Solicitation Summary: 2026 Kaniksu Fuels Treatments

This is a Request for Proposal (RFP) issued by the USDA Forest Service for fuels treatment and stewardship contracting services on the Kaniksu National Forest in Newport, Washington. The solicitation number is 12363N26Q4089, with an offer due date of April 23, 2026, by 0800 PT. The contract will be awarded against the Pacific Northwest Stewardship BPA as a commercial services contract with timber removal requirements.

The work comprises three categories: mandatory mechanical treatments (mechanical piling across three geographic areas, mastication on 30 acres, and road decommissioning of 3,808 feet), mandatory manual treatments split into two groups (whip felling across 2,141 acres in one area, and pre-commercial thinning, post-harvest treatments, hand piling, and slash removal totaling 2,199.5 acres in a second area), and optional pre-commercial thinning work on 89 additional acres. The overall period of performance extends from June 10, 2026, through November 30, 2027, with specific seasonal restrictions for certain work items (Work Items 4, 6, and 7 must complete by August 1, 2026; Work Item 1 is prohibited until July 1, 2026). Contractors must submit separate technical and price proposals electronically. Technical evaluation criteria are: Technical Approach (significantly more important), Relevant Past Performance (significantly more important), and Benefit to Local Community (utilizing labor and materials from Pend Oreille, Stevens, Ferry, and Spokane counties). The combined technical factors are weighted approximately equal to price. Contractors must provide a Quality Control Plan, crew size with daily production rates, equipment specifications, key personnel assignments, and a general work sequence timeline. All mandatory line items must be priced for consideration, and unit prices prevail for payment. A post-award conference is required within 10 days of award. Contractors must comply with Washington State Farm/Forest Labor Contractor licensing requirements, Migrant and Seasonal Agricultural Workers Protection Act certifications, and specified fire precautions and protection measures for cultural resources, improvements, and streamcourses.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

363N

WASHINGTON DC 20250-1138

MS-1138

1400 INDEPENDENCE AVE SW

USDA-FS STEWARDSHIP CONTRACTING BR

05L0 CODE 16. ADMINISTERED BYCODE

X

X

X

115310

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR363N

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

05/26/2026 0800 PT

04/23/2026

307-321-3901KEITH BRUGGER

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

12363N26Q4089

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 4 See ScheduleOFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

NEWPORT WA 99156

NEWPORT WA 99156

KANIKSU NATIONAL FOREST

USDA FOREST SERVICE

15. DELIVER TO

WASHINGTON DC 20250-1138

MS-1138

1400 INDEPENDENCE AVE SW

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$34

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

USDA-FS STEWARDSHIP CONTRACTING BR

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

2026 Kaniksu Fuels Treatments SSC -12363N26Q4089 Period of Performance: 06/10/2026 to 11/30/2027

0001 1a. Mechanical Piling- Boulder Park Geographic Area 1,728 ac Product/Service Code: F099 Product/Service Description: NATURAL

RESOURCES/CONSERVATION- OTHER

Requisition No: 1163662 Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

X

XX

DATED

KEITH R. BRUGGER

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

0002 1b. Mechanical Piling - Ione Geographic Area

1,207 ac

Product/Service Code: F099

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- OTHER

Requisition No: 1163662

0003 1c. Mechanical Piling- Eastside Geographic Area

398 ac

Product/Service Code: F099

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- OTHER

Requisition No: 1163662

0004 2. Mastication

Product/Service Code: F099

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- OTHER

Requisition No: 1163665

0005 3. Road Decommissioning

3,808 feet

Product/Service Code: F099

Product/Service Description: NATURAL

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

4 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12363N26Q4089

RESOURCES/CONSERVATION- OTHER

Requisition No: 1163665

0006 4. Whip Felling

2,141 ac

Product/Service Code: F099

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- OTHER

Requisition No: 1163664

Period of Performance: 06/10/2026 to 08/01/2026

0007 5a. Pre-Commercial Thinning

724 ac

Product/Service Code: F099

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- OTHER

Requisition No: 1163377

Period of Performance: 06/10/2026 to 11/30/2026

0008 6. Post-Harvest Pre-Commercial Thinning

367 ac

Product/Service Code: F099

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- OTHER

Requisition No: 1163377

Period of Performance: 06/10/2026 to 08/01/2026

0009 7. Post-Harvest Slashing

839 ac

Product/Service Code: F099

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- OTHER

Requisition No: 1163377

Period of Performance: 06/10/2026 to 11/30/2026

0010 8. Hand Piling

268 ac

Product/Service Code: F099

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- OTHER

Requisition No: 1163377

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12363N26Q4089

Period of Performance: 06/10/2026 to 11/30/2026

0011 9. Slash Removal

1.5 ac

Product/Service Code: F099

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- OTHER

Requisition No: 1163377

Period of Performance: 06/10/2026 to 11/30/2026

0012 5b. Pre-Commercial Thinning

89 acres

(Option Line Item)

Product/Service Code: F099

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- OTHER

Requisition No: 1163377

Period of Performance: 06/10/2026 to 11/30/2026

The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice

Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasury.

All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S.

Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

1. GENERAL INFORMATION:

Proposals shall be valid for 60 days after the date of receipt for the solicitation. If additional time is needed, an extension will be requested. Refer to Section 18 for instructions on preparing your proposal and pricing. Submit technical proposals and price proposals separately, via email, to the individual(s) shown in box 28 of page 1.

SCHEDULE OF ITEMS

MANDATORY WORK ACTIVITIES:

ITEM

NO.

DESCRIPTION OF

MANDATORY WORK ACTIVITIES UNIT ESTIMATED

QUANTITY UNIT PRICE TOTAL PRICE

Mechanical Treatments

1a Mechanical Piling – Boulder Park Geographic Area Acre 1,728 $ $

1b Mechanical Piling – Ione Geographic Area Acre 1,207 $ $

1c Mechanical Piling – Eastside Geographic Area Acre 398 $ $

2 Mastication Acres 30 $ $

3 Road Decommissioning Feet 3,808 $ $

Total Mechanical Treatments Service Items $

Manual Treatments #1- Kalispel, Kings Lake, Little Tacoma, Rankin, Swamp Creek Contract Areas

4 Whip Felling Acre 2,141 $ $

Total Manual Treatments #1 Service Items

Manual Treatments #2- Ione, Limestone, Lost Creek, Misery Lake Contract Areas

5a Pre-Commercial Thinning Acre 724 $ $

6 Post-Harvest Pre-Commercial Thinning Acre 367 $ $

7 Post-Harvest Slashing Acre 839 $ $

8 Hand Piling Acre 268 $ $

9 Slash Removal Acre 1.5 $ $

Total Manual Treatments #2 Service Items $

OPTIONAL WORK ACTIVITIES:

ITEM

NO.

DESCRIPTION OF

OPTIONAL WORK ACTIVITIES UNIT ESTIMATED

QUANTITY UNIT PRICE TOTAL PRICE

5b Pre-Commercial Thinning Acre 89 $ $

Notes:

These schedules are for pricing/payment purposes. See Instructions to Offerors for business proposal requirements.

Multiple awards MAY be made from this Call Order. Treatments are on the same footprint but are separated by treatment type to allow for individual awards. Offerors are encouraged to provide pricing for all items on the schedule, however offerors may only provide pricing for work items they wish to be considered for. Each call order awarded may cover a specific segment or portion of the overall requirement. These schedules are for pricing/payment purposes. Unit prices prevail.

Contractors must provide production rates and availability to complete work within the period of performance in technical proposals. Contractors are encouraged to indicate in their technical proposal their preference of treatment activity for Forest Service consideration.

If funding dictates and it is in the best interest of the government, work items may be awarded by Unit/Acre and for amounts less than the total acreage estimates based on the unit prices quoted. Unit prices prevail.

No site visit is scheduled for this project. Interested vendors are encouraged to visit the project area to familiarize themselves with the requirements.

2. LAND MANAGEMENT ACTIVITIES.

The Forest Service is executing this procurement under the stewardship contracting authority provided under Section 8205 of Public Law 113-79, the Agricultural Act of 2014 as amended under Section 204 & 207 of the Consolidated Appropriations Act (Omnibus Bill 2018). Stewardship authority grants the Forest Service Chief or designee the authority to aggregate contractual requirements into stewardship projects and solicit those requirements utilizing full and open competition.

Performance of land management activities shall be in accordance with Project Description and Work Specifications. Payment for Land Management Work Activities in Schedule of Items will be made in Appropriated Funds.

All Base Work Activities (Mandatory) shall be performed. Optional activities are listed in order of planned priority.

Award may be made for optional items in any order that the Contracting Officer determines is in the best interest of the Government.

3. PROJECT DESCRIPTION

(a) Description of Work- The objectives of this project are to increase timber production, improve forest health and vigor and reduce the threat of catastrophic wildfire within the Forest and Wildland Urban Interface by accomplishing the following:

1. Mechanically rake and pile residual activity slash and preexisting ground fuels within identified units.

2. Mechanically masticate brush and small trees to change the fuel profile from vertical to horizontal.

3. Decommissioning of temporary roads constructed for harvest operations.

4. Whip fell ladder fuels to aid in piling and prescribed burning treatments.

5. Thin young trees to increase tree vigor, restore species composition and improve forest health and resilience.

6. Hand pile thinning slash to reduce wildfire hazard.

(b) Resulting Contract – This BPA call will be issued against the Pacific Northwest Stewardship BPA when ordered by warranted contracting personnel. The resultant contract will be a commercial services contract with requirements for timber removal.

(c) Project Location- All of the projects will take place on the Newport & Sullivan Lake Ranger

District. Primary geographic areas where work is located are King’s Lake (Eastside Geographical), Tacoma Creek/Cusick Creek (Boulder Park Geographical), Ione (Ione Geographical), Flume Creek (Limestone), Lost Creek and Misery Lake. Please see Google Map links below for general project area locations. Please see attached maps for specific unit locations.

1. Boulder Park Geographical Area - https://maps.app.goo.gl/UiHS4Ktm8e1gXjrH9

2. Eastside Geographical Area - https://maps.app.goo.gl/a3HTxMGbSsjm69R37

3. Ione Geographical Area - https://maps.app.goo.gl/vhNCP8PjeRQoVmiY7

4. Flume Creek (Limestone) Area - https://maps.app.goo.gl/QJ6WdGvpkNMALq1u7

5. Lost Creek Area - https://maps.app.goo.gl/c9MiowrJdfAL9mAMA

6. Misery Lake Area - https://maps.app.goo.gl/cyr7WbK77UX7jujD9

(d) Under this contract, “Contractor’s Operations” shall include activities of or use of equipment of Contractor, Contractor’s employees, agents, Subcontractors, or their employees or agents, acting in the course of their employment in operations hereunder on National Forest lands or within Forest Service protection boundary (unless acting under the immediate supervision of Forest Service).

https://maps.app.goo.gl/UiHS4Ktm8e1gXjrH9 https://maps.app.goo.gl/vhNCP8PjeRQoVmiY7 https://maps.app.goo.gl/QJ6WdGvpkNMALq1u7 https://maps.app.goo.gl/c9MiowrJdfAL9mAMA https://maps.app.goo.gl/cyr7WbK77UX7jujD9

Contractor’s Operations shall be conducted in a workmanlike and orderly manner. The timing of required Forest Service designation of work on the ground and the performance of other Forest Service work shall not be such as to cause unnecessary delay to Contractor.

4. SPECIFICATIONS

General specifications for each Contract Activity individually described by an item number in the Schedule of Items can be found in Appendix A.

5. FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after receipt of Notice to Proceed or Order for specific work items, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than November 30, 2027. The time stated for completion shall include final cleanup of the premises.

Performance shall be made only as authorized by orders issued in accordance with the Ordering clauses. Except as this contract otherwise provides, the Government shall order all services within the scope that are required by Government activities specified in the Schedule only with the vendor holding this contract for the specified services.

6. PERIOD OF PERFORMANCE

The period of performance for Work Items 1-3 is from date of award through November 30, 2027. The period of performance for Work Items 5, 8 and 9is from date of award through November 30, 2026. The period of performance for Work Items 4, 6 and 7 is from date of award through August 1, 2026.

7. CONTRACT OPERATIONS SCHEDULE

Contractor shall, before commencing operations, provide in writing an annual operating schedule of anticipated major activities and needs for removal of Included Timber and completing stewardship projects, such as logging, road maintenance, and construction. Upon reasonable notice to Forest Service, such a schedule shall be subject to modifications necessitated by weather, markets, or other unpredictable circumstances.

Timeframe Restriction Description

Operation Scheduling OR date of award – August 1, 2026

Work Item #4, 6 and 7 activities must be completed prior to Work Item #1 activities OR if work items are not awarded to same vendor (multi-award) completed prior to August 1,2026.

Operation Scheduling OR July 1,2026

– December 2027

Work Item #1 (Mechanial Piling) activities prohibited prior to completion of Work Item #4, 6 and 7 activities OR if work items are not awarded to same vendor (multi-award) July 1,2026 – December 2027.

May 19, 2026 – December 1, 2026 Period of performance for Road Decomissioning projects, no other specialized restrictions.

March 1 – August 31 Annually Protect active Goshawk nests –no activities permitted in Rankin unit 9, Little Tacoma unit 50, and Swamp Creek units 91 & 92.

8. POST AWARD CONFERENCE

A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at Newport & Sullivan Lake Ranger Station or can be a teleconference.

9. AGAR 452.204-70 MODIFICATION FOR CONTRACT CLOSEOUT (JAN 2025)

Upon contract closeout for contracts utilizing anything other than cost reimbursement:

(a) If unliquidated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (CO) shall issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but will not be required to provide a signature. The CO shall immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(b) Upon contract closeout for contracts utilizing SAP: if unliquidated funds of more than $1000 remain on the contract, the CO shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and will be required to provide a signature. (The CO may also request a “Contractor Release of Claims” be completed by the contractor, although not required for contracts and orders using SAP.) If the bilateral modification and Release of Claims are not returned to the CO within 60 days, the CO shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(c) Upon contract closeout for contracts utilizing anything other than cost reimbursement, if unliquidated funds of more than $1000 remain on the contract, the CO shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and a “Contractor Release of Claims” and will be required to provide a signature on both forms. If the bilateral modification and Release of Claims are not returned to the CO within 120 days, the CO shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

10. KEY PERSONNEL

(a) The Contractor shall assign to this contract the following key personnel:

Overall Project Manager Fuels Treatment Supervisor (for non-commercial activities) Individual Sub-Managers – Individuals supervising individual sub-contracts for work items not covered by personnel noted previously herein.

(b) During the first 90 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

Key Personnel- Representatives:

Unless otherwise agreed, Contractor shall designate, in writing, a representative who is authorized to receive notices in regard to performance under this contract and take related action. In no case shall Contractor designate any representative to this contract who is currently debarred, proposed for debarment, or suspended by the Federal Government. Contractor’s representative shall provide a copy of the contract to Contractor’s field supervisor and persons authorized to assume responsibilities in the field super- visor’s absence. Prior to initial operations and after shutdowns of 10 days or more, Contractor’s representative shall notify Forest Service two days, excluding weekends and Federal holidays, before any operations begin on Contract Area.

Contractor’s representative shall designate, in writing, a field supervisor, one of whose responsibilities shall be on-the-ground direction and supervision of Contractor’s Operations. The field supervisor shall be readily available to the area of operations when operations are in progress and shall be authorized to receive notices in regard to performance under this contract and take related action. The responsibilities of the field supervisor shall include the safeguarding of National Forest resources and performance within the terms of the contract. Contractor representative will furnish Forest Service with names of persons authorized to assume responsibilities in field supervisor’s absence. Such delegations may be made a part of Contractor’s annual Operating Schedule.

Unless Contracting Officer designates another Forest Service representative and notifies Contractor in writing, the COR is the representative of Forest Service. Forest Service representative shall:

(a) Receive notice in regard to performance under this contract,

(b) Take action in relation to this contract, and

(c) Be readily available to the area of service work activities.

Contracting Officer shall designate other on-the-ground representatives in writing along with their specific contractual responsibilities and authority. Representatives with authority delegated in writing are the only Forest Service personnel authorized to provide notice or take related actions under the contract. Such delegation shall be made within 60 days of contract award.

11. PROTECTION MEASURES NEEDED FOR PLANTS, ANIMALS, CULTURAL RESOURCES, AND CAVE

RESOURCES

Locations of known areas needing special measures for the protection of plants, animals, cultural resources, and/or cave resources are shown on Contract Area Map and/or identified on the ground.

In addition to any special protection measures noted, Contractor has a general duty to protect all known and identified resources referenced in this Subsection from damage or removal during Contractor’s operations.

Discovery of additional areas, resources, or members of species needing special protection shall be promptly reported to the other party, and operations shall be delayed or interrupted at that location, if Contracting Officer determines there is risk of damage to such areas, resources, or species from continued operations.

Wheeled or track-laying equipment shall not be operated in areas identified as needing special measures for the protection of cultural resources, except on roads, landings, tractor roads, or approved skid trails. Unless agreed otherwise, trees will not be felled into such areas. Contractor may be required to backblade skid trails and other ground disturbed by Contractor’s operations within such areas in lieu of required cross ditching.

Contractor shall immediately notify Forest Service if disturbance occurs to any area identified as needing special protection measures and shall immediately halt operations in the vicinity of the disturbance until Forest Service authorizes Contractor to proceed. Contractor shall bear costs of resource evaluation and restoration to identified sites. Such payment shall not relieve Contractor from civil or criminal remedies otherwise provided by law.

Forest Service has exercised due diligence and followed established protocols in identifying known areas needing special protection measures. Nevertheless, nothing in this provision shall be interpreted as creating any warranty that all locations and special measures for the protection of plants, animals, cultural resources, and cave resources have been described herein, elsewhere in the contract, or designated on the ground.

Label on Contract Area Map Restrictions

SMA (Special Measures Area)

Wheeled or track laying equipment shall not be operated in areas identified, except on existing roads. SMA locations are shown on the Contract Area Map and lie outside of cutting unit boundaries.

Label on Contract Area Map Restrictions

Contract Area

No vehicle will be permitted to operate off system roads without prior Forest Service written agreement. Use of OHV’s (off-highway vehicles) including but not limited to 4-wheelers, 6- wheelers and motorcycles is prohibited without prior Forest Service written agreement.

WL (Wetlands Protection)

Wheeled or track laying equipment shall not be operated in areas identified, except on existing roads. WL locations are shown on the Contract Area Map and lie inside and outside of cutting unit boundaries.

The boundaries will either be marked with paint and tags or ribbon.

No Cut Areas

Wheeled or track laying equipment shall not be operated in areas identified, except on existing roads. No Cut Areas are shown on the Contract Area Map and lie inside of cutting unit boundaries. The boundaries will either be marked with paint and tags or ribbon.

12. PROTECTION OF IMPROVEMENTS

So far as practicable, the Contractor shall protect all physical improvements including, but not limited to, roads, trails, ditches, fences, waterlines, and other improvements, existing in the contract area, determined to have continuing need or use, and designated on the Contract Area Map.

The Contractor shall keep all roads and trails needed for fire protection or other purposes and designated on the Contract Area Map reasonably free of equipment and products, slash, and debris resulting from the Contractor’s operations. The Contractor shall make timely restoration of any such improvements damaged by the Contractor’s operations and, when directed (because of such operations) shall move such improvements if and as specified by the Forest Service.

All protected improvements will be protected from damage by the Contractor. If any protected improvements are disturbed, the Contractor shall immediately contact the COR and will be liable for the cost of repairs.

PROTECTED IMPROVEMENTS

IMPROVEMENT DESCRIPTION LOCATION

Roads All Roads (including associated features) As identified on Contract Area Map

Tails Protect Trails As identified on Contract Area Map

Powerlines In and adjacent to Rankin Units 5, 7, 8, 11, 12, 13, 14, and 19. Ione Units 81, 40, and 39. Kings Lake 263 & 91. Kalispel Moon 83.

As identified on Contract Area Map

Gates Protect all gates in the timber sale units and etc.

As identified on Contract Area Map

Fences Protect any visible fences (barbed wire or wooden dowel) that are or are not on the Contract Area Maps.

As identified on Contract Area Map

Cattleguards Protect all cattleguards’ located throughout contract area identified on the Contract Area Maps.

As identified on Contract Area Map

Forest Service shall notify all utility companies, or other parties affected, and make arrangements for all necessary adjustments of the public utility fixtures, pipelines, and other appurtenances likely to be affected by Contractor’s Operations.

When Contractor’s Operations are adjacent to properties of railway, telephone, or power companies, or other property, work shall not begin until Contractor has identified actions necessary to prevent damage.

Contractor shall cooperate with the owners of any underground or overhead utility lines in their removal and/or rearrangement operations in order that these operations may progress in a reasonable manner, utility duplication or rearrangement work may be reduced to a minimum, and services shall not be unnecessarily interrupted.

In the event of interruption to utility services because of accidental breakage or as a result of lines being exposed or unsupported, Contractor shall promptly notify the proper authority and shall cooperate with that authority in the restoration of service until the service is restored.

13. STREAMCOURSE PROTECTION

“Streamcourses” that are subject to provisions of this Section are shown on Contract Area Map. Unless otherwise agreed, the following measures shall be observed to protect Streamcourses:

(a) Contractor’s Operations shall be conducted to prevent debris from entering Streamcourses, except as may be authorized under paragraph (d). In event Contractor causes debris to enter Streamcourses in amounts that may adversely affect the natural flow of the stream, water quality, or fishery resource, Contractor shall remove such debris as soon as practicable, but not to exceed 48 hours, and in an agreed manner that will cause the least disturbance to Streamcourses.

(b) Culverts or bridges shall be required at all points where it is necessary to cross Streamcourses unless otherwise agreed with the COR. Such facilities shall be of sufficient size and design and installed in a manner to provide unobstructed flow of water and to minimize damage to Streamcourses.

(c) Wheeled or track-laying equipment shall not be operated in Streamcourses, except at crossings designated by Forest Service or as essential to construction or removal of culverts and bridges.

(d) Flow in Streamcourses may be temporarily diverted only if such diversion is necessary for Contractor’s planned construction and Forest Service gives written authorization. Such flow shall be restored to the natural course as soon as practicable and, in any event, prior to a major storm runoff period or runoff season.

Label on Contract Area Map Restrictions

Protect Streamcourse

Wheeled or track laying equipment shall not be operated in areas identified, except on existing roads. Protected Streamcourse locations are shown on the Contract Area Map and lie outside of cutting unit boundaries typically.

StreamRiver

Work Items # 5-8- An untreated 10 ft buffer shall be left around any intermittent stream or wetland identifiable on the ground by rock scour, standing water, or wetland vegetation. Unit maps show potential streams and wetlands, however, most mapped streams will not qualify as intermittent and perennial streams, but they are shown to aid

Label on Contract Area Map Restrictions potential contractor identification during implementation. See Unit Maps and Detailed Unit Information Sheet.

StreamRiver Work Item #8- Piles shall not be located within 25 feet from any live stream or wetland

14. AGAR 452.236-70 EMERGENCY RESPONSE, FIRE SUPPRESSION, AND LIABILITY.

(a) Contractor's Responsibility for Responding to Emergencies. When directed by the contracting officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). This is considered to be within the general scope of the contract. An equitable adjustment for the temporary use of employees and equipment will be made under the Contract Terms and Conditions—Commercial Products and Commercial Services Changes clause, FAR 52.212-4 (c).

(b) Contractor's Responsibility for Fire Fighting. The Contractor, under the provisions of FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents, subcontractors, or employees subject to the fire classifications listed in subsection (c).

(c) Fire Suppression Costs. The Contractor's obligations for cost of fire suppression vary according to three classifications of fires as follows:

(1) Operations Fire. An “operations fire” is a fire caused by the Contractor's operations other than a negligent fire. The Contractor agrees to reimburse the Forest Service for such cost for each operations fire, subject to a maximum dollar amount of $300,000.00. The cost of the Contractor's actions, supplies, and equipment expended or used on suppressing any such fire, or otherwise provided at the request of Forest Service, shall be credited toward such maximum. If the Contractor's actual cost exceeds the contractor's maximum obligation stated above, the Forest Service shall reimburse the contractor for the excess.

(2) Negligent Fire. A “negligent fire” is a fire caused by the negligence or fault of the Contractor's operations including, but not limited to, one caused by smoking by persons engaged in the Contractor's operations during the course of their employment, or during rest or lunch periods; or if the Contractor's failure to comply with requirements under this contract results in a fire starting or permits a fire to spread. Damages and the cost of suppressing negligent fires shall be borne by the Contractor.

(3) Other Fires on Contract Area. The Forest Service shall pay the Contractor, at firefighting rates common in the area or at prior agreed rates, for equipment or personnel furnished by the Contractor at the request of the Forest Service, on any fire on the contract area other than an operations fire or a negligent fire.

(d) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.

(e) Performance by the Contractor. Where the Contractor's employees, agents, contractors, subcontractors, or their employees or agents perform the Contractor's operations in connection with fire responsibilities, the Contractor's obligations shall be the same as if performance was by the Contractor.

(f) State Law. The Contractor shall not be relieved by the terms of this contract of any liability to the United States for fire suppression costs recovered in an action based on State law, except for such costs resulting from operations fires. Amounts due to the Contractor for firefighting expenditures on operations fires shall not be withheld pending settlement of any such claim or action based on State law.

(End of Clause)

15. FIRE PRECAUTIONS AND CONTROL

Specific fire prevention measures are listed below and shall be effective for the period April 15 to October 15 of each year. The CO may change the dates of the Fire Precautionary Period by advanced written notice if justified by unusual weather or other conditions. Equitable Adjustment will not be granted for a change in the Fire Precautionary Period dates. Required tools and equipment shall be kept in a serviceable condition and immediately available for firefighting at all times during the Contractor’s operations in the Fire Precautionary Period or as otherwise required.

SPECIFIED FIRE PRECAUTIONS

Prior to initiating the Contractor’s operations during the Fire Precautionary Period, the Contractor shall file with the Government a Fire Prevention and Control Plan providing for the prevention and the control of fires on the Contract Area and other areas of the Contractor’s operations. Such plan shall include a detailed list of personnel and equipment at the Contractor’s disposal for implementing the plan.

SPECIFIC FIRE PRECAUTIONS.

When the industrial fire precaution level is I or higher, unless waiver is granted, specific required fire precautionary measures are as follows:

A. Fire Security.

Contractor shall designate in writing a person or persons who shall perform fire security services listed below on Contract Area and vicinity. The designated person will be capable of operating Contractor's communications and fire fighting equipment specified in the contract, excluding helicopters, and of directing the activities of Contractor's personnel on Forest fires. Such person must report any fire detected to Forest Service within 15 minutes of detection. In lieu of having the designated person perform the required supervisory duties, Contractor may provide another person meeting the qualifications stated above to direct the activities of Contractor's personnel and equipment during all fire fighting activities.

Services described shall be for at least 1 hour from the time Contractor's Operations are shut down. For the purposes of this provision, personnel servicing equipment, and their vehicles, who are not engaged in cutting or welding metal are excluded.

Fire security services shall consist of moving throughout the operation area or areas constantly looking, reporting, and taking suppression action on any fires detected. Where possible, the designated person shall observe inaccessible portions of helicopter operating areas from vantage points within or adjacent to Contract Area.

Contractor shall furnish fire security services based on the predicted industrial precaution level, obtained by Contractor from the appropriate Ranger District Headquarters. If predictions made after 6:00 p.m. local time, are significantly different than originally estimated, Forest Service will inform Contractor when changes in fire security services are indicated.

B. Fire Extinguisher and Equipment (on Trucks, Tractors, Power Saws, etc.).

(a) Each yarder or loader equipped with an internal combustion engine or other spark emitting source shall be equipped with a readily accessible fire extinguisher, with an Underwriter's Laboratory (UL) Rating of at least 5 B,C.

(b) All power-driven equipment operated by Contractor on National Forest land, except portable fire pumps, shall be equipped with one fire extinguisher having a UL rating of at least 5 B,C and one "D" handled or long handled round point shovel, size O or larger. In addition, each motor patrol, truck and passenger-carrying vehicle shall be equipped with a double-bit axe or Pulaski, 3-1/2 pounds or larger.

(c) Equipment required in (a) and (b) shall be kept in a serviceable condition and shall be readily available.

(d) Each gasoline power saw operator shall be equipped with a pressurized chemical fire extinguisher of not less than 8-ounce capacity by weight, and one long handled round point shovel, size O or larger, except at a landing where a suitable fire extinguisher and shovel are immediately available. The extinguisher will always be kept in possession of the saw operator. The shovel shall be accessible to the operator within 1 minute.

(e) Each helicopter shall be equipped with one fire extinguisher having a UL rating of at least 5 B,C mounted inside the aircraft within reach of the pilot's operating position.

(f) One refill for each type or one extra extinguisher to replace each size extinguisher required on equipment shall be safely stored in the fire toolbox or other agreed upon place on Contract Area that is protected and readily available.

(g) At each area where helicopters are being serviced or supplied, a carbon dioxide fire extinguisher with a UL rating of at least 20 B,C will be provided on the site and placed where it is available for immediate use.

C. Spark arresters and mufflers.

Each internal combustion engine shall be equipped with a spark arrester qualified and rated under USDA Forest Service Standard 5100-la as shown in the National Wildfire Coordination Group Spark Arrester Guide, unless it is:

(a) Equipped with a turbine-driven exhaust supercharger such as the turbocharger. There shall be no exhaust bypass.

(b) A multi-position engine, such as on power saws which must meet the performance levels set forth in the

Society of Automotive Engineers (SAE) "multi-positioned small engine exhaust fire ignition standard, SAE recommended practice J335B" as now or hereafter amended.

(c) A passenger carrying vehicle or light truck, or medium truck up to 40,000 GVW, used on roads and equipped with a factory designed muffler complete with baffles and an exhaust system in good working condition.

(d) A heavy-duty truck, such as a dump or log truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.

Exhaust equipment described in this Subsection, including spark arresters and mufflers, shall be properly installed and constantly maintained in serviceable condition.

D. Fire Tools.

Contractor shall furnish serviceable firefighting tools in a readily accessible fire toolbox or compartment of sound construction with a hinged lid and hasp so arranged that the box can be secured or sealed. The box shall be red and marked "Fire Tools" in letters at least 1 inch high. It shall contain a minimum of:

(a) Two axes or Pulaski’s with a 32-inch handle.

(b) Three adze eye hoes. One Pulaski may be substituted for one adze eye hoe.

(c) Three long handled, round point shovels, size 0 or larger.

E. Tank Truck.

Contractor shall provide a tank truck or trailer, containing not less than 300 gallons of water, during yarding, skidding, loading, land clearing, right-of-way clearing, mechanical falling, and mechanical treatment of slash.

Such tank truck or trailer shall be maintained in a serviceable condition and located within 10 minutes, round trip, from each operating side during Fire Precautionary Period (closed season), unless substitute measures are agreed to.

The tank truck or trailer shall be equipped with a pump capable of discharging 20 gallons of water per minute, using a 1/4-inch nozzle tip, through a 50-foot length of poly or rubber lined hose. In addition, 500 feet of serviceable hard rubber poly or rubber lined or FJRL hose of not less than 1 inch outside diameter, fitted with a nozzle capable of discharging a straight stream of 1/4 inch diameter and a spray pattern shall be immediately available for use. The tank, pump, nozzle and at least 250 feet, of the total 500 feet of hose, shall always be connected and ready for use. Synthetic hose may be used by agreement.

If a trailer is used, it shall be equipped with a hitch to facilitate prompt movement. A serviceable tow vehicle shall be immediately available for attachment to the trailer and must meet the time requirements stated above. Such truck or trailer shall be equipped to operate for a minimum of 8 hours.

Where designated on Contract Area Map, Contractor shall provide a tank trailer or water source and pumping equipment, including accessories, which can be lifted and transported by the yarding system. The component parts shall meet all specifications above. The tank trailer or water supply and pumping accessories shall be deliverable to a fire, in area of operations, within 15 minutes of detection.

In lieu of the above tank trailer or water supply for helicopter operations, Contractor may provide a suitable helicopter water bucket with a 300-gallon capacity. When Contractor provides a water bucket, a water source shall be provided within 5 minutes round trip flight time from operating side.

F. Communications.

During Contractor's Operations, excluding power saw falling and bucking, Contractor shall provide adequate two-way communication facilities to report a fire to Forest Service within 15 minutes of detection. Citizen Band radios (CB's) are not considered adequate two-way communications because FCC Regulations prohibit commercial use.

G. Smoking and Open Fire Restrictions.

Smoking and fires shall be permitted only at the option of Contractor. Contractor shall not permit open fires on Contract Area without advance permission in writing from Forest Service.

H. Blasting.

Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service.

Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5-gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control.

Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

I. Compliance with State Fire Laws.

Listing of specific fire precautionary measures in the foregoing Subsections is not intended to relieve Contractor in any way from compliance with State fire laws covering fire prevention and suppression equipment, applicable to Contractor's Operations.

J. Aircraft Communications.

Every aircraft used in conjunction with Contractor's Operations shall be equipped with an operable radio system.

The radio system shall be capable of transmitting and receiving on VHF frequency 122.85 Megahertz (MHz) with a minimum output of 5 watts at the transmitter. The system shall be located and installed so that the pilot can operate it while flying. A shielded all-weather broad-band antenna shall be part of the system. Radio and antenna shall be properly installed and maintained.

Upon discovery or notification of a fire on Contract Area, all aircraft pilots controlled by Contractor shall monitor VHF frequency 122.85 MHz when within 5 miles of a fire and broadcast their intentions.

K. Logging Block Equipment.

Contractor shall provide a serviceable 5-gallon backpack pump full of water, one axe, and one long handled round point shovel, size 0 or larger, at each haul-back block through which a running line pass.

The area below such blocks must be kept clear of all flammable debris under 4 inches in diameter for 6 feet in all directions. Material larger than 4 inches that poses a fire risk, such as punky logs, must also be removed.

Contractor shall avoid line-rub on rocks or woody material which may result in sparks or enough heat to cause ignition of fire.

EMERGENCY FIRE PRECAUTIONS.

Contractor shall restrict operations in accordance with the Industrial Fire Precaution Levels attached. Forest Service may change the Industrial Fire Precaution Levels to other values upon revision of the National Fire Danger Rating System and may change the specific Industrial Fire Precaution Levels when such changes are necessary for the protection of the National Forest. When sent to Contractor, the revised Industrial Fire Precaution Levels will supersede the attached levels.

INDUSTRIAL FIRE PRECAUTIONS SCHEDULE

LEVEL I. FIRE SEASON

Fire season requirements are in effect. In addition to other fire prevention measures, a Firewatch is required at this and all higher levels unless otherwise waived

LEVEL II. LIMITED SHUTDOWN

The following may operate only between the hours of 8 P.M. and 1 P.M.:

Power saws except at loading sites;

Feller-bunchers with rotary head saws;

Cable yarding;

Blasting;

Welding, cutting, or grinding of metal.

LEVEL III. RESTRICTED SHUTDOWN

Cable yarding is prohibited except that gravity operated logging systems employing non-motorized carriages or approved motorized carriages (defined below), may operate between 8 P.M. and 1 P.M. when all blocks and moving lines are suspended 10 feet above the ground except the line between the carriage and the chokers and during rigging.

The following are permitted to operate between the hours of 8 P.M. and 1 P.M. where mechanized equipment capable of constructing fire line is immediately available to quickly reach and effectively attack a fire start:

Ground-based operations (defined below);

Power saws on ground-based operations;

Rotary head saw feller-bunchers with a continuous Firewatch;

Non-rotary head saw feller-bunchers;

Tethered logging systems (defined below).

The following are permitted to operate between the hours of 8 P.M. and 1 P.M.:

Power saws at loading sites;

Loading or hauling of any product or material;

Blasting;

Welding, cutting, or grinding of metal;

Any other spark emitting operation not specifically mentioned.

LEVEL IV. COMPLETE SHUTDOWN

All operations are prohibited.

NOTE: Where hauling involves transit through more than one shutdown/regulated use area, the precaution level at the woods loading site shall govern the level of haul restriction, unless otherwise prohibited by other than the IFPL system. Under IFPL III, all trucks must be loaded and leaving the loading site no later than 1 P.M.

WAIVERS:

Advance written waiver of the above precautions may be issued by the Contracting Officer or Forest Service Representative for any and all activities. Activities for which waivers may be issued include, but are not limited to:

Mechanized loading and hauling.

Road maintenance such as sprinkling, graveling, grading and paving.

Cable yarding using gravity systems or suspended lines and blocks, or other yarding systems where extra prevention measures will significantly reduce the risk of fire.

Power saws at loading sites or in felling and bucking where extra prevention measures will significantly reduce the risk of fire.

Maintenance of equipment (other than metal cutting and welding) or improvements such as structures, fences and powerlines.

Contractor shall submit written waiver, or substitute precautions under B7.21, with specific measures to be taken by Contractor to reduce the risk of ignition, and/or the spread of fire. The Contracting Officer or Forest Service Representative shall consider site specific weather factors, fuel conditions, and specific operations that result in less risk of fire ignition and/or spread than contemplated when precaution level was predicted. Consideration shall also be given to measures that reduce the precaution levels above. Contractor shall assure that all conditions of such waivers or substitute precautions are met.

Forest Service will inform Contractor when changes in restrictions or industrial precautions are indicated.

IFPL DEFINITIONS:

Approv…