561A423101 Replace HWH 100CD DWGs.pdf

PDF 2 MB Posted

Attached to
Y1DA--561A4-23-101 Replace Hot Water Heaters
Solicitation number
36C24226B0052
Issued by

About this file

This document is a comprehensive design and construction specification for replacing hot water heaters and associated recirculation systems at Lyons VA Medical Center in New Jersey, presented as a 100% Construction Documents (CD) submission.

The project involves replacement of hot water heaters and recirculation pumps across five buildings (Buildings 03, 07, 53, 54, and 143) at the facility. The scope includes demolition of existing equipment, installation of new semi-instantaneous steam water heaters (Patterson-Kelley PK-08D or Bell & Gossett NBF models), new recirculation pump systems, condensate receiver and pump assemblies, thermostatic mixing valves set to 120°F, and associated piping and electrical infrastructure. Key equipment specifications are detailed in schedules showing make/model (Patterson-Kelley PK-08D and Bell & Gossett NBF units at 120/160V, 1-phase, 60Hz), electrical panel assignments, and circuit requirements. The project employs a phased approach to maintain continuous hot water service by retaining one functioning water heater per building throughout construction. Electrical work includes dedicated 15-20 amp GFCI-protected branch circuits with disconnect switches for each heater and pump. Mechanical work encompasses new concrete equipment pads, piping with trapeze hanger supports, and steam/condensate line connections. Plumbing systems require coordination with existing distribution networks, domestic hot/cold water connections, and recirculation loops. General notes emphasize field verification of existing conditions, lockout/tagout procedures during phased demolition, concrete scanning for underground utilities prior to cutting/drilling, and protection of existing equipment during work. The drawings include site plans, mechanical/electrical/plumbing demolition and new work details, equipment schedules, electrical panel schedules showing load calculations, and plumbing schematics with control point specifications.

View the file

Other files

File Type Posted
561A4-23-101 RFI - Responses-2.pdf PDF
36C24226B0052 0002.docx DOCX document
561A4-23-101 RFI Responses-.pdf PDF
SOW _Revised_561A4-23-101 Replace Hot Water Heaters.docx DOCX document
36C24226B0052 0001.docx DOCX document
36C24226B0052-.docx DOCX document
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION DEVIATION 02.pdf PDF
100 Lyons Specs.pdf PDF
36C24226B0052.docx DOCX document
wages.pdf PDF
Buy American Certificate.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering, P.C.

4500 State Route 434 Apalachin, NY 13732 (607)223-4334

Department of Veterans Affairs

LOCATION MAP DRAWING LIST

Approved by Medical Center Director

Approved by Project COR

Approved by Infection Control

Approved by Director of Facility Management Service

Approved by Medical Director

Approved by Safety Officer

Approved by Project CO

APPLICABLE CODES PROJECT CONTACT DIRECTORY

CONTRACTING OFFICER (CO)

CONTRACTING OFFICER REPRESENTATIVE (COR)

WILBERT ORTIX JUSINO

EMAIL: Wilbert.OrtizJusino@va.gov

PHONE: (908) 647-0180 EXT. 214256

MEP

WATSON ENGINEERING, PC

4500 STATE ROUTE 434

APALACHIN, NY 13732

(607) 223-4334 www.watson-engineer.com

SCOTT NUSSBAUM

EMAIL: Scott.Nussbaum@va.gov

PHONE: (518) 269-6063

VA DESIGN MANUALS

NFPA

NEC

JCAHO

OSHA

ASHRAE

INTERNATIONAL BUILDING CODE

2/20/2026

Au to de sk

D oc s:

//V

A-

Ly on s

VA

H ot W at er

H ea te r/L yo ns

H ot

W at er H ea te r_ R

.rv t 2/

/2

2:

:1

PM

T-001

TITLE SHEET

REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

100% CD SUBMISSION

REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

2/20/2026 JWE JWC

561A4-23-101100% CD SUBMISSION

ALL BUILDINGS

SHEET NUMBER SHEET NAME

T-001 TITLE SHEET

G-001 GENERAL NOTES & SYMBOLS

G-002 PROJECT SITE PLAN

G-102 GENERAL NEW WORK - BUILDING 07

G-105 GENERAL NEW WORK - BUILDING 143

G-501 GENERAL DETAILS

MD101 MECHANICAL DEMOLITION - BUILDING 03

MD102 MECHANICAL DEMOLITION - BUILDING 07

MD103 MECHANICAL DEMOLITION - BUILDING 53

MD104 MECHANICAL DEMOLITION - BUILDING 54

MD105 MECHANICAL DEMOLITION - BUILDING 143

M-101 MECHANICAL PLAN - BUILDING 03

M-102 MECHANICAL PLAN - BUILDING 07

M-103 MECHANICAL PLAN - BUILDING 53

M-104 MECHANICAL PLAN - BUILDING 54

M-105 MECHANICAL PLAN - BUILDING 143

M-501 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-701 MECHANICAL SCHEMATICS

ED101 ELECTRICAL DEMOLITION - BUILDING 03

ED102 ELECTRICAL DEMOLITION - BUILDING 07

ED103 ELECTRICAL DEMOLITION - BUILDING 53

SHEET NUMBER SHEET NAME

ED104 ELECTRICAL DEMOLITION - BUILDING 54

ED105 ELECTRICAL DEMOLITION - BUILDING 143

E-101 ELECTRICAL PLAN - BUILDING 03

E-102 ELECTRICAL PLAN - BUILDING 07

E-103 ELECTRICAL PLAN - BUILDING 53

E-104 ELECTRICAL PLAN - BUILDING 54

E-105 ELECTRICAL PLAN - BUILDING 143

E-501 ELECTRICAL DETAILS

E-601 ELECTRICAL SCHEDULES

PD101 PLUMBING DEMOLITION - BUILDING 03

PD102 PLUMBING DEMOLITION - BUILDING 07

PD103 PLUMBING DEMOLITION - BUILDING 53

PD104 PLUMBING DEMOLITION - BUILDING 54

PD105 PLUMBING DEMOLITION - BUILDING 143

P-101 PLUMBING PLAN - BUILDING 03

P-102 PLUMBING PLAN - BUILDING 07

P-103 PLUMBING PLAN - BUILDING 53

P-104 PLUMBING PLAN - BUILDING 54

P-105 PLUMBING PLAN - BUILDING 143

P-501 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-701 PLUMBING SCHEMATICS

Revision Number Revisions: Date:

BACKFLOW PREVENTER BFP

ELBOW UP

ELBOW DOWN

TEE UP

TEE DOWN

CONCENTRIC REDUCER

CAP

UNION

WYE STRAINER

FLOW DIRECTION

SHUT OFF VALVE

CHECK VALVE

CONTROL VALVE

THREE-WAY CONTROL VALVE

TEMPERATURE/PRESSURE RELIEF

VALVE

THERMOSTAT T

IN-LINE TEMPERATURE SENSOR

T

DRAIN D

DOMESTIC COLD WATER DCW

DOMESTIC HOT WATER RETURN DHWR

DOMESTIC HOT WATER DHW

HIGH PRESSURE STEAM HPS

LOW PRESSURE STEAM LPS

MEDIUM PRESSURE STEAM MPS

BUTTERFLY VALVE

BALL VALVE

PUMP

DRAWING SYMBOLS & ABBREVIATIONS

LOW PRESSURE CONDENSATE LPC

MEDIUM PRESSURE CONDENSATE MPC

PUMPED CONDENSATE PC

CONNECT TO EXISTING

CONNECT TO EXISTING

EQUIPMENT TAG

KEYED NOTE #

XX-###

SPOT ELEVATION (FT, IN) X'-##"

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

UNLESS SPECIFICALLY NOTED AS EXISTING, ALL ITEMS, EQUIPMENT, AND WORK SHOW IS NEW AND SHALL BE FURNISHED AND INSTALLED BY

THE CONTRACTOR.

DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDINGS WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER INSOFAR AS POSSIBLE. ALL WORK SHALL BE COORDINATED WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE AND IS SUBJECT TO HIS CONTINUOUS APPROVAL.

THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THAT HE INTENDS TO INSTALL. IF THERE ARE ANY DIFFERENCES IN THE EQUIPMENT SHOWN ON THE DESIGN DRAWINGS AND THE EQUIPMENT TO BE INSTALLED, THE CONTRACTOR SHALL MAKE ALL CHANGES AND ADJUSTMENTS TO ACCOMMODATE THE PROPOSED EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. THIS APPLIES TO ALL SUPPORT SERVICES AND FACILITIES NECESSARY TO PROPERLY INSTALL THE EQUIPMENT TO FUNCTION ADEQUATELY AS PART OF THE SYSTEMS FOR WHICH THEY WERE DESIGNED AND SELECTED. THESE CHARACTERISTICS INCLUDE SUCH THINGS AS WEIGHT, DIMENSIONS, ELECTRICAL, MECHANICAL, PLUMBING, AND UTILITY SERVICES, ETC. ACCOMMODATING SERVICES INCLUDE SUCH THINGS AS DIMENSIONS, LOCATIONS, AND SIZES OF SUPPORTING MEMBERS, PIPE, CONNECTION SIZES, ELECTRICAL SERVICE SIZE AND PROTECTION, ELECTRICAL CONNECTION LOCATION, UTILITY AND PLUMBING CONNECTION SIZES AND LOCATIONS, ETC. ALL REQUIRED CHANGES TO THE CONTRACT DRAWINGS AND SPECIFICATIONS SHALL BE DESIGNED AND STAMPED BY REGISTERED ENGINEERS IN THE APPROPRIATE DISCIPLINE EMPLOYED BY THE CONTRACTOR AND SHALL BE INCLUDED AS PART OF THE EQUIPMENT SUBMITTALS. ALL CHANGES SHALL BE SUBJECT TO

THE APPROVAL OF THE PROJECT A/E AND THE CONTRACTING OFFICER ’S REPRESENTATIVE.

REQUEST APPROVAL FROM THE CONTRACTING OFFICER ’S REPRESENTATIVE SEVEN DAYS IN ADVANCE FOR THE SHUTDOWN OF ANY EXISTING

SYSTEM.

FINAL ADVANCE NOTICE OF 48 HOURS SHALL BE GIVEN TO THE CONTRACTING OFFICER ’S REPRESENTATIVE PRIOR TO THE PROPOSED

SHUTDOWN OF ANY SYSTEM.

THE CLOSING AND OPENING OF VALVES SHALL BE WITNESSED BY THE CONTRACTING OFFICER ’S REPRESENTATIVE; NOTIFY LOCAL

AUTHORITIES AS REQUIRED.

PROVIDE ADEQUATE FIRE PROTECTION IN THE ENTIRE CONSTRUCTION AREA FOR THE DURATION OF THE CONSTRUCTION PERIOD. REFER TO

SPECIFICATION DIVISION 1, “GENERAL REQUIREMENTS”, “FIRE SAFETY REQUIREMENTS”.

THE ENTIRE EXISTING FIRE PROTECTION SYSTEM SHALL BE RESTORED TO FULL OPERATION AT THE END OF EACH WORKING DAY. ALL EXISTING FIRE ALARMS AND FIRE EXITS AND ANY OTHER ASPECT OF THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN IN FULL OPERATION. THE COST OF RESPONSE TO ANY FALSE ALARM AS CHARGED BY ANY LOCAL FIRE DEPARTMENT SHALL BE PAID BY THE CONTRACTOR.

THE GENERAL NOTES ON THIS SHEET APPLY TO ALL THE DRAWING DISCIPLINES.

THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE, ALTHOUGH NO ATTEMPT WAS MADE TO SHOW EVERY OFFSET, FITTING, BEAM, PIPE SUPPORT, ETC. CHANGES REQUIRED TO FIT EQUIPMENT, PIPING, AND DUCTWORK SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE

OWNER. ANY MAJOR DISCREPANCIES SHALL BE CLARIFIED PRIOR TO SUBMITTAL OF BID.

THE WORK INCLUDES ALL ITEMS OF THE SPECIFICATIONS.

VISIT THE SITE AND BE FULLY COGNIZANT OF ALL CONDITIONS PRIOR TO SUBMITTING BID. REPORT ANY DISCREPANCIES TO THE ENGINEER

PRIOR TO SUBMITTAL OF BID.

DO NOT BEGIN FABRICATION, CUT ANY MEMBERS, OR BEGIN INSTALLATION UNTIL THE SUBMITTALS AND SHOP DRAWINGS HAVE BEEN APPROVED. ANY WORK CONSTRUCTED OR INSTALLED PRIOR TO THE APPROVAL OF SUBMITTALS AND SHOP DRAWINGS SHALL BE AT THE CONTRACTOR’S RISK AND SHALL BE REMOVED AND REINSTALLED OR RECONSTRUCTED AT THE CONTRACTOR ’S EXPENSE AT THE REQUEST OF THE CONTRACTING OFFICER’S REPRESENTATIVE TO THE COMPLETE SATISFACTION OF THE CONTRACTING OFFICER ’S REPRESENTATIVE.

FOR ALL FLOOR, WALL, AND ROOF PENETRATION, VERIFY THE LOCATION OF THE (E) STRUCTURAL MEMBERS PRIOR TO DRILLING AND CUTTING, RELOCATE OPENINGS AS REQUIRED AND OFFSET DUCTS, PIPES, CONDUIT, ETC. AS APPROPRIATE. REVIEW THE STRUCTURAL DRAWINGS IN THE

ENGINEERING OFFICE.

WHERE THERE IS A CONFLICT ON THE PLANS, SPECIFICATIONS, NOTES, GENERAL NOTES, REFERENCES, PUBLICATIONS, CODES, ETC. WITH RESPECT TO MATERIALS, PRODUCTS, METHODS, WORKMANSHIP, PROCEDURE, EXECUTION, ETC. THE MOST STRINGENT OR BENEFICIAL TO THE OWNER AS DETERMINED BY THE CONTRACTING OFFICER ’S REPRESENTATIVE SHALL BE UTILIZED OR INSTALLED. NO RELIEF OR EXTRA PAYMENT SHALL BE MADE TO THE CONTRACTOR BECAUSE OF THE INTERPRETATION OF THE CONTRACTING OFFICER ’S REPRESENTATIVE.

ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF THE APPLICABLE CODES AND STANDARDS WHETHER STATUTORY OR NOT. ALL WORK SHALL BE INSTALLED TO COMPLY WITH THE UNIFORM BUILDING MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE CODES, NATIONAL ELECTRICAL CODE, UNDERWRITER ’S LABORATORY, INC., AMERICAN NATIONAL STANDARD INSTITUTE, INC., NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION, BASIC ELECTRICAL REGULATIONS, AND CODES AND STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). IF ANY PART OF THE INSTALLATION DOES NOT MEET CODE, NOTIFY THE CONTRACTING OFFICER’S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION. IF ANY PART OF THE PROJECT CANNOT BE INSTALLED TO CONFORM WITH THE PLANS AND/OR SPECIFICATIONS, NOTIFY THE CONTRACTING OFFICER ’S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION.

ALL EXISTING PIPING, CONDUIT, AND MECHANICAL, PLUMBING, AND ELECTRICAL EQUIPMENT NOT TO BE REUSED OR REMAIN IN SERVICE SHALL BE REMOVED FROM THE FACILITY. THE CONTRACTING OFFICER’S REPRESENTATIVE HAS THE OPTION TO RECLAIM ANY DEMOLISHED MATERIALS OR EQUIPMENT FOR THE GOVERNMENT, IN WHICH CASE IT SHALL BE DELIVERED TO THE LOCATION DESIGNATED BY THE CONTRACTING

OFFICER’S REPRESENTATIVE.

FOR EACH PHASE AND BEFORE INTERRUPTING EACH (E) UTILITY, DETERMINE, IN ADVANCE, IF ANY DOWNSTREAM SERVICE BEYOND THE CONSTRUCTION AREA OF THE PHASE, WILL BE INTERRUPTED AND PROVIDE A TEMPORARY SERVICE BYPASSING THE CONSTRUCTION AREA.

DETERMINE ALL SUCH TEMPORARY SERVICES PRIOR TO SUBMITTING BID. THERE WILL BE NO FUTURE CONSIDERATION TO THE CONTRACTOR FOR ANY TEMPORARY SERVICES REQUIRED. PREPARE A DETAILED SHOP DRAWING SHOWING ALL OF THE EXISTING UTILITIES IN THEIR

RELOCATED LOCATION AND ALL THE NEW HVAC SYSTEMS.

