDENSATE LINE BETWEEN
TWO CONCRETE VAULTS. THE
CONTRACTOR SHALL BE RESPONSIBLE
TO PROVIDE THE CORRECT SLOPE OF
THE CONDENSATE LINE BETWEEN THE
TWO VAULTS. A NEW FIELD WRAP SHALL
BE PLACED ON THE EXISTING EXPOSED
STEAM AND NEW CONDENSATE LINE.
CONTRACTOR SHALL PROVIDE NEW
ASPHALT PAVING OF THE REMOVED
PARKING LOT AND ROAD. PROVIDE NEW
CURBING, GUTTER AND SOD REPAIR
WHERE APPLICABLE. PROVIDE
TEMPORARY FENCING TO PROTECT THE
WORK SITE FROM RESIDENTS. BCI
BACKGROUND CHECKS AND HIPPA
AGREEMENTS ARE REQUIRED FOR ALL
ON-SITE WORKERS.
PROJECT SITE
North: ______ South: ______ East: ______ West: ______
d) Unlimited Area Building: Yes ______ No ______ Code Section: ______ a a
3) Three Story: A (3)______
2) Two Story: A (2)______
1) One Story: ______
c) Total Allowable Area for:
1_< Allowable Area
Actual Area
b) Sum of the Ratio Calculations for Mixed Occupancies:
a) 0.25I = 100f F P 30
WstA I 100100 fIA t taA = A + +
Official for Complex Buildings. Including, but not limited to:
g) Fire Stopping, Including Tested Design Number.
f) Exterior and Interior Accessibility Route.
e) Fire Assembly Locator Sheet.
a) High Rise Requirements.
b) Atriums.
c) Performance Based Criteria.
d) Means or Egress Analysis.
2) Additional Code Information shall be provided at the discretion of the Building
Code Accessibility Chapters, the more restrictive requirement shall govern.
through - ADA Guidelines and specific reference to the International Building
1) In case of conflict with the U.S. Department of Justice Federal Registers Parts
FOOTNOTES:
d) Drinking Fountains: ______ Service Sinks: ______
c) Bath Tubs or Showers: ______
b) Lavatories - Required (m) ______ (f) ______ Provided (m) ______ (f) ______
a) Water Closets - Required (m) ______ (f) ______ Provided (m) ______ (f) _____
M. Minimum Number of Required Plumbing Facilities:
Exit Width Required: ______ Exit Width Provided: ______
Element Hours Assembly ListingListing
Element AssemblyHours
Smoke Partitions Fire Partitions
Exterior Bearing Walls Interior Bearing Walls Exterior Non-Bearing Walls Structural Frame Partitions - Permanent Fire Barriers
Floors - Ceiling Floors Roofs - Ceiling Roofs Exterior Doors and Windows Shaft Enclosures Fire Walls
BAHTBABABA
L. Design Occupant Load: ______
K. Fire Resistance Rating Requirements for Building Elements (hours).
Area Modifications:J:
____________________________________________Tabular Area:I:
per Floor (square feet): __________________________Actual AreaH:
Number of Stories: ______ Building Height: ______G:
Required: ______ Provided: ______ Type of Sprinkler System: ____________
Sprinklers:F:
Mixed Occupancies: ______ Nonseparated Uses: ______E.
separation distance (in hours):
Requirements for the Exterior Walls based on the fireFire Resistance RatingD.
EXISTING BUILDING
N/A N/A N/A
N/A
N/A
N/A
Special Use and Occupancy (e.g. High Rise, Covered Mall): __________________
Design Wind Speed: ______ mphB. Seismic Design Category: ______
C. Type of Construction (circle one):
Change in Use: Yes ______ No ______ Mixed Occupancy: Yes ______ No ______
A. Occupancy and Group: ________ ________ ________ ________ ________
CODE ANALYSIS
Guidelines ADA Accessibility Building Conservation Uniform Code for National Electrical Code
Conservation Code International Energy International Fire Code International Plumbing Code International Mechanical Code International Building Code
YearYear
APPLICABLE CODES
20232024
N/A
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
07.17.2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
REVIEWED FOR CODE
COMPLIANCE
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
898 North 900 East, American Fork, UT
07/17/2026
DL
WHW JOB NO.:
26110
ALL RIGHTS RESERVED ©
WHW ENGINEERING, LLC.
These documents are protected under the United States 1978 copyright act. It is an exclusive work of original authorship. None of the pictorial, graphic, or technical charts or drawings depicted may be reproduced by any method, mechanical, electronic, or otherwise; nor may they be used or re-used for any purpose without the express prior written permission of WHW Engineering, LLC.
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
OWNER
SHEET TITLE
COPYRIGHT NOTICE
PROJECT NAME & ADDRESS
USDC USDC - STEAM
CONDENSATE LINE REPAIR
PHASE 2
DFCM# 27338410
CODE REVIEW STAMP
CONSULTANTS
BC
WP
Phone: (801) 957 - 7230 Taylorsville, Utah 84129 4315 S 2700 W Floor 3 Construction & Management Division of Facilities
Department of Administrative Services
Internet: http://www.dfcm.utah.gov
State of Utah
07/16/2026
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
SPECIAL INSPECTIONS AND
TESTING
G002
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
MECHANICAL LEGEND
SYMBOL ABR. DESCRIPTION
GENERAL TERMINOLOGY
SECTION LETTER DESIGNATION
SECTION DRAWN ON THIS SHEET
DETAIL NUMBER DESIGNATION
CORRESPONDING WITH GRID LOCATION
MECHANICAL EQUIPMENT DESIGNATION
EQUIPMENT ITEM DESIGNATION
REGISTER, GRILL OR DIFFUSER
DESIGNATION WITH BALANCING CFM LISTED
BELOW
GRILLE, OR LOUVER DESIGNATION WHERE
BALANCING NOT REQUIRED
REVISION DESIGNATOR AND NUMBER
KEY NOTE DESIGNATOR AND NUMBER
POC POINT OF CONNECTION
POR POINT OF REMOVAL
AFF ABOVE FINISHED FLOOR
AP ACCESS PANEL
CENTER LINE ELEVATION
INV. ELEV. INVERT ELEVATION
GC GENERAL CONTRACTOR
MC MECHANICAL CONTRACTOR
ATC CONTROL CONTRACTOR
EC ELECTRICAL CONTRACTOR
FPC FIRE PROTECTION CONTROL
NIC NOT IN CONTRACT
NTS NOT TO SCALE
VCP VITRIFIED CLAY PIPE
C COMMON
NC NORMALLY CLOSED
NO NORMALLY OPEN
ME101
A
A2
AH
CFM
D-1
R-1
LC EL.
SYMBOL ABR. DESCRIPTION
WET SIDE
PUMP
REGULATOR
PSD PUMP SUCTION DIFFUSER
UNION
MANUAL ACTUATOR (BALL,
BUTTERFLY, NEEDLE, ETC. VALVES)
MANUAL ACTUATOR (GATE, GLOBE,
S&D, OS&Y, ETC. VALVES)
PNEUMATIC DIAPHRAGM ACTUATOR
ELECTRIC MOTOR ACTUATOR
SOLENOID ACTUATOR
THREADED VALVE CONNECTION
FLANGED VALVE CONNECTION
BUTTERFLY VALVE
GATE VALVE
GLOBE VALVE - STRAIGHT PATTERN
GLOBE VALVE - ANGLE PATTERN
MOTORIZED 2-WAY CONTROL VALVE
MOTORIZED 3-WAY CONTROL VALVE
CHECK VALVE
PRV PRESSURE REDUCING VALVE
PRV PRESSURE REDUCING VALVE W/ CHECK
CBV CIRCUIT BALANCING VALVE
BV BALL VALVE
PRV PRESSURE RELIEF VALVE
TRV THERMAL RELIEF VALVE
SRV SAFETY RELIEF VALE
PLUG VALVE
NEEDLE VALVE
TDV TRIPLE DUTY VALVE
TDV TRIPLE DUTY VALVE - ANGLE
TDV TRIPLE DUTY VALVE - STRAIGHT
AUTOMATIC AIR VENT
MANUAL AIR VENT
STRAINER
STRAINER W/ PLUGGED BLOW OFF
VTI VENTURI
PRESSURE GAUGE AND GAUGE COCK -
WATER
PRESSURE GAUGE AND GAUGE COCK -
STEAM
THERMOMETER AND THERMOWELL
WATER TEMPERATURE SENSOR AND
THERMOWELL
FLOW SWITCH
PS PRESSURE SWITCH
TW THERMOWELL
PRESSURE AND TEMPERATURE TAP
INVERTED BUCKET STEAM TRAP
THERMOSTATIC STEAM TRAP
FLOAT & THERMOSTATIC STEAM TRAP
DIRECTION OF FLOW
BACKFLOW PREVENTING VALVE
R
M
S
M
M
P
T
S
S
F
PS
IBT
T
TT
F&T
SYMBOL ABR. DESCRIPTION
WET SIDE CONT
PITCH DOWN
ELBOW UP
ELBOW DOWN
TEE UP
TEE DOWN
EXISTING PIPING TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
PIPE CAP OR PLUG
CONCENTRIC REDUCER
ECCENTRIC REDUCER
EXPANSION JOINT
FLEXIBLE CONNECTION
ANCHOR POINT
CONDENSATE DRAIN
NATURAL GAS PIPING
CHEMICAL FEED LINE
MAKE-UP WATER LINE
CW CULINARY COLD WATER
HW CULINARY HOT WATER
RECIRCULATED CULINARY HOT WATER
EQUIPMENT DRAIN
HEATING WATER SUPPLY
HEATING WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
HIGH TEMPERATURE
HEATING WATER SUPPLY
HIGH TEMPERATURE
HEATING WATER RETURN
LOW PRESSURE STEAM
LOW PRESSURE STEAM RETURN
MEDIUM PRESSURE STEAM
MEDIUM PRESSURE STEAM RETURN
HIGH PRESSURE STEAM
HIGH PRESSURE STEAM RETURN
CWS CONDENSER SUPPLY
CWR CONDENSER RETURN
PUMPED CONDENSATE
REFRIGERANT LIQUID
REFRIGERANT SUCTION
REFRIGERANT HOT GAS
FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL VENT
CD
G
CF
MU
D
HWS
HWR
CHWS
CHWR
HTWS
HTWR
LPS
LPR
MPS
MPR
HPS
HPR
PC
L
S
HG
FOS
FOR
FOV
GENERAL NOTES:
MECHANICAL INFORMATION IS NOT LIMITED TO THE
MECHANICAL DRAWINGS. CONTRACTOR SHALL BE
RESPONSIBLE FOR INFORMATION OF THE EXISTING
BUILDING AND SITE CONDITIONS, EXISTING PIPING,
EXISTING ELECTRICAL, AND EXISTING SUPPORTS.
A - EACH DRAWING SHEET AND THE SPECIFICATIONS
HAVE BEEN PREPARED TO SUPPLEMENT EACH OTHER
AND THEY SHALL BE INTERPRETED AS AN INTEGRAL
UNIT WITH ITEMS SHOWN AND NOTED ON ONE AND
NOT THE OTHER BEING FURNISHED AND INSTALLED AS
THOUGH SHOWN AND CALLED OUT IN ALL PLACES.
ITEMS IN SPECIFICATIONS OR DRAWINGS LISTED
WHICH ARE DIFFERING IN EFFICIENCY OR QUALITY
SHALL BE HELD TO THE GREATEST OF: EFFICIENCY,
QUALITY OR GOVERNING CODE.
B - THE CONTRACTOR WILL BE HELD RESPONSIBLE
FOR THE INSTALLATION OF THE SYSTEMS ACCORDING
TO THE TRUE INTENT AND MEANING OF THE
CONTRACT DOCUMENTS.
C - THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT
WITH PROPER SERVICE ACCESS AND CLEARANCES
ACCORDING TO MANUFACTURERS
RECOMMENDATIONS. THE CONTRACTOR SHALL
REVIEW SUPPLIERS BID PACKAGES FOR
COMPLETENESS AND COMPLIANCE TO THE
SPECIFICATIONS, SCHEDULES, AND DESIGN INTENT
(ALL EQUIPMENT AND METHODS). THE CONTRACTOR
SHALL REMOVE AND REINSTALL CORRECTLY AT HIS
OWN EXPENSE ANY EQUIPMENT NOT IN COMPLIANCE.
D - THE CONTRACTOR SHALL CONSULT
MANUFACTURERS INSTALLATION INSTRUCTIONS FOR
SIZES, METHODS, ACCESSORIES, AND CLEARANCES IN
SPACE AVAILABLE PRIOR TO BIDDING PROJECT.
E - ANYTHING NOT CLEAR OR IN CONFLICT WILL BE
EXPLAINED BY MAKING APPLICATION TO THE
ENGINEER IN WRITING.
ANY AND ALL ALTERATIONS TO THE SYSTEM SHOWN
SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO
CHANGES FOR APPROVAL. CONTRACTOR SHALL NOT
START ANY CHANGES UNTIL NOTIFIED IN WRITING. IF
CHANGES ARE MADE PRIOR TO APPROVAL
CONTRACTOR SHALL TAKE ALL RESPONSIBILITY FOR
THE CHANGES MADE AND ALL COSTS RELATING TO
FAILURE OR REPLACEMENT OF ALTERATIONS.
CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS
AND LOCATIONS.
THE WORKING DRAWINGS ARE DIAGRAMMATIC. THEY
DO NOT SHOW EVERY OFFSET, BEND, OR ELBOW
NECESSARY FOR THE COMPLETE INSTALLATION IN THE
SPACE PROVIDED. ALL LOCATIONS FOR MECHANICAL
EQUIPMENT SHALL BE FIELD VERIFIED AND
COORDINATED WITH ALL DRAWINGS. THE
CONTRACTOR SHALL PROVIDE OR COORDINATE WITH
THE GENERAL CONTRACTOR PROVISIONS FOR
BLOCKOUTS OR CORE DRILLS THROUGH STRUCTURE.
THE INSTRUCTION TO "PROVIDE" ALSO INCLUDES
INSTALLATION.
MECHANICAL CONTRACTOR SHALL PROVIDE AND
INSTALL SMOKE AND FIRE DAMPERS AS REQUIRED BY
LOCAL CODES AND AUTHORITIES.
SHEET METAL DUCT SIZES SHOWN ON DRAWINGS ARE
FREE AREA DIMENSIONS.
PROVIDE AND INSTALL BALANCING DAMPERS IN ALL
SUPPLY AND EXHAUST AIR BRANCH DUCTS. BALANCE
TO CFM SHOWN ON PLAN.
SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR
EXACT LOCATION OF DIFFUSERS AND GRILLES.
PROVIDE TURNING VANES IN ALL ELBOWS OF
RECTANGULAR DUCT.
THE CONTRACTOR SHALL ASSUME ALL
RESPONSIBILITY IN HANDLING AND DISPOSING OF
REFRIGERANTS, OILS, ETC. ALL SUCH MATERIALS
SHALL BE HANDLED, DISPOSED, AND USED IN
ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL
LAWS.
THE MECHANICAL CONTRACTOR SHALL VERIFY MOTOR
VOLTAGES WITH THE ELECTRICAL DRAWING BEFORE
ORDERING MOTORIZED EQUIPMENT AND CONTROLS.
C.F.M. LISTED IS ACTUAL AIR.
SUPPLIERS SHALL REVIEW ALL DRAWINGS AND THE
SPECIFICATIONS PRIOR TO SUBMITTING PRICES TO
THE CONTRACTOR. ALL QUESTIONS AND
DISCREPANCIES SHALL BE BROUGHT TO THE
ENGINEERS ATTENTION PRIOR TO BIDDING.
CONTRACTOR SHALL THOROUGHLY REVIEW AND SIGN
SUBMITTALS FOR COMPLETENESS AND COMPLIANCE
TO THE SPECIFICATIONS PRIOR TO ENGINEERS
REVIEW. SUPPLIERS SHALL HIGHLIGHT OR MARK ALL
INFORMATION REQUIRED TO SHOW COMPLIANCE TO
THE SPECIFICATIONS. ALL REQUESTED EXCEPTIONS
TO THE SPECIFICATIONS, OR SCHEDULES SHALL BE
CLEARLY NOTED AND EXPLAINED. SUBMITTAL REVIEW
AND ACCEPTANCE IS FOR DESIGN CONCEPT ONLY,
AND DOES NOT AT ANY TIME RELIEVE THE
CONTRACTOR OF RESPONSIBILITY TO MEET
SPECIFICATIONS, CAPACITIES, OR DESIGN INTENT.
ALL MECHANICAL SHALL BE INSTALLED AND CONFORM
TO THE 2024 EDITION OF THE IMC AND IPC WITH UTAH
ANNOTATIONS AND LOCAL AUTHORITY
REQUIREMENTS.
THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE
DRAINING DOWN AND RE-FILLING OF ALL SYSTEMS
NECESSARY TO COMPLETE THE WORK OUTLINED BY
THIS PROJECT. THIS INCLUDES PROVIDING THE
REQUIRED CHEMICAL TREATMENT WHEN RE-FILLING
THE SYSTEM.
CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE
BCI BACKGROUND CHECKS AND HIPPA AGREEMENTS
FOR ALL WORKERS, SUBCONTRACTORS, ETC THAT
WILL BE ON-SITE FOR WORK. REMIT ALL BCIS FOR
APPROVAL TO THE USDC REPRESENTATIVE.
ALL PIPING, MATERIALS, ETC. SHALL BE NEW AND
DOMESTIC MADE UNLESS SPECIFICALLY AUTHORIZED
IN WRITING PRIOR TO BID.
PROVIDE TEMPORARY FENCING TO SECURE THE
ENTIRE WORKSITE. CONTRACTOR SHALL BE
RESPONSIBLE TO SECURE THE WORKSITE,
CONTRACTOR VEHICLES, TOOLS, MATERIALS,
EQUIPMENT, ETC FROM ENTRY OR DISTURBANCE
FROM RESIDENTS AT ALL TIMES. ENSURE THAT WORK
SITE IS PROPERLY SECURED DURING AND AFTER
WORK HOURS. CONTRACTOR SHALL PERFORM A
SWEEP OF JOBSITE DAILY TO SECURE ANY TOOLS,
CONSTRUCTION MATERIALS, DEBRIS, ETC THAT COULD
POTENTIALLY BE TAKEN AND USED AS A WEAPON BY
THE RESIDENTS OF THE FACILITY.
