Addendum-1-to-RFP-No-5-B191-P-00162-00.doc

DOC document 243 KB Posted

Attached to
Estimating the Manufacturing Advantage of Dry-Coating of Cathodes in a Lithium-Ion Cell Plant
Solicitation number
5-B191-P-00162-00
Issued by

About this file

This document is an Addendum (No. 1) to a Request for Proposal (RFP) from Argonne National Laboratory for a study on lithium-ion battery manufacturing processes. The addendum extends the proposal submission deadline from the original date to June 5, 2025, at 3:00 PM CT. The RFP (Solicitation No. 5-B191-P-00162-00) seeks a research study to estimate design and cost changes for lithium-ion battery cell plants using dry-coating cathode electrode techniques, with analysis focused on three plant sizes ranging from 5 to 50 GWh annual capacity. The procurement is being managed by Parker C. Hawk, Procurement Specialist 2, from Argonne National Laboratory's Procurement Department, with contact information provided for submitting acknowledgment of the addendum.

View the file

Other files

File Type Posted
Addendum-2-to-RFP-No-5-B191-P-00162-00.doc DOC document
Argonne RFP No 5-B191-P-00162-00.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Parker C. Hawk Procurement Specialist 2 Financial Management and Procurement Services

Procurement Department Argonne National Laboratory

9700 South Cass Avenue, Bldg. 201

Lemont, IL 60439

Phone:(630)252-2731 Email:phawk@anl.gov

05/21/2025

TO ALL OFFERORS:

Subject:

Solicitation Q&A Request for FORMDROPDOWN No. 5-B191-P-00162-00 Addendum No. 1 Attached herewith for your information and use in preparing your proposal for subject project is one (1) copy of Addendum No. 1.

Kindly acknowledge receipt of this Addendum by signing and returning one (1) copy of this letter.

Please email receipt to Procurement at phawk@anl.gov Sincerely, Parker C. Hawk Procurement Specialist 2 Procurement Department

Receipt Acknowledged:

Company:

By:

cc:

File

CF

Addendum No. 1

TO

REQUEST FOR FORMDROPDOWN

5-B191-P-00162-00

FOR

Argonne National Laboratory

BLDG. 201 OCF

9700 S. Cass Ave.

Lemont, IL 60439

5/21/2025 This addendum is being issued to modify the subject FORMDROPDOWN as follows:

Proposal Due Date Extension:

· The RFP Due Date is extended through June 5, 2025, by 3:00 PM CT.

ALL OTHER TERMS AND CONDITIONS OF THE ABOVE REFERENCED RFP REMAIN THE SAME.

Attachments: 0

U. S. Department of Energy laboratory managed by UChicago Argonne, LLC

File details come from the government source that posted it. Updated .