598-22-102 Construction DWGS.pdf
PDF 18 MB Posted
- Solicitation number
- 36C25624R0045
About this file
This document appears to be construction drawings related to Solicitation Number 36C25624R0045, which is a solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 for the project "Y1NZ--598-22-102 | Fisher House Utilities Site Prep - JLM". The solicitation is for 598-22-102 Fisher House Utilities Site Prep work, as detailed in the solicitation and attachments. The contracting opportunity is for construction services. Key details are not provided in this document, as it appears to only contain the construction drawings, and does not include the full solicitation package. To summarize the full requirements, pricing terms, response dates, and other salient information, the complete solicitation package would need to be reviewed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 598-22-102 - PRE-BID RFIs COMPLETE.docx | DOCX document | |
| Site Map for Garage PV Palletts.pdf | ||
| 36C25624R0045 0001.docx | DOCX document | |
| 2024-04-02 Sign in for Site Visit.pdf | ||
| 598-22-102 Statement of Work.pdf | ||
| 36C25624R0045 - SOLICITATION.docx | DOCX document | |
| 598-22-102 Site Visit Map JLM Parking and Meeting.pdf | ||
| EXHIBIT B CONTRACTOR EVALUATION FORM.docx | DOCX document | |
| 598-22-102 Fisher House Utilities Site Prep Project Specifications.pdf | ||
| AR DOL WD AR2024032 eff 010524.pdf | ||
| EXHIBIT A PERFORMANCE RELEVANCY SURVEY - FH.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE PROJECT IMAGE PROJECT IMAGE
/2
/2
:0
:5
P
M C
U s e rs
\o m a n ts c h \D o c u m e n ts
\A
-1
-F is h e r
H o u s e
U ti lit ie s o m a n ts c h
.r v t
G-001
COVER
1 2OKM
FISHER HOUSE SITE
PREPARATION DESIGN -
UTILITIES
JOHN L. MCCLELLAN MEMORIAL OF
CENTRAL ARKANSAS VHCS
4300 W. 7TH STREET
LITTLE ROCK, ARKANSAS 72205 MAY 31, 2023
100% BID DOCUMENTS
598-22-10222-130
FISHER HOUSE SITE PREPARATION
DESIGN - UTILITIES
JOHN L. MCCLELLAN MEMORIAL OF CENTRAL ARKANSAS VHCS
4300 W. 7TH STREET
LITTLE ROCK, ARKANSAS 72205
VA PROJECT #: 598-22-102
CA
DRAWING LIST
GENERAL
G-001 COVER 1 2
G-002 GENERAL NOTES 2 2
CIVIL
CD100 CIVIL DEMOLITION PLAN 1 10
CD101 CIVIL DEMOLITION PLAN 2 10
CS100 CIVIL SITE, PAVING, AND GRADING PLAN 3 10
CS101 CIVIL SITE, PAVING, AND GRADING PLAN 4 10
CS102 TRAFFIC CONTROL PLAN 5 10
CU100 CIVIL UTILITY PLAN 6 10
CU101 CIVIL UTILITY PLAN 7 10
CG100 EROSION CONTROL PLAN 8 10
CU501 STANDARD DETAILS 9 10
CU502 STANDARD DETAILS 10 10
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 2
A-501 ENLARGED PLAN AND WALL SECTION 2 2
ELECTRICAL
E-100 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND
ABBREVIATIONS
1 5
ED-001 SOLAR PANEL DEMOLITION 2 5
E-101 SOLAR STRING DEMOLITION AND RE-WIRING 3 5
E-500 ELECTRICAL DETAILS 4 5
E-600 ONE-LINE DIAGRAM 5 5
FISHER HOUSE LOCATION
JOHN L. McCLELLAN
MEMORIAL VA
DocuSign Envelope ID: 2F24ECC3-44A0-463F-8AAC-98EEEB32CA9D
5/30/2023
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
100% BID DOCUMENTS
JOHN L. MCCLELLAN MEMORIAL OF
CENTRAL ARKANSAS VHCS
4300 W. 7TH STREET
LITTLE ROCK, ARKANSAS 72205
5/
/2
:1 7:
P
M
G-002
ZLRNSY
GENERAL NOTES
2 2MAY 31, 2023
FISHER HOUSE SITE
PREPERATION-UTILITIES
598-22-102
22-130
1. ABBREVIATIONS:
1.a. CO - CONTRACTING OFFICER
1.b. COR - CONTRACTING OFFICER'S REPRESENTATIVE.
1.c. COTR - CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE.
1.d. VA - DEPARTMENT OF VETERANS AFFAIRS
1.e. VAMC - VETERANS AFFAIRS MEDICAL FACILITY
2. DEFINITIIONS:
2.a. PROJECT SITE - ALL PROPERTY OF THE VA HOSPITAL LOCATED AT 4300 W. 7TH STREET, LITTLE ROCK, AR 72205.
2.b. DISTURBED AREA - ALL AREAS WHERE CONSTRUCTION AND/OR DEMOLITION ACTIVITIES EXPOSE SOIL OR AGGREGATE BASE MATERIALS, INCLUDING FOR PLACEMENT OF TEMPORARY SURFACES FOR STAGING.
3. ALL WORK, MATERIALS, AND WORKMANSHIP SHALL BE PERFORMED IN STRICT ACCORDANCE WITH AND SHALL CONFORM TO ALL FEDERAL, STATE, AND LOCAL REGULATIONS, AND IN ACCORDANCE WITH ALL MANUFACTURER
SPECIFICATIONS.
4. ALL WORK ON THE VA-OWNED SEPTIC SYSTEM MUST BE CONSTRUCTED IN ACCORDANCE WITH AND SHALL CONFORM
TO THE PROJECT SPECIFICATIONS.
5. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE PLUMBING CODES AND REGULATIONS AND PAYING FOR AND OBTAINING ALL NECESSARY AND REQUIRED INSPECTIONS, APPROVALS, AND PERMITS NECESSARY TO
PERFORM ALL WORK INDICATED IN THE CONSTRUCTION DOCUMENTS.
6. ALL WORK SHALL BE EXECUTED IN A MANNER THAT PROVIDES FOR PROTECTION OF AND MAINTENANCE OF ALL PEDESTRIAN CORRIDORS, INCLUDING MAINTAINING ADA ACCESSIBLE PATHWAYS IF AND WHEN CONSTRUCTION OBSTRUCTS SUCH PATHS BETWEEN PUBLIC FACILITIES WITHIN THE PROPERTY, OR WITHIN THE PROPERTY AND
RIGHT-OF-WAY.
7. THE CONTRACTOR SHALL PROVIDE FOR PROTECTION OF PUBLIC AND CONSTRUCTION WORKERS AROUND THE SITE.
BARRIERS SHALL BE CONSTRUCTED AS NEEDED TO PROVIDE CONTROL OF SAFE INGRESS AND EGRESS ON PREMISES.
FIRE EXITS ON THE FACILITY SHALL AT NO TIME BE OBSTRUCTED.
8. DRAWING DETAILS ARE INCLUDED IN THE CONSTRUCTION DRAWINGS TO SHOW CONSTRUCTION AT SPECIFIC LOCATIONS AND ARE INTENDED TO SHOW GENERAL REQUIREMENTS THROUGHOUT. DETAILS NOTED “TYP” ARE
TYPICAL, AND IMPLY THAT ALL CONDITIONS SHALL BE TREATED SIMILARLY.
9. THE CONTRACTOR MUST FULLY FAMILIARIZE HIMSELF OF THE CONDITIONS RELATING TO THE CONSTRUCTION AND LABOR UNDER WHICH THE WORK WILL BE PERFORMED. FAILURE TO DO SO WILL NOT RELIEVE THE CONTRACTOR OF HIS OBLIGATION TO FURNISH ALL LABOR AND MATERIAL NECESSARY TO CARRY OUT THE PROVISIONS OF THE CONTRACT DOCUMENTS AND COMPLETE THE CONTEMPLATED WORK FOR THE CONSIDERATION SET FORTH IN HIS BID.
10. THE CONSTRUCTION AREA SHALL BE THOROUGHLY CLEANED PRIOR, DURING, AND AFTER CONSTRUCTION.
11. THE APPROVAL OF SUBMITTALS BY THE COR SHALL NOT BE CONSTRUED AS A COMPLETE CHECK, BUT WILL INDICATE
ONLY THAT THE GENERAL METHOD OF CONSTRUCTION, MATERIALS, DETAILING, AND OTHER INFORMATION ARE SATISFACTORY. APPROVAL WILL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FOR ANY ERROR WHICH MAY EXIST, AS THE CONTRACTOR UNDER THE CONTRACTOR QUALITY CONTROL (CQC) REQUIREMENTS OF THIS CONTRACT, IS RESPONSIBLE FOR THE DIMENSIONS AND DESIGN OF ADEQUATE CONNECTIONS, DETAILS, AND SATISFACTORY
CONSTRUCTION OF ALL WORK.
