571 Kalamazoo DMVA fence maintenance ft custer training center.pdf

PDF 214 KB Posted

Attached to
Fencing at Camp Grayling JMTC and Ft. Custer Training Center
Solicitation number
RFP-511-180000002238-1
Issued by
Isabella County, Michigan

About this file

This is a State of Michigan wage rates schedule from the Department of Military and Veterans Affairs (DMVA) for a fence maintenance, repair and replacement project at Fort Custer Training Center in Kalamazoo County. The document establishes the official 2018 commercial prevailing wage rates for state-funded projects, issued on April 19, 2018, with contracts required to be awarded by July 18, 2018. The 30-page schedule covers various construction trades including asbestos/lead abatement, boilermakers, bricklayers, carpenters, cement masons, electricians, glaziers, ironworkers, laborers, painters, plumbers, roofers and other specialized workers.

The wage schedule provides detailed hourly rates for straight time, time and a half, and double time, along with overtime provisions for each trade classification. It includes apprentice rate schedules with progressive wage increases based on hours worked. The document specifies that contractors and subcontractors must post these wage and fringe benefit rates in a conspicuous place at the construction site. Make-up day provisions and work schedule arrangements (such as 4 ten-hour days) are noted for applicable trades.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Michigan WHPWRequest@michigan.gov Official Request #: 571 Requestor: DMVA Project Description: Fence Maintenance, Repair and Replacement at Ft. Custer Training Center Project Number:

Kalamazoo County Official 2018 Commercial Prevailing Wage Rates for State Funded Projects Issue Date: 4/19/2018 Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Asbestos & Lead Abatement Laborer

MLDC 9/7/2017

Asbestos & Lead Abatement Laborer $41.30 $55.23 $69.16 H H H X X X X D Y Apprentice Rates:

Trainee 600 hours + 1 calendar $30.22 $33.28 $41.73 comment 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

Asbestos, Lead and Mold Abatement, Hazardous Material Handler

AS207 3/27/2017

Asbestos, Lead and Mold Abatement, Hazardous Material Handler $40.75 $54.25 $67.75 H H H X X X X D Y comment Four ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

Boilermaker

BO169 2/17/2015

Boilermaker $54.70 $81.08 $107.45 H H H H H H H D Y Apprentice Rates:

1st 6 months $40.31 $59.49 $78.67 2nd 6 months $41.45 $61.21 $80.95 3rd 6 months $42.57 $62.88 $83.19 4th 6 months $43.69 $64.57 $85.43 5th 6 months $44.81 $66.24 $87.67 6th 6 months $48.63 $72.50 $96.36 7th 6 months $49.32 $73.01 $96.69 8th 6 months $51.58 $76.40 $101.21

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

County Kalamazoo

Official 2018 Commercial Prevailing Wage Rates for State Funded Projects Issue Date: 4/19/2018 Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

Bricklayer

BR9-17-BL 11/9/2016

Bricklayer and Block $44.75 $57.48 $70.20 H H H H H H H D Y Apprentice Rates:

0 - 749 hours $33.67 $41.13 $48.58 750 - 1,499 hours $35.06 $43.21 $51.36 1,500 - 2,249 hours $36.44 $45.28 $54.12 2,250 - 2,999 hours $37.83 $47.37 $56.90 3,000 - 3,749 hours $39.21 $49.43 $59.66 3,750 - 4,499 hours $40.60 $51.52 $62.44 4,500 - 5,249 hours $41.98 $53.59 $65.20 5,250 - 6,000 hours $43.37 $55.67 $67.98 comment make up day allowed Saturday, Four 10s allowed M-F

BR9-17-S 11/9/2016

Stone, Artificial and Marble Masonry, and Pointer, Cleaner, Caulker $44.75 $57.48 $70.20 H H H H H H H D Y Apprentice Rates:

0-749 hours $35.06 $43.21 $51.36 750-1499 hours $36.44 $45.28 $54.12 1500-2249 hours $37.83 $47.37 $56.90 2250-2999 hours $39.21 $49.43 $59.66 3000-3749 hours $40.60 $51.52 $62.44 3750-4499 hours $41.98 $53.59 $65.20 comment Four 10s allowed M-F Carpenter

CA-100FL 7/5/2017

Floor Layer $42.09 $53.76 $65.42 X X H H H H H D N Apprentice Rates:

1st year $32.76 $39.76 $46.76 2nd year $35.09 $43.26 $51.42 3rd year $37.42 $46.75 $56.08 4th year $38.59 $48.50 $58.42

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed Saturday

CA-525 7/5/2017

Carpenter $41.35 $52.43 $63.50 X X H H H H H D N Apprentice Rates:

1st year $34.70 $42.45 $50.20 2nd year $35.81 $44.12 $52.42 3rd year $38.03 $47.44 $56.86 4th year $40.24 $50.76 $61.28 comment make up day allowed Saturday

CA-525-FL 7/5/2017

Resilient Floorlayer $42.09 $53.76 $65.42 X X X H H H H D N Apprentice Rates:

1st year $32.76 $39.76 $46.76 2nd year $35.09 $43.26 $51.42 3rd year $37.42 $46.75 $56.08 4th year $38.59 $48.50 $58.42

Cement Mason

BR9-17-CM 11/9/2016

Cement Mason $42.48 $53.97 $65.46 X X H X X X H D Y Apprentice Rates:

0 - 749 hours $33.68 $41.03 $48.37 750 - 1,499 hours $34.94 $42.91 $50.89 1,500 - 2,249 hours $36.20 $44.81 $53.41 2,250 - 2,999 hours $37.45 $46.68 $55.91 3,000 - 3,749 hours $38.71 $48.57 $58.43 3,750 - 4,499 hours $39.97 $50.46 $60.95 comment Four 10s allowed M-F

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

PL16-5 8/18/2016

Cement Mason $38.30 $50.53 $62.75 H H H H H H H D Y Apprentice Rates:

1st year $29.74 $37.69 $45.63 2nd year $32.19 $41.36 $50.53 3rd year $34.63 $45.02 $55.41 comment make up day allowed Four 10s allowed Monday-Thursday with Friday or Saturday inclement weather make up days. Saturday hours for inclement weather make up shall be paid straight rate unless over 40 hours worked.

Electrician

EC-131-IW 8/31/2017

Journeyman Electrician - Inside Wireman $47.17 $67.49 $87.80 H H H H H H H D Y Apprentice Rates:

1st period $21.68 $29.52 $37.36 2nd period $25.38 $35.05 $44.72 3rd period $27.13 $37.67 $48.22 4th period $28.89 $40.32 $51.74 5th period $30.66 $42.97 $55.28 6th period $34.17 $48.24 $62.30 comment make up day allowed Four 10s may be worked if consecutive Monday thru Thursday. Friday may be used as a makeup day.

EC-131-SC 1/19/2006

Sound and Communication Technician $22.55 $31.35 $40.14 H H H H H H H D Y Apprentice Rates:

1st 6 months $10.96 $15.80 $20.64 2nd 6 months $11.84 $17.12 $22.40 3rd 6 months $12.72 $18.44 $24.16 4th 6 months $13.60 $19.76 $25.92 5th 6 months $14.48 $21.08 $27.68 6th 6 months $15.36 $22.40 $29.44 make up day allowed

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Elevator Constructor

EL-85 4/8/2013

Elevator Constructor Mechanic $70.77 $116.32 D D D D D D D D Y Apprentice Rates:

1st year $50.27 $75.32 2nd year $54.83 $84.44 3rd year $57.10 $88.98 4th year $61.66 $98.10 comment 4 tens allowed M-TH Glazier

GL-312 10/10/2014

Glazier $33.79 $46.69 $59.59 X X X X X X X D Y Apprentice Rates:

1st 90 days $19.60 $25.41 $31.21 2nd 90 days $20.89 $27.34 $33.79 2nd 6 months $22.18 $29.27 $36.37 3rd 6 months $23.47 $31.21 $38.95 4th 6 months $24.76 $33.15 $41.53 5th 6 months $26.05 $35.08 $44.11 6th 6 months $27.34 $37.01 $46.69 7th 6 months $28.63 $38.95 $49.27 8th 6 months $29.92 $40.89 $51.85 9th 6 months $31.21 $42.82 $54.43 10th 6 months $32.50 $44.75 $57.01 comment make up day allowed A four ten hour day work week is allowed. If 4 or more straight-time hours lost due to job being down, Friday may be scheduled as a make up day.

Heat and Frost Insulator

AS25S 3/31/2017

Spray Insulation - Qualified Senior Sprayer, application of all products $29.04 $42.35 X X X H H H H H N

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

County Statewide

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Heat and Frost Insulator and Asbestos Worker

AS47 7/25/2017

Heat and Frost Insulator and Asbestos Worker $47.75 $63.01 $78.27 H H H H H H H D Y Apprentice Rates:

1st year $27.88 $35.51 $43.14 2nd year $31.85 $41.00 $50.16 3rd year $35.82 $46.50 $57.18 4th year $39.80 $52.01 $64.22 5th year $43.78 $57.51 $71.25 comment make up day allowed Friday for cancelled work in a four 10 hour schedule Ironworker

IR-25-F2 3/31/2017

Fence, Sound Barrier & Guardrail erection/installation and Exterior Signage $31.95 $42.05 $52.15 X X H X X X H D Y work Apprentice Rates:

60% Level $22.99 $29.05 $35.11 65% Level $24.11 $30.68 $37.24 70% Level $25.24 $32.31 $39.38 75% Level $26.35 $33.92 $41.50 80% Level $27.47 $35.55 $43.63 85% Level $28.59 $37.18 $45.76 comment Four ten hour work days may be worked during Monday-Saturday.

IR-25-HH-WEST 12/5/2016

Heavy Hauler $41.43 $52.55 $63.67 H H H H H H H D Y Apprentice Rates:

1st Year $26.18 $31.74 $37.30 2nd Year $29.52 $36.75 $43.98 3rd Year $34.71 $43.60 $52.50 4th Year $36.94 $46.95 $56.96 comment make up day allowed If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

IR-25-PE-Z2 3/31/2017

Pre-engineered Metal Work $45.87 $56.03 $66.19 X X H X X X X D Y Apprentice Rates:

Probation 1st Year $26.83 $32.03 $37.23 1st Level $28.96 $34.92 $40.88 2nd Level $28.96 $34.92 $40.88 3rd Level $31.08 $37.79 $44.50 4th Level $33.21 $40.68 $48.15 5th Level $35.33 $43.55 $51.77 6th Level $37.46 $46.43 $55.41 comment make up day allowed 4 tens allowed M-Th with Saturday make up day

IR-25-REF-WEST 7/5/2017

Reinforcing: any work in connection with field fabrication, post tensioning, $49.25 $61.47 $73.68 H H H H H H H D Y prestressing of handling by power, rigging, crane signaling, crane assembly and dismantle, racking, sorting, cutting, bending, hoisting, placing, burning, welding, use of tie gun, and tying of all materials used to reinforce concrete construction. Realigning of reinforcing steel, wire mesh and placing of steel dowels, as well as refastening and resetting same while concrete is being poured. The handling and placing of j or jack bar on slip form construction.

The placing of all clips, bolts, and steel rods and wire fabricator mesh pertaining to gunite construction. Drilling holes in concrete for dowels used to reinforce a concrete slab, beam or wall and the use of a chemical anchoring system (such as epoxy) to secure dowels. The use of a non-metallic carbon fiber or polymer typically used to reinforce concrete. Some brand names are NEFMAC, leadline or Tokyo rope.

Apprentice Rates:

1st Level $31.94 $40.13 $48.32 2nd Level $31.94 $40.13 $48.32 3rd Level $33.47 $42.42 $51.37 4th Level $35.00 $44.71 $54.41 5th Level $37.87 $47.72 $57.57 6th Level $38.94 $49.31 $59.69 7th Level $42.45 $53.35 $64.25 8th Level $43.52 $54.95 $66.37 comment make up day allowed If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision IR-25-RIG-west 7/5/2017 Rigging, heavy machinery moving and related tasks $49.25 $61.47 $73.68 X X X X X X X D Y Apprentice Rates:

1st Level $31.94 $40.13 $48.32 2nd Level $31.94 $40.13 $48.32 3rd Level $33.47 $42.42 $51.37 4th Level $35.00 $44.71 $54.41 5th Level $37.87 $47.72 $57.57 6th Level $38.94 $49.31 $59.69 7th Level $42.45 $53.35 $64.25 8th Level $43.52 $54.95 $66.37 comment make up day allowed Saturday

IR-25-STR-WEST 7/5/2017

Structural, ornamental, welder and pre-cast $49.25 $61.47 $73.68 H H H H H H H D Y Apprentice Rates:

1ST LEVEL $31.94 $40.13 $48.32

2ND LEVEL $31.94 $40.13 $48.32

3RD LEVEL $33.47 $42.42 $51.37

4TH LEVEL $35.00 $44.71 $54.41

5TH LEVEL $37.87 $47.72 $57.57

6TH LEVEL $38.94 $49.31 $59.69

7TH LEVEL $42.45 $53.35 $64.25

8TH LEVEL $43.52 $54.95 $66.37

comment make up day allowed If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Laborer L355-1-A 5/31/2017 Class A Laborer - All Construction Laborers on buildings, pumps, well wheels, $33.19 $43.30 $53.41 X X H H H H H D Y air, electric or gasoline tools, motor driven buggies, Laborers on fire watch duty, working on swing scaffolds, heavy construction work, confined space and FME, carpenter tender, cement finisher tender, heater tender, flagperson, except foremen and others falling within specified classifications.

Apprentice Rates:

0-1,000 work hours $28.13 $35.71 $43.29 1,001-2,000 work hours $29.15 $37.24 $45.33 2,001-3,000 work hours $30.16 $38.75 $47.35 3,001-4,000 work hours $32.18 $41.79 $51.39 comment make up day allowed Monday - Saturday L355-1-B 5/31/2017 Class B Laborer - jackhammer operator, crocklayer and caisson worker in $33.44 $43.68 $53.91 X X H H H H H D Y buildings Apprentice Rates:

0-1,000 work hours $28.32 $35.99 $43.67 1,001-2,000 work hours $29.35 $37.54 $45.73 2,001-3,000 work hours $30.37 $39.07 $47.77 3,001-4,000 work hours $32.42 $42.15 $51.87 comment make up day allowed Monday - Saturday L355-1-C 5/31/2017 Class C Laborer - Top men on chimneys or towers over thirty feet (30’) in $33.94 $44.43 $54.91 X X H H H H H D Y height, material mixers, operators of portable mixers, plasterer tenders, mason tenders that have received certification from the MLTAI for mason tending, and MLTAI-certified demolition burner.

Apprentice Rates:

0-1,000 work hours $28.70 $36.57 $44.43 1,001-2,000 work hours $29.75 $38.14 $46.53 2,001-3,000 work hours $30.79 $39.70 $48.61 3,001-4,000 work hours $32.89 $42.85 $52.81 comment make up day allowed Monday - Saturday

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision L355-1-D 5/31/2017 Class D Laborer - Concrete Specialist When there are no Cement Finishers $38.39 $51.05 $63.71 X X H H H H H D Y available, the classification of Concrete Specialist may be utilized and shall include troweling, finishing, screeding, patching, cutting and curing of cast in place or precast concrete by any and all methods.

Apprentice Rates:

0-1,000 work hours $32.06 $41.55 $51.05 1,001-2,000 work hours $33.33 $43.46 $53.59 2,001-3,000 work hours $34.59 $45.35 $56.11 3,001-4,000 work hours $37.12 $49.15 $61.17 comment make up day allowed Monday - Saturday Laborer - Hazardous

LHAZ-Z9-A 11/13/2017

Class A Laborer - performing work in conjunction with site preparation and $32.92 $46.40 $59.87 H H H H H H H D Y other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal regulations; or a laborer performing work in conjunction with the removal , handling, or containment of hazardous waste substances when use of personal protective equipment level " D" is required.

Apprentice Rates:

0-1,000 work hours $27.93 $38.91 $49.89 1,001-2,000 work hours $28.93 $40.41 $51.89 2,001-3,000 work hours $29.93 $41.91 $53.89 3,001-4,000 work hours $31.92 $44.89 $57.87 comment make up day allowed 4 10s allowed M-Th or T-F; inclement weather makeup day Friday

LHAZ-Z9-B 11/13/2017

Class B Laborer - performing work in conjunction with the removal, handling, $33.92 $47.90 $61.87 H H H H H H H D Y or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.

Apprentice Rates:

0-1,000 work hours $28.68 $40.03 $51.39 1,001-2,000 work hours $29.73 $41.61 $53.49 2,001-3,000 work hours $30.78 $43.19 $55.59 3,001-4,000 work hours $32.87 $46.32 $59.77

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed 4 10s allowed M-Th or T-F; inclement weather makeup day Friday Laborer Underground - Open Cut, Class I

LAUC-Z4-1 9/7/2017

Construction Laborer $33.67 $43.98 $54.27 X X X X X X X D Y Apprentice Rates:

0-1,000 work hours $29.17 $37.22 $45.27 1,001-2,000 work hours $30.07 $38.58 $47.07 2,001-3,000 work hours $30.97 $39.92 $48.87 3,001-4,000 work hours $32.77 $42.62 $52.47

Laborer Underground - Open Cut, Class II

LAUC-Z4-2 9/5/2017

Mortar and material mixer, concrete form man, signal man, well point man, $33.80 $44.17 $54.53 X X X X X X X D Y manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.

Apprentice Rates:

0-1,000 work hours $29.26 $37.36 $45.45 1,001-2,000 work hours $30.17 $38.72 $47.27 2,001-3,000 work hours $31.08 $40.09 $49.09 3,001-4,000 work hours $32.89 $42.80 $52.71

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Laborer Underground - Open Cut, Class III

LAUC-Z4-3 9/7/2017

Air, gasoline and electric tool operator, vibrator operator, drillers, pump $33.91 $44.34 $54.75 X X X X X X X D Y man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger man, and directional boring man.

Apprentice Rates:

0-1,000 work hours $29.35 $37.50 $45.63 1,001-2,000 work hours $30.26 $38.86 $47.45 2,001-3,000 work hours $31.17 $40.22 $49.27 3,001-4,000 work hours $33.00 $42.97 $52.93

Laborer Underground - Open Cut, Class IV

LAUC-Z4-4 9/7/2017

Trench or excavating grade man. $33.98 $44.44 $54.89 X X X X X X X D Y Apprentice Rates:

0-1,000 work hours $29.40 $37.57 $45.73 1,001-2,000 work hours $30.32 $38.95 $47.57 2,001-3,000 work hours $31.23 $40.32 $49.39 3,001-4,000 work hours $33.06 $43.06 $53.05

Laborer Underground - Open Cut, Class V

LAUC-Z4-5 9/7/2017

Pipe Layer $34.10 $44.62 $55.13 X X X X X X X D Y Apprentice Rates:

0-1,000 work hours $29.49 $37.70 $45.91 1,001-2,000 work hours $30.41 $39.08 $47.75 2,001-3,000 work hours $31.33 $40.46 $49.59 3,001-4,000 work hours $33.18 $43.24 $53.29

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Laborer Underground - Open Cut, Class VI

LAUC-Z4-6 9/7/2017

Grouting man, top man assistant, audio visual television operations and all $31.32 $40.45 $49.57 X X X X X X X D Y other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work & the installation and repair of water service pipe and appurtenances.

Apprentice Rates:

0-1,000 work hours $27.40 $34.57 $41.73 1,001-2,000 work hours $28.19 $35.76 $43.31 2,001-3,000 work hours $28.97 $36.92 $44.87 3,001-4,000 work hours $30.54 $39.28 $48.01

Laborer Underground - Open Cut, Class VII

LAUC-Z4-7 9/7/2017

Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil $29.66 $37.96 $46.25 X X X X X X X D Y grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.

Apprentice Rates:

0-1,000 work hours $26.16 $32.71 $39.25 1,001-2,000 work hours $26.86 $33.76 $40.65 2,001-3,000 work hours $27.56 $34.81 $42.05 3,001-4,000 work hours $28.96 $36.91 $44.85

Laborer Underground - Tunnel, Shaft & Caisson

LAUCT-Z2-1 9/7/2017

Class I - Tunnel, shaft and caisson laborer, dump man, shanty man, hog $36.82 $48.70 $60.57 X X X X X X X D Y house tender, testing man (on gas), and watchman.

Apprentice Rates:

0-1,000 work hours $31.52 $40.75 $49.97 1,001-2,000 work hours $32.58 $42.34 $52.09 2,001-3,000 work hours $33.64 $43.93 $54.21 3,001-4,000 work hours $35.76 $47.11 $58.45

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

LAUCT-Z2-2 9/7/2017

Class II - Manhole, headwall, catch basin builder, bricklayer tender, mortar $36.91 $48.83 $60.75 X X X X X X X D Y man, material mixer, fence erector, and guard rail builder Apprentice Rates:

0-1,000 work hours $31.58 $40.84 $50.09 1,001-2,000 work hours $32.65 $42.45 $52.23 2,001-3,000 work hours $33.71 $44.03 $54.35 3,001-4,000 work hours $35.84 $47.23 $58.61

LAUCT-Z2-3 9/7/2017

Class III - Air tool operator (jack hammer man, bush hammer man and $37.01 $48.98 $60.95 X X X X X X X D Y grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, concrete shoveler, conveyor man, floor man, gasoline and electric tool operator, gunnite man, grout operator, welder, heading dinky man, inside lock tender, pea gravel operator, pump man, outside lock tender, scaffold man, top signal man, switch man, track man, tugger man, utility man, vibrator man, winch operator, pipe jacking man, wagon drill and air track operator and concrete saw operator (under 40 h.p.).

Apprentice Rates:

0-1,000 work hours $31.66 $40.96 $50.25 1,001-2,000 work hours $32.73 $42.57 $52.39 2,001-3,000 work hours $33.80 $44.17 $54.53 3,001-4,000 work hours $35.94 $47.38 $58.81

LAUCT-Z2-4 9/7/2017

Class IV - Tunnel, shaft and caisson mucker, bracer man, liner plate man, $37.17 $49.22 $61.27 X X X X X X X D Y long haul dinky driver and well point man.

Apprentice Rates:

0-1,000 work hours $31.78 $41.14 $50.49 1,001-2,000 work hours $32.86 $42.76 $52.65 2,001-3,000 work hours $33.93 $44.37 $54.79 3,001-4,000 work hours $36.09 $47.61 $59.11

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

LAUCT-Z2-5 9/7/2017

Class V - Tunnel, shaft and caisson miner, drill runner, keyboard operator, $37.43 $49.62 $61.79 X X X X X X X D Y power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars) Apprentice Rates:

0-1,000 work hours $31.97 $41.43 $50.87 1,001-2,000 work hours $33.06 $43.06 $53.05 2,001-3,000 work hours $34.16 $44.71 $55.25 3,001-4,000 work hours $36.34 $47.98 $59.61

LAUCT-Z2-6 9/7/2017

Class VI - Dynamite man and powder man. $37.74 $50.08 $62.41 X X X X X X X D Y Apprentice Rates:

0-1,000 work hours $32.20 $41.77 $51.33 1,001-2,000 work hours $33.31 $43.43 $53.55 2,001-3,000 work hours $34.42 $45.10 $55.77 3,001-4,000 work hours $36.63 $48.41 $60.19

LAUCT-Z2-7 9/7/2017

Class VII - Restoration laborer, seeding, sodding, planting, cutting, mulching $30.01 $38.48 $46.95 X X X X X X X D Y and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.

Apprentice Rates:

0-1,000 work hours $26.41 $33.09 $39.75 1,001-2,000 work hours $27.13 $34.17 $41.19 2,001-3,000 work hours $27.85 $35.25 $42.63 3,001-4,000 work hours $29.29 $37.41 $45.51

Landscape Laborer

LLAN-Z2-A 10/13/2015

Landscape Specialist: includes air, gas, and diesel equipment operator, $28.25 $39.04 $49.82 X X H X X X H D Y skidsteer (or equivalent), lawn sprinkler installer on landscaping work where seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintenance of landscape projects occurs.

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment Sundays paid at time & one half. Holidays paid at double time.

LLAN-Z2-B 10/13/2015

Skilled Landscape Laborer: small power tool operator, lawn sprinkler $24.05 $32.74 $41.42 X X H X X X H D Y installers' tender, material mover, truck driver on when seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintaining of landscape projects occurs comment Sundays paid at time & one half. Holidays paid at double time.

Operating Engineer

EN-AC 6/7/2017

Compressor or Welding Machine $46.07 $57.38 $68.68 X X H H D D D D Y comment make up day allowed Friday, Four 10 hour days may be scheduled Monday-Thursday or Tuesday- Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

EN-F 6/7/2017

Forklift or Straight Mast $47.52 $59.55 $71.58 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled M-Th or T-F. Work not performed due to weather on M-Th may be scheduled on Friday

EN-FO 6/7/2017

Fireman or Oiler $45.04 $55.83 $66.62 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

EN-L 6/7/2017

Lull or Extend-a-Boom Forklift $53.38 $68.34 $83.30 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled M-Th or T-F. Work not performed due to weather on M-Th may be scheduled on Friday

EN-OS120 6/7/2017

Crane with main boom & jib 120' or longer $56.92 $80.60 $104.28 X X H H D D D D Y

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Worked not performed due to weather, Monday-Thursday may be scheuled Friday

EN-OSA 6/7/2017

Crane w/ main Boom & Jib 220' or longer $58.03 $75.32 $92.60 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

EN-OSA3 6/7/2017

Crane w/ main Boom & Jib 300' or longer $59.54 $74.73 $90.41 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work unabled to be performed due to weather, Monday-Thursday may be scheduled on Friday.

EN-OSA4 6/7/2017

Crane w/ main Boom & Jib 400' or longer $61.04 $79.83 $98.62 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

EN-OSB 6/7/2017

Crane with main boom and jib 140' or longer $57.74 $74.88 $92.02 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work unabled to be performed due to weather, Monday-Thursday may be scheduled on Friday.

EN-RC 6/7/2017

Regular Crane Operator, Job Mechanic, Concrete Pump with Boom $56.06 $72.36 $88.66 X X H H D D D D Y Apprentice Rates:

0-999 hours $44.78 $56.19 $67.60 1,000-1,999 hours $46.41 $58.64 $70.86 2,000-2,999 hours $48.04 $61.08 $74.12 3,000-3,999 hours $49.67 $63.53 $77.38 4,000-4,999 hours $51.31 $65.98 $80.66 5,000-5,999 hours $52.93 $68.42 $83.90

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

EN-RE 6/7/2017

Regular Engineer, Hydro Excavator & Remote Controlled Concrete Breaker $55.11 $70.94 $86.76 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

Operating Engineer - Marine Construction

GLF D 4/2/2014

Diver/Wet Tender/Tender/Rov Pilot/Rov Tender $52.80 $79.20 $105.60 H H H H H H H D N

GLF-1 1/23/2017

Diver/Wet Tender, Engineer (hydraulic dredge) $72.32 $93.82 $115.32 X X H H H H H D Y comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters

GLF-2 1/23/2017

Crane/Backhoe Operator, 70 ton or over Tug Operator, Mechanic/Welder, $70.82 $91.57 $112.32 X X H H H H H D Y Assistant Engineer (hydraulic dredge), Leverman (hydraulic dredge), Diver Tender comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

GLF-2B 1/23/2017

Friction, Lattice Boom or Crane License Certification $72.32 $93.82 $115.32 X X H H H H H D Y comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands, therein, & connecting & tributary waters

GLF-3 1/23/2017

Deck Equipment Operator, Machineryman, Maintenance of Crane (over 50 $66.27 $84.75 $103.22 X X H H H H H D Y ton capacity) or Backhoe (115,000 lbs or more), Tug/Launch Operator, Loader, Dozer on Barge, Deck Machinery

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

GLF-4 1/23/2017

Deck Equipment Operator, (Machineryman/Fireman), (4 equipment units or $60.07 $75.45 $90.82 X X H H H H H D Y more), Off Road Trucks, Deck Hand, Tug Engineer, & Crane Maintenance 50 ton capacity and under or Backhoe 115,000 lbs or less, Assistant Tug Operator comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters Operating Engineer Steel Work

EN-324-EF 6/8/2017

Forklift, 1 Drum Hoist $60.41 $79.00 $97.58 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW120 6/7/2017

Crane w/ 120' boom or longer $63.11 $83.05 $102.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW120-O 6/7/2017

Crane w/ 120' boom or longer w/ Oiler $64.11 $84.55 $104.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW140 6/7/2017

Crane w/ 140' boom or longer $64.29 $84.82 $105.34 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW140-O 6/7/2017

Crane w/ 140' boom or longer W/ Oiler $65.29 $86.32 $107.34 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

EN-324-SW220 6/7/2017

Boom & Jib 220' or longer $64.56 $85.22 $105.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW220-O 6/7/2017

Crane w/ 220' boom or longer w/ Oiler $65.56 $86.72 $107.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW300 6/7/2017

Boom & Jib 300' or longer $66.06 $87.47 $108.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW300-O 6/7/2017

Crane w/ 300' boom or longer w/ Oiler $67.06 $88.97 $110.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW400 6/7/2017

Boom & Jib 400' or longer $67.56 $89.72 $111.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW400-O 6/7/2017

Crane w/ 400' boom or longer w/ Oiler $68.56 $91.22 $113.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWCO 6/7/2017

Crane Operator, Job Mechanic, 3 Drum Hoist & Excavator $62.75 $82.51 $102.26 H H D H H H D D Y Apprentice Rates:

0-999 hours $49.40 $63.26 $77.11 1,000-1,999 hours $51.38 $66.23 $81.07 2,000-2,999 hours $53.35 $69.19 $85.01 3,000-3,999 hours $55.33 $72.16 $88.97 4,000-4,999 hours $57.30 $75.11 $92.91 5,000 hours $59.28 $78.08 $96.87

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWCO-O 6/7/2017

Crane Operator w/ Oiler $63.75 $84.01 $104.26 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWCW 6/7/2017

Compressor or Welder Operator $55.30 $71.33 $87.36 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWHO 6/7/2017

Hoisting Operator, 2 Drum Hoist, & Rubber Tire Backhoe $62.11 $81.55 $100.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWO 6/7/2017

Oiler $53.89 $69.22 $84.54 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWTD50 6/7/2017

Tower Crane & Derrick where work is 50' or more $63.84 $84.14 $104.44 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWTD50-O 6/7/2017

Tower Crane & Derrick 50' or more w/ Oiler $64.84 $85.64 $106.44 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Operating Engineer Underground

EN-324A2-UC1 9/7/2017

Class I Equipment - Backfiller Tamper, Backhoe, Batch Plant Operator, $53.29 $68.46 $83.62 H H H H H H H D Y Clamshell, Concrete Paver 2 drums or larger, Conveyor Loader Euclid type, Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, endloader, gradall, grader, hydro excavator, power shovel, roller asphalt, scraper self-propelled or tractor drawn, side boom tractor, slip form paver, slope paver, trencher over 8 ft. digging capacity, well drilling rig, concrete pump with boom operator Apprentice Rates:

0-999 hours $42.89 $53.50 $64.12 1,000-1,999 hours $44.41 $55.78 $67.16 2,000-2,999 hours $45.93 $58.06 $70.20 3,000-3,999 hours $47.43 $60.32 $73.20 4,000-4,999 hours $48.95 $62.60 $76.24 5,000-5,999 hours $50.47 $64.88 $79.28

EN-324A2-UC2 9/7/2017

Class II Equipment - Boom Truck, Crusher, Hoist, Pump 6 inch discharge or $48.39 $61.11 $73.82 H H H H H H H D Y larger, side boom tractor, Tractor (pneu-tired other than backhoe or front end loader), Trencher 8 ft. digging capcity and smaller, Vac Truck

EN-324A2-UC3 9/7/2017

Class III Equipment - Air Compressors 600 cfm or larger, Air Compressors 2 $47.89 $60.36 $72.82 H H H H H H H D Y or more less than 600 dfm, Boom Truck non-swinging non-powered type boom, Concrete Breaker self-propelled or truck mounted, Concrete paver 1 drum 1/2 yd. or larger, Elevator other than passenger, Pump 4 inch to 6 inch discharge, pumpcrete machine, wagon drill, welding machine or generator 2 or more 300 amp or larger

EN-324A2-UC4 9/7/2017

Class IV Equipment - Boiler, Concrete Saw 40 hp or over, curing machine self $47.60 $59.93 $72.24 H H H H H H H D Y propelled, end dumps, extend a boom forklift, farm tractor with attachment, finishing machine concrete, firemen, hydraulic pipe pushing machine, mulching equipment, oiler, pumps up to 4 inch discharge, roller other than asphalt, stump remover, sweeper wayne type, trencher, vibrating compaction equipment self propelled 6 ft. wide or over, water wagon.

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

Painter

PT-312 7/27/2016

Brush & Roll, Drywall Taping $35.54 $47.29 $59.04 H H H H H H H D Y Apprentice Rates:

0-1,000 hours $24.96 $31.42 $37.88 1,001-2,000 hours $26.14 $33.19 $40.24 2,001-3,000 hours $28.02 $36.01 $44.00 3,001-4,000 hours $29.66 $38.47 $47.28 4,001-5,000 hours $32.01 $42.00 $51.98 5,001-6,000 hours $34.36 $45.52 $56.68 comment make up day allowed A four 10 hour day work schedule may be used, consecutive days, Monday- Friday. A makeup day may be scheduled for missed work due to holidays or inclement weather, Monday-Friday.

Painter - Sign Display

PT-591 12/12/2017

The trade jurisdiction consists of painting and other related surface finishing $19.94 $29.93 $39.88 X X X X X X X D N operations; lettering, and all operations so related; pictorial and graphic art work; screen process procedures; application of photographs, translates, refinished surface-type materials used in lieu of painted methods, display graphics; adhesive backed lettering and art work; sign hanging, sign installation, erection and construction; bulletin board construction; plastic sign fabrication; advertising displays and exhibits; and the preparing of surfaces for finishing of the same to include but not limited to application of filler of seams, grooves, nail and/or screw holes; and such area practices pertaining to the sign and display industry.

Pipe and Manhole Rehab

TM247 4/17/2015

General Laborer for rehab work or normal cleaning and cctv work-top man, $28.20 $38.20 H H H H H H H H N scaffold man, CCTV assistant, jetter-vac assistant

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

TM247-2 4/17/2015

Tap cutter/CCTV Tech/Grout Equipment Operator: unit driver and operator $32.70 $44.95 H H H H H H H H N of CCTV; grouting equipment and tap cutting equipment

TM247-3 4/17/2015

CCTV Technician/Combo Unit Operator: unit driver and operator of cctv unit $31.45 $43.07 H H H H H H H H N or combo unit in connection with normal cleaning and televising work

TM247-4 4/17/2015

Boiler Operator: unit driver and operator of steam/water heater units and all $33.20 $45.70 H H H H H H H H N ancillary equipment associated

TM247-5 4/17/2015

Combo Unit driver & Jetter-Vac Operator $33.20 $45.70 H H H H H H H H N

TM247-6 4/17/2015

Pipe Bursting & Slip-lining Equipment Operator $34.20 $47.20 H H H H H H H H N

Plasterer

BR9-17-PL 11/9/2016

Plasterer $42.48 $53.97 $65.46 H H H H H H H D Y Apprentice Rates:

0-749 hours $33.68 $41.03 $48.37 750-1499 hours $34.94 $42.91 $50.89 1500-2249 hours $36.20 $44.81 $53.41 2250-2999 hours $37.45 $46.68 $55.91 3000-3749 hours $38.71 $48.57 $58.43 3750-4499 hours $39.97 $50.46 $60.95 comment make up day allowed Four 10s allowed M-F

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

PL16-1 10/23/2012

Plasterer $33.61 $44.20 $54.79 H H H H H H H D N Apprentice Rates:

1st year $26.20 $33.09 $39.97 2nd year $28.31 $36.25 $44.19 3rd year $30.43 $39.43 $48.43

Plumber, Pipefitter, HVAC & Refrigeration

PL-357 7/24/2017

Plumber, Pipefitter, HVAC & Refrigeration $53.20 $70.13 $87.05 H H H H H H D D Y Apprentice Rates:

1st Year $27.43 $36.57 $45.71 2nd Year $28.44 $38.09 $47.73 3rd Year $39.66 $49.82 $59.97 4th Year $40.68 $51.35 $62.01 5th Year $43.05 $54.90 $66.75 comment make up day allowed OT M-F after the first 4 hours OT double time rate.

PL-357-LC 7/24/2017

Light Commercial Plumber & HVAC $42.50 $55.20 $67.90 H H H X H H H D Y Light Commercial Construction on one story plus walkout - Office buildings, Gas stations and vehicle service garages, Recreational vehicle locations, Public exhibits, Outlying fairs, Race tracks and non- hospital owned medical offices, Pole type building – excluding all Industrial applications.

Apprentice Rates:

Probation - 6 months $15.24 $22.86 $30.48 1st Year $25.66 $33.92 $42.17 2nd Year $28.20 $37.73 $47.25 3rd Year $37.42 $47.58 $57.74 4th Year $38.69 $49.49 $60.28 5th Year $39.96 $51.39 $62.82 comment make up day allowed An alternate workweek of 4 10 hour days may be worked. In case of inclement weather Monday thru Thursday, Friday can be an optional make-up day at straight time pay.

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Plumber, Pipefitter, Welder, HVAC & Refrigeration

PL-333-RI 12/1/2015

Plumber, Pipefitter, Welder, HVAC & Refrigeration $55.02 $82.33 $109.64 H H H H H H H D Y Apprentice Rates:

1st 6 months $26.00 $38.81 $51.60 2nd 6 months $38.07 $56.91 $75.74 3rd 6 months $39.77 $59.46 $79.14 4th 6 months $41.46 $62.00 $82.52 5th 6 months $43.16 $64.54 $85.92 6th 6 months $44.85 $67.08 $89.30 7th 6 months $46.55 $69.63 $92.70 8th 6 months $48.24 $72.16 $96.08 9th 6 months $49.94 $74.72 $99.48 10th 6 months $51.63 $77.25 $102.86 comment Four 10s allowed Monday thru Thursday. Friday not a makeup, considered OT, paid @ time & one-half.

Subdivision of county Fort Custer only Roofer

RO-70-Z3 7/5/2017

Commercial Roofer $41.59 $53.57 $65.54 H H H X H H H D Y Apprentice Rates:

1st Class $25.84 $32.25 $38.65 2nd Class $26.85 $33.70 $40.54 3rd Class $29.34 $36.79 $44.24 4th Class $31.58 $40.07 $48.57 5th Class $33.24 $42.52 $51.80 6th Class $34.36 $44.16 $53.96 7th Class $35.48 $45.81 $56.13 comment make up day allowed Friday or Saturday, 4 tens allowed M-Th 5 consecutive nine hour days M-F also allowed, time over forty hours per/week shall be at OT. Sat makeup day

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Sewer Relining

SR-I 11/24/2015

Class I-Operator of audio visual CCTV system including remote in-ground $43.66 $59.01 $74.36 H H H H H H H D N cutter and other equipment used in conjunction with CCTV system.

SR-II 11/24/2015

Class II-Operator of hot water heaters and circulation system; water jetters; $42.13 $56.72 $71.30 H H H H H H H D N and vacuum and mechanical debris removal systems and those assisting.

Sheet Metal Worker

SHM-7-1 12/7/2017

Sheet Metal Worker $50.97 $66.60 $82.23 H H H H D D D D Y Apprentice Rates:

First Year $27.12 $34.93 $42.75 Second Year $32.89 $42.27 $51.65 Third Year $41.59 $52.53 $63.47 Fourth Year $44.72 $57.23 $69.73 comment make up day allowed 4 10s allowed as consecutive days, M-Th or T-F. Make up day allowed for work missed due to inclement weather, make up hours to be paid at regular

Official Request #: 571 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Ft. posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Sprinkler Fitter

SP 669 1/4/2017

Sprinkler Fitter $51.64 $68.45 $85.26 H H H H H H H D Y Apprentice Rates:

Class 1 $23.03 $30.60 $38.16 Class 2 $24.71 $33.12 $41.52 Class 3 $34.01 $43.26 $52.50 Class 4 $35.69 $45.78 $55.86 Class 5 $37.62 $48.55 $59.47 Class 6 $39.30 $51.07 $62.83 Class 7 $40.99 $53.60 $66.21 Class…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .