6-0004145-B Attachment E - Compensation and Fees.xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 0004145-B
- Issued by
- Texas
About this file
This document is a Compensation and Fees Attachment (Attachment E) for a Request for Proposal (RFP) issued by the Texas Facilities Commission (TFC) for doors, coiling grilles, turnstiles, vehicle barriers, and dock levelers services. The solicitation seeks repair, installation, and maintenance services for various facility components including wood, glass, metal fire-rated, automated and non-automated swing and slider doors, hatches, gate operators, parking equipment, turnstiles, vehicle barriers, dock levelers, and locksmithing services. The contract will cover multiple Texas locations including Austin, Houston, Dallas/Ft. Worth, San Antonio, Waco, and El Paso, with most services concentrated in Austin.
The pricing attachment outlines labor rates for different technician categories including door/gate technicians, apprentices, locksmiths, and locksmith helpers, with both normal and premium hour rates. The document specifies a markup structure for sub-contracted services and materials, with a maximum markup of 25% for both categories. Normal hours are defined as Monday through Friday, 8 AM - 5 PM, with premium hours falling outside this timeframe. The solicitation requires vendors to submit a separate Compensation and Fees Form for each location, and TFC reserves the right to request invoices or receipts for verification purposes. Notably, the current attachment does not include specific dollar amounts for the labor rates, suggesting these are to be filled in by the responding vendor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Comp and Fees
| Company Name: | ||||
| Location: | *See notes at the bottom | |||
| ATTACHMENT E - COMPENSATION AND FEES | ||||
| Respondent may not add qualifications, conditions, exceptions, variations or additional items to the proposal, or otherwise modify the pricing structure of the RFP in any manner. Any such modifications will not be considered for evaluation, and may be cause for rejection of the proposal, at the full and sole discretion of TFC. All materials and labor must be accounted for in the pricing submitted below. Respondent may not add additional price points after proposal opening. | ||||
| # | Labor | Unit of Measure | Hourly Rate | |
| 1 | Door/Gate Technician - Normal | Hour | $ - 0 | |
| 2 | Door/Gate Technician - Premium | Hour | $ - 0 | |
| 3 | Apprentice/Non-Licensed Tech. - Normal | Hour | $ - 0 | |
| 4 | Apprentice/Non-Licensed Tech. - Premium | Hour | $ - 0 | |
| 5 | Locksmith - Normal | Hour | $ - 0 | |
| 6 | Locksmith - Premium | Hour | $ - 0 | |
| 7 | Locksmith Helper - Normal | Hour | $ - 0 | |
| 8 | Locksmith Helper - Premium | Hour | $ - 0 | |
| Sub-Contracted Services Mark-Up | ||||
| Vendor shall invoice at cost*** plus % | % Mark-Up | 0.00% | ||
| Not to exceed 25% | ||||
| Material Mark-Up | ||||
| Material Mark-Up*** plus % | % Mark-Up | 0.00% | ||
| Not to exceed 25% | ||||
| *Normal Hours: Monday thru Friday, 8 AM - 5 PM | ||||
| **Premium hours are hours which fall outside Normal Hours | ||||
| All sub-contractor quotes/invoices need to be provided with the prime contractor quotes. | ||||
| ***Cost - TFC reserves the right to request from Contractor any invoices or receipts for verification purposes. | ||||
| NOTE: One Compensation and Fees Form shall be submitted per location. | ||||
| LOCATIONS AVAILABLE: Austin, Houston, Dallas/Ft.Worth, San Antonio, Waco, and El Paso. |
&R&"+,Regular"&8Solicitation No. 0004145-B RFP for Doors, Coiling Grilles, Turnstiles, Vehicle Barriers, and Dock Levelers
File details come from the government source that posted it. Updated .