- Dallas County, Texas
About this file
This document is a Furniture Bid Advertisement issued by Perkins&Will on behalf of The University of Texas at Dallas (UTD) for the Jindal School of Management III (JSOM III) project located in Richardson, TX. The Request for Proposal (RFP) seeks qualified vendors to provide, deliver, and install furniture for various spaces including private offices, workstations, classrooms, computer labs, executive suites, boardrooms, and multipurpose areas. The project involves 25 primary manufacturer packages and 2 alternate packages, with an approximate gross square footage of 125,000 square feet. Key dates include the RFP posting on November 4th, 2025, with responses due by December 2nd, 2025, and the project anticipated to be awarded on December 19th, 2025. Furniture installation is scheduled to begin June 22nd, 2026, with completion targeted for July 24th, 2026, and fall classes set to begin on August 25th, 2026.
The bid requires comprehensive pricing that includes freight, tariffs, delivery, and installation costs within the subtotals. Vendors must submit detailed responses through Bonfire, UTD's Project Information Management System, with strict communication protocols prohibiting direct contact with project team members. Pricing must be firm for 120 days and include manufacturer information, visual requirements, and specific documentation. The project allows for potential multiple dealer awards depending on project needs, with alternates considered only if base bid requirements are fully met. Dealers authorized to sell Kimball products must price the base bid before proposing alternatives, and no substitutions will be accepted outside of the specifically identified Bid Form Alternatives Tab.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2218 Bryan Street, Suite 200
Dallas, Texas 75201 www.perkinswill.com
FURNITURE BID ADVERTISEMENT – PACKAGE A
Project Name: The University of Texas at Dallas – Jindal School of Management III (UTD - JSOM III)
Location: Richardson, TX Issued Date: 10.27.2025
Prepared By: Leah Dailey, Candace Kalugyer Project Number: 144086.000
TABLE OF CONTENTS
SECTION 01 RFP INVITATION
• Letter to Bidders
• Terms & Conditions
SECTION 02 RFP INFORMATION
• Overview
• Packages
• Documents
• RFP Schedule
SECTION 03 PROJECT INFORMATION
• Site
Section 01 | Letter to Bidders
Perkins&Will, on behalf of The University of Texas at Dallas (UTD) is requesting proposals for the furniture package for Jindal
School of Management III (JSOM III) in Richardson, TX. The objective of this Request for Proposal (RFP) is to engage qualified
Vendors to provide, deliver, and install furniture. The responses will assist the project team in selecting the future furniture partner for this project. This request includes the majority of the furniture requirements for the project, including but not limited to private offices, workstations, classrooms, and ancillary furniture.
The response submitted will be evaluated by The University of Texas at Dallas – Jindal School of Management III project team and will be kept confidential. Thank you for your continued interest in this project and becoming a part of the JSOM III project.
Regards, Leah Dailey, NCIDQ, RID, IIDA
FFE Specialist
Perkins&Will
Candace Kalugyer, NCIDQ, RID, IIDA
Sr. FFE Specialist
Perkins&Will
Furniture Bid Advertisement
Project Name: The University of Texas at Dallas – Jindal School of Management III
Date: 10.27.2025 www.perkinswill.com 2
Section 01 | Terms & Conditions
RFP GENERAL TERMS & CONDITIONS:
The following terms and conditions are not exclusive. The client reserves the right to change and/or modify the terms and conditions of this RFP at its sole discretion. Any changes will be communicated to active RFP participants.
LATE SUBMISSIONS:
The client reserves the right to disqualify proposals received after the submission deadline.
ACCEPTANCE OF PROPOSALS:
By accepting a proposal for consideration and review, Client will not be legally bound in any way. Oral and written communications between Client and respondents on the subject matter of the proposal during the selection process will not be legally binding. Client will not be legally bound to respondents until such time as the parties have executed a mutually acceptable and definitive written agreement. Client will reserve the right to select and negotiate with any respondents they judge qualified for competitive proposals, and to terminate negotiations with any and all respondents. The client may contact you for future information as required.
PERIOD OF VALIDITY PROPOSAL:
Your proposal must be firm for a period of (120) days from the date of receipt by client. If your response is unable to meet this requirement you must indicate this in your response in the bid spreadsheet.