G-1
G-2
G-3
G-4
G-5
G-6
G-7
G-8
G-9
G-10
G-11
G-12
G-13
G-14
G-15
G-16
G-17
G-18
G-19
G-20
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
898 North 900 East, American Fork, UT
07/17/2026
DL
WHW JOB NO.:
26110
ALL RIGHTS RESERVED ©
WHW ENGINEERING, LLC.
These documents are protected under the United States 1978 copyright act. It is an exclusive work of original authorship. None of the pictorial, graphic, or technical charts or drawings depicted may be reproduced by any method, mechanical, electronic, or otherwise; nor may they be used or re-used for any purpose without the express prior written permission of WHW Engineering, LLC.
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
OWNER
SHEET TITLE
COPYRIGHT NOTICE
PROJECT NAME & ADDRESS
USDC USDC - STEAM
CONDENSATE LINE REPAIR
PHASE 2
DFCM# 27338410
CODE REVIEW STAMP
CONSULTANTS
BC
WP
Phone: (801) 957 - 7230 Taylorsville, Utah 84129 4315 S 2700 W Floor 3 Construction & Management Division of Facilities
Department of Administrative Services
Internet: http://www.dfcm.utah.gov
State of Utah
07/16/2026
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
MECHANICAL
GENERAL NOTES
AND LEGEND
MG001
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
TUNNEL "B
TU
N
N
EL
A
TUNNEL "C
TUNNEL "D"
TUNNEL "F
TR-1
DB-2 DB-2
DB-3
DB-4
DB-4
DB-4
TR-3
TR-2
TR-1
TR-4
TUNNEL "D
DB-4
DB-4
DB-4
TUNNEL "E
TU
NN
EL
C"
TUNNEL "A
TUNNEL "D"
TUNNEL "D"
TUNNEL "D"
TUNNEL "E
TUNNEL "E"
DB-4
DB-2
DB-6
D B
-6
DB-6
D B
-6
D B
-6
DB-5
D B
-6
DB-6
DB-6
D B
-6 D
B -6
DB-2
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
898 North 900 East, American Fork, UT
07/17/2026
DL
WHW JOB NO.:
26110
ALL RIGHTS RESERVED ©
WHW ENGINEERING, LLC.
These documents are protected under the United States 1978 copyright act. It is an exclusive work of original authorship. None of the pictorial, graphic, or technical charts or drawings depicted may be reproduced by any method, mechanical, electronic, or otherwise; nor may they be used or re-used for any purpose without the express prior written permission of WHW Engineering, LLC.
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
OWNER
SHEET TITLE
COPYRIGHT NOTICE
PROJECT NAME & ADDRESS
USDC USDC - STEAM
CONDENSATE LINE REPAIR
PHASE 2
DFCM# 27338410
CODE REVIEW STAMP
CONSULTANTS
BC
WP
Phone: (801) 957 - 7230 Taylorsville, Utah 84129 4315 S 2700 W Floor 3 Construction & Management Division of Facilities
Department of Administrative Services
Internet: http://www.dfcm.utah.gov
State of Utah
07/16/2026
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
MECHANICAL
SITE PIPING PLAN
MS101
GENERAL NOTES:
1. CONTRACTOR SHALL FIELD VERIFY EXISTING
MECHANICAL, STRUCTURAL, ELECTRICAL AND
ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT
LIMITED TO: EXISTING ROUTING AND LOCATION OF
DUCTWORK, PIPING, ELECTRICAL, AND STRUCTURAL
ELEMENTS. CONTRACTOR SHALL FIELD VERIFY ANY
POTENTIAL CONFLICTS BETWEEN NEW MECHANICAL
ELEMENTS AND EXISTING CONDITIONS PRIOR TO
BEGINNING DEMOLITION OR ORDERING EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL
COORDINATION BETWEEN SUB-TIER CONTRACTORS.
THIS SHALL INCLUDE THE COORDINATION BETWEEN
SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS AND
FACILITIES, SUB-TIER CONTRACTORS AND
ARCHITECT/ENGINEER, ETC.
3. CONTRACTOR SHALL COORDINATE WITH DFCM
PROVIDED HAZMAT REPORT PRIOR TO THE DEMOLITION
OF ANY EQUIPMENT, DUCTWORK, DUCT INSULATION,
PIPING, PIPE INSULATION, ETC.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE LAWFUL
DISPOSAL OF ASPHALT, CONCRETE, PIPING, SOD, DIRT
OR ANY OTHER UNWANTED MATERIALS IN RELATION TO
THE SCOPE OF THIS PROJECT.
5. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE THE
MEANS TO SECURE THE ENTIRE WORKSITE FROM
RESIDENTS OF USDC.
6. PROVIDE TEMPORARY FENCING TO SECURE THE ENTIRE
WORKSITE. CONTRACTOR SHALL BE RESPONSIBLE TO
SECURE THE WORKSITE, CONTRACTOR VEHICLES,
TOOLS, MATERIALS, EQUIPMENT, ETC FROM ENTRY OR
DISTURBANCE FROM RESIDENTS AT ALL TIMES.
7. COORDINATE WITH USDC FOR ANY STEAM AND
CONDENSATE LINE SHUTDOWN TIME. 72 HOUR NOTICE
MUST BE GIVEN.
SHEET NOTES:
SEE SHEET MD401 AND ME401 FOR LARGE SCALE
MECHANICAL PLANS.
SEE SHEET ME402 FOR LARGE SCALE MECHANICAL
PLAN.
MD
ME
MECHANICAL SITE PIPING PLAN
SCALE = NONE
TRUE
NORTH
ME 2
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
D B
-6 D
B -6
EXPANSION
VAULT #36" WATERLINE (E)
ANCHOR #16
VAULT
#4
6 4" CR (E)
4" CR(E)
10" HPS(E)
10" HPS(E)
4" CR(E)
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
898 North 900 East, American Fork, UT
07/17/2026
DL
WHW JOB NO.:
26110
ALL RIGHTS RESERVED ©
WHW ENGINEERING, LLC.
These documents are protected under the United States 1978 copyright act. It is an exclusive work of original authorship. None of the pictorial, graphic, or technical charts or drawings depicted may be reproduced by any method, mechanical, electronic, or otherwise; nor may they be used or re-used for any purpose without the express prior written permission of WHW Engineering, LLC.
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
OWNER
SHEET TITLE
COPYRIGHT NOTICE
PROJECT NAME & ADDRESS
USDC USDC - STEAM
CONDENSATE LINE REPAIR
PHASE 2
DFCM# 27338410
CODE REVIEW STAMP
CONSULTANTS
BC
WP
Phone: (801) 957 - 7230 Taylorsville, Utah 84129 4315 S 2700 W Floor 3 Construction & Management Division of Facilities
Department of Administrative Services
Internet: http://www.dfcm.utah.gov
State of Utah
07/16/2026
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
LARGE SCALE
MECHANICAL PIPING
DEMOLITION PLAN
MD401
1/16" = 1' - 0"
0 2' 4' 8' 16' 32' 64'
MECHANICAL PIPING DEMOLITION
PLAN
TRUE
NORTH
GENERAL NOTES:
1. CONTRACTOR SHALL FIELD VERIFY EXISTING
MECHANICAL, STRUCTURAL, ELECTRICAL AND
ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT
LIMITED TO: EXISTING ROUTING AND LOCATION OF
DUCTWORK, PIPING, ELECTRICAL, AND STRUCTURAL
ELEMENTS. CONTRACTOR SHALL FIELD VERIFY ANY
POTENTIAL CONFLICTS BETWEEN NEW MECHANICAL
ELEMENTS AND EXISTING CONDITIONS PRIOR TO
BEGINNING DEMOLITION OR ORDERING EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL
COORDINATION BETWEEN SUB-TIER CONTRACTORS.
THIS SHALL INCLUDE THE COORDINATION BETWEEN
SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS AND
FACILITIES, SUB-TIER CONTRACTORS AND
ARCHITECT/ENGINEER, ETC.
3. CONTRACTOR SHALL COORDINATE WITH DFCM
PROVIDED HAZMAT REPORT PRIOR TO THE DEMOLITION
OF ANY EQUIPMENT, DUCTWORK, DUCT INSULATION,
PIPING, PIPE INSULATION, ETC.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE LAWFUL
DISPOSAL OF ASPHALT, CONCRETE, PIPING, SOD, DIRT
OR ANY OTHER UNWANTED MATERIALS IN RELATION TO
THE SCOPE OF THIS PROJECT.
5. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE THE
MEANS TO SECURE THE ENTIRE WORKSITE FROM
RESIDENTS OF USDC.
6. PROVIDE TEMPORARY FENCING TO SECURE THE ENTIRE
WORKSITE. CONTRACTOR SHALL BE RESPONSIBLE TO
SECURE THE WORKSITE, CONTRACTOR VEHICLES,
TOOLS, MATERIALS,EQUIPMENT, ETC FROM ENTRY OR
DISTURBANCE FROM RESIDENTS AT ALL TIMES.
7. COORDINATE WITH USDC FOR ANY STEAM LINE
SHUTDOWN TIME . 72 HOUR NOTICE MUST BE GIVEN.
8. CONTRACTOR SHALL BE RESPONSIBLE TO REPLACE AND
INSTALL ANY DISTURBED GILSULATE DURING THE
CONSTRUCTION PROCESS.