12. SUBMITTALS SHALL BE IN COMPLIANCE WITH CONTRACT REQUIREMENTS AND SPECIFICATIONS WITH CONSIDERATION TO ACTUAL FIELD CONDITIONS. INCOMPLETE SUBMITTALS SHALL NOT BE REVIEWED AND WILL BE RETURNED TO THE
CONTRACTOR.
13. COORDINATE LOCATION OF STAGING AND STORAGE AREAS WITH THE COR.
14. SHOULD ANY CONFLICT ARISE BETWEEN THE CONTRACT DRAWINGS AND THE SPECIFICATIONS, THE CONTRACTOR
SHALL PROVIDE THE HIGHER QUALITY/QUANTITY OF WORK, THEN TO THE LEAST DEGREE NECESSARY. THE SPECIFICATIONS ALONG WITH THE APPLICABLE CODES SHALL OVERRULE THE CONTRACT DRAWINGS.
15. SUBMIT PRODUCT DATA ON ALL ITEMS SPECIFIED ON THE CONSTRUCTION DRAWINGS.
16. PATCH ALL SURFACES AFFECTED BY NEW CONSTRUCTION TO MATCH THE DIMENSIONS AND SPECIFICATIONS OF THE
ORIGINAL MATERIALS. IN AREAS OF NARROW PAVEMENT PATCHING, USE CONCRETE BASE AS SHOWN IN PAVEMENT
PATCHING DETAILS, INCLUDED IN CONSTRUCTION DRAWINGS.
17. CONTRACTOR SHALL PROTECT AND PRESERVE ALL EXISTING ITEMS TO REMAIN OR REUSE AND SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF DAMAGED ITEMS DURING THE COURSE OF CONSTRUCTION AND RESTORE SUCH AREAS TO THE SATISFACTION OF THE COR TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE
GOVERNMENT.
18. ALL EXCAVATION IN THE IMMEDIATE AREA OF EXISTING UTILITIES SHALL BE PERFORMED BY HAND AND WITH THE
UTMOST CARE TO PROTECT EXISTING UTILITIES.
19. THE LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES, INCLUDING BUT NOT LIMITED TO STEAM AND CONDENSATE LINES, DOMESTIC AND CHILLED WATER LINES, GAS LINES, SANITARY AND STORM SEWERS, AND ELECTRICAL AND COMMUNICATION CONDUITS HAVE BEEN INDICATED BASED ON INFORMATION PROVIDED BY PRIOR DESIGN AND AS-BUILT PLANS, AS WELL AS FIELD LOCATION OF RESULTS OF A SUBSURFACE UTILITY INVESTIGATION. IT IS POSSIBLE THAT ACTUAL SUBSURFACE UTILITIES AND PIPING MAY VARY FROM THE INDICATED. THEREFORE, PRIOR TO STARTING WORK IN ANY AREA, THE CONTRACTOR SHALL TAKE THE NECESSARY STEPS TO DETERMINE THE ACTUAL LOCATIONS AND ELEVATIONS OF ALL EXISTING UNDERGROUND PIPING, CONDUITS, AND STRUCTURES. THE CONTRACTOR SHALL CARRY OUT THE OPERATIONS IN SUCH AS MANNER AS TO PREVENT INTERFERENCE WITH THE LINES WHICH ARE TO REMAIN UNDISTURBED. ANY SUCH PIPE OR CONDUIT OR STRUCTURE DISTURBED IN THE COURSE OF THIS CONTRACT SHALL BE REPAIRED AND/OR REPLACED IMMEDIATELY BY CONTRACTOR AS DIRECTED BY THE COR AT NO EXTRA COST
TO THE GOVERNMENT.
20. PROTECT ALL UTILITIES AND OTHER STRUCTURES DURING EXCAVATION AND BACKFILL OPERATIONS. ANY DAMAGE TO THE EXISTING UTILITIES AND STRUCTURES CAUSED BY CONTRACTOR'S WORK SHALL BE IMMEDIATELY REPORTED TO THE COR AND REPAIRED TO THE ORIGINAL CONDITION BY QUALIFIED PERSONNEL AT THE CONTRACTORS EXPENSE. THE CONTRACTOR SHALL NOT INTERFERE WITH, OR INTERRUPT, ANY UTILITY MAIN OR SERVICE CONNECTION WITHOUT
PRIOR APPROVAL FROM THE COR.
21. BEFORE AND DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL PROVIDE A CHAIN-LINK CONSTRUCTION FENCE, 6 FEET MINIMUM HEIGHT, AROUND CONSTRUCTION AREAS DESIGNATED BY THE COR AS REQUIRING ENCLOSURE BY FENCING, PROVIDE GATES AS REQUIRED FOR ACCESS WITH NECESSARY HARDWARE, INCLUDING HASPS AND PADLOCKS. FASTEN FENCE FABRIC TO TERMINAL POSTS WITH TENSION BANDS AND TO LINE POSTS AND TOP AND BOTTOM RAILS WITH TIE WIRES SPACED AT A MAXIMUM OF 15 INCHES. BOTTOM OF FENCES SHALL EXTEND TO ONE
INCH ABOVE GRADE. REMOVE THE FENCE WHEN DIRECTED BY THE COR.
22. CONTRACTOR TO SUBMIT DESIGN CALCULATIONS SIGNED AN SEALED BY A PROFESSIONAL ENGINEER CURRENTLY
LICENSED IN THE STATE OF ARKANSAS FOR ALL ELEMENTS REQUIRING STRUCTURAL DESIGN.
23. ALL EXCAVATION IS UNCLASSIFIED AND NO ADDITIONAL PAYMENT WILL BE MADE FOR ANY ROCK EXCAVATION OR
BURIED CONCRETE EXCAVATION REGARDLESS OF THE VOLUME, LOCATION, OR TYPE.
SITE PIPING NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ALL EXCESS EXCAVATED MATERIAL
AND CONSTRUCTION WASTE TO AN OFF-SITE LICENSED WASTE DISPOSAL SITE AT NO ADDITIONAL COST TO THE
OWNER.
2. ALL TRENCH LINES ON HARDENED SURFACES SHALL BE SAW CUT OR MILLED.
3. ALL TRENCHES SHALL BE BACKFILLED AS SOON AS PRACTICABLE. OPEN TRENCHES SHALL BE KEPT TO A MINIMUM.
OPEN TRENCHES SHALL BE STEEL PLATED WHEN THEY CANNOT BE IMMEDIATELY COVERED. UPON BACKFILLING THE CONTRACTOR SHALL BROOM SWEEP STREETS AND USE APPROPRIATE METHODS TO CONTROL DUST AND HOSE DOWN PAVEMENT TO KEEP SURFACES CLEAN. TRENCHES WITHIN THE ROADWAY SHALL BE BACKFILLED BY THE END OF EACH WORK DAY, AND TEMPORARY PAVEMENT INSTALLED EACH DAY. WHERE FIRE ACCESS MUST BE MAINTAINED ON A STREET, CONTRACTOR SHALL ASSURE A MINIMUM 15' STABILIZED ROUTE AROUND THE EXCAVATION.
4. CONTRACTOR SHALL TAKE STEPS NECESSARY TO PRESERVE EXISTING CURB AND PAVEMENT AND MINIMIZE THE
AMOUNT OF CURBING AND PAVEMENT THAT MUST BE REPLACED.
5. THE CONTRACTOR SHALL PROTECT ALL STRUCTURES, ROADS, UTILITIES, TREES, LANDSCAPING, ETC. DURING THE PROGRESS OF THE WORK, AND SHALL REMOVE DAILY FROM THE SITE DEBRIS AND UNUSED MATERIALS. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL RESTORE THE SITES AS CLOSELY AS POSSIBLE TO THEIR ORIGINAL
CONDITION.
6. ALL SIDEWALK AREAS SHALL BE CLEAR OF OBSTRUCTIONS AND BROOM SWEPT AT THE END OF EACH WORK DAY. FOR AREAS WHERE THE COR HAS NOTED PEDESTRIAN ACCESS MUST BE MAINTAINED DURING OPERATING HOURS, CORRIDORS MUST MAINTAIN IN THIS CONDITION DURING OPERATING HOURS.