Section 02 | Overview
GENERAL RFP SCOPE + INFORMATION:
Bid participation shall be transmitted to the project team utilizing Bonfire, which is UTD’s Project Information Management
System. Requests for Information (RFIs) must also be transmitted via Bonfire, this system will be used to track the status, topic, and relevant dates for each RFI. Direct communication with project team members or stakeholders outside of the Bonfire platform (including phone calls, texts, or in-person discussions) is strictly prohibited. Responses to questions will be shared with all bidders. Please refer to the included schedule for deadlines.
PROJECT DETAILS:
Address: 800 W Campbell Rd, Richardson, TX 75080
Approximate Gross Square Footage: 125,000 Square Feet
Types of Spaces: Include, but are not limited to Classrooms, Computer Lab, Private Offices, Executive Suite, Executive
Boardroom, Conference/Meeting Rooms, Breakout Rooms, and Multipurpose/Event Room.
PROJECT AWARD DETAILS:
• This is a request for pricing the project will be awarded by package, multiple dealers may be awarded, depending on project needs.
• Alternates will be reviewed, only as noted in the Bid Form Alternatives Tab. No substitutions will be accepted outside of those specifically identified in the Bid Form Alternatives Tab. If you are unable to supply a particular product, please include in your questions.
• Any proposed alternatives must include visual documentation of the product, along with finish equivalent to the basis of design specification. Refer to the specifications for additional requirements and details.
Date: 10.27.2025 www.perkinswill.com 3
Section 02 | Packages
PACKAGE LISTING:
The following is a list of the Manufacturer Packages included in this project. Each package is provided with a blank box in the Bid
Form (Excel Workbook) where the Respondent shall enter the lump sum proposal amount in numerals.
• The dollar amount entered on the Bid Form Summary Tab for each package must match the amount shown on the corresponding Bid Form Package Tab.
• In the event of any discrepancy between the Bid Form Summary Tab and the corresponding Bid Form Package Tab, the Bid
Form Summary Tab shall govern.
Package A
Package 01 – All Seating
Package 02 – Bernhardt
Package 03 – Bright
Package 04 – CCN
Package 05 – Davis
Package 06 – DPG
Package 07 – DTank
Package 08 – ERG
Package 09 – Fulbright
Package 10 – Haworth
Package 11 – HBF
Package 12 – Hi5
Package 13 – Hon
Package 14 – Humanscale
Package 15 – Keilhauer
Package 16 – KI
Package 17 – Kimball
Package 18 – Kimball Typical Private Offices
Package 19 – MillerKnoll
Package 20 – Mitylite
Package 21 – Sit on It
Package 22 – Spec
Package 23 – Steelcase
Package 24 – Versteel
Package 25 – Via
Date: 10.27.2025 www.perkinswill.com 4
Alternate Packages
Package 26 – ALT Typical Private Offices
Package 27 – ALT Executive Storage
Section 02 | Documents
FILES INCLUDED:
• 01 RFP – UTD JSOM III – Invitation_PKG A (this PDF)
• 02 RFP – UTD JSOM III – Spec Book_PKG A (PDF)
• 03 RFP – UTD JSOM III – Furniture Plans (PDF)
• 03.2 RFP – UTD JSOM III – Furniture Plans_COLOR BY PKG (PDF)
• 04 RFP – UTD JSOM III – Bid Form_PKG A (Excel Workbook)
• 05 PW Digital Release Form EFTA (Word File)
RESPONSE FILE REQUIREMENTS:
1. RFP Pricing (Excel workbook)
Documentation to be provided in the live Excel spreadsheet template provided.
Dealer name to be included in the file name as the suffix.
o For example, if the dealer is named XYZ then the file name is “UTD JSOM III-RFP Bid Form-XYZ.xlxs”
2. RFP Alternatives Response Book (.pdf)
Documentation to be provided in pdf format. The response book will be organized and assembled per the directions that follow.
Dealer name to be included in the file name as the suffix.
o For example, if the dealer is named XYZ then the file name is “UTD JSOM III-RFP Response Book-XYZ.pdf”
RFP PRICING REQUIREMENTS:
Completed RFP Summary Form (IN EXCEL) for all the furniture outlined in the specification book provided for the RFP.
1. The RFP response must meet the specifications as outlined in all the documents provided in this RFP. No exceptions;
failure to meet the specifications will result in immediate disqualification
2. Do not add or delete any rows or columns in Bid Form.
3. Include any rebate, special incentives, or other key dollar considerations in the comments/clarifications/exclusions cell.
4. Any alternative pricing scenarios must be submitted in the Bid Form Alternatives Tab. Alternates will only be considered if all base bid requirements have been fully met and completed. Dealers authorized to sell Kimball are required to price the base bid before proposing any alternate. No substitutions will be accepted outside of those specifically identified in the Bid Form Alternatives Tab.
5. All pricing submitted shall include costs for freight (including fuel surcharges), tariffs, surcharges, delivery, and installation within the subtotals provided.
Date: 10.27.2025 www.perkinswill.com 5
6. Delivery and installation shall be coordinated with the General Contractor, Building Management, and Owner’s
Representative, and are to be assumed during standard business hours (Monday–Friday). Due to the nature of construction projects, schedule adjustments may be required; therefore, bidders shall include coordination time and flexibility within installation costs. The successful bidder shall be responsible for coordinating site and elevator access with the General Contractor, Project Manager, and Building Management.
7. Provide PDF version of bid pricing Bid Form Summary Tab.
RFP ALTERNATIVES RESPONSE BOOK:
1. Manufacturer Information
Provide a company overview for the manufacturer. At a minimum, include the following:
Company Overview
HQ Location
Number of Employees
Number of Years in Business
Terms of Warranty
Purchasing Contracts – if applicable
Key Team Members (ie. Local Representative)
2. Visual Requirements
Provide a PDF page for each typical that includes both dimensioned plan view and white sweep isometric view.
Typicals to be represented at ¼” scale.
Drawings to include tags with product sizes. (ie, PO.01 30x66 / 24x48)
Labeled image of finish equivalent(s) to the basis of design specification
Section 02 | RFP Schedule
FURNITURE RFP POSTED:
Tuesday, November 4th at 5pm CST
FURNITURE RFP QUESTIONS DUE:
Tuesday, November 11th at 5pm CST
FURNITURE RFP ANSWERS RETURNED:
Tuesday, November 18st at 5pm CST
FURNITURE RFP RESPONSE DUE:
Tuesday, December 2nd at 5pm CST
FURNITURE PROJECT AWARDED:
Notice to Proceed with Formal Proposals
Friday, December 19th, 2025
FURNITURE PURCHASE ORDERS CUT/ISSUED:
Monday, January 19th, 2026
FURNITURE ORDER ENTRY
Anticipated Monday, February 2nd, 2026
Date: 10.27.2025 www.perkinswill.com 6
SUBSTANTIAL COMPLETION:
Anticipated Tuesday, June 16th, 2026
FURNITURE INSTALLATION BEGINS:
Anticipated Monday, June 22nd, 2026
FURNITURE INSTALLATION & PUNCH COMPLETION:
Anticipated Friday, July 24th, 2026
LEED - BUILDING IAQ FLUSH:
Path 2.0 During Occupancy (27 Days)
Anticipated Saturday, June 27th, 2026 - Friday, July 24th, 2026
BUILDING TURN OVER:
Anticipated Monday, July 27th, 2026
OPERATIONAL & OCCUPIED:
Anticipated Client Move-in Adjustment Period:
Monday, July 27th, 2026 - Monday, August 24th, 2026
2026 FALL CLASSES BEGIN:
TUESDAY, AUGUST 25TH, 2026
Section 03 | Site
VERTICAL TRANSPORTATION/HOISTING:
Vendors shall consider the following logistical constraints in your responses:
• There are (3) passenger elevators, with front access.
• Elevator 3 Dimensions Doorway: 12” D x 42” W x 84” H Clear Opening
• Elevator Dimensions Cab Height: 88 ¾”H Clear Under Ceiling
• Elevator 01 Dimensions Interior Cab: 65 ½”W x 93”W
• Elevator 02 & 03 Dimensions Interior Cab: 57”D x 81”W
• Use of the elevator must be coordinated in advance with the Construction Manager and Owner.
LOADING ZONE:
• The building has a designated loading dock.
• The building does not generally allow access for 18-wheelers.