THE CONTRACTOR IS HEREBY NOTIFIED THAT SOME WORK MAY BE REQUIRED OUTSIDE OF THE AREAS SHOWN ON THESE DRAWINGS. THIS COULD INCLUDE CONTROL MODIFICATIONS OR CONNECTIONS AT REMOTE LOCATIONS, CONTROL PANELS, CPU ’S, ETC.

BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, TRANSITIONS, FITTINGS, AND ACCESSORIES THAT MAY BE REQUIRED. COORDINATE ALL THE WORK OF ALL THE TRADES TO INSURE ALL DUCTS, PIPES, CONDUITS, ETC. DO NOT CONFLICT

AND CLEAR STRUCTURAL AND ARCHITECTURAL MEMBERS.

THE CONTRACTOR SHALL PAY FOR ALL DAMAGE, INCLUDING WATER DAMAGE, TO PROPERTY AND EQUIPMENT CAUSED BY HIS WORK

THROUGHOUT THE CONSTRUCTION AND WARRANTEE PERIOD.

ALL VALVES AND CONTROL DEVICES. SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION.

ALL UL LISTED EQUIPMENT SHALL BE INSTALLED AS PER LISTING OR LABELING. MAXIMUM FUSE SIZES MEANS FUSE PROTECTION REQUIRED.

PATCH AND PAINT TO MATCH EXISTING, ALL SURFACES DAMAGED BY THE DEMOLITION AND ALL OPENINGS NOT TO BE REUSED.

REPAIR DAMAGE TO CEILING, WALLS, ETC. TO THE SATISFACTION OF THE CONTRACTING OFFICER ’S REPRESENTATIVE.

WHEN A DETAIL OR NOTE IS IDENTIFIED AS TYPICAL, THE CONTRACTOR IS TO APPLY THE DETAIL OR NOTE TO EVERY SIMILAR CONDITION, WHETHER OR NOT THE REFERENCED DETAIL OR NOTE IS REPEATED OR REFERENCED.

WHERE NO CONSTRUCTION DETAIL IS INDICATED, SUCH WORK SHALL BE SIMILAR TO COMPARABLE WORK DETAILED OR NOTED ELSEWHERE OR TO MATCH EXISTING CONDITIONS, SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER ’S REPRESENTATIVE.

ALL HOLES, VOIDS, AND DAMAGED OR UNEVEN SURFACES WHICH ARE CAUSED BY THE CONTRACTOR ’S WORK AND WHICH REMAIN EXPOSED IN THE WALL, FLOOR, CEILING, OR OTHER SURFACES SHALL BE PATCHED, REPAIRED, AND BROUGHT FLUSH WITH THE ADJACENT CONSTRUCTION.

SUCH SURFACES, NOT CONCEALED BY THE NEW CONSTRUCTION, SHALL MATCH IN EVERY RESPECT THE EXISTING NON-DAMAGED CONSTRUCTION. REMOVE EXISTING UTILITIES BACK BEHIND EXISTING SURFACES AND CAP SO AS NOT TO INTERFERE WITH NEW PATCHES.

THE DEMOLITION SHALL INCLUDE ALL ASSOCIATED ANCHORAGES, HANGERS, SUPPORTS, BRACES, FASTENERS, MASTIC, MORTAR, LATH, AND RELATED ITEMS. THE EXISTING SUBSTRATE, INCLUDING CONCRETE, MASONRY, METAL FRAMING AND FURRING SHALL BE REPAIRED WHERE

DAMAGE BY THE CONTRACTOR’S WORK.

PROVIDE ALL VALVES, INSTRUMENTS, FITTINGS, ETC. AS SHOWN ON THE PIPING DIAGRAMS, SCHEMATICS, ETC. IT IS NOT POSSIBLE TO SHOW ALL VALVES, INSTRUMENTS, ETC. ON THE PLANS, HOWEVER, SELECTED VALVES HAVE BEEN SHOWN FOR REFERENCE. ALL VALVES SHALL BE

ACCESSIBLE FROM THE FLOOR OR FROM FIXED PLATFORMS.

THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM COMPLETE AND FULLY OPERABLE. THE CONNECTION TO THE EXISTING CONTROL SYSTEM SHALL BE COMPLETE SUCH THAT ALL NEW MONITORING AND CONTROL POINTS ARE RECOGNIZED BY THE EXISTING CONTROL SYSTEM AND THAT ALL NEW POINTS CAN BE READ, ACTUATED, AND RESET FROM THE EXISTING FRONT END, AND VICE-VERSA. THE ENGINEER SHALL BE NOTIFIED WHEN EACH PHASE OF THE SYSTEM HAS BEEN COMPLETELY CHECKED OUT, ADJUSTED, CALIBRATED, AND PUT INTO FINAL WORKING CONDITION WITH ALL THE TROUBLESHOOTING COMPLETED. A SUBSEQUENT JOBSITE MEETING WILL BE SCHEDULED WITH TWO WEEKS NOTICE AT WHICH TIME THE CONTROLS CONTRACTOR WILL DEMONSTRATE THE OPERATION OF THE CONTROL SYSTEMS TO ALL CONCERNED. IF ANY ITEMS OF THE CONTROL SEQUENCE CANNOT BE SUCCESSFULLY DEMONSTRATED OR REQUIRE FURTHER TROUBLESHOOTING, A SUBSEQUENT CONTROLS INSPECTION WILL BE REQUIRED AND WILL BE AT THE CONTRACTOR ’S EXPENSE. THIS PROVISION SHALL BE A CONDITION OF FINAL ACCEPTANCE. THE CONTRACTOR SHALL BE PREPARED TO DEMONSTRATE ALL ITEMS IN THE SEQUENCE OF OPERATION. SUBSEQUENT CONTROLS DEMONSTRATIONS AND VERIFICATIONS WILL BE REQUIRED AT THE

COMPLETION OF THE PROJECT.

GENERAL NOTES

1.

2.

3.

4.

5.

DURING THE EXECUTION OF THIS CONTRACT, THE PROJECT AREA WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER, STAFF, OR OTHER BUILDING OCCUPANTS. ALL WORK SHALL BE COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND IS SUBJECT TO HIS CONTINUOUS APPROVAL.

"NORMAL" WORKING HOURS ON THE POST ARE FROM 7:00 AM TO 5:00 PM, MONDAY THROUGH FRIDAY; HOURS OUTSIDE OF "NORMAL" WORKING HOURS ARE DEFINED AS "OFF HOURS". THE CONTRACTOR SHALL DEVELOP A SCHEDULE OF DEMOLITION, NEW INSTALLATION, AND CHANGEOVER OF THE MECHANICAL, PLUMBING, AND UTILITY SYSTEMKS THAT WILL ALLOW FOR MINIMUM DOWNTIME.

THE CONTRACTOR SHALL DEVELOP AND PRESENT A CONSTRUCTION PLAN AND WORK SCHEDULE WITH ALL PHASING, STAGING, AND SEQUENCING OF WORK FOR APPROVAL PRIOR TO THE COMMENCEMENT AND BEGINNING IMPLEMENTATION OF HIS WORK. THE CONTRACTOR SHALL DETERMINE PRIOR TO SUBMITTING HIS WORK SCHEDULE, THE SPECIFIC TIME AVAILABILITY OF ALL AREAS AND SPACES AND DETERMINE

WHAT WORK MUST BE DONE DURING "OFF HOURS".

ALL WORK IN OCCUPIED SPACES SHALL BE DONE DURING "OFF HOURS". ALL WORK AS REQUIRED TO RETURN EXISTING SYSTEMS TO FUNCTIONALITY, REPLACE CEILING TILES, AND CONSTRUCTION CLEANUP SHALL BE FULLY COMPLETE AND APPROVED BY THE COR PRIOR TO THE END-OF-SHIFT AND BEFORE THE OPENING OF THE AREA TO STAFF AND OTHER BUILDING OCCUPANTS.

WITH THE EXCEPTION OF SIGNIFICANT NOISE GENERATING ACTIVITIES SUCH AS CORE DRILLING, ETC., WORK OUTSIDE OF THE OCCUPIED

SPACES, SUCH AS ON THE ROOF, ETC., MAY BE PERFORMED DURING NORMAL WORKING HOURS.

