This notice describes a federal contract opportunity to renovate patient rooms and common spaces at a VA medical center. The Michael E. DeBakey VA Medical Center in Houston, Texas is seeking proposals for project number 580-18-122 to renovate Community Living Center Unit 1C. Work includes demolition, architectural, mechanical, electrical, plumbing, communications, fire protection and interior finishes. The period of performance is 365 calendar days with a notice to proceed. The solicitation will be issued as a Request for Proposals and made available electronically on February 3, 2021. A 90-day acceptance period and bid bond are required. Performance and payment bonds will be required from the contractor receiving the award, which is estimated between $2-5 million. The opportunity is only available to service-disabled veteran-owned small businesses. At least 15% of contract costs must be spent on employees of SDVOSB concerns. Offerors must register on various websites and have completed representations and certifications by the due date.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA OF WORK
COMMUNITY LIVING CENTER, UNIT 1C
OLD SPANISH TRAIL
VETERANS HOSPITAL 5 DRIVE
A L
M E
D A
R O
A D
PROJECT LOCATION
MICHAEL E. DEBAKEY VA MEDICAL CENTER
BUILDING 100
UNIT 1C
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg. OF 59
CONSULTANTS
F
SHEET TITLE
ARCHITECT & ENGINEER OF RECORD
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
FIRE PROTECTION ENGINEER
HENDERSON ENGINEERS
8345 LENEXA DRIVE, SUITE 300
LENEXA, KS 66214
(913) 742-5000
SPUR-DESIGN
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
SPUR-DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
SPUR-DESIGN
4425 E. AGAVE ROAD, SUITE 106
(BLDG. 2), SUITE #13
PHOENIX, AZ 85044
RENOVATE CLC UNIT 1C, BUILDING 100COVER SHEET
3/31/2020 AWM JET
MICHAEL E. DEBAKEY VA MEDICAL CENTER
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030
MICHAEL E. DEBAKEY VA MEDICAL CENTER
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030
BID DOCUMENTS
RENOVATE CLC UNIT 1C, BUILDING 100
GI000
DEPARTMENT OF VETERANS AFFAIRS
580-18-122
VA PROJECT NUMBER: 580-18-122
BID DOCUMENTS
N
NUMBER SHEET NAME
[01] GENERAL
1 GI000 COVER SHEET
2 GI001 GENERAL INFORMATION
3 GI102 LIFE SAFETY
4 GI103 PHASING
5 GI104 ALTERNATE OPTIONS
6 GI105 VERTICAL AND HORIZONTAL ASSEMBLIES
[02] ARCHITECTURAL
7 AD100 ARCHITECTURAL DEMOLITION PLAN
8 AD200 ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN
9 AE100 ARCHITECTURAL FLOOR PLAN
10 AE102 ARCHITECTURAL FLOOR PLAN - FF&E
11 AE103 ARCHITECTURAL FLOOR PLAN - FINISHES
12 AE104 ARCHITECTURAL FLOOR PLAN - SIGNAGE
13 AE200 ARCHITECTURAL REFLECTED CEILING PLAN
14 AE300 ARCHITECTURAL ENLARGED PLANS AND ELEVATIONS
15 AE301 ARCHITECTURAL ENLARGED PLANS AND ELEVATIONS
16 AE302 ARCHITECTURAL ENLARGED PLANS AND ELEVATIONS
17 AE400 ARCHITECTURAL DETAILS - DOORS & WINDOWS
18 AE401 ARCHITECTURAL DETAILS
19 AE402 ARCHITECTURAL DETAILS
[03] FIRE PROTECTION
20 FA000 FIRE ALARM LEGEND
21 FAD101 FIRE ALARM FIRST FLOOR DEMOLITION PLAN
22 FA101 FIRE ALARM FIRST FLOOR PLAN
[04] PLUMBING
23 P-000 PLUMBING LEGEND
24 PLD-101 PLUMBING DEMOLITION PLAN - FIRST FLOOR
25 PLD-102 PLUMBING DEMOLITION PLAN - FIRST FLOOR INTERSTITIAL
26 PL-100 PLUMBING PLAN - BASEMENT INTERSTITIAL
27 PL-101 PLUMBING PLAN - FIRST FLOOR
28 PL-102 PLUMBING PLAN - FIRST FLOOR INTERSTITIAL
29 P-401 PLUMBING ENLARGED PLANS
30 P-501 PLUMBING DETAILS
31 P-601 PLUMBING SCHEDULES
[05] MECHANICAL
32 M000 MECHANICAL LEGEND
33 MHD101 MECHANICAL HVAC DEMOLITION FLOOR PLAN
34 MPD101 MECHANICAL PIPING DEMOLITION FLOOR PLAN
35 MHT101 MECHANICAL HVAC TEMPORARY DUCT AND PIPING PLAN
36 MH101 MECHANICAL HVAC FLOOR PLAN
37 MH102 MECHANICAL HVAC INTERSTITIAL PLAN
38 MP101 MECHANICAL PIPING FLOOR PLAN
39 M401 MECHANICAL ENLARGED PLANS
40 M501 MECHANICAL DETAILS
41 M601 MECHANICAL SCHEDULES
42 M701 HVAC PIPING DIAGRAMS
43 M801 MECHANICAL INSTRUMENTATION - CONTROLS
[06] ELECTRICAL
44 E-000 ELECTRICAL LEGEND
45 ELD101 ELECTRICAL LIGHTING FIRST FLOOR DEMOLITION PLAN
46 EPD101 ELECTRICAL POWER FIRST FLOOR DEMOLITION PLAN
47 EL101 ELECTRICAL LIGHTING FIRST FLOOR PLAN
48 EP101 ELECTRICAL POWER FIRST FLOOR PLAN
49 EQ101 ELECTRICAL MECHANICAL EQUIPMENT FIRST FLOOR PLAN
50 E-501 ELECTRICAL DETAILS
51 E-601 ELECTRICAL ONE-LINE DIAGRAM
52 E-602 ELECTRICAL SCHEDULES
53 E-603 ELECTRICAL SCHEDULES
54 E-701 LIGHTING CONTROL DIAGRAMS
[07] TECHNOLOGY
55 T-000 TECHNOLOGY LEGEND
56 TD101 TECHNOLOGY FIRST FLOOR DEMOLITION PLAN
57 T-101 TECHNOLOGY FIRST FLOOR PLAN
58 TY101 SECURITY FIRST FLOOR PLAN
59 T-501 TECHNOLOGY SCHEDULES AND DETAILS
TOTAL SHEETS: 59
N
Revision # Date jet Image
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS
SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) (2018) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• NFPA 101 LIFE SAFETY CODE (2018) (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC) (2017)
• INTERNATIONAL PLUMBING CODE (IPC) (2018)
• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318) MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL
CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW
LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT.
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION.
THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS
ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
ACT (SP) ACOUSTICAL CEILING TILE (WITH SPRAYED PLASTIC FINISH)
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES
ADC AUTOMATIC DOOR CLOSER
ADH ADHESIVE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
ABG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
ALUM ALUMINUM
AR AS REQUIRED
ASB ASBESTOS
AWT ACOUSTICAL WALL TREATMENT
DEMO DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
ELEC ELECTRIC
EA EACH
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTINGUISHER
ETR EXISTING TO REMAIN
F FEMALE
FD FLOOR DRAIN
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF&E FURNITURE, FIXTURE, & EQUIPMENT
FP FIRE PROTECTION OR FIREPROOF
FR FIRE RATING, FIRE RESISTANCE, OR FRAME
FT FEET OR FOOT
FURR FURRING
FV FIELD VERIFY
SC SEALED CONCRETE
SCHED SCHEDULE
SF SQUARE FOOT (FEET)
SIM SIMILAR
SPEC SPECIFICATION
SQ IN SQUARE INCH
SQ YD SQUARE YARD
STRUCT STRUCTURAL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STOR STORAGE
T&G TONGUE AND GROOVE
THRU THROUGH
TO TOP OF
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOS TOP OF STEEL
TYP TYPICAL
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL CONFIRM ALL ITEMS REQUIRED BASED UPON
THE OVERALL DESIGN INTENT OF THE ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY WORK TO CONFIRM THE ACCURACY OF THE DRAWINGS, AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL
DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN AND FREE OF OBSTRUCTIONS AT
ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE CONSTRUCTION WORK. PROVIDE DUST
PROOFING ENCLOSURES TO SEPARATE WORK AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN PLACE DURING THE SCOPE OF WORK.
SHOULD ANY DAMAGE OCCUR, PATCH AND REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR REPLACED BACK TO ITS ORIGINAL
CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT PARTICULATE MATERIAL FROM
EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE ADEQUATE LIGHTING LEVELS FOR
CONSTRUCTION.
10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS, BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO THE GOVERNMENT.
11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS DIRECTED BY THE COR.
MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING AND APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF THE MEDICAL CENTER.
INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE
DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION DOCUMENTS.
ROOM NAME, NUMBER
AND SQUARE FEET
X'-X"
COLUMN GRID
KEYNOTE
WALL OR PARTITION TYPE
PLAN NORTH ARROW WITH TRUE NORTH
ELEVATION INDICATOR,
INTERIOR/EXTERIOR
BUILDING SECTION
INDICATOR
ELEVATION INDICATOR
BREAK, STRAIGHT (SEE SECTION INDICATORS,
BUILDING, WITH BREAK STANDARDS)
DIMENSION LINE
CENTER LINE
1 1/2"
MATCH LINE
N
1A
A
A
CORNER GUARDCG
A101
DETAIL INDICATOR
1 / A101
SIM
Name
150 SF
A101
SIM
A101
SIM
WINDOW TYPE
1A
A SUMMARY OVERVIEW OF THE PROJECT OBJECTIVES INCLUDES:
RESIDENT ROOMS
• REPLACE THE EXISTING RADIANT HEAT PANEL SYSTEM WITH CONVENTIONAL
HVAC AND TU BOXES WITH REHEAT.
• REPLACE CEILING MOUNTED RADIANT HEAT PANELS WITH 2'-0 x 2'-0"
ACOUSTICAL CEILING GRID AND TILE.
• PROVIDE NEW LED LIGHTING IN NEW CEILING GRID.
• UPDATE FLOOR FINISHES.
• PROVIDE ADDITIONAL ELECTRICAL OUTLETS.
NURSING CORE AND SUPPORT SPACES
• RENOVATE AND UPGRADE CORE AND SUPPORT SPACES TO ALIGN WITH THE
NEEDS OF THE COMMUNITY LIVING CENTER PER THE VA DESIGN GUIDE AND
FACILITY-SPECIFIC PROGRAMMING REQUIREMENTS.
MULTIFUNCTION SPACE
• RENOVATE AND UPGRADE THE MULTIFUNCTION SPACE TO ALIGN WITH THE
NEEDS OF THE COMMUNITY LIVING CENTER PER THE VA DESIGN GUIDE AND
FACILITY-SPECIFIC PROGRAMMING REQUIREMENTS.
• PROVIDE AN ADDITIONAL KITCHEN / SERVING SPACE WITH DIRECT ACCESS TO
THE DINING AREA.
LAV LAVATORY
LF LINEAR FEET (FOOT)
LVR LOUVER
LF LINEAR FEET (FOOT)
MAX MAXIMUM
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
OC ON CENTER
OPP OPPOSITE
PNL PANEL
PVC POLYVINYL CHLORIDE (PLASTIC)
GENERAL NOTES
ARCHITECTURAL ABBREVIATIONS
CODES, STANDARDS, AND EXECUTIVE ORDERS ENERGY REQUIREMENTS
ADA MOUNTING HEIGHTS AND CLEARANCES
SYMBOLS LEGENDPROJECT DESCRIPTION
INTERNATIONAL ENERGY CONSERVATION CODE (IECC) (2018)
BUILDING LOCATION: HOUSTON, TEXAS, USA
CLIMATE ZONE (FIGURE C301.1): ZONE 2A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES USED FOR HEATING AND COOLING LOAD CALCULATIONS
SHALL BE A MAXIMUM OF 72 DEGREES FAHRENHEIT AND MINIMUM OF 75 DEGREES FAHRENHEIT
FOR COOLING.
BUILDING ENVELOPE REQUIREMENTS (C402):
OPAQUE THERMAL ENVELOPE REQUIREMENTS (TABLE C402.2):
ROOFS
INSULATION ENTIRELY ABOVE DECK:
METAL BUILDINGS (W/ R-5 THERMAL BLOCKS):
ATTIC AND OTHER:
WALLS, ABOVE GRADE
MASS:
METAL BUILDING:
METAL FRAMED:
WOOD FRAMED AND OTHER:
WALLS, BELOW GRADE
BELOW-GRADE WALL:
FLOORS
MASS:
JOIST/FRAMING:
SLAB-ON-GRADE
UNHEATED SLABS:
HEATED SLABS:
OPAQUE DOORS
SWINGING:
ROLL-UP OR SLIDING:
FENESTRATION (TABLE C402.3):
VERTICAL FENESTRATION
U-FACTOR
FIXED FENESTRATION:
OPERABLE FENESTRATION:
ENTRANCE DOORS:
SHGC
SHGC
SKYLIGHTS
U-FACTOR
SHGC
MAXIMUM AREA (C402.3.1)
THE VERTICAL FENESTRATION AREA (NOT INCLUDING OPAQUE DOORS AND
OPAQUE SPANDREL PANELS) SHALL NOT EXCEED 30 PERCENT OF THE GROSS
ABOVE-GRADE WALL AREA. THE SKYLIGHT AREA SHALL NOT EXCEED 3 PERCENT
OF THE GROSS ROOF AREA.
REQUIRED AS DESIGNED
R-25ci N/A N/A
R-5.7ci N/A N/A N/A
N/A
N/A N/A
N/A N/A
U-0.61 N/A
0.50 N/A 0.83
0.25
N/A N/A
BAT BATTEN
BEV BEVEL
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BTWN BETWEEN
CAC CEILING ATTENUATION CLASS
CB CORNER BEAD
CBB CEMENTITIOUS BACKER BOARD
CCTV CLOSED CIRCUIT TELEVISION
C / C CONTRACTOR FURNISHED / CONTRACTOR INSTALLED
CL CENTER LINE
CMU CONCRETE MASONRY UNIT
CONT CONTINUE OR CONTINUOUS
CR CARD READER
GA GAGE
GALV GALVANIC OR GALVANIZED
GB GRAB BAR
GD GUARD
GL GLASS
GT GROUT
GWB GYPSUM WALLBOARD
HDR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HS HEAT-STRENGTHENED (GLASS)
OR HIGH STRENGTH
HT HEIGHT
IN INCH OR INCHES
KPL KICKPLATE
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
QUAL QUALITY
R RADIUS OR RISER
RCP REFLECTED CEILING PLAN
RECPT RECEPTACLE
REF REFERENCE
REQD REQUIRED
REV REVISION
RM ROOM
RO ROUGH OPENING
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
VAR VARIES
V / C VA PROVIDED / CONTRACTOR INSTALLED
V / V VA PROVIDED / VA INSTALLED
W/ WITH
W/O WITHOUT
WC WALL COVERING OR WATER CLOSET
WD WOOD
WDW WINDOW
WR WASTE RECEPTACLE
X BRACE CROSS BRACE
NFPA 101-2018 EDITION
PROJECT AREA
15,407 GROSS SQFT
SPRINKLER SYSTEM
BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13
CONSTRUCTION TYPE
IBC (2018) TYPE II-A
NFPA 101 (2018) TYPE II (111)
OCCUPANCY CLASSIFICATION: HEALTHCARE OCCUPANCY
IBC (2018) - I-2
FIRE RESISTANCE RATINGS - NFPA 220 (2018)
EXTERIOR BEARING WALLS 1HR
INTERIOR BEARING WALLS 1HR
COLUMNS 1HR
BEAMS, GIRDERS, TRUSSES 1HR
FLOOR/CEILING ASSEMBLIES 1HR
INTERIOR NON-BEARING WALLS 0 HR
EXTERIOR NON-BEARING WALLS 0HR
FIRE-RESISTIVE REQUIREMENTS
NON COMBUSTIBLE MATERIALS FOR INTERIOR NON-BEARING WALLS.
CONCRETE/ PRECAST
CONCRETE
SOIL
SAND, EIFS FINISH COAT, OR
CEMENT PLASTER
BRICK
CMU
STONE
FIBERGLASS SEMI RIGID
INSULATION
FIBERGLASS BATT INSULATION
MINERAL WOOL SEMI RIGID
INSULATION
EXPANDED POLYSTYRENE RIGID
INSULATION
EXTRUDED POLYSTYRENE RIGID
INSULATION
POLYISOCYANURATE RIGID
INSULATION
GYPSUM BOARD
EXTERIOR GYPSUM SHEATHING
EXTERIOR CEMENT BOARD
COATED GLASS MAT WATER RESISTANT GYP BD
PLYWOOD
COVER BOARD
SPRAY-APPLIED CLOSED CELL
INSULATION
18" MIN.
M
IN
FRONT
APPROACH,
PULL SIDE
36" MIN.
M
IN
HINGE
APPROACH,
PULL SIDE
HINGE
APPROACH,
PULL SIDE
*12" MIN.
M
IN
FRONT
APPROACH,
PUSH SIDE
*12" MIN.
M
IN
. HINGE
APPROACH,
PUSH SIDE
22" MIN. 24" MIN.*4
M
IN
. LATCH
APPROACH,
PULL SIDE
24" MIN.
*4
M
IN
. LATCH
APPROACH,
PUSH SIDE
*IF BOTH CLOSER AND LATCH ARE PROVIDED
*54" MIN. IF CLOSER IS PROVIDED
*48" IF CLOSER IS PROVIDED*IF BOTH CLOSER AND LATCH ARE PROVIDED
**48" MIN. IF BOTH CLOSER AND LATCH PROVIDED
FRONT
APPROACH,
PUSH SIDE
M
IN
M
IN
42" MIN.
M A
X
M A
X
M A
X
M
IN
1'-6" MIN
1. GENERAL CONTRACTOR TO PROVIDE METAL BLOCKING FOR ALL WALL MOUNTED
ACCESSORIES, FIXTURES, AND EQUIPMENT.
2. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER FINISHED FLOOR TO THE
OPERABLE PART OF THE FIXTURE.
3. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL FIXTURES MAY BE USED.
REFER TO SPECIFICATIONS FOR FIXTURE TYPES USED IN THIS PROJECT.
4. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE, BACKING TO BE PROVIDED AS
SHIM FOR FLUSH APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.
6" MAX
M
IN
SHOWER
VA TURNING RADIUS BARIATRIC TURNING RADIUS
DRINKING
FOUNTAIN
PAPER TOWEL
DISPENSER
SANITARY
NAPKIN
DISPENSER
M A
X
WASTE
RECEPTACLE
LAVATORY
WITH MIRROR
ON CENTER
WALL
M A
X
SOAP
DISPENSER
M A
X
M A
X
17 MIN
/4
M
IN
M A
X
1'-5 1/2" MIN
WALL
M A
X
M A
X
1'-6" MIN
7 1/2" MIN
WALL
LAVATORY
WITH APRON
M A
X
1'-6" MIN
URINAL
WALL
1'-6"
CLEAR FLOOR
5'-0"
CLEAR FLOOR
4'-8"
2'-11 3/4" MIN
11 1/2" 3'-6 1/2" MIN 1'-0"
4'-6 1/4" MIN
M
IN
WALLWALL
/4
M A
X
WALL HOOK
CLOCK
WALL
ø 5'-6" ø 6'-0"
FINISHED
FLOOR
CLEAR FLOOR SPACE AT
WATER CLOSETS
M A
X
FIRE
EXTINGUISHER
CABINET
WEIGHT > 40LBS
M A
X
FIRE
EXTINGUISHER
CABINET
WEIGHT < 40LBS
M A
X
M A
X
TOILET SEAT
COVER
DISPENSER
BABY
CHANGING
STATION
5'-0"
CLEAR FLOOR SPACE AT
ADA DRINKING FOUNTAIN
2'-6"
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg. OF 59
CONSULTANTS
F
SHEET TITLE
ARCHITECT & ENGINEER OF RECORD
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
FIRE PROTECTION ENGINEER
HENDERSON ENGINEERS
8345 LENEXA DRIVE, SUITE 300
LENEXA, KS 66214
(913) 742-5000
SPUR-DESIGN
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
SPUR-DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
SPUR-DESIGN
4425 E. AGAVE ROAD, SUITE 106
(BLDG. 2), SUITE #13
PHOENIX, AZ 85044
RENOVATE CLC UNIT 1C, BUILDING 100GENERAL INFORMATION
3/31/2020 AWM JET
MICHAEL E. DEBAKEY VA MEDICAL CENTER
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030
GI001
580-18-122
BID DOCUMENTS
Revision # Date
SMOKE COMPARTMENT EXIT
EGRESS PATH
GENERAL NOTES - LIFE SAFETY
FEC FIRE EXTINGUISHER CABINET
xx" xx" xx" xx
D
ACTUAL CLEAR WIDTH
REQUIRED CLEAR WIDTH
ACTUAL EGRESS
MAXIMUM EGRESS CAPACITY
EGRESS COMPONENT
(D)DOOR (S)STAIRWAY
LIFE SAFETY LEGEND
ILLUMINATED EXIT SIGN
1. CONTRACTOR SHALL CAREFULLY REVIEW ALL APPLICABLE DESIGN CRITERIA, THESE DRAWINGS, AND THE PROJECT SPECIFICATIONS FOR IMPORTANT QUALIFICATION, DEFINITION, SUBMITTAL, PRODUCT, INSTALLATION, AND TESTING REQUIREMENTS.
2. ALL SUBMITTALS, INSTALLATION, AND TESTING SHALL BE COMPLETED IN A NEAT, WORKMAN-LIKE MANNER.
3. PRODUCT, DESIGN, INSTALLATION, AND TESTING ALTERNATE APPROACHES AND/OR SUBSTITUTIONS WILL BE CONSIDERED BY THE
ENGINEER IF THE CONTRACTOR PROVIDES WRITTEN, WELL-DOCUMENTED, ENGINEERING-BASED SUBSTANTIATION FOR PROPOSED
ALTERNATIVE.
4. AUDIBILITY DESIGN GOALS SHALL BE CONFIRMED BY MEASUREMENT WITH CALIBRATED TEST EQUIPMENT. IF RESULTS INDICATE THAT ADDITIONAL NOTIFICATION APPLIANCES, THE CONTRACTOR SHALL ADD THEM AT NO ADDITIONAL COST.
5. THE EXPECTED AMBIENT SOUND PRESSURE LEVELS ARE AS FOLLOWS:
• OFFICES, RESTROOMS, RESIDENT ROOMS, CIRCULATION AREAS: 55 dBA
• MECHANICAL EQUIPMENT AREAS: 85 dBA
6. THE DESIGN GOAL IS FOR THE ALERT TONE PRECEDING THE VOICE MESSAGE TO REACH THE FOLLOWING SOUND PRESSURE LEVELS
(PUBLIC MODE):
• OFFICES, RESTROOMS, RESIDENT ROOMS, CIRCULATION AREAS: 70 dBA
• MECHANICAL EQUIPMENT AREAS: 100 dBA
7. SPEAKERS MAY BE FIELD-LOCATED WITHIN 6 FT OF THE LOCATION INDICATED ON THE APPROVED DESIGN WITHOUT CONSULTING THE
ENGINEER.
8. CLEAR STROBES SHALL BE PROVIDED WHERE INDICATED ON THE APPROVED DESIGN.
9. STROBES MAY BE FIELD-LOCATED WITHIN 3 FT OF THE LOCATION INDICATED ON THE APPROVED DESIGN WITHOUT CONSULTING THE
ENGINEER.
10. INITIATING DEVICES MAY BE FIELD-LOCATED WITHIN 3 FT OF THE LOCATION INDICATED ON THE APPROVED DESIGN WITHOUT CONSULTING
THE ENGINEER.
11. ALL CIRCUITS SHALL BE PROVIDED IN CONDUIT IN ACCORDANCE WITH NFPA 70 AND THE CONDUIT LISTING.
12. CONTRACTOR SHALL PERFORM ALL ACCEPTANCE TESTING IN ACCORDANCE WITH THE APPLICABLE DESIGN CRITERIA AND THE
EQUIPMENT MANUFACTURER'S INSTRUCTIONS, UNO.
13. CONTRACTOR SHALL PERFORM TESTING AND PROVIDE DOCUMENTATION PRIOR TO REQUESTING ENGINEER'S PRESENCE TO WITNESS
TESTING, UNO.
NOT IN CONTRACT
OCCUPANT LOAD FACTORS SQFT / PERSON
ASSEMBLY (UNCONCENTRATED) 15 NET SQFT
BUSINESS (CONCENTRATED) 50 SQFT
BUSINESS (OFFICES) 150 SQFT
SLEEPING 120 SQFT
STORAGE 500 SQFT
INPATIENT TREATMENT 240 SQFT
TOTAL OCCUPANT LOAD
243 OCCUPANTS
OCCUPANCY AND EGRESS
75'-0" RADIUS MEASURED FROM
FIRE EXTINGUISHER CABINET LOCATION
NOTE
REFERENCE FIRE PROTECTION PLANS FOR LOCATIONS OF
FIRE ALARM PULL STATIONS, AUDIBLE AND VISUAL STROBES,
SPEAKERS, DOOR HOLDERS, AND SMOKE DETECTORS.
EGRESS COMPONENTS
MINIMUM REQUIRED DOOR WIDTH = 32" MIN.
MINIMUM REQUIRED WIDTH OF EGRESS COMPONENTS = (243 OCC. X 0.2"/OCC.) = 49"
ACUTAL EGRESS COMPONENT WIDTH PROVIDED = 253.5"
MAXIMUM COMMON PATH OF TRAVEL
100'-0"
MAXIMUM TRAVEL DISTANCE
200'-0"
MAXIMUM DEAD-END CORRIDOR
30'-0"
1 HOUR FIRE / SMOKE
2 HOUR FIRE / SMOKE
ROOM SCHEDULE - LIFE SAFETY
FIRE ALARM PULL-STATIONFA P-S
TRAVEL
DIS
TANCE
8'
- 0"
TRAVEL
DIS
TANCE
5'-
0"
1,433 SF
MECHANICAL
BAY 3
1C-138A
310 SF
LOUNGE,
STAFF
106 SF
NURSE
LEADER
105 SF
NURSE
PRAC
209 SF
DEN
79 SF
UTILITY,
CLEAN
1,600 SF
ACTIVIY ROOM,
MULTIPURPOSE
110 SF
MED
ROOM
64 SF
TOILET
82 SF
TOILET
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
HAC
[NIC]
BATHING FACILITY
[NIC]
TOILET
[NIC]
KITCHEN
[NIC]
HAC
[NIC]
323 SF
RESIDENT
ROOM
1C-118
314 SF
RESIDENT
ROOM
1C-120
314 SF
RESIDENT
ROOM
1C-122
318 SF
RESIDENT
ROOM
1C-124
318 SF
RESIDENT
ROOM
1C-126
314 SF
RESIDENT
ROOM
1C-126B
229 SF
RESIDENT
ROOM
1C-130
207 SF
RESIDENT
ROOM
1C-134 319 SF
RESIDENT
ROOM
1C-140
314 SF
RESIDENT
ROOM
1C-142
314 SF
RESIDENT
ROOM
1C-144
318 SF
RESIDENT
ROOM
1C-146
318 SF
RESIDENT
ROOM
1C-148
314 SF
RESIDENT
ROOM
1C-150
314 SF
RESIDENT
ROOM
1C-152
315 SF
RESIDENT
ROOM
1C-154
D
32" 81"
84"
62 SF
CLEAN
SUPPLY
242 SF
STORAGE
197 SF
WAITING
327 SF
CORRIDOR
926 SF
CORRIDOR
750 SF
CORRIDOR
89 SF
KITCHEN
156 SF
WAITING
183 SF
NURSE
WORK
AREA
110 57 SF
CLEAN
LINEN
92 SF
COPY
87 SF
LAUNDRY
78 SF
NURSE
WORKSTATON
ALCOVE
ALCOVE
ALCOVE
ALCOVE
D
D
1A
1A
1A 1A
1A
1A
1A
1A1A
1A
1A 1A
1A
1A
D
32" 81"
422.5
84"
D
32" 81"
422.5
84"
FEC
FA P-S
FEC
FEC
FA P-S
FA P-S FA P-S
1C
FIRST FLOOR
N
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg. OF 59
CONSULTANTS
F
SHEET TITLE
ARCHITECT & ENGINEER OF RECORD
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
FIRE PROTECTION ENGINEER
HENDERSON ENGINEERS
8345 LENEXA DRIVE, SUITE 300
LENEXA, KS 66214
(913) 742-5000
SPUR-DESIGN
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
SPUR-DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
SPUR-DESIGN
4425 E. AGAVE ROAD, SUITE 106
(BLDG. 2), SUITE #13
PHOENIX, AZ 85044
RENOVATE CLC UNIT 1C, BUILDING 100LIFE SAFETY
3/31/2020 AWM JET
MICHAEL E. DEBAKEY VA MEDICAL CENTER
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030
GI102
580-18-122
BID DOCUMENTS
1/8" = 1'-0"1
FLOOR PLAN - LIFE SAFETY
NUMBER NAME AREA LOAD FACTOR OCCUPANT LOAD
1C-111 KITCHEN 374 SF 150 FT² 4
1C-111A HAC 40 SF 500 FT² 1
1C-118 RESIDENT ROOM 323 SF 120 FT² 2
1C-118A RESIDENT, TOILET 54 SF 120 FT² 1
1C-120 RESIDENT ROOM 314 SF 120 FT² 2
1C-122 RESIDENT ROOM 314 SF 120 FT² 2
1C-122A RESIDENT, TOILET 54 SF 120 FT² 1
1C-124 RESIDENT ROOM 318 SF 120 FT² 2
1C-126 RESIDENT ROOM 318 SF 120 FT² 2
1C-126A RESIDENT, TOILET 54 SF 120 FT² 1
1C-126B RESIDENT ROOM 314 SF 120 FT² 2
1C-130 RESIDENT ROOM 229 SF 120 FT² 2
1C-130A RESIDENT, TOILET 43 SF 120 FT² 1
1C-132 HAC 40 SF 500 FT² 1
1C-134 RESIDENT ROOM 207 SF 120 FT² 2
1C-138A MECHANICAL BAY 3 1,433 SF 500 FT² 3
1C-140 RESIDENT ROOM 319 SF 120 FT² 2
1C-140A RESIDENT, TOILET 54 SF 120 FT² 1
1C-142 RESIDENT ROOM 314 SF 120 FT² 2
1C-143 BATHING 292 SF 240 FT² 1
1C-143A BATHING, TOILET 47 SF 240 FT² 1
1C-144 RESIDENT ROOM 314 SF 120 FT² 2
1C-144A RESIDENT, TOILET 54 SF 120 FT² 1
1C-146 RESIDENT ROOM 318 SF 120 FT² 2
1C-148 RESIDENT ROOM 318 SF 120 FT² 2
1C-148A RESIDENT, TOILET 54 SF 120 FT² 1
1C-150 RESIDENT ROOM 314 SF 120 FT² 2
1C-152 RESIDENT ROOM 314 SF 120 FT² 2
1C-152A RESIDENT, TOILET 54 SF 120 FT² 1
1C-154 RESIDENT ROOM 315 SF 120 FT² 2
100 WAITING 156 SF 15 FT² 11
101 TOILET 64 SF 240 FT² 1
102 MED ROOM 110 SF 500 FT² 1
103 NURSE LEADER 106 SF 150 FT² 1
104 NURSE PRAC 105 SF 150 FT² 1
105 KITCHEN 89 SF 150 FT² 1
106 TOILET 82 SF 240 FT² 1
107 LAUNDRY 87 SF 500 FT² 1
108 CLEAN LINEN 57 SF 500 FT² 1
109 COPY 92 SF 150 FT² 1
110 NURSE WORK AREA 183 SF 50 FT² 4
111 ACTIVITY ROOM, MULTIPURPOSE 1,600 SF 15 FT² 107
112 DEN 209 SF 15 FT² 14
113 CLEAN SUPPLY 62 SF 500 FT² 1
114 STORAGE 242 SF 500 FT² 1
115 UTILITY, CLEAN 79 SF 500 FT² 1
116 WAITING 197 SF 15 FT² 13
117 NURSE WORKSTATON 78 SF 50 FT² 1
118 CORRIDOR 750 SF 240 FT² 3
119 CORRIDOR 239 SF 240 FT² 1
120 ALCOVE 23 SF 240 FT² 1
121 ALCOVE 19 SF 240 FT² 1
122 ALCOVE 20 SF 240 FT² 1
123 CORRIDOR 327 SF 240 FT² 2
124 ALCOVE 12 SF 240 FT² 1
125 CORRIDOR 926 SF 240 FT² 6
126 LOUNGE, STAFF 310 SF 15 FT² 20
126A LOCKERS 18 SF 15 FT² 1
OCCUPANT TOTAL: 243
Revision # Date
GENERAL NOTES
1. PROVIDE TEMPORARY 1-HOUR RATED SLAB-TO-SLAB BARRIERS CONSIST OF 3-5/8" METAL STUD FRAMING WITH 5/8" ON BOTH SIDES. BARRIERS SHALL BE INSPECTED BY VA PCRA STAFF PRIOR TO START OF CONSTRUCTION IN SPACE. MAINTAIN
NEGATIVE PRESSURE VENTILATION IN THE CONSTRUCTION SPACE.
2. PROVIDE TWO STICKY MATS AT EACH CONSTRUCTION ACCESS POINT IN ALL PHASES.
3. VA REQUIRES THAT ALL APPLICABLE PERMITS BE COMPLETED AND APPROVED PRIOR TO BEGINNING ANY WORK ON STATION.
PERMITS INCLUDE: ICRA, PCRA, ILSM, ABOVE CEILING, FIRE/SMOKE WALL, UTILITY, FIRE SPRINKLER, FIRE ALARM SYSTEM, MEDICAL GASES, CONFINED SPACE AND HOT WORK.
PHASING FLOOR PLAN NOTES
PHASE I
PHASE II
PHASING FLOOR PLAN LEGEND
DUST CONTROL PLAN NOTES
1. TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY AFTER VA COR'S APPROVAL TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS; ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT
PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
2. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION
STAGING PREP AREA.
3. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTE. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE COR. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT
PRIOR APPROVAL OF THE COR.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCUATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER
MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY PLACES.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE, OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY COR. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, PRE-FILTER AND HEPA FILTER SHALL
BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
3. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILIING SHALL BE VERIFIED DAILY.
4. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER
RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCUATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THOUGHOUT THE PROJECT IN
THE FREQUENCY AS IDENTIFIED BY THE COR.
EGRESS ACCESS MUST BE MAINTAINED FOR
OCCUPIED FACILITY AT ALL TIMES.
EGRESS ACCESS MUST BE MAINTAINED FOR
OCCUPIED FACILITY AT ALL TIMES.
NOT IN CONTRACT
DEN
STORAGE
CLEAN
SUPPLY
UTILITY,
CLEAN
WAITING
COPYNURSE
WORK AREA
CLEAN
LINEN
CORRIDOR
CORRIDOR
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
PHASE II
CONSTRUCTION ZONE
PROVIDE TEMPORARY
SIGNAGE INDICATING NO
EMERGENCY EXITS BEYOND
THIS POINT
PORTION OF STORAGE
AREA TO BE UTILIZED FOR
TEMPORARY MED ROOM
MECHANICAL
BAY 3
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
HAC
[NIC]
BATHING
FACILITY
[NIC]
TOILET
[NIC]
KITCHEN
[NIC]
HAC
[NIC]
PHASE II
CONSTRUCTION ZONE
DEN
STORAGE
CLEAN
SUPPLY
UTILITY,
CLEAN
WAITING
COPY
CLEAN
LINEN
CORRIDOR
CORRIDOR
LOUNGE,
STAFF
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
NURSE
WORK AREA
ACTIVITY
ROOM,
MULTIPURPOSE
MECHANICAL
BAY 3
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
HAC
[NIC]
BATHING
FACILITY
[NIC]
TOILET
[NIC]
KITCHEN
[NIC]
HAC
[NIC]
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
W/C BATH
MEDICATION
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
CORRIDOR
DINING,
RECREATION
MECHANICAL
BAY 3
BREAK
ROOM
EXAM /
TREATMENT
TOILET,
STAFF
NURSES
STATION
PHASE I
CONSTRUCTION ZONE
PROVIDE TEMPORARY
SIGNAGE INDICATING NO
EMERGENCY EXITS BEYOND
THIS POINT
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
HAC
NO WORK
BATHING, TUB
NO WORK
BATHING,
TOILET
NO WORK
KITCHEN
NO WORK
HAC
NO WORK
PHASE I
CONSTRUCTION ZONE
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
W/C BATH
MEDICATION
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
CORRIDOR
DINING,
RECREATION
MECHANICAL
BAY 3
BREAK
ROOM
EXAM /
TREATMENT
TOILET,
STAFF
NURSES
STATION
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
HAC
NO WORK
BATHING, TUB
NO WORK
BATHING,
TOILET
NO WORK
KITCHEN
NO WORK
HAC
NO WORK
1C
FIRST FLOOR
N
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg. OF 59
CONSULTANTS
F
SHEET TITLE
ARCHITECT & ENGINEER OF RECORD
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
FIRE PROTECTION ENGINEER
HENDERSON ENGINEERS
8345 LENEXA DRIVE, SUITE 300
LENEXA, KS 66214
(913) 742-5000
SPUR-DESIGN
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
SPUR-DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
SPUR-DESIGN
4425 E. AGAVE ROAD, SUITE 106
(BLDG. 2), SUITE #13
PHOENIX, AZ 85044
RENOVATE CLC UNIT 1C, BUILDING 100PHASING
3/31/2020 AWM JET
MICHAEL E. DEBAKEY VA MEDICAL CENTER
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030
GI103
580-18-122
BID DOCUMENTS
1" = 20'-0"2.0
PHASE II - FLOOR PLAN - RENOVATION
1" = 20'-0"2.1
PHASE II - RCP - RENOVATION
1" = 20'-0"1.0
PHASE I - FLOOR PLAN - EXISTING
1" = 20'-0"1.1
PHASE I - RCP - EXISTING
Revision # Date
110 SF
MED
ROOM
64 SF
TOILET
82 SF
TOILET
1,433 SF
MECHANICAL
BAY 3
1C-138A
310 SF
LOUNGE,
STAFF
106 SF
NURSE
LEADER
105 SF
NURSE
PRAC
209 SF
DEN
79 SF
UTILITY,
CLEAN
1,600 SF
ACTIVITY
ROOM,
MULTIPURPOSE
926 SF
CORRIDOR
242 SF
STORAGE
197 SF
WAITING
87 SF
LAUNDRY
89 SF
KITCHEN
92 SF
COPY
156 SF
WAITING
57 SF
CLEAN
LINEN
183 SF
NURSE
WORK
AREA
62 SF
CLEAN
SUPPLY
78 SF
NURSE
WORKSTATON
750 SF
CORRIDOR
239 SF
CORRIDOR
327 SF
CORRIDOR
323 SF
RESIDENT
ROOM
1C-118
314 SF
RESIDENT
ROOM
1C-120
314 SF
RESIDENT
ROOM
1C-122
318 SF
RESIDENT
ROOM
1C-124
318 SF
RESIDENT
ROOM
1C-126
314 SF
RESIDENT
ROOM
1C-126B
229 SF
RESIDENT
ROOM
1C-130
207 SF
RESIDENT
ROOM
1C-134
319 SF
RESIDENT
ROOM
1C-140
314 SF
RESIDENT
ROOM
1C-142
314 SF
RESIDENT
ROOM
1C-144
318 SF
RESIDENT
ROOM
1C-146
318 SF
RESIDENT
ROOM
1C-148
314 SF
RESIDENT
ROOM
1C-150
314 SF
RESIDENT
ROOM
1C-152
315 SF
RESIDENT
ROOM
1C-154
18 SF
LOCKERS
126A
23 SF
ALCOVE
19 SF
ALCOVE
20 SF
ALCOVE
12 SF
ALCOVE
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
BATHROOM,
RESIDENT
[NIC]
HAC
[NIC]
BATHING FACILITY
[NIC]
TOILET
[NIC]
KITCHEN
[NIC]
HAC
[NIC]
16'-4" 24'-6" 8'-5 1/2"
20'-0 1/2"
ALTERNATE OPTION KEYNOTES
ALTERNATE OPTION NOTES
1. REFERENCE MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR ALTERNATE
OPTION COORDINATION BETWEEN DIVISIONS.
2. WHERE FURNITURE, FIXTURES, OR EQUIPMENT ARE DEDUCTED, CONTRACTOR MUST
STILL PROVIDE ANY REQUIRED SUPPORT FOR FURNITURE, FIXTURES, OR EQUIPMENT.
REFERENCE 01 00 00 GENERAL REQUIREMENTS [STATMENT OF BID ITEMS, ALTERNATE OPTIONS]
REFERENCE COST ESTIMATE AND COST ESTIMATE NARRATIVE
OMIT CUSTOM ARCHITECTURAL CASEWORK AS INDICATED ON THE ALTERNATE OPTIONS PLAN;
SUBSTITUTE WITH A PREMANUFACTURED OPTION IN THE FF&E PACKAGE.
SUBSTITUTE AUTOMATIC MOVABLE WALL AT DEN AREA WITH MANUAL MOVABLE WALL.
[1 INSTANCE]
OMIT PREMANUFACTURED ELECTRIC FIREPLACE AND MANTEL.
[1 INSTANCE]
OMIT METAL LOCKERS IN STAFF LOUNGE.
[6 INSTANCES OF 3-TIER LOCKER UNIT]
OMIT NEW FACEPLATES AT ALL ELECTRICAL OUTLETS, REUSE EXISTING.
OMIT ALL CUSTOM SIGNAGE AT RESIDENT ROOM ENTRY DOORS;
SUBSTITUTE WITH VA STANDARD SIGNAGE.
[16 INSTANCES]
OMIT NEW WINDOW TREATMENTS AS INDICATED ON THE ALTERNATE OPTIONS PLAN.
OMIT ALL LAMINATE HEADERS AT BED.
[30 INSTANCES]
OMIT DECORATIVE WALL SCONCES AT PATIENT ENTRY
[16 INSTANCES]
SUBSTITUTE STOREFRONT SYSTEM AT NURSE WORK AREA WITH HOLLOW METAL WINDOWS.
[APPROXIMATELY 23'-0" LINEAR FEET; 5'-0" HEIGHT]
11 OMIT AUTOMATIC MOVABLE WALL AT DEN AREA IN ENTIRETY.
[1 INSTANCE]
12 OMIT VA STANDARD SIGNAGE IN ENTIRETY.
13 OMIT NEW WALL PAINT AND THE REMOVAL, STORAGE, AND REINSTALLATION OF EXISTING
WINDOW TREATMENT IN ALL RESIDENT ROOMS.
14 OMIT NEW HARDWARE AT EXISTING RESIDENT ROOM ENTRY DOORS, REUSE EXISTING.
[17 INSTANCES]
DOORS: 117.35, 117.36, 117.37, 117.38, 117.39, 117.40, 117.41, 117.42, 117.44, 117.45, 117.50, 117.52, 117.55, 117.56, 117.59, 117.63, 117.66, 117.82
1C
FIRST FLOOR
N
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg. OF 59
CONSULTANTS
F
SHEET TITLE
ARCHITECT & ENGINEER OF RECORD
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
FIRE PROTECTION ENGINEER
HENDERSON ENGINEERS
8345 LENEXA DRIVE, SUITE 300
LENEXA, KS 66214
(913) 742-5000
SPUR-DESIGN
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
SPUR-DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
SPUR-DESIGN
4425 E. AGAVE ROAD, SUITE 106
(BLDG. 2), SUITE #13
PHOENIX, AZ 85044
RENOVATE CLC UNIT 1C, BUILDING 100ALTERNATE OPTIONS
3/31/2020 AWM JET
MICHAEL E. DEBAKEY VA MEDICAL CENTER
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030
GI104
580-18-122
BID DOCUMENTS
1/8" = 1'-0"1
FLOOR PLAN - ALTERNATE OPTIONS N
Revision # Date
TAPE AND BED GYP. BD.
ONLY ABOVE CEILING EACH SIDE
CEILING MATERIAL
AS SCHEDULED
SOUND ATTENUATION
FIRE BLANKETS AS REQ'D
5/8" TYPE 'X' GYP. BD. EACH SIDE OF
METAL STUDS AT 16" O.C.
FINISH AS SCHEDULED
BASE AND FLOORING AS SCHEDULED
C E
IL
IN
G H
E
IG
H T
R E
: R C
P
F
LO
O R
T O
U N
D E
R S
ID
E
O F
S T
R U
C T
U R
E A
B O
V E
C E
IL
IN
G H
E
IG
H T
R E
: R C
P 6"
F
LO
O R
T O
U N
D E
R S
ID
E
O F
S T
R U
C T
U R
E A
B O
V E
1 LAYER 5/8" GYP. BD. ON EACH SIDE OF 4" [20 GAUGE MINIMUM] METAL
STUDS AT 16" O.C. EXTEND FROM FIN. FLR. TO UNDERSIDE OF DECK.
EXTEND GYP. BD. FROM FIN. FLR. TO UNDERSIDE OF DECK. OMIT SOUND
BATTS.
1 LAYER 5/8" TYPE 'X' GYP. BD. ON EACH SIDE OF 4" [20 GAUGE MINIMUM]
METAL STUDS AT 16" O.C. EXTEND FROM FIN. FLR. TO UNDERSIDE OF
DECK. SEAL W/ FIRE SEALANT TOP & BOTTOM. RATED ONE HOUR. UL
#U419
1 LAYER 5/8" TYPE 'X' GYP. BD. ON EACH SIDE OF 4" [20 GAUGE MINIMUM]
METAL STUDS AT 16" O.C. W/ (STC 45) SOUND ATTENUATION FIRE
BLANKETS. EXTEND FROM FIN. FLR. TO UNDERSIDE OF DECK. SEAL W/
FIRE SEALANT TOP & BOTTOM. RATED SMOKE & ONE HOUR. UL #U465
TYPE 1 - 1 HR RATED / SMOKE
DETAILSDETAILS MARK
1A
DETAILSDETAILS
SEAL TO STRUCTURE WITH APPROVED
FIRE-RATED SEALANT
1B
MARK
2A
2B
MARK
3A
3B
3C
MARK
4A
4B
4C
DETAILSMARK
6A
6B
5/8" GYP. BD. ONE SIDE OF METAL
STUD AT 16" O.C.
FINISH AS SCHEDULED
C E
IL
IN
G H
E
IG
H T
R E
: R C
P
1 LAYER 5/8" GYP. BD. ON ONE SIDE OF 4" [20 GAUGE MINIMUM] METAL STUDS
AT 16" O.C. EXTEND TO UNDERSIDE OF EXISTING STRUCTURE. SEAL TO
EXISTING STRUCTURE WITH ACOUSTIC SEALANT. ALL JOINTS TAPED.
1 LAYER 5/8" GYP. BD. ON ONE SIDE OF 4" [20 GAUGE MINIMUM] METAL STUDS AT
16" O.C. EXTEND TO UNDERSIDE OF EXISTING STRUCTURE. SEAL TO EXISTING
STRUCTURE WITH ACOUSTIC SEALANT. ALL JOINTS TAPED. ONE LAYER 1/4" TILE
BACKER BOARD 1 SIDE. EXTEND TO 6" ABOVE FINISHED CEILING.
F
LO
O R
T O
U N
D E
R S
ID
E
O F
S T
R U
C T
U R
E A
B O
V E
1 LAYER 5/8" GYP. BD. ON EACH SIDE OF 4" [20 GAUGE MINIMUM] METAL
STUDS AT 16" O.C. W/ ACOUSTIC SEALANT TOP & BOTTOM AND SOUND
ATTENUATION BATTS (STC 45). EXTEND FROM FIN. FLR. TO UNDERSIDE OF
EXISTING STRUCTURE.
T
IL
E
F
LO
O R
T O
C E
IL
IN
G
1 LAYER 5/8" GYP. BD. ON ONE SIDE OF 2 1/2" METAL STUDS AT 16" O.C.
EXTEND 6" ABOVE CEILING.
C E
IL
IN
G H
E
IG
H T
R E
: R C
P 6"
1 LAYER 5/8" TYPE 'X' GYP. BD. EACH SIDE OF 4" [20 GAUGE MINIMUM]
METAL STUDS AT 16" O.C. EXTEND TO UNDERSIDE OF EXISTING
STRUCTURE. SEAL W/ FIRE SEALANT TOP & BOTTOM. ONE LAYER 1/4"
TILE BACKER BD. 1 SIDE. EXTEND 6" ABOVE FINISHED CEILING.
1 LAYER 5/8" TYPE 'X' GYP. BD. EACH SIDE OF 4" [20 GAUGE MINIMUM]
METAL STUDS AT 16" O.C. EXTEND TO UNDERSIDE OF EXISTING
STRUCTURE. SEAL W/ FIRE SEALANT TOP & BOTTOM. ONE LAYER 1/4" TILE
BACKER BD. EA. SIDE. EXTEND TO WAINSCOT HEIGHT.
F
LO
O R
T O
U N
D E
R S
ID
E
O F
S T
R U
C T
U R
E A
B O
V E
1 LAYER 5/8" TYPE 'X' GYP. BD. EACH SIDE OF 4" [20 GAUGE MINIMUM] METAL
STUDS AT 16" O.C. EXTEND TO UNDERSIDE OF EXISTING STRUCTURE. SEAL
W/ FIRE SEALANT TOP & BOTTOM. ONE LAYER 1/4" TILE BACKER BD. EA.
SIDE. EXTEND TO 6" ABOVE CEILING.
1 LAYER 5/8" GYP. BD. ON ONE SIDE OF 4" [20 GAUGE MINIMUM] METAL STUDS AT
16" O.C. EXTEND TO UNDERSIDE OF EXISTING STRUCTURE. SEAL TO EXISTING
STRUCTURE WITH ACOUSTIC SEALANT. ALL JOINTS TAPED. ONE LAYER 1/4" TILE
BACKER BOARD 1 SIDE. EXTEND TO WAINSCOT HEIGHT.
W A
IN
S
C O
T H
E
IG
H T
TILE BACKER BOARD AS REQUIRED
W A
IN
S
C O
T H
E
IG
H T
DETAILSMARK
5A
5B
5C
C E
IL
IN
G H
E
IG
H T
R E
: R C
P 6"
F
LO
O R
T O
U N
D E
R S
ID
E
O F
S T
R U
C T
U R
E A
B O
V E
1 LAYER 5/8" GYP. BD. EACH SIDE OF 4" [20 GAUGE MINIMUM] METAL
STUDS AT 16" O.C. W/ ACOUSTIC SEALANT TOP & BOTTOM. EXTEND TO
UNDERSIDE OF EXISTING STRUCTURE. ONE LAYER 1/4" TILE BACKER BD.
1 SIDE. EXTEND 6" ABOVE CEILING.
1 LAYER 5/8" GYP. BD. EACH SIDE OF 4" [20 GAUGE MINIMUM] METAL STUDS AT
16" O.C. W/ ACOUSTIC SEALANT TOP & BOTTOM. EXTEND TO UNDERSIDE OF
EXISTING STRUCTURE. ONE LAYER 1/4" TILE BACKER BD. 1 SIDE. EXTEND TO
WAINSCOT HEIGHT.
1 LAYER 5/8" GYP. BD. EACH SIDE OF 4" [20 GAUGE MINIMUM] METAL STUDS
AT 16" O.C. W/ ACOUSTIC SEALANT TOP & BOTTOM. EXTEND TO UNDERSIDE
OF EXISTING STRUCTURE. 1 LAYER 1/4" TILE BACKER BD. EA. SIDE. EXTEND
TO 6" ABOVE FINISHED CEILING.
W A
IN
S
C O
T H
E
IG
H T
T
IL
E
W A
IN
S
C O
T
1 LAYER 5/8" GYP. BD. ON ONE SIDE OF 2 1/2" METAL STUDS AT 16" O.C.
EXTEND 6" ABOVE CEILING. ONE LAYER 1/4" TILE BACKER BOARD,
EXTEND TO WAINSCOT HEIGHT.
3D
1 LAYER 5/8" TYPE 'X' GYP. BD. ON ONE SIDE OF 4" [20 GAUGE MINIMUM
METAL STUDS AT 16" O.C. EXTEND TO UNDERSIDE OF EXISTING
STRUCTURE. SEAL TO EXISTING STRUCTURE WITH ACOUSTIC SEALANT.
ALL JOINTS TAPED.
F
LO
O R
T O
U N
D E
R S
ID
E
O F
S T
R U
C T
U R
E A
B O
V E
TYPE 2 - NON-RATEDTYPE 3 - NON-RATEDTYPE 4 - 1 HR RATED / SMOKETYPE 5 - NON RATEDTYPE 6 - NON RATED
UNDERSIDE OF DECK
SEAL ALL GAPS & FILL ALL
VOIDS WITH APPROVED
FIRE-RATED MATERIALS
TAPE AND BED GYP. BD.
ONLY ABOVE CEILING EACH SIDE
CEILING MATERIAL
AS SCHEDULED
UNDERSIDE OF DECK
SEAL ALL GAPS & FILL ALL
VOIDS WITH APPROVED
FIRE-RATED MATERIALS
SOUND ATTENUATION
FIRE BLANKETS AS REQ'D
5/8" GYP. BD. EACH SIDE OF METAL
STUDS AT 16" O.C.
FINISH AS SCHEDULED
BASE AND FLOORING AS SCHEDULED
SEAL TO STRUCTURE WITH APPROVED
FIRE-RATED SEALANT
CEILING MATERIAL
AS SCHEDULED
UNDERSIDE OF DECK
SEAL ALL GAPS & FILL ALL
VOIDS WITH APPROVED
FIRE-RATED MATERIALS
BASE AND FLOORING AS SCHEDULED
TAPE AND BED GYP. BD.
ONLY ABOVE CEILING EACH SIDE
CEILING MATERIAL
AS SCHEDULED
UNDERSIDE OF DECK
SEAL ALL GAPS & FILL ALL
VOIDS WITH APPROVED
FIRE-RATED MATERIALS
SOUND ATTENUATION
FIRE BLANKETS AS REQ'D
5/8" TYPE 'X' GYP. BD. EACH SIDE OF
METAL STUDS AT 16" O.C.
FINISH AS SCHEDULED
BASE AND FLOORING AS SCHEDULED
SEAL TO STRUCTURE
TILE BACKER BOARD AS REQUIRED
TAPE AND BED GYP. BD.
ONLY ABOVE CEILING EACH SIDE
CEILING MATERIAL
AS SCHEDULED
UNDERSIDE OF DECK
SEAL ALL GAPS & FILL ALL
VOIDS WITH APPROVED
FIRE-RATED MATERIALS
SOUND ATTENUATION
FIRE BLANKETS AS REQ'D
5/8" GYP. BD. EACH SIDE OF METAL
STUDS AT 16" O.C.
FINISH AS SCHEDULED
BASE AND FLOORING AS SCHEDULED
SEAL TO STRUCTURE
TILE BACKER BOARD AS REQUIRED
TAPE AND BED GYP. BD.
ONLY ABOVE CEILING EACH SIDE
CEILING MATERIAL
AS SCHEDULED
UNDERSIDE OF DECK
SEAL ALL GAPS & FILL ALL
VOIDS WITH APPROVED
FIRE-RATED MATERIALS
5/8" GYP. BD. ONE SIDE OF METAL
STUDS AT 16" O.C.
FINISH AS SCHEDULED
BASE AND FLOORING AS SCHEDULED
SEAL TO STRUCTURE
TILE BACKER BOARD AS REQUIRED
1. NOT ALL PARTITION TYPES SHOWN HERE MAY BE USED. REFER TO PLANS FOR LOCATION AND TYPES OF EACH
PARTITION.
2. PAINT CONTINUOUS 4" TALL, STENCILED LETTERS, ABOVE CEILING, ON BOTH SIDES OF ALL FIRE AND SMOKE WALLS
DESIGNATING THE PARTITION RATING INDICATED ON THE LIFE SAFETY PLAN.
3. REFER TO FINISH SCHEDULE AND INTERIOR ELEVATIONS FOR LOCATIONS OF ALL WALL TILE.
PROVIDE AND INSTALL CEMENTITIOUS BACKER BOARD IN LIEU OF GWB AT ALL SCHEDULED TILE LOCATIONS. UNLESS
NOTED OTHERWISE, TILE SHALL BE INSTALLED PER TILE COUNCIL OF AMERICA LATEST STANDARDS FOR EACH TYPE OF
BACKING MATERIAL REPRESENTED IN WALL/PARTITION.
4. ALL SUSPENDED WALLS AND PARTITIONS SHALL HAVE GWB WHICH EXTENDS A MINIMUM OF 6" ABOVE THE SUSPENDED
CEILING UNLESS SHOWN AND/OR NOTED OTHERWISE BY THE ARCHITECT.
5. REFER TO STRUCTURAL DRAWINGS FOR ALL LOAD BEARING WALL CONDITIONS IN REGARDS TO STRUCTURAL
REQUIREMENTS.
6. "ALIGN" MEANS SIMILAR COMPONENTS OF CONSTRUCTION, E.G. WALLS, JAMBS, ETC. SHALL ALIGN ACROSS VOIDS AND
JOINTS.
7. PARTITIONS SHALL BE CONTINUOUS OVER DOORS SAME ADJACENT WALLS (UNLESS NOTED OTHERWISE) WHERE DRYWALL CONTINUES ABOVE CEILING AND ABOVE THE CEILING LEVEL UP TO THE STRUCTURE ABOVE. ALL GYPSUM BOARD RETURNS SHALL HAVE CORNER BEADS MINIMUM FLOOR TO CEILING. ALL PENETRATIONS IN DRYWALL CONSTRUCTION ABOVE FINISHED CEILING SHALL BE EFFECTIVELY SEALED TO PREVENT SOUND LEAKAGE AND
SMOKE/FIRE STOPPING TAPE/CAULK AT ALL RATED PARTITIONS.
8. ALL MECHANICAL CHASES AND OTHER NOTED CHASES ARE TO EXTEND UP TO THE UNDERSIDE OF THE DECK STRUCTURE ABOVE. ALL PLUMBING CHASES UNLESS OTHERWISE NOTED, SHALL EXTEND ABOVE THE HIGHEST ADJOINING CEILING
AND BE BRACED TO STRUCTURE.
9. ALL CONSTRUCTION DESIGNATED TO BE SUPPORTED BY ROOF STRUCTURE SHALL BE SUPPORTED BY TOP CHORD OF
STRUCTURAL JOISTS AND NOT FROM THE METAL DECK.
10. COORDINATE WITH MILLWORK DRAWINGS FOR PLACEMENT OF METAL BLOCKING IN WALLS/PARTITIONS.
11. IMPACT RESISTANT GWB, WHERE NOTED, IS OPTIONAL ABOVE 8' AFF AND BEHIND LOCKERS.
12. SEAL THE TOP AND BOTTOM OF WALL AS WELL AS ALL PENETRATIONS WHERE SMOKE PARTITIONS ARE DESIGNATED ON
THE LIFE SAFETY PLAN TO ELIMINATE THE PASSAGE OF SMOKE.
13. ALL PARTITIONS THAT HOST PLUMBING FIXTURES SHALL RECEIVE MOLD / MOISTURE RESISTANT GWB IN LIEU OF
REGULAR GWB.
GENERAL PARTITION NOTES
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg. OF 59
CONSULTANTS
F
SHEET TITLE
ARCHITECT & ENGINEER OF RECORD
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
FIRE PROTECTION ENGINEER
HENDERSON ENGINEERS
8345 LENEXA DRIVE, SUITE 300
LENEXA, KS 66214
(913) 742-5000
SPUR-DESIGN
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
SPUR-DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
SPUR-DESIGN
4425 E. AGAVE ROAD, SUITE 106
(BLDG. 2), SUITE #13
PHOENIX, AZ 85044
RENOVATE CLC UNIT 1C, BUILDING 100VERTICAL AND HORIZONTAL
ASSEMBLIES
3/31/2020 AWM JET
MICHAEL E. DEBAKEY VA MEDICAL CENTER
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030
GI105
580-18-122
BID DOCUMENTS
Revision # Date
RESIDENT
ROOM
1C-118
RESIDENT
ROOM
1C-120
RESIDENT
ROOM
1C-122
RESIDENT
ROOM
1C-124
RESIDENT
ROOM
1C-126
RESIDENT
ROOM
1C-128
RESIDENT
ROOM
1C-130
RESIDENT
ROOM
1C-134
W/C
BATH
1C-136
MEDICATION
ROOM
1C-138
319 SF
RESIDENT
ROOM
1C-141
RESIDENT
ROOM
1C-142
RESIDENT
ROOM
1C-144
RESIDENT
ROOM
1C-146
RESIDENT
ROOM
1C-148
RESIDENT
ROOM
1C-150
RESIDENT
ROOM
1C-152
RESIDENT
ROOM
1C-154
OFFICE,
SOCIAL
WORKER
1C-160E
OFFICE,
MEDICAL
DIRECTOR
1C-160D
OFFICE,
DIRECTOR
1C-160C
OFFICE,
NURSE
LEADER
1C-160F
COPY/
WORK
ROOM
1C-160B
CORRIDOR
C1C-160
CONFERENCE
ROOM
1C-160A
WORKROOM,
TEAM
1C-160
CORRIDOR
C1C-105
CORRIDOR
C1C-104
CORRIDOR
C1C-107
DINING,
RECREATION
1C-111C
MECHANICAL
BAY 3
1C-138A
BREAK
ROOM
1C-125
EXAM /
TREATMENT
1C-127
TOILET,
STAFF
1C-129
NURSES
STATION
1C-106
1 111
1 1
1 1 1
1 1
2 2 222
1 1
11 1
2 2
3 3
5 5
5 5 5 5 5
9 10
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
BATHROOM,
RESIDENT
NO WORK
HAC
NO WORK
BATHING, TUB
NO WORK
BATHING, TOILET
NO WORK
KITCHEN
NO WORK
HAC
NO WORK
12 12
DEMOLITION PLAN NOTES
1. THE DEMOLITION DRAWINGS ARE DEEMED SCHEMATIC. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING EXISTING DEMOLITION WORK PRIOR TO SUBMISSION OF PROPOSAL. DRAWINGS ARE PART OF A COMPLETE DOCUMENT SET.
CONTRACTOR SHALL CONFIRM ALL ITEMS REQUIRED TO BE DEMOLISHED AND EXTENT OF DEMOLITION BASED UPON THE
OVERALL INTENT OF THE ENTIRE DOCUMENT SET.
2. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY DEMOLITION TO CONFIRM ACCURACY IN THE DRAWINGS.
REPORT ANY DISCREPANCIES TO CONTRACTING OFFICER. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS
AND EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE CONSTRUCTION WORK.
PROVIDE FIRE-RATED DUST PROOFING ENCLOSURES TO SEPARATE WORK AREAS FROM THE EXISTING FACILITIES.
4. DURING DEMOLITION, PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN PLACE DURING THE RENOVATION WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND REPAIR TO MATCH EXISTING ADJACENT FINISHES.
5. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED FOR REPLACED BACK TO ITS ORIGINAL
CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
6. ALL ITEMS INDICATED WITH A DASHED LINE SHALL BE REMOVED IN THEIR ENTIRETY INCLUDING RELATED COMPONENTS.
7. REMOVAL OF MECHANICAL, ELECTRICAL, AND PLUMBING SHOULD BE LIMITED TO WHAT IS NECESSARY FOR SAFE REMOVAL
OF THE INDICATED WALL OR CEILING. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
8. CONTRACTOR TO DEMO ALL FIXTURES, CEILINGS, MECHANICAL, PLUMBING, AND ELECTRICAL AS REQUIRED TO COMPLETE
THE SCOPE OF WORK OUTLINED WITHIN THE CONSTRUCTION DOCUMENTS.