This is a prevailing wage rate schedule issued by the State of Michigan Department of Military and Veterans Affairs (DMVA) for fence maintenance, repair and replacement work at Camp Grayling Joint Maneuver Training Center (JMTC) in Otsego County. The document was issued on April 19, 2018 and stipulates that the contract must be awarded by July 18, 2018. The schedule provides detailed wage rates for various construction trades including asbestos/lead abatement workers, boilermakers, bricklayers, carpenters, cement finishers, electricians, glaziers, ironworkers, laborers, painters, plumbers, roofers and other related trades.
The document lists comprehensive wage rates including straight time hourly rates, time and a half rates, and double time rates for journeymen and apprentices across all trades. It also specifies overtime provisions and make-up day allowances for each classification. The rates are official prevailing wages that must be posted at construction sites and paid on state-funded projects in Otsego County. The schedule includes 27 pages of detailed wage classifications and rates that contractors and subcontractors must follow when performing work under this contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Michigan WHPWRequest@michigan.gov Official Request #: 570 Requestor: DMVA Project Description: Fence Maintenance, Repair and Replacement at Camp Grayling JMTC Project Number:
Otsego County Official 2018 Commercial Prevailing Wage Rates for State Funded Projects Issue Date: 4/19/2018 Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Asbestos & Lead Abatement Laborer
MLDC 9/7/2017
Asbestos & Lead Abatement Laborer $41.30 $55.23 $69.16 H H H X X X X D Y Apprentice Rates:
Trainee 600 hours + 1 calendar $30.22 $33.28 $41.73 comment 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days
Asbestos, Lead and Mold Abatement, Hazardous Material Handler
AS207 3/27/2017
Asbestos, Lead and Mold Abatement, Hazardous Material Handler $40.75 $54.25 $67.75 H H H X X X X D Y comment Four ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days
Boilermaker
BO169 2/17/2015
Boilermaker $54.70 $81.08 $107.45 H H H H H H H D Y Apprentice Rates:
1st 6 months $40.31 $59.49 $78.67 2nd 6 months $41.45 $61.21 $80.95 3rd 6 months $42.57 $62.88 $83.19 4th 6 months $43.69 $64.57 $85.43 5th 6 months $44.81 $66.24 $87.67 6th 6 months $48.63 $72.50 $96.36 7th 6 months $49.32 $73.01 $96.69 8th 6 months $51.58 $76.40 $101.21
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
County Otsego
Official 2018 Commercial Prevailing Wage Rates for State Funded Projects Issue Date: 4/19/2018 Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision
Bricklayer
BR9-40 11/4/2016
Bricklayer $43.21 $55.53 $67.85 H H H H H H H D Y Apprentice Rates:
0-749 hours $32.49 $39.71 $46.93 750-1499 hours $33.83 $41.72 $49.61 1500-2249 hours $35.17 $43.73 $52.29 2250-2,999 hours $36.51 $45.74 $54.97 3000-3749 hours $37.85 $47.75 $57.65 3750-4499 hours $39.19 $49.76 $60.33 4500-5249 hours $40.53 $51.77 $63.01 5250-6000 hours $41.87 $53.78 $65.69 comment make up day allowed 4 10s allowed M-F, Saturday makeup day
BR9-40-BL 11/4/2016
Caulker, Pointer, Cleaner, Plasterer, Tile Setter, Terrazzo Worker $43.21 $55.53 $67.85 H H H H H H H D Y Apprentice Rates:
0-749 hours $33.83 $41.72 $49.61 750-1499 hours $35.17 $43.73 $52.29 1500-2249 hours $36.51 $45.74 $54.97 2250-2999 hours $37.85 $47.75 $57.65 3000-3749 hours $39.19 $49.76 $60.33 3750-4499 hours $40.53 $51.77 $63.01 comment 4 10s allowed M-F
BR9-40S 11/4/2016
Stone Mason $43.21 $55.53 $67.85 H H H H H H H D Y Apprentice Rates:
750-1499 hours $35.17 $43.73 $52.29 1500-2249 hours $36.51 $45.74 $54.97 2250-2999 hours $37.85 $47.75 $57.65 3000-3749 hours $39.19 $49.76 $60.33 3750-4499 hours $40.53 $51.77 $63.01
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment 4 10s allowed M-F Carpenter
CA202 7/5/2017
Carpenter $39.22 $49.56 $59.90 X X H H H H H D Y Apprentice Rates:
1st year $33.02 $40.26 $47.50 2nd year $34.05 $41.80 $49.56 3rd year $36.12 $44.91 $53.70 4th year $38.19 $48.02 $57.84 comment make up day allowed 4 10s allowed M-Th, Friday make up day for 4-10s Saturday make up day for 5-8s for inclement weather
CA202PD 7/5/2017
Pile Driver $39.87 $50.54 $61.20 X X H H H H H D Y Apprentice Rates:
1st Year $33.47 $40.94 $48.40 2nd Year $34.54 $42.54 $50.54 3rd Year $36.67 $45.74 $54.80 4th Year $38.80 $48.93 $59.06 comment make up day allowed Four 10s allowed Monday-Thursday, Friday make up day for 4-10s Saturday make up day for 5-8s for inclement weather
Cement Finisher
BR9-40-CF 11/4/2016
Cement Finisher $38.93 $49.37 $59.81 X X H X X X H D Y Apprentice Rates:
0-749 hours $30.94 $37.62 $44.30 750-1499 hours $32.08 $39.33 $46.58 1500-2249 hours $33.22 $41.04 $48.86 2250-2999 hours $34.36 $42.75 $51.14 3000-3749 hours $35.51 $44.48 $53.44 3750-4499 hours $36.65 $46.18 $55.72
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment 4 10s allowed M-F Cement Mason
PL16-13 8/18/2016
Cement Mason $38.66 $51.29 $63.92 H H H H H H H D Y Apprentice Rates:
1st year $29.82 $38.03 $46.24 2nd year $32.34 $41.81 $51.28 3rd year $34.87 $45.60 $56.34 comment make up day allowed Four 10s allowed Monday-Thursday with Friday or Saturday inclement weather make up days. Saturday hours for inclement weather make up shall be paid straight rate unless over 40 hours worked.
Drywall
PT-1803-DF 6/2/2016
Drywall Finisher $38.49 $50.50 $62.50 H H H H H H H D Y Apprentice Rates:
0 - 900 hours $26.48 $32.48 $38.48 901- 1800 hours $30.09 $37.90 $45.70 1801 - 2700 hours $33.69 $43.30 $52.90 2701 - 3600 hours $36.09 $46.90 $57.70 comment make up day allowed 4 10 hour days allowed on consecutive days, Monday-Friday. Make up day allowed M-F for work missed due to holidays or inclement weather.
Electrician
EC-498-IW 5/26/2017
Journeyman Electrician - Inside Wireman $46.78 $66.69 $86.60 H H H H H H D D Y Apprentice Rates:
1st Period 0-1000 hours $18.49 $24.71 $30.92 Period 2 1000-2000 hours $20.00 $26.97 $33.94 Period 3 2000-2500 hours $23.40 $32.08 $40.74 Period 4 3500-5000 hours $24.96 $34.42 $43.86 Period 5 5000-6500 hours $28.79 $40.16 $51.52 Period 6 6500-8000 hours $32.03 $45.01 $58.00
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed Four tens allowed if consecutive days M-Th; Friday may be used as a make-up day. Double time beyond 12 hours Mon. - Fri.
Subdivision of county All Townships EXCEPT Dover, Chester and Charlton.
EC-692-IW-Z2 10/24/2017
Journeyman Electrician - Inside Wireman $45.77 $64.92 $84.07 H H H H H H H D Y Apprentice Rates:
1000-1999 hours $19.08 $26.63 $34.16 2000-2999 hours $20.76 $29.14 $37.52 3000-3999 hours $22.42 $31.64 $40.84 4000-5999 hours $26.16 $37.24 $48.32 6000-7999 hours $28.00 $40.00 $52.00 8000+ hours $35.52 $50.31 $65.07 comment make up day allowed Four 10s allowed M-F; Monday or Friday may be used for make-up days.
Subdivision of county Townships of Dover, Chester and Charlton ONLY.
EC-692-SC 10/24/2017
Sound and Communication Installer/Technician $31.39 $44.04 $56.68 H H H H H H H D N Apprentice Rates:
1st period $13.14 $18.64 $24.13 2nd period $15.58 $22.30 $29.01 3rd period $18.02 $25.97 $33.89 4th period $20.45 $29.61 $38.75
Subdivision of county Dover, Chester & Charlton townships Elevator Constructor
EL 36 8/7/2007
Elevator Constructor Mechanic $56.46 $94.99 D D D D D D D D Y Apprentice Rates:
1st Year Apprentice $37.74 $58.93 2nd Year Apprentice $41.90 $66.94 3rd Year Apprentice $43.98 $70.95 4th Year Apprentice $48.14 $78.96 make up day allowed
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Glazier
GL-826 6/3/2016
Glazier $44.78 $60.87 $76.95 H H H H H H H D Y Apprentice Rates:
1st 6 months $31.91 $41.57 $51.21 2nd 6 months $33.52 $43.98 $54.43 3rd 6 months $35.12 $46.38 $57.63 4th 6 months $36.74 $48.81 $60.87 5th 6 months $38.35 $51.22 $64.09 6th 6 months $39.96 $53.64 $67.31 7th 6 months $41.57 $56.05 $70.53 8th 6 months $43.17 $58.45 $73.73 comment 4 tens allowed on consecutive days Heat and Frost Insulator
AS25S 3/31/2017
Spray Insulation - Qualified Senior Sprayer, application of all products $29.04 $42.35 X X X H H H H H N
Heat and Frost Insulator and Asbestos Worker
AS47 7/25/2017
Heat and Frost Insulator and Asbestos Worker $47.75 $63.01 $78.27 H H H H H H H D Y Apprentice Rates:
1st year $27.88 $35.51 $43.14 2nd year $31.85 $41.00 $50.16 3rd year $35.82 $46.50 $57.18 4th year $39.80 $52.01 $64.22 5th year $43.78 $57.51 $71.25 comment make up day allowed Friday for cancelled work in a four 10 hour schedule
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Ironworker
IR-25-F2 3/31/2017
Fence, Sound Barrier & Guardrail erection/installation and Exterior Signage $31.95 $42.05 $52.15 X X H X X X H D Y work Apprentice Rates:
60% Level $22.99 $29.05 $35.11 65% Level $24.11 $30.68 $37.24 70% Level $25.24 $32.31 $39.38 75% Level $26.35 $33.92 $41.50 80% Level $27.47 $35.55 $43.63 85% Level $28.59 $37.18 $45.76 comment Four ten hour work days may be worked during Monday-Saturday.
IR-25-GZ2 7/5/2017
Siding, Glazing, Curtain Wall $48.13 $59.92 $71.70 X X H H H H D D Y Apprentice Rates:
Level 1 $31.20 $37.93 $44.65 Level 2 $33.31 $40.67 $48.02 Level 3 $35.42 $43.41 $51.39 Level 4 $37.54 $46.16 $54.77 Level 5 $39.66 $48.92 $58.17 Level 6 $41.78 $51.67 $61.55 comment make up day allowed Friday, 4 tens may be worked Monday thru Thursday @ straight time.
IR-25-PE-Z2 3/31/2017
Pre-engineered Metal Work $45.87 $56.03 $66.19 X X H X X X X D Y Apprentice Rates:
Probation 1st Year $26.83 $32.03 $37.23 1st Level $28.96 $34.92 $40.88 2nd Level $28.96 $34.92 $40.88 3rd Level $31.08 $37.79 $44.50 4th Level $33.21 $40.68 $48.15 5th Level $35.33 $43.55 $51.77 6th Level $37.46 $46.43 $55.41 comment make up day allowed 4 tens allowed M-Th with Saturday make up day Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision
IR-25-RF 7/5/2017
Reinforced Iron Work $57.30 $85.66 $114.02 H H D H D D D D N Apprentice Rates:
Level 1 $40.32 $59.89 $79.46 Level 2 $42.68 $63.43 $84.18 Level 3 $45.22 $67.24 $89.26 Level 4 $47.75 $71.04 $94.32 Level 5 $50.29 $74.84 $99.40 Level 6 $50.29 $74.84 $99.40 make up day allowed
IR-25-RIG 7/5/2017
Rigging Work $63.51 $95.00 $126.49 H H H H H H H D N Apprentice Rates:
Level 1& 2 $38.22 $56.16 $74.85 Level 3 $41.05 $61.54 $82.01 Level 4 $43.87 $65.76 $87.65 Level 5 $46.70 $70.01 $93.31 Level 6 $49.53 $74.25 $98.97
IR-25-SD 7/5/2017
Decking $55.47 $82.87 $110.26 X X H H H H D D Y comment make up day allowed 4 tens may be worked Monday thru Thursday @ straight time. If bad weather, Friday may be a make up day. If holiday celebrated on a Monday, 4 10s may be worked Tuesday thru Friday. Work in excess of 12 hours per day must be paid @ double time.
IR-25-STR 7/5/2017
Structural, ornamental, welder and pre-cast $63.64 $95.12 $126.60 H H H H H H D D Y Apprentice Rates:
Levels 1 & 2 $38.22 $56.99 $75.75 Level 3 $41.05 $61.24 $81.41 Level 4 $43.87 $65.46 $87.05 Level 5 $46.70 $69.71 $92.71 Level 6 $49.53 $73.95 $98.37 Level 7 $52.35 $78.18 $104.01 Level 8 $55.18 $82.43 $109.67
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed 4 tens may be worked Monday thru Thursday @ straight time. If bad weather, Friday may be a make up day. If holiday celebrated on a Monday, 4 10s may be worked Tuesday thru Friday. Work in excess of 12 hours per day must be paid @ double time.
IR-25-STR-D 7/5/2017
Industrial Door erection & construction $43.74 $65.27 $86.80 H H H H H H D D Y comment make up day allowed Friday for bad weather when 4 tens scheduled for M-Th. If holiday celebrated on M, 4 tens may be worked T-F. Work in excess of 12 hours per day must be paid @ double time.
Laborer L1098-N-A 7/21/2017 Class A Laborer: building and heavy construction work, demolition, mortar $30.07 $38.57 $47.07 X X H H H H H D Y mixers, mason tender, carpenter tender, fire watch, heater tender, all 3" pumps and below, furniture mover, material mixers, vibrator operators, operators of concrete mixers, chipping hammers, tamping machines, sand blasters, concrete breakers (90 lb hammer or less), cement gun nozzelman, operators of motor driven buggies, plaster mixers and plaster tenders, pipe or crock layers, caisson work in buildings only, except others falling within class B.
Cleaning and clearing of all debris, including wire brushing of windows, scraping of floors, removal of surplus material from all fixtures within confines of structure and cleaning all debris in building and construction area.
The general cleanup, including sweeping, cleaning, washdown and wiping of construction facility, equipment and furnishings and removal and loading or burning of all debris including crates, boxes, packaging waste material.
Washing and cleaning of walls, partitions, ceilings, windows, bathrooms, kitchens, laboratory, and all fixtures and facilities therein. Cleanup, mopping, washing, waxing and polishing or dusting of all floors or areas.
Apprentice Rates:
1,001-2,000 work hours $26.67 $33.47 $40.27 2,001-3,000 work hours $27.52 $34.75 $41.97 3,001-4,000 work hours $29.22 $37.29 $45.37 comment make up day allowed Saturday
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision L1098-N-B 7/21/2017 Class B Refractory Work: inside or outside digester, tanks, lime kilns, chests, $31.33 $40.47 $49.60 X X H H H H H D Y boilers, and boiler tubes, including the handling of acid, chlorine, chemicals, epoxies, liquids and cleaning of existing precipitators, hydro blasting, hydro washing, and sandblasting.
Apprentice Rates:
0-1,000 work hours $26.76 $33.61 $40.46 1,001-2,000 work hours $27.68 $34.99 $42.30 2,001-3,000 work hours $28.59 $36.36 $44.12 3,001-4,000 work hours $30.42 $39.10 $47.78 comment make up day allowed Saturday Laborer - Hazardous
LHAZ-Z10-A 11/13/2017
Class A Laborer performing work in conjunction with site preparation and $30.07 $42.07 $54.07 H H H H H H H D Y other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal regulations; or a laborer performing work in conjunction with the removal, handling, or containment of hazardous waste substances when use of personal protective equipment level "D" is required.
Apprentice Rates:
0-1,000 work hours $25.82 $35.69 $45.57 1,001-2,000 work hours $26.67 $36.97 $47.27 2,001-3,000 work hours $27.52 $38.25 $48.97 3,001-4,000 work hours $29.22 $40.79 $52.37 comment make up day allowed 4 10s allowed M-Th or T-F; inclement weather makeup day Friday
LHAZ-Z10-B 11/13/2017
Class B Laborer - performing work in conjunction with the removal, handling, $31.07 $43.57 $56.07 H H H H H H H D Y or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.
Apprentice Rates:
0-1,000 work hours $26.57 $36.82 $47.07 1,001-2,000 work hours $27.47 $38.17 $48.87 2,001-3,000 work hours $28.37 $39.52 $50.67 3,001-4,000 work hours $30.17 $42.22 $54.27
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed 4 10s allowed M-Th or T-F; inclement weather makeup day Friday Laborer Underground - Open Cut, Class I
LAUC-Z4-1 9/7/2017
Construction Laborer $33.67 $43.98 $54.27 X X X X X X X D Y Apprentice Rates:
0-1,000 work hours $29.17 $37.22 $45.27 1,001-2,000 work hours $30.07 $38.58 $47.07 2,001-3,000 work hours $30.97 $39.92 $48.87 3,001-4,000 work hours $32.77 $42.62 $52.47
Laborer Underground - Open Cut, Class II
LAUC-Z4-2 9/5/2017
Mortar and material mixer, concrete form man, signal man, well point man, $33.80 $44.17 $54.53 X X X X X X X D Y manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.
Apprentice Rates:
0-1,000 work hours $29.26 $37.36 $45.45 1,001-2,000 work hours $30.17 $38.72 $47.27 2,001-3,000 work hours $31.08 $40.09 $49.09 3,001-4,000 work hours $32.89 $42.80 $52.71
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Laborer Underground - Open Cut, Class III
LAUC-Z4-3 9/7/2017
Air, gasoline and electric tool operator, vibrator operator, drillers, pump $33.91 $44.34 $54.75 X X X X X X X D Y man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger man, and directional boring man.
Apprentice Rates:
0-1,000 work hours $29.35 $37.50 $45.63 1,001-2,000 work hours $30.26 $38.86 $47.45 2,001-3,000 work hours $31.17 $40.22 $49.27 3,001-4,000 work hours $33.00 $42.97 $52.93
Laborer Underground - Open Cut, Class IV
LAUC-Z4-4 9/7/2017
Trench or excavating grade man. $33.98 $44.44 $54.89 X X X X X X X D Y Apprentice Rates:
0-1,000 work hours $29.40 $37.57 $45.73 1,001-2,000 work hours $30.32 $38.95 $47.57 2,001-3,000 work hours $31.23 $40.32 $49.39 3,001-4,000 work hours $33.06 $43.06 $53.05
Laborer Underground - Open Cut, Class V
LAUC-Z4-5 9/7/2017
Pipe Layer $34.10 $44.62 $55.13 X X X X X X X D Y Apprentice Rates:
0-1,000 work hours $29.49 $37.70 $45.91 1,001-2,000 work hours $30.41 $39.08 $47.75 2,001-3,000 work hours $31.33 $40.46 $49.59 3,001-4,000 work hours $33.18 $43.24 $53.29
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Laborer Underground - Open Cut, Class VI
LAUC-Z4-6 9/7/2017
Grouting man, top man assistant, audio visual television operations and all $31.32 $40.45 $49.57 X X X X X X X D Y other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work & the installation and repair of water service pipe and appurtenances.
Apprentice Rates:
0-1,000 work hours $27.40 $34.57 $41.73 1,001-2,000 work hours $28.19 $35.76 $43.31 2,001-3,000 work hours $28.97 $36.92 $44.87 3,001-4,000 work hours $30.54 $39.28 $48.01
Laborer Underground - Open Cut, Class VII
LAUC-Z4-7 9/7/2017
Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil $29.66 $37.96 $46.25 X X X X X X X D Y grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.
Apprentice Rates:
0-1,000 work hours $26.16 $32.71 $39.25 1,001-2,000 work hours $26.86 $33.76 $40.65 2,001-3,000 work hours $27.56 $34.81 $42.05 3,001-4,000 work hours $28.96 $36.91 $44.85
Laborer Underground - Tunnel, Shaft & Caisson
LAUCT-Z2-1 9/7/2017
Class I - Tunnel, shaft and caisson laborer, dump man, shanty man, hog $36.82 $48.70 $60.57 X X X X X X X D Y house tender, testing man (on gas), and watchman.
Apprentice Rates:
0-1,000 work hours $31.52 $40.75 $49.97 1,001-2,000 work hours $32.58 $42.34 $52.09 2,001-3,000 work hours $33.64 $43.93 $54.21 3,001-4,000 work hours $35.76 $47.11 $58.45
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision
LAUCT-Z2-2 9/7/2017
Class II - Manhole, headwall, catch basin builder, bricklayer tender, mortar $36.91 $48.83 $60.75 X X X X X X X D Y man, material mixer, fence erector, and guard rail builder Apprentice Rates:
0-1,000 work hours $31.58 $40.84 $50.09 1,001-2,000 work hours $32.65 $42.45 $52.23 2,001-3,000 work hours $33.71 $44.03 $54.35 3,001-4,000 work hours $35.84 $47.23 $58.61
LAUCT-Z2-3 9/7/2017
Class III - Air tool operator (jack hammer man, bush hammer man and $37.01 $48.98 $60.95 X X X X X X X D Y grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, concrete shoveler, conveyor man, floor man, gasoline and electric tool operator, gunnite man, grout operator, welder, heading dinky man, inside lock tender, pea gravel operator, pump man, outside lock tender, scaffold man, top signal man, switch man, track man, tugger man, utility man, vibrator man, winch operator, pipe jacking man, wagon drill and air track operator and concrete saw operator (under 40 h.p.).
Apprentice Rates:
0-1,000 work hours $31.66 $40.96 $50.25 1,001-2,000 work hours $32.73 $42.57 $52.39 2,001-3,000 work hours $33.80 $44.17 $54.53 3,001-4,000 work hours $35.94 $47.38 $58.81
LAUCT-Z2-4 9/7/2017
Class IV - Tunnel, shaft and caisson mucker, bracer man, liner plate man, $37.17 $49.22 $61.27 X X X X X X X D Y long haul dinky driver and well point man.
Apprentice Rates:
0-1,000 work hours $31.78 $41.14 $50.49 1,001-2,000 work hours $32.86 $42.76 $52.65 2,001-3,000 work hours $33.93 $44.37 $54.79 3,001-4,000 work hours $36.09 $47.61 $59.11
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision
LAUCT-Z2-5 9/7/2017
Class V - Tunnel, shaft and caisson miner, drill runner, keyboard operator, $37.43 $49.62 $61.79 X X X X X X X D Y power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars) Apprentice Rates:
0-1,000 work hours $31.97 $41.43 $50.87 1,001-2,000 work hours $33.06 $43.06 $53.05 2,001-3,000 work hours $34.16 $44.71 $55.25 3,001-4,000 work hours $36.34 $47.98 $59.61
LAUCT-Z2-6 9/7/2017
Class VI - Dynamite man and powder man. $37.74 $50.08 $62.41 X X X X X X X D Y Apprentice Rates:
0-1,000 work hours $32.20 $41.77 $51.33 1,001-2,000 work hours $33.31 $43.43 $53.55 2,001-3,000 work hours $34.42 $45.10 $55.77 3,001-4,000 work hours $36.63 $48.41 $60.19
LAUCT-Z2-7 9/7/2017
Class VII - Restoration laborer, seeding, sodding, planting, cutting, mulching $30.01 $38.48 $46.95 X X X X X X X D Y and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.
Apprentice Rates:
0-1,000 work hours $26.41 $33.09 $39.75 1,001-2,000 work hours $27.13 $34.17 $41.19 2,001-3,000 work hours $27.85 $35.25 $42.63 3,001-4,000 work hours $29.29 $37.41 $45.51
Landscape Laborer
LLAN-Z2-A 10/13/2015
Landscape Specialist: includes air, gas, and diesel equipment operator, $28.25 $39.04 $49.82 X X H X X X H D Y skidsteer (or equivalent), lawn sprinkler installer on landscaping work where seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintenance of landscape projects occurs.
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment Sundays paid at time & one half. Holidays paid at double time.
LLAN-Z2-B 10/13/2015
Skilled Landscape Laborer: small power tool operator, lawn sprinkler $24.05 $32.74 $41.42 X X H X X X H D Y installers' tender, material mover, truck driver on when seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintaining of landscape projects occurs comment Sundays paid at time & one half. Holidays paid at double time.
Operating Engineer
EN-AC 6/7/2017
Compressor or Welding Machine $46.07 $57.38 $68.68 X X H H D D D D Y comment make up day allowed Friday, Four 10 hour days may be scheduled Monday-Thursday or Tuesday- Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
EN-F 6/7/2017
Forklift or Straight Mast $47.52 $59.55 $71.58 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled M-Th or T-F. Work not performed due to weather on M-Th may be scheduled on Friday
EN-FO 6/7/2017
Fireman or Oiler $45.04 $55.83 $66.62 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.
Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
EN-L 6/7/2017
Lull or Extend-a-Boom Forklift $53.38 $68.34 $83.30 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled M-Th or T-F. Work not performed due to weather on M-Th may be scheduled on Friday
EN-OS120 6/7/2017
Crane with main boom & jib 120' or longer $56.92 $80.60 $104.28 X X H H D D D D Y
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.
Worked not performed due to weather, Monday-Thursday may be scheuled Friday
EN-OSA 6/7/2017
Crane w/ main Boom & Jib 220' or longer $58.03 $75.32 $92.60 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.
Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
EN-OSA3 6/7/2017
Crane w/ main Boom & Jib 300' or longer $59.54 $74.73 $90.41 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.
Work unabled to be performed due to weather, Monday-Thursday may be scheduled on Friday.
EN-OSA4 6/7/2017
Crane w/ main Boom & Jib 400' or longer $61.04 $79.83 $98.62 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.
Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
EN-OSB 6/7/2017
Crane with main boom and jib 140' or longer $57.74 $74.88 $92.02 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.
Work unabled to be performed due to weather, Monday-Thursday may be scheduled on Friday.
EN-RC 6/7/2017
Regular Crane Operator, Job Mechanic, Concrete Pump with Boom $56.06 $72.36 $88.66 X X H H D D D D Y Apprentice Rates:
0-999 hours $44.78 $56.19 $67.60 1,000-1,999 hours $46.41 $58.64 $70.86 2,000-2,999 hours $48.04 $61.08 $74.12 3,000-3,999 hours $49.67 $63.53 $77.38 4,000-4,999 hours $51.31 $65.98 $80.66 5,000-5,999 hours $52.93 $68.42 $83.90
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.
Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
EN-RE 6/7/2017
Regular Engineer, Hydro Excavator & Remote Controlled Concrete Breaker $55.11 $70.94 $86.76 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.
Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Operating Engineer - Marine Construction
GLF D 4/2/2014
Diver/Wet Tender/Tender/Rov Pilot/Rov Tender $52.80 $79.20 $105.60 H H H H H H H D N
GLF-1 1/23/2017
Diver/Wet Tender, Engineer (hydraulic dredge) $72.32 $93.82 $115.32 X X H H H H H D Y comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters
GLF-2 1/23/2017
Crane/Backhoe Operator, 70 ton or over Tug Operator, Mechanic/Welder, $70.82 $91.57 $112.32 X X H H H H H D Y Assistant Engineer (hydraulic dredge), Leverman (hydraulic dredge), Diver Tender comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters
GLF-2B 1/23/2017
Friction, Lattice Boom or Crane License Certification $72.32 $93.82 $115.32 X X H H H H H D Y comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands, therein, & connecting & tributary waters
GLF-3 1/23/2017
Deck Equipment Operator, Machineryman, Maintenance of Crane (over 50 $66.27 $84.75 $103.22 X X H H H H H D Y ton capacity) or Backhoe (115,000 lbs or more), Tug/Launch Operator, Loader, Dozer on Barge, Deck Machinery
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
County Statewide
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters
GLF-4 1/23/2017
Deck Equipment Operator, (Machineryman/Fireman), (4 equipment units or $60.07 $75.45 $90.82 X X H H H H H D Y more), Off Road Trucks, Deck Hand, Tug Engineer, & Crane Maintenance 50 ton capacity and under or Backhoe 115,000 lbs or less, Assistant Tug Operator comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters Operating Engineer Steel Work
EN-324-EF 6/8/2017
Forklift, 1 Drum Hoist $60.41 $79.00 $97.58 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW120 6/7/2017
Crane w/ 120' boom or longer $63.11 $83.05 $102.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW120-O 6/7/2017
Crane w/ 120' boom or longer w/ Oiler $64.11 $84.55 $104.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW140 6/7/2017
Crane w/ 140' boom or longer $64.29 $84.82 $105.34 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW140-O 6/7/2017
Crane w/ 140' boom or longer W/ Oiler $65.29 $86.32 $107.34 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision
EN-324-SW220 6/7/2017
Boom & Jib 220' or longer $64.56 $85.22 $105.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW220-O 6/7/2017
Crane w/ 220' boom or longer w/ Oiler $65.56 $86.72 $107.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW300 6/7/2017
Boom & Jib 300' or longer $66.06 $87.47 $108.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW300-O 6/7/2017
Crane w/ 300' boom or longer w/ Oiler $67.06 $88.97 $110.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW400 6/7/2017
Boom & Jib 400' or longer $67.56 $89.72 $111.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW400-O 6/7/2017
Crane w/ 400' boom or longer w/ Oiler $68.56 $91.22 $113.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWCO 6/7/2017
Crane Operator, Job Mechanic, 3 Drum Hoist & Excavator $62.75 $82.51 $102.26 H H D H H H D D Y Apprentice Rates:
0-999 hours $49.40 $63.26 $77.11 1,000-1,999 hours $51.38 $66.23 $81.07 2,000-2,999 hours $53.35 $69.19 $85.01 3,000-3,999 hours $55.33 $72.16 $88.97 4,000-4,999 hours $57.30 $75.11 $92.91 5,000 hours $59.28 $78.08 $96.87
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWCO-O 6/7/2017
Crane Operator w/ Oiler $63.75 $84.01 $104.26 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWCW 6/7/2017
Compressor or Welder Operator $55.30 $71.33 $87.36 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWHO 6/7/2017
Hoisting Operator, 2 Drum Hoist, & Rubber Tire Backhoe $62.11 $81.55 $100.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWO 6/7/2017
Oiler $53.89 $69.22 $84.54 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWTD50 6/7/2017
Tower Crane & Derrick where work is 50' or more $63.84 $84.14 $104.44 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWTD50-O 6/7/2017
Tower Crane & Derrick 50' or more w/ Oiler $64.84 $85.64 $106.44 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Operating Engineer Underground
EN-324A2-UC1 9/7/2017
Class I Equipment - Backfiller Tamper, Backhoe, Batch Plant Operator, $53.29 $68.46 $83.62 H H H H H H H D Y Clamshell, Concrete Paver 2 drums or larger, Conveyor Loader Euclid type, Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, endloader, gradall, grader, hydro excavator, power shovel, roller asphalt, scraper self-propelled or tractor drawn, side boom tractor, slip form paver, slope paver, trencher over 8 ft. digging capacity, well drilling rig, concrete pump with boom operator Apprentice Rates:
0-999 hours $42.89 $53.50 $64.12 1,000-1,999 hours $44.41 $55.78 $67.16 2,000-2,999 hours $45.93 $58.06 $70.20 3,000-3,999 hours $47.43 $60.32 $73.20 4,000-4,999 hours $48.95 $62.60 $76.24 5,000-5,999 hours $50.47 $64.88 $79.28
EN-324A2-UC2 9/7/2017
Class II Equipment - Boom Truck, Crusher, Hoist, Pump 6 inch discharge or $48.39 $61.11 $73.82 H H H H H H H D Y larger, side boom tractor, Tractor (pneu-tired other than backhoe or front end loader), Trencher 8 ft. digging capcity and smaller, Vac Truck
EN-324A2-UC3 9/7/2017
Class III Equipment - Air Compressors 600 cfm or larger, Air Compressors 2 $47.89 $60.36 $72.82 H H H H H H H D Y or more less than 600 dfm, Boom Truck non-swinging non-powered type boom, Concrete Breaker self-propelled or truck mounted, Concrete paver 1 drum 1/2 yd. or larger, Elevator other than passenger, Pump 4 inch to 6 inch discharge, pumpcrete machine, wagon drill, welding machine or generator 2 or more 300 amp or larger
EN-324A2-UC4 9/7/2017
Class IV Equipment - Boiler, Concrete Saw 40 hp or over, curing machine self $47.60 $59.93 $72.24 H H H H H H H D Y propelled, end dumps, extend a boom forklift, farm tractor with attachment, finishing machine concrete, firemen, hydraulic pipe pushing machine, mulching equipment, oiler, pumps up to 4 inch discharge, roller other than asphalt, stump remover, sweeper wayne type, trencher, vibrating compaction equipment self propelled 6 ft. wide or over, water wagon.
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision
Painter
PT-1803-P 6/2/2016
Painter $36.18 $47.65 $59.11 H H H H H H H D Y Apprentice Rates:
1st year $23.25 $28.25 $33.25 2nd year $28.15 $35.60 $43.05 3rd year $31.59 $40.76 $49.93 comment make up day allowed 4 10 hour days allowed on consecutive days, Monday-Friday. Make up day allowed M-F for work missed due to holidays or inclement weather.
Painter - Sign Display
PT-591 12/12/2017
The trade jurisdiction consists of painting and other related surface finishing $19.94 $29.93 $39.88 X X X X X X X D N operations; lettering, and all operations so related; pictorial and graphic art work; screen process procedures; application of photographs, translates, refinished surface-type materials used in lieu of painted methods, display graphics; adhesive backed lettering and art work; sign hanging, sign installation, erection and construction; bulletin board construction; plastic sign fabrication; advertising displays and exhibits; and the preparing of surfaces for finishing of the same to include but not limited to application of filler of seams, grooves, nail and/or screw holes; and such area practices pertaining to the sign and display industry.
Pipe and Manhole Rehab
TM247 4/17/2015
General Laborer for rehab work or normal cleaning and cctv work-top man, $28.20 $38.20 H H H H H H H H N scaffold man, CCTV assistant, jetter-vac assistant
TM247-2 4/17/2015
Tap cutter/CCTV Tech/Grout Equipment Operator: unit driver and operator $32.70 $44.95 H H H H H H H H N of CCTV; grouting equipment and tap cutting equipment
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision
TM247-3 4/17/2015
CCTV Technician/Combo Unit Operator: unit driver and operator of cctv unit $31.45 $43.07 H H H H H H H H N or combo unit in connection with normal cleaning and televising work
TM247-4 4/17/2015
Boiler Operator: unit driver and operator of steam/water heater units and all $33.20 $45.70 H H H H H H H H N ancillary equipment associated
TM247-5 4/17/2015
Combo Unit driver & Jetter-Vac Operator $33.20 $45.70 H H H H H H H H N
TM247-6 4/17/2015
Pipe Bursting & Slip-lining Equipment Operator $34.20 $47.20 H H H H H H H H N
Plasterer
PL16-1 10/23/2012
Plasterer $33.61 $44.20 $54.79 H H H H H H H D N Apprentice Rates:
1st year $26.20 $33.09 $39.97 2nd year $28.31 $36.25 $44.19 3rd year $30.43 $39.43 $48.43
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Plumber, Pipefitter, Welder, HVAC & Refrigeration
PL-85-Z2 6/16/2016
Plumber, Pipefitter, Welder, HVAC & Refrigeration $49.49 $63.80 $78.10 H H H H H H H D Y Apprentice Rates:
1st 6 months $30.54 $37.69 $44.84 2nd 6 months $32.52 $40.39 $48.26 3rd 6 months $34.50 $43.09 $51.67 4th 6 months $36.48 $45.78 $55.08 5th 6 months $38.46 $48.47 $58.49 6th 6 months $40.44 $51.17 $61.90 7th 6 months $42.42 $53.87 $65.31 8th 6 months $44.40 $56.56 $68.72 9th & 10th 6 months $46.38 $59.25 $72.13 comment make up day allowed 4 tens allowed M-Th; Friday makeup day Roofer
RO-149-NL 8/18/2008
Commercial Roofer $29.18 $38.00 $46.81 X X X X X X X D Y Apprentice Rates:
Apprentice 1 $18.02 $23.08 $28.14 Apprentice 2 $21.34 $26.68 $32.02 Apprentice 3 $22.55 $28.45 $34.35 Apprentice 4 $23.76 $30.23 $36.69 Apprentice 5 $24.97 $32.00 $39.02 Apprentice 6 $26.20 $33.79 $41.39 comment make up day allowed Straight time is not to exceed ten (10) hours per day or forty (40) hours per Sewer Relining
SR-I 11/24/2015
Class I-Operator of audio visual CCTV system including remote in-ground $43.66 $59.01 $74.36 H H H H H H H D N cutter and other equipment used in conjunction with CCTV system.
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision
SR-II 11/24/2015
Class II-Operator of hot water heaters and circulation system; water jetters; $42.13 $56.72 $71.30 H H H H H H H D N and vacuum and mechanical debris removal systems and those assisting.
Sheet Metal Worker
SHM-7-3 12/7/2017
Sheet Metal Worker $49.28 $62.50 $75.71 H H D H H H D D Y Apprentice Rates:
1st 6 months $16.13 $21.54 $26.95 2nd 6 months $18.88 $24.95 $31.02 3rd 6 months $20.78 $27.52 $34.25 4th 6 months $23.53 $30.93 $38.32 5th 6 months $25.42 $33.48 $41.53 6th 6 months $28.17 $36.89 $45.60 7th 6 months $30.06 $39.44 $48.81 8th 6 months $32.56 $42.47 $52.38 comment make up day allowed 4 10s allowed as consecutive days, M-Th or T-F Sprinkler Fitter
SP 669 1/4/2017
Sprinkler Fitter $51.64 $68.45 $85.26 H H H H H H H D Y Apprentice Rates:
Class 1 $23.03 $30.60 $38.16 Class 2 $24.71 $33.12 $41.52 Class 3 $34.01 $43.26 $52.50 Class 4 $35.69 $45.78 $55.86 Class 5 $37.62 $48.55 $59.47 Class 6 $39.30 $51.07 $62.83 Class 7 $40.99 $53.60 $66.21 Class 8 $42.67 $56.12 $69.57 Class 9 $44.35 $58.64 $72.93 Class 10 $46.03 $61.16 $76.29 make up day allowed
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.
Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Tile Finisher
BR9-40-TW 11/4/2016
Tile, Terrazzo, Marble Finisher $35.45 $44.04 $52.64 H H H H H H H D Y Apprentice Rates:
750-1499 hours $29.74 $35.70 $41.65 1500-2249 hours $30.69 $37.12 $43.55 2250-2999 hours $31.64 $38.54 $45.45 3000-3749 hours $32.59 $39.97 $47.35 3750-4499 hours $33.55 $41.41 $49.27 comment 4 10s allowed M-F Truck Driver
TM-RB2 6/7/2016
of all trucks of 8 cubic yd capacity or over $44.10 $48.81 H H H H H H H H Y
TM-RB2A 6/7/2016
of all trucks of 8 cubic yard capacity or less (except dump trucks of 8 cubic $44.00 $48.66 H H H H H H H H Y yard capacity or over, tandem axle trucks, transit mix and semis, euclid type equipment, double bottoms and low boys)
TM-RB2B 6/7/2016
on euclid type equipment $44.25 $49.04 H H H H H H H H Y
Official Request #: 570 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.