PHASING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering, P.C.

4500 State Route 434 Apalachin, NY 13732 (607)223-4334

2/20/2026

Au to de sk

D oc s:

//V

A-

Ly on s

VA

H ot W at er

H ea te r/L yo ns

H ot

W at er H ea te r_ R

.rv t 2/

/2

2:

:1

PM

G-001

GENERAL NOTES & SYMBOLS REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

2/20/2026 JWE JWC

561A4-23-101100% CD SUBMISSION

ALL BUILDINGS

1.

2.

3.

THE FOLLOWING DESIGN BID DEDUCTS ARE PROVIDED FOR COST EVALUATION PURPOSES:

OMIT REPLACEMENT OF EXISTING NEWER HOT WATER HEATER IN BUILDING 07 (HW-B07-02); LEAVE IN SERVICE.

REUSE THE EXISTING DOMESTIC HOT WATER RECIRCULATION PUMPS IN LIEU OF PROVIDING NEW EQUIPMENT.

EXCLUDE BMS PROVISIONS IN THE PROPOSED WATER HEATERS.

BID DEDUCTS

THE INTENT OF THIS PROJECT IS TO REPLACE A TOTAL OF TEN (10) STEAM TO HOT WATER HEATERS ALONG WITH THEIR ASSOCIATED RECIRCULATION PUMPS ACROSS FIVE (5) BUILDINGS AT THE VA HEALTHCARE CAMPUS IN LYONS, NJ. THE BUILDINGS INCLUDED IN THE PROJECT SCOPE ARE 3, 7, 53, 54, 143 EACH OF WHICH CONTAINS TWO (2) HOT WATER HEATERS. THE EXISTING CONDITIONS OF THE EQUIPMENT, MECHANICAL ROOMS AND PIPING LAYOUTS WERE EVAULATED DURING TWO SITE VISITS. FINDINGS FROM THESE INVESTIGATIONS, ALONG WITH A RECOMMENDED DESIGN APPROACH

FOR EACH BUILDING, ARE SUMMARIZED IN TABLE 1 BELOW.

EXECUTIVE SUMMARY

PROJECT DESIGN APPROACH SCHEDULE

LOCATION TAG EQUIPMENT TYPE

EXISTING EQUIPMENT PROPOSED EQUIPMENT ELECTRICAL

MAKE MODEL MAKE MODEL

POWER

(V/PH/HZ) PANEL

BUILDING 3 HWH-B03-01 HOT WATER HEATER RECO SHL TB 150 PATTERSON-KELLEY PK-08D 120/160 EPB BUILDING 3 HWH-B03-02 HOT WATER HEATER RECO SHL TB 150 PATTERSON-KELLEY PK-08D 120/160 EPB BUILDING 3 P-B03-01 RECIRC PUMP GRUNDFOS UH-26-99-BF BELL & GOSSETT NBF-36 120/160 EPB BUILDING 3 P-B03-02 RECIRC PUMP GRUNDFOS UH-26-99-BF BELL & GOSSETT NBF-36 120/160 EPB BUILDING 7 HWH-B03-03 HOT WATER HEATER QUICKDRAW 4 N 5AIS PATTERSON-KELLEY PK-08D 120/160 PP7BA BUILDING 7 HWH-B03-04 HOT WATER HEATER QUICKDRAW 60 L 5AIS PATTERSON-KELLEY PK-08D 120/160 PP7BA BUILDING 7 P-B07-01 RECIRC PUMP BELL & GOSSETT SERIES 100 BNFI FD BELL & GOSSETT NBF-25 120/160 PP7BA BUILDING 53 HWH-B53-01 HOT WATER HEATER PATTERSON KELLEY 201150-1 PATTERSON-KELLEY PK-08D 120/160 PP53BA BUILDING 53 HWH-B53-02 HOT WATER HEATER PATTERSON KELLEY 201150-1 PATTERSON-KELLEY PK-08D 120/160 PP53BA BUILDING 53 P-B53-01 HOT WATER HEATER TACO 0013-SF3 BELL & GOSSETT NBF-36 120/160 PP53BA BUILDING 54 HWH-B54-01 HOT WATER HEATER PATTERSON KELLEY C068010 PATTERSON-KELLEY PK-08D 120/160 NMB1 BUILDING 54 HWH-B54-02 HOT WATER HEATER PATTERSON KELLEY C068010 PATTERSON-KELLEY PK-08D 120/160 NMB1 BUILDING 54 P-B54-01 RECIRC PUMP BELL & GOSSETT SERIES 100 BELL & GOSSETT NBF-36 120/160 NMB1 BUILDING 54 P-B54-02 RECIRC PUMP BELL & GOSSETT NBF-36 BELL & GOSSETT NBF-36 120/160 NMB1 BUILDING 143 HWH-B143-01 HOT WATER HEATER PVXK 12.114.08.75 N PATTERSON-KELLEY PK-08D 120/160 AP-E4-LI NW BUILDING 143 HWH-B143-02 HOT WATER HEATER PVXK 12.114.0.75 N PATTERSON-KELLEY PK-08D 120/160 AP-E4-LI NW BUILDING 143 P-B143-01 RECIRC PUMP TACO 2400-50S-3P BELL & GOSSETT PL-55 120/160 AP-E4-LI NW BUILDING 143 P-B143-02 RECIRC PUMP BELL & GOSSETT SERIES 100 BELL & GOSSETT NBF-25 120/160 AP-E4-LI NW BUILDING 143 P-B153-03 RECIRC PUMP BELL & GOSSETT SERIES 100 BELL & GOSSETT NBF-25 120/160 AP-E4-LI NW

LOT 7

LOT 1 & 2

PARKING

BLDG 6

LOT 4

BLDG 143

WEST CIRCLE

DRIVE TENNIS

COURTS

LOT 9

LO

T 8

BLDG 53

EAST CIRCLE DRIVE

LOT 6

BLDG 3

BLDG 7

BLDG 57

BLDG 55

BLDG 2

BLDG 14

BLDG 6

BLDG 4

BLDG 8

BLDG 1

BLDG 14

BLDG 9

BLDG 7

BLDG 138

BLDG 2

BLDG 138

BLDG 12

BLDG 15

BLDG 11

BLDG 13

BLDG 135BLDG 54

BLDG T93

BLDG 16

BLDG 135

BLDG 18

BLDG 135

BLDG 133

BLDG 136

BLDG 25

BLDG 50

BLDG 26

BLDG

BLDG 118

BLDG 19

BLDG 18

BLDG 69

LOT 3

BLDG 47

BLDG 118

BLDG 5

LOT 4

BLDG 55

LOT 1 & 2

PARKING

LOT 7

LOT 9

LOT 6

LO

T 8

BLDG 143

EAST CIRCLE DRIVE

TENNIS

COURTS

WEST CIRCLE

DRIVE

BLDG 53

BLDG 4

BLDG 1

BLDG 57

BLDG 3

BLDG 9

BLDG 8

BLDG 15

BLDG 13

BLDG 16

BLDG 135

BLDG 26

BLDG 136

BLDG T93

BLDG 133

BLDG 25

BLDG 50

BLDG 69

BLDG 19

LOT 3

BLDG

BLDG 47

BLDG 5

BLDG 10

AREA OF WORK

KN

O

LL

C

R O

FT

R

O

AD

ORCHARD DRIVE

TRUE NORTH

PLAN NORTH

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering, P.C.

4500 State Route 434 Apalachin, NY 13732 (607)223-4334

2/20/2026

Au to de sk

D oc s:

//V

A-

Ly on s

VA

H ot W at er

H ea te r/L yo ns

H ot

W at er H ea te r_ R

.rv t 2/

/2

2:

:1

PM

G-002

PROJECT SITE PLAN REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

2/20/2026 JWE JWC

561A4-23-101100% CD SUBMISSION

ALL BUILDINGS

1" = 100'-0"

LYONS VA SITE PLAN

AREA OF WORK

KEYED PLAN

1" = 30'

PLAN NORTH

TRUE NORTH

A.

