This document is a site map for a proposed garage photovoltaic (PV) pallet project at the John L. McClellan Memorial Veterans Hospital in Little Rock, Arkansas. The related federal contract opportunity is Solicitation Number 36C25624R0045 for the "Fisher House Utilities Site Prep" project (598-22-102).

The site map provides an overview of the proposed site layout, including the locations of fencing, utilities, lighting, parking, and other infrastructure. Key details include the total site area of approximately ### acres, with a total disturbed area of ### acres. The soil type is TFB Tifton Loamy Sand. The document also includes erosion control notes outlining requirements for stabilizing exposed areas, maintaining erosion control measures, and responsibilities for the contractor. Overall, this site map provides the necessary details to understand the physical layout and site preparation work required for the PV pallet installation project.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WALL

VAULT

4' IRON

FENCE

UG/T

UG/T

UG/T

UG/T

UG/T

SS

SS

EL=400.33

6" CONCRETE

AT&T

ELECTRIC

BOX

5' CHAINLINK

FENCE

SS

SS

SS

SS SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS SS SS SS SS SS SS

UG/T UG/T UG/T UG/T UG/T

UG/T UG/T

BENCHMARK

SET MAG NAIL

N=150616.67 E=1215283.53

EL=398.67

BENCHMARK

SET MAG NAIL

N=150575.01 E=1215390.40

INTERSTATE 630

UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C UG/C

UG/C

UG/C

UG/C

UG/C

UG/C

UG/C

UG/C

UG/C

UG/C

WM

LO

D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD

F.E.C

F.E.C

F.E.C

F.E.C

TELE/ DATA/

CAB TV

EQUIP.

FH

TRANSFORMER

CONC. PAD

FH TRASH

AREA

VA GENERATOR

FUTURE

EX

IT

EN

T

FHCP

FHCP

FHCP

FHCP

FHCP

FHCP

FHCP

FHCP

6"

DC

BA

WM

W 7TH ST

W 7T

H

ST

W 7T

H

ST

W

7TH ST

COTTAGE

DR

H O

O

PE

R D

R

SHUFFIELD DR

SHUFFIELD DR

GA

S

BF

P

BF

P

LO

C

LOCLOCLOCLOCLOCLOCLOCLOCLOCLOC

LO

C

LO

C

LOC LOC LOC LOC LOC LOC LOC LOC LOC

LO

C

LOCLOCLOCLOCLOCLOCLOCLOCLOCLOC

LO

C

LO

C

LOC LOC LOC LOC LOC LOC LOC LOC LOC

LO

C

LO

C

LOC

LO

C

LO

C

LOC

LO

C

LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC

LO

C

LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC

LO

D LOD

LOD

SS

SS

SS

SS

SS

SS

SS

SS

SS

OHP OHP OHP OHP OHP OHP OHP

OHP OHP OHP OHP

ONL

Y

ONL

Y ON

LY

ON

LY

EXIT

EXI

T

EXIT

EXIT

ONLY

ONLY

CROSSTIE

WALL

LIGHT POLE

LIGHT POLE

BASE

W

W

W W W W W W W W W W W W

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG/E

UG/E

UG

/E

UG/E

UG/E

UG/E

UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E

UG/E

UG/E UG/E

UG/E

UG

/E

W W W

WWWWWW

W

W

W

W

W

UG/E

UG/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E UG/E UG/E UG/E UG/E UG/E

W UG/E UG/E UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

W

W

W

W

W

36" WATERLINEUG/E

UG/E

UG/E

UG/E UG/E UG/E UG/E UG/E UG/E UG/E

UG/E

UG/E

UG/E

BASE

W

W

W

W W W W W

W W W

W

W

W

UG/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

W

W

W

W

W

W

W

UG/E

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

UG

/E

UG/E UG/E UG/E UG/E UG/E UG/E UG/E

UG/E

UG/E UG/E UG/E UG/E UG/E

UG/E

UG/E

UG/E

UG/E UG/E

UG

/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

GAS

GAS

GAS

GAS

GAS

GAS

GA

S

GA

S

GA

S

LODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

LO

D

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

LOD

LODLOD

PROPOSED INLET PROTECTION

(TYP.)

PROPOSED INLET PROTECTION

(TYP.)

SOD LIMITS OF DISTURBANCE

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

Location

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

Foresite Group, LLC 2128 Moores Mill Rd.

Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net

100% BID DOCUMENTS

JOHN L. MCCLELLAN MEMORIAL OF

CENTRAL ARKANSAS VHCS

4300 W. 7TH STREET

LITTLE ROCK, ARKANSAS 72205

SITE DATA

TOTAL SITE AREA = ##### AC.

TOTAL DISTURBED AREA = ### AC.

5/

/2

:2 3:

P

M

CG100

ZLRNSY

EROSION CONTROL PLAN

8 10MAY 31, 2023

FISHER HOUSE SITE

PREPERATION-UTILITIES

598-22-102

22-130

SOIL TYPE

TFB TIFTON LOAMY SAND 2 TO 5 PERCENT

SLOPES

EROSION NOTES:

1. THE INSTALLATION OF EROSION CONTROL MEASURES AND

PRACTICES SHALL TAKE PLACE PRIOR TO OR CONCURRENT

WITH ALL LAND DISTURBING ACTIVITIES THROUGHOUT THE

ENTIRE PROJECT.

2. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR

TEMPORARY SEEDING.

3. EROSION AND SEDIMENT CONTROL MEASURES WILL BE

MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE

APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION

CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL

MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT

THE SEDIMENT SOURCE.

4. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE

PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT

CONTROL MEASURES AND PRACTICES PRIOR TO LAND

DISTURBING ACTIVITIES.

5. THE CONTRACTOR SHALL REMOVE ACCUMULATED SILT

WHEN THE ACCUMULATED SILT IS ONE-THIRD (1/3) FULL FOR ALL

EROSION & SEDIMENT CONTROL STRUCTURES.

6. MAINTENANCE OF ALL SOIL EROSION AND SEDIMENTATION

CONTROL MEASURES AND PRACTICES, WHETHER TEMPORARY

OR PERMANENT, SHALL BE AT ALL TIMES THE RESPONSIBILITY

OF THE CONTRACTOR.

7. THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC

PLAN IS TO INSPECT THE INSTALLATION OF THE INITIAL

SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL

BMPS WITHIN 7 DAYS AFTER INSTALLATION.

8. AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE

A SIGNIFICANT EFFECT ON BMPS WITH A HYDRAULIC

COMPONENT MUST BE CERTIFIED BY THE DESIGN

PROFESSIONAL.

9. WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS

OF THE STATE, EXCEPT AS AUTHORIZED BY A SECTION 404

PERMIT.

1" = 40'

SCALE IN FEET

40 20 40 80 before you dig belowKnow what's

Call

R

SS

SS

SS

W W

W

GAS

VHALITGreenE Polygon

VHALITGreenE Typewritten Text Parking Garage - Enter off of Jack Stephens. Use small truck/fork lift to transfer from entry of garage to storage area.

VHALITGreenE Line

VHALITGreenE Typewritten Text Jack Stepphens Drive

File details come from the government source that posted it. Updated .