This is an architectural construction document drawing set for a federal project. The document is a First Floor General Resource Plan prepared by Alesia Architecture P.C. for the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management. The project, identified as 589A7-23-305, involves preparing a site for Choice Dining Equipment at 5500 E Kellogg Avenue, Wichita, Kansas. The drawing was issued on May 17, 2024, and drawn by JJG with review by RJO.

The document contains detailed architectural floor plans and photographs depicting the existing conditions of food service areas, including the Hot Production/Tray Assembly Line on both the north and south sides, along with supporting spaces such as the Supervisors Office, Multipurpose Room, Staff Breakroom, Staff Workroom, Kitchen Manager area, Cold Food Prep room, and associated storage areas. The plan is fully sprinklered and includes multiple detailed section views at various scales (ranging from 1/16" = 1'-0" to 12" = 1'-0") to show equipment placement and spatial configurations. The project documentation is marked as Construction Documents and includes the Architect/Engineer of Record stamp for licensed Nebraska architect Richard Joseph Onken (A-5125).

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

WR

J

W ,1

J J

F

J

SD

J J

J J

J J

J

W,1

J

F

SD

R E

X

2 2

JJ

J

F A

C P

S S S S S S S S S S S S

S S

S

SS

S S

S S

S S

S

S S S S S S S

DN

DN

SUPERVISORS

OFFICE

MULTIPURPOSE

ROOM

STAFF

BREAKROOM

STAFF

WORKROOM

KITCHEN

MANAGER

107A

HOT

PRODUCTION/TRAY

ASSEMBLY

LINE

COLD FOOD

PREP

103A

GR101

GR101

GR101

GR101A

GR101A

GR101B

GR101B

5 GR101A

GR101C

GR101C

GR101C

GR101D

GR101D

GR101D

TRUE

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CONSTRUCTION

DOCUMENTS

PREPARE SITE FOR CHOICE

DINING EQUIPMENT

589A7-23-305

5500 E KELLOGG AVE, WICHITA, KS

A

B

C

D

E

F

A u to d e s k D o c s /1

A -2

-3

P re p a re

S it e f o r C h o ic e

D in in g /5

A -2

-3

.B

.A rc h

R

-E x is ti n g

.r v t

/2

/2

:4

:2

P

M

GR101

FIRST FLOOR - GENERAL RESOURCE

PLAN

RJO JJG05/17/2024

3/16" = 1'-0"1

FIRST FLOOR - GENERAL RESOURCE PLAN

12" = 1'-0"3

HOT PRODUCTION/TRAY ASSEMBLY LINE - NORTH

12" = 1'-0"5

HOT PRODUCTION/TRAY ASSEMBLY LINE - NORTH

12" = 1'-0"2

HOT PRODUCTION/TRAY ASSEMBLY LINE - SOUTH

12" = 1'-0"4

HOT PRODUCTION/TRAY ASSEMBLY LINE - SOUTH

12" = 1'-0"6

HOT PRODUCTION/TRAY ASSEMBLY LINE - SOUTH

Mark Revisions: Date:

A

R C H I T E

C

T

S T A T E

O F N E B

R A S K A

05/17/2024

RICHARD

JOSEPH

ONKEN

A-5125

File details come from the government source that posted it. Updated .