SHEET NOTES:
REMOVE AND REPLACE EXISTING 4" GRAVITY FEED
CONDENSATE RETURN PIPING IN THIS APPROXIMATE
LOCATION. EXPOSE BOTH EXISTING STEAM AND
CONDENSATE PIPING. REMOVE AND DISPOSE OF
GILSULATE INSULATING THE EXISTING PIPING. THE
INTENT IS REDUCE DOWNTIME TO FURTHEST EXTENT.
CUT AND REMOVE EXISTING ASPHALT IN PARKING LOT
AS NEEDED TO EXPOSE EXISTING STEAM AND
CONDENSATE PIPING. REMOVE AND DISPOSE PROPERLY
OF GILSULATE INSULATING THE EXISTING PIPING. FIELD
VERIFY EXACT PIPE ROUTING PRIOR TO CUTTING.
SHORE TRENCH PER OSHA GUIDELINES AS NECESSARY.
COORDINATE WITH OWNER FOR LOCATION TO STORE
BACKFILL MATERIALS.
CUT AND REMOVE LANDSCAPING AS NEEDED TO
EXPOSE EXISTING STEAM AND CONDENSATE PIPING.
FIELD VERIFY EXACT PIPE ROUTING PRIOR TO CUTTING.
REMOVE AND DISPOSE OF GILSULATE INSULATING THE
EXISTING PIPING. SHORE TRENCH PER OSHA
GUIDELINES AS NECESSARY. CUT CONCRETE GUTTERS
WITH THE INTENT TO REPLACE. COORDINATE WITH
OWNER FOR LOCATION TO STORE BACKFILL MATERIALS.
REMOVED TRENCH MATERIALS SHALL BE TEMPORARILY
STORED IN THIS APPROXIMATE LOCATION. FIELD VERIFY.
PROTECT EXISTING STEAM, WATER, SANTIARY SEWER
PIPING AND ANY OTHER UTILITIES DURING DEMOLITION
AND CONSTRUCTION.
EXISTING MEDIUM VOLTAGE IN THIS APPROXIMATE
LOCATION. PROTECT DURING DEMOLITION AND
CONSTRUCTION.
CAREFULLY DIG AROUND AND EXPOSE EXISTING
BUILDING FOOTING IN THIS APPROXIMATE LOCATION.
THE INTENT TO PROVIDE ACCESS FOR STRUCTURAL
ENGINEER TO EXAMINE BUILDING FOOTINGS FOR
DAMAGE.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
D B
-6 D
B -6
VAULT #36" WATERLINE (E)
ANCHOR #16
VAULT
#4
4" CR
10" HPS(E)
10" HPS(E)
4" CR
CP 11
2-1/2" VENT 12
2-1/2" VENT 12
CP
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
898 North 900 East, American Fork, UT
07/17/2026
DL
WHW JOB NO.:
26110
ALL RIGHTS RESERVED ©
WHW ENGINEERING, LLC.
These documents are protected under the United States 1978 copyright act. It is an exclusive work of original authorship. None of the pictorial, graphic, or technical charts or drawings depicted may be reproduced by any method, mechanical, electronic, or otherwise; nor may they be used or re-used for any purpose without the express prior written permission of WHW Engineering, LLC.
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
OWNER
SHEET TITLE
COPYRIGHT NOTICE
PROJECT NAME & ADDRESS
USDC USDC - STEAM
CONDENSATE LINE REPAIR
PHASE 2
DFCM# 27338410
CODE REVIEW STAMP
CONSULTANTS
BC
WP
Phone: (801) 957 - 7230 Taylorsville, Utah 84129 4315 S 2700 W Floor 3 Construction & Management Division of Facilities
Department of Administrative Services
Internet: http://www.dfcm.utah.gov
State of Utah
07/16/2026
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
LARGE SCALE
MECHANICAL
PIPING PLAN
ME401
1/16" = 1' - 0" 0 2' 4' 8' 16' 32' 64'
MECHANICAL PIPING PLAN
TRUE
NORTH
SHEET NOTES:
PROVIDE NEW 4" SCH 80 DOMESTIC MADE ASTM A-106
SEAMLESS PCR RETURN PIPING IN THIS APPROXIMATE
LOCATION. COORDINATE ELEVATIONS TO PROVIDE
CORRECT 1/8" PER FOOT SLOPE BETWEEN THE TWO
VAULTS ON THE NEW CONDENSATE PIPING. ENGINEER,
INSPECTOR AND OWNER MUST SIGN OFF THAT PIPING IS
CORRECTLY SLOPED PRIOR TO FIELD INSTALLED
INSULATION AND BACKFILLING. AFTER SLOPE
INSPECTION, PROVIDE FIELD WRAP INSULATION
INTENDED FOR BURIED APPLICATION, FOAMGLAS
INSULATION FOR CONDENSATE AND EXISTING EXPOSED
STEAM PIPING WITH PITTWRAP SS OR APPROVED EQUAL.
INSTALL PER MANUFACTURERS REQUIREMENTS AND
RECOMMENDATIONS. THE INTENT IS TO MINIMIZE STEAM
DOWNTIME, COORDINATE, PLAN AND TAKE ALL
MEASURES NECESSARY TO REDUCE STEAM DOWNTIME.
TIE INTO EXISTING CONDENSATE PIPING WITHIN THE
VAULT IN THIS APPROXIMATE LOCATION.CORE DRILL
NEW PIPE PENETRATION AS NEEDED. PROVIDE NEW
SEAL AROUND VAULT PENETRATION. SEE LARGE SCALE
VAULT DIAGRAMS. FIELD VERIFY ELEVATION PROVIDES
1/8" SLOPE PER FOOT ON NEW CONDENSATE PIPING FOR
THE ENTIRE PIPE LENGTH BETWEEN VAULT #4 AND #3.
PROVIDE ON CONTRACTOR REDLINES AT THE END OF
THE PROJECT, THE FIELD MEASURED ELEVATION OF THE
CONDENSATE PIPING LEAVING VAULT#4, ENTERING
VAULT #3 AND LEAVING VAULT #3.
TIE INTO EXISTING CONDENSATE PIPING WITHIN THE
VAULT IN THIS APPROXIMATE LOCATION. PROVIDE NEW
SEAL AROUND VAULT PENETRATION. SEE LARGE SCALE
VAULT DIAGRAMS. FIELD VERIFY EXISTING ELEVATION
PROVIDES 1/8" SLOPE PER FOOT ON NEW CONDENSATE
PIPING FOR THE ENTIRE PIPE LENGTH.
MODIFY EXISTING ANCHORS AS NEEDED TO SERVE NEW
CONDENSATE RETURN PIPING IN THIS APPROXIMATE
LOCATION. SEE DETAIL A2 ON SHEET ME502. COAT ALL
CONCRETE AND METAL SURFACES WITH
WATERPROOFING BITUMASTIC.
BACKFILL, COMPACT, GRADE, PROVIDE GRAVEL BASE
AND RE-ASPHALT TO PATCH AND MATCH EXISTING
PARKING LOT IN THIS APPROXIMATE. FIELD VERIFY.
PROVIDE NEW CONCRETE CURB AND GUTTER TO MATCH
EXISTING. FIELD VERIFY.
BACKFILL, COMPACT, GRADE ,AND PROVIDE NEW TOP
SOIL AND RE-SOD IN THIS APPROXIMATE LOCATION.
RE-SOD WHEN WEATHER IS WARM ENOUGH TO RE-SOD.
PROVIDE WITH MEANS TO WATER THE SOD UNTIL THE
SOD IS ESTABLISHED. WATERING SHALL NOT REQUIRE
THE OWNER TO MODIFY THE EXISTING SPRINKLER
SYSTEM OR SCHEDULE. HOSES, SPRINKLERS AND
TIMERS ARE SUGGESTED.
PROVIDE NEW CAST IRON MANHOLE COVER TO FIT OVER
EXISTING MANHOLE. PROVIDE WITH STEAM LABEL AND
4X 1" HOLES. SEE EXAMPLE ON SHEET ME502.
MODIFY EXISTING OR PROVIDE NEW PIPE GUIDES FOR
CONDENSATE PIPING AS NEEDED TO KEEP PROPER 1/8"
SLOPE AND AVOID PIPE BELLYING PRIOR TO
BACKFILLING. COAT ALL CONCRETE AND METAL
SURFACES WITH WATERPROOFING BITUMASTIC. FIELD
VERIFY.
PROVIDE PIPE SUPPORT FOR EXPANSION LOOP IN THIS
APPROXIMATE LOCATION. COAT ALL CONCRETE AND
METAL SURFACES WITH WATERPROOFING BITUMASTIC.
FIELD VERIFY.
PROVIDE NEW STEAM POWERED CONDENSATE PUMP IN
THIS APPROXIMATE LOCATION. INSTALL PER
MANUFACTURER RECOMMENDATIONS AND DETAIL
SHOWN ON ME 501. PROVIDE WITH INSULATION. CUT A 5'
L X 3'6" W X 4' D SUMP IN THE BOTTOM OF THE
CONCRETE VAULT TO ACT AS A SUMP FOR THE
CONDENSATE PUMP. PROVIDE 3" CONCRETE WALLS
AROUND THE SUMP, WITH 6" OF GRAVEL AT THE BOTTOM
OF THE SUMP FOR DRAINAGE. THE INTENT OF THE SUMP
IS TO ALLOW THE CORRECT ELEVATION NEEDED TO
SLOPE PIPING 1/8" PER FOOT FROM VAULT #4 TO VAULT
#3. SEE DETAIL ON SHEET ME501. ADJUST DEPTH OF
VAULT AS NEEDED TO GET THE ELEVATION. FIELD
VERIFY.
PROVIDE NEW 2-1/2" VENT FROM VENTED CONDENSATE
RECEIVER IN THIS APPROXIMATE LOCATION. ROUTE
PARALLEL TO NEW CONDENSATE LINE, SLOPE BACK TO
CONDENASTE PUMP. WRAP WITH FOAMGLAS INSULATION
WITH PITTWRAP SS FOR BURIED APPLICATION OR
APPROVED EQUAL. THE INTENT TO PROVIDE THE VENT
TO ATMOSPHERE WITHIN THE GRASS AREA IN THIS
APPROXIMATE LOCATION. COORDINATE FINAL
POSITIONING WITH OWNER. ENCASE VERTICAL PIPING
WITHIN ROUND CONCRETE PYLON. FIELD VERIFY.
GENERAL NOTES:
1. CONTRACTOR SHALL FIELD VERIFY EXISTING
MECHANICAL, STRUCTURAL, ELECTRICAL AND
ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT
LIMITED TO: EXISTING ROUTING AND LOCATION OF
DUCTWORK, PIPING, ELECTRICAL, AND STRUCTURAL
ELEMENTS. CONTRACTOR SHALL FIELD VERIFY ANY
POTENTIAL CONFLICTS BETWEEN NEW MECHANICAL
ELEMENTS AND EXISTING CONDITIONS PRIOR TO
BEGINNING DEMOLITION OR ORDERING EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL
COORDINATION BETWEEN SUB-TIER CONTRACTORS.
THIS SHALL INCLUDE THE COORDINATION BETWEEN
SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS AND
FACILITIES, SUB-TIER CONTRACTORS AND
ARCHITECT/ENGINEER, ETC.
3. CONTRACTOR SHALL COORDINATE WITH DFCM
PROVIDED HAZMAT REPORT PRIOR TO THE DEMOLITION
OF ANY EQUIPMENT, DUCTWORK, DUCT INSULATION,
PIPING, PIPE INSULATION, ETC.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE LAWFUL
DISPOSAL OF ASPHALT, CONCRETE, PIPING, SOD, DIRT
OR ANY OTHER UNWANTED MATERIALS IN RELATION TO
THE SCOPE OF THIS PROJECT.
5. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE THE
MEANS TO SECURE THE ENTIRE WORKSITE FROM
RESIDENTS OF USDC.
6. PROVIDE TEMPORARY FENCING TO SECURE THE ENTIRE
WORKSITE. CONTRACTOR SHALL BE RESPONSIBLE TO
SECURE THE WORKSITE, CONTRACTOR VEHICLES,
TOOLS, MATERIALS,EQUIPMENT, ETC FROM ENTRY OR
DISTURBANCE FROM RESIDENTS AT ALL TIMES.
7. COORDINATE WITH USDC FOR ANY STEAM LINE
SHUTDOWN TIME . 72 HOUR NOTICE MUST BE GIVEN.
8. CONTRACTOR SHALL BE RESPONSIBLE TO REPLACE AND
INSTALL ANY DISTURBED GILSULATE DURING THE
CONSTRUCTION PROCESS.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
VAULT
#2
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
898 North 900 East, American Fork, UT
07/17/2026
DL
WHW JOB NO.:
26110
ALL RIGHTS RESERVED ©
WHW ENGINEERING, LLC.
These documents are protected under the United States 1978 copyright act. It is an exclusive work of original authorship. None of the pictorial, graphic, or technical charts or drawings depicted may be reproduced by any method, mechanical, electronic, or otherwise; nor may they be used or re-used for any purpose without the express prior written permission of WHW Engineering, LLC.
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
OWNER
SHEET TITLE
COPYRIGHT NOTICE
PROJECT NAME & ADDRESS
USDC USDC - STEAM
CONDENSATE LINE REPAIR
PHASE 2
DFCM# 27338410
CODE REVIEW STAMP
CONSULTANTS
BC
WP
Phone: (801) 957 - 7230 Taylorsville, Utah 84129 4315 S 2700 W Floor 3 Construction & Management Division of Facilities
Department of Administrative Services
Internet: http://www.dfcm.utah.gov
State of Utah
07/16/2026
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
LARGE SCALE
MECHANICAL
PIPING PLAN
ME402
1/4" = 1' - 0" 0 4'1' 2' 8' 16'
LARGE SCALE MECHANICAL PIPING
PLAN
TRUE
NORTH
SHEET NOTES:
MODIFY EXISTING CONDENSATE PUMP LOCATED IN
VAULT #2 WITH THE FOLLOWING. REMOVE AND REPLACE
EXISTING 4" PIPING SECTION ENTERING THE VAULT WITH
8" PIPING. THE INTENT IS TO CREATE A VENTED
RECEIVER WITH THE LARGER PIPING. SEE DETAIL ON
SHEET ME501. PROVIDE 2-1/2" VENT PIPING FROM TOP
OF 8 " PIPE TO VENT TO ATMOSPHERE BY MANHOLE.
LOWER EXISTING CONDENSATE PUMP 16", MODIFY
EXISTING PIPING AND SUMP AS NECESSARY TO HAVE 16"
DROP BELOW THE VENTED CONDENSATE RECEIVER.
PROVIDE AND INSTALL ADJUSTABLE PRV TO MOTIVE
STEAM PIPING SERVING THE EXISTING CONDENSATE
PUMP. PROVIDE INSULATION ON EXISTING PUMP,
ALUMINUM JACKETED INSULATION ON VENT PIPING AND
ALL EXPOSED PIPING. PROVIDE NEW METAL CYCLE
COUNTER SERVING THE EXISTING PUMP. PROVIDE ON
CONTRACTOR REDLINES AT THE END OF THE PROJECT,
THE FIELD MEASURED ELEVATION OF THE CONDENSATE
PIPING ENTERING VAULT#2 AND LEAVING VAULT #2.
GENERAL NOTES:
1. CONTRACTOR SHALL FIELD VERIFY EXISTING
MECHANICAL, STRUCTURAL, ELECTRICAL AND
ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT
LIMITED TO: EXISTING ROUTING AND LOCATION OF
DUCTWORK, PIPING, ELECTRICAL, AND STRUCTURAL
ELEMENTS. CONTRACTOR SHALL FIELD VERIFY ANY
POTENTIAL CONFLICTS BETWEEN NEW MECHANICAL
ELEMENTS AND EXISTING CONDITIONS PRIOR TO
BEGINNING DEMOLITION OR ORDERING EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL
COORDINATION BETWEEN SUB-TIER CONTRACTORS.
THIS SHALL INCLUDE THE COORDINATION BETWEEN
SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS AND
FACILITIES, SUB-TIER CONTRACTORS AND
ARCHITECT/ENGINEER, ETC.
3. CONTRACTOR SHALL COORDINATE WITH DFCM
PROVIDED HAZMAT REPORT PRIOR TO THE DEMOLITION
OF ANY EQUIPMENT, DUCTWORK, DUCT INSULATION,
PIPING, PIPE INSULATION, ETC.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE LAWFUL
DISPOSAL OF ASPHALT, CONCRETE, PIPING, SOD, DIRT
OR ANY OTHER UNWANTED MATERIALS IN RELATION TO
THE SCOPE OF THIS PROJECT.
5. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE THE
MEANS TO SECURE THE ENTIRE WORKSITE FROM
RESIDENTS OF USDC.
6. PROVIDE TEMPORARY FENCING TO SECURE THE ENTIRE
WORKSITE. CONTRACTOR SHALL BE RESPONSIBLE TO
SECURE THE WORKSITE, CONTRACTOR VEHICLES,
TOOLS, MATERIALS,EQUIPMENT, ETC FROM ENTRY OR
DISTURBANCE FROM RESIDENTS AT ALL TIMES.
7. COORDINATE WITH USDC FOR ANY STEAM LINE
SHUTDOWN TIME . 72 HOUR NOTICE MUST BE GIVEN.
8. CONTRACTOR SHALL BE RESPONSIBLE TO REPLACE AND
INSTALL ANY DISTURBED GILSULATE DURING THE
CONSTRUCTION PROCESS.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
18" CURB & GUTTER DETAIL
SCALE: NONEC2
4" MIN.
GRAVEL
R=2"
R=1"
18"
4- 3/
4"
6"1"
6"
6- 1/
2" 3/
4"
CONCRETE
BLOCK (TYP.)
CONCRETE SHALL BE
CLEAR OF PIPE
JOINTS. (TYP)
SIDE EXCAVATION
(TYPICAL)
ALL BEARING SURFACES SHALL
BE AGAINST UNDISTURBED
GROUND (TYP)
BEARING AREAS EACH DIRECTION
OF THRUST IN SQUARE FEET
PIPE
SIZE
TEES &
DEADEND
90°
ELBOWS
45° ELBOW, CROSSES
IN DIRECTION OF FLOW
22-1/2°
ELBOWS
6"&8" 4.0 5.5 3.0 2.0
TYPICAL THRUST BLOCK INSTALLATION DETAIL
SCALE: NONEB2
TEE ELBOW
PIPE ANCHOR AND SUPPORT DETAIL
SCALE: NONED4
NOTE:
ALL THREAD FASTENERS SHALL BE 1-1/2"
STANDOFF AFTER BASE PLATE, WASHERS, AND
NUTS ARE INSTALLED.
1-1/2"
STAINLESS STEEL
LOCK WASHER
BASE PLATE
EPOXY VOIDS IN BASE PLATE
HILTI HY-150 ANCHOR BOLT
CONCRETE WALL, FLOOR, OR ROOF
F&T TRAP DETAILB4
DETAIL NOTES:
DRIP LEG-FULL SIZE
BALL VALVE
STRAINER
F & T TRAP
UNION
CHECK VALVE
TO CONDENSATE PUMP
DIRT LEG CAP
SCALE: NONE
6 2
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
898 North 900 East, American Fork, UT
07/17/2026
DL
WHW JOB NO.:
26110
ALL RIGHTS RESERVED ©
WHW ENGINEERING, LLC.
These documents are protected under the United States 1978 copyright act. It is an exclusive work of original authorship. None of the pictorial, graphic, or technical charts or drawings depicted may be reproduced by any method, mechanical, electronic, or otherwise; nor may they be used or re-used for any purpose without the express prior written permission of WHW Engineering, LLC.
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
OWNER
SHEET TITLE
COPYRIGHT NOTICE
PROJECT NAME & ADDRESS
USDC USDC - STEAM
CONDENSATE LINE REPAIR
PHASE 2
DFCM# 27338410
CODE REVIEW STAMP
CONSULTANTS
BC
WP
Phone: (801) 957 - 7230 Taylorsville, Utah 84129 4315 S 2700 W Floor 3 Construction & Management Division of Facilities
Department of Administrative Services
Internet: http://www.dfcm.utah.gov
State of Utah
07/16/2026
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
MECHANICAL
DETAILS
ME501
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
8" GREATER THAN
INSULATION WIDTH
NOTE:
ALL METAL PARTS
MUST BE COMPLETELY
ENCLOSED IN SAND.
CONCRETE AND METAL
SURFACES SHALL BE
COATED WITH 3 COATS OF BITUMASTIC.
DIRECT BURIED PIPING GUIDE DETAILC1 SCALE: NONE
SAND BED MIN 4" ALL
AROUND PIPING
TYP
SPACER ANGLES
1-1/2 x 1-1/2 x 1/4
STEEL GUIDE BRACKET
2"-4" PIPE = 5/8" DIAM.
10" PIPE = 2-1/2"x2-1/2"x1/4"
3" MIN.
2" 4"
SAND
4"
2"-4" PIPE = 10"
10" PIPE = 16"
2"-4" PIPE = 8"
10" PIPE = 12"
4"
3" MIN.
PIPE PENETRATION THROUGH
CONCRETE VAULT WALL DETAILC3 SCALE: NONE
INTERIOR
MECHANICAL LINK-
SEAL TYPE WALL
PENETRATION SEAL
MODEL-LS
LINK SEAL TYPE WALL
SLEEVE MODEL-WS
WATER STOP AND
ANCHOR COLLAR
CONCRETE VAULT
WALL
CONCRETE VAULT
WALL
10"Ø & 4"Ø
NEW PIPING
THROUGH NEW
VAULT WALL
ANCHOR SCHEDULE
ANCHOR
NUMBER
MAX. UNBALANCED PIPE
SURFACE AREA SQ. FT.
W
(INCHES)
D
(INCHES)
T
(INCHES)
NO. OF
REBARS EA
SIDE
SIZE OF
REBARS
NO.
13,14,15,16 160 44 24 14 7 3
END ANCHOR SCHEDULE-STEEL
PIPE SIZE
SUPPORT CHANNEL
ANCHOR POST
I BEAM KNEE BRACE
FILLET
K
INCHESCHANNEL
L
(INCHES)
2",2-1/2", 3" NR 5 I 14.75 NR 1/4"
4" 4 5.4 26" 5 I 14.75 * 2-1/2"Ø 1/4"
10" 8 11.5 38" 10 I 35 * 6"Ø 5/16"
NR = NOT REQUIRED
* = PIPE DIA. SCH 40
INTERMEDIATE ANCHOR SCHEDULE-STEEL
PIPE SIZE
SUPPORT CHANNEL
ANCHOR POST
I BEAM KNEE BRACE
FILLET
K
INCHESCHANNEL
L
(INCHES)
2",2-1/2",3" NR NR 5 I 14.75 NR 1/4"
4" NR 26" 6 I 12.5 NR 1/4"
10" 8 11.5 28" 10 I 35 6"Ø 5/16"
NR = NOT REQUIRED
* = PIPE DIA SCH. 40
1-1/4"
THREADED
ROD
POUR 2000 PSI CONCRETE
AT 28 DAYS AGAINST
UNDISTRUBED SOIL
6"
2" SCHEDULE 40 PIPE
TACK WELD THREADED ROD TO NUT AFTER
FINAL ADJUSTMENT AND SIGN OFF FROM
OWNER, ENGINEER AND INSPECTOR
NOTE:
CONCRETE AND METAL
SURFACES SHALL BE
COATED WITH BITUMASTIC
AFTER FINAL
ADJUSTMENTS.
NO EXCEPTIONS!
PIPE
INSULATION
PROTECTION
SADDLE
PLACE HALF OF
REBAR IN TOP
1/3 OF HEIGHT
T
D
6"
PLACE HALF OF
REBAR IN TOP
1/3 OF HEIGHT
K
TYPICAL 1/3D
2/3D
2" MAX
L
UNDISTURBED
SOIL
NEW ASPHALT, SIDE
WALK, GRASS COVER
OVER EXCAVATION
USE 6" THK TOP SOIL
UNDER GRASS
SURFACE
USE 6" THK PEA
GRAVEL UNDER SIDE
WALK SURFACE SAND
DIRECT BURIED PIPING ANCHOR DETAILA2
PIPE INSULATION WITH
PITT WRAP
MANHOLE COVER LID EXAMPLEC5
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
898 North 900 East, American Fork, UT
07/17/2026
DL
WHW JOB NO.:
26110
ALL RIGHTS RESERVED ©
WHW ENGINEERING, LLC.
These documents are protected under the United States 1978 copyright act. It is an exclusive work of original authorship. None of the pictorial, graphic, or technical charts or drawings depicted may be reproduced by any method, mechanical, electronic, or otherwise; nor may they be used or re-used for any purpose without the express prior written permission of WHW Engineering, LLC.
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
OWNER
SHEET TITLE
COPYRIGHT NOTICE
PROJECT NAME & ADDRESS
USDC USDC - STEAM
CONDENSATE LINE REPAIR
PHASE 2
DFCM# 27338410
CODE REVIEW STAMP
CONSULTANTS
BC
WP
Phone: (801) 957 - 7230 Taylorsville, Utah 84129 4315 S 2700 W Floor 3 Construction & Management Division of Facilities
Department of Administrative Services
Internet: http://www.dfcm.utah.gov
State of Utah
07/16/2026
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
MECHANICAL
DETAILS
ME502
7 3/4"
6 1/2"
B
(2) EPIC®
PICKBARS
3" FLAT FACE
GOTHIC
(4) 1" DIA. HOLES
DRILLED THRU COVER
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
SCALE: 1/8"=1'-0"
VAULT #4
DEMO PIPING DETAILC3
9'-0"
10'-4"
3'-0"
9' -0
1 3
1 3
1 3
HPS
PCR
HPS
PCR
11 14
SCALE: 1/8"=1'-0"
VAULT #3
DEMO PIPING DETAILC1
9'-0"
10'-4"
3'-0"
9' -0
1 3
1 3
1 3
H
PS
PC
R
SCALE: 1/8"=1'-0"
VAULT #4
PIPING DETAILA3
9'-0"
10'-4"
3'-0"
9' -0
1 3
1 3
HPS
PCR
HPS
PCR
11 14
SCALE: 1/8"=1'-0"
VAULT #3
PIPING DETAILA1
9'-0"
10'-4" 9'
-0
1 3
H
PS
PC
R
4" CR
4" CR
CP
2-1/2" VENT
3" CR
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
898 North 900 East, American Fork, UT
07/17/2026
DL
WHW JOB NO.:
26110
ALL RIGHTS RESERVED ©
WHW ENGINEERING, LLC.
These documents are protected under the United States 1978 copyright act. It is an exclusive work of original authorship. None of the pictorial, graphic, or technical charts or drawings depicted may be reproduced by any method, mechanical, electronic, or otherwise; nor may they be used or re-used for any purpose without the express prior written permission of WHW Engineering, LLC.
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
OWNER
SHEET TITLE
COPYRIGHT NOTICE
PROJECT NAME & ADDRESS
USDC USDC - STEAM
CONDENSATE LINE REPAIR
PHASE 2
DFCM# 27338410
CODE REVIEW STAMP
CONSULTANTS
BC
WP
Phone: (801) 957 - 7230 Taylorsville, Utah 84129 4315 S 2700 W Floor 3 Construction & Management Division of Facilities
Department of Administrative Services
Internet: http://www.dfcm.utah.gov
State of Utah
07/16/2026
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
MECHANICAL
DETAILS
ME503
NEW VAULT SHEET NOTES:
10"Ø SCH.(E) 80 HPS SEAMLESS PIPE.
6"Ø SCH.(E) 80 HPS SEAMLESS PIPE.
4"Ø SCH.(E) 80 PCR SEAMLESS PIPE.
3"Ø SCH.(E) 80 PCR SEAMLESS PIPE.
REMOVE EXISTING CONDENSATE
PIPING BACK TO THIS APPROXIMATE
LOCATION. FIELD VERIFY EXACT PIPE
ROUTING AND POINTS OF REMOVAL.
PROVIDE 3" THK. INSULATION WITH
ALUMINUM JACKET AROUND
CONDENSATE PIPING IN VAULT.
PROVIDE 300# TRIPLE OFF-SET
BUTTERFLY VALVE SAME SIZE AS
PIPING.
NEW VAULT SHEET NOTES:
SCH. 80 LONG RADIUS WELDED 90° ELL.
EXISTING STEAM PIPING SERVING THE
GREEN HOUSE. FIELD VERIFY.
EXISTING CONDENSATE RETURN
PIPING SERVING GREENHOUSE AND
FUTURE EAST SIDE. FIELD VERIFY.
EXISTING STEAM AND CONDENSATE
PIPING. FIELD VERIFY.
4"Ø SCH.(E) 80 HPS STEAM
2-1/2"Ø SCH.(E) 80 HPS STEAM
2"Ø SCH.(E) 80 HPS STEAM
TIE INTO EXISTING CONDENSATE
PIPING IN THIS APPROXIMATE
LOCATION. PROVIDE NEW 4' SCH 80
DOMESTIC MADE PIPE. PROVIDE WITH
ALUMINUM JACKETED INSULATION.
FIELD VERIFY EXACT PIPE ROUTING
AND POINTS OF CONNECTION.
PROVIDE NEW METRA SEAL FOR HIGH
TEMP APPLICATIONS OR APPROVED
EQUAL IN EXISTING PENETRATION FOR
WATER TIGHT SEAL. FIELD VERIFY.
CUT 4'6" L X 3'6" W X 4'D SUMP IN THE
BOTTOM OF THE VAULT. PROVIDE WITH
3" CONCRETE WALLS AND 6" OF
GRAVEL FOR DRAINAGE AT THE
BOTTOM OF THE SUMP. THE INTENT OF
THE SUMP IS TO ALLOW THE CORRECT
ELEVATION NEEDED TO SLOPE PIPING
1/8" PER FOOT FROM VAULT #4 TO
VAULT #3. ADJUST DEPTH OF VAULT AS
NEEDED TO GET THE CORRECT
ELEVATION. FIELD VERIFY.
MODIFY EXISTING CONDENSATE PIPING
TO CONNECT BEFORE ENTERING THE
VENTED STEAM CONDENSATE TO THE
NEW CONDENSATE PUMP IN THIS
APPROXIMATE LOCATION. FIELD
VERIFY EXACT PIPE ROUTING AND
POINTS OF CONNECITON.
PROVIDE NEW STEAM POWERED
CONDENSATE PUMP IN THIS
APPROXIMATE LOCATION. INSTALL PER
MANUFACTURER RECOMMENDATIONS
AND DETAIL SHOWN ON ME 501.
PROVIDE WITH INSULATION. SEE
DETAIL ON SHEET ME501.
PROVIDE 2-1/2" VENT LINE PARALLEL
TO NEW CONDENSATE LINE IN THIS
APPROXIMATE LOCATION. INSULATE
WITH ALUMINUM JACKETING WITHIN
THE VAULT, AND 1" FOAMGLAS WITH
PITT WRAP SS FOR BURIED
APPLICATIONS OR APPROVED EQUAL.
CORE DRILL NEW PENETRATION IN
VAULT WALL. RUN VENT LINE BACK TO
GRASS AREA AS SHOWN ON ME401
DRAWINGS.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
TYPICAL SINGLE PIPE
EXPANSION LOOP DETAIL
10'
EXPANSION SINGLE
PIPE SUPPORT
SUPPORT (TYPICAL)
EXPANSION SINGLE PIPE
STANDARD PIPE
SUPPORT
2'
REDUCING PLATE
9'
*EXPANSION SINGLE PIPE SUPPORT
REQ'D WHEN X+Y EXCEEDS 9'.
X 2'
MIN.
6" TYPICAL
CONDUIT
TRANSITION
CONDUIT
WELD
INSULATION
CIRCULAR
SECTION A-A
OVERSIZED CONDUIT TO BE DESIGNED
& UTILIZED TO ENSURE CARRIER
PIPE INSULATION WILL NOT CON-
TACT THE INTERIOR OF THE
CASING PIPE DUE TO THERMAL
EXPANSION OR CONTRACTION
FORCES.
NOTE:
1. SPECIFIC JOBSITE REQUIREMENTS & DIFFERING FIELD CONDITIONS WILL
DICTATE WHICH TYPE OF OVERSIZED CONDUIT WILL BE UTILIZED (CIR-
CULAR OR ELLIPTICAL).
2. EXPANSION TYPE SUPPORTS SHALL BE UTILIZED TO COMPENSATE FOR
THE NECESSARY THERMAL EXPANSION WHEREVER A CHANGE OF DIREC-
TION (90° ELLS, 45° ELLS, ZEES, TEES, LOOPS, ETC.) OCCURS IN THE
CONDUIT SYSTEM. THIS INCLUDES EXPANSION SUPPORTS IN EACH LEG
AS NECESSARY TO COMPENSATE FOR THERMAL EXPANSION IN BOTH
DIRECTIONS.
3. OVERSIZED CONDUIT TO ALLOW FOR MOVEMENT OF PIPE. TRANSITION
CONDUIT 10 GA. THICK-WELDED AT BOTH CONDUITS (IF REQUIRED FOR EX-
PANSION).
A
A
9' M
AX
Y
TYPICAL EXPANSION ELBOW
EXPANSION
PIPE SUPPORT
EXPANSION
PIPE SUPPORT
CONTINUOUSLY WELDED
TRANSITION CONDUIT (IF
REQUIRED FOR EXPANSION)
ANGLE TO SUIT
FIELD CONDITIONS
OR REQUIREMENTS
EXPANSION
PIPE SUPPORT
A
CONTINUOUSLY WELDED
TRANSITION CONDUIT (IF
REQUIRED FOR EXPANSION)
NOTE:
1. USE STANDARD EXPANSION SUPPORTS
FOR SINGLE PIPE SYSTEMS, REF. SK-3;
USE TYPE "A" SUPPORTS FOR DUAL PIPE
EXPANSION SUPPORTS
2. USE STANDARD, NON-EXPANSION PIPE
SUPPORTS IN STRAIGHT CONDUIT
CONTINUOUSLY WELDED
TRANSITION CONDUIT (IF
REQUIRED FOR EXPANSION) WELD
CARRIER
PIPE
CIRCULAR
SECTION A-A
INSULATION
OVERSIZED
COATED CONDUIT
A
A2 TYPICAL SINGLE PIPE EXPANSION LOOP DETAIL
SCALE: NONE
A4 TYPICAL EXPANSION ELBOW DETAIL
SCALE: NONE
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
898 North 900 East, American Fork, UT
07/17/2026
DL
WHW JOB NO.:
26110
ALL RIGHTS RESERVED ©
WHW ENGINEERING, LLC.
These documents are protected under the United States 1978 copyright act. It is an exclusive work of original authorship. None of the pictorial, graphic, or technical charts or drawings depicted may be reproduced by any method, mechanical, electronic, or otherwise; nor may they be used or re-used for any purpose without the express prior written permission of WHW Engineering, LLC.
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
OWNER
SHEET TITLE
COPYRIGHT NOTICE
PROJECT NAME & ADDRESS
USDC USDC - STEAM
CONDENSATE LINE REPAIR
PHASE 2
DFCM# 27338410
CODE REVIEW STAMP
CONSULTANTS
BC
WP
Phone: (801) 957 - 7230 Taylorsville, Utah 84129 4315 S 2700 W Floor 3 Construction & Management Division of Facilities
Department of Administrative Services
Internet: http://www.dfcm.utah.gov
State of Utah
07/16/2026
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
MECHANICAL
DETAILS
ME504
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
40'-0"
2'-0"
A 6"
9'-0" 9'-0" 9'-0" 9'-0" 2'-0"
A
3" OF EXPOSED
CONDUIT AT EACH
END OF PIPE.
PIPE SUPPORT (TYP.)
(SEE DWG. NO. SK-2
OR DWG. NO. SK-4)
EXPOSED PIPE
MINIMUM GAUGE AND THICKNESS FOR STEEL CASING CONDUIT SYSTEMS
The above thicknesses will support a highway loading H-20, or equivalent, with a minimum of 2’ burial and 95% of maximum density compacted backfill in cohesive soils or 70% of relative density compacted backfill for cohesive soils. For special loadings and soil conditions, conduit thickness may change.
10 GA. (MINIMUM) STEEL CONDUIT
FACTORY CORROSION COATING
INSULATION
CORROSION COATING
AIR SPACE
EXPOSED CONDUIT
CARRIER PIPE
SECTION A-A
EXPOSED CARRIER PIPE
NOTE:
This detail shows a single pipe in a conduit. The support spacing dimensions and casing thickness are applicable for a dual pipe system in a single conduit.
6"
3"
TYPICAL EXPANSION PIPE SUPPORT
24 GA.
SHEET
METAL
EXPANSION PIPE
SUPPORT
STEEL ANGLE STIFFENER
IS REQUIRED ON ALL
EXPANSION SUPPORTS
WHEN CARRIER PIPE DIA.
EXCEEDS 10".
DIMENSION
REQUIRED FOR THERMAL
EXPANSION
INSULATION
CARRIER PIPE
24 GA. SHEET METAL AFFIXED
WITH METAL SCREWS.
COATED STEEL CONDUIT
10 GA. STEEL PLATE WELDED TO 10
GA. STEEL PIPE SECTION & SIZED
TO ACCOMMODATE THERMAL EXPANSION
& CONDUIT REDUCER TRANSITION.
DRILL & PLUG WELD OUTER CONDUIT TO
10 GA. STEEL PIPE EXPANSION SUPPORT.
10 GA. STEEL PIPE SECTION SAME DIA.
AS CONDUIT. CUT, TENSIONED & WELDED
TO FIT INSIDE CONDUIT.
NOTE 1
CALICUM
SILICATE
NOTE:
NOTE 1
24 GA. SHEET METAL
1. INSULATION CAN BE MINERAL WOOL OR CALCIUM
SILICATE AS PER THE BROCHURE AND PROJECT
SPECIFICATIONS.
2. CONDUIT WITH EXPANSION PIPE SUPPORTS SHALL
HAVE SHIPPING BARS TACK WELDED ON CARRIER
PIPE AND CONDUIT AND SHALL BE PAINTED TO
SHOW TOP OF CONDUIT FOR PROPER SHIPPING,
HANDLING, AND INSTALLATION.
8"
12"
PROFILE VIEW
EXPANSION PIPE
SUPPORT
EXPANSION SUPPORT.
10 GA. STEEL PIPE
OUTER CONDUIT TO
DRILL & PLUG WELD
A1 ELBOW EXPANSION #1 DETAIL
SCALE: NONE
A3 TYPICAL INSTALLED PIPE SUPPORT/GUIDE DETAIL
SCALE: NONE
CASING TYPE CASING DIAMETER MIN. WALL THICKNESS
BLACK STEEL UP THROUGH 26" 0.1345" (10 GAUGE)
SMOOTH WALL 28" THROUGH 36" 0.1943" (6 GAUGE)
38" THROUGH 42" 0.2242" (4 GAUGE)
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
898 North 900 East, American Fork, UT
07/17/2026
DL
WHW JOB NO.:
26110
ALL RIGHTS RESERVED ©
WHW ENGINEERING, LLC.
These documents are protected under the United States 1978 copyright act. It is an exclusive work of original authorship. None of the pictorial, graphic, or technical charts or drawings depicted may be reproduced by any method, mechanical, electronic, or otherwise; nor may they be used or re-used for any purpose without the express prior written permission of WHW Engineering, LLC.
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
OWNER
SHEET TITLE
COPYRIGHT NOTICE
PROJECT NAME & ADDRESS
USDC USDC - STEAM
CONDENSATE LINE REPAIR
PHASE 2
DFCM# 27338410
CODE REVIEW STAMP
CONSULTANTS
BC
WP
Phone: (801) 957 - 7230 Taylorsville, Utah 84129 4315 S 2700 W Floor 3 Construction & Management Division of Facilities
Department of Administrative Services
Internet: http://www.dfcm.utah.gov
State of Utah
07/16/2026
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
MECHANICAL
DETAILS
ME505
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
TYPICAL EXPANSION PIPE SUPPORT
24 GA.
SHEET
METAL
EXPANSION PIPE
SUPPORT
STEEL ANGLE STIFFENER
IS REQUIRED ON ALL
EXPANSION SUPPORTS
WHEN CARRIER PIPE DIA.
EXCEEDS 10".
DIMENSION
REQUIRED FOR THERMAL
EXPANSION
INSULATION
CARRIER PIPE
24 GA. SHEET METAL AFFIXED
WITH METAL SCREWS.
COATED STEEL CONDUIT
10 GA. STEEL PLATE WELDED TO 10
GA. STEEL PIPE SECTION & SIZED
TO ACCOMMODATE THERMAL EXPANSION
& CONDUIT REDUCER TRANSITION.
DRILL & PLUG WELD OUTER CONDUIT TO
10 GA. STEEL PIPE EXPANSION SUPPORT.
10 GA. STEEL PIPE SECTION SAME DIA.
AS CONDUIT. CUT, TENSIONED & WELDED
TO FIT INSIDE CONDUIT.
NOTE 1
CALICUM
SILICATE
NOTE:
NOTE 1
24 GA. SHEET METAL
1. INSULATION CAN BE MINERAL WOOL OR CALCIUM
SILICATE AS PER THE BROCHURE AND PROJECT
SPECIFICATIONS.
2. CONDUIT WITH EXPANSION PIPE SUPPORTS SHALL
HAVE SHIPPING BARS TACK WELDED ON CARRIER
PIPE AND CONDUIT AND SHALL BE PAINTED TO
SHOW TOP OF CONDUIT FOR PROPER SHIPPING,
HANDLING, AND INSTALLATION.
8"
12"
PROFILE VIEW
EXPANSION PIPE
SUPPORT
EXPANSION SUPPORT.
10 GA. STEEL PIPE
OUTER CONDUIT TO
DRILL & PLUG WELD
1/2” ANCHOR PLATE CONTINUOUSLY WELDED TO
CARRIER PIPE AND CONDUIT. ANCHOR PLATE
TO EXCEED CONDUIT O.D. BY MINIMUM OF 6”
AND CONCRETE ENCASED.
CONCRETE ENCASEMENT
ANGLE TO
SUIT FIELD
CONDITIONS OR
REQUIREMENTS.
PIPE
SUPPORTS
(TYP.)
FIELD
JOINT
REF. SK-1 OR SK-4
FOR PIPE SUPPORTS.
A1 TYPICAL EXPANSION PIPE SUPPORT DETAIL
SCALE: NONE
C3 TYPICAL EXPANSION ELBOW DETAIL
SCALE: NONE
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
898 North 900 East, American Fork, UT
07/17/2026
DL
WHW JOB NO.:
26110
ALL RIGHTS RESERVED ©
WHW ENGINEERING, LLC.
These documents are protected under the United States 1978 copyright act. It is an exclusive work of original authorship. None of the pictorial, graphic, or technical charts or drawings depicted may be reproduced by any method, mechanical, electronic, or otherwise; nor may they be used or re-used for any purpose without the express prior written permission of WHW Engineering, LLC.
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
OWNER
SHEET TITLE
COPYRIGHT NOTICE
PROJECT NAME & ADDRESS
USDC USDC - STEAM
CONDENSATE LINE REPAIR
PHASE 2
DFCM# 27338410
CODE REVIEW STAMP
CONSULTANTS
BC
WP
Phone: (801) 957 - 7230 Taylorsville, Utah 84129 4315 S 2700 W Floor 3 Construction & Management Division of Facilities
Department of Administrative Services
Internet: http://www.dfcm.utah.gov
State of Utah
07/16/2026
SEFORP
HATUFOETATS
RE
EN
IGNELANOIS
WINWARD M.
PACKER
No. 375080
MECHANICAL
DETAILS
ME506
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
07/27/2026
CONDUIT CLOSURE
32 GA. X 1/2"
CONDUIT WELD
CONDUIT COATING
CONDUIT
WIDE S.S. STRAPS
2 EACH
2"
INSULATION
PIPE WELD
STEEL SLEEVE IS SAME THICKNESS AS CONDUIT
2" JOINT COATING*
AIR SPACE
CARRIER PIPE
3" 12" 3" CLEANED
BARE METAL
* JOINT COATING MATERIALS OPTIONS:
1. CHEMICALLY CURED
POLYURETHANE
NOTE:
2. HEAT SHRINKABLE SLEEVE.
3. LIQUID EPOXY COATING
GRIND SHIPPING BARS, (DO NOT TORCH CUT)
BETWEEN CARRIER PIPE AND CONDUIT
BEFORE MAKING JOINT OR COLD SPRINGING.
CONDUIT
WELD
CARRIER
PIPE
CONDUIT
CLOSURE
SLEEVE
COATED
CONDUIT
1" HALF COUPLING (VENT)
GLAND
GLAND FOLLOWER
TEMPERATURES
GASKETS FOR
DRESSER GRADE 'A'
W/ STAINLESS STEEL NUTS
STAINLESS STEEL STUDS
1" HALF COUPLING
(DRAIN)
OPTIONAL VENT
LOCATION
TO 700°F.
DRESSER GRADE 'B'
FOR 700° TO 1,000°F.
GASKETS
1" HALF COUPLING (VENT)
DRESSER GRADE 'A'
TEMPERATURES
DRESSER GRADE 'B'
GASKETS FOR
TO 700°F.
GASKETS
FOR 700° TO 1,000°F.
OPTIONAL DRAIN
LOCATION
1" HALF COUPLING
(DRAIN)
CHEMICALLY BONDED
MASTIC OR ONE COAT OF
W/ 3 COATS OF BITUMINOUS