For Reference - PL-100 with Gridlines.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25621R0056
About this file
This document outlines a federal contract opportunity for construction services. The Michael E. DeBakey VA Medical Center in Houston, Texas is seeking to renovate patient rooms, administrative spaces, and common areas in Unit 1C of Building 100 on its campus. The fixed-price construction contract will include demolition, architectural, mechanical, electrical, plumbing, communications, fire protection, and interior finishes work according to provided drawings and specifications. The period of performance is 365 calendar days from the notice to proceed. Interested service-disabled veteran-owned small businesses should monitor the website for the solicitation release on or around February 3, 2021 and register to receive any amendments, as the solicitation will be issued as a request for proposals with a 90-day acceptance period and bid bond requirement. Performance and payment bonds will also be required from the successful offeror. The contract value is estimated between $2,000,000 and $5,000,000 under NAICS code 236220.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
18.5 18 17.5 17 16 15.8 15.5 15 14.5 1413.9
N
N.9
P
P.5
Q
Q.5
R
R.8
S
1918.9
2" V (ETR)2" V (ETR)
2" V
4" V U.F. (ETR)
4" SS (ETR)
4" SS (ETR)
4" SS (ETR)
1 1/2" DHWR (ETR)
4" DHW (ETR)
6" DCW (ETR)
3/4" DCW (ETR)
3/4" DHWR (ETR)
3/4" DCW (ETR)
3/4" DHW (ETR)
2" V U.F. (ETR)
4" SS (ETR)
1 1/2" DHWR (ETR)
4" DHW (ETR)
6" DCW (ETR)
3/4" DCW (ETR)
3/4" DCW (ETR)
8" SS (ETR)
4" SS (ETR)
4" SS (ETR)
4" SS (ETR)
2 1/2" SS (ETR)
4" SS (ETR)
3" SS (ETR)
S S
E
T R
S S
E
T R
S S
E
T R
S S
E
T R
3/4" DHWR (ETR)
3/4" DHW (ETR)
3/4" DCW (ETR)
4" SS (ETR)
4" SS (ETR)
3" SS (ETR)
4" SS (ETR)
4" WASTE FR. ABV.
2" FD FR. ABV
2" WASTE FROM WASHER BOX ABV.
2" WASTE FR. FLOOR DRAIN ABV.
2" WASTE FR. SINK ABV.
2" WASTE FROM SINK ABV.
4" WASTE FROM FLOOR ABV.
2" SS2" SS
2" WASTE FROM 1ST FLOOR ABV.
2" WASTE FR. ABV.
/2
D H
W R
E
T R
D C
W
E T
R
S S
E
T R
/4
D
H W
R
E T
R
/4
D
C W
E
T R
1 1/2" SS (ETR)
2" WASTE FROM FLOOR ABOVE.
4" SS (ETR)
1 1/2" DHWR (ETR)
SLAB ON GRADE
IN SHADED AREA
SLAB ON GRADE
IN SHADED AREA
CORE DRILL WALL FOR NEW PIPE.
PROVIDE LINK-SEAL OR EQUAL TO
MAKE WATER TIGHT. 4" WASTE FR. ABV. (ETR)
4" WASTE FR. ABV. (ETR)
4" F.C.O. FROM ABV.
4" F.C.O. FROM ABV.
4" SS
4" SS
CORE DRILL WALL
FOR NEW PIPE.
PROVIDE LINK-SEAL
OR EQUAL TO MAKE
WATER TIGHT.
1C
FIRST FLOOR
V
W
W
WASTE PIPING - ABOVE FLOOR (W)
WASTE PIPING - BELOW FLOOR (W)
VENT PIPING (V)
EXISTING PIPING TO REMAIN (ETR)
EXISTING PIPING TO BE REMOVED
DOMESTIC HOT WATER RECIRC.
DOMESTIC COLD WATER
DOMESTIC HOT WATER
LIMIT OF DEMOLITION
EXISTING TO REMAINETR
PIPING SYMBOLS
GENERAL PLUMBING SYMBOLS
PLUMBING PLAN NOTE CALL OUT
PLUMBING DEMO PLAN NOTE CALL OUT1
PLUMBING EQUIPMENT DESIGNATIONXX-1
ELBOW DOWN
ELBOW UP
RETICULATION PUMP
BALL VALVE
BUTTERFLY VALVE
EXISTING PIPING UNDER FLOOR (U.F.)
UNDER FLOORU.F.
SAW CUT FLOOR
PHASE #1
PHASE #2
DRAWING NUMBER
VA PROJECT NUMBER
DATE
PROJECT TITLE
BUILDING NUMBER
PROJECT LOCATION
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08-6231
Office of Construction and Facilities Management
Dwg.
CONSULTANTS
F
SHEET TITLE
ARCHITECT & ENGINEER OF RECORD
N O
T F O R
C O
N S
TR
U C
TIO
N
FULLY SPRINKLERED
PROJECT PHASE
2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
U.S. Department of Veteran Affairs
F
E
D
C
B
A
E
D
C
B
A
FIRE PROTECTION ENGINEER
HENDERSON ENGINEERS
8345 LENEXA DRIVE, SUITE 300
LENEXA, KS 66214
(913) 742-5733
SPUR-DESIGN
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
SPUR-DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
SPUR-DESIGN
4425 E. AGAVE ROAD, SUITE 106
(BLDG. 2), SUITE #13
PHOENIX, AZ 85044
RENOVATE CLC UNIT 1CPLUMBING PLAN - BASEMENT
INTERSTITIAL
3/31/2020 JRM GH
MICHAEL E. DEBAKEY VA MEDICAL CENTER
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030
PL-100
580-18-122
BID DOCUMENTS
1/8" = 1'-0"1
BASEMENT UTILITY TUNNEL PLUMBING PLAN
N
PHASING NOTES:
1. ALL PLAN WORK SHOWN ON THIS SHEET IS SUBJECT TO THE OVERALL PROJECT PHASING
SEQUENCE OUTLINED ON ARCHITECTURAL SHEET GI-103.
2. IN ADDITION, IF THE DEDUCT ALTERNATE IS ELECTED, ALL PLAN WORK ON THIS SHEET IS ALSO
SUBJECT TO THE REDUCED AREAS OF WORK AS DEFINED ON ARCHITECTURAL SHEET G1-104.
PLUMBING KEY NOTES:
1. CONTRACTOR TO VERIFY TUNNEL LOCATION AND LIMITS TO SLAB ON GRADE. SHOWN FOR REFERENCE
ONLY.
2. CONTRACTOR TO VERIFY SLAB ON GRADE LIMITS BEFORE CONSTRUCTION BEGINS.
Revision # Date
| Sheets |
| PL-100 - PLUMBING PLAN - BASEMENT INTERSTITIAL |
File details come from the government source that posted it. Updated .