7. ALL DEWATERING, IF REQUIRED, SHALL BE INCLUDED IN THE BASE BID.
8. RESTORATION, INCLUDING REMOVAL OF EXCESS EXCAVATED MATERIAL AND PLACEMENT OF TEMPORARY PAVEMENT, SHALL BE PERFORMED AND COMPLETED ON A DAILY BASIS. ALL ROADS SHALL BE PASSABLE TO VEHICULAR TRAFFIC AT
THE END OF EACH DAY.
9. ABANDONED PIPES ARE TO BE PLUGGED WITH LEAN CONCRETE OR FLOWABLE FILL AND NOTED FOR AS-BUILTS.
10. USE FLOWABLE FILL IN CLOSE PROXIMITY TO OTHER UTILITIES TO ASSURE PROTECTION AND COMPACTION.
PROJECT SEQUENCING NOTES
THE FOLLOWING SEQUENCE MAY BE ADJUSTED BY THE CONTRACTOR AS APPROVED BY THE CONTRACTING OFFICER.
1. MOBILIZATION AND ESTABLISHMENT OF STAGING AREAS. STAGING AND LAYDOWN TO BE APPROVED BY COR PRIOR
TO USE.
2. BECAUSE THIS IS A LINEAR UTILITY PROJECT, THE STEPS BELOW WILL GENERALLY BE REPEATED FOR EACH SECTION OF PIPING. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE A SCHEDULE OF CONSTRUCTION DETAILING SECTIONS TO BE CONSTRUCTED, AS WELL AS SECTIONS TO BE ABANDONED AND/OR REMOVED, WITH MINIMIZED DISRUPTION OF SERVICE TO THE VA FACILITIES ON THIS PROPERTY. THE CONTRACTOR IS RESPONSIBLE FOR PREPARATION OF A CONSTRUCTION SCHEDULE WITH PHASING. THIS PLAN SHALL BE APPROVED BY THE COR PRIOR TO
COMMENCEMENT OF CONSTRUCTION.
3. PHASING PLANS SHALL INCLUDE PLANS FOR TRANSITION TO NEW SECTIONS OF WATER MAIN. ALL NEW CONSTRUCTION MUST BE PRESSURE TESTED, FLUSHED (IN ACCORDANCE WITH NFPA 24 FOR FIRE MAINS), DISINFECTED, AND AS-BUILT PRIOR TO PLACING IN SERVICE.
4. CONTRACTOR SHALL PROVIDE THE FOLLOWING PLANS TO THE COR FOR APPROVAL:
4.a. EROSION AND SEDIMENTATION CONTROL PLANS.
4.b. PEDESTRIAN AND TRAFFIC CONTROL PLANS.
5. FOR EACH PHASE;
5.a. IMPLEMENT EROSION CONTROL AND PEDESTRIAN PROTECTION PLANS.
5.b. CONDUCT TEST PITS AND OTHER INVESTIGATIONS OF UNDERGROUND UTILITIES AS NEEDED PRIOR TO
COMMENCEMENT OF CONSTRUCTION.
5.c. CONDUCT TEST PITS AT ALL LATERAL CONNECTIONS TO CONFIRM THE SIZE AND MATERIAL OF LATERALS, AND
NOTIFY THE COR OF ANY DISCREPANCY TO WHAT IS SHOWN ON THE PLANS.
5.d. SAWCUT EXISTING SURFACES AND DEMOLISH HARD SURFACES TO BE REMOVED, EXCAVATE FOR NEW PIPING.
PROTECT EXISTING UTILITIES AND REPAIR ANY DAMAGED DURING EXCAVATION.
5.e. INSTALL NEW PIPING, APPURTENANCES, AND FITTINGS WITHOUT INTERRUPTION OF EXISTING PIPING.
5.f. PATCH HARDENED SURFACES WITH LIKE MATERIALS OR PLACE MULCH, GRASS, OR OTHER LANDSCAPE
MATERIALS TO MATCH SURROUNDING AREAS IN NON-PAVED AREAS.
5.g. REPLACE LATERAL CONNECTIONS TO EACH BUILDING. FOR EXISTING SERVICE LATERALS TO REMAIN, CONNECT
EXISTING SERVICES TO NEW MAINS.
5.h. DEACTIVATE EXISTING PIPING AND SERVICES AS NO LONGER NEEDED AND SERVICES ARE CUT OVER TO NEW
MAINS. REMOVE AND/OR ABANDON IN PLACE AS REQUIRED.
5.i. COMPLETE SITE RESTORATION (INCLUDING LANDSCAPE STABILIZATION AND PAVEMENT PATCHES), CLEAN-UP, AND DEMOBILIZATION.
6. ALL WATER MAINS AND APPURTENANCES IN CONTACT WITH POTABLE WATER SHALL BE NATIONAL SANITATION
FOUNDATION (NSF) APPROVED.
7. ALL WATER MAIN SHALL BE CLASS 52 DUCTILE IRON PIPE, DOUBLE CEMENT LINED, MECHANICAL JOINT
8. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES AND UNDERGROUND FEATURES PRIOR TO CONSTRUCTION AND
ADJUST WORK AS NECESSARY TO PROVIDE REQUIRED CLEARANCES AND AVOID CONFLICTS.
9. WHEN THE CONTRACTOR ENCOUNTERS FORMERLY ABANDONED UTILITY LINES, CONTRACTOR TO REMOVE AND
DISPOSE OF AS REQUIRED FOR NEW WORK.
10. REMOVE EXISTING TREES AND ALL ROOTS WITHIN 5' OF PROPOSED WORK UNLESS OTHERWISE NOTED. IF NECESSARY REMOVE, STORE, AND REINSTALL ANY EMERGENCY CALL CENTERS AND THEIR LIGHTING AND ANY CONDUITS AND
OTHER FEATURES TO THE ORIGINAL CONDITION.
OTHER GENERAL NOTES
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND
OPERABLE PLUMBING SYSTEM AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.
2. THE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND INDICATIVE OF WORK TO BE PERFORMED. THE DRAWINGS ARE NOT INTENDED TO SHOW EVERY PIPE, FITTING, VALVE, OR APPURTENANCE REQUIRED FOR A COMPLETE INSTALLATION.
DO NOT SCALE LOCATION DIMENSIONS FROM THESE DRAWINGS. DRAWINGS ARE NOT TO BE SCALED FOR THE ACCURATE CUTTING OF PIPE OR ITS EXACT LOCATION. BEFORE ANY PIPING IS INSTALLED. CONFER WITH ALL OTHER CONTRACTORS IN ORDER TO ESTABLISH THE LOCATION OF THEIR PIPING, CONDUIT, DUCTWORK, GRILLES, FOUNDATIONS, STRUCTURAL STEEL, LIGHTING FIXTURES AND OTHER EQUIPMENT SO AS TO AVOID INTERFERENCE.
FAILURE TO COORDINATE SHALL NOT RESULT IN ANY ADDITIONAL EXPENSES TO THE OWNER AND ENGINEER.
3. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING AND VERIFYING ALL CONDITIONS AND DIMENSIONS AND FOR COORDINATION OF THEIR WORK WITH THAT OF ALL OTHER TRADES. PERFORM WORK IN A NEAT. ORDERLY MANNER
AND WITH THE LEAST POSSIBLE INTERFERENCES.
4. WORK SHALL CONFORM TO OR MEET THE REQUIREMENTS OF THE MOST CURRENT EDITION OF:
4.a. INTERNATIONAL PLUMBING CODE
4.b. INTERNATIONAL ENERGY CONSERVATION CODE
4.c. INTERNATIONAL BUILDING CODE
4.d. NEC (NFPA 70)
4.e. NFPA 24
4.f. ALL FEDERAL, STATE AND LOCAL CODES AND ORDINANCES
4.g. VA STANDARD DESIGN GUIDE
CONTRACTOR SHALL CONFORM TO NSF 61 (605.4, 606.5. 702.1. 702.2. 703.3) FOR THE WATER DISTRIBUTION PIPING
5. CONTRACTOR SHALL PROTECT THE PIPING FROM STRESS AND STRAIN. CONTRACTOR SHALL PROTECT THE IN-SLAB PIPING FORM CORROSION AND STRESS/STRAIN TO CONFORM TO INTERNATIONAL PLUMBING CODE 305.1, 306.3.
30B.5. REFER TO PIPING SUPPORT SPACING SCHEDULE OF THE CODE.
6. ALL MATERIALS, EQUIPMENT AND DEVICES SHALL, AS A MINIMUM, MEET THE REQUIREMENTS OF UNDERWRITER'S LABORATORY (UL) WHERE UL REQUIREMENTS ARE ESTABLISHED FOR THOSE ITEMS. ALL ITEMS SHALL BE CLASSIFIED BY
UL AS SUITABLE FOR THE PURPOSE OF THE CODE.
7. REFER TO SCHEMATIC DIAGRAMS FOR ALL PIPE SIZES AND PIPING LOCATIONS NOT SHOWN ON THE PLANS UNLESS
NOTED OTHERWISE ON THE DRAWINGS.
8. ALL EQUIPMENT AND MATERIALS INCORPORATED IN THIS WORK SHALL BE NEW UNLESS NOTED OTHERWISE AND SHALL BE CURRENT PRODUCTS BY MANUFACTURERS REGULARLY ENGAGED IN THE PRODUCTION OF SUCH PRODUCTS.
9. ALL FACTORY APPLIED COATINGS AND FINISHES SHALL BE PROVIDE WITHOUT RUST. SCRATCHES OR DENTS.
10. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY SECTION 22 05 11 - COMMON WORK RESULTS FOR PLUMBING.
CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN PROVIDED BY
THE CONTRACTOR AND HAVE BEEN APPROVED.
COORDINATION REQUIREMENTS
1. COORDINATE LOCATIONS AND INSTALLATION OF PLUMBING WORK WITH OTHER TRADES TO AVOID CONFLICTS AND INTERFERENCES. MODIFICATIONS DUE TO FIELD CONDITIONS SHALL BE COMPLETELY RESOLVED BY CONTRACTOR IN ACCORDANCE WITH RECOMMENDATIONS OF THE CONSTRUCTION MANAGER OR GENERAL CONTRACTOR.
2. COORDINATE FINAL LOCATIONS OF PLUMBING EQUIPMENT WITH ARCHITECTURAL/PLUMBING PLANS.
3. CONTRACTOR TO PROVIDE TO THE CONSTRUCTION MANAGER, GENERAL CONTRACTOR AND ALL OTHER TRADES DIMENSIONED LOCATIONS AND SIZES OF ALL REQUIRED FLOOR AND WALL OPENINGS. PROVIDE FOR INSTALLATION OF
SLEEVES AND FRAMING AS REQUIRED.
SS
SS
SSSSSS
4' IRON
FENCE
12" OAK
SS
SS
SS
SS
SS
SS
SS
SS
SS
EL=400.33
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
18" OAK
18" OAK
SS
SS
BENCHMARK
SET MAG NAIL
N=150616.67 E=1215283.53
EL=398.67
BENCHMARK
SET MAG NAIL
N=150575.01 E=1215390.40
LOD
LO
D LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
W
7TH ST
H O
O
PE
R D
R
SHUFFIELD DR
LO
C
LO
C
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LO
C
LO
C
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LO
C
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLO
C
LO
C
LO
C
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LO
C
LO
C
LO
C
LOCLOCLOC
LO
C
LO
C
LO
C
LOC LOC LOC
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LO
C
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
D
LOD
LOD
LOD
LOD
SS
SS
SS
SS
S
ONL
Y
ONL
Y ON
LY
ON
LY
LIGHT POLE
W W W W W W W W W W W W W W
W
W
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
W
W
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
W
W
W
W
BASE
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W W W W W
W W W W W W W W W W W
W
W W
W W
W W
W W
W W
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
UG/E UG/E UG/E UG/E
UG/E
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
UG/E
UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
EXISTING CURB
AND GUTTER
(TO REMAIN, TYP.)
EXISTING UTILITIES
(TO REMAIN, TYP.)
EXISTING ASPHALT PAVEMENT (TO
BE SAWCUT, REMOVE, AND
REPLACED FOR UTILITY TRENCH,
TYP.)
FISHER HOUSE FUTURE LIMITS OF CONSTRUCTION
PORTION OF SOLAR CANOPIES AND SUPPORT
COLUMNS AND FOUNDATIONS LOCATED ON THE
FISHER HOUSE PROJECT AREA SHALL BE REMOVED.
PATCH PAVEMENT FOR COLUMN/FOUNDATION
REMOVAL. ALL OTHER EXISTING IMPROVEMENTS
SHALL REMAIN AT THIS TIME.
EXISTING CURB AND GUTTER
(TO BE SAWCUT, REMOVED, AND
REPLACED, TYP.) FOR NEW CURB RAMP
EXISTING ASPHALT PAVEMENT
(TO BE SAWCUT, REMOVED, AND
REPLACED FOR UTILITY SERVICE
VAULT, TYP.)
EXISTING SIGN
(TO REMAIN)
EXISTING ASPHALT PAVEMENT AND
CURB AND GUTTER (TO BE SAWCUT,
REMOVE, AND REPLACED FOR
UTILITY TRENCH, TYP.)
EXISTING PAVEMENT STRIPING
(TO BE ERADICATED, TYP.)
PROPOSED FUTURE IMPROVEMENTS PER
VA PROJECT #598-18-106, TITLED
"CONSTRUCT MAIN ENTRANCE FOR JLM"
PORTION OF EXISTING SIDEWALK (TO BE
SAWCUT, REMOVED, AND REPLACED, TYP.)
EXISTING GAS LINE ACCORDING TO
UAMS GIS DATA. CONTRACTOR
SHALL FIELD VERIFY UTILITY LINE
APPROXIMATE LOCATION
OF 4" GAS MAIN.
FURTHER INVESTIGATION
NECESSARY TO
CONFIRM LOCATION,
OWNERSHIP AND
EXISTANCE OF SAID
MAIN
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
100% BID DOCUMENTS
JOHN L. MCCLELLAN MEMORIAL OF
CENTRAL ARKANSAS VHCS
4300 W. 7TH STREET
LITTLE ROCK, ARKANSAS 72205
LEGEND
CONCRETE TO BE REMOVED
SOLAR PANEL REMOVED
ASPHALT AND/OR CURB & GUTTER TO BE
REMOVED
EXISTING FENCE
PROPERTY LINE
EXISTING UNDERGROUND POWER
EXISTING UNDERGROUND TELEPHONE
EXISTING WATER
EXISTING SANITARY SEWER
EXISTING STORM
PROPOSED LIMITS OF DISTRUBANCE
PROPOSED LIMITS OF CONSTRUCTION
FUTURE FISHER HOUSE LIMITS OF
CONSTRUCTION
EXISTING CONTOURS
5/
/2
:1 8:
CD100
CIVIL DEMOLITION PLAN
1 10MAY 31, 2023
XXXX
KEY PLAN
GENERAL NOTES:
1) ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
INSTALLED PRIOR TO ANY WORK INCLUDING DEMOLITION.
2) REMOVE SHRUBS AND TREES AS NOTED. GRUB OUT ROOTS
AND STUMPS AND LEGALLY DISPOSE OF DEBRIS.
3) CONTRACTOR SHALL INSTALL A TEMPORARY CONSTRUCTION
FENCE AROUND THE LIMITS OF CONSTRUCTION AS NEEDED.
DEMOLITION NOTES:
1) ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY
WITH APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND
UTILITY INSTALLATION CODES.
2) ALL MATERIALS AND CONSTRUCTION METHODS SHALL BE IN
ACCORDANCE WITH VA STANDARD SPECIFICATIONS.
3) THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE
PLANS. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR
LOCATIONS SHOWN, AND IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO FIELD VERIFY THE LOCATIONS OF ALL UTILITIES
WITHIN THE LIMITS OF CONSTRUCTION AND TO NOTIFY THE COR
AND ENGINEER IN CASE OF DISCREPANCIES THAT AFFECT THE
CONSTRUCTION PROJECT.
4) THE CONTRACTOR IS RESPONSIBLE FOR NOTIFICATION OF AND
LIAISON WITH UTILITY COMPANIES IN THE PROCESS OF LOCATION
AND RELOCATION OF AND TIE-IN TO UTILITIES.
5) CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY
OCCUR TO ANY ADJACENT STRUCTURES OR PROPERTY, OR ANY
EXISTING STRUCTURES WITHIN LIMITS OF CONSTRUCTION THAT
ARE DESIGNATED ON THE PLANS TO REMAIN, AND SHALL REPAIR
OR REPLACE SUCH DAMAGED PROPERTY TO THE COR'S
SATISFACTION AT NO COST TO THE VA.
6) THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS
AND SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT OF
THE ENGINEER.
7) CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE COR
AND ALL EXISTING UTILITY PROVIDERS BEFORE REMOVING ANY/ALL
UTILITIES FROM THEIR EXISTING LOCATION ON THE SITE. THE
CONTRACTOR SHALL PERFORM ALL UTILITY DEMOLITION OR
RELOCATION ACTIVITIES IN ACCORDANCE WITH THE EXISTING
UTILITIES SPECIFICATIONS, MATERIALS, AND REQUIREMENTS.
8) CONTRACTOR TO COORDINATE WITH COR AND VA FACILITIES
MANAGER TO DETERMINE CONDITION OF ALL EXISTING UTILITIES
AND WHETHER UTILITIES ARE CURRENTLY IN SERVICE. UTILITIES
THAT ARE NOT IN SERVICE SHALL BE REMOVED OR ABANDONED IN
PLACE, AT THE DISCRETION OF THE COR.
9) THE CONTRACTOR SHALL SEQUENCE THE WORK AND PROVIDE
TEMPORARY MEASURES AS NECESSARY TO MAINTAIN ACCESS TO
THE SITE THROUGH ALL ENTRANCES AT ALL TIMES DURING
CONSTRUCTION. TEMPORARY PROVISIONS MAY INCLUDE, BUT ARE
NOT LIMITED TO: BARRICADES, FLASHING LIGHTS, FLAGMAN,
TEMPORARY PAVEMENT, AND DIRECTIONAL SIGNAGE AS
NECESSARY TO ACCOMPLISH THE WORK.
10) CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS OF
CRANES AND CONSTRUCTION EQUIPMENT OPERATIONS DURING
DEMOLITION ACTIVITY.
11) ALL BUFFERS AND SAVE AREAS SHALL BE CLEARLY IDENTIFIED
BY FLAGGING AND/OR FENCING PRIOR TO COMMENCEMENT OF
ANY LAND DISTURBANCE.
12) THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS
MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL,
STATE, AND FEDERAL LAWS.
13) ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY
DISPOSED OF, OFF SITE.
14) CONTRACTOR TO POT HOLE EXISTING WATER LINES,
UNDERGROUND ELECTRICAL LINES, GAS LINE, UNDERGROUND
TELEPHONE, FIBER OPTIC, AND ANY OTHER UTILITY LINES WITHIN
THE PROJECT AREA DURING DEMOLITION ACTIVITIES AND
COORDINATE FIELD LOCATIONS AND DEPTHS OF THESE UTILITIES
WITH ENGINEER FOR PROPOSED UTILITY CROSSINGS AND
PROPOSED PAVEMENT OVER EXISTING LINES. THESE LINES MAY
REQUIRE RELOCATION.
15) CONSTRUCTION FENCE: BEFORE CONSTRUCTION OPERATION
BEGIN, CONTRACTOR SHALL PROVIDE A CHAIN LINK
CONSTRUCTION FENCE, 6 FEET MINIMUM HEIGHT, AROUND THE
CONSTRUCTION AREA INDICATED ON SHEET G-001. PROVIDE
GATES AS REQUIRED FOR ACCESS WITH NECESSARY HARDWARE,
INCLUSING HASPS AND PADLOCKS. FASTEN FENCE FABRIC TO
TERMINAL POSTS WITH TENSION BANDS AND TO LINE POSTS AND
TOP AND BOTTOM RAILS WITH TIE WIRES SPACED AT A MAXIMUM 15
INCHES. BOTTOM OF FENCES SHALL EXTEND TO 1 INCH ABOVE
GRADE. REMOVE THE FENCE WHEN DIRECTED BY COR.
EROSION CONTROL NOTES
(SEE ALSO EROSION CONTROL PLAN)
1) EROSION CONTROL DEVICES ARE TO BE INSTALLED PRIOR TO
ANY CLEARING OR EARTHWORK OPERATIONS AND SHALL BE
MAINTAINED THROUGHOUT CONSTRUCTION AND UNTIL
PERMANENT GROUND COVER IS ESTABLISHED IN ALL DISTURBED
AREAS.
2) THE CONTRACTOR SHALL PROVIDE DUST CONTROL AND SHALL
PROTECT ADJACENT PAVEMENTS FROM SOIL ACCUMULATION
DURING CONSTRUCTION.
3) ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED
BY THE ENGINEER OR OTHER INSPECTORS AS DETERMINED BY
FIELD CONDITIONS.
4) STORM DRAINAGE STRUCTURES AND CONDUITS SHALL BE
PROTECTED FROM SEDIMENTATION AS REQUIRED BY STATE OR
LOCAL CODES.
UG/E UG/E
UG/T UG/T
W W
SS SS
LOD LOD
(SHEET CD101. DETAIL 1) MATCHLINE:(SHEET CD101. DETAIL 1) MATCHLINE:
(S H
EE
T
C D
1.
D
ET
AI
L
2) M
AT
C
H
LI
N E:
(S H
EE
T
C D
1.
D
ET
AI
L
2) M
AT
C
H
LI
N E:
1" = 20'
SCALE IN FEET
20 10 20 40 before you dig belowKnow what's
Call
R
SS
SS
SS
W W
W
GAS
LOC LOC
EXISTING SOLAR PANEL CANOPY AND
SUPPORT (REFERENCE PHOTOS)
EXISTING SOLAR CANOPY DETAIL (FOR REFERENCE ONLY)
NOT TO SCALE
WALL
VAULT
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
6" CONCRETE
AT&T
ELECTRIC
BOX
UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T
W 7T
H
ST
W 7T
H
ST
COTTAGE
DR
OHP
OHP OHP OHP OHP OHP OHP OHP OHP
ONL
Y
ONL
Y ON
LY
ON
LY
EXIT
EXI
T
EXIT
ONLY
ONLY
CROSSTIE
WALL
LOD
LIGHT POLE
BASE
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
36" WATERLINE
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
BASE
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
W
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD
LO
D
LODLOD
LOD
EXISTING CURB AND GUTTER
(TO BE SAWCUT, REMOVED,
AND REPLACED, TYP.)
EXISTING ASPHALT PAVEMENT (TO BE
SAWCUT, REMOVED, AND REPLACED
FOR UTILITY PULL BOX (TYP.)
EXISTING FENCE
(TO REMAIN, TYP.)
EXISTING
RETAINING WALL
(TO REMAIN, TYP.)
PROPOSED FUTURE
IMPROVEMENTS (BY OTHERS)
PORTION OF EXISTING SIDEWALK (TO BE
SAWCUT, REMOVED, AND REPLACED, TYP.)
EXISTING ASPHALT PAVEMENT (TO
BE SAWCUT, REMOVE, AND
REPLACED FOR UTILITY ( TYP.)
SS
SS
SS
SS
SS
SSSSSS
SSSS
SS
SSSSSS
SS
SSSSSS
SS
SS
SS
SS
SSSS
SS
SS
SSSS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS SS SS SSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLOD
SHUFFIELD DR
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
W
W
W
W
W
W
W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
UG/E UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG
/E
UG
/E
UG
/E
WWWWWWWWWWWWWWW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
W
W
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
W
W
W
W
W
W
W W W W W W W
W
GAS GAS GAS GAS GAS GAS GAS GAS
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
EXISTING ASPHALT PAVEMENT (TO
BE SAWCUT, REMOVE, AND
REPLACED FOR UTILITY TRENCH,
TYP.)
EXISTING CONCRETE
PAVEMENT (TO BE SAWCUT,
REMOVE, AND REPLACED
FOR UTILITY TRENCH, TYP.)
EXISTING LIGHT POLE
(TO REMAIN)
EXISTING CURB AND GUTTER
(TO BE SAWCUT, REMOVED,
AND REPLACED, TYP.)
EXISTING SIDEWALK
(TO BE SAWCUT, REMOVED,
AND REPLACED)
EXISTING ASPHALT PAVEMENT (TO
BE SAWCUT, REMOVE, AND
REPLACED FOR UTILITY TRENCH,
TYP.)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
100% BID DOCUMENTS
JOHN L. MCCLELLAN MEMORIAL OF
CENTRAL ARKANSAS VHCS
4300 W. 7TH STREET
LITTLE ROCK, ARKANSAS 72205
1" = 20'
SCALE IN FEET
20 10 20 40 before you dig belowKnow what's
Call
R
KEY PLAN
GENERAL NOTES:
1) ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
INSTALLED PRIOR TO ANY WORK INCLUDING DEMOLITION.
2) REMOVE SHRUBS AND TREES AS NOTED. GRUB OUT ROOTS
AND STUMPS AND LEGALLY DISPOSE OF DEBRIS.
3) CONTRACTOR SHALL INSTALL A TEMPORARY CONSTRUCTION
FENCE AROUND THE LIMITS OF CONSTRUCTION AS NEEDED.
DEMOLITION NOTES:
1) ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY
WITH APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND
UTILITY INSTALLATION CODES.
2) ALL MATERIALS AND CONSTRUCTION METHODS SHALL BE IN
ACCORDANCE WITH VA STANDARD SPECIFICATIONS.
3) THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE
PLANS. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR
LOCATIONS SHOWN, AND IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO FIELD VERIFY THE LOCATIONS OF ALL UTILITIES
WITHIN THE LIMITS OF CONSTRUCTION AND TO NOTIFY THE COR
AND ENGINEER IN CASE OF DISCREPANCIES THAT AFFECT THE
CONSTRUCTION PROJECT.
4) THE CONTRACTOR IS RESPONSIBLE FOR NOTIFICATION OF AND
LIAISON WITH UTILITY COMPANIES IN THE PROCESS OF LOCATION
AND RELOCATION OF AND TIE-IN TO UTILITIES.
5) CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY
OCCUR TO ANY ADJACENT STRUCTURES OR PROPERTY, OR ANY
EXISTING STRUCTURES WITHIN LIMITS OF CONSTRUCTION THAT
ARE DESIGNATED ON THE PLANS TO REMAIN, AND SHALL REPAIR
OR REPLACE SUCH DAMAGED PROPERTY TO THE COR'S
SATISFACTION AT NO COST TO THE VA.
6) THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS
AND SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT OF
THE ENGINEER.
7) CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE COR
AND ALL EXISTING UTILITY PROVIDERS BEFORE REMOVING ANY/ALL
UTILITIES FROM THEIR EXISTING LOCATION ON THE SITE. THE
CONTRACTOR SHALL PERFORM ALL UTILITY DEMOLITION OR
RELOCATION ACTIVITIES IN ACCORDANCE WITH THE EXISTING
UTILITIES SPECIFICATIONS, MATERIALS, AND REQUIREMENTS.
8) CONTRACTOR TO COORDINATE WITH COR AND VA FACILITIES
MANAGER TO DETERMINE CONDITION OF ALL EXISTING UTILITIES
AND WHETHER UTILITIES ARE CURRENTLY IN SERVICE. UTILITIES
THAT ARE NOT IN SERVICE SHALL BE REMOVED OR ABANDONED IN
PLACE, AT THE DISCRETION OF THE COR.
9) THE CONTRACTOR SHALL SEQUENCE THE WORK AND PROVIDE
TEMPORARY MEASURES AS NECESSARY TO MAINTAIN ACCESS TO
THE SITE THROUGH ALL ENTRANCES AT ALL TIMES DURING
CONSTRUCTION. TEMPORARY PROVISIONS MAY INCLUDE, BUT ARE
NOT LIMITED TO: BARRICADES, FLASHING LIGHTS, FLAGMAN,
TEMPORARY PAVEMENT, AND DIRECTIONAL SIGNAGE AS
NECESSARY TO ACCOMPLISH THE WORK.
10) CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS OF
CRANES AND CONSTRUCTION EQUIPMENT OPERATIONS DURING
DEMOLITION ACTIVITY.
11) ALL BUFFERS AND SAVE AREAS SHALL BE CLEARLY IDENTIFIED
BY FLAGGING AND/OR FENCING PRIOR TO COMMENCEMENT OF
ANY LAND DISTURBANCE.
12) THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS
MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL,
STATE, AND FEDERAL LAWS.
13) ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY
DISPOSED OF, OFF SITE.
14) CONTRACTOR TO POT HOLE EXISTING WATER LINES,
UNDERGROUND ELECTRICAL LINES, GAS LINE, UNDERGROUND
TELEPHONE, FIBER OPTIC, AND ANY OTHER UTILITY LINES WITHIN
THE PROJECT AREA DURING DEMOLITION ACTIVITIES AND
COORDINATE FIELD LOCATIONS AND DEPTHS OF THESE UTILITIES
WITH ENGINEER FOR PROPOSED UTILITY CROSSINGS AND
PROPOSED PAVEMENT OVER EXISTING LINES. THESE LINES MAY
REQUIRE RELOCATION.
15) CONSTRUCTION FENCE: BEFORE CONSTRUCTION OPERATION
BEGIN, CONTRACTOR SHALL PROVIDE A CHAIN LINK
CONSTRUCTION FENCE, 7 FEET MINIMUM HEIGHT, AROUND THE
CONSTRUCTION AREA INDICATED ON SHEET G-101. PROVIDE
GATES AS REQUIRED FOR ACCESS WITH NECESSARY HARDWARE,
INCLUSING HASPS AND PADLOCKS. FASTEN FENCE FABRIC TO
TERMINAL POSTS WITH TENSION BANDS AND TO LINE POSTS AND
TOP AND BOTTOM RAILS WITH TIE WIRES SPACED AT A MAXIMUM 15
INCHES. BOTTOM OF FENCES SHALL EXTEND TO 1 INCH ABOVE
GRADE. REMOVE THE FENCE WHEN DIRECTED BY COR.
EROSION CONTROL NOTES
(SEE ALSO EROSION CONTROL PLAN)
1) EROSION CONTROL DEVICES ARE TO BE INSTALLED PRIOR TO
ANY CLEARING OR EARTHWORK OPERATIONS AND SHALL BE
MAINTAINED THROUGHOUT CONSTRUCTION AND UNTIL
PERMANENT GROUND COVER IS ESTABLISHED IN ALL DISTURBED
AREAS.
2) THE CONTRACTOR SHALL PROVIDE DUST CONTROL AND SHALL
PROTECT ADJACENT PAVEMENTS FROM SOIL ACCUMULATION
DURING CONSTRUCTION.
3) ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED
BY THE ENGINEER OR OTHER INSPECTORS AS DETERMINED BY
FIELD CONDITIONS.
4) STORM DRAINAGE STRUCTURES AND CONDUITS SHALL BE
PROTECTED FROM SEDIMENTATION AS REQUIRED BY STATE OR
LOCAL CODES.
(SHEET CD100) MATCHLINE:(SHEET CD100) MATCHLINE:
5/
/2
:1 8:
CD101
CIVIL DEMOLITION PLAN
2 10MAY 31, 2023
(S H
EE
T
C D
0)
M
AT
C H
LI
N
E:
(S
H
EE
T C
D
0) M
AT
C
H
LI
N E:
UNDER GROUND POWER DEMOLITION
SCALE: 1" = 20'CD101
UNDERGROUND TELECOMMUNICATION DEMOLITION
SCALE: 1" = 20'CD101
SS
SS
SS
W W
W
GAS
LEGEND
CONCRETE TO BE REMOVED
SOLAR PANEL REMOVED
ASPHALT AND/OR CURB & GUTTER TO BE
REMOVED
EXISTING FENCE
PROPERTY LINE
EXISTING UNDERGROUND POWER
EXISTING UNDERGROUND TELEPHONE
EXISTING WATER
EXISTING SANITARY SEWER
EXISTING STORM
PROPOSED LIMITS OF DISTRUBANCE
PROPOSED LIMITS OF CONSTRUCTION
FUTURE FISHER HOUSE LIMITS OF
CONSTRUCTION
EXISTING CONTOURSXXXX
UG/E UG/E
UG/T UG/T
W W
SS SS
LOD LOD
LOC LOC
4' IRON
FENCE
NO
RT
H
°4 5'4
2" E
AS
T
5.
SOUTH 87°47'17" EAST 472.61'
NORTH 48°33'52" WEST 153.42'
NORTH 02°16'33" EAST
67.15'
NORTH 57°51'00" WEST 241.11'
LOC
LO
C LOC
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
F.E.C
F.E.C
F.E.C
F.E.C
TELE/ DATA/
CAB TV
EQUIP.
FH
TRANSFORMER
CONC. PAD
FH TRASH
AREA
VA GENERATOR
FUTURE
EX
IT
EN
T
FHCP
FHCP
FHCP
FHCP
FHCP
FHCP
FHCP
FHCP
W
7TH ST
H O
O
PE
R D
R
SHUFFIELD DR
LO
C
LO
C
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LO
C
LO
C
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LO
C
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLO
C
LO
C
LO
C
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LO
C
LO
C
LO
C
LOCLOCLOC
LO
C
LO
C
LO
C
LOC LOC LOC
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LO
C
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LOC
LOC
LOC
LOC
SS
SS
SS
SS
S
ONL
Y
ONL
Y ON
LY
ON
LY
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
PROPOSED ACCESSIBLE CURB
RAMP WITH CURB RETURNS
(TYP.)
PROPOSED CONCRETE
SIDEWALK (TYP.)
PROPOSED UTILITY
TRENCH PAVEMENT
PATCH AND CURB AND
GUTTER (TYP.)
PROPOSED UTILITY
TRENCH PAVEMENT
PATCH
FUTURE FISHER HOUSE
IMPROVEMENTS (BY OTHERS)
PROPOSED PAVEMENT SEAL
COAT AND RE-STRIPE (TYP.)
PROPOSED CURB AND GUTTER TO BE
INSTALLED BY FISHER HOUSE CONTRACTOR
AT TIME OF FISHER HOUSE CONSTRUCTION
FISHER HOUSE FUTURE
LIMITS OF CONSTRUCTION
PROPOSED TYPE B BOLLARDS
APPROXIMATE LOCATION OF FUTURE MAIN
ENTRANCE IMPROVEMENTS BY OTHERS.
SHOWN FOR REFERENCE ONLY.
PROPOSED UTILITY
TRENCH PAVEMENT PATCH
PROPOSED 5'X5'
MINIMUM FLAT LANDING
AT BOTTOM OF THE
CURB RAMPS (TYP.)
5'
6.5' RAMP
TC
BC
400.89 400.39
TC
BC
400.43 400.43
TC
BC
400.90 400.40
TC
BC
401.00 400.50
TC
BC
400.97 400.97
400.53
399.88
399.15
399.22
399.95
400.60
TC
BC
397.93 397.93
TC
BC
398.27 397.77
TC
BC
398.34 397.84
TC
BC
398.36
397.86 TC
BC
398.36 398.36
TC
BC
398.34 398.34
TC
BC
398.82 398.32
TC
BC
398.89 398.89
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
100% BID DOCUMENTS
JOHN L. MCCLELLAN MEMORIAL OF
CENTRAL ARKANSAS VHCS
4300 W. 7TH STREET
LITTLE ROCK, ARKANSAS 72205
GENERAL NOTES:
1) ALL PROPOSED DIMENSIONS USED TO SHOW THE GEOMETRIC
LAYOUT OF THE PROPOSED PARKING LOT AND DRIVES ARE SHOWN
AT THE FACE OF CURB. ALL PROPOSED DIMENSIONS USED TO SHOW
THE GEOMETRIC LAYOUT OF THE PROPOSED BUILDING LOCATION
ARE GIVEN AT THE OUTSIDE FACE OF THE BUILDING CORNERS. ALL
CURB RADII ARE GIVEN AT THE FACE OF CURB.
2) CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES
BETWEEN THE EXISTING CONDITIONS IN THE FIELD AND THE SURVEY
SHOWN ON THE PLANS BEFORE PROCEEDING WITH ANY NEW
CONSTRUCTION.
3) CONTRACTOR IS RESPONSIBLE FOR CORRECT HORIZONTAL AND
VERTICAL ALIGNMENT OF ALL TIES BETWEEN PROPOSED AND
EXISTING PAVEMENTS, CURB AND GUTTER, SIDEWALKS, WALLS, AND
UTILITIES.
SITE NOTES:
1) ALL BUFFERS, TREE SAVE AREAS, AND UNDISTURBED AREAS
SHALL BE CLEARLY IDENTIFIED BY FLAGGING AND/OR FENCING PRIOR
TO COMMENCEMENT OF ANY LAND DISTURBANCE.
2) NO OUTSIDE STORAGE IS PROPOSED. THIS INCLUDES SUPPLIES,
VEHICLE, EQUIPMENT, PRODUCTS, ETC.
3) ALL EROSION, SEDIMENT CONTROL AND TREE PROTECTION
MEASURES SHALL BE INSTALLED PRIOR TO ANY GRADING.
4) MAXIMUM CUT OR FILL SLOPE=2H:IV
5) 24 HOUR CONTACT: SHANE YARBROUGH, P.E., (334) 887-6064
6) IN ALL AREAS OF FILL OR OTHERWISE DISTURBANCE OF EXISTING
CONDITIONS, UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL
FULLY AND COMPLETELY REMOVE AND LEGALLY DISPOSE OFF-SITE,
ALL PLANT MATERIALS INCLUDING BUT NOT LIMITED TO ROOT
SYSTEMS, CONCRETE, REINFORCED CONCRETE, ASPHALT DEBRIS,
UNDERBRUSH, TOPSOIL, AND OTHER DELETERIOUS MATERIAL. THE
SUBGRADE TO REMAIN SHALL BE COMPACTED TO 98% STANDARD
PROCTOR MAXIMUM DRY DENSITY FOLLOWING FULL REMOVAL OF
THESE MATERIALS.
7) CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION AND
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROLS DURING
CONSTRUCTION FOR PROTECTION OF ADJACENT ROADWAYS.
LEGEND
STANDARD DUTY ASPHALT PAVING
SEAL COAT
CONCRETE SIDEWALK PAVING
STANDARD DUTY CONCRETE PAVING
FUTURE BUILDING LINE
PROPERTY LINE
FUTURE FISHER HOUSE LIMITS OF
CONSTRUCTION
PROPOSED LIMITS OF CONSTRUCTION
PARKING COUNT
TRAFFIC SIGN
5/
/2
:1 9:
CS100
CIVIL SITE, PAVING, AND GRADING PLAN
3 10MAY 31, 2023
KEY PLAN
(SHEET CS101. DETAIL 1) MATCHLINE:(SHEET CS101. DETAIL 1) MATCHLINE:
(S H
EE
T
C S1
. D
ET
AI
L 2)
M
AT
C H
LI
N
E:
(S
H
EE
T C
S1
. D
ET
AI
L
2) M
AT
C
H
LI
N E:
1" = 20'
SCALE IN FEET
20 10 20 40 before you dig belowKnow what's
Call
R
SS
SS
SS
W W
W
GAS
LOC LOC
6" CONCRETE
N O
R
TH
1°
'1
1" E
A S
T
5.
W 7T
H
ST
W 7T
H
ST
COTTAGE
DR
OHP
OHP OHP OHP OHP OHP OHP OHP OHP
ONL
Y
ONL
Y ON
LY
ON
LY
EXIT
EXI
T
EXIT
ONLY
ONLY
CROSSTIE
WALL
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC LOC
LO
C
LOCLOC
LOC
PROPOSED UTILITY
PAVEMENT PATCH
SURROUNDING PULL
BOX (TYP.)
EXISTING FENCE
(TO REMAIN, TYP.)
PROPOSED UTILITY
PAVEMENT PATCH AND NEW
CURB AND GUTTER TO
MATCH EXISTING (TYP.)
APPROXIMATE LOCATION OF
FUTURE MAIN ENTRANCE
IMPROVEMENTS BY OTHERS.
SHOWN FOR REFERENCE ONLY
PROPOSED 5'X5'
MINIMUM FLAT LANDING
AT BOTTOM OF THE
CURB RAMPS (TYP.)
399.88
399.15
399.22
399.95
TC
BC
397.93 397.93
TC
BC
398.27 397.77
TC
BC
398.34 397.84
TC
BC
398.36
397.86 TC
BC
398.36 398.36
TC
BC
398.34 398.34
TC
BC
398.82 398.32
TC
BC
398.89 398.89
0 SOUTH 02°38'39" WEST
47.00'
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC LOCLOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOCLOC
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
SHUFFIELD DR
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
PROPOSED UTILITY
TRENCH PAVEMENT
PATCH (TYP.)
PROPOSED CURB AND
GUTTER (TO MATCH
EXISTING, TYP.)
PROPOSED CONCRETE
SIDEWALK (TO MATCH
EXISTING, TYP.)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
100% BID DOCUMENTS
JOHN L. MCCLELLAN MEMORIAL OF
CENTRAL ARKANSAS VHCS
4300 W. 7TH STREET
LITTLE ROCK, ARKANSAS 72205
GENERAL NOTES:
1) ALL PROPOSED DIMENSIONS USED TO SHOW THE GEOMETRIC
LAYOUT OF THE PROPOSED PARKING LOT AND DRIVES ARE SHOWN
AT THE FACE OF CURB. ALL PROPOSED DIMENSIONS USED TO SHOW
THE GEOMETRIC LAYOUT OF THE PROPOSED BUILDING LOCATION
ARE GIVEN AT THE OUTSIDE FACE OF THE BUILDING CORNERS. ALL
CURB RADII ARE GIVEN AT THE FACE OF CURB.
2) CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES
BETWEEN THE EXISTING CONDITIONS IN THE FIELD AND THE SURVEY
SHOWN ON THE PLANS BEFORE PROCEEDING WITH ANY NEW
CONSTRUCTION.
3) CONTRACTOR IS RESPONSIBLE FOR CORRECT HORIZONTAL AND
VERTICAL ALIGNMENT OF ALL TIES BETWEEN PROPOSED AND
EXISTING PAVEMENTS, CURB AND GUTTER, SIDEWALKS, WALLS, AND
UTILITIES.
SITE NOTES:
1) SEE ARCHITECTURAL PLANS FOR BUILDING FLOOR PLAN
DIMENSIONS, DOOR LOCATIONS, SITE LIGHTING PLAN, AND OTHER
ARCHITECTURAL DETAILS.
2) ALL BUFFERS, TREE SAVE AREAS, AND UNDISTURBED AREAS
SHALL BE CLEARLY IDENTIFIED BY FLAGGING AND/OR FENCING PRIOR
TO COMMENCEMENT OF ANY LAND DISTURBANCE.
3) NO OUTSIDE STORAGE IS PROPOSED. THIS INCLUDES SUPPLIES,
VEHICLE, EQUIPMENT, PRODUCTS, ETC.
4) ALL EROSION, SEDIMENT CONTROL AND TREE PROTECTION
MEASURES SHALL BE INSTALLED PRIOR TO ANY GRADING.
5) MAXIMUM CUT OR FILL SLOPE=2H:IV
6) 24 HOUR CONTACT: SHANE YARBROUGH, P.E., (334) 887-6064
7) IN ALL AREAS OF FILL OR OTHERWISE DISTURBANCE OF EXISTING
CONDITIONS, UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL
FULLY AND COMPLETELY REMOVE AND LEGALLY DISPOSE OFF-SITE,
ALL PLANT MATERIALS INCLUDING BUT NOT LIMITED TO ROOT
SYSTEMS, CONCRETE, REINFORCED CONCRETE, ASPHALT DEBRIS,
UNDERBRUSH, TOPSOIL, AND OTHER DELETERIOUS MATERIAL. THE
SUBGRADE TO REMAIN SHALL BE COMPACTED TO 98% STANDARD
PROCTOR MAXIMUM DRY DENSITY FOLLOWING FULL REMOVAL OF
THESE MATERIALS.
8) ALL SUBGRADE PREP AND AREAS OF THE SITE TO RECEIVE FILL
SHALL BE COMPLETED IN STRICT CONFORMANCE WITH THE
RECOMMENDATIONS IN THE REPORT BY TERRACON CONSULTANTS,
INC. DATED MARCH 16, 2020. THE CONTRACTOR SHALL HAVE THIS
REPORT ON THE JOB SITE FOR REFERENCE AT ALL TIMES. THE
CONTRACTOR SHALL PROVIDE EARTHWORK OPERATIONS AND
CONSTRUCTION PHASE MONITORING TO ENSURE THAT ALL
COMPACTION IS COMPLETED IN ACCORDANCE WITH THE
GEOTECHNICAL REPORT. THE CONTRACTOR SHALL PROVIDE TESTING
REPORTS TO THE COR REGARDING COMPACTION TESTING PER THE
TESTING PROTOCOL IN THE GEOTECHNICAL REPORT.
9) CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION AND
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROLS DURING
CONSTRUCTION FOR PROTECTION OF ADJACENT ROADWAYS.
LEGEND
STANDARD DUTY ASPHALT PAVING
CONCRETE SIDEWALK PAVING
STANDARD DUTY CONCRETE PAVING
FUTURE BUILDING LINE
PROPERTY LINE
PARKING COUNT
TRAFFIC SIGN
5/
/2
:1 9:
CS101
CIVIL SITE, PAVING, AND GRADING PLAN
4 10MAY 31, 2023
1" = 20'
SCALE IN FEET
20 10 20 40 before you dig belowKnow what's
Call
R
(S H
EE
T
C S1
) M
AT
C
H
LI
N E:
(S H
EE
T
C S1
) M
AT
C
H
LI
N E:
UNDER GROUND POWER SITE AND PAVING PLAN
SCALE: 1" = 20'CS101
UNDERGROUND TELECOMMUNICATION SITE AND PAVING PLAN
SCALE: 1" = 20'CS101
(SHEET CS100) MATCHLINE:(SHEET CS100) MATCHLINE:
SS
SS
SS
W W
W
NORTH 88°44'26" WEST 855.44'
5' CHAINLINK
FENCE
W 7TH ST
W 7T
H
ST
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
OHP OHP OHP OHP OHP OHP OHP OHP
CROSSTIE
WALL
LOC LOC
LO
C
LOCLOC
LOC
100'
100'
50' 100' 100'
FLAG MAN WITH STOP SIGN
FLAG MAN WITH STOP SIGN
INSTALL "ONE LANE ROAD
AHEAD" SIGN
INSTALL "ROAD WORK
AHEAD" SIGN
INSTALL "ROAD WORK
AHEAD" SIGN
INSTALL "ONE LANE ROAD
AHEAD" SIGN
50'
PROPOSED
AREA OF WORK
NO
RT
H
°4 5'4
2" E
AS
T
5.
SOUTH 87°47'17" EAST 472.61'
EX
IT
EN
T
H O
O
PE
R D
R
SHUFFIELD DR
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LO
C
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LOC
LOC
LOC
LOC
50'
100'
100'
FLAG MAN WITH STOP SIGN
INSTALL "ONE LANE ROAD
AHEAD" SIGN
INSTALL "ROAD WORK
AHEAD" SIGN
50'
FLAG MAN WITH STOP SIGN10
0'
INSTALL "ONE LANE ROAD
AHEAD" SIGN
PROPOSED
AREA OF WORK
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
100% BID DOCUMENTS
JOHN L. MCCLELLAN MEMORIAL OF
CENTRAL ARKANSAS VHCS
4300 W. 7TH STREET
LITTLE ROCK, ARKANSAS 72205
GENERAL NOTES:
1) CONTRACTOR IS REQUIRED TO MAINTAIN A MINIMUM OF ONE
LANE OF TRAVEL THROUGH THE REOADWAYS FOR THE DURATION OF
THE WORK.
2) CONTRACTOR SHALL UTILIZE STEEL PLATES AS NECCESARY TO
MAINTAIN TRAFFIC FLOW UNTIL ASPHALT OR CONCRETE SURFACES
ARE REPAIRED.
3) CONTRACTOR IS REQUIRED TO COORDINATE ROADWAY
SHUTDOWN AND TRAFFIC CONTROL PLAN WITH THE VA A MINIMUM OF
ONE (1) WEEK PRIOR TO THE EXPECTED SHUTDOWN.
4) CONTRACTOR SHALL UTILIZE THIS TRAFFIC CONTROL SETUP
DURING PERIODS OF OFF-PEAK TRAFFIC VOLUMES. THE
CONTRACTOR SHALL OBSERVE ALL LANE CLOSURE PROHIBITION
RESTRICTIONS.
5) ALL FLAGING OPERATIONS SHALL COMPLY WITH ALL LANE
CLOSURE PROHIBITION RESTRICTIONS. INSTALL AND MAINTAIN ALL
FLAGGING OPERATIONS IN ACCORDANCE WITH THE REQUIREMENTS
OF THE ARDOT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
AND AS DIRECTED BY VA AND ENGINEER.
6) THIS PLAN DOES NOT COMPLETELY ADDRESS TRAFFIC CONTROL
REQUIREMENTS. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL
PLANS PER EACH INCIDENT WHERE TRAFFIC WILL BE INTERUPTED.
THESE PLANS WILL BE SUBMITTED FIVE (5) DAYS IN ADVANCE OF
PLANNED WORK.
LEGEND
PROPOSED AREA OF WORK
PROPOSED ROAD WORK SIGN
PROPOSED FLAG GUY
5/
/2
:2 0:
CS102
TRAFFIC CONTROL PLAN
5 10MAY 31, 2023
1" = 20'
SCALE IN FEET
20 10 20 40 before you dig belowKnow what's
Call
R
SS
SS
SS
W W
SS
SSSSSS
4' IRON
FENCE
SS
SS
SSMH
INV.=390.28
SS
SS
SS
SS
SS
SS
SS
6" C
LAY
SSMH
TOP=400.25
INV.=387.75
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSTOP=398.60
12" CLAY
12" CLAY
UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C
WM
F.E.C
F.E.C
F.E.C
F.E.C
TELE/ DATA/
CAB TV
EQUIP.
FH
TRANSFORMER
CONC. PAD
FH TRASH
AREA
VA GENERATOR
FUTURE
EX
IT
EN
T
FHCP
FHCP
FHCP
FHCP
FHCP
FHCP
FHCP
FHCP
FW
W
6"
DC
BA
W
WM
W
W
7TH ST
H O
O
PE
R D
R
SHUFFIELD DR
GA
S
GA
S
W
BF
P
BF
P
SS
SS
SS
S
ONL
Y
ONL
Y ON
LY
ON
LY
LIGHT POLE
W W W W W W W W W W W W WW
W
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
W
W
BASE
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W W W W W
W W W W W W W W W W W
W W
W W
W W
W W
W W
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
UG/E UG/E UG/E UG/E
UG/E
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .