About this file

This is a Michigan Department of Military and Veterans Affairs (DMVA) prevailing wage rate schedule for commercial projects issued on April 19, 2018 for fence maintenance, repair and replacement work at Camp Grayling Joint Military Training Center in Kalkaska County. The contract must be awarded by July 18, 2018. The document outlines the required wage rates for various construction trades that would be involved in the fencing project, including laborers, operators, carpenters, and fence erectors.

The schedule provides detailed hourly straight time, time and a half, and double time rates for each worker classification, along with apprentice rate scales and overtime provisions. For example, fence erectors under the Iron Workers classification (IR-25-F2) must be paid a base rate of $31.95 per hour, with time and a half at $42.05 and double time at $52.15. The document specifies that contractors must post these wage rates in a conspicuous place at the construction site and pay workers according to these minimums as required by state law for public works projects.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Michigan WHPWRequest@michigan.gov Official Request #: 569 Requestor: DMVA Project Description: Fence Maintenance, Repair and Replacement at Camp Grayling JMTC Project Number:

Kalkaska County Official 2018 Commercial Prevailing Wage Rates for State Funded Projects Issue Date: 4/19/2018 Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Asbestos & Lead Abatement Laborer

MLDC 9/7/2017

Asbestos & Lead Abatement Laborer $41.30 $55.23 $69.16 H H H X X X X D Y Apprentice Rates:

Trainee 600 hours + 1 calendar $30.22 $33.28 $41.73 comment 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

Asbestos, Lead and Mold Abatement, Hazardous Material Handler

AS207 3/27/2017

Asbestos, Lead and Mold Abatement, Hazardous Material Handler $40.75 $54.25 $67.75 H H H X X X X D Y comment Four ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

Boilermaker

BO169 2/17/2015

Boilermaker $54.70 $81.08 $107.45 H H H H H H H D Y Apprentice Rates:

1st 6 months $40.31 $59.49 $78.67 2nd 6 months $41.45 $61.21 $80.95 3rd 6 months $42.57 $62.88 $83.19 4th 6 months $43.69 $64.57 $85.43 5th 6 months $44.81 $66.24 $87.67 6th 6 months $48.63 $72.50 $96.36 7th 6 months $49.32 $73.01 $96.69 8th 6 months $51.58 $76.40 $101.21

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

County Kalkaska

Official 2018 Commercial Prevailing Wage Rates for State Funded Projects Issue Date: 4/19/2018 Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

Bricklayer

BR9-40 11/4/2016

Bricklayer $43.21 $55.53 $67.85 H H H H H H H D Y Apprentice Rates:

0-749 hours $32.49 $39.71 $46.93 750-1499 hours $33.83 $41.72 $49.61 1500-2249 hours $35.17 $43.73 $52.29 2250-2,999 hours $36.51 $45.74 $54.97 3000-3749 hours $37.85 $47.75 $57.65 3750-4499 hours $39.19 $49.76 $60.33 4500-5249 hours $40.53 $51.77 $63.01 5250-6000 hours $41.87 $53.78 $65.69 comment make up day allowed 4 10s allowed M-F, Saturday makeup day

BR9-40-BL 11/4/2016

Caulker, Pointer, Cleaner, Plasterer, Tile Setter, Terrazzo Worker $43.21 $55.53 $67.85 H H H H H H H D Y Apprentice Rates:

0-749 hours $33.83 $41.72 $49.61 750-1499 hours $35.17 $43.73 $52.29 1500-2249 hours $36.51 $45.74 $54.97 2250-2999 hours $37.85 $47.75 $57.65 3000-3749 hours $39.19 $49.76 $60.33 3750-4499 hours $40.53 $51.77 $63.01 comment 4 10s allowed M-F

BR9-40S 11/4/2016

Stone Mason $43.21 $55.53 $67.85 H H H H H H H D Y Apprentice Rates:

750-1499 hours $35.17 $43.73 $52.29 1500-2249 hours $36.51 $45.74 $54.97 2250-2999 hours $37.85 $47.75 $57.65 3000-3749 hours $39.19 $49.76 $60.33 3750-4499 hours $40.53 $51.77 $63.01

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment 4 10s allowed M-F Carpenter

CA202 7/5/2017

Carpenter $39.22 $49.56 $59.90 X X H H H H H D Y Apprentice Rates:

1st year $33.02 $40.26 $47.50 2nd year $34.05 $41.80 $49.56 3rd year $36.12 $44.91 $53.70 4th year $38.19 $48.02 $57.84 comment make up day allowed 4 10s allowed M-Th, Friday make up day for 4-10s Saturday make up day for 5-8s for inclement weather

CA202PD 7/5/2017

Pile Driver $39.87 $50.54 $61.20 X X H H H H H D Y Apprentice Rates:

1st Year $33.47 $40.94 $48.40 2nd Year $34.54 $42.54 $50.54 3rd Year $36.67 $45.74 $54.80 4th Year $38.80 $48.93 $59.06 comment make up day allowed Four 10s allowed Monday-Thursday, Friday make up day for 4-10s Saturday make up day for 5-8s for inclement weather

Cement Finisher

BR9-40-CF 11/4/2016

Cement Finisher $38.93 $49.37 $59.81 X X H X X X H D Y Apprentice Rates:

0-749 hours $30.94 $37.62 $44.30 750-1499 hours $32.08 $39.33 $46.58 1500-2249 hours $33.22 $41.04 $48.86 2250-2999 hours $34.36 $42.75 $51.14 3000-3749 hours $35.51 $44.48 $53.44 3750-4499 hours $36.65 $46.18 $55.72

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment 4 10s allowed M-F Cement Mason

PL16-13 8/18/2016

Cement Mason $38.66 $51.29 $63.92 H H H H H H H D Y Apprentice Rates:

1st year $29.82 $38.03 $46.24 2nd year $32.34 $41.81 $51.28 3rd year $34.87 $45.60 $56.34 comment make up day allowed Four 10s allowed Monday-Thursday with Friday or Saturday inclement weather make up days. Saturday hours for inclement weather make up shall be paid straight rate unless over 40 hours worked.

Drywall

PT-1803-DF 6/2/2016

Drywall Finisher $38.49 $50.50 $62.50 H H H H H H H D Y Apprentice Rates:

0 - 900 hours $26.48 $32.48 $38.48 901- 1800 hours $30.09 $37.90 $45.70 1801 - 2700 hours $33.69 $43.30 $52.90 2701 - 3600 hours $36.09 $46.90 $57.70 comment make up day allowed 4 10 hour days allowed on consecutive days, Monday-Friday. Make up day allowed M-F for work missed due to holidays or inclement weather.

Electrician

EC-498-IW 5/26/2017

Journeyman Electrician - Inside Wireman $46.78 $66.69 $86.60 H H H H H H D D Y Apprentice Rates:

1st Period 0-1000 hours $18.49 $24.71 $30.92 Period 2 1000-2000 hours $20.00 $26.97 $33.94 Period 3 2000-2500 hours $23.40 $32.08 $40.74 Period 4 3500-5000 hours $24.96 $34.42 $43.86 Period 5 5000-6500 hours $28.79 $40.16 $51.52 Period 6 6500-8000 hours $32.03 $45.01 $58.00

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed Four tens allowed if consecutive days M-Th; Friday may be used as a make-up day. Double time beyond 12 hours Mon. - Fri.

Elevator Constructor

EL-85 4/8/2013

Elevator Constructor Mechanic $70.77 $116.32 D D D D D D D D Y Apprentice Rates:

1st year $50.27 $75.32 2nd year $54.83 $84.44 3rd year $57.10 $88.98 4th year $61.66 $98.10 comment 4 tens allowed M-TH Glazier

GL-826 6/3/2016

Glazier $44.78 $60.87 $76.95 H H H H H H H D Y Apprentice Rates:

1st 6 months $31.91 $41.57 $51.21 2nd 6 months $33.52 $43.98 $54.43 3rd 6 months $35.12 $46.38 $57.63 4th 6 months $36.74 $48.81 $60.87 5th 6 months $38.35 $51.22 $64.09 6th 6 months $39.96 $53.64 $67.31 7th 6 months $41.57 $56.05 $70.53 8th 6 months $43.17 $58.45 $73.73 comment 4 tens allowed on consecutive days Heat and Frost Insulator

AS25S 3/31/2017

Spray Insulation - Qualified Senior Sprayer, application of all products $29.04 $42.35 X X X H H H H H N

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

County Statewide

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Heat and Frost Insulator and Asbestos Worker

AS47 7/25/2017

Heat and Frost Insulator and Asbestos Worker $47.75 $63.01 $78.27 H H H H H H H D Y Apprentice Rates:

1st year $27.88 $35.51 $43.14 2nd year $31.85 $41.00 $50.16 3rd year $35.82 $46.50 $57.18 4th year $39.80 $52.01 $64.22 5th year $43.78 $57.51 $71.25 comment make up day allowed Friday for cancelled work in a four 10 hour schedule Ironworker

IR-25-F2 3/31/2017

Fence, Sound Barrier & Guardrail erection/installation and Exterior Signage $31.95 $42.05 $52.15 X X H X X X H D Y work Apprentice Rates:

60% Level $22.99 $29.05 $35.11 65% Level $24.11 $30.68 $37.24 70% Level $25.24 $32.31 $39.38 75% Level $26.35 $33.92 $41.50 80% Level $27.47 $35.55 $43.63 85% Level $28.59 $37.18 $45.76 comment Four ten hour work days may be worked during Monday-Saturday.

IR-25-HH-WEST 12/5/2016

Heavy Hauler $41.43 $52.55 $63.67 H H H H H H H D Y Apprentice Rates:

1st Year $26.18 $31.74 $37.30 2nd Year $29.52 $36.75 $43.98 3rd Year $34.71 $43.60 $52.50 4th Year $36.94 $46.95 $56.96 comment make up day allowed If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

IR-25-PE-Z2 3/31/2017

Pre-engineered Metal Work $45.87 $56.03 $66.19 X X H X X X X D Y Apprentice Rates:

Probation 1st Year $26.83 $32.03 $37.23 1st Level $28.96 $34.92 $40.88 2nd Level $28.96 $34.92 $40.88 3rd Level $31.08 $37.79 $44.50 4th Level $33.21 $40.68 $48.15 5th Level $35.33 $43.55 $51.77 6th Level $37.46 $46.43 $55.41 comment make up day allowed 4 tens allowed M-Th with Saturday make up day

IR-25-REF-WEST 7/5/2017

Reinforcing: any work in connection with field fabrication, post tensioning, $49.25 $61.47 $73.68 H H H H H H H D Y prestressing of handling by power, rigging, crane signaling, crane assembly and dismantle, racking, sorting, cutting, bending, hoisting, placing, burning, welding, use of tie gun, and tying of all materials used to reinforce concrete construction. Realigning of reinforcing steel, wire mesh and placing of steel dowels, as well as refastening and resetting same while concrete is being poured. The handling and placing of j or jack bar on slip form construction.

The placing of all clips, bolts, and steel rods and wire fabricator mesh pertaining to gunite construction. Drilling holes in concrete for dowels used to reinforce a concrete slab, beam or wall and the use of a chemical anchoring system (such as epoxy) to secure dowels. The use of a non-metallic carbon fiber or polymer typically used to reinforce concrete. Some brand names are NEFMAC, leadline or Tokyo rope.

Apprentice Rates:

1st Level $31.94 $40.13 $48.32 2nd Level $31.94 $40.13 $48.32 3rd Level $33.47 $42.42 $51.37 4th Level $35.00 $44.71 $54.41 5th Level $37.87 $47.72 $57.57 6th Level $38.94 $49.31 $59.69 7th Level $42.45 $53.35 $64.25 8th Level $43.52 $54.95 $66.37 comment make up day allowed If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision IR-25-RIG-west 7/5/2017 Rigging, heavy machinery moving and related tasks $49.25 $61.47 $73.68 X X X X X X X D Y Apprentice Rates:

1st Level $31.94 $40.13 $48.32 2nd Level $31.94 $40.13 $48.32 3rd Level $33.47 $42.42 $51.37 4th Level $35.00 $44.71 $54.41 5th Level $37.87 $47.72 $57.57 6th Level $38.94 $49.31 $59.69 7th Level $42.45 $53.35 $64.25 8th Level $43.52 $54.95 $66.37 comment make up day allowed Saturday

IR-25-STR-WEST 7/5/2017

Structural, ornamental, welder and pre-cast $49.25 $61.47 $73.68 H H H H H H H D Y Apprentice Rates:

1ST LEVEL $31.94 $40.13 $48.32

2ND LEVEL $31.94 $40.13 $48.32

3RD LEVEL $33.47 $42.42 $51.37

4TH LEVEL $35.00 $44.71 $54.41

5TH LEVEL $37.87 $47.72 $57.57

6TH LEVEL $38.94 $49.31 $59.69

7TH LEVEL $42.45 $53.35 $64.25

8TH LEVEL $43.52 $54.95 $66.37

comment make up day allowed If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Laborer L1098-N-A 7/21/2017 Class A Laborer: building and heavy construction work, demolition, mortar $30.07 $38.57 $47.07 X X H H H H H D Y mixers, mason tender, carpenter tender, fire watch, heater tender, all 3" pumps and below, furniture mover, material mixers, vibrator operators, operators of concrete mixers, chipping hammers, tamping machines, sand blasters, concrete breakers (90 lb hammer or less), cement gun nozzelman, operators of motor driven buggies, plaster mixers and plaster tenders, pipe or crock layers, caisson work in buildings only, except others falling within class B.

Cleaning and clearing of all debris, including wire brushing of windows, scraping of floors, removal of surplus material from all fixtures within confines of structure and cleaning all debris in building and construction area.

The general cleanup, including sweeping, cleaning, washdown and wiping of construction facility, equipment and furnishings and removal and loading or burning of all debris including crates, boxes, packaging waste material.

Washing and cleaning of walls, partitions, ceilings, windows, bathrooms, kitchens, laboratory, and all fixtures and facilities therein. Cleanup, mopping, washing, waxing and polishing or dusting of all floors or areas.

Apprentice Rates:

1,001-2,000 work hours $26.67 $33.47 $40.27 2,001-3,000 work hours $27.52 $34.75 $41.97 3,001-4,000 work hours $29.22 $37.29 $45.37 comment make up day allowed Saturday L1098-N-B 7/21/2017 Class B Refractory Work: inside or outside digester, tanks, lime kilns, chests, $31.33 $40.47 $49.60 X X H H H H H D Y boilers, and boiler tubes, including the handling of acid, chlorine, chemicals, epoxies, liquids and cleaning of existing precipitators, hydro blasting, hydro washing, and sandblasting.

Apprentice Rates:

0-1,000 work hours $26.76 $33.61 $40.46 1,001-2,000 work hours $27.68 $34.99 $42.30 2,001-3,000 work hours $28.59 $36.36 $44.12 3,001-4,000 work hours $30.42 $39.10 $47.78 comment make up day allowed Saturday

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Laborer - Hazardous

LHAZ-Z10-A 11/13/2017

Class A Laborer performing work in conjunction with site preparation and $30.07 $42.07 $54.07 H H H H H H H D Y other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal regulations; or a laborer performing work in conjunction with the removal, handling, or containment of hazardous waste substances when use of personal protective equipment level "D" is required.

Apprentice Rates:

0-1,000 work hours $25.82 $35.69 $45.57 1,001-2,000 work hours $26.67 $36.97 $47.27 2,001-3,000 work hours $27.52 $38.25 $48.97 3,001-4,000 work hours $29.22 $40.79 $52.37 comment make up day allowed 4 10s allowed M-Th or T-F; inclement weather makeup day Friday

LHAZ-Z10-B 11/13/2017

Class B Laborer - performing work in conjunction with the removal, handling, $31.07 $43.57 $56.07 H H H H H H H D Y or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.

Apprentice Rates:

0-1,000 work hours $26.57 $36.82 $47.07 1,001-2,000 work hours $27.47 $38.17 $48.87 2,001-3,000 work hours $28.37 $39.52 $50.67 3,001-4,000 work hours $30.17 $42.22 $54.27 comment make up day allowed 4 10s allowed M-Th or T-F; inclement weather makeup day Friday Laborer Underground - Open Cut, Class I

LAUC-Z4-1 9/7/2017

Construction Laborer $33.67 $43.98 $54.27 X X X X X X X D Y Apprentice Rates:

0-1,000 work hours $29.17 $37.22 $45.27 1,001-2,000 work hours $30.07 $38.58 $47.07 2,001-3,000 work hours $30.97 $39.92 $48.87 3,001-4,000 work hours $32.77 $42.62 $52.47

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Laborer Underground - Open Cut, Class II

LAUC-Z4-2 9/5/2017

Mortar and material mixer, concrete form man, signal man, well point man, $33.80 $44.17 $54.53 X X X X X X X D Y manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.

Apprentice Rates:

0-1,000 work hours $29.26 $37.36 $45.45 1,001-2,000 work hours $30.17 $38.72 $47.27 2,001-3,000 work hours $31.08 $40.09 $49.09 3,001-4,000 work hours $32.89 $42.80 $52.71

Laborer Underground - Open Cut, Class III

LAUC-Z4-3 9/7/2017

Air, gasoline and electric tool operator, vibrator operator, drillers, pump $33.91 $44.34 $54.75 X X X X X X X D Y man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger man, and directional boring man.

Apprentice Rates:

0-1,000 work hours $29.35 $37.50 $45.63 1,001-2,000 work hours $30.26 $38.86 $47.45 2,001-3,000 work hours $31.17 $40.22 $49.27 3,001-4,000 work hours $33.00 $42.97 $52.93

Laborer Underground - Open Cut, Class IV

LAUC-Z4-4 9/7/2017

Trench or excavating grade man. $33.98 $44.44 $54.89 X X X X X X X D Y Apprentice Rates:

0-1,000 work hours $29.40 $37.57 $45.73 1,001-2,000 work hours $30.32 $38.95 $47.57 2,001-3,000 work hours $31.23 $40.32 $49.39 3,001-4,000 work hours $33.06 $43.06 $53.05

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Laborer Underground - Open Cut, Class V

LAUC-Z4-5 9/7/2017

Pipe Layer $34.10 $44.62 $55.13 X X X X X X X D Y Apprentice Rates:

0-1,000 work hours $29.49 $37.70 $45.91 1,001-2,000 work hours $30.41 $39.08 $47.75 2,001-3,000 work hours $31.33 $40.46 $49.59 3,001-4,000 work hours $33.18 $43.24 $53.29

Laborer Underground - Open Cut, Class VI

LAUC-Z4-6 9/7/2017

Grouting man, top man assistant, audio visual television operations and all $31.32 $40.45 $49.57 X X X X X X X D Y other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work & the installation and repair of water service pipe and appurtenances.

Apprentice Rates:

0-1,000 work hours $27.40 $34.57 $41.73 1,001-2,000 work hours $28.19 $35.76 $43.31 2,001-3,000 work hours $28.97 $36.92 $44.87 3,001-4,000 work hours $30.54 $39.28 $48.01

Laborer Underground - Open Cut, Class VII

LAUC-Z4-7 9/7/2017

Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil $29.66 $37.96 $46.25 X X X X X X X D Y grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.

Apprentice Rates:

0-1,000 work hours $26.16 $32.71 $39.25 1,001-2,000 work hours $26.86 $33.76 $40.65 2,001-3,000 work hours $27.56 $34.81 $42.05 3,001-4,000 work hours $28.96 $36.91 $44.85

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Laborer Underground - Tunnel, Shaft & Caisson

LAUCT-Z2-1 9/7/2017

Class I - Tunnel, shaft and caisson laborer, dump man, shanty man, hog $36.82 $48.70 $60.57 X X X X X X X D Y house tender, testing man (on gas), and watchman.

Apprentice Rates:

0-1,000 work hours $31.52 $40.75 $49.97 1,001-2,000 work hours $32.58 $42.34 $52.09 2,001-3,000 work hours $33.64 $43.93 $54.21 3,001-4,000 work hours $35.76 $47.11 $58.45

LAUCT-Z2-2 9/7/2017

Class II - Manhole, headwall, catch basin builder, bricklayer tender, mortar $36.91 $48.83 $60.75 X X X X X X X D Y man, material mixer, fence erector, and guard rail builder Apprentice Rates:

0-1,000 work hours $31.58 $40.84 $50.09 1,001-2,000 work hours $32.65 $42.45 $52.23 2,001-3,000 work hours $33.71 $44.03 $54.35 3,001-4,000 work hours $35.84 $47.23 $58.61

LAUCT-Z2-3 9/7/2017

Class III - Air tool operator (jack hammer man, bush hammer man and $37.01 $48.98 $60.95 X X X X X X X D Y grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, concrete shoveler, conveyor man, floor man, gasoline and electric tool operator, gunnite man, grout operator, welder, heading dinky man, inside lock tender, pea gravel operator, pump man, outside lock tender, scaffold man, top signal man, switch man, track man, tugger man, utility man, vibrator man, winch operator, pipe jacking man, wagon drill and air track operator and concrete saw operator (under 40 h.p.).

Apprentice Rates:

0-1,000 work hours $31.66 $40.96 $50.25 1,001-2,000 work hours $32.73 $42.57 $52.39 2,001-3,000 work hours $33.80 $44.17 $54.53 3,001-4,000 work hours $35.94 $47.38 $58.81

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

LAUCT-Z2-4 9/7/2017

Class IV - Tunnel, shaft and caisson mucker, bracer man, liner plate man, $37.17 $49.22 $61.27 X X X X X X X D Y long haul dinky driver and well point man.

Apprentice Rates:

0-1,000 work hours $31.78 $41.14 $50.49 1,001-2,000 work hours $32.86 $42.76 $52.65 2,001-3,000 work hours $33.93 $44.37 $54.79 3,001-4,000 work hours $36.09 $47.61 $59.11

LAUCT-Z2-5 9/7/2017

Class V - Tunnel, shaft and caisson miner, drill runner, keyboard operator, $37.43 $49.62 $61.79 X X X X X X X D Y power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars) Apprentice Rates:

0-1,000 work hours $31.97 $41.43 $50.87 1,001-2,000 work hours $33.06 $43.06 $53.05 2,001-3,000 work hours $34.16 $44.71 $55.25 3,001-4,000 work hours $36.34 $47.98 $59.61

LAUCT-Z2-6 9/7/2017

Class VI - Dynamite man and powder man. $37.74 $50.08 $62.41 X X X X X X X D Y Apprentice Rates:

0-1,000 work hours $32.20 $41.77 $51.33 1,001-2,000 work hours $33.31 $43.43 $53.55 2,001-3,000 work hours $34.42 $45.10 $55.77 3,001-4,000 work hours $36.63 $48.41 $60.19

LAUCT-Z2-7 9/7/2017

Class VII - Restoration laborer, seeding, sodding, planting, cutting, mulching $30.01 $38.48 $46.95 X X X X X X X D Y and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.

Apprentice Rates:

0-1,000 work hours $26.41 $33.09 $39.75 1,001-2,000 work hours $27.13 $34.17 $41.19 2,001-3,000 work hours $27.85 $35.25 $42.63 3,001-4,000 work hours $29.29 $37.41 $45.51

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

Landscape Laborer

LLAN-Z2-A 10/13/2015

Landscape Specialist: includes air, gas, and diesel equipment operator, $28.25 $39.04 $49.82 X X H X X X H D Y skidsteer (or equivalent), lawn sprinkler installer on landscaping work where seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintenance of landscape projects occurs.

comment Sundays paid at time & one half. Holidays paid at double time.

LLAN-Z2-B 10/13/2015

Skilled Landscape Laborer: small power tool operator, lawn sprinkler $24.05 $32.74 $41.42 X X H X X X H D Y installers' tender, material mover, truck driver on when seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintaining of landscape projects occurs comment Sundays paid at time & one half. Holidays paid at double time.

Operating Engineer

EN-AC 6/7/2017

Compressor or Welding Machine $46.07 $57.38 $68.68 X X H H D D D D Y comment make up day allowed Friday, Four 10 hour days may be scheduled Monday-Thursday or Tuesday- Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

EN-F 6/7/2017

Forklift or Straight Mast $47.52 $59.55 $71.58 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled M-Th or T-F. Work not performed due to weather on M-Th may be scheduled on Friday

EN-FO 6/7/2017

Fireman or Oiler $45.04 $55.83 $66.62 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

EN-L 6/7/2017

Lull or Extend-a-Boom Forklift $53.38 $68.34 $83.30 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled M-Th or T-F. Work not performed due to weather on M-Th may be scheduled on Friday

EN-OS120 6/7/2017

Crane with main boom & jib 120' or longer $56.92 $80.60 $104.28 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Worked not performed due to weather, Monday-Thursday may be scheuled Friday

EN-OSA 6/7/2017

Crane w/ main Boom & Jib 220' or longer $58.03 $75.32 $92.60 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

EN-OSA3 6/7/2017

Crane w/ main Boom & Jib 300' or longer $59.54 $74.73 $90.41 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work unabled to be performed due to weather, Monday-Thursday may be scheduled on Friday.

EN-OSA4 6/7/2017

Crane w/ main Boom & Jib 400' or longer $61.04 $79.83 $98.62 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

EN-OSB 6/7/2017

Crane with main boom and jib 140' or longer $57.74 $74.88 $92.02 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work unabled to be performed due to weather, Monday-Thursday may be scheduled on Friday.

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

EN-RC 6/7/2017

Regular Crane Operator, Job Mechanic, Concrete Pump with Boom $56.06 $72.36 $88.66 X X H H D D D D Y Apprentice Rates:

0-999 hours $44.78 $56.19 $67.60 1,000-1,999 hours $46.41 $58.64 $70.86 2,000-2,999 hours $48.04 $61.08 $74.12 3,000-3,999 hours $49.67 $63.53 $77.38 4,000-4,999 hours $51.31 $65.98 $80.66 5,000-5,999 hours $52.93 $68.42 $83.90 comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

EN-RE 6/7/2017

Regular Engineer, Hydro Excavator & Remote Controlled Concrete Breaker $55.11 $70.94 $86.76 X X H H D D D D Y comment make up day allowed Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday.

Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

Operating Engineer - Marine Construction

GLF D 4/2/2014

Diver/Wet Tender/Tender/Rov Pilot/Rov Tender $52.80 $79.20 $105.60 H H H H H H H D N

GLF-1 1/23/2017

Diver/Wet Tender, Engineer (hydraulic dredge) $72.32 $93.82 $115.32 X X H H H H H D Y comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters

GLF-2 1/23/2017

Crane/Backhoe Operator, 70 ton or over Tug Operator, Mechanic/Welder, $70.82 $91.57 $112.32 X X H H H H H D Y Assistant Engineer (hydraulic dredge), Leverman (hydraulic dredge), Diver Tender comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

GLF-2B 1/23/2017

Friction, Lattice Boom or Crane License Certification $72.32 $93.82 $115.32 X X H H H H H D Y comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands, therein, & connecting & tributary waters

GLF-3 1/23/2017

Deck Equipment Operator, Machineryman, Maintenance of Crane (over 50 $66.27 $84.75 $103.22 X X H H H H H D Y ton capacity) or Backhoe (115,000 lbs or more), Tug/Launch Operator, Loader, Dozer on Barge, Deck Machinery comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

GLF-4 1/23/2017

Deck Equipment Operator, (Machineryman/Fireman), (4 equipment units or $60.07 $75.45 $90.82 X X H H H H H D Y more), Off Road Trucks, Deck Hand, Tug Engineer, & Crane Maintenance 50 ton capacity and under or Backhoe 115,000 lbs or less, Assistant Tug Operator comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters Operating Engineer Steel Work

EN-324-EF 6/8/2017

Forklift, 1 Drum Hoist $60.41 $79.00 $97.58 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW120 6/7/2017

Crane w/ 120' boom or longer $63.11 $83.05 $102.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW120-O 6/7/2017

Crane w/ 120' boom or longer w/ Oiler $64.11 $84.55 $104.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

EN-324-SW140 6/7/2017

Crane w/ 140' boom or longer $64.29 $84.82 $105.34 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW140-O 6/7/2017

Crane w/ 140' boom or longer W/ Oiler $65.29 $86.32 $107.34 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW220 6/7/2017

Boom & Jib 220' or longer $64.56 $85.22 $105.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW220-O 6/7/2017

Crane w/ 220' boom or longer w/ Oiler $65.56 $86.72 $107.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW300 6/7/2017

Boom & Jib 300' or longer $66.06 $87.47 $108.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW300-O 6/7/2017

Crane w/ 300' boom or longer w/ Oiler $67.06 $88.97 $110.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW400 6/7/2017

Boom & Jib 400' or longer $67.56 $89.72 $111.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SW400-O 6/7/2017

Crane w/ 400' boom or longer w/ Oiler $68.56 $91.22 $113.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

EN-324-SWCO 6/7/2017

Crane Operator, Job Mechanic, 3 Drum Hoist & Excavator $62.75 $82.51 $102.26 H H D H H H D D Y Apprentice Rates:

0-999 hours $49.40 $63.26 $77.11 1,000-1,999 hours $51.38 $66.23 $81.07 2,000-2,999 hours $53.35 $69.19 $85.01 3,000-3,999 hours $55.33 $72.16 $88.97 4,000-4,999 hours $57.30 $75.11 $92.91 5,000 hours $59.28 $78.08 $96.87 comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWCO-O 6/7/2017

Crane Operator w/ Oiler $63.75 $84.01 $104.26 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWCW 6/7/2017

Compressor or Welder Operator $55.30 $71.33 $87.36 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWHO 6/7/2017

Hoisting Operator, 2 Drum Hoist, & Rubber Tire Backhoe $62.11 $81.55 $100.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWO 6/7/2017

Oiler $53.89 $69.22 $84.54 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWTD50 6/7/2017

Tower Crane & Derrick where work is 50' or more $63.84 $84.14 $104.44 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather

EN-324-SWTD50-O 6/7/2017

Tower Crane & Derrick 50' or more w/ Oiler $64.84 $85.64 $106.44 H H D H H H D D Y

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather Operating Engineer Underground

EN-324A2-UC1 9/7/2017

Class I Equipment - Backfiller Tamper, Backhoe, Batch Plant Operator, $53.29 $68.46 $83.62 H H H H H H H D Y Clamshell, Concrete Paver 2 drums or larger, Conveyor Loader Euclid type, Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, endloader, gradall, grader, hydro excavator, power shovel, roller asphalt, scraper self-propelled or tractor drawn, side boom tractor, slip form paver, slope paver, trencher over 8 ft. digging capacity, well drilling rig, concrete pump with boom operator Apprentice Rates:

0-999 hours $42.89 $53.50 $64.12 1,000-1,999 hours $44.41 $55.78 $67.16 2,000-2,999 hours $45.93 $58.06 $70.20 3,000-3,999 hours $47.43 $60.32 $73.20 4,000-4,999 hours $48.95 $62.60 $76.24 5,000-5,999 hours $50.47 $64.88 $79.28

EN-324A2-UC2 9/7/2017

Class II Equipment - Boom Truck, Crusher, Hoist, Pump 6 inch discharge or $48.39 $61.11 $73.82 H H H H H H H D Y larger, side boom tractor, Tractor (pneu-tired other than backhoe or front end loader), Trencher 8 ft. digging capcity and smaller, Vac Truck

EN-324A2-UC3 9/7/2017

Class III Equipment - Air Compressors 600 cfm or larger, Air Compressors 2 $47.89 $60.36 $72.82 H H H H H H H D Y or more less than 600 dfm, Boom Truck non-swinging non-powered type boom, Concrete Breaker self-propelled or truck mounted, Concrete paver 1 drum 1/2 yd. or larger, Elevator other than passenger, Pump 4 inch to 6 inch discharge, pumpcrete machine, wagon drill, welding machine or generator 2 or more 300 amp or larger

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

EN-324A2-UC4 9/7/2017

Class IV Equipment - Boiler, Concrete Saw 40 hp or over, curing machine self $47.60 $59.93 $72.24 H H H H H H H D Y propelled, end dumps, extend a boom forklift, farm tractor with attachment, finishing machine concrete, firemen, hydraulic pipe pushing machine, mulching equipment, oiler, pumps up to 4 inch discharge, roller other than asphalt, stump remover, sweeper wayne type, trencher, vibrating compaction equipment self propelled 6 ft. wide or over, water wagon.

Painter

PT-1803-P 6/2/2016

Painter $36.18 $47.65 $59.11 H H H H H H H D Y Apprentice Rates:

1st year $23.25 $28.25 $33.25 2nd year $28.15 $35.60 $43.05 3rd year $31.59 $40.76 $49.93 comment make up day allowed 4 10 hour days allowed on consecutive days, Monday-Friday. Make up day allowed M-F for work missed due to holidays or inclement weather.

Painter - Sign Display

PT-591 12/12/2017

The trade jurisdiction consists of painting and other related surface finishing $19.94 $29.93 $39.88 X X X X X X X D N operations; lettering, and all operations so related; pictorial and graphic art work; screen process procedures; application of photographs, translates, refinished surface-type materials used in lieu of painted methods, display graphics; adhesive backed lettering and art work; sign hanging, sign installation, erection and construction; bulletin board construction; plastic sign fabrication; advertising displays and exhibits; and the preparing of surfaces for finishing of the same to include but not limited to application of filler of seams, grooves, nail and/or screw holes; and such area practices pertaining to the sign and display industry.

Pipe and Manhole Rehab

TM247 4/17/2015

General Laborer for rehab work or normal cleaning and cctv work-top man, $28.20 $38.20 H H H H H H H H N scaffold man, CCTV assistant, jetter-vac assistant

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

TM247-2 4/17/2015

Tap cutter/CCTV Tech/Grout Equipment Operator: unit driver and operator $32.70 $44.95 H H H H H H H H N of CCTV; grouting equipment and tap cutting equipment

TM247-3 4/17/2015

CCTV Technician/Combo Unit Operator: unit driver and operator of cctv unit $31.45 $43.07 H H H H H H H H N or combo unit in connection with normal cleaning and televising work

TM247-4 4/17/2015

Boiler Operator: unit driver and operator of steam/water heater units and all $33.20 $45.70 H H H H H H H H N ancillary equipment associated

TM247-5 4/17/2015

Combo Unit driver & Jetter-Vac Operator $33.20 $45.70 H H H H H H H H N

TM247-6 4/17/2015

Pipe Bursting & Slip-lining Equipment Operator $34.20 $47.20 H H H H H H H H N

Plasterer

PL16-1 10/23/2012

Plasterer $33.61 $44.20 $54.79 H H H H H H H D N Apprentice Rates:

1st year $26.20 $33.09 $39.97 2nd year $28.31 $36.25 $44.19 3rd year $30.43 $39.43 $48.43

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Plumber, Pipefitter, Welder, HVAC & Refrigeration

PL-85-Z2 6/16/2016

Plumber, Pipefitter, Welder, HVAC & Refrigeration $49.49 $63.80 $78.10 H H H H H H H D Y Apprentice Rates:

1st 6 months $30.54 $37.69 $44.84 2nd 6 months $32.52 $40.39 $48.26 3rd 6 months $34.50 $43.09 $51.67 4th 6 months $36.48 $45.78 $55.08 5th 6 months $38.46 $48.47 $58.49 6th 6 months $40.44 $51.17 $61.90 7th 6 months $42.42 $53.87 $65.31 8th 6 months $44.40 $56.56 $68.72 9th & 10th 6 months $46.38 $59.25 $72.13 comment make up day allowed 4 tens allowed M-Th; Friday makeup day Roofer

RO-149-NL 8/18/2008

Commercial Roofer $29.18 $38.00 $46.81 X X X X X X X D Y Apprentice Rates:

Apprentice 1 $18.02 $23.08 $28.14 Apprentice 2 $21.34 $26.68 $32.02 Apprentice 3 $22.55 $28.45 $34.35 Apprentice 4 $23.76 $30.23 $36.69 Apprentice 5 $24.97 $32.00 $39.02 Apprentice 6 $26.20 $33.79 $41.39 comment make up day allowed Straight time is not to exceed ten (10) hours per day or forty (40) hours per Sewer Relining

SR-I 11/24/2015

Class I-Operator of audio visual CCTV system including remote in-ground $43.66 $59.01 $74.36 H H H H H H H D N cutter and other equipment used in conjunction with CCTV system.

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision

SR-II 11/24/2015

Class II-Operator of hot water heaters and circulation system; water jetters; $42.13 $56.72 $71.30 H H H H H H H D N and vacuum and mechanical debris removal systems and those assisting.

Sheet Metal Worker

SHM-7-3 12/7/2017

Sheet Metal Worker $49.28 $62.50 $75.71 H H D H H H D D Y Apprentice Rates:

1st 6 months $16.13 $21.54 $26.95 2nd 6 months $18.88 $24.95 $31.02 3rd 6 months $20.78 $27.52 $34.25 4th 6 months $23.53 $30.93 $38.32 5th 6 months $25.42 $33.48 $41.53 6th 6 months $28.17 $36.89 $45.60 7th 6 months $30.06 $39.44 $48.81 8th 6 months $32.56 $42.47 $52.38 comment make up day allowed 4 10s allowed as consecutive days, M-Th or T-F Sprinkler Fitter

SP 669 1/4/2017

Sprinkler Fitter $51.64 $68.45 $85.26 H H H H H H H D Y Apprentice Rates:

Class 1 $23.03 $30.60 $38.16 Class 2 $24.71 $33.12 $41.52 Class 3 $34.01 $43.26 $52.50 Class 4 $35.69 $45.78 $55.86 Class 5 $37.62 $48.55 $59.47 Class 6 $39.30 $51.07 $62.83 Class 7 $40.99 $53.60 $66.21 Class 8 $42.67 $56.12 $69.57 Class 9 $44.35 $58.64 $72.93 Class 10 $46.03 $61.16 $76.29 make up day allowed

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

Contract must be awarded by: 7/18/2018 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision Tile Finisher

BR9-40-TW 11/4/2016

Tile, Terrazzo, Marble Finisher $35.45 $44.04 $52.64 H H H H H H H D Y Apprentice Rates:

750-1499 hours $29.74 $35.70 $41.65 1500-2249 hours $30.69 $37.12 $43.55 2250-2999 hours $31.64 $38.54 $45.45 3000-3749 hours $32.59 $39.97 $47.35 3750-4499 hours $33.55 $41.41 $49.27 comment 4 10s allowed M-F Truck Driver

TM-RB2 6/7/2016

of all trucks of 8 cubic yd capacity or over $44.10 $48.81 H H H H H H H H Y

TM-RB2A 6/7/2016

of all trucks of 8 cubic yard capacity or less (except dump trucks of 8 cubic $44.00 $48.66 H H H H H H H H Y yard capacity or over, tandem axle trucks, transit mix and semis, euclid type equipment, double bottoms and low boys)

TM-RB2B 6/7/2016

on euclid type equipment $44.25 $49.04 H H H H H H H H Y

Official Request #: 569 Official Rate Schedule Requestor: DMVA Every contractor and subcontractor shall keep Project Description: Fence Maintenance, Repair and Replacement at Camp posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: benefit rates prescribed in a contract.

File details come from the government source that posted it. Updated .