5a. KFT Mechanized DUI.pdf
PDF 185 KB Posted
- Attached to
- 2026 Kaniksu Fuels Treatments SSC-Region 6 Pacific Northwest Stewardship BPA- Colville National Forest
- Solicitation number
- 12363N26Q4089
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains detailed information sheets for mechanized piling work under the Pacific Northwest Stewardship BPA (Blanket Purchase Agreement) Call Order in the Pend Oreille Valley region. The contract encompasses three geographic areas: Boulder Park/Ione, Ione, and Eastside, with a combined total of 3,333 acres requiring mechanized piling services.
The Boulder Park/Ione area includes 25 sub-items (001A through 001Y) totaling 1,728 acres across units named Rankin, Little Tacoma, and Swamp Creek, with elevations ranging from 2,740 to 3,840 feet and slopes from 12% to 40%. The Ione Geographic Area comprises 25 sub-items (002A through 002Y) totaling 1,207 acres in the Ione and Limestone units, with elevations between 2,370 and 4,900 feet and slopes from 7% to 35%. The Eastside Geographic Area contains 12 sub-items (003A through 003M) totaling 398 acres across Kalispel Moon and Kings Lake units, with elevations ranging from 2,638 to 4,560 feet and slopes from 2% to 35%. All sub-items specify a maximum diameter to pile of 10 inches across all locations. A critical requirement noted across all units is that whip felling by separate contract must be completed before piling operations begin.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOULDER PARK MECHANIZED PILING - DETAILED INFORMATION SHEET
PACIFIC NORTHWEST STEWARDSHIP BPA - CALL ORDER
PEND OREILLE VALLEY
IONE MECHANIZED PILING - DETAILED INFORMATION SHEET
001A Rankin 12 5 2,860 40% 10 *1 001B Rankin 14 15 2,740 35% 10 *1 001C Rankin 17 13 2,950 40% 10 *1 001D Rankin 34 64 2,900 30% 10 *1 001E Rankin 36 8 2,800 20% 10 *1 001F Rankin 37 78 3,120 30% 10 *1 001G Rankin 38 25 3,140 30% 10 *1 001H Rankin 39 59 3,080 30% 10 *1 001I Rankin 40 96 3,200 25% 10 *1 001J Little Tacoma 41 18 3,530 22% 10 *1 001K Little Tacoma 44 91 3,660 18% 10 *1 001L Little Tacoma 45 41 3,180 17% 10 *1 001M Little Tacoma 49 60 3,840 20% 10 *1 001N Little Tacoma 50 84 3,650 20% 10 *1 001O Little Tacoma 66 81 3,240 12% 10 *1 001P Swamp Creek 69 123 3,000 20% 10 *1 001Q Swamp Creek 70 267 3,000 15% 10 *1 001R Swamp Creek 80 105 3,760 20% 10 *1 001S Swamp Creek 88 20 3,140 15% 10 *1 001T Swamp Creek 89 130 3,360 15% 10 *1 001U Swamp Creek 91 61 3,480 15% 10 *1 001V Swamp Creek 92 128 3,320 15% 10 *1 001W Swamp Creek 93 17 3,700 20% 10 *1 001X Swamp Creek 109 98 3,000 31% 10 *1 001Y Swamp Creek 170 41 3,200 25% 10 *1
Total Acres 1728
Footnotes: Where and when applicable *1 Unit will be whip felled by separate contract before piling begins.
REMARKS
SUB-ITEM
NO.
UNIT
NAME/NUMBER
ACRES
ELE
VEVATIO
N FT
AVG. EST
% SLOPE
MAX. D
IAMET
ER
TO PILE
(in ch es)
EASTSIDE GEOGRAPHIC AREA MECHANIZED PILING - DETAILED INFORMATION SHEET
PEND OREILLE VALLEY
003A Kalispel Moon 73 73 3,211 21% 10 *1
003B Kalispel Moon 75 20 3,178 24% 10 *1
003C Kalispel Moon 82 83 2,821 11% 10 *1
003D Kalispel Moon 83 37 2,638 22% 10 *1
003E Kings Lake 85 25 3,060 25% 10 *1
003F Kings Lake 91 86 2,950 12% 10 *1
003G Kings Lake 263 12 3,560 2% 10 *1
003H Kings Lake 283 13 3,860 21% 10 *1
003I Kings Lake 289 19 4,560 31% 10 *1
003K Kings Lake 292 10 4,470 27% 10 *1
003L Kings Lake 293 8 4,410 22% 10 *1
003M Kings Lake 638 12 3,190 35% 10 *1
Total Acres 398
Footnotes: Where and when applicable *1 Unit will be whip felled by separate contract before piling begins.
SUB-ITEM
NO.
UNIT
NAME/NUMBER
ACRES
ELE
VEVATIO
N
FT
. AVG. EST %
SLOPE
MAX. D
IAMETER
TO PILE
(in ch
REMARKS
IONE GEOGRAPHIC AREA MECHANIZED PILING - DETAILED INFORMATION SHEET
PEND OREILLE VALLEY
002A Ione 38 14 2,490 7% 10 *1 002B Ione 39 17 2,370 20% 10 *1 002C Ione 40 24 2,450 16% 10 *1 002D Ione 41 91 2,760 17% 10 *1 002E Ione 42 12 2,730 15% 10 *1 002F Ione 64 3 3,430 16% 10 *1 002G Ione 68 144 2,950 12% 10 *1 002H Ione 69 9 2,970 11% 10 *1 002I Ione 70 107 3,250 7% 10 *1 002J Ione 71 50 3,240 9% 10 *1 002K Ione 72 62 3,110 17% 10 *1 002L Ione 75 40 2,860 13% 10 *1 002M Ione 76 40 2,830 17% 10 *1 002N Ione 81 77 2,600 13% 10 *1 002O Ione 83 33 2,860 20% 10 *1 002P Ione 84 168 3,050 16% 10 *1 002Q Ione 85 64 3,230 13% 10 *1 002R Ione 86 48 3,590 23% 10 *1 002S Ione 88 71 3,520 9% 10 *1 002T Ione 164 2 3,470 19% 10 *1 002U Ione 188 29 3,420 11% 10 *1 002V Limestone 41 44 4,900 35% 10 *1 002W Limestone 43 36 4,400 35% 10 *1 002X Limestone 46 10 3,300 15% 10 *1 002Y Limestone 49 12 3,160 20% 10 *1
Total Acres 1207
Footnotes: Where and when applicable *1 Unit will be whip felled by separate contract before piling begins.
SUB-ITEM NO.
UNIT
NAME/NUMBER
ACRES
ELE
VEVATIO
N
AVG. EST
% SLOPE
MAX. D
IAMETER
TO PILE
(in ch
REMARKS
| 4a. Mech Piling DUI_BoulderPark |
| Boulder Park Detailed Info |
| 4c. Eastside Mech Piling DUI |
| Trail EA Detailed Info Sheet |
| 4e. Ione Mech Piling DUI |
| Ione Detailed Info Sheet |
File details come from the government source that posted it. Updated .