Site Map for Garage PV Palletts.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25624R0045
About this file
This document is a site map for a proposed garage photovoltaic (PV) pallet project at the John L. McClellan Memorial Veterans Hospital in Little Rock, Arkansas. The related federal contract opportunity is Solicitation Number 36C25624R0045 for the "Fisher House Utilities Site Prep" project (598-22-102).
The site map provides an overview of the proposed site layout, including the locations of fencing, utilities, lighting, parking, and other infrastructure. Key details include the total site area of approximately ### acres, with a total disturbed area of ### acres. The soil type is TFB Tifton Loamy Sand. The document also includes erosion control notes outlining requirements for stabilizing exposed areas, maintaining erosion control measures, and responsibilities for the contractor. Overall, this site map provides the necessary details to understand the physical layout and site preparation work required for the PV pallet installation project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 598-22-102 - PRE-BID RFIs COMPLETE.docx | DOCX document | |
| 36C25624R0045 0001.docx | DOCX document | |
| 2024-04-02 Sign in for Site Visit.pdf | ||
| 598-22-102 Statement of Work.pdf | ||
| 36C25624R0045 - SOLICITATION.docx | DOCX document | |
| 598-22-102 Construction DWGS.pdf | ||
| 598-22-102 Site Visit Map JLM Parking and Meeting.pdf | ||
| EXHIBIT B CONTRACTOR EVALUATION FORM.docx | DOCX document | |
| 598-22-102 Fisher House Utilities Site Prep Project Specifications.pdf | ||
| AR DOL WD AR2024032 eff 010524.pdf | ||
| EXHIBIT A PERFORMANCE RELEVANCY SURVEY - FH.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WALL
VAULT
4' IRON
FENCE
UG/T
UG/T
UG/T
UG/T
UG/T
SS
SS
EL=400.33
6" CONCRETE
AT&T
ELECTRIC
BOX
5' CHAINLINK
FENCE
SS
SS
SS
SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS SS SS SS SS
UG/T UG/T UG/T UG/T UG/T
UG/T UG/T
BENCHMARK
SET MAG NAIL
N=150616.67 E=1215283.53
EL=398.67
BENCHMARK
SET MAG NAIL
N=150575.01 E=1215390.40
INTERSTATE 630
UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
WM
LO
D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
F.E.C
F.E.C
F.E.C
F.E.C
TELE/ DATA/
CAB TV
EQUIP.
FH
TRANSFORMER
CONC. PAD
FH TRASH
AREA
VA GENERATOR
FUTURE
EX
IT
EN
T
FHCP
FHCP
FHCP
FHCP
FHCP
FHCP
FHCP
FHCP
6"
DC
BA
WM
W 7TH ST
W 7T
H
ST
W 7T
H
ST
W
7TH ST
COTTAGE
DR
H O
O
PE
R D
R
SHUFFIELD DR
SHUFFIELD DR
GA
S
BF
P
BF
P
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LO
C
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LO
C
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LO
C
LOC
LO
C
LO
C
LOC
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
D LOD
LOD
SS
SS
SS
SS
SS
SS
SS
SS
SS
OHP OHP OHP OHP OHP OHP OHP
OHP OHP OHP OHP
ONL
Y
ONL
Y ON
LY
ON
LY
EXIT
EXI
T
EXIT
EXIT
ONLY
ONLY
CROSSTIE
WALL
LIGHT POLE
LIGHT POLE
BASE
W
W
W W W W W W W W W W W W
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG
/E
UG
/E
UG/E
UG/E
UG
/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E UG/E
UG/E
UG
/E
W W W
WWWWWW
W
W
W
W
W
UG/E
UG/E
UG
/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E
W UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
W
W
W
W
W
36" WATERLINEUG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
BASE
W
W
W
W W W W W
W W W
W
W
W
UG/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
W
W
W
W
W
W
W
UG/E
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
UG
/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG
/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
GAS
GAS
GAS
GAS
GAS
GAS
GA
S
GA
S
GA
S
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
LO
D
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
LOD
LODLOD
PROPOSED INLET PROTECTION
(TYP.)
PROPOSED INLET PROTECTION
(TYP.)
SOD LIMITS OF DISTURBANCE
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
100% BID DOCUMENTS
JOHN L. MCCLELLAN MEMORIAL OF
CENTRAL ARKANSAS VHCS
4300 W. 7TH STREET
LITTLE ROCK, ARKANSAS 72205
SITE DATA
TOTAL SITE AREA = ##### AC.
TOTAL DISTURBED AREA = ### AC.
5/
/2
:2 3:
P
M
CG100
ZLRNSY
EROSION CONTROL PLAN
8 10MAY 31, 2023
FISHER HOUSE SITE
PREPERATION-UTILITIES
598-22-102
22-130
SOIL TYPE
TFB TIFTON LOAMY SAND 2 TO 5 PERCENT
SLOPES
EROSION NOTES:
1. THE INSTALLATION OF EROSION CONTROL MEASURES AND
PRACTICES SHALL TAKE PLACE PRIOR TO OR CONCURRENT
WITH ALL LAND DISTURBING ACTIVITIES THROUGHOUT THE
ENTIRE PROJECT.
2. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR
TEMPORARY SEEDING.
3. EROSION AND SEDIMENT CONTROL MEASURES WILL BE
MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE
APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION
CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT
THE SEDIMENT SOURCE.
4. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE
PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT
CONTROL MEASURES AND PRACTICES PRIOR TO LAND
DISTURBING ACTIVITIES.
5. THE CONTRACTOR SHALL REMOVE ACCUMULATED SILT
WHEN THE ACCUMULATED SILT IS ONE-THIRD (1/3) FULL FOR ALL
EROSION & SEDIMENT CONTROL STRUCTURES.
6. MAINTENANCE OF ALL SOIL EROSION AND SEDIMENTATION
CONTROL MEASURES AND PRACTICES, WHETHER TEMPORARY
OR PERMANENT, SHALL BE AT ALL TIMES THE RESPONSIBILITY
OF THE CONTRACTOR.
7. THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC
PLAN IS TO INSPECT THE INSTALLATION OF THE INITIAL
SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL
BMPS WITHIN 7 DAYS AFTER INSTALLATION.
8. AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE
A SIGNIFICANT EFFECT ON BMPS WITH A HYDRAULIC
COMPONENT MUST BE CERTIFIED BY THE DESIGN
PROFESSIONAL.
9. WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS
OF THE STATE, EXCEPT AS AUTHORIZED BY A SECTION 404
PERMIT.
1" = 40'
SCALE IN FEET
40 20 40 80 before you dig belowKnow what's
Call
R
SS
SS
SS
W W
W
GAS
VHALITGreenE Polygon
VHALITGreenE Typewritten Text Parking Garage - Enter off of Jack Stephens. Use small truck/fork lift to transfer from entry of garage to storage area.
VHALITGreenE Line
VHALITGreenE Typewritten Text Jack Stepphens Drive
File details come from the government source that posted it. Updated .