About this file

This document summarizes a federal contract solicitation for construction services. The Central Arkansas Veterans Healthcare System is seeking a contractor to develop private and semi-private bed spaces at the John L. McClellan Veterans Memorial Hospital in Little Rock, Arkansas. The project number is 598-18-103. The solicitation will be issued as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The anticipated contract award date is approximately 30 days after receipt of proposals by September 1, 2021. The recommended contract performance period is 485 calendar days after issuance of the notice to proceed. The location of work is the John L. McClellan Veterans Memorial Hospital. The contractor shall provide all labor, materials, tools, equipment, expertise, administration, supervision, transportation, and other items necessary to complete the scope of work, drawings, and specifications. NAICS code 236220 applies with a small business size standard of $39.5 million. The construction cost range is between $5-10 million.

View the file

Other files

File Type Posted
RFI 79 DRAWING 4.pdf PDF
PRE-BID RFIS COMPLETE.docx DOCX document
RFI 79 DRAWING 3.pdf PDF
RFI 79 DRAWING 1.pdf PDF
nLight IECC 2018 Applications Guide.pdf PDF
RFI 79 DRAWING 2.pdf PDF
AMENDMENT 36C25621R0145 0002.docx DOCX document
SITE VISIT SIGN IN SHEET.pdf PDF
AMENDMENT 36C25621R0145 0001.docx DOCX document
081121_PRE-BID RFIs_PARTIAL RESPONSES.docx DOCX document
P07 WAGE DETERMINATION AR20210032 04-02-2021.pdf PDF
59818103 Specifications.pdf PDF
EXHIBIT C CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY v2.docx DOCX document
SOW - revised.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY v2.docx DOCX document
598918103 Drawings 2 of 2.pdf PDF
36C25621R0145.docx DOCX document
598918103 Drawings 1 of 2.pdf PDF
EXHIBIT B Past and Present Performance Questionnaire.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOHN L. McCLELLAN MEMORIAL VETERANS HOSPITAL

VA Project No: 598-18-103

VA Contract No: 36C25618D0004

Bancroft-AE Project No: 17-119

DEVELOP PRIVATE/ SEMI-PRIVATE BED

SPACES FOR 4B AND 4C PODS

JOHN L McCLELLAN

MEMORIAL VETERANS HOSPITAL

100% CONSTRUCTION DOCUMENTS

NOVEMBER 16, 2020

BASIS OF DESIGN

John L. McClellan Memorial Veterans Hospital Develop Private / Semi-Private Bed Spaces for 4th Floor

VA Contract Number: 36C25618D0004 Bancroft Project Number: 17-119

Issued For: User and VA approval

By:

Bancroft Architects + Engineers 700 Nicholas Blvd, Suite 300 Elk Grove Village, Illinois 60007

847.952.9362 | www.bancroft-ae.com

1. Executive Summary

2. Conceptual Design

3. Architectural Basis of Design

4. Next Steps

5. Mechanical Basis of Design

6. Plumbing Basis of Design

7. Medical Gas Basis of Design

8. Fire Protection Basis of Design

9. Electrical Basis of Design

Issued as separate document

Appendix A -Meeting Minutes

Appendix B -Field Reports

Appendix C -Plumbing Load Calculations

Appendix D -Mechanical Load Calculations

Appendix E –Electrical Load Calculations

Appendix F –Product Data

Appendix G—Owners Project Requirements

Basis of Design Table of Contents

INTRODUCTION PROJECT SCOPE

DESIGN TEAM

This document is a Conceptual Design Summary which will serve as the starting point for the Basis of De-sign (BOD), a living document that will evolve through the duration of this project. This document was cre-ated starting from the following key elements of developmental discovery:

Project Kick-Off Meeting - October 17 2018

Field Survey of 4th Floor Bed Spaces Existing Conditions October 17 - October 19, 2018

It is not the BOD’s function or intent to document every element of this entire process as it is developed;

rather it is to perform as an organized summary of the key developments of the project process. In addi-tion to the BOD, total documentation of the design process consists of project minutes of meetings, nu-merous design studies and options presented for consideration.

In 2018, Bancroft AE was contracted to provide Architectural/Engineering design services for the John L.

McClellan Memorial Veterans Hospital in Little Rock, Arkansas. The main project focus is to reduce the number of open multi-bed patient rooms in Pod ‘B’ and Pod ‘C’. The design renovation is to increase the amount of private and semi-private bed spaces, provide isolation rooms to each pod, and provide private

ADA bathrooms with bathing accommodations for each bedroom. The goal is to design a more functional space addressing patient privacy, accessibility and providing a space for proper patient care and discretion.

Currently the existing pods have single bed space, double bed space and 3 person bed space without private bathing facility. The scope of design services include Conceptual Design, Schematic Design, Design

Development, Construction Document and Construction Administration services for an approximately 20,000 g.s.f. (including corridors) renovation.

The optimal solution will respond to the needs of its patients and users to the greatest extent possible creating a well balance harmony in design and end user satisfaction and staff-patients efficiencies. The A/E will work with Central Arkansas Healthcare System (CAVHS) staff, Engineering Staff, Patient Care staff and other staff as required to collect all information required to design an improved floor plan in accordance with the TIL, local, state and federal building codes and standards that correct problems with facility structure, design, workflow efficiency, security and improve overall facility operations.

Aerial view of JLM Veteran Hospital

Executive Summary1

NAME COMPANY ROLE

Bradley Martin Central Arkansas Veterans Healthcare

System

Project CO

Ambera Parker Central Arkansas Veterans Healthcare

System

Contract Specialist

Richard Palmer Central Arkansas Veterans Healthcare

System

Project COR

Patricia Bailey Bancroft Architects + Engineers Project Manager

Dennis Mika Bancroft Architects + Engineers Sr. Healthcare Design Architect

Jennifer Villena-Johnson Bancroft Architects + Engineers Project Architect

David Greene Bancroft Architects + Engineers Engineer, Mechanical

Walter Groszko Bancroft Architects + Engineers Engineer, Electrical

Mike Imaoka Bancroft Architects + Engineers Engineer, Plumbing

Ambrose Towe Bancroft Architects + Engineers Engineer, Fire Protection

Dick Engleman Bancroft Architects + Engineers Cost Estimator

APPLICABLE CODES

As of October, 2018 the following Codes and Standards have been adopted by the VA:

VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).

International Building Code 2018 (IBC) (Only when specifically referenced in VA Design Documents)

NFPA 101 Life Safety Code 2018

NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900

Occupational, Safety and Health Administration (OSHA) Standards.

VA Seismic Design Requirements, H-18-8

National Electrical Code (NEC)

International Plumbing Code (IPC)

Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.

ASME Boiler and Pressure Vessel Code

ASME Code for Pressure Piping

Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free De-sign Guide (PG-18-13)

Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary

(ACI 318)

Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)

Energy policy Act of 2005 (EPAct)

DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi- Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.

Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding

(MOU)

Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Manage-ment.

The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification.

Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2007.

Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2007.

ASHRAE-110 F Velocity Measurement Procedures.

Sheet Metal and Air Conditioning Contractors Associations (SMACNA)

International Mechanical Code (IMC)

Underwriter’s Laboratories (UL).

EXISTING CONDITIONS

The Central Arkansas Veterans Healthcare System (CAVHS), a Department of Veterans Affairs (VA) health care provider, with two hospitals, John L. McClellan Memorial Veterans Hospital, located in Little

Rock and Eugene J. Towbin Healthcare Center in North Little Rock. The two medical center locations provide a broad spectrum of inpatient and outpatient comprehensive healthcare services through pri-mary, tertiary and long term care in the areas of medicine, surgery, mental health, physical medicine and rehabilitation, neurology, dentistry, ophthalmology, geriatrics, extended care and women’s health.

The history of the CAVHS began with Fort Logan H. Roots. In 1893, the U.S. Army chose Big Rock in

North Little Rock as the location for one of its new military posts. Fort Logan H. Roots, as it was later named, served as an important military training facility in the late nineteenth and early twentieth centu-ries. When the United States entered World War I in 1917, Camp Pike (now Camp Joseph T. Robinson) was constructed to provide the military with a larger training facility.

Fort Roots maintained a hospital, during the 1918 influenza epidemic, and barracks were converted to a hospital ward to accommodate the increased patient load. In 1921 the fort was transferred to the Public

Health Service for use as a veteran’s hospital. On April 29, 1922, Executive Order No. 3669 placed Fort

Roots under the control of the newly established Veterans Bureau. Today, Fort Roots remains an im-portant part of the U.S. Department of Veterans Affairs, serving veterans in Arkansas and surrounding states. Over the years Fort Roots has been reduced in acreage, the buildings have come and gone, many of the post’s early structures still circle the parade ground.

The Fort Logan H. Roots Military Post Historic District was placed on the National Register of Historic Places on

September 4, 1974.

In December 1945, Senator John L. McClellan announced the approval of a 500-bed hospital for veterans to be built on Roosevelt Road in Little Rock. Throughout his term in office, he continually sought to improve healthcare and benefits for veterans. Among McClellan’s last major achievements included his successful bat-tles to secure appropriation and approval for the hospital on Roosevelt Road, the John L. McClellan Veterans

Administration Hospital, completed in 1984.

This System serves as a teaching facility for more than 1,500 students and residents enrolled in approximately

65 educational affiliates; its principal affiliate is the University of Arkansas for Medical Sciences. Throughout more than 80 years of rich history, CAVHS has been widely recognized for excellence in education and re-search, and – first and foremost – for a tradition of quality and caring for more than 65,000 Arkansas Veterans annually. In 1984 the new modern 825,657sf replacement , John L. McClellan VA Medical Center was con-structed in Little Rock on the campus of University of Arkansas Medical School at 4300 West 7th Street.

As of 2014, CAVHS has 280 hospital beds on both campuses as well as a 119-bed Domiciliary Residential Re-habilitation Treatment Unit that provides long-term rehabilitative care and a 152-bed community living center on its North Little Rock campus.

Executive Summary1

EXISTING PARTIAL BUILDING FLOOR PLAN

FOURTH FLOOR POD “C” FOURTH FLOOR POD “B”

NOT IN CONTRACT

LEGEND

CONSTRUCTION STRATEGIES

Renovating an existing structure while normal activity continues is a challenging task that must be met with advanced planning for phased implementation of the design during construction. The need for a multi-phased construction project becomes evident as clinical and facility operations must continue in existing occupied spaces during construction work without disruptions. During the early planning and design phases a process shall be developed to define the constructability from demolition to completion of construction with a compre-hensive look at the impact of each phase on the new and existing facility. To better anticipate difficulties be-fore plans are finalized and construction commences, project designers and hospital managers must carefully collaborate in developing drawings which document and detail each phase of the project. Several key goals to consider as follows:

1. Construction Phasing

Project will be required to be phased as necessary to keep facility operational at all times. Only one

Pod at a time will be under construction.

Coordination with key personnel to develop a detailed phasing plan.

Phasing to maximize efficiencies and minimize construction impact on the surrounding community.

Determine construction phase activities that can potentially disrupt existing normal operations.

Develop mitigation plan to allow operations to continue.

Study the site and surrounding areas to designate lay-out areas and on-site trailer location.

Define owner restrictions during construction.

2. Security

Construction phasing plan to designate areas of construction isolated from secure perimeter of facility.

Temporary construction fencing to be provided for safety and separation of construction site.

3. Utility Interruptions

Determine any temporary utilities necessary for facility to remain operational at all times.

Coordination required with facility management group to schedule any utility interruptions.

Time and impact of any utility interruptions to be limited.

Refer to Mechanical, Electrical and Plumbing Narratives contained in this document for additional de-tailed information regarding work related to required interruption of existing engineering systems.

Facility Map of the Main Floor

Executive Summary1

Conceptual Design2

RENOVATION STRATEGIES

Renovating an existing building with spatial constraints offers unique challenges to implementing the greatest amount of private/semi-private patient rooms with private bathrooms containing bathing accommodations for each room in an existing building structure. Compromise is typically the norm in planning and design of newer healthcare facilities in older structures but the function and life safety are not. Several key goals for both this renovation as well as others are addressed below:

1. Standardization

All patient rooms to receive new head walls and privacy curtains. Head walls to include minimum number of gases required per the VA Guidelines.

All new bathrooms to be ADA accessible with shower, lavatory, and water closet. The bathroom door/wall shall include accommodations to allow for the free passage for the patient lift system.

All new finishes will be required throughout in these areas.

Each patient room will have a patient lift system which will allow uninterrupted patient transport into the bathroom/shower will be required. There will be 4 new isolation rooms in each of the

Pod’s “B” and Pod’s “C”. Patient lift will follow the “H” type system above beds and a “linear” system in each bathrooms.

Gypsum walls throughout the space will require repair and painting.

Cementitious Backer Board will be used in all toilet rooms with full height wall tile.

Upgrade lighting with LED lights in patient rooms, patient toilet rooms, and corridors.

Existing ceilings will be removed and replaced with new. Replacement of ceilings in corridors will also be required in order to install modified ductwork, sprinklers, and plumbing piping.

2. Flexibility

Rooms will need to be flexible for future reconfiguration. In rooms which currently include infrastructure for “multiple” patients, the design/planning shall include provisions for leaving the infrastructure in place in order to meet a higher patient count/demand in emergency situations .

3. Surveys

Asbestos survey. The A/E will review the existing asbestos survey and determine any additional locations required to be on the asbestos survey. Asbestos abatement will follow Master

Construction’s Section 02 82 13 from TIL local, state and federal requirements .

Electrical load survey. The A/E will determine the electrical load requirements through the design process. The listing of known electrical equipment is provided to assist the A/E determines electrical requirements.

Mechanical Requirements Survey. The A/E will conduct a mechanical requirements survey of patient room to determine needs to be incorporated into the project. Consideration will include air exchange requirements, air supply, and ventilation. At this time no major systems are included only the re-distribution of the existing building’s MEP systems. The A/E will provide the station with the engineered loads required by the new renovation. The responsibility to provide the requested requirements are supported by the building power plant.

Sketch 2: November 27, 2018

During the first meeting, the preliminary design was presented to the team showing Pod “B” with Pod “C” being a mirror image. New exhaust ductwork to be provided for all new ADA bathroom with shower. Alternates were presented with the Pod “B” concept.

PRELIMINARY CONCEPTS

Conceptual Design2

Sketch 4: February 26, 2019

Further plan design enhancement is part of the design process. During the design stages, 6 private patient rooms, 4 isolation rooms, and 12 semi-private bedrooms were achievable. Each of these rooms have approximately 64 sf of private ADA bathrooms with ADA showers, ADA water closet, and ADA lavatory with a lift station in each room. The existing communal shower rooms are converted to equipment storage rooms. Each bedroom suites will have new wall finishes, new privacy curtains, and new lift stations along with new headboards. The strategy is to take advantage of existing plumbing risers and vents in the new design.

Conceptual Design

Conceptual Design

Sketch 6: June 21, 2019

Conceptual Design to include 45 beds, each with private bathroom. 1 family waiting room is included in Pod ’B’, 1 nurse nook in each pod, and 1 HAC in each pod.

This plan design includes 15 private bedrooms, 11 semi-private bedrooms

(22 beds) and 8 isolation rooms.

Corridor ceilings will require removal for installation of mechanical, plumbing, and medical gas systems. Upon completion, new ceiling grid and tile will be installed. Existing ceiling lights, fire protection, fire detection, etc. will be reinstalled.

Corridor flooring will require replacement due to modifications to the existing doors.

2 Conceptual Design

Conceptual Design (cont.)

Sketch 6: June 21, 2019

Plan shows location of beds within each pod (shaded area indicates 3 ft. bed clearance). It is understood that the constraints of working within existing paramaters (existing walls to remain), that rooms will vary in size and will be generally smaller than VA guideline recommendations.

InPatient bedroom sizes (does not include bathrooms)

VA guidelines recommend 280 s.f. for private patient bedrooms.

Private patient bedroom sizes range from 212 s.f. to 304 s.f..

Semi-private patient bedrooms range from 404 s.f. to 483 s.f..

Isolation bedroom sizes

VA guidelines recommend 240 s.f. for isolation bedrooms.

Isolation bedrooms range from 196 s.f.

to 219 s.f..

Patient bathrooms

ADA bathroom includes roll-in shower, floor mounted water closet and wall mounted lavatory.

Typical bathroom size is 64 s.f.

Sketch 8: August 8, 2019

Conceptual Design to include 46 beds

(23 in each pod). Each private bedroom and semi-private bedroom will have a private bathroom. 1 HAC in each pod. Pod ‘C’ has 1 Nurse Nookk and 1 Nurse Office.

This plan design includes 16 private bedrooms, 11 semi-private bedrooms

(22 beds) and 8 isolation rooms.

Corridor ceilings will require removal for installation of mechanical, plumbing, and medical gas systems. Upon completion, new ceiling grid/tile, light fixtures, supply/return grilles, and sprinkler heads will be replaced with new. Existing fire detection systems and identification tracking devices will be reused.

Corridor flooring will require replacement due to modifications to the existing doors.

FINAL Conceptual Design

April 2, 2020

Proposed CORE renovation work submitted to VA COR.

Work to include areas in color. Work includes new floor, wall and ceiling finishes; removal of several walls to accommodate new room uses.

June 12, 2020:

Contract Modification was approved.

During course of redesigning for CORE renovation, the following items have been added:

Replace exterior windows with storefront (no operables).

New floor , wall and ceiling finishes throughout all rooms (except Signal and Telephone rooms).

Staff Toilets to NOT be enlarged per nursing staff request.

SCOPE OF WORK Modification Conceptual Design

Conceptual Design2

June 25, 2020

Three options proposed for the new design of the primary Nurse Station for both pods.

Option 1 was selected by VA with the following request:

Add linear lighting in soffit above reception desks to provide a more modern look.

Nurse Station Design Concept

OPTION 1

OPTION 2

OPTION 3

DEMOLITION

The building shell , including stairwells, shall remain intact. Existing exterior walls will remain. Exterior windows will be replaced with non-operable aluminum storefront.

Demolition to the interior building:

Existing bathroom suites to be demolished.

Selected bedroom interior partitions walls to be removed and space to be reorganized for new room layout.

All bedroom suite doors and frames to be removed and replaced with larger door openings.

All acoustical ceiling tiles in bedroom suites and hallway corridors to be removed and replaced. All ceiling mounted accessories such as cameras, wireless access points, and nurse call lights to be reinstalled in same locations.

All acoustical ceiling tiles in main corridor to be removed and replaced in original location. Light fixtures and mechanical supply and return grilles to be new. All ceiling mounted accessories such as cameras, wireless access points, security systems, fire detection and alarm to be reused and reinstalled in original location.

Existing wall mounted screens to be removed and reinstalled.

June 12, 2020: Scope or Work was modified to include the CORE areas of Pod ‘B’ and Pod ‘C’. CORE area renovations will include updating finishes, and enlargement of various rooms, and replacement of exterior windows.

Architectural Basis of Design3

DEMOLITION FLOOR PLANS FOR POD’S “B” AND “C”

1. Interior Partitions

a. Selective existing interior partition walls will be removed for new bedroom suite layout with new bathrooms.

b. New cementitious backer board with either tile or solid surface surround at shower enclosre. New moisture resistant gypsum board on all other walls in toilet room.

c. New interior partition walls at new bedroom suites and bathroom suites consisting of 3 5/8” metal studs with 5/8” moisture resistant gypsum wall board and new finishes.

d. New plumbing wall chases at back to back plumbing locations consisting of 5/8” cementitious backer board and 6” metal studs wall.

3. Sound Attenuation & Acoustical Privacy

a. Existing walls typically extend 4”-6” above finish ceiling, and shall remain. New partition walls will extend the same and will include sound attenuating fiberglass batt insulation with STC 40 sound rating.

b. Walls surrounding the outer walls of the isolation suites will extend to the bottom of the structure above, including existing walls.

c. Provide new acoustical ceiling tile and grid system in all bedroom and bathroom suites. New acoustical ceiling tile and grid system in corridors.

4. Borrowed Lite & Visual Privacy

a. Provide borrowed lights at entry to ante rooms and isolation rooms.

b. Provide privacy curtains at all bedroom suites.

5. Doors

a. Bedroom doors to be solid core wood doors 1 ¾” throughout with painted hollow metal frames. Width of doors into private and semi-private patient rooms will be 48”. Doors in isolation bedrooms will be 48” x 12” (pairs).

b. Bathrooms doors to be sliding barn doors with aluminum frames and solid core wood doors.

6. Finishes:

a. New finishes throughout each Pod, including Core Areas.

b. Refer to Interior Finishes on following sheet.

7. Life Safety

a. Provide UL rated construction where indicated on life safety drawings.

b. Existing fire extinguishers and cabinets shall remain.

INTERIOR BUILDING SYSTEMS EXISTING PHOTOS

INTERIOR FINISHES

New integrated headboard design at each bed station location. Updated based on VA guidelines and equipment requirements.

New patient lift systems. Patient lifts are installed in each bedroom and will provide continuous lift from each bed into the bathroom where it will reach the toilet and shower.

New privacy curtains.

New painted finishes throughout the bedrooms.

Paint colors to match station standards.

New gypsum board ceiling in isolation suites. New acoustical ceiling tiles and grids throughout the bathrooms and bedroom suites and corridors.

New acoustical ceiling tile throughout. Patient bedrooms, patient corridors and the main Nurse Station will receive a higher NRC (noise reduction coefficient) rated tile than the standard ACT to be located elsewhere.

Bathrooms will have epoxy floors and walls. Walls surrounding the showers will have solid surface to the ceiling.

New upper and lower cabinets in bedroom suites to further enhance staff work efficiencies allowing for storage of medical supplies such as gowns, gloves, etc.

New floor finishes in bedrooms will be welded sheet vinyl. New floor finishes in corridors and CORE areas will be luxury vinyl tile.

VA FLOOR PLAN TEMPLATES

Note: Drawing Templates not to scale.

3 Architectural Basis of Design

Upon selection of a conceptual design direction, the design team will work to develop said concept into design development.

This next level will focus on identifying and further articulating elements such as:

Patient Rooms and Bathrooms development.

Impact of new construction on existing interior space(s).

Construction phasing and infection control.

Scope of building mechanical, plumbing, electrical and fire protection work.

Development of Opinion of Probable Construction Cost (OPCC).

Further project development as it pertains to VA requirements will also be studied and incorporated into the project for the De-sign Development submittal.

NEXT STEPS - Design Development

NEXT STEPS4

Mechanical Basis of Design5

DESIGN CODES AND STANDARDS

The design of the HVAC systems shall be in accordance with the following codes and standards:

International Building Code VA HVAC Design Manual 2011 International Mechanical Code (IMC) ASHRAE Standard 170, Ventilation of Health Care Facilities VA Master Specifications (H-08-1) VA Standard Details (H-08-4) Applicable National Fire Protection Association (NFPA) codes including, but not limited to, NRPA 70-93 (National Electric Code) Sheet Metal and Air Conditioning Contractors Association (SMACNA) Air Conditioning and Refrigeration Institute (ARI) Underwriter’s Laboratories (UL) National Electric Manufacturers Association (NEMA)

GENERAL

Outdoor weather conditions are based on engineering weather data from VA Design Manual for Little Rock, Arkansas. Winter design condition is the 99.6% occurrence design value. Summer design condition is the 0.4% occurrence design value.

Outdoor Design Conditions:

Winter: 15.3°F db Summer: 99.3°F db, 77.3°F wb

Ventilation rates shall be in accordance with the VA HVAC Design Manual 2017

Indoor Design Conditions:

Patient Bedrooms (BRMS1)

Dry bulb temperature/cooling: 75°F Dry bulb temperature/heating: 70° Relative humidity/Cooling: 60% Relative humidity/Heating: 30% Minimum air changes/Hr.: 6 Room pressure: positive (+) Number of people: 1

Indoor Design Conditions:

Isolation Ante Rooms

Dry bulb temperature/cooling: 75°F Dry bulb temperature/heating: 70°F 100% exhaust air Minimum air changes/Hr.: 10 Room pressure: negative (- )

Existing HVAC System Description, Location 3rd Floor Mechanical Room

POD B:

SF-7 /RF-7 – Serves center core for floors 4 thru 7.

SF-8/RF-8 – Serves outer perimeter for floors 4 thru 7.

EX-4 – Serves toilet exhaust for floors 4 thru 7.

POD C:

SF-1 /RF-1 – Serves center core for floors 4 thru 7.

SF-2/RF-2 – Serves outer perimeter for floors 4 thru 7.

EX-1 – Serves toilet exhaust for floors 4 thru 7.

Both air handling units that serve Pod B and Pod C are VAV air handling units with a minimum 33% out-side air as well as meeting the VA guideline requirement of having 2 Pre-filters and a final MERV 14 filter.

Indoor Design Conditions:

Isolation Patient Bedrooms

Dry bulb temperature/cooling: 75°F Dry bulb temperature/heating: 70°F 100% exhaust air Relative humidity/Cooling: 60% Relative humidity/Heating: 20% Minimum air changes/Hr.: 12 Room pressure: negative (- -) Number of People: 1

DEMOLITION HVAC SYSTEM DESCRIPTION

Existing branch ductwork, diffusers and grilles, supplying and returning air to the highlighted area shown below shall be demolished and capped at the mains. Existing VAV Box terminal units dedicat-ed to the highlighted areas shall also be demolished along with it’s associated piping, valving and thermostats. Based on the existing airflow rates obtained from existing as-built drawings and Test and Balance Reports, there is no significant change in air flow for the new design. Therefore the existing air handling unit systems will be re-used with no modifications.

Private/Semi-Private Bedrooms and Office Spaces:

New DDC controlled VAV terminal units with hot water reheat, thermostats, and branch piping will be in-stalled to accommodate the new floor layout. Each patient room will be zoned individually with it’s own

VAV terminal unit and thermostatic controls. New medium and low pressure supply and return ductwork will tie into the existing mains. Any existing ductwork that is deemed too small for the revised airflow rates will be replaced with new.

Isolation Room/Ante Rooms:

There will be four new Infectious Isolation rooms in each pod. The isolation rooms and ante rooms will be 100% exhaust. Exhaust for the isolation rooms will be accomplished using a high velocity mixed flow induction fan with a bag in/bag out HEPA filter. The four isolation rooms in each pod will all be combined on one fan system. The fans and HEPA filters will be designed for N+1 redundancy.

The proposed location for the new induced flow exhaust fans is on the second floor roof of the POD 2C, as shown in the photo below. The new exhaust ductwork will run down from the fourth floor into the mechanical room below and then out onto the second floor roof.

Each isolation room will be zoned separately via new bubble tight Venturi control valves on the exhaust and constant volume terminal units with a hot water reheat on the supply. All exhaust ductwork upstream of the HEPA filters shall have welded stainless steel construc-tion.

Each isolation and ante room will be equipment with a room air pressure monitor with audio alarms to ensure the rooms maintain the required pressure relationship at all times.

HVAC SYSTEM DESCRIPTION

HVAC SYSTEM DESCRIPTION continued

Pod C Pod B

Core Areas:

The core areas consist of office, storage and bathroom spaces . New VAV terminal units will be provided to supply air to the Core area spaces.

The existing electrical closets in both PODS will be cooled via a dedicated vav box from the main system. The amount of air required for cooling each space is determined from load data obtained from the VA from the and new design requirements. The cooling required is based on maintaining 90 degrees space temperature and does not ac-count for any future electrical loads that may be added. BAE recommends that no new electrical transformers should be added to the fourth floor electrical rooms.

Patient Bathrooms:

The exhaust for the patient bathrooms and staff bathrooms will tie into the existing toilet exhaust system with new ex-haust grilles provided.

HVAC SYSTEM DESCRIPTION continued

Controls:

All new devices (ie, valves, VAV air terminal units, fans) will tied into the existing Siemens building auto-mation system.

Mechanical Basis of Design5

Plumbing Basis of Design6

Plumbing lines (mains, sub mains and branches) will be modified as required to accommodate new floor plan. Water supply shut off valves serving project area (4th floor) to be closed prior to work. Sanitary, vent and domestic water lines that will no longer be in use will be demolished and removed in their entirety.

Dead legs will not be allowed in project area. Project and room specific toilets, sinks, etc. will be disconnected and removed. Remaining piping not in contract (mains, sub mains and branches) to be capped water tight. Fixtures and other equipment not in the contract area to remain.

EXISTING CONDITIONS / DEMOLITION

PLUMBING SYSTEM DESCRIPTION

New shut off valves will be provided for each new fixture. New cleanouts will be provided where required.

Demolition work on the 3rd floor will have to be done to allow for modifications to the 4th floor plumbing work. New solation valves to be provided for each room branch.

New connections will be made at existing riser locations for all domestic water lines. New sanitary and vent connections to be made at existing sanitary mains or sub mains on the 3rd floor and vent lines on the 4th floor.

The new insulated cold water, hot water, and hot water recirculation piping will be distributed from overhead (above ceiling) to all new plumbing fixtures.

Plumbing fixtures:

Floor mounted, floor discharge water closets, made of vitreous china. Including exposed hardwired sensor flush valves. (Patient area)

Wall mounted, wall discharge water closets, made of vitreous china, including exposed hardwired sensor flush valve (Staff area)

Wall mounted vitreous china lavatory including hardwired sensor faucet w/programmable flush cycle.

(Set by VA)

Integral lavatory in sold surface countertop including hardwired sensor faucet w/ programmable flush cycle. (Set by VA)

Terrazzo mop service basin with drop front. Including hose bibb for additional sanitation provisions.

Individual tempering (mixing) valves will be provided for all lavatories, showers, etc. as required by the current VA Design Guide to prevent scalding. Hardwired, programmable lavatory faucets with purge feature for Legionella control as per section 4.5 of the current VA Design Guide.

Non-emergency plumbing fixtures such as water closets, lavatories, shower heads, floor drains will be selected and provided per drawing and plumbing material list. American Standard or equal plumbing fixtures and Sloan or equal sensor activated flush valves and faucets will be provided as recommended by the VA.. All fixtures and equipment to comply with the made in America act. Final location of all plumbing fixtures as per architectural drawings.

The design of the plumbing system will be in accordance with the latest editions of the following codes and standards:

Underwriters Laboratory, Inc. (UL)

American National Standards Institute (ANSI)

American Society for Testing Materials (ASTM)

American Water Works Association (AWWA)

Cast-Iron Soil Pipe Institute (CISPI)

International Plumbing Code, 2018 Edition

VA Plumbing Design Manual 2018

National Sanitation Foundation (NSF)

DESIGN CODES AND STANDARDS

Medical Gas Basis of Design7

Existing medical gas piping and outlets will be removed or modified as required to accommodate new head walls and their locations in each patient bedroom. Existing head wall consists of :

1 medical vacuum, 1 oxygen and 1 medical air connection per single patient bed

2 medical vacuum, 2 oxygen and 2 medical air connection per double patient beds

Existing medical gas valve boxes and associated alarm panels will remain. Each pod consists of:

2 valve boxes

2 alarm panels

EXISTING CONDITIONS / DEMOLITION

MEDICAL GAS SYSTEM DESCRIPTION

Medical gas piping serving each pod will be demolished to the valve boxes located in the corridor.

The valve boxes may be used as isolation shut-offs during construction. New piping will be routed and installed to meet VA Design Guide. There will be no medical gas piping serving the center core room(s).

Shut-off valves:

Existing valve boxes to remain or be relocated to accommodate new architectural layout. Additional lockable service valves have been provided above the ceiling to serve each service branch. Each service branch will serve between one (1) and three (3) patient rooms.

Alarms:

Existing alarm panels to remain.

Piping:

All piping used for all medical air pipes will be hard drawn seamless medical gas tubing type ‘K’ or

‘L’ (ASTM) B819) and bear one of the following markings: OXY., MED., OXY/MED, ACR/OXY, OR

ACR/MED.

Station Patient/Outlets:

Station outlets consist of primary and secondary check valves which allow secondary pieces of equipment to be attached to the medical gas line. The medical gas piping and layout will be coordinated with the head board design of the project. Each outlet shall be labeled with the name or chemical symbol and the specific color coding of the gas supplied.

Each patient bed will require medical gases that comply with VA guideline requirements for Patient beds and Isolation room beds.

Requirements for Patient Room (BRMS1):

Medical Air: 2

Medical Vacuum: 4

Oxygen: 2

Number of people: 1

Requirements for Patient Room, Isolation (BRIT1):

Medical Air: 2

Medical Vacuum: 4

Oxygen: 2

Number of people: 1

DESIGN CRITERIA

Fire Protection Basis of Design8

FIRE PROTECTION SYSTEM DESCRIPTION

Existing sprinkler main will remain as is, whereas, the sprinkler head locations will be modified per the new reflected ceiling plans. Sprinkler heads will be replaced to QRS (quick response sprinklers).

Corridors will only require new sprinkler heads, as the locations will not change.

The design of the fire protection system will be in accordance with the following codes and standards:

NFPA 13 Standard for the Installation of Sprinkler Systems

NFPA 70 National Electrical Code

NFPA 72 National Fire Alarm and Signaling Code

NFPA 99 Health Care Facilities Code

NFPA 101 Life Safety Code

Underwriters Laboratory, Inc. (UL)

American National Standards Institute (ANSI)

Tests by independent agencies whose classifications and requirements have general acceptance as regulatory:

Underwriters Laboratories, Inc. (UL)

Factory Mutual

Owner's Insurance Company

DESIGN CODES AND STANDARDS

Electrical Basis of Design9

DESIGN CODES AND STANDARDS

The electrical design for this project is based on, but not limited to, the following publications, codes, specifica-tions, etc.:

VA Electrical Design Manual 2015 (PG-18-10)

VA Master Specification (PG-18-1)

VA Design Guides (PG-18-12)

National Fire Alarm Code – NFPA-72

National Electrical Code (NEC) – NFPA-70

Standard for Healthcare Facilities – NFPA-99

National Electrical Manufacturers (NEMA)

Institute of Electrical and Electronics Engineers (IEEE)

American National Standards Institute (ANSI)

ASTM International (Formerly American Society for Testing and Materials)

Occupational Safety and Health Hazards (OSHA)

Underwriters Laboratory (UL)

Illuminating Engineering Society of North America (IESNA)

The scope of this project is to demolish electrical in core areas, corridors and patient rooms and design an updated electrical system, lighting system, fire alarm system, security and data and communications system in Pod ‘B’ and Pod ‘C’ on the 4th floor of the John L. McClellan Memorial Veterans Hospital.

Normal and Emergency 208/120V power is provided to the 4th floor Pod ‘B’ and Pod ‘C’ from the 3rd floor panel 3DH and 3DQH respectively. Emergency and Normal power for Pod ‘C’ will be provided from upgraded panels in Electrical Closet 4C-145 and new Electrical Closet 4C-145A. Emergency and Normal power for Pod ‘B’ will be provided from upgraded panels in Electrical Closet 4B-122 and new Electrical Closet 4B-120. 480/277V emergency power to plume fans, will be provided directly from the 3rd floor existing panel “NEW 277/480V”.

Upgrading the facility electric power distribution system (i.e. bringing new power to the 4th floor or to the roof), is not included in the scope of work.

Because the 4th floor electrical panels feed all the floors above (5th, 6th, 7th and 8th floors), load measurements were performed. The 4th floor electrical design includes limitations on Emergency Power in POD B. Any future Emergency Power increases in POD B for floors above the 4th floor, will need to be made available on the upper floors. POD B 4th floor cannot support Emergency Power increases to upper floors. POD B Normal power and POD C Normal and Emergency Power have spare capacity. But, future electrical load increases on upper floors must consider 4th floor loads in any electrical design.

GENERAL

PATIENT HEADWALLS

The inclusion of Patient Bed Headwalls in all patient rooms will consolidate most of the patient power requirements onto the headwalls. Initial design is to include four (4) Emergency Power and (4) Normal Power receptacles onto each headwall.

Each Headwall is feed from two Emergency Power circuits and from two Normal Power circuits, for reliability. A dimmable switch for Exam Lights and a dimmable switch for Patient Bed Lights will also be included. The Headwalls will also be provisioned for a Nurse Call module, a Code Blue Module and a Patient Pillow Speaker to access Nurse Call and Television Entertainment. Bed controls are also provided through the Nurse Call system. .

The Information Technology (IT) portion of the headwalls is described in the Communications Section.

LIGHTING

LIGHTING CONTROLS

BASIC MATERIALS AND METHODS

RACEWAYS

Lighting system will be designed to comply with the ANSI/ASHRAE/IESNA 90.1. All the light fixtures will be energy saving LED type with dimmable driver where applicable. Space specific lighting levels will be provided as per the Patient Room Design Standards, Lighting Design manual (LDM) and the Illuminating Engineering Society of North America (IESNA).

The lighting throughout the corridors will consist of 2’ x 4’ LED, with emergency power to fixtures required for egress. The corridor lighting circuits will be feed from the Pod A 277V system.

Patient Room lights will consist of dual function reading/ambient light, dual function exam/ambient light switched from the headboard, and down lights based on room size, switched at the room entrance. Bathroom lights will be controlled by an Occupancy Sensor, timed for 60 minutes. Lighting power will be fed from existing panelboards. Most power to lights will be 120VAC, as per code. 277V is not allowed near patient beds.

Emergency lighting system: will consist of self-illuminated LED type exit marker signs will be provided throughout corridors to identify pathways to doors for egress.

Occupant sensor or vacancy sensor and manual toggle controls will be provided for bathrooms and non-patient rooms.

Occupant sensor or vacancy sensor and manual toggle controls will be provided for Corridors.

The following guidelines for the electrical equipment and materials selection will be used:

Conductors will be copper with 600V, type THHN/THWN insulation.

Conductors No. 12 and smaller will be solid copper. Conductors No. 10 and larger will be stranded.

Branch circuits supplying personal computers, dimmable lighting and other harmonic generating equipment will be provided with individual neutral.

All materials will be new, VA approved and shall comply with local code requirements.

Only UL listed materials, equipment and devices will be specified.

Conductor ampacities will be based on 60° C ratings for loads rated 100 amps and less and 75° C ratings for loads greater than 100 amps.

Minimum wire size will be #12 AWG for 480/277V branch circuits and #10 AWG for 208/120V branch circuits.

Power wiring will be sized to limit voltage drop in branch circuits to 3% at farthest outlet. Total voltage drop for feeders and branch circuits will be limited to 5% overall.

600V and auxiliary system wiring will be installed in conduit or raceway. Minimum conduit size for 600V and auxiliary systems wiring will be 3/4” (minimum) inside diameter. All multi-floor, vertical runs shall be fitted with drain/vent fittings. Open wiring is prohibited.

Electrical Metallic Tubing (EMT) with compression type fittings will be utilized for the interior work in all finished spaces. Conduit will be installed concealed behind the dry wall and above suspended ceilings, except electrical rooms, telecommunication rooms and signal rooms.

Conduits in core area walls that are not being demolished will remain and be reused.

Galvanized rigid steel conduit will be used for all conduits larger than 3”.

PVC coated Galvanized rigid steel heavy wall conduit with threaded fittings for all conduits exposed to the weather will be provided.

Conduit fill will be 40% or less as required by code.

All raceways will be independently supported from structure. All raceways shall contain an equipment grounding conductor.

Recessed outlet and device boxes will be steel. Surface mounted boxes will be galvanized steel.

Flexible Metallic Conduit (FMC) will be provided for lighting fixture connections, at motor connections, and at equipment connections subject to vibration.

Conduit penetration through walls will be sealed.

Conduit in equipment rooms, and in unfinished areas will be exposed. Conduit in finished areas will be concealed.

Conduit requirements for fire alarm, telephone, data transmission, security and other auxiliary systems will be similar to that for 600V wiring. Conduit in office or other finished areas will be stubbed into space above suspended ceiling.

Color coding on all power, lighting, life safety, and other low voltage conduits will be provided as follows:

Fire Alarm conduits– RED paint

Emergency lighting conduit– YELLOW paint

Normal lighting conduit– GREEN paint

Normal power conduit– WHITE paint

HVAC control conduit– BLUE paint

COMMUNICATIONS SYSTEMS EDWARDS EST3 - FIRE DETECTION AND ALARM SYSTEM

EDWARDS EST3 - SECURITY SYSTEM

ENTERTAINMENT SYSTEM

Electrical Basis of Design9

Electrical contractor will install appropriate equipment and wiring in each patient room location. Remaining hardware, cabling and final interconnections into Telephone Closet and Signal Closet equipment is by others and not included in the scope of work. Wiring into Signal and Telephone rooms will be cut to length, have a connector installed, and left coiled for the VA to plug into patch panels or equipment as required.

Telecommunications outlets will be installed in patient rooms per Patient Room Design Standards.

Voip phones will be provided per Patient Room Design Standards and as determined by the VA. The “old fashioned” Plain Old Telephone System (POTS), will not be reused. Contractor will transfer the unused POTS phone sets to the VA. Existing POTS equipment in the Signal Rooms will remain in service to serve other floors and areas outside of the project.

Four Data and voice ports will be installed in headwalls and at locations per Patient Room Design Standards.

All the data and voice cables will be CAT 6E type, and terminated by data and voice system contractors.

For ease of tracing, cable jacket colors must be:

Telephone/ POTS (plain old telephone system)– PINK

Data– GREEN and BLUE

Video Cameras– WHITE

Biomedicine– YELLOW

Computers, Printers—PURPLE

WIFI, Access Points—ORANGE

Cell Phones, Laptops—ORANGE

All room and corridor Technology Equipment will be reused unless found damaged.

The Real Time Location System (IR modules and Room Modules) will be removed and re-installed by the VA’s Bioengineering Group.

The Headwall will be provisioned for the Nurse Call System. The new Nurse Call System (Installed by another project 598-19-114), will include:

Nurse Call Module on Headwall, Code Blue / Staff Emergency / Panic Call Module on Headwall, A combined Pillow Speaker / Nurse Call and Entertainment control, A Nurse Call Patient Information Module will be mounted on outside wall, WIFI and Motorola Radio Antennae will be reinstalled iby VA IT group, and reconfigured to support the Private, Semiprivate and Isolation Room.

Existing fire alarm and detection systems will be “taken down”, as ithe majority of these systems will be completely redesigned. Existing detectors will be reused if documented as “passed”, in NFPA Test Reports. Otherwise, new fire detection and alarm devices will be provided along with manual pull stations. New audio/visual (strobe/speaker) devices will be provided to meet NFPA Code requirements.

Pull stations will be installed at the ends of the corridors within 5’-0” of the exits to stairwells and exit doors.

Smoke detectors will be installed in “sleeping” Patient Rooms. Fire Alarm Control Panel and annunciator devices will be configured as required.

The modified Fire Alarm/ Fire Detection systems will be test as required by NFPA-72.

All local security devices including local wiring will be installed by contractor, and wiring routed and coiled into Signal Rooms. The security systems’ contractor will terminate to the local wiring locations and route the wiring to appropriate security systems’ in the Signal Rooms

Wiring will originate from the Patient headwalls, and be routed into Telephone Closets and coiled.

Terminations and additional equipment in Telephone Closets is not include in contract.

GROUNDING

ENERGY EFFICIENCY AND OPTIMUM OPERATION

LIGHTNING PROTECTION

Grounding and Bonding of all panelboards will be performed per NEC 250 and NEC 517.

A separate insulated equipment grounding conductor will be installed in each feeder and branch circuit sized in accordance with NEC.

Grounding conductors will be copper.

Equipment grounding conductors will be specified in all power conduits including feeders, branch circuits and switch legs.

Each receptacle will be grounded by means of an insulated copper conductor.

Existing building grounding grid will be utilized for all grounds.

Motorized equipment 5 HP and larger will be provided with variable frequency drives (VFD’s) for control and to minimize energy consumption.

Lightning Protection is not required in this design.

Appendices Refer to separate document for the following:

Appendix ‘A’- Meeting Minutes

Appendix ‘B’ - Field Reports

Appendix ‘C’ - Plumbing Load Calculations

Appendix ‘D’ - Mechanical Load Calculations

Appendix ‘E’ - Electrical Load Calculations

Appendix ‘F’ - Products

Appendix ‘G’- Owners Project Requirements

Appendix10

File details come from the government source that posted it. Updated .