- 591/24470. JBB; MDOT M&T Building Ventilation
- Solicitation number
- RFQ 171 260000000204 2
- Issued by
- Huron County, Michigan
About this file
This is a design and construction bid document for the Michigan Department of Technology, Management and Budget (DTMB) Facilities and Business Services Administration, in coordination with the Michigan Department of Transportation (MDOT), for ventilation upgrades to the M&T Building located at 120 Tobin-Alpha Road, Crystal Falls, Michigan 49920. The project involves Level 2 renovation work under the 2021 Michigan Rehabilitation Code, requiring building, electrical, and mechanical permits. The scope of work includes installation of a mechanical exhaust fan (EF-1) with a capacity of 1,910 CFM at 0.132 inches of water gauge, an intake louver (IL-1) measuring 36 by 36 inches, wall demolition to create openings for mechanical equipment, metal stud framing with headers, insulation installation, and integration of a carbon monoxide and nitrogen dioxide detection system with motorized damper controls. The project is issued for bidding on March 13, 2026. Design and construction oversight is managed by DTMB's Design & Construction Division, with Jason Pascoe (906-280-1046) and Jeff Barsch (906-251-0727) serving as primary contacts. The professional service contractor U.P. Engineers & Architects, Inc. is the design consultant, with Aaron Janke (906-315-1332) as the project manager.
The construction documents specify that all work must comply with applicable 2021 Michigan codes including the Rehabilitation Code, Mechanical Code, and 2023 Electrical Code. Contractors are required to verify existing site conditions, coordinate with all trades to avoid conflicts, obtain necessary permits and inspections, and ensure installations meet manufacturer specifications. The existing building is Construction Type II-B with S-1 occupancy classification. All materials must be new and meet UL standards where applicable. The contractor must provide complete mechanical, plumbing, and electrical systems as indicated in the drawings and specifications, with motors and motor controllers supplied by the mechanical contractor and electrical connections furnished by the electrical contractor. A 120-volt, 20-ampere circuit must be provided for the exhaust fan, motorized louver, and gas detection system. The project requires coordination between the mechanical and electrical contractors for proper interlock operation and control system integration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P L U R I B U E
S U N U M
C I R C U M S P I C E
SI QU EREI S PENI NSULAM AMOENA
M
FILE NO.: 591.24470.JBB
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
FACILITIES AND BUSINESS SERVICES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
CONTACT LIST:
STATE OF MICHIGAN DTMB
JASON PASCOE, DESIGN & CONSTRUCTION DIVISION
906-280-1046, PASCOEJ2@MICHIGAN.GOV
JEFF BARSCH, DESIGN & CONSTRUCTION DIVISION
906-251-0727, BARSCHJ@MICHIGAN.GOV
MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT)
VINCENT CUSHING, MDOT FACILITIES ENGINEER
517-855-1489, CUSHINGV@MICHIGAN.GOV
DAN KARI, CRYSTAL FALLS TSC MANAGER
906-630-7774, KARID@MICHIGAN.GOV
PROFESSIONAL SERVICE CONTRACTOR
AARON JANKE, PROJECT MANAGER (PRIMARY CONTACT)
906-315-1332, AJANKE@UPEA.COM
BUILDING PERMIT
ELECTRICAL PERMIT
MECHANICAL PERMIT
PLAN REVIEW NUMBER: PR2026BCC-000674
PERMITS REQUIRED (ALL PERMITS STATE OF MICHIGAN LARA)
BUILDING CODE REVIEW
AUTHORITY HAVING JURISDICTION (AHJ): STATE OF MICHIGAN
APPLICABLE CODES:
2021 MICHIGAN REHABILITATION CODE (2021 IEBC AMENDED)
2021 MICHIGAN MECHANICAL CODE (2021 IMC AMENDED)
2023 MICHIGAN ELECTRICAL CODE (2023 NEC AMENDED)
CODE SECTION: EXPLANATION:
SECTION 603: LEVEL 2 RENOVATION LOUVERS BEING ADDED TO
EXISTING BUILDING. WORK AREA
LESS THAN 50% OF BUILDING AREA.
CHAPTER 8: LEVEL 2 RENOVATION RENOVATION AREAS O THE
BUILDING SHALL COMPLY WITH
APPLICABLE SECTIONS FOR ALL
DISCIPLINES IN THIS CHAPTER
EXISTING BUILDING INFORMATION:
CONSTRUCTION TYPE: II-B
EXISTING OCCUPANCY TO REMAIN: S-1
SHEET INDEX
NUMBER SHEET NAME
G001 TITLE SHEET
A001 ARCHITECTURAL STANDARDS
A101 DEMOLITION PLAN AND ELEVATIONS
A102 DETAILS
M001 MECHANICAL AND PLUMBING ABBREVIATIONS
AND SYMBOLS
M101 MECHANICAL PLAN, DETAILS, & SCHEDULES
E101 ELECTRICAL PLAN, NOTES, & DETAILS
33 G5
30 65
17 139
55 52
32 180
14 12
CEDARVILLE
HESSEL
WHITEFISH
POINT
SAULT
STE
MARIE
NATIONAL PARK
ISLE ROYALE
NORWAY
MARENISCO
WHITE PINE
BERGLAND
NEWBERRY
SILVER
CITY
BESSEMER
IRONWOOD
WAKEFIELD
GREEN BAY
GWINN
HERMANSVILLE
MENOMINEE
IRON MOUNTAIN
VULCAN
CASPIAN
TROUT
WATERSMEET
CREEK
CROSSING
MASS
CITY
BRUCE
ONTONAGON
ROCKLAND BARAGA
ARNHEIM
CRYSTAL
FALLS
ISHPEMING
MICHIGAMME
L'ANSE
AURA SKANEE
MARQUETTE
NEGAUNEE
MANISTIQUE
ESCANABA
FAYETTE
GARDEN
MUNISING
CURTIS
CITY
GOULD
HARBOR
CALUMET
RIPLEYHOUGHTON
CHASSELL
HANCOCK
DELAWARE
LAKE
LINDEN
LAURIUM
EAGLE
HARBOR
COPPER
MACKINAC
ISLAND
IGNACE
ST
INDIAN
RIVER
CHEBOYGAN
MACKINAW CITY
PELSTON
ONAWAY
GAYLORD
PETOSKEY
CHARLEVOIX
MANCELONA
KALKASKA
TRAVERSE
CITY
EMPIRE
ELBERTA
ARCADIA
MANISTEE
SCOTTVILLE
BALDWINLUDINGTON
SHELBY
BIG RAPIDS
MOUNT
PLEASANT
CADILLAC
GRAYLING
EAST
TAWAS
ROSCOMMON
LACHINE ALPENA
WOLVERINE
ATLANTA
ROGERS CITYALANSON
CROSS
VILLAGE
BOYNE CITY
BELLAIRE
JORDAN
E.
EASTPORTNORTHPORT
LELAND
BUCKLEY
FIFE
LAKE
FRANKFORT
MESICK
MANTON
BEAR
LAKE
LILLEY
HESPERIA
WHITE
CLOUD
EVART
REMUS
MIDLAND
SAGINAW
BAY
CITY
HARRISVILLE
CURRAN
MIO
OSCODA
TAWAS CITY
WEST
BRANCH
STANDISH
GLADWIN
McBAIN
LAKE CITY
CLARE
CARO
TROUT LAKE
BREVORT
IRON RIVERBRULE
WASHBURN
POPLAR
ASHLAND
PORT WING BAYFIELD
ODARRAH
MELLEN
UPSON
HURLEY
GLIDDEN
PARK FALLS
CLAM LAKE
MERCER
PRESQUE
ISLE
LAND O'LAKES
EAGLE
RIVER
PHELPS
FLORENCE
NIAGRA
CRANDON
SUPERIOR
HAYWARD
MINONG
CABLE
SHELL LAKE
GRANTSBURG
BALSAM
LAKE BARRON
MENOMONIE
DURAND
ALMA
WHITEHALL
BLACK
RIVER
FALLS
SPARTA
LA CROSSE
FRIENDSHIP
MONTELLO
WAUTOMA
GREEN
LAKE
FOND DU LAC
OSHKOSH
APPLETON
DE PERE
GREEN BAY
KEWAUNEE
STURGEON BAY
MARINETTE
OCONTO
SHAWANO
KESHENA
WAUSAU
STEVENS
POINT
WAUPACA
RHINELANDERPHILIPS
MEDFORD
MERRILL
ANTIGO
EAU CLARE
LADYSMITH
THREE
LAKES
MICHIGAN
WISCONSIN
LAKE
MICHIGAN
LAKE
SUPERIOR
HURON
LAKE
100 PORTAGE STREET
HOUGHTON, MI 49931
P (906) 482-4810 F (906) 482-9799
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
U.P. ENGINEERS &
ARCHITECTS, INC.
2906 N. STEPHENSON AVE, SUITE 2
IRON MOUNTAIN, MI 49801
P (906) 779-0937 F (906) 779-0947
424 S. PINE ST.
ISHPEMING, MI 49849
P (906) 485-1011 F (906) 485-1013
1701 DUNLAP AVE., SUITE B
MARINETTE, WI 54143
P (715) 732-4188 F (715) 732-4189
707 ASHMUN STREET
SAULT STE. MARIE, MI 49783
P (906) 635-0511 F (906) 635-0612
PR
OJ
EC
T
NO
w w w .u pe a.
co m
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- C ry st al F al ls
M a nd T a nd
C
SB
V en til at io n
St ud y\ D w gs
\M ec ha ni ca l\M
-0
D
TM
B- C ry st al F al ls
_M
EC
H _R
.rv t
3/
/2
:2 3:
A
M
M&T BUILDING VENTILATION UPGRADES
MICHIGAN DEPARTMENT OF TRANSPORTATION
G001
TITLE SHEET
M
T B
U
IL
D
IN
G V
EN
TI
LA
TI
O N
U
PG
R A
D
ES
MI
CH
IG
AN
D
EP
AR
TM
EN
T O
F T
RA
NS
PO
RT
AT
IO
N
0 T
OB
IN
-A
LP
HA
R
D, C
RY
ST
AL
FA
LL
S, M I 4
M1 2-
DK
S
SC
P
AS
J
SC
P
M& T B
UI
LD
IN
G
VE
NT
ILA
TIO
N
UP
GR
AD
ES
MI
CH
IG
AN
D
EP
AR
TM
EN
T O
F T
RA
NS
PO
RT
AT
IO
N
120 TOBIN-ALPHA RD, CRYSTAL FALLS, MI 49920
PROJECT LOCATION
PROJECT SITE
PROJECT VICINITY MAP
BI
D
D
IN
G
/1 3/
MICHIGAN DEPT. OF TECHNOLOGY,
MANAGEMENT AND BUDGET
A301
BUILDING SECTION
A301
WALL SECTION
A301
DETAIL SECTION
DETAIL NUMBER
SHEET NUMBER
SYMBOLS
A201
ELEVATION
ELEVTION NUMBER
SHEET NUMBER
A301
CALLOUT
DETAIL NUMBER
SHEET NUMBER
1 TITLE
1/8" = 1'-0"
DETAIL NAMEDETAIL NUMBER
DETAIL SCALE
101.1
FIRST FLOOR
BASEMENT FLOOR
SECOND FLOOR
DOOR, WINDOW, & ROOM
IDENTIFICATION NUMBERS
DOOR IDENTIFICATION NUMBER
WINDOW IDENTIFICATION NUMBER
ROOM IDENTIFICATION BY FLOOR AS FOLLOWS:
OFFICE ROOM IDENTIFICATION NUMBERROOM NAME
ROOM NUMBER
DOOR IDENTIFICATION NUMBERS SHALL REPEAT ROOM NUMBER.
MULTIPLE DOORS IN A ROOM WILL USE A POSTSCRIPT LETTER FOR
EACH ADDITIONAL DOOR REQUIRED.
A
AB ANCHOR BOLT
AC ACOUSTIC / ACOUSTICAL
A/C AIR CONDITIONING
AFF ABOVE FINISH FLOOR
ACT ACOUSTICAL CEILING TILE
AHU AIR HANDLING UNIT
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECTURAL
B
BBR BASEBOARD RADIATION
BD BOARD
BDRY BOUNDARY
BF BARRIER FREE
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BSMT BASEMENT
C
CA COMPRESSED AIR
CB CATCH BASIN
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CLT CLOSET
CONF CONFERENCE
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CW COLD WATER
D
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DN DOWN
DW DISHWASHER
DWG DRAWING
ABBREVIATIONS
E
E EAST
EA EACH
EF EXHAUST FAN
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV ELEVATION
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY
EXT EXTERIOR
EXP EXPANSION
EWC ELECTRIC WATER COOLER
EXTG EXISTING
F
FA FIRE ALARM
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FINISHED FLOOR ELEVATION
FIN FINISHED
FLR FLOOR
FT FOOT OR FEET
FTG FOOTING
G
GA GAUGE
GALV GALVANIZED
GPBD GYPSUM BOARD
GYP GYPSUM
GB GRAB BAR
H
HB HOSE BIB
HGT HEIGHT
HORIZ HORIZONTAL
HPDL HIGH PRESSURE DECORATIVE LAMINATE
HM HOLLOW METAL
HVAC HEATING / VENTILATION / AIR CONDITIONING
HTR HEATER
HW HOT WATER
I
IN INCH
INSUL INSULATION
J
JAN JANITOR
JST JOIST
JT JOINT
K
KD KNOCKDOWN
KO KNOCKOUT
L
LAM LAMINATE
LAV LAVITORY
LT
LINEAR FOOT / FEET
LTG
LIVE LOAD
LB POUND
DL DEAD LOAD
LIGHTING
LIGHT
LF
LL
M
MAX MAXIMUM
MECH MECHANICAL
MIN
MECHANICAL
MISC
MET METAL
MISCELLANEOUS
MINIMUM
MFR
MECH
MANUFACTURER
MO MASONRY OPENING
MTD MOUNTED
N
N NORTH
NA NOT APPLICABLE
NOT TO SCALE
NIC NOT IN CONTRACT
NTS
O
OA OVERALL
OC ON CENTER
OVERHEAD
OD OUTSIDE DIAMETER
OH
O/O OUT TO OUT
OPPOSITE
OPG OPENING
OPP
ORIENTED STRAND BOARDOSB
OUNCEOZ
P
PL PLATE
PC PRECAST
PAINT
PNL PANEL
PNT
PR PAIR
PRESSURE TREATED
PREFIN PREFINISHED
PT
PLAM PLASTIC LAMINATE
PLYWOODPWD
POUNDS PER SQUARE FOOTPSF
PSI POUNDS PER SQUARE INCH
Q
QT QUARRY TILE
QTY QUANTITY
R
REINF REINFORCE
RM ROOM
RTU ROOF TOP UNIT
RO ROUGH OPENING
RD ROOF DRAIN
S
S SOUTH
SAN SANITARY
SF SQUARE FOOT / FEET
SIM SIMILAR
SCHED SCHEDULE
SQ SQAURE
SPEC SPECIFICATIONS
STL STEEL
STRUCT STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
S & V STAIN AND VARNISH
SYS SYSTEM
T
TEL TELEPHONE
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TOW TOP OF WALL
TOF TOP OF FOOTING
TYP TYPICAL
U
UNO UNLESS NOTED OTHERWISE
V V
VINYL BASEVB
VINYL COMPOSITION TILE
VERT VERTICAL
VTR VENT THRU ROOF
VCT
VWC VINYL WALL COVERING
VENT
SYMBOLS
ANGLEL
CENTERLINE
Ø DIAMETER
x BY (AS IN 2 x 4 ) C
/ PER
AND
L
AT@
± PLUS OR MINUS
# POUND
" INCH
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- C ry st al F al ls
M a nd T a nd
C
SB
V en til at io n
St ud y\ D w gs
\M
-0
D
TM
B-
C ry st al
F al ls _R
.rv t
3/
/2
:2 8:
A
M
A001
ARCHITECTURAL
STANDARDS
M& T B
UI
LD
IN
G
VE
NT
ILA
TIO
N
UP
GR
AD
ES
MI
CH
IG
AN
D
EP
AR
TM
EN
T O
F T
RA
NS
PO
RT
AT
IO
N
0 T
OB
IN
-A
LP
HA
R
D, C
RY
ST
AL
FA
LL
S, M I 4
M1 2-
JH
R
AS
J
AS
J
JH
R
M& T B
UI
LD
IN
G
VE
NT
ILA
TIO
N
UP
GR
AD
ES
MI
CH
IG
AN
D
EP
AR
TM
EN
T O
F T
RA
NS
PO
RT
AT
IO
N
BI
D
D
IN
G
/1 3/
UP
A101
A1
A101 B1
C4 A102
A4 A102
A101
C2
CONTRACTOR SHALL VERIFY FINAL
LOCATION OF LOUVER WITH
EXISTING EQUIPMENT ON MEZZANINE
CONTRACTOR SHALL VERIFY FINAL
LOCATION OF LOUVER WITH
EXISTING EQUIPMENT ON MEZZANINE
1 REMOVE PORTION OF WALL TO CREATE OPENING FOR MECHANICAL
EQUIPMENT. COORDINATE WITH MECHANICAL CONTRACTOR. OPENING SIZE
SHALL BE BETWEEN STUDS. CONTRACTOR SHALL CUT OPENING TO
REQUIRED SIZE FOR MECHANICAL INTAKE/EXHAUST AND HEADER AND
PLATE NOTED IN DETAILS ON THIS PAGE. CONTRACTOR SHALL NOT
PERFORM DEMOLITION WORK UNTIL HEADER IS READY TO BE INSTALLED.
HEADER SHALL BE INSTALLED IMMEDIATELY AFTER DEMOLITION WORK IS
PERFORMED.
CONTRACTOR TO VERIFY FINAL LOCATION OF THE EXHAUST FAN WITH
EXISTING EQUIPMENT ON MEZZANINE
KEYNOTES
EF-1
VE
RI
FY
IN
FI
EL
D
6"
VERIFY IN FIELD
8' - 1"
PROPOSED MECHANICAL EXHAUST FAN
IL-1
VERIFY IN FIELD
36' - 5"
PROPOSED MECHANICAL INTAKE LOUVER
PROPOSED MECHANICAL EXHAUST FAN EF-1
EXISTING UNIT HEATER
EXISTING MEZZANINE RAILING
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- C ry st al F al ls
M a nd T a nd
C
SB
V en til at io n
St ud y\ D w gs
\M
-0
D
TM
B-
C ry st al
F al ls _R
.rv t
3/
/2
:2 8:
A
M
A101
DEMOLITION PLAN
AND ELEVATIONS
M& T B
UI
LD
IN
G
VE
NT
ILA
TIO
N
UP
GR
AD
ES
MI
CH
IG
AN
D
EP
AR
TM
EN
T O
F T
RA
NS
PO
RT
AT
IO
N
0 T
OB
IN
-A
LP
HA
R
D, C
RY
ST
AL
FA
LL
S, M I 4
M1 2-
JH
R
AS
J
AS
J
JH
R
M& T B
UI
LD
IN
G
VE
NT
ILA
TIO
N
UP
GR
AD
ES
MI
CH
IG
AN
D
EP
AR
TM
EN
T O
F T
RA
NS
PO
RT
AT
IO
N
3/16" = 1'-0"A4 DEMOLITION PLAN
3/16" = 1'-0"A1 WEST EXTERIOR ELEVATION
3/16" = 1'-0"B1 NORTH EXTERIOR ELEVATION
BI
D
D
IN
G
/1 3/
3/16" = 1'-0"C2 INTERIOR ELEVATION
J-CHANNEL AROUND PERIMETER
6" CSW #16 GAUGE METAL STUDS.
DISTANCE TO BE VERIFIED IN FIELD.
EXHAUST FAN AND COMPONENTS
PER MECHANICAL
(3) 8" CSW #16 GAUGE METAL STUD HEADER w/ TRACK AS SHOWN.
6" CSW #16 GAUGE METAL STUDS VERTICAL FOR JACK STUDS.
JACK STUDS SHALL EXTEND DISTANCE REQUIRED TO GO
BETWEEN METAL BUILDING FRAME COMPONENTS OR PURLINS.
DISTANCE TO BE VERIFIED IN FIELD.
EXISTING INSULATION TO REMAIN. EXISTING
INSULATION AND FINISH IS PRE-ENGINEERED
METAL BUILDING INSULATION BATTING.
REFERENCE PICTURE ON THIS SHEET
PROVIDE INSULATION OF THE SAME R-VALUE AS EXISTING IN HEADER
WEATHER RESISTIVE SEALANT
AND BACKER ROD BETWEEN
J-CHANNEL AND EXHAUST.
CONTRACTOR SHALL ENSURE
SEAL IS TIGHT.
MOUNT FAN AS TIGHT AS POSSIBLE TO WALL AT INTERIOR OF
BUILDING
LOUVER AND COMPONENTS
PER MECHANICAL
J-CHANNEL AROUND PERIMETER (3) 8" CSW #16 GAUGE METAL STUD
HEADER w/ TRACK AS SHOWN.
6" CSW #16 GAUGE METAL STUDS
VERTICAL FOR JACK STUDS. JACK STUDS
SHALL EXTEND DISTANCE REQUIRED TO
GO BETWEEN METAL BUILDING FRAME
COMPONENTS OR PURLINS. DISTANCE TO
BE VERIFIED IN FIELD.
PROVIDE INSULATION OF THE SAME
R-VALUE AS EXISTING IN HEADER
WEATHER RESISTIVE SEALANT
AND BACKER ROD BETWEEN
J-CHANNEL AND INTAKE.
CONTRACTOR SHALL ENSURE
SEAL IS TIGHT.
WEATHER RESISTIVE SEALANT
AND BACKER ROD BETWEEN
WALL AND INTAKE.
CONTRACTOR SHALL ENSURE
SEAL IS TIGHT.
6" CSW #16 GAUGE METAL STUDS.
DISTANCE TO BE VERIFIED IN FIELD.
EXISTING INSULATION TO REMAIN.
EXISTING INSULATION AND FINISH IS
PRE-ENGINEERED METAL BUILDING
INSULATION BATTING. REFERENCE
PICTURE ON THIS SHEET.
BRAKE METAL MAY BE USED AT INTERIOR
ALSO TO ENSURE PROPER SEAL WITH
WALL (AT TOP AND BOTTOM)
EXISTING INTERIOR FINISH AND
INSULATION
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- C ry st al F al ls
M a nd T a nd
C
SB
V en til at io n
St ud y\ D w gs
\M
-0
D
TM
B-
C ry st al
F al ls _R
.rv t
3/
/2
:2 8:
A
M
A102
DETAILS
M& T B
UI
LD
IN
G
VE
NT
ILA
TIO
N
UP
GR
AD
ES
MI
CH
IG
AN
D
EP
AR
TM
EN
T O
F T
RA
NS
PO
RT
AT
IO
N
0 T
OB
IN
-A
LP
HA
R
D, C
RY
ST
AL
FA
LL
S, M I 4
M1 2-
JH
R
AS
J
AS
J
JH
R
M& T B
UI
LD
IN
G
VE
NT
ILA
TIO
N
UP
GR
AD
ES
MI
CH
IG
AN
D
EP
AR
TM
EN
T O
F T
RA
NS
PO
RT
AT
IO
N
BI
D
D
IN
G
/1 3/
NOT TO SCALEA4 WALL EXHAUST FAN DETAIL
NOT TO SCALEC4 DUCTED WALL LOUVER DETAIL (INTAKE)
STM
STM
PLUMBING PIPING MECHANICAL PIPING
DUCTWORK
CDS
CDR
CHWS
CHWR
CDS
CDR
CHWR
CHWS
AIR
ST
G
G
AIR
HWR
HWR
HWS
HWS
FP
FP
C
C
ST
V
V
SAN
HWC
SAN
EA24x14
EA24x14
EA24x14
HW
CW
HWC
OA24x14
OA24x14
OA24x14
RA24x14
SA24x14
SA24x14
S D
SA24x14
RA24x14
RA24x14
CW
HW
STM
CDR
CDS
CHWR
CHWS
HWR
HWS
G
AIR
FP
C
ST
CW
V
SAN
HWC
HW
HYDRONIC HOT WATER SUPPLY - NEW
HYDRONIC HOT WATER SUPPLY - EXISTING
HYDRONIC HOT WATER SUPPLY - DEMO
HYDRONIC HOT WATER RETURN - NEW
HYDRONIC HOT WATER RETURN - EXISTING
HYDRONIC HOT WATER RETURN - DEMO
COMPRESSED AIR - NEW
COMPRESSED AIR - EXISTING
COMPRESSED AIR - DEMO
GAS - NEW
GAS - EXISTING
GAS - DEMO
DOMESTIC COLD WATER - EXISTING
DOMESTIC COLD WATER - DEMO
DOMESTIC COLD WATER - NEW
DOMESTIC HOT WATER - EXISTING
DOMESTIC HOT WATER - DEMO
DOMESTIC HOT WATER - NEW
DOMESTIC HOT WATER RECIRC - EXISTING
DOMESTIC HOT WATER RECIRC DEMO
DOMESTIC HOT WATER RECIRC - NEW
SANITARY - EXISTING
SANITARY - DEMO
SANITARY - NEW
VENT - EXISTING
VENT - DEMO
VENT - NEW
STORM - EXISTING
STORM - DEMO
STORM - NEW
CONDENSATE - EXISTING
CONDENSATE - DEMO
CONDENSATE - NEW
FIRE PROTECTION - EXISTING
FIRE PROTECTION - DEMO
FIRE PROTECTION - NEW
ABBREVIATIONS
PIPING "T"
PIPING 90
STRAINER
SYMBOL LEGEND
CAP
NOTES
INLINE PUMP
BALANCE VALVE
PRESSURE RELIEF VALVE
3-WAY CONTROL VALVE
2-WAY CONTROL VALVE
GLOBE VALVE
GATE VALVE
CHECK VALVE
CIRCUIT SETTER
BUTTERFLY VALVE
BALL VALVE
EXHAUST AIR DUCT DOWN
EXHAUST AIR DUCT UP
RETURN AIR DUCT DOWN
RETURN AIR DUCT UP
SUPPLY AIR DUCT DOWN
SUPPLY AIR DUCT UP
AIR FLOW
HUMIDISTAT - 60" A.F.F.
THERMOSTAT - 60" A.F.F.
DUCT SMOKE DETECTOR
MOTORIZED DAMPER
FIRE / SMOKE DAMPER
(RATING DETERMINED BY WALL TYPE)
VOLUME CONTROL DAMPER
SQUARE TO ROUND TRANSITION
RETURN OR EXHAUST REGISTER
SUPPLY REGISTER
RELIEF AIR HOOD - ROOF
FRESH AIR INTAKE HOOD - ROOF
EXHAUST FAN - ROOF
RETURN OR EXHAUST AIR GRILLE
LINEAR DIFFUSER
SUPPLY AIR DIFFUSER PIPE BREAK
PIPE DOWN
PIPE UP
CLEAN OUT
GAS METER
UNION
HOSE BIBB
ELECTRIC BELL
SIAMESE CONNECTION
BARE FIN TUBE ELEMENT
FIN TUBE ELEMENT WITH COVER
EXTERNALLY INSULATED DUCTWORK
INTERNALLY LINED DUCTWORK
SUPPLY AIR DUCT - EXISTING
SUPPLY AIR DUCT - DEMO
SUPPLY AIR DUCT - NEW
RETURN AIR DUCT - EXISTING
RETURN AIR DUCT - DEMO
RETURN AIR DUCT - NEW
OUTSIDE AIR DUCT - EXISTING
OUTSIDE AIR DUCT - DEMO
OUTSIDE AIR DUCT - NEW
EXHAUST AIR DUCT - EXISTING
EXHAUST AIR DUCT - DEMO
EXHAUST AIR DUCT - NEW
CONDENSOR WATER SUPPLY
CONDENSOR WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSOR WATER SUPPLY - DEMO
CONDENSOR WATER SUPPLY - EXIST
CONDENSOR WATER RETURN - DEMO
CONDENSOR WATER RETURN - EXIST
CHILLED WATER SUPPLY - DEMO
CHILLED WATER SUPPLY - EXIST
CHILLED WATER RETURN - DEMO
CHILLED WATER RETURN - EXIST
METER
STEAM - NEW
STEAM - EXISTING
STEAM - DEMO
CONNECTION TO EXISTING
ACCU AIR COOLED CONDENSING UNIT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
AS AIR SEPERATOR
B BOILER
BB BASEBOARD
BC BOOSTER COIL
BDD BACKDRAFT DAMPER
BFG BELOW FINISHED GRADE
BFP BACKFLOW PREVENTER
BHP BRAKE HORSE POWER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BT BATH TUB
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
C CONVECTOR
CA COMPRESSED AIR
CB CATCH BASIN
CC COOLING COIL
CCF 100 CUBIC FEET
CD CEILING DIFFUSER
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFP CLEAN OUT FERRULE AND PLUG
CH CHILLER
CI CAST IRON
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CO CLEAN OUT
CO CARBON MONOXIDE
COND CONDENSATE
CO2 CARBON DIOXIDE
CT COOLING TOWER
CU CONDENSING UNIT
CU FT CUBIC FOOT
CUH CABINET UNIT HEATER
CW COLD WATER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DIFFUSER
DB DRY BULB
DEG F DEGREE FAHRENHEIT
DF DRINKING FOUNTAIN
DI DIGITAL INPUT
DIA DIAMETER
DN DOWN
DO DIGITAL OUTPUT
DWV DRAIN, WASTE AND VENT
EA EACH
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EG EXHAUST AIR GRILLE
ELEV ELEVATION
ER EXHAUST AIR REGISTER
EUH ELECTRIC UNIT HEATER
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
EXH EXHAUST
F FURNACE
FAI FRESH AIR INTAKE
FBO FURNISHED BY OTHERS
FC FAN COIL
FD FLOOR DRAIN
FD FIRE DAMPER
FIN FIN TUBE RADIATION
FLG FLANGE
FP FIRE PROTECTION
FPM FEET PER MINUTE
FT FOOT OR FEET
F&T FLOAT AND THERMOSTATIC TRAP
G GAS (NATURAL)
GAL GALLON
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GT GREASE TRAP
H HYDROGEN
HB HOSE BIBB
HC HEATING COIL
HCO HORIZONTAL CLEANOUT
HP HORSE POWER
HTR HEATER
HVAC HEATING, VENTILATING & AIR COND
HW HOT WATER
HWC HOT WATER RECIRCULATING
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
IE INVERT ELEVATION
IF INLINE FAN
IL INTAKE LOUVER
IN INCH OR INCHES
IP IRON PIPE
INV INVERT
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
JC JANITOR'S CLOSET
JS JANITOR'S SINK
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LBS POUNDS
LHWR LOW TEMPERATURE HOT WATER
RETURN
LHWS LOW TEMPERATURE HOT WATER
SUPPLY
LIQ LIQUID (REFRIGERATION)
LV LOUVER
LP PROPANE GAS (LIQUID)
LWT LEAVING WATER TEMPERATURE
M METER
MAU MAKE-UP AIR HANDLING UNIT
MAX MAXIMUM
MB MOP BASIN
MBH BRITISH THERMAL UNITS (1000)
MBTUH BRITISH THERMAL UNITS (1000)
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
MD MOTORIZED DAMPER
MECH MECHANICAL
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT
PROTECTION
OA OUTDOOR AIR
OAI OUTDOOR AIR INTAKE
OC ON CENTER
OD OVERFLOW DRAIN
ODP OPEN DRIP PROOF
OXY OXYGEN
P PUMP
PC PLUMBING CONTRACTOR
PD PNEUMATIC OPERATED DAMPER
PIV POST INDICATING VALVE
PRV PRESSURE REDUCING VALVE
PT PRESSURE TEMPERATURE PLUG
PTAC PACKAGED TERMINAL AIR COND. UNIT
PVAC PROCESS VACUUM
S SINK
SA SUPPLY AIR
SAD SUPPLY AIR DIFFUSER
SAF SUPPLY AIR FAN
SAN SANITARY SEWER
SD SMOKE DETECTOR
SG SUPPLY AIR GRILLE
SH SHOWER HEAD
SHC STEAM HEATING COIL
SR SUPPLY REGISTER
SS STAINLESS STEEL
ST STORM
STM STEAM
SUCT SUCTION (REFRIGERATION)
TCC TEMPERATURE CONTROL CONTRACTOR
TCD TEMPERATURE CONTROL DAMPER
TCP TEMPERATURE CONTROL PANEL
TD TRANSFER DUCT
TG TRANSFER AIR GRILLE
TT THERMOSTATIC TRAP
TYP TYPICAL
UG UNDERGROUND
UH UNIT HEATER
UV UNIT VENTILATOR
V VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME BOX
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VS VENT STACK (SANITARY)
VTR VENT THRU ROOF (SANITARY)
VUV VERTICAL UNIT VENTILATOR
W WASTE
WB WET BULB
WC WATER CLOSET
W/O WITHOUT
WH WATER HEATER
WSHP WATER SOURCE HEAT PUMP
NOTE:
NOT ALL ABBREVIATIONS AND/OR SYMBOLS ARE
USED IN THIS SET OF DOCUMENTS.
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NIC NOT INCLUDED OR NOT IN CONTRACT
NIT NITROGEN
NO NORMALLY OPEN
KW KILOWATT
R REGISTER
RA RETURN AIR
RD ROOF DRAIN
RET RETURN
RF RETURN FAN
RG RETURN AIR GRILLE
RPZ REDUCED PRESSURE ZONE BACKFLOW PREVENTER
RR RETURN REGISTER
RTU ROOF TOP UNIT
MECHANICAL/PLUMBING AND FIRE PROTECTION GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND DO NOT NECESSARILY INDICATE
EVERY OFFSET, VALVE, FITTING, ETC. REQUIRED. CONTRACTOR IS RESPONSIBLE FOR FIELD ROUTING
ALL DUCTWORK AND PIPING AT NO ADDITIONAL COST.
2. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS AND OPERATIONS AND
PERFORM ALL LABOR REQUIRED FOR INSTALLATIONS AS INDICATED THE DRAWINGS, IN THE
SPECIFICATIONS AND AS REQUIRED BY LOCAL, STATE AND FEDERAL CODES, AND AS MAY BE
REASONABLY IMPLIED TO ACCOMPLISH COMPLETE MECHANICAL, PLUMBING AND FIRE PROTECTION
SYSTEMS.
3. ALL ELECTRICAL DISCONNECTS REQUIRED PER NEC CODE SHALL BE FURNISHED AND
INSTALLED BY THE ELECTRICAL CONTRACTOR UNLESS NOTED OTHERWISE.
4. CONTRACTOR SHALL PROVIDE PRODUCTS AS SPECIFIED ON THE DRAWINGS AND
SPECIFICATIONS, HOWEVER, WHERE THE WORDS "EQUAL TO" ARE USED, ADDITIONAL PRODUCTS
MAY BE SUBMITTED AS PROPOSED SUBSTITUTIONS, BUT REQUIRE APPROVAL FROM
ARCHITECT/ENGINEER.
5. DESIGN DRAWINGS SHOW GENERAL ARRANGEMENT AND EXTENT OF WORK. THE DRAWINGS
ARE DIAGRAMMATIC AND MAY NOT NECESSARILY BE DRAWN TO SCALE FOR PURPOSE OF CLARITY AND LEGIBILITY. IT IS INTENDED THAT ALL ITEMS BE LOCATED SYMMETRICALLY WITH ARCHITECTURAL
ELEMENTS WHERE FEASIBLE AND BE INSTALLED TO AVOID OBSTRUCTIONS AND PRESERVE
HEADROOM. CONTRACTOR SHALL REVIEW PLANS OF OTHER TRADES WITH HIS OWN WORK TO AVOID CONFLICTS AND INTERFERENCES. CONTRACTOR MUST MAKE USE OF ALL SOURCES OF INFORMATION
INCLUDING DRAWINGS OF EQUIPMENT FURNISHED BY OTHERS. FAILURE TO REVIEW WORKING
SPACES OR CHECK DIMENSIONS IN QUESTION SHALL NOT WARRANT CONFLICTS.
6. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE COMPLIMENTARY. WHERE DRAWINGS
AND SPECIFICATIONS CONFLICT EACH OTHER, IT IS THE CONTRACTORS RESPONSIBILITY TO GET CLARIFICATION FROM THE ARCHITECT/ENGINEER PRIOR TO BIDDING. FAILURE TO GET CLARIFICATION SHALL NOT RESULT IN ADDITIONAL COST AND THE MORE STRINGENT SHALL BE USED AS INTENDED
BASIS FOR BIDDING.
7. PLANS AND SPECIFICATIONS ARE INTENDED TO CONFORM TO GOVERNING CODES AND
STANDARDS. IF NON-CONFORMITIES ARE DISCOVERED WHILE BIDDING, OR PERFORMING THE WORK IMPLIED, BRING THE SAME TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR CLARIFICATION IN WRITING PRIOR TO SUBMITTING BID OR PROCEEDING WITH WORK. NON-CONFORMITIES OF CODE COMPLIANCE WORK INSTALLED AND CORRECTIONS REQUIRED WITHOUT CONSULTION AND WRITTEN RESPONSE OF SAME BY THE ENGINEER WILL BE THE CONTRACTORS FINANCIAL RESPONSIBILITY.
8. MOTORS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AS REQUIRED BY THE
EQUIPMENT FURNISHED BY THE MECHANICAL CONTRACTOR. MOTORS TO BE SUITABLE FOR LOAD, DUTY, VOLTAGE, FREQUENCY, HAZARD, SERVICE AND LOCATION INTENDED. SINGLE PHASE MOTORS MUST HAVE INTEGRAL THERMAL OVERLOAD PROTECTION IN ADDITION TO THAT PROVIDED IN MOTOR
CONTROLLERS. MOTORS TO CONFORM IN DESIGN AND PERFORMANCE TO THE MOTOR STANDARDS
OF NEMA. MOTORS RATED FOR CONTINUOUS DUTY UNDER FULL LOAD WITH A MAXIMUM
TEMPERATURE RISE OF 105 DEG F FOR OPEN, 125 DEG F FOR DRIP PROOF AND 130 DEG F FOR
EXPLOSION PROOF AND TOTALLY ENCLOSED TYPES. SUPPLY MOTORS WITH BELT DRIVES WITH
ADJUSTABLE BASES, REMOVABLE BELT GUARDS AND VARIABLE PITCH DRIVE PULLEY SELECTED SO THAT MIDPOINT OF VARIABLE RANGE OF PULLEY WILL DRIVE EQUIPMENT AT RATED SPEED. MOTORS
1 HP AND LARGER SHALL BE THREE PHASE (UNLESS OTHERWISE LISTED).
9. MOTOR CONTROLLERS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR FOR
MOTORS FURNISHED BY THE MECHANICAL CONTRACTOR. MOTOR CONTROLLERS SHALL BE OF SIZES AND TYPES AS NEEDED TO MEET THE OPERATIONAL CONDITIONS AS REQUIRED BY THE SEQUENCE OF OPERATION. ELECTRICAL CONTRACTOR TO FURNISH AND INSTALL THE POWER CIRCUIT, LOCAL
DISCONNECT AND CONNECTION TO MOTOR TERMINALS. MECHANICAL CONTRACTOR TO MOUNT
MOTOR CONTROLLERS AND CONTROL COMPONENTS AND WIRE AND MAKE ALL FINAL CONTROL
CONNECTIONS BETWEEN DEVICES.
10. THE DRAWINGS INDICATE KNOWN UTILITY AND DRAINAGE LINES IN ACCORDANCE WITH THE
INFORMATION FURNISHED TO THE ENGINEER. RESPONSIBILITY FOR LOCATING, UNCOVERING,
DISPOSING OR MAINTAINING ALL EXISTING UTILITY LINES TO REST SOLELY WITH THE CONTRACTOR.
VERIFY LOCATIONS AND DEPTHS OF SERVICE CONNECTION POINTS BEFORE PROCEEDING WITH
CONSTRUCTION.
11. CONTRACTOR SHALL CHECK EXISTING PREMISES BEFORE SUBMISSION OF BIDS TO CHECK
ALL CONDITIONS WHICH MAY EFFECT THE PERFORMANCE OF THE WORK INVOLVED. NO
ALLOWANCES OR EXTRA PAYMENT WILL BE MADE DUE TO CONTRACTOR'S FAILURE TO EXAMINE SITE
AND FULLY DISCERN WORKING CONDITIONS.
12. MECHANICAL CONTRACTOR SHALL RECEIVE, PROPERLY HOUSE, HANDLE, HOIST, AND
DELIVER TO PROPER LOCATION EQUIPMENT AND OTHER MATERIALS REQUIRED FOR THIS CONTRACT.
13. THE CONTRACTOR SHALL OBTAIN PERMITS, ARRANGE FOR INSPECTIONS, AND PAY FEES AND EXPENSES IN CONNECTION THEREWITH, AS A PART OF THE WORK REQUIRING SUCH PERMITS. EVERY
EFFORT IS MADE TO DESCRIBE THE WORK REQUIREMENTS IN CONFORMITY WITH APPLICABLE
CODES.
14. THE CONTRACTOR SHALL REVIEW ANY ALTERNATES OF OTHER TRADES, AND PRICE THEIR BID
TO ACCOUNT FOR ITEMS AFFECTING HIS WORK.
15. PIPING PASSING THROUGH CORRIDORS, TUNNELS, CHASES, ETC. SHALL BE CONSIDERED FOR
PROPER DRAINAGE. CONSULT WITH THE OTHER CONTRACTORS AND AVOID CONFLICT WITH
LOCATION OF PIPING. ORDER OF PRIORITY FOR ALL PIPING AND CONDUITS TO BE INSTALLED SHALL
BE AS FOLLOWS WITH THE HIGHEST PRIORITY LISTED FIRST.
A. PLUMBING DRAIN LINES
B. CONDENSATE LINES
C. DUCTWORK
D. FIRE PROTECTION
E. HOT AND COLD WATER PIPING
F. ELECTRICAL CONDUIT
16. WORK ASSIGNMENTS INFERRED BY THE DRAWINGS AND NOTES INCLUDED IN THESE PROJECT
DOCUMENTS ARE INFORMATIONAL ONLY AND ARE NOT INTENDED TO RELIEVE THE BIDDING
CONTRACTOR OF HIS OBLIGATION TO THE OWNER TO PROVIDE A COMPLETE AND COORDINATED
PROJECT. COMPREHENSIVE SUBCONTRACTOR COORDINATION AND FINAL WORK ASSIGNMENTS TO
SUBCONTRACTORS ARE THE SOLE RESPONSIBILITY OF THE BIDDING CONTRACTOR.
17. ALL DUCTS SERVING SUPPLY, RETURN AND EXHAUST TERMINALS SHALL BE PROVIDED WITH
BALANCE DAMPERS. FOR CLARITY, ALL DAMPERS MAY NOT BE SHOWN ON PLANS.
18. PROVIDE DIELECTRIC UNIONS/CONNECTIONS AT ALL JUNCTIONS OF DISSIMILAR METALS.
M
M
H
T
M
OD
OD
OD
OVERFLOW STORM - EXISTING
OVERFLOW STORM - DEMO
OVERFLOW STORM - NEW
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- C ry st al F al ls
M a nd T a nd
C
SB
V en til at io n
St ud y\ D w gs
\M ec ha ni ca l\M
-0
D
TM
B- C ry st al F al ls
_M
EC
H _R
.rv t
3/
/2
:2 3:
A
M
M001
MECHANICAL AND
PLUMBING
ABBREVIATIONS
AND SYMBOLS
M
T B
U
IL
D
IN
G V
EN
TI
LA
TI
O N
U
PG
R A
D
ES
MI
CH
IG
AN
D
EP
AR
TM
EN
T O
F T
RA
NS
PO
RT
AT
IO
N
0 T
OB
IN
-A
LP
HA
R
D, C
RY
ST
AL
FA
LL
S, M I 4
M
-0
D
KS
SC
P
AS
J
SC
P
M
T B
U
IL
D
IN
G V
EN
TI
LA
TI
O N
U
PG
R A
D
ES
M
IC
H
IG
A N
D
EP
A R
TM
EN
T O
F
TR
A N
SP
O
R
TA
TI
O
N
BI
D D
IN
G
/1
3/
EF-1
IL-1
C O
/N O
FAN GUARD
MOTOR
FASTEN SECURELY TO WALL
CAULK PERIMETER
GRAVITY BACKDRAFT
DAMPER
WEATHER SHIELD
WITH BIRD SCREEN
PARALLEL BLADE
DAMPER
LOW VOLTAGE DAMPER
ACTUATOR MOUNTED ON
EXTERIOR OF DUCT
(PROVIDE INSULATION
STANDOFF)
DRAINABLE FIXED BLADE LOUVER
(SEE SCHEDULE)
O
PE
N
IN
G S
IZ
E
(F
IE
LD
V
ER
IF
Y)
1 CO/NO2 SENSOR MOUNTED AT MANUFACTURER'S RECOMMENDATIONS.
PROVIDE POWER SUPPLY AS REQUIRED. PROVIDE RELAYS FOR EXHAUST
FAN AND LOUVER FOR INTERLOCK. SEE WIRING DIAGRAM ON ELECTRICAL
DRAWINGS. MANUFACTURER'S RECOMMENDATIONS INCLUDES MOUNTING
HEIGHT.
KEYNOTES
EXHAUST FAN (EF-1):
EXHAUST FAN SHALL BE SUPPLIED WITH LOCAL HAND/OFF/AUTO (HOA) SWITCH WITH RED
INDICATOR LIGHT. INDICATOR LIGHT SHALL BE ENERGIZED WHENEVER FAN IS IN OPERATION.
- IN "HAND" MODE, MOTORIZED DAMPER ON INTAKE LOUVER SHALL FULLY OPEN AND
CONNECTED EXHAUST FAN SHALL BE ENERGIZED AND SHALL REMAIN ENERGIZED UNTIL
MANUALLY SHUT OFF.
- IN "AUTO" MODE, INTAKE LOUVER AND FAN SHALL OPERATE PER CO/NO2 SEQUENCE AS
INDICATED BELOW.
- IN "OFF" MODE, MOTORIZED DAMPER SHALL FULLY CLOSE AND EXHAUST FAN SHALL BE DE-
ENERGIZED. THIS MODE SHALL BE USED FOR MAINTENANCE AND INSPECTION PURPOSES
ONLY.
CO/NO2 OPERATION:
CARBON MONOXIDE (CO) AND NITROGEN DIOXIDE (NO2) DETECTORS SHALL PREVENT CO
LEVELS OF 22 PPM (ADJ) AND NO2 LEVELS OF 3 PPM (ADJ). UPON DETECTION OF USER
ADJUSTABLE CO/NO2 LEVELS, MOTORIZED DAMPER ON INTAKE LOUVER SHALL FULLY OPEN
AND CONNECTED EXHAUST FAN SHALL BE ENERGIZED. SYSTEM SHALL OPERATE FOR A
MINIMUM OF 30 MINUTES AND UNTIL CONCENTRATION LEVELS OF NO/CO2 HAVE DROPPED
BELOW SET LEVELS.
SEQUENCE OF OPERATIONS (CO/NO2 DETECTION SYSTEM)
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- C ry st al F al ls
M a nd T a nd
C
SB
V en til at io n
St ud y\ D w gs
\M ec ha ni ca l\M
-0
D
TM
B- C ry st al F al ls
_M
EC
H _R
.rv t
3/
/2
:2 3:
A
M
M101
MECHANICAL PLAN,
DETAILS, &
SCHEDULES
M
T B
U
IL
D
IN
G V
EN
TI
LA
TI
O N
U
PG
R A
D
ES
MI
CH
IG
AN
D
EP
AR
TM
EN
T O
F T
RA
NS
PO
RT
AT
IO
N
0 T
OB
IN
-A
LP
HA
R
D, C
RY
ST
AL
FA
LL
S, M I 4
M
-0
D
KS
SC
P
AS
J
SC
P
M
T B
U
IL
D
IN
G V
EN
TI
LA
TI
O N
U
PG
R A
D
ES
M
IC
H
IG
A N
D
EP
A R
TM
EN
T O
F
TR
A N
SP
O
R
TA
TI
O
N
3/16" = 1'-0"A4 MECHANICAL PLAN
VENTILATION CALCULATION AND CODE REQUIREMENTS PER MICHIGAN MECHANICAL CODE
ROOM NAME OCCUPANCY CLASSIFICATION
FLOOR AREA
(SQ FT) AIR DISTRIBUTION CONFIGURATION
OCCUPANCY
DENSITY,
PEOPLE /1000
FT2
ZONE
POPULATION, #
OF PEOPLE IN
THE SPACE
PEOPLE OUTDOOR
AIR RATE,
CFM/PERSON
AREA
OUTDOOR AIR
RATE, CFM/FT2
EA Rate CFM/ft2 Exhaust Airflow Rate per Room
PEOPLE
OUTDOOR AIR
RATE (CFM)
AREA
OUTDOOR AIR
RATE (CFM)
OUTDOOR
AIRFLOW TO
THE ZONE
(CFM)
ZONE AIR
DISTRIBUTION
EFFECTIVENESS
ZONE
OUTDOOR
AIRFLOW
(CFM)
EXHAUST
AIRFLOW
RATE FROM
THE ROOM
(CFM)
Garage Parking Garage (Enclosed) 2481 MAEKUP AIR DRAWN IN ON THE OPPOSITE SIDE OF THE
ROOM FROM THE EXHAUST AND/OR RETURN
0 0 0.0 0.00 0.75 Repair Garages, Enclosed
Parking Garages 0 0 0 0.8 0 1860
Grand total 0 1860
FAN SCHEDULE
MARK DESCRIPTION MANUFACTURER MODEL
NUMBER
AIR FLOW
(CFM)
EXT. SP.
(IN. WG) RPM ELECTRICAL NOTESVOLTS PHASE HP
EF-1 SIDEWALL BELT DRIVE FAN GREENHECK BAER-24 1,910 0.132 604 115 1 1/4 1 - 4
1. COORDINATE ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR.
2. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
3. PROVIDE WITH BACKDRAFT DAMPER, WALL HOUSING, AND 45 DEG. WEATHERHOOD.
4. PROVIDE WITH CO/NO2 CONTROL SYSTEM.
LOUVER SCHEDULE
ID DESCRIPTION MANUFACTURER MODEL MATERIAL DIMENSIONS
(WxH) (IN)
THICKNESS
(IN) CFM
PRESSURE
DROP
(IN. WG.)
FREE AREA
(SQ. FT.)
VELOCITY
(FT/MIN)
IL-1 INTAKE LOUVER GREENHECK ESD-403 ALUMINUM 36 x 36 4 1,910 0.036 4.21 453
1. PROVIDE WITH BIRDSCREEN AND MOTORIZED DAMPER PER DETAILS.
NOT TO SCALEA2 WALL EXHAUST FAN DETAIL
NOT TO SCALEC1 DUCTED WALL LOUVER DETAIL (INTAKE)
BI
D
D
IN
G
/1 3/
1. IT SHALL BE THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO NOTIFY OTHER
CONTRACTORS TO ARRANGE CLEARANCES AND ACCESS OPENINGS FOR ALL LARGE ELECTRICAL
EQUIPMENT.
2. IT SHALL BE UNDERSTOOD THAT THE ACT OF SUBMITTING A BID BY THE CONTRACTOR
CARRIES WITH IT THE AGREEMENT TO ALL ITEMS AND CONDITIONS REFERRED OR INDICATED OR
IMPLIED ON THE DRAWINGS AND THE SPECIFICATIONS AND NO CONSIDERATION WILL BE
GRANTED FOR ANY ALLEGED MISUNDERSTANDING OF MATERIALS TO BE FURNISHED FOR WORK
TO BE DONE.
3. THE ELECTRICAL INSTALLATION SHALL COMPLY WITH RULES AND REGULATIONS OF THE
LATEST EDITION OF THE OCCUPATIONAL SAFETY AND HEALTH ACT, NATIONAL ELECTRICAL CODE, STATE ELECTRICAL CODE, LOCAL MUNICIPAL CODE AND ANY OTHER BOARD HAVING
JURISDICTION OVER THE ELECTRICAL INSTALLATION.
4. THE ELECTRICAL CONTRACTOR SHALL NOT ASSUME THAT ANY DRAWING OR
SPECIFICATION FORMING A PART OF THE CONTRACT DOCUMENTS AUTHORIZES THE VIOLATION
OF ANY CODE, REGULATION OR STANDARD. WHERE CONFLICTS ARISE, IT SHALL BE DEEMED THAT
THE CONTRACTOR HAS ESTIMATED THE COST OF ALL WORK TO BE COMPLETED IN ACCORD WITH
THE PREVAILING CODE.
5. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR ELECTRICAL WORK AND
SHALL PAY ALL REQUIRED FEES AND SALES OR USE TAX AND FINES AS APPLICABLE TO THIS
BRANCH OF WORK.
6. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL DELIVER TO THE OWNER
WITHOUT COST ALL REQUIRED CERTIFICATES OF INSPECTION AND APPROVAL.
7. THE INTENT AND OBJECT OF THESE SPECIFICATIONS AND DRAWINGS IS TO INCLUDE A
COMPLETE WIRING SYSTEM FROM SERVICE PANEL TO EACH AND EVERY OUTLET INDICATED OR
SPECIFIED, INCLUDING CONNECTING ALL ELECTRICAL DEVICES AND/OR EQUIPMENT FURNISHED
BY THE OWNER OR OTHER CONTRACTORS.
8. THE DRAWINGS, WHICH CONSTITUTE A PART OF THE CONTRACT, ARE DIAGRAMMATIC AND
INDICATE THE GENERAL ARRANGEMENT OF CIRCUITS AND OUTLETS, LOCATION OF SWITCHES,
PANELBOARD AND OTHER WORK, BUT EXTREME ACCURACY IS NOT GUARANTEED AND FIELD
VERIFICATION OF ALL LOCATIONS AND DIMENSIONS IS DIRECTED.
9. GROUND ALL EQUIPMENT INCLUDING CONDUIT, RECEPTACLES, LIGHTING, MOTORS, PIPING
AS PER ARTICLE 250 OF THE NATIONAL ELECTRICAL CODE, AND AS SHOWN ON THESE DRAWINGS.
10. PROVIDE ONLY MATERIALS THAT ARE NEW OF THE TYPE AND QUALITY SPECIFIED, WHERE
UNDERWRITERS LABORATORIES HAVE ESTABLISHED STANDARDS FOR SUCH MATERIALS,
PROVIDE ONLY MATERIALS BEARING THE U.L. LABEL.
11. ARCHITECTURAL DRAWINGS SHOWING DIMENSIONS FOR ELECTRICAL DEVICES TAKE
PRECEDENCE OVER THE ELECTRICAL DRAWINGS.
12. SYSTEMS SHALL BE FREE FROM SHORTS AND GROUNDS. TEST FOR MECHANICAL AND
ELECTRICAL DEFECTS. VERIFY CORRECT CONNECTION OF HOT, NEUTRAL AND GROUND
CONDUCTORS. ALL CONDUCTORS SHALL BE COLOR CODED AND LABELED WITH ZONE
IDENTIFICATION FOR THE CASE OF LIGHTING.
13. WHEN MATERIAL AND/OR WORKMANSHIP IS FOUND NOT TO COMPLY WITH THE SPECIFIED
REQUIREMENTS, WITHIN THREE DAYS AFTER RECEIPT OF NOTICE OF SUCH NON-COMPLIANCE,
REMOVE THE NON-COMPLYING ITEMS FROM THE JOB AND REPLACE WITH NEW ITEMS MEETING
THE REQUIREMENTS. COSTS FOR REPAIR OF NON-COMPLIANCE WORK SHALL BE BY THE
CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER.
14. UPON COMPLETION OF THE WORK, THOROUGHLY CLEAN ALL DEVICES AND EQUIPMENT.
15. WORK ASSIGNMENTS INFERRED BY THE DRAWINGS AND NOTES INCLUDED IN THESE
PROJECT DOCUMENTS ARE INFORMATIONAL ONLY AND ARE NOT INTENDED TO RELIEVE THE
BIDDING CONTRACTOR OF HIS OBLIGATION TO THE OWNER TO PROVIDE A COMPLETE AND
COORDINATED PROJECT. COMPREHENSIVE SUBCONTRACTOR COORDINATION AND FINAL WORK
ASSIGNMENTS TO SUBCONTRACTORS ARE THE SOLE RESPONSIBILITY OF THE BIDDING
CONTRACTOR.
GENERAL NOTES:
PANEL - RECESSED
PANEL - SURFACE MOUNT
AUTOMATIC TRANSFER SWITCH (ATS)
DISCONNECT
NORMALLY OPEN SWITCH
NORMALLY CLOSED SWITCH
CIRCUIT BREAKER WITH SIZE AS NOTED
NORMALLY OPEN CONTACT
NORMALLY CLOSED CONTACT
FUSED SWITCH
ELECTRIC METER
GROUND
IN-LINE FUSE
TRANSFORMER
STARTER DISCONNECT
THERMOSTAT
CONNECTION TO MOTOR
FUSED DISCONNECT
DISCONNECT
ABBREVIATIONS
A AMPERES
AV PANELBOARD AV
AV AUDIO/VIDEO
A/V AUDIO/VIDEO
C PANELBOARD KPP-C
C.B. CIRCUIT BREAKER
GFCI GROUND FAULT CIRCUIT INTERUPTING
GFI GROUND FAULT CIRCUIT INTERUPTING
KVA KILO-VOLT AMPS (ELECTRIC POWER)
QT QUAD TUBE (FLUORESCENT LAMP)
TT TWIN TUBE (FLUORESCENT LAMP)
TYP TYPICAL
V VOLT
4W FOUR WIRE
3ø THREE PHASE
MISCELLANEOUS SYMBOLS
L
N E
M
T
EF EXHAUST FAN
IL INTAKE LOUVER
EF-1
IL-1
EXISTING ELECTRICAL PANELS. SQUARE D TYPE QO.
EXISTING METER
EXISTING 200 AMP, 120/240 SINGLE
PHASE OVERHEAD SERVICE.
1 PROVIDE 120V, 20 AMP CIRCUIT FROM EITHER EXISTING PANEL FOR NEW
EXHAUST FAN, MOTORIZED LOUVER, AND GAS DETECTION SYSTEM. ONE
CIRCUIT CAN SERVE ALL THREE. PROVIDE NEW BREAKER AND
DISCONNECT.
KEYNOTES
1.
2.
ALL NEW WIRING SHALL BE IN EMT.
COORDINATE EXHAUST FAN AND LOUVER WIRING INTERLOCK WITH
MECHANICAL CONTRACTOR.
GENERAL NOTES
MOTORIZED DAMPER ON
INTAKE LOUVER
EXHAUST FAN
CONTROL FROM NO2
AND CO DETECTORS
HAND
OFF
AUTO
CO
NO2
CR-1
M1
CR-1 O.L.M1
N
H
N
H M
CR-1 O.L.M
1Ø, 60HZ
1Ø, 60HZ
CO AND NO2 CONTACTS ARE TO BE
DRY CONTACT OUTPUTS FROM
CONTROL SYSTEM BASED ON SENSOR
INPUTS
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- C ry st al F al ls
M a nd T a nd
C
SB
V en til at io n
St ud y\ D w gs
\M ec ha ni ca l\M
-0
D
TM
B- C ry st al F al ls
_M
EC
H _R
.rv t
3/
/2
:2 3:
A
M
E101
ELECTRICAL PLAN,
NOTES, & DETAILS
M
T B
U
IL
D
IN
G V
EN
TI
LA
TI
O N
U
PG
R A
D
ES
MI
CH
IG
AN
D
EP
AR
TM
EN
T O
F T
RA
NS
PO
RT
AT
IO
N
0 T
OB
IN
-A
LP
HA
R
D, C
RY
ST
AL
FA
LL
S, M I 4
M
-0
D
KS
SC
P
AS
J
SC
P
M
T B
U
IL
D
IN
G V
EN
TI
LA
TI
O N
U
PG
R A
D
ES
M
IC
H
IG
A N
D
EP
A R
TM
EN
T O
F
TR
A N
SP
O
R
TA
TI
O
N
3/16" = 1'-0"A4 ELECTRICAL PLAN
NOT TO SCALEA2 EF/LOUVER INTERLOCK
BI
D
D
IN
G
/1 3/
M&T BUILDING VENTILATION UPGRADES
| G001 - TITLE SHEET |
| M001 - MECHANICAL AND PLUMBING ABBREVIATIONS AND SYMBOLS |
| M101 - MECHANICAL PLAN, DETAILS, & SCHEDULES |
| E101 - ELECTRICAL PLAN, NOTES, & DETAILS |