GENERAL NEW WORK NOTES

PROVIDE NEW CONCRETE EQUIPMENT PADS AS INDICATED ON THE DRAWINGS. CONSTRUCT PADS TO SUPPORT DESIGN LOADS AND EQUIPMENT WEIGHT, WITH LEVEL AND PLUMB SURFACES. FINISH TOP SURFACE SMOOTH AND FREE OF DEFECTS. VERIFY DIMENSIONS AND LOCATIONS PRIOR TO PLACEMENT.

COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH EXISTING UTILITIES, PIPING, OR

CONDUITS. CURE CONCRETE IN ACCORDANCE WITH MANUFACTURER ’S RECOMMENDATIONS AND

PROJECT SPECIFICATIONS.

PLAN NORTH

TRUE NORTH

MECHANICAL

ROOM

N-109

G-102

0' - 0"

MECHANICAL

ROOM

N-109

0' - 6"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering, P.C.

4500 State Route 434 Apalachin, NY 13732 (607)223-4334

GENERAL NOTES:

KEYED MAP:

KEYED NOTES:

NOT FOR

CONSTRUCTION

2/20/2026

Au to de sk

D oc s:

//V

A-

Ly on s

VA

H ot W at er

H ea te r/L yo ns

H ot

W at er H ea te r_ R

.rv t 2/

/2

2:

:1

PM

G-102

GENERAL NEW WORK - BUILDING

REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

2/20/2026 JWE JWC

561A4-23-101100% CD SUBMISSION

ALL BUILDINGS

KEYED NOTES

1 PROVIDE NEW CONCRETE HOUSEKEEPING PAD FOR INDIRECT WATER HEATER. COORDINATE SIZE, THICKNESS, AND ELEVATION WITH EQUIPMENT REQUIREMENTS. REFER TO DETAIL #1 ON G-501 FOR

MORE INFORMATION.

2 EXISTING CONCRETE HOUSEKEEPING PAD TO REMAIN.

1/4" = 1'-0"1 GENERAL NEW WORK PLAN - BUILDING 07

1/2" = 1'-0"2 GENERAL - NEW WORK PLAN - BUILDING 07 - -ENLARGED

MECHANICAL

ROOM

N-105

STAIR 3

PATIENT

STORAGE

1B-121

CORRIDOR

C1-5

STORAGE

1C-102

ENGINEERING

STORAGE

1C-103

CORRIDOR

C1-5B

TEMPORARY

MEDICAL WASTE

HOLDING

1C-102A

PLAN NORTH

TRUE NORTH

PLAN NORTH

TRUE NORTH

PLAN NORTH

TRUE NORTH

PLAN NORTH

TRUE NORTH

G-105

AREA OF WORK

KEYED PLAN

1" = 50'

PLAN NORTH

TRUE NORTH

A.

GENERAL NEW WORK NOTES

PROVIDE NEW CONCRETE EQUIPMENT PADS AS INDICATED ON THE DRAWINGS. CONSTRUCT PADS TO SUPPORT DESIGN LOADS AND EQUIPMENT WEIGHT, WITH LEVEL AND PLUMB SURFACES. FINISH TOP SURFACE SMOOTH AND FREE OF DEFECTS. VERIFY DIMENSIONS AND LOCATIONS PRIOR TO PLACEMENT.

COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH EXISTING UTILITIES, PIPING, OR

CONDUITS. CURE CONCRETE IN ACCORDANCE WITH MANUFACTURER ’S RECOMMENDATIONS AND

PROJECT SPECIFICATIONS.

0' - 0"

1' - 2 5/16"

1' - 6 5/16"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering, P.C.

4500 State Route 434 Apalachin, NY 13732 (607)223-4334

GENERAL NOTES:

KEYED MAP:

KEYED NOTES:

NOT FOR

CONSTRUCTION

2/20/2026

Au to de sk

D oc s:

//V

A-

Ly on s

VA

H ot W at er

H ea te r/L yo ns

H ot

W at er H ea te r_ R

.rv t 2/

/2

2:

:1

PM

G-105

GENERAL NEW WORK - BUILDING

REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

2/20/2026 JWE JWC

561A4-23-101100% CD SUBMISSION

ALL BUILDINGS

1/4" = 1'-0"1 GENERAL NEW WORK PLAN - BUILDING 143

KEYED NOTES

1 PROVIDE NEW 4" CONCRETE TOPPING ON EXISTING HOUSEKEEPING PAD. CLEAN AND PREP EXISTING SURFACE PRIOR TO POUR. MATCH EXISTING PAD FOOTPRINT AND FINISH. REFER TO DETAIL #1 ON

G-501 FOR MORE INFORMATION.

2 EXISTING CONCRETE HOUSEKEEPING PAD TO REMAIN.

1/2" = 1'-0"2 GENERAL - NEW WORK PLAN - BUILDING 143 - -ENLARGED

SECTION A-A (BASE NOT POURED WITH SLAB)

SECTION A-A (EXISTING SLAB EXTENSION)

PLAN SECTION B-B

EQUIPMENT BASE PLATE

PROVIDE #3 BARS 12" O.C.

EACH WAY IN THE BASE & DOWEL

BASE TO FLOOR

EQUIPMENT BASE PLATE

WELD HEAD TO PLATE

OR BEND OVER END 5D

FLOOR

PIPE SLEEVE (5D, 3" MIN.)

ANCHOR BOLT (TYP)

CONCRETE BASE

NOTES:

1.

2.

L & W DIMENSIONS SHALL BE 6"

GREATER THAN THE EQUIPMENT

BASE PLATE ON ALL SIDES.

REFER TO SPECIFICATION SECTION

03 30 53 FOR MORE INFORMATION

A

A

B B

TYPICAL ANCHOR BOLT

NUT & WASHER

L

W

D

1"

5D

2D

TYPICAL ANCHOR BOLT

NUT & WASHER

PROVIDE #3 BARS 12" O.C.

EACH WAY IN THE BASE & DOWEL

BASE TO FLOOR

6"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering, P.C.

4500 State Route 434 Apalachin, NY 13732 (607)223-4334

2/20/2026

Au to de sk

D oc s:

//V

A-

Ly on s

VA

H ot W at er

H ea te r/L yo ns

H ot

W at er H ea te r_ R

.rv t 2/

/2

2:

:2

PM

G-501

GENERAL DETAILS REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

2/20/2026 JWE JWC

561A4-23-101100% CD SUBMISSION

ALL BUILDINGS

12" = 1'-0"1 CONCRETE EQUIPMENT BASES

PUMP RM

B013

MECHANICAL

B007

BUILDING

SUPPLIES /

EQUIP. STORAGE

B005

ELEVATOR

EQUIP. ROOM

B008

UTILITY TRENCH

CORRIDOR

B011

PC

LPC

LPS

LPS

LP

S

LPC

LPC

PLAN NORTH

TRUE NORTH

MD101

AREA OF WORK

KEYED PLAN

1" = 50'

PLAN NORTH

TRUE NORTH

A.

B.

C.

D.

E.

F.

G.

H.

I.

GENERAL MECHANICAL DEMOLITON NOTES

PLAN VIEWS ARE INTENDED TO SHOW GENERAL ROOM LAYOUT ONLY. EXISTING ROOM CONFIGURATIONS AND PIPING ARRANGEMENTS SHOWN ARE BASED ON AVAILABLE INFORMATION AND MAY VARY IN FIELD.

CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO DEMOLITION. REMOVE ONLY THAT

PIPING AND EQUIPMENT NECESSARY TO ACCOMMODATE WATER HEATER REPLACEMENT WHILE

MAINTAINING EXISTING DISTRIBUTION SYSTEMS TO REMAIN.

DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT

REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.

REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ELECTRICAL, AND PLUMBING CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE

REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES

INDICATED.

DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF

PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED.

PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN

PROGRESS, AND TIMELY DISCONNECTION OF UTILITY SERVICES.

EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND

REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH

SIMILAR EXISTING WORK. STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER OF RECORD. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND

REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL WORK.

UNLESS SPECIFIED OTHERWISE, ALL PIPING AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE PROPERTY. THIS INCLUDES ALL PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN ROOF, WALLS, FLOORS, IN AN APPROVED MANNER.

ONLY ONE WATER HEATER SHOULD BE REMOVED AT A TIME. AFTER THE FIRST UNIT IS REPLACED WITH A NEW ONE, THE SECOND WATER HEATER MAY THEN BE REMOVED. BOTH WATER HEATERS CANNOT BE DEMOLISHED SIMULTANEOUSLY TO ENSURE CONTINUOUS HOT WATER SERVICE TO THE BUILDING.

VERIFY PHASING APPROACH WITH THE COR PRIOR TO PROCEEDING WITH DEMOLITION WORK.

THIS PROJECT IS PHASED WITHIN EACH BUILDING. POWER, STEAM, AND CONDENSATE RETURN SERVING ONE FUNCTIONING WATER HEATER PER BUILDING SHALL REMAIN ACTIVE THROUGHOUT THE PROJECT DURATION. PERFORM LOCKOUT/TAGOUT (LOTO) OF ENERGY SYSTEMS ONLY AS REQUIRED TO SUPPORT PHASED DEMOLITION AND INSTALLATION. SAVE ALL REMOVED WATER HEATERS AND PUMPS FOR COR-

FMS REVIEW.

PROTECT AND PRESERVE ALL MECHANICAL VALVES, ACTUATORS, AND PUMPS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. VERIFY CONDITION WITH COR PRIOR TO REMOVAL OR WORK IN ADJACENT

AREAS.

PC

LPS

LPC

LP

C

LP

S

LPC

LPS

HWH-B03-01 (E) HWH-B03-01 (E)

LPC

LP

C

EXISTING

CONCRETE

EQUIPMENT PAD

EXISTING

CONCRETE

EQUIPMENT PAD

EXISTING

CONDENSATE

RETURN PUMPS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering, P.C.

4500 State Route 434 Apalachin, NY 13732 (607)223-4334

GENERAL NOTES:

KEYED MAP:

KEYED NOTES:

NOT FOR

CONSTRUCTION

2/20/2026

Au to de sk

D oc s:

//V

A-

Ly on s

VA

H ot W at er

H ea te r/L yo ns

H ot

W at er H ea te r_ R

.rv t 2/

/2

2:

:2

PM

MD101

MECHANICAL DEMOLITION -

BUILDING 03

REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

2/20/2026 JWE JWC

561A4-23-101100% CD SUBMISSION

1/4" = 1'-0"1 MECHANICAL REMOVAL PLAN - BUILDING 03

KEYED NOTES

1 REMOVE EXISTING LOW PRESSURE STEAM PIPING BACK TO NEAREST ISOLATION VALVE. REFER TO

DETAIL #1 ON M-701 FOR MORE INFORMATION.

2 REMOVE EXISTING LOW PRESSURE CONDENSATE PIPING BACK TO NEAREST ISOLATION VALVE. REFER

TO DETAIL #1 ON M-701 FOR MORE INFORMATION.

1/2" = 1'-0"2 MECHANICAL REMOVAL PLAN - BUILDING 03 - ENLARGED

A.

B.

C.

D.

E.

F.

G.

H.

I.

GENERAL MECHANICAL DEMOLITON NOTES

PLAN VIEWS ARE INTENDED TO SHOW GENERAL ROOM LAYOUT ONLY. EXISTING ROOM CONFIGURATIONS AND PIPING ARRANGEMENTS SHOWN ARE BASED ON AVAILABLE INFORMATION AND MAY VARY IN FIELD.

CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO DEMOLITION. REMOVE ONLY THAT

PIPING AND EQUIPMENT NECESSARY TO ACCOMMODATE WATER HEATER REPLACEMENT WHILE

MAINTAINING EXISTING DISTRIBUTION SYSTEMS TO REMAIN.

DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT

REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.

REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ELECTRICAL, AND PLUMBING CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE

REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES

INDICATED.

DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF

PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED.

PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN

PROGRESS, AND TIMELY DISCONNECTION OF UTILITY SERVICES.

EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND

REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH

SIMILAR EXISTING WORK. STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER OF RECORD. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND

REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL WORK.

UNLESS SPECIFIED OTHERWISE, ALL PIPING AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE PROPERTY. THIS INCLUDES ALL PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN ROOF, WALLS, FLOORS, IN AN APPROVED MANNER.

ONLY ONE WATER HEATER SHOULD BE REMOVED AT A TIME. AFTER THE FIRST UNIT IS REPLACED WITH A NEW ONE, THE SECOND WATER HEATER MAY THEN BE REMOVED. BOTH WATER HEATERS CANNOT BE DEMOLISHED SIMULTANEOUSLY TO ENSURE CONTINUOUS HOT WATER SERVICE TO THE BUILDING.

VERIFY PHASING APPROACH WITH THE COR PRIOR TO PROCEEDING WITH DEMOLITION WORK.

THIS PROJECT IS PHASED WITHIN EACH BUILDING. POWER, STEAM, AND CONDENSATE RETURN SERVING ONE FUNCTIONING WATER HEATER PER BUILDING SHALL REMAIN ACTIVE THROUGHOUT THE PROJECT DURATION. PERFORM LOCKOUT/TAGOUT (LOTO) OF ENERGY SYSTEMS ONLY AS REQUIRED TO SUPPORT PHASED DEMOLITION AND INSTALLATION. SAVE ALL REMOVED WATER HEATERS AND PUMPS FOR COR-

FMS REVIEW.

PROTECT AND PRESERVE ALL MECHANICAL VALVES, ACTUATORS, AND PUMPS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. VERIFY CONDITION WITH COR PRIOR TO REMOVAL OR WORK IN ADJACENT

AREAS.

AREA OF WORK

KEYED PLAN

1" = 30'

PLAN NORTH

TRUE NORTH

HPS

H

PS

M

PC

PLAN NORTH

TRUE NORTH

M

PS MD102

MPS

MPS

MPC

HWH-B07-01 (E)

HWH-B07-02 (E)

EXISTING CONCRETE

EQUIPMENT PAD TO REMAIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering, P.C.

4500 State Route 434 Apalachin, NY 13732 (607)223-4334

GENERAL NOTES:

KEYED MAP:

KEYED NOTES:

NOT FOR

CONSTRUCTION

2/20/2026

Au to de sk

D oc s:

//V

A-

Ly on s

VA

H ot W at er

H ea te r/L yo ns

H ot

W at er H ea te r_ R

.rv t 2/

/2

2:

:2

PM

MD102

MECHANICAL DEMOLITION -

BUILDING 07

REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

2/20/2026 JWE JWC

561A4-23-101100% CD SUBMISSION

KEYED NOTES

1 REMOVE EXISTING MEDIUM PRESSURE STEAM PIPING BACK TO NEAREST ISOLATION VALVE. REFER TO

DETAIL #1 ON M-701 FOR MORE INFORMATION.

2 REMOVE EXISTING MEDIUM PRESSURE CONDENSATE PIPING BACK TO NEAREST ISOLATION VALVE.

REFER TO DETAIL #1 ON M-701 FOR MORE INFORMATION.

3 THE VA WILL RETAIN BOTH EXISTING WATER HEATERS. DEMOLITION ACTIVITES MUST BE PERFORMED

IN A MANNER THAT DOES NOT DAMAGE THESE UNITS. THE VA WILL INSPECT THE DEMOLITION

PROCESS TO VERIFY THAT THE EXISTING CONDITIONS OF THE WATER HEATERS ARE NOT AFFECTED.

1/4" = 1'-0"1 MECHANICAL REMOVAL PLAN - BUILDING 07

1/2" = 1'-0"2 MECHANICAL REMOVAL PLAN - BUILDING 07 - ENLARGED

1" = 50'

PLAN NORTH

TRUE NORTH

MECHANICAL

SERVICE ROOM

ST-1A

STORAGE

CORRIDOR

LPS

LPC

PLAN NORTH

TRUE NORTH

PLAN NORTH

TRUE NORTH

MD103

A.

B.

C.

D.

E.

F.

G.

H.

I.

GENERAL MECHANICAL DEMOLITON NOTES

PLAN VIEWS ARE INTENDED TO SHOW GENERAL ROOM LAYOUT ONLY. EXISTING ROOM CONFIGURATIONS AND PIPING ARRANGEMENTS SHOWN ARE BASED ON AVAILABLE INFORMATION AND MAY VARY IN FIELD.

CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO DEMOLITION. REMOVE ONLY THAT

PIPING AND EQUIPMENT NECESSARY TO ACCOMMODATE WATER HEATER REPLACEMENT WHILE

MAINTAINING EXISTING DISTRIBUTION SYSTEMS TO REMAIN.

DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT

REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.

REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ELECTRICAL, AND PLUMBING CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE

REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES

INDICATED.

DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF

PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED.

PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN

PROGRESS, AND TIMELY DISCONNECTION OF UTILITY SERVICES.

EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND

REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH

SIMILAR EXISTING WORK. STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER OF RECORD. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND

REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL WORK.

UNLESS SPECIFIED OTHERWISE, ALL PIPING AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE PROPERTY. THIS INCLUDES ALL PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN ROOF, WALLS, FLOORS, IN AN APPROVED MANNER.

ONLY ONE WATER HEATER SHOULD BE REMOVED AT A TIME. AFTER THE FIRST UNIT IS REPLACED WITH A NEW ONE, THE SECOND WATER HEATER MAY THEN BE REMOVED. BOTH WATER HEATERS CANNOT BE DEMOLISHED SIMULTANEOUSLY TO ENSURE CONTINUOUS HOT WATER SERVICE TO THE BUILDING.

VERIFY PHASING APPROACH WITH THE COR PRIOR TO PROCEEDING WITH DEMOLITION WORK.

THIS PROJECT IS PHASED WITHIN EACH BUILDING. POWER, STEAM, AND CONDENSATE RETURN SERVING ONE FUNCTIONING WATER HEATER PER BUILDING SHALL REMAIN ACTIVE THROUGHOUT THE PROJECT DURATION. PERFORM LOCKOUT/TAGOUT (LOTO) OF ENERGY SYSTEMS ONLY AS REQUIRED TO SUPPORT PHASED DEMOLITION AND INSTALLATION. SAVE ALL REMOVED WATER HEATERS AND PUMPS FOR COR-

FMS REVIEW.

PROTECT AND PRESERVE ALL MECHANICAL VALVES, ACTUATORS, AND PUMPS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. VERIFY CONDITION WITH COR PRIOR TO REMOVAL OR WORK IN ADJACENT

AREAS.

LPC

LPS

2 2

HWH-B53-02 (E) HWH-B53-02 (E)

EXISTING CONCRETE

EQUIPMENT PAD TO REMAIN

MECHANICAL

SERVICE ROOM

ST-1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering, P.C.

4500 State Route 434 Apalachin, NY 13732 (607)223-4334

GENERAL NOTES:

KEYED MAP:

KEYED NOTES:

NOT FOR

CONSTRUCTION

2/20/2026

Au to de sk

D oc s:

//V

A-

Ly on s

VA

H ot W at er

H ea te r/L yo ns

H ot

W at er H ea te r_ R

.rv t 2/

/2

2:

:3

PM

MD103

MECHANICAL DEMOLITION -

BUILDING 53

REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

2/20/2026 JWE JWC

561A4-23-101100% CD SUBMISSION

1/4" = 1'-0"1 MECHANICAL REMOVAL PLAN - BUILDING 53

KEYED NOTES

1 REMOVE EXISTING LOW PRESSURE STEAM PIPING BACK TO NEAREST ISOLATION VALVE. REFER TO

DETAIL #1 ON M-701 FOR MORE INFORMATION.

2 REMOVE EXISTING LOW PRESSURE CONDENSATE PIPING BACK TO NEAREST ISOLATION VALVE. REFER

TO DETAIL #1 ON M-701 FOR MORE INFORMATION. REFER TO DETAIL #1 ON M-701 FOR MORE

INFORMATION.

1/2" = 1'-0"2 MECHANICAL REMOVAL PLAN - BUILDING 53 - ENLARGED

C.

D.

E.

F.

G.

H.

I.

GENERAL MECHANICAL DEMOLITON NOTES

PLAN VIEWS ARE INTENDED TO SHOW GENERAL ROOM LAYOUT ONLY. EXISTING ROOM CONFIGURATIONS AND PIPING ARRANGEMENTS SHOWN ARE BASED ON AVAILABLE INFORMATION AND MAY VARY IN FIELD.

CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO DEMOLITION. REMOVE ONLY THAT

PIPING AND EQUIPMENT NECESSARY TO ACCOMMODATE WATER HEATER REPLACEMENT WHILE

MAINTAINING EXISTING DISTRIBUTION SYSTEMS TO REMAIN.

DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT

REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.

REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ELECTRICAL, AND PLUMBING CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE

REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES

INDICATED.

DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF

PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED.

PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN

PROGRESS, AND TIMELY DISCONNECTION OF UTILITY SERVICES.

EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND

REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH

SIMILAR EXISTING WORK. STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER OF RECORD. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND

REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL WORK.

UNLESS SPECIFIED OTHERWISE, ALL PIPING AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE PROPERTY. THIS INCLUDES ALL PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN ROOF, WALLS, FLOORS, IN AN APPROVED MANNER.

ONLY ONE WATER HEATER SHOULD BE REMOVED AT A TIME. AFTER THE FIRST UNIT IS REPLACED WITH A NEW ONE, THE SECOND WATER HEATER MAY THEN BE REMOVED. BOTH WATER HEATERS CANNOT BE DEMOLISHED SIMULTANEOUSLY TO ENSURE CONTINUOUS HOT WATER SERVICE TO THE BUILDING.

VERIFY PHASING APPROACH WITH THE COR PRIOR TO PROCEEDING WITH DEMOLITION WORK.

THIS PROJECT IS PHASED WITHIN EACH BUILDING. POWER, STEAM, AND CONDENSATE RETURN SERVING ONE FUNCTIONING WATER HEATER PER BUILDING SHALL REMAIN ACTIVE THROUGHOUT THE PROJECT DURATION. PERFORM LOCKOUT/TAGOUT (LOTO) OF ENERGY SYSTEMS ONLY AS REQUIRED TO SUPPORT PHASED DEMOLITION AND INSTALLATION. SAVE ALL REMOVED WATER HEATERS AND PUMPS FOR COR-

FMS REVIEW.

PROTECT AND PRESERVE ALL MECHANICAL VALVES, ACTUATORS, AND PUMPS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. VERIFY CONDITION WITH COR PRIOR TO REMOVAL OR WORK IN ADJACENT

AREAS.

AREA OF WORK

KEYED PLAN

1" = 30'

PLAN NORTH

TRUE NORTH

LPS

LP

C

PLAN NORTH

TRUE NORTH

PLAN NORTH

TRUE NORTH

MECHANICAL

EXISTING

SWITCHGEAR

DAIRY

REFRIGERATOR

NON FOOD STOR

LOUNGE

TOIL

TOIL

MECHANICAL

CORRIDOR

MD104

LPS

LPC

HPC

LPS

HWH-B54-01 (E)

HWH-B54-02 (E)

LP

S

LP

S

MECHANICAL

MECHANICAL

EXISTING EQUIPMENT

PAD TO REMAIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering, P.C.

4500 State Route 434 Apalachin, NY 13732 (607)223-4334

GENERAL NOTES:

KEYED MAP:

KEYED NOTES:

NOT FOR

CONSTRUCTION

2/20/2026

Au to de sk

D oc s:

//V

A-

Ly on s

VA

H ot W at er

H ea te r/L yo ns

H ot

W at er H ea te r_ R

.rv t 2/

/2

2:

:3

PM

MD104

MECHANICAL DEMOLITION -

BUILDING 54

REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

2/20/2026 JWE JWC

561A4-23-101100% CD SUBMISSION

KEYED NOTES

1 REMOVE EXISTING LOW PRESSURE STEAM PIPING BACK TO NEAREST ISOLATION VALVE. REFER TO

DETAIL #1 ON M-701 FOR MORE INFORMATION.

2 REMOVE EXISTING LOW PRESSURE CONDENSATE PIPING BACK TO NEAREST ISOLATION VALVE.

1/4" = 1'-0"1 MECHANICAL REMOVAL PLAN - BUILDING 54

1/2" = 1'-0"2 MECHANICAL REMOVAL PLAN - BUILDING 54 - ENLARGED

MECHANICAL

ROOM

N-105

PATIENT

STORAGE

1B-121

CORRIDOR

C1-5

STORAGE

1C-102

ENGINEERING

STORAGE

1C-103

CORRIDOR

C1-5B

TEMPORARY

MEDICAL WASTE

HOLDING

1C-102A

STAIR 3

LPS

LPC

PLAN NORTH

TRUE NORTH

PLAN NORTH

TRUE NORTH

PLAN NORTH

TRUE NORTH

PLAN NORTH

TRUE NORTH

MD105

AREA OF WORK

KEYED PLAN

1" = 50'

PLAN NORTH

TRUE NORTH

A.

B.

C.

D.

E.

F.

G.

H.

I.

GENERAL MECHANICAL DEMOLITON NOTES

PLAN VIEWS ARE INTENDED TO SHOW GENERAL ROOM LAYOUT ONLY. EXISTING ROOM CONFIGURATIONS AND PIPING ARRANGEMENTS SHOWN ARE BASED ON AVAILABLE INFORMATION AND MAY VARY IN FIELD.

CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO DEMOLITION. REMOVE ONLY THAT

PIPING AND EQUIPMENT NECESSARY TO ACCOMMODATE WATER HEATER REPLACEMENT WHILE

MAINTAINING EXISTING DISTRIBUTION SYSTEMS TO REMAIN.

DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT

REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.

REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ELECTRICAL, AND PLUMBING CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE

REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES

INDICATED.

DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF

PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED.

PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN

PROGRESS, AND TIMELY DISCONNECTION OF UTILITY SERVICES.

EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND

REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH

SIMILAR EXISTING WORK. STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER OF RECORD. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND

REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL WORK.

UNLESS SPECIFIED OTHERWISE, ALL PIPING AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE PROPERTY. THIS INCLUDES ALL PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN ROOF, WALLS, FLOORS, IN AN APPROVED MANNER.

ONLY ONE WATER HEATER SHOULD BE REMOVED AT A TIME. AFTER THE FIRST UNIT IS REPLACED WITH A NEW ONE, THE SECOND WATER HEATER MAY THEN BE REMOVED. BOTH WATER HEATERS CANNOT BE DEMOLISHED SIMULTANEOUSLY TO ENSURE CONTINUOUS HOT WATER SERVICE TO THE BUILDING.

VERIFY PHASING APPROACH WITH THE COR PRIOR TO PROCEEDING WITH DEMOLITION WORK.

THIS PROJECT IS PHASED WITHIN EACH BUILDING. POWER, STEAM, AND CONDENSATE RETURN SERVING ONE FUNCTIONING WATER HEATER PER BUILDING SHALL REMAIN ACTIVE THROUGHOUT THE PROJECT DURATION. PERFORM LOCKOUT/TAGOUT (LOTO) OF ENERGY SYSTEMS ONLY AS REQUIRED TO SUPPORT PHASED DEMOLITION AND INSTALLATION. SAVE ALL REMOVED WATER HEATERS AND PUMPS FOR COR-

FMS REVIEW.

PROTECT AND PRESERVE ALL MECHANICAL VALVES, ACTUATORS, AND PUMPS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. VERIFY CONDITION WITH COR PRIOR TO REMOVAL OR WORK IN ADJACENT

AREAS.

LPC

LPS

LPS

LP

S

LP

C LP

C

HWH-B143-02 (E)

HWH-B143-02 (E)

EXISTING EQUIPMENT

PAD TO REMAIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering, P.C.

4500 State Route 434 Apalachin, NY 13732 (607)223-4334

GENERAL NOTES:

KEYED MAP:

KEYED NOTES:

NOT FOR

CONSTRUCTION

2/20/2026

Au to de sk

D oc s:

//V

A-

Ly on s

VA

H ot W at er

H ea te r/L yo ns

H ot

W at er H ea te r_ R

.rv t 2/

/2

2:

:3

PM

MD105

MECHANICAL DEMOLITION -

BUILDING 143

REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

2/20/2026 JWE JWC

561A4-23-101100% CD SUBMISSION

1/4" = 1'-0"1 MECHANICAL REMOVAL PLAN - BUILDING 143

KEYED NOTES

1 REMOVE EXISTING LOW PRESSURE STEAM PIPING BACK TO NEAREST ISOLATION VALVE. REFER TO

DETAIL #1 ON M-701 FOR MORE INFORMATION.

2 REMOVE EXISTING LOW PRESSURE CONDENSATE PIPING BACK TO NEAREST ISOLATION VALVE. REFER

TO DETAIL #1 ON M-701 FOR MORE INFORMATION.

1/2" = 1'-0"2 MECHANICAL REMOVAL PLAN - BUILDING 143 - ENLARGED

PUMP RM

B013

MECHANICAL

B007

BUILDING

SUPPLIES /

EQUIP. STORAGE

B005

ELEVATOR

EQUIP. ROOM

B008

UTILITY TRENCH

CORRIDOR

B011

PC

LPC

LPS

LP

S

LPC

PC

PLAN NORTH

TRUE NORTH

M-101

AREA OF WORK

KEYED PLAN

1" = 50'

PLAN NORTH

TRUE NORTH

A.

B.

C.

D.

E.

F.

G.

GENERAL MECHANICAL NEW WORK NOTES

PLAN VIEWS ARE DIAGRAMMATIC AND INTENDED TO SHOW GENERAL ROOM LAYOUT AND EQUIPMENT

ARRANGEMENT ONLY. EXISTING CONDITIONS AND EXACT CONNECTION LOCATIONS MAY VARY.

CONTRACTOR SHALL FIELD VERIFY ROOM CONFIGURATION, PIPING ARRANGEMENT, AND CONNECTION POINTS PRIOR TO INSTALLATION. SYSTEMS SHALL FOLLOW THE ARRANGEMENT SHOWN AS CLOSELY AS

PRACTICABLE; HOWEVER, ACTUAL FIELD CONDITIONS SHALL GOVERN. PROVIDE NECESSARY

MODIFICATIONS TO SUIT FIELD CONDITIONS AND AVOID CONFLICTS WITH OTHER TRADES. IF A CONFLICT

CANNOT BE RESOLVED WITHOUT COMPROMISING THE DESIGN INTENT, NOTIFY ENGINEER FOR

RESOLUTION. IN AREAS OF CONFLICT, COMPLETE ONLY WORK NOT AFFECTED PRIOR TO RESOLUTION.

ALL MECHANICAL WORK SHALL BE DONE IN ACCORDANCE WITH ALL LOCAL AND STATE REGULATIONS.

ALL MECHANICAL WORK SHALL BE DONE IN ACCORDANCE WITH ALL LOCAL AND STATE REGULATIONS.

CONNECTIONS TO EQUIPMENT SHALL CONFORM TO MANUFACTURER'S SPECIFICATIONS AND

INSTALLATION MANUALS.

ALL HANGER SYSTEMS FOR PIPING AND EQUIPMENT SHALL BE SECURED TO BUILDING STRUCTURAL

SYSTEM.

ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.

DUE TO THE SCALE OF THE DRAWINGS, NOT ALL PIPING, VALVES, OR FITTINGS ARE SHOWN. REFER TO DETAILS AND SCHEMATICS FOR PIPING LAYOUT, ARRANGEMENT, AND CONNECTION REQUIREMENTS.

IWH-B03-01

IWH-B03-02

LP

C

LPC

LPS

LPS

LP

C

LP

C

LPC

PC

LP

S

LP

S

SCP-01

PC

EXISTING

CONCRETE

EQUIPMENT PAD

EXISTING

CONCRETE

EQUIPMENT PAD

EXISTING

CONDENSATE

RETURN PUMPS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering, P.C.

4500 State Route 434 Apalachin, NY 13732 (607)223-4334

GENERAL NOTES:

KEYED MAP:

KEYED NOTES:

NOT FOR

CONSTRUCTION

2/20/2026

Au to de sk

D oc s:

//V

A-

Ly on s

VA

H ot W at er

H ea te r/L yo ns

H ot

W at er H ea te r_ R

.rv t 2/

/2

2:

:3

PM

M-101

MECHANICAL PLAN - BUILDING 03 REPLACE HOT WATER HEATERS

LYONS VAMC NJ

151 KNOLLCROFT RD, LYONS, NJ 07939

2/20/2026 JWE JWC

561A4-23-101100% CD SUBMISSION

1/4" =…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .