This document is a comprehensive design and construction specification for replacing hot water heaters and associated recirculation systems at Lyons VA Medical Center in New Jersey, presented as a 100% Construction Documents (CD) submission.
The project involves replacement of hot water heaters and recirculation pumps across five buildings (Buildings 03, 07, 53, 54, and 143) at the facility. The scope includes demolition of existing equipment, installation of new semi-instantaneous steam water heaters (Patterson-Kelley PK-08D or Bell & Gossett NBF models), new recirculation pump systems, condensate receiver and pump assemblies, thermostatic mixing valves set to 120°F, and associated piping and electrical infrastructure. Key equipment specifications are detailed in schedules showing make/model (Patterson-Kelley PK-08D and Bell & Gossett NBF units at 120/160V, 1-phase, 60Hz), electrical panel assignments, and circuit requirements. The project employs a phased approach to maintain continuous hot water service by retaining one functioning water heater per building throughout construction. Electrical work includes dedicated 15-20 amp GFCI-protected branch circuits with disconnect switches for each heater and pump. Mechanical work encompasses new concrete equipment pads, piping with trapeze hanger supports, and steam/condensate line connections. Plumbing systems require coordination with existing distribution networks, domestic hot/cold water connections, and recirculation loops. General notes emphasize field verification of existing conditions, lockout/tagout procedures during phased demolition, concrete scanning for underground utilities prior to cutting/drilling, and protection of existing equipment during work. The drawings include site plans, mechanical/electrical/plumbing demolition and new work details, equipment schedules, electrical panel schedules showing load calculations, and plumbing schematics with control point specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 561A4-23-101 RFI - Responses-2.pdf | ||
| 36C24226B0052 0002.docx | DOCX document | |
| 561A4-23-101 RFI Responses-.pdf | ||
| SOW _Revised_561A4-23-101 Replace Hot Water Heaters.docx | DOCX document | |
| 36C24226B0052 0001.docx | DOCX document | |
| 36C24226B0052-.docx | DOCX document | |
| 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION DEVIATION 02.pdf | ||
| 100 Lyons Specs.pdf | ||
| 36C24226B0052.docx | DOCX document | |
| wages.pdf | ||
| Buy American Certificate.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
4500 State Route 434 Apalachin, NY 13732 (607)223-4334
Department of Veterans Affairs
LOCATION MAP DRAWING LIST
Approved by Medical Center Director
Approved by Project COR
Approved by Infection Control
Approved by Director of Facility Management Service
Approved by Medical Director
Approved by Safety Officer
Approved by Project CO
APPLICABLE CODES PROJECT CONTACT DIRECTORY
CONTRACTING OFFICER (CO)
CONTRACTING OFFICER REPRESENTATIVE (COR)
WILBERT ORTIX JUSINO
EMAIL: Wilbert.OrtizJusino@va.gov
PHONE: (908) 647-0180 EXT. 214256
MEP
WATSON ENGINEERING, PC
4500 STATE ROUTE 434
APALACHIN, NY 13732
(607) 223-4334 www.watson-engineer.com
SCOTT NUSSBAUM
EMAIL: Scott.Nussbaum@va.gov
PHONE: (518) 269-6063
VA DESIGN MANUALS
NFPA
NEC
JCAHO
OSHA
ASHRAE
INTERNATIONAL BUILDING CODE
2/20/2026
Au to de sk
D oc s:
//V
A-
Ly on s
VA
H ot W at er
H ea te r/L yo ns
H ot
W at er H ea te r_ R
.rv t 2/
/2
2:
:1
PM
T-001
TITLE SHEET
REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
100% CD SUBMISSION
REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
2/20/2026 JWE JWC
561A4-23-101100% CD SUBMISSION
ALL BUILDINGS
SHEET NUMBER SHEET NAME
T-001 TITLE SHEET
G-001 GENERAL NOTES & SYMBOLS
G-002 PROJECT SITE PLAN
G-102 GENERAL NEW WORK - BUILDING 07
G-105 GENERAL NEW WORK - BUILDING 143
G-501 GENERAL DETAILS
MD101 MECHANICAL DEMOLITION - BUILDING 03
MD102 MECHANICAL DEMOLITION - BUILDING 07
MD103 MECHANICAL DEMOLITION - BUILDING 53
MD104 MECHANICAL DEMOLITION - BUILDING 54
MD105 MECHANICAL DEMOLITION - BUILDING 143
M-101 MECHANICAL PLAN - BUILDING 03
M-102 MECHANICAL PLAN - BUILDING 07
M-103 MECHANICAL PLAN - BUILDING 53
M-104 MECHANICAL PLAN - BUILDING 54
M-105 MECHANICAL PLAN - BUILDING 143
M-501 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-701 MECHANICAL SCHEMATICS
ED101 ELECTRICAL DEMOLITION - BUILDING 03
ED102 ELECTRICAL DEMOLITION - BUILDING 07
ED103 ELECTRICAL DEMOLITION - BUILDING 53
SHEET NUMBER SHEET NAME
ED104 ELECTRICAL DEMOLITION - BUILDING 54
ED105 ELECTRICAL DEMOLITION - BUILDING 143
E-101 ELECTRICAL PLAN - BUILDING 03
E-102 ELECTRICAL PLAN - BUILDING 07
E-103 ELECTRICAL PLAN - BUILDING 53
E-104 ELECTRICAL PLAN - BUILDING 54
E-105 ELECTRICAL PLAN - BUILDING 143
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL SCHEDULES
PD101 PLUMBING DEMOLITION - BUILDING 03
PD102 PLUMBING DEMOLITION - BUILDING 07
PD103 PLUMBING DEMOLITION - BUILDING 53
PD104 PLUMBING DEMOLITION - BUILDING 54
PD105 PLUMBING DEMOLITION - BUILDING 143
P-101 PLUMBING PLAN - BUILDING 03
P-102 PLUMBING PLAN - BUILDING 07
P-103 PLUMBING PLAN - BUILDING 53
P-104 PLUMBING PLAN - BUILDING 54
P-105 PLUMBING PLAN - BUILDING 143
P-501 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-701 PLUMBING SCHEMATICS
Revision Number Revisions: Date:
BACKFLOW PREVENTER BFP
ELBOW UP
ELBOW DOWN
TEE UP
TEE DOWN
CONCENTRIC REDUCER
CAP
UNION
WYE STRAINER
FLOW DIRECTION
SHUT OFF VALVE
CHECK VALVE
CONTROL VALVE
THREE-WAY CONTROL VALVE
TEMPERATURE/PRESSURE RELIEF
VALVE
THERMOSTAT T
IN-LINE TEMPERATURE SENSOR
T
DRAIN D
DOMESTIC COLD WATER DCW
DOMESTIC HOT WATER RETURN DHWR
DOMESTIC HOT WATER DHW
HIGH PRESSURE STEAM HPS
LOW PRESSURE STEAM LPS
MEDIUM PRESSURE STEAM MPS
BUTTERFLY VALVE
BALL VALVE
PUMP
DRAWING SYMBOLS & ABBREVIATIONS
LOW PRESSURE CONDENSATE LPC
MEDIUM PRESSURE CONDENSATE MPC
PUMPED CONDENSATE PC
CONNECT TO EXISTING
CONNECT TO EXISTING
EQUIPMENT TAG
KEYED NOTE #
XX-###
SPOT ELEVATION (FT, IN) X'-##"
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
UNLESS SPECIFICALLY NOTED AS EXISTING, ALL ITEMS, EQUIPMENT, AND WORK SHOW IS NEW AND SHALL BE FURNISHED AND INSTALLED BY
THE CONTRACTOR.
DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDINGS WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER INSOFAR AS POSSIBLE. ALL WORK SHALL BE COORDINATED WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE AND IS SUBJECT TO HIS CONTINUOUS APPROVAL.
THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THAT HE INTENDS TO INSTALL. IF THERE ARE ANY DIFFERENCES IN THE EQUIPMENT SHOWN ON THE DESIGN DRAWINGS AND THE EQUIPMENT TO BE INSTALLED, THE CONTRACTOR SHALL MAKE ALL CHANGES AND ADJUSTMENTS TO ACCOMMODATE THE PROPOSED EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. THIS APPLIES TO ALL SUPPORT SERVICES AND FACILITIES NECESSARY TO PROPERLY INSTALL THE EQUIPMENT TO FUNCTION ADEQUATELY AS PART OF THE SYSTEMS FOR WHICH THEY WERE DESIGNED AND SELECTED. THESE CHARACTERISTICS INCLUDE SUCH THINGS AS WEIGHT, DIMENSIONS, ELECTRICAL, MECHANICAL, PLUMBING, AND UTILITY SERVICES, ETC. ACCOMMODATING SERVICES INCLUDE SUCH THINGS AS DIMENSIONS, LOCATIONS, AND SIZES OF SUPPORTING MEMBERS, PIPE, CONNECTION SIZES, ELECTRICAL SERVICE SIZE AND PROTECTION, ELECTRICAL CONNECTION LOCATION, UTILITY AND PLUMBING CONNECTION SIZES AND LOCATIONS, ETC. ALL REQUIRED CHANGES TO THE CONTRACT DRAWINGS AND SPECIFICATIONS SHALL BE DESIGNED AND STAMPED BY REGISTERED ENGINEERS IN THE APPROPRIATE DISCIPLINE EMPLOYED BY THE CONTRACTOR AND SHALL BE INCLUDED AS PART OF THE EQUIPMENT SUBMITTALS. ALL CHANGES SHALL BE SUBJECT TO
THE APPROVAL OF THE PROJECT A/E AND THE CONTRACTING OFFICER ’S REPRESENTATIVE.
REQUEST APPROVAL FROM THE CONTRACTING OFFICER ’S REPRESENTATIVE SEVEN DAYS IN ADVANCE FOR THE SHUTDOWN OF ANY EXISTING
SYSTEM.
FINAL ADVANCE NOTICE OF 48 HOURS SHALL BE GIVEN TO THE CONTRACTING OFFICER ’S REPRESENTATIVE PRIOR TO THE PROPOSED
SHUTDOWN OF ANY SYSTEM.
THE CLOSING AND OPENING OF VALVES SHALL BE WITNESSED BY THE CONTRACTING OFFICER ’S REPRESENTATIVE; NOTIFY LOCAL
AUTHORITIES AS REQUIRED.
PROVIDE ADEQUATE FIRE PROTECTION IN THE ENTIRE CONSTRUCTION AREA FOR THE DURATION OF THE CONSTRUCTION PERIOD. REFER TO
SPECIFICATION DIVISION 1, “GENERAL REQUIREMENTS”, “FIRE SAFETY REQUIREMENTS”.
THE ENTIRE EXISTING FIRE PROTECTION SYSTEM SHALL BE RESTORED TO FULL OPERATION AT THE END OF EACH WORKING DAY. ALL EXISTING FIRE ALARMS AND FIRE EXITS AND ANY OTHER ASPECT OF THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN IN FULL OPERATION. THE COST OF RESPONSE TO ANY FALSE ALARM AS CHARGED BY ANY LOCAL FIRE DEPARTMENT SHALL BE PAID BY THE CONTRACTOR.
THE GENERAL NOTES ON THIS SHEET APPLY TO ALL THE DRAWING DISCIPLINES.
THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE, ALTHOUGH NO ATTEMPT WAS MADE TO SHOW EVERY OFFSET, FITTING, BEAM, PIPE SUPPORT, ETC. CHANGES REQUIRED TO FIT EQUIPMENT, PIPING, AND DUCTWORK SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
OWNER. ANY MAJOR DISCREPANCIES SHALL BE CLARIFIED PRIOR TO SUBMITTAL OF BID.
THE WORK INCLUDES ALL ITEMS OF THE SPECIFICATIONS.
VISIT THE SITE AND BE FULLY COGNIZANT OF ALL CONDITIONS PRIOR TO SUBMITTING BID. REPORT ANY DISCREPANCIES TO THE ENGINEER
PRIOR TO SUBMITTAL OF BID.
DO NOT BEGIN FABRICATION, CUT ANY MEMBERS, OR BEGIN INSTALLATION UNTIL THE SUBMITTALS AND SHOP DRAWINGS HAVE BEEN APPROVED. ANY WORK CONSTRUCTED OR INSTALLED PRIOR TO THE APPROVAL OF SUBMITTALS AND SHOP DRAWINGS SHALL BE AT THE CONTRACTOR’S RISK AND SHALL BE REMOVED AND REINSTALLED OR RECONSTRUCTED AT THE CONTRACTOR ’S EXPENSE AT THE REQUEST OF THE CONTRACTING OFFICER’S REPRESENTATIVE TO THE COMPLETE SATISFACTION OF THE CONTRACTING OFFICER ’S REPRESENTATIVE.
FOR ALL FLOOR, WALL, AND ROOF PENETRATION, VERIFY THE LOCATION OF THE (E) STRUCTURAL MEMBERS PRIOR TO DRILLING AND CUTTING, RELOCATE OPENINGS AS REQUIRED AND OFFSET DUCTS, PIPES, CONDUIT, ETC. AS APPROPRIATE. REVIEW THE STRUCTURAL DRAWINGS IN THE
ENGINEERING OFFICE.
WHERE THERE IS A CONFLICT ON THE PLANS, SPECIFICATIONS, NOTES, GENERAL NOTES, REFERENCES, PUBLICATIONS, CODES, ETC. WITH RESPECT TO MATERIALS, PRODUCTS, METHODS, WORKMANSHIP, PROCEDURE, EXECUTION, ETC. THE MOST STRINGENT OR BENEFICIAL TO THE OWNER AS DETERMINED BY THE CONTRACTING OFFICER ’S REPRESENTATIVE SHALL BE UTILIZED OR INSTALLED. NO RELIEF OR EXTRA PAYMENT SHALL BE MADE TO THE CONTRACTOR BECAUSE OF THE INTERPRETATION OF THE CONTRACTING OFFICER ’S REPRESENTATIVE.
ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF THE APPLICABLE CODES AND STANDARDS WHETHER STATUTORY OR NOT. ALL WORK SHALL BE INSTALLED TO COMPLY WITH THE UNIFORM BUILDING MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE CODES, NATIONAL ELECTRICAL CODE, UNDERWRITER ’S LABORATORY, INC., AMERICAN NATIONAL STANDARD INSTITUTE, INC., NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION, BASIC ELECTRICAL REGULATIONS, AND CODES AND STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). IF ANY PART OF THE INSTALLATION DOES NOT MEET CODE, NOTIFY THE CONTRACTING OFFICER’S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION. IF ANY PART OF THE PROJECT CANNOT BE INSTALLED TO CONFORM WITH THE PLANS AND/OR SPECIFICATIONS, NOTIFY THE CONTRACTING OFFICER ’S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION.
ALL EXISTING PIPING, CONDUIT, AND MECHANICAL, PLUMBING, AND ELECTRICAL EQUIPMENT NOT TO BE REUSED OR REMAIN IN SERVICE SHALL BE REMOVED FROM THE FACILITY. THE CONTRACTING OFFICER’S REPRESENTATIVE HAS THE OPTION TO RECLAIM ANY DEMOLISHED MATERIALS OR EQUIPMENT FOR THE GOVERNMENT, IN WHICH CASE IT SHALL BE DELIVERED TO THE LOCATION DESIGNATED BY THE CONTRACTING
OFFICER’S REPRESENTATIVE.
FOR EACH PHASE AND BEFORE INTERRUPTING EACH (E) UTILITY, DETERMINE, IN ADVANCE, IF ANY DOWNSTREAM SERVICE BEYOND THE CONSTRUCTION AREA OF THE PHASE, WILL BE INTERRUPTED AND PROVIDE A TEMPORARY SERVICE BYPASSING THE CONSTRUCTION AREA.
DETERMINE ALL SUCH TEMPORARY SERVICES PRIOR TO SUBMITTING BID. THERE WILL BE NO FUTURE CONSIDERATION TO THE CONTRACTOR FOR ANY TEMPORARY SERVICES REQUIRED. PREPARE A DETAILED SHOP DRAWING SHOWING ALL OF THE EXISTING UTILITIES IN THEIR
RELOCATED LOCATION AND ALL THE NEW HVAC SYSTEMS.
THE CONTRACTOR IS HEREBY NOTIFIED THAT SOME WORK MAY BE REQUIRED OUTSIDE OF THE AREAS SHOWN ON THESE DRAWINGS. THIS COULD INCLUDE CONTROL MODIFICATIONS OR CONNECTIONS AT REMOTE LOCATIONS, CONTROL PANELS, CPU ’S, ETC.
BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, TRANSITIONS, FITTINGS, AND ACCESSORIES THAT MAY BE REQUIRED. COORDINATE ALL THE WORK OF ALL THE TRADES TO INSURE ALL DUCTS, PIPES, CONDUITS, ETC. DO NOT CONFLICT
AND CLEAR STRUCTURAL AND ARCHITECTURAL MEMBERS.
THE CONTRACTOR SHALL PAY FOR ALL DAMAGE, INCLUDING WATER DAMAGE, TO PROPERTY AND EQUIPMENT CAUSED BY HIS WORK
THROUGHOUT THE CONSTRUCTION AND WARRANTEE PERIOD.
ALL VALVES AND CONTROL DEVICES. SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION.
ALL UL LISTED EQUIPMENT SHALL BE INSTALLED AS PER LISTING OR LABELING. MAXIMUM FUSE SIZES MEANS FUSE PROTECTION REQUIRED.
PATCH AND PAINT TO MATCH EXISTING, ALL SURFACES DAMAGED BY THE DEMOLITION AND ALL OPENINGS NOT TO BE REUSED.
REPAIR DAMAGE TO CEILING, WALLS, ETC. TO THE SATISFACTION OF THE CONTRACTING OFFICER ’S REPRESENTATIVE.
WHEN A DETAIL OR NOTE IS IDENTIFIED AS TYPICAL, THE CONTRACTOR IS TO APPLY THE DETAIL OR NOTE TO EVERY SIMILAR CONDITION, WHETHER OR NOT THE REFERENCED DETAIL OR NOTE IS REPEATED OR REFERENCED.
WHERE NO CONSTRUCTION DETAIL IS INDICATED, SUCH WORK SHALL BE SIMILAR TO COMPARABLE WORK DETAILED OR NOTED ELSEWHERE OR TO MATCH EXISTING CONDITIONS, SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER ’S REPRESENTATIVE.
ALL HOLES, VOIDS, AND DAMAGED OR UNEVEN SURFACES WHICH ARE CAUSED BY THE CONTRACTOR ’S WORK AND WHICH REMAIN EXPOSED IN THE WALL, FLOOR, CEILING, OR OTHER SURFACES SHALL BE PATCHED, REPAIRED, AND BROUGHT FLUSH WITH THE ADJACENT CONSTRUCTION.
SUCH SURFACES, NOT CONCEALED BY THE NEW CONSTRUCTION, SHALL MATCH IN EVERY RESPECT THE EXISTING NON-DAMAGED CONSTRUCTION. REMOVE EXISTING UTILITIES BACK BEHIND EXISTING SURFACES AND CAP SO AS NOT TO INTERFERE WITH NEW PATCHES.
THE DEMOLITION SHALL INCLUDE ALL ASSOCIATED ANCHORAGES, HANGERS, SUPPORTS, BRACES, FASTENERS, MASTIC, MORTAR, LATH, AND RELATED ITEMS. THE EXISTING SUBSTRATE, INCLUDING CONCRETE, MASONRY, METAL FRAMING AND FURRING SHALL BE REPAIRED WHERE
DAMAGE BY THE CONTRACTOR’S WORK.
PROVIDE ALL VALVES, INSTRUMENTS, FITTINGS, ETC. AS SHOWN ON THE PIPING DIAGRAMS, SCHEMATICS, ETC. IT IS NOT POSSIBLE TO SHOW ALL VALVES, INSTRUMENTS, ETC. ON THE PLANS, HOWEVER, SELECTED VALVES HAVE BEEN SHOWN FOR REFERENCE. ALL VALVES SHALL BE
ACCESSIBLE FROM THE FLOOR OR FROM FIXED PLATFORMS.
THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM COMPLETE AND FULLY OPERABLE. THE CONNECTION TO THE EXISTING CONTROL SYSTEM SHALL BE COMPLETE SUCH THAT ALL NEW MONITORING AND CONTROL POINTS ARE RECOGNIZED BY THE EXISTING CONTROL SYSTEM AND THAT ALL NEW POINTS CAN BE READ, ACTUATED, AND RESET FROM THE EXISTING FRONT END, AND VICE-VERSA. THE ENGINEER SHALL BE NOTIFIED WHEN EACH PHASE OF THE SYSTEM HAS BEEN COMPLETELY CHECKED OUT, ADJUSTED, CALIBRATED, AND PUT INTO FINAL WORKING CONDITION WITH ALL THE TROUBLESHOOTING COMPLETED. A SUBSEQUENT JOBSITE MEETING WILL BE SCHEDULED WITH TWO WEEKS NOTICE AT WHICH TIME THE CONTROLS CONTRACTOR WILL DEMONSTRATE THE OPERATION OF THE CONTROL SYSTEMS TO ALL CONCERNED. IF ANY ITEMS OF THE CONTROL SEQUENCE CANNOT BE SUCCESSFULLY DEMONSTRATED OR REQUIRE FURTHER TROUBLESHOOTING, A SUBSEQUENT CONTROLS INSPECTION WILL BE REQUIRED AND WILL BE AT THE CONTRACTOR ’S EXPENSE. THIS PROVISION SHALL BE A CONDITION OF FINAL ACCEPTANCE. THE CONTRACTOR SHALL BE PREPARED TO DEMONSTRATE ALL ITEMS IN THE SEQUENCE OF OPERATION. SUBSEQUENT CONTROLS DEMONSTRATIONS AND VERIFICATIONS WILL BE REQUIRED AT THE
COMPLETION OF THE PROJECT.
GENERAL NOTES
1.
2.
3.
4.
5.
DURING THE EXECUTION OF THIS CONTRACT, THE PROJECT AREA WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER, STAFF, OR OTHER BUILDING OCCUPANTS. ALL WORK SHALL BE COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND IS SUBJECT TO HIS CONTINUOUS APPROVAL.
"NORMAL" WORKING HOURS ON THE POST ARE FROM 7:00 AM TO 5:00 PM, MONDAY THROUGH FRIDAY; HOURS OUTSIDE OF "NORMAL" WORKING HOURS ARE DEFINED AS "OFF HOURS". THE CONTRACTOR SHALL DEVELOP A SCHEDULE OF DEMOLITION, NEW INSTALLATION, AND CHANGEOVER OF THE MECHANICAL, PLUMBING, AND UTILITY SYSTEMKS THAT WILL ALLOW FOR MINIMUM DOWNTIME.
THE CONTRACTOR SHALL DEVELOP AND PRESENT A CONSTRUCTION PLAN AND WORK SCHEDULE WITH ALL PHASING, STAGING, AND SEQUENCING OF WORK FOR APPROVAL PRIOR TO THE COMMENCEMENT AND BEGINNING IMPLEMENTATION OF HIS WORK. THE CONTRACTOR SHALL DETERMINE PRIOR TO SUBMITTING HIS WORK SCHEDULE, THE SPECIFIC TIME AVAILABILITY OF ALL AREAS AND SPACES AND DETERMINE
WHAT WORK MUST BE DONE DURING "OFF HOURS".
ALL WORK IN OCCUPIED SPACES SHALL BE DONE DURING "OFF HOURS". ALL WORK AS REQUIRED TO RETURN EXISTING SYSTEMS TO FUNCTIONALITY, REPLACE CEILING TILES, AND CONSTRUCTION CLEANUP SHALL BE FULLY COMPLETE AND APPROVED BY THE COR PRIOR TO THE END-OF-SHIFT AND BEFORE THE OPENING OF THE AREA TO STAFF AND OTHER BUILDING OCCUPANTS.
WITH THE EXCEPTION OF SIGNIFICANT NOISE GENERATING ACTIVITIES SUCH AS CORE DRILLING, ETC., WORK OUTSIDE OF THE OCCUPIED
SPACES, SUCH AS ON THE ROOF, ETC., MAY BE PERFORMED DURING NORMAL WORKING HOURS.
PHASING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
4500 State Route 434 Apalachin, NY 13732 (607)223-4334
2/20/2026
Au to de sk
D oc s:
//V
A-
Ly on s
VA
H ot W at er
H ea te r/L yo ns
H ot
W at er H ea te r_ R
.rv t 2/
/2
2:
:1
PM
G-001
GENERAL NOTES & SYMBOLS REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
2/20/2026 JWE JWC
561A4-23-101100% CD SUBMISSION
ALL BUILDINGS
1.
2.
3.
THE FOLLOWING DESIGN BID DEDUCTS ARE PROVIDED FOR COST EVALUATION PURPOSES:
OMIT REPLACEMENT OF EXISTING NEWER HOT WATER HEATER IN BUILDING 07 (HW-B07-02); LEAVE IN SERVICE.
REUSE THE EXISTING DOMESTIC HOT WATER RECIRCULATION PUMPS IN LIEU OF PROVIDING NEW EQUIPMENT.
EXCLUDE BMS PROVISIONS IN THE PROPOSED WATER HEATERS.
BID DEDUCTS
THE INTENT OF THIS PROJECT IS TO REPLACE A TOTAL OF TEN (10) STEAM TO HOT WATER HEATERS ALONG WITH THEIR ASSOCIATED RECIRCULATION PUMPS ACROSS FIVE (5) BUILDINGS AT THE VA HEALTHCARE CAMPUS IN LYONS, NJ. THE BUILDINGS INCLUDED IN THE PROJECT SCOPE ARE 3, 7, 53, 54, 143 EACH OF WHICH CONTAINS TWO (2) HOT WATER HEATERS. THE EXISTING CONDITIONS OF THE EQUIPMENT, MECHANICAL ROOMS AND PIPING LAYOUTS WERE EVAULATED DURING TWO SITE VISITS. FINDINGS FROM THESE INVESTIGATIONS, ALONG WITH A RECOMMENDED DESIGN APPROACH
FOR EACH BUILDING, ARE SUMMARIZED IN TABLE 1 BELOW.
EXECUTIVE SUMMARY
PROJECT DESIGN APPROACH SCHEDULE
LOCATION TAG EQUIPMENT TYPE
EXISTING EQUIPMENT PROPOSED EQUIPMENT ELECTRICAL
MAKE MODEL MAKE MODEL
POWER
(V/PH/HZ) PANEL
BUILDING 3 HWH-B03-01 HOT WATER HEATER RECO SHL TB 150 PATTERSON-KELLEY PK-08D 120/160 EPB BUILDING 3 HWH-B03-02 HOT WATER HEATER RECO SHL TB 150 PATTERSON-KELLEY PK-08D 120/160 EPB BUILDING 3 P-B03-01 RECIRC PUMP GRUNDFOS UH-26-99-BF BELL & GOSSETT NBF-36 120/160 EPB BUILDING 3 P-B03-02 RECIRC PUMP GRUNDFOS UH-26-99-BF BELL & GOSSETT NBF-36 120/160 EPB BUILDING 7 HWH-B03-03 HOT WATER HEATER QUICKDRAW 4 N 5AIS PATTERSON-KELLEY PK-08D 120/160 PP7BA BUILDING 7 HWH-B03-04 HOT WATER HEATER QUICKDRAW 60 L 5AIS PATTERSON-KELLEY PK-08D 120/160 PP7BA BUILDING 7 P-B07-01 RECIRC PUMP BELL & GOSSETT SERIES 100 BNFI FD BELL & GOSSETT NBF-25 120/160 PP7BA BUILDING 53 HWH-B53-01 HOT WATER HEATER PATTERSON KELLEY 201150-1 PATTERSON-KELLEY PK-08D 120/160 PP53BA BUILDING 53 HWH-B53-02 HOT WATER HEATER PATTERSON KELLEY 201150-1 PATTERSON-KELLEY PK-08D 120/160 PP53BA BUILDING 53 P-B53-01 HOT WATER HEATER TACO 0013-SF3 BELL & GOSSETT NBF-36 120/160 PP53BA BUILDING 54 HWH-B54-01 HOT WATER HEATER PATTERSON KELLEY C068010 PATTERSON-KELLEY PK-08D 120/160 NMB1 BUILDING 54 HWH-B54-02 HOT WATER HEATER PATTERSON KELLEY C068010 PATTERSON-KELLEY PK-08D 120/160 NMB1 BUILDING 54 P-B54-01 RECIRC PUMP BELL & GOSSETT SERIES 100 BELL & GOSSETT NBF-36 120/160 NMB1 BUILDING 54 P-B54-02 RECIRC PUMP BELL & GOSSETT NBF-36 BELL & GOSSETT NBF-36 120/160 NMB1 BUILDING 143 HWH-B143-01 HOT WATER HEATER PVXK 12.114.08.75 N PATTERSON-KELLEY PK-08D 120/160 AP-E4-LI NW BUILDING 143 HWH-B143-02 HOT WATER HEATER PVXK 12.114.0.75 N PATTERSON-KELLEY PK-08D 120/160 AP-E4-LI NW BUILDING 143 P-B143-01 RECIRC PUMP TACO 2400-50S-3P BELL & GOSSETT PL-55 120/160 AP-E4-LI NW BUILDING 143 P-B143-02 RECIRC PUMP BELL & GOSSETT SERIES 100 BELL & GOSSETT NBF-25 120/160 AP-E4-LI NW BUILDING 143 P-B153-03 RECIRC PUMP BELL & GOSSETT SERIES 100 BELL & GOSSETT NBF-25 120/160 AP-E4-LI NW
LOT 7
LOT 1 & 2
PARKING
BLDG 6
LOT 4
BLDG 143
WEST CIRCLE
DRIVE TENNIS
COURTS
LOT 9
LO
T 8
BLDG 53
EAST CIRCLE DRIVE
LOT 6
BLDG 3
BLDG 7
BLDG 57
BLDG 55
BLDG 2
BLDG 14
BLDG 6
BLDG 4
BLDG 8
BLDG 1
BLDG 14
BLDG 9
BLDG 7
BLDG 138
BLDG 2
BLDG 138
BLDG 12
BLDG 15
BLDG 11
BLDG 13
BLDG 135BLDG 54
BLDG T93
BLDG 16
BLDG 135
BLDG 18
BLDG 135
BLDG 133
BLDG 136
BLDG 25
BLDG 50
BLDG 26
BLDG
BLDG 118
BLDG 19
BLDG 18
BLDG 69
LOT 3
BLDG 47
BLDG 118
BLDG 5
LOT 4
BLDG 55
LOT 1 & 2
PARKING
LOT 7
LOT 9
LOT 6
LO
T 8
BLDG 143
EAST CIRCLE DRIVE
TENNIS
COURTS
WEST CIRCLE
DRIVE
BLDG 53
BLDG 4
BLDG 1
BLDG 57
BLDG 3
BLDG 9
BLDG 8
BLDG 15
BLDG 13
BLDG 16
BLDG 135
BLDG 26
BLDG 136
BLDG T93
BLDG 133
BLDG 25
BLDG 50
BLDG 69
BLDG 19
LOT 3
BLDG
BLDG 47
BLDG 5
BLDG 10
AREA OF WORK
KN
O
LL
C
R O
FT
R
O
AD
ORCHARD DRIVE
TRUE NORTH
PLAN NORTH
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
4500 State Route 434 Apalachin, NY 13732 (607)223-4334
2/20/2026
Au to de sk
D oc s:
//V
A-
Ly on s
VA
H ot W at er
H ea te r/L yo ns
H ot
W at er H ea te r_ R
.rv t 2/
/2
2:
:1
PM
G-002
PROJECT SITE PLAN REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
2/20/2026 JWE JWC
561A4-23-101100% CD SUBMISSION
ALL BUILDINGS
1" = 100'-0"
LYONS VA SITE PLAN
AREA OF WORK
KEYED PLAN
1" = 30'
PLAN NORTH
TRUE NORTH
A.
GENERAL NEW WORK NOTES
PROVIDE NEW CONCRETE EQUIPMENT PADS AS INDICATED ON THE DRAWINGS. CONSTRUCT PADS TO SUPPORT DESIGN LOADS AND EQUIPMENT WEIGHT, WITH LEVEL AND PLUMB SURFACES. FINISH TOP SURFACE SMOOTH AND FREE OF DEFECTS. VERIFY DIMENSIONS AND LOCATIONS PRIOR TO PLACEMENT.
COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH EXISTING UTILITIES, PIPING, OR
CONDUITS. CURE CONCRETE IN ACCORDANCE WITH MANUFACTURER ’S RECOMMENDATIONS AND
PROJECT SPECIFICATIONS.
PLAN NORTH
TRUE NORTH
MECHANICAL
ROOM
N-109
G-102
0' - 0"
MECHANICAL
ROOM
N-109
0' - 6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
4500 State Route 434 Apalachin, NY 13732 (607)223-4334
GENERAL NOTES:
KEYED MAP:
KEYED NOTES:
NOT FOR
CONSTRUCTION
2/20/2026
Au to de sk
D oc s:
//V
A-
Ly on s
VA
H ot W at er
H ea te r/L yo ns
H ot
W at er H ea te r_ R
.rv t 2/
/2
2:
:1
PM
G-102
GENERAL NEW WORK - BUILDING
REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
2/20/2026 JWE JWC
561A4-23-101100% CD SUBMISSION
ALL BUILDINGS
KEYED NOTES
1 PROVIDE NEW CONCRETE HOUSEKEEPING PAD FOR INDIRECT WATER HEATER. COORDINATE SIZE, THICKNESS, AND ELEVATION WITH EQUIPMENT REQUIREMENTS. REFER TO DETAIL #1 ON G-501 FOR
MORE INFORMATION.
2 EXISTING CONCRETE HOUSEKEEPING PAD TO REMAIN.
1/4" = 1'-0"1 GENERAL NEW WORK PLAN - BUILDING 07
1/2" = 1'-0"2 GENERAL - NEW WORK PLAN - BUILDING 07 - -ENLARGED
MECHANICAL
ROOM
N-105
STAIR 3
PATIENT
STORAGE
1B-121
CORRIDOR
C1-5
STORAGE
1C-102
ENGINEERING
STORAGE
1C-103
CORRIDOR
C1-5B
TEMPORARY
MEDICAL WASTE
HOLDING
1C-102A
PLAN NORTH
TRUE NORTH
PLAN NORTH
TRUE NORTH
PLAN NORTH
TRUE NORTH
PLAN NORTH
TRUE NORTH
G-105
AREA OF WORK
KEYED PLAN
1" = 50'
PLAN NORTH
TRUE NORTH
A.
GENERAL NEW WORK NOTES
PROVIDE NEW CONCRETE EQUIPMENT PADS AS INDICATED ON THE DRAWINGS. CONSTRUCT PADS TO SUPPORT DESIGN LOADS AND EQUIPMENT WEIGHT, WITH LEVEL AND PLUMB SURFACES. FINISH TOP SURFACE SMOOTH AND FREE OF DEFECTS. VERIFY DIMENSIONS AND LOCATIONS PRIOR TO PLACEMENT.
COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH EXISTING UTILITIES, PIPING, OR
CONDUITS. CURE CONCRETE IN ACCORDANCE WITH MANUFACTURER ’S RECOMMENDATIONS AND
PROJECT SPECIFICATIONS.
0' - 0"
1' - 2 5/16"
1' - 6 5/16"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
4500 State Route 434 Apalachin, NY 13732 (607)223-4334
GENERAL NOTES:
KEYED MAP:
KEYED NOTES:
NOT FOR
CONSTRUCTION
2/20/2026
Au to de sk
D oc s:
//V
A-
Ly on s
VA
H ot W at er
H ea te r/L yo ns
H ot
W at er H ea te r_ R
.rv t 2/
/2
2:
:1
PM
G-105
GENERAL NEW WORK - BUILDING
REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
2/20/2026 JWE JWC
561A4-23-101100% CD SUBMISSION
ALL BUILDINGS
1/4" = 1'-0"1 GENERAL NEW WORK PLAN - BUILDING 143
KEYED NOTES
1 PROVIDE NEW 4" CONCRETE TOPPING ON EXISTING HOUSEKEEPING PAD. CLEAN AND PREP EXISTING SURFACE PRIOR TO POUR. MATCH EXISTING PAD FOOTPRINT AND FINISH. REFER TO DETAIL #1 ON
G-501 FOR MORE INFORMATION.
2 EXISTING CONCRETE HOUSEKEEPING PAD TO REMAIN.
1/2" = 1'-0"2 GENERAL - NEW WORK PLAN - BUILDING 143 - -ENLARGED
SECTION A-A (BASE NOT POURED WITH SLAB)
SECTION A-A (EXISTING SLAB EXTENSION)
PLAN SECTION B-B
EQUIPMENT BASE PLATE
PROVIDE #3 BARS 12" O.C.
EACH WAY IN THE BASE & DOWEL
BASE TO FLOOR
EQUIPMENT BASE PLATE
WELD HEAD TO PLATE
OR BEND OVER END 5D
FLOOR
PIPE SLEEVE (5D, 3" MIN.)
ANCHOR BOLT (TYP)
CONCRETE BASE
NOTES:
1.
2.
L & W DIMENSIONS SHALL BE 6"
GREATER THAN THE EQUIPMENT
BASE PLATE ON ALL SIDES.
REFER TO SPECIFICATION SECTION
03 30 53 FOR MORE INFORMATION
A
A
B B
TYPICAL ANCHOR BOLT
NUT & WASHER
L
W
D
1"
5D
2D
TYPICAL ANCHOR BOLT
NUT & WASHER
PROVIDE #3 BARS 12" O.C.
EACH WAY IN THE BASE & DOWEL
BASE TO FLOOR
6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
4500 State Route 434 Apalachin, NY 13732 (607)223-4334
2/20/2026
Au to de sk
D oc s:
//V
A-
Ly on s
VA
H ot W at er
H ea te r/L yo ns
H ot
W at er H ea te r_ R
.rv t 2/
/2
2:
:2
PM
G-501
GENERAL DETAILS REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
2/20/2026 JWE JWC
561A4-23-101100% CD SUBMISSION
ALL BUILDINGS
12" = 1'-0"1 CONCRETE EQUIPMENT BASES
PUMP RM
B013
MECHANICAL
B007
BUILDING
SUPPLIES /
EQUIP. STORAGE
B005
ELEVATOR
EQUIP. ROOM
B008
UTILITY TRENCH
CORRIDOR
B011
PC
LPC
LPS
LPS
LP
S
LPC
LPC
PLAN NORTH
TRUE NORTH
MD101
AREA OF WORK
KEYED PLAN
1" = 50'
PLAN NORTH
TRUE NORTH
A.
B.
C.
D.
E.
F.
G.
H.
I.
GENERAL MECHANICAL DEMOLITON NOTES
PLAN VIEWS ARE INTENDED TO SHOW GENERAL ROOM LAYOUT ONLY. EXISTING ROOM CONFIGURATIONS AND PIPING ARRANGEMENTS SHOWN ARE BASED ON AVAILABLE INFORMATION AND MAY VARY IN FIELD.
CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO DEMOLITION. REMOVE ONLY THAT
PIPING AND EQUIPMENT NECESSARY TO ACCOMMODATE WATER HEATER REPLACEMENT WHILE
MAINTAINING EXISTING DISTRIBUTION SYSTEMS TO REMAIN.
DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT
REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.
REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ELECTRICAL, AND PLUMBING CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE
REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES
INDICATED.
DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF
PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED.
PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN
PROGRESS, AND TIMELY DISCONNECTION OF UTILITY SERVICES.
EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND
REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH
SIMILAR EXISTING WORK. STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER OF RECORD. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND
REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL WORK.
UNLESS SPECIFIED OTHERWISE, ALL PIPING AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE PROPERTY. THIS INCLUDES ALL PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN ROOF, WALLS, FLOORS, IN AN APPROVED MANNER.
ONLY ONE WATER HEATER SHOULD BE REMOVED AT A TIME. AFTER THE FIRST UNIT IS REPLACED WITH A NEW ONE, THE SECOND WATER HEATER MAY THEN BE REMOVED. BOTH WATER HEATERS CANNOT BE DEMOLISHED SIMULTANEOUSLY TO ENSURE CONTINUOUS HOT WATER SERVICE TO THE BUILDING.
VERIFY PHASING APPROACH WITH THE COR PRIOR TO PROCEEDING WITH DEMOLITION WORK.
THIS PROJECT IS PHASED WITHIN EACH BUILDING. POWER, STEAM, AND CONDENSATE RETURN SERVING ONE FUNCTIONING WATER HEATER PER BUILDING SHALL REMAIN ACTIVE THROUGHOUT THE PROJECT DURATION. PERFORM LOCKOUT/TAGOUT (LOTO) OF ENERGY SYSTEMS ONLY AS REQUIRED TO SUPPORT PHASED DEMOLITION AND INSTALLATION. SAVE ALL REMOVED WATER HEATERS AND PUMPS FOR COR-
FMS REVIEW.
PROTECT AND PRESERVE ALL MECHANICAL VALVES, ACTUATORS, AND PUMPS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. VERIFY CONDITION WITH COR PRIOR TO REMOVAL OR WORK IN ADJACENT
AREAS.
PC
LPS
LPC
LP
C
LP
S
LPC
LPS
HWH-B03-01 (E) HWH-B03-01 (E)
LPC
LP
C
EXISTING
CONCRETE
EQUIPMENT PAD
EXISTING
CONCRETE
EQUIPMENT PAD
EXISTING
CONDENSATE
RETURN PUMPS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
4500 State Route 434 Apalachin, NY 13732 (607)223-4334
GENERAL NOTES:
KEYED MAP:
KEYED NOTES:
NOT FOR
CONSTRUCTION
2/20/2026
Au to de sk
D oc s:
//V
A-
Ly on s
VA
H ot W at er
H ea te r/L yo ns
H ot
W at er H ea te r_ R
.rv t 2/
/2
2:
:2
PM
MD101
MECHANICAL DEMOLITION -
BUILDING 03
REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
2/20/2026 JWE JWC
561A4-23-101100% CD SUBMISSION
1/4" = 1'-0"1 MECHANICAL REMOVAL PLAN - BUILDING 03
KEYED NOTES
1 REMOVE EXISTING LOW PRESSURE STEAM PIPING BACK TO NEAREST ISOLATION VALVE. REFER TO
DETAIL #1 ON M-701 FOR MORE INFORMATION.
2 REMOVE EXISTING LOW PRESSURE CONDENSATE PIPING BACK TO NEAREST ISOLATION VALVE. REFER
TO DETAIL #1 ON M-701 FOR MORE INFORMATION.
1/2" = 1'-0"2 MECHANICAL REMOVAL PLAN - BUILDING 03 - ENLARGED
A.
B.
C.
D.
E.
F.
G.
H.
I.
GENERAL MECHANICAL DEMOLITON NOTES
PLAN VIEWS ARE INTENDED TO SHOW GENERAL ROOM LAYOUT ONLY. EXISTING ROOM CONFIGURATIONS AND PIPING ARRANGEMENTS SHOWN ARE BASED ON AVAILABLE INFORMATION AND MAY VARY IN FIELD.
CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO DEMOLITION. REMOVE ONLY THAT
PIPING AND EQUIPMENT NECESSARY TO ACCOMMODATE WATER HEATER REPLACEMENT WHILE
MAINTAINING EXISTING DISTRIBUTION SYSTEMS TO REMAIN.
DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT
REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.
REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ELECTRICAL, AND PLUMBING CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE
REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES
INDICATED.
DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF
PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED.
PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN
PROGRESS, AND TIMELY DISCONNECTION OF UTILITY SERVICES.
EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND
REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH
SIMILAR EXISTING WORK. STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER OF RECORD. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND
REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL WORK.
UNLESS SPECIFIED OTHERWISE, ALL PIPING AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE PROPERTY. THIS INCLUDES ALL PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN ROOF, WALLS, FLOORS, IN AN APPROVED MANNER.
ONLY ONE WATER HEATER SHOULD BE REMOVED AT A TIME. AFTER THE FIRST UNIT IS REPLACED WITH A NEW ONE, THE SECOND WATER HEATER MAY THEN BE REMOVED. BOTH WATER HEATERS CANNOT BE DEMOLISHED SIMULTANEOUSLY TO ENSURE CONTINUOUS HOT WATER SERVICE TO THE BUILDING.
VERIFY PHASING APPROACH WITH THE COR PRIOR TO PROCEEDING WITH DEMOLITION WORK.
THIS PROJECT IS PHASED WITHIN EACH BUILDING. POWER, STEAM, AND CONDENSATE RETURN SERVING ONE FUNCTIONING WATER HEATER PER BUILDING SHALL REMAIN ACTIVE THROUGHOUT THE PROJECT DURATION. PERFORM LOCKOUT/TAGOUT (LOTO) OF ENERGY SYSTEMS ONLY AS REQUIRED TO SUPPORT PHASED DEMOLITION AND INSTALLATION. SAVE ALL REMOVED WATER HEATERS AND PUMPS FOR COR-
FMS REVIEW.
PROTECT AND PRESERVE ALL MECHANICAL VALVES, ACTUATORS, AND PUMPS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. VERIFY CONDITION WITH COR PRIOR TO REMOVAL OR WORK IN ADJACENT
AREAS.
AREA OF WORK
KEYED PLAN
1" = 30'
PLAN NORTH
TRUE NORTH
HPS
H
PS
M
PC
PLAN NORTH
TRUE NORTH
M
PS MD102
MPS
MPS
MPC
HWH-B07-01 (E)
HWH-B07-02 (E)
EXISTING CONCRETE
EQUIPMENT PAD TO REMAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
4500 State Route 434 Apalachin, NY 13732 (607)223-4334
GENERAL NOTES:
KEYED MAP:
KEYED NOTES:
NOT FOR
CONSTRUCTION
2/20/2026
Au to de sk
D oc s:
//V
A-
Ly on s
VA
H ot W at er
H ea te r/L yo ns
H ot
W at er H ea te r_ R
.rv t 2/
/2
2:
:2
PM
MD102
MECHANICAL DEMOLITION -
BUILDING 07
REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
2/20/2026 JWE JWC
561A4-23-101100% CD SUBMISSION
KEYED NOTES
1 REMOVE EXISTING MEDIUM PRESSURE STEAM PIPING BACK TO NEAREST ISOLATION VALVE. REFER TO
DETAIL #1 ON M-701 FOR MORE INFORMATION.
2 REMOVE EXISTING MEDIUM PRESSURE CONDENSATE PIPING BACK TO NEAREST ISOLATION VALVE.
REFER TO DETAIL #1 ON M-701 FOR MORE INFORMATION.
3 THE VA WILL RETAIN BOTH EXISTING WATER HEATERS. DEMOLITION ACTIVITES MUST BE PERFORMED
IN A MANNER THAT DOES NOT DAMAGE THESE UNITS. THE VA WILL INSPECT THE DEMOLITION
PROCESS TO VERIFY THAT THE EXISTING CONDITIONS OF THE WATER HEATERS ARE NOT AFFECTED.
1/4" = 1'-0"1 MECHANICAL REMOVAL PLAN - BUILDING 07
1/2" = 1'-0"2 MECHANICAL REMOVAL PLAN - BUILDING 07 - ENLARGED
1" = 50'
PLAN NORTH
TRUE NORTH
MECHANICAL
SERVICE ROOM
ST-1A
STORAGE
CORRIDOR
LPS
LPC
PLAN NORTH
TRUE NORTH
PLAN NORTH
TRUE NORTH
MD103
A.
B.
C.
D.
E.
F.
G.
H.
I.
GENERAL MECHANICAL DEMOLITON NOTES
PLAN VIEWS ARE INTENDED TO SHOW GENERAL ROOM LAYOUT ONLY. EXISTING ROOM CONFIGURATIONS AND PIPING ARRANGEMENTS SHOWN ARE BASED ON AVAILABLE INFORMATION AND MAY VARY IN FIELD.
CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO DEMOLITION. REMOVE ONLY THAT
PIPING AND EQUIPMENT NECESSARY TO ACCOMMODATE WATER HEATER REPLACEMENT WHILE
MAINTAINING EXISTING DISTRIBUTION SYSTEMS TO REMAIN.
DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT
REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.
REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ELECTRICAL, AND PLUMBING CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE
REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES
INDICATED.
DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF
PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED.
PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN
PROGRESS, AND TIMELY DISCONNECTION OF UTILITY SERVICES.
EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND
REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH
SIMILAR EXISTING WORK. STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER OF RECORD. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND
REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL WORK.
UNLESS SPECIFIED OTHERWISE, ALL PIPING AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE PROPERTY. THIS INCLUDES ALL PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN ROOF, WALLS, FLOORS, IN AN APPROVED MANNER.
ONLY ONE WATER HEATER SHOULD BE REMOVED AT A TIME. AFTER THE FIRST UNIT IS REPLACED WITH A NEW ONE, THE SECOND WATER HEATER MAY THEN BE REMOVED. BOTH WATER HEATERS CANNOT BE DEMOLISHED SIMULTANEOUSLY TO ENSURE CONTINUOUS HOT WATER SERVICE TO THE BUILDING.
VERIFY PHASING APPROACH WITH THE COR PRIOR TO PROCEEDING WITH DEMOLITION WORK.
THIS PROJECT IS PHASED WITHIN EACH BUILDING. POWER, STEAM, AND CONDENSATE RETURN SERVING ONE FUNCTIONING WATER HEATER PER BUILDING SHALL REMAIN ACTIVE THROUGHOUT THE PROJECT DURATION. PERFORM LOCKOUT/TAGOUT (LOTO) OF ENERGY SYSTEMS ONLY AS REQUIRED TO SUPPORT PHASED DEMOLITION AND INSTALLATION. SAVE ALL REMOVED WATER HEATERS AND PUMPS FOR COR-
FMS REVIEW.
PROTECT AND PRESERVE ALL MECHANICAL VALVES, ACTUATORS, AND PUMPS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. VERIFY CONDITION WITH COR PRIOR TO REMOVAL OR WORK IN ADJACENT
AREAS.
LPC
LPS
2 2
HWH-B53-02 (E) HWH-B53-02 (E)
EXISTING CONCRETE
EQUIPMENT PAD TO REMAIN
MECHANICAL
SERVICE ROOM
ST-1A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
4500 State Route 434 Apalachin, NY 13732 (607)223-4334
GENERAL NOTES:
KEYED MAP:
KEYED NOTES:
NOT FOR
CONSTRUCTION
2/20/2026
Au to de sk
D oc s:
//V
A-
Ly on s
VA
H ot W at er
H ea te r/L yo ns
H ot
W at er H ea te r_ R
.rv t 2/
/2
2:
:3
PM
MD103
MECHANICAL DEMOLITION -
BUILDING 53
REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
2/20/2026 JWE JWC
561A4-23-101100% CD SUBMISSION
1/4" = 1'-0"1 MECHANICAL REMOVAL PLAN - BUILDING 53
KEYED NOTES
1 REMOVE EXISTING LOW PRESSURE STEAM PIPING BACK TO NEAREST ISOLATION VALVE. REFER TO
DETAIL #1 ON M-701 FOR MORE INFORMATION.
2 REMOVE EXISTING LOW PRESSURE CONDENSATE PIPING BACK TO NEAREST ISOLATION VALVE. REFER
TO DETAIL #1 ON M-701 FOR MORE INFORMATION. REFER TO DETAIL #1 ON M-701 FOR MORE
INFORMATION.
1/2" = 1'-0"2 MECHANICAL REMOVAL PLAN - BUILDING 53 - ENLARGED
C.
D.
E.
F.
G.
H.
I.
GENERAL MECHANICAL DEMOLITON NOTES
PLAN VIEWS ARE INTENDED TO SHOW GENERAL ROOM LAYOUT ONLY. EXISTING ROOM CONFIGURATIONS AND PIPING ARRANGEMENTS SHOWN ARE BASED ON AVAILABLE INFORMATION AND MAY VARY IN FIELD.
CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO DEMOLITION. REMOVE ONLY THAT
PIPING AND EQUIPMENT NECESSARY TO ACCOMMODATE WATER HEATER REPLACEMENT WHILE
MAINTAINING EXISTING DISTRIBUTION SYSTEMS TO REMAIN.
DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT
REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.
REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ELECTRICAL, AND PLUMBING CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE
REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES
INDICATED.
DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF
PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED.
PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN
PROGRESS, AND TIMELY DISCONNECTION OF UTILITY SERVICES.
EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND
REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH
SIMILAR EXISTING WORK. STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER OF RECORD. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND
REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL WORK.
UNLESS SPECIFIED OTHERWISE, ALL PIPING AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE PROPERTY. THIS INCLUDES ALL PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN ROOF, WALLS, FLOORS, IN AN APPROVED MANNER.
ONLY ONE WATER HEATER SHOULD BE REMOVED AT A TIME. AFTER THE FIRST UNIT IS REPLACED WITH A NEW ONE, THE SECOND WATER HEATER MAY THEN BE REMOVED. BOTH WATER HEATERS CANNOT BE DEMOLISHED SIMULTANEOUSLY TO ENSURE CONTINUOUS HOT WATER SERVICE TO THE BUILDING.
VERIFY PHASING APPROACH WITH THE COR PRIOR TO PROCEEDING WITH DEMOLITION WORK.
THIS PROJECT IS PHASED WITHIN EACH BUILDING. POWER, STEAM, AND CONDENSATE RETURN SERVING ONE FUNCTIONING WATER HEATER PER BUILDING SHALL REMAIN ACTIVE THROUGHOUT THE PROJECT DURATION. PERFORM LOCKOUT/TAGOUT (LOTO) OF ENERGY SYSTEMS ONLY AS REQUIRED TO SUPPORT PHASED DEMOLITION AND INSTALLATION. SAVE ALL REMOVED WATER HEATERS AND PUMPS FOR COR-
FMS REVIEW.
PROTECT AND PRESERVE ALL MECHANICAL VALVES, ACTUATORS, AND PUMPS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. VERIFY CONDITION WITH COR PRIOR TO REMOVAL OR WORK IN ADJACENT
AREAS.
AREA OF WORK
KEYED PLAN
1" = 30'
PLAN NORTH
TRUE NORTH
LPS
LP
C
PLAN NORTH
TRUE NORTH
PLAN NORTH
TRUE NORTH
MECHANICAL
EXISTING
SWITCHGEAR
DAIRY
REFRIGERATOR
NON FOOD STOR
LOUNGE
TOIL
TOIL
MECHANICAL
CORRIDOR
MD104
LPS
LPC
HPC
LPS
HWH-B54-01 (E)
HWH-B54-02 (E)
LP
S
LP
S
MECHANICAL
MECHANICAL
EXISTING EQUIPMENT
PAD TO REMAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
4500 State Route 434 Apalachin, NY 13732 (607)223-4334
GENERAL NOTES:
KEYED MAP:
KEYED NOTES:
NOT FOR
CONSTRUCTION
2/20/2026
Au to de sk
D oc s:
//V
A-
Ly on s
VA
H ot W at er
H ea te r/L yo ns
H ot
W at er H ea te r_ R
.rv t 2/
/2
2:
:3
PM
MD104
MECHANICAL DEMOLITION -
BUILDING 54
REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
2/20/2026 JWE JWC
561A4-23-101100% CD SUBMISSION
KEYED NOTES
1 REMOVE EXISTING LOW PRESSURE STEAM PIPING BACK TO NEAREST ISOLATION VALVE. REFER TO
DETAIL #1 ON M-701 FOR MORE INFORMATION.
2 REMOVE EXISTING LOW PRESSURE CONDENSATE PIPING BACK TO NEAREST ISOLATION VALVE.
1/4" = 1'-0"1 MECHANICAL REMOVAL PLAN - BUILDING 54
1/2" = 1'-0"2 MECHANICAL REMOVAL PLAN - BUILDING 54 - ENLARGED
MECHANICAL
ROOM
N-105
PATIENT
STORAGE
1B-121
CORRIDOR
C1-5
STORAGE
1C-102
ENGINEERING
STORAGE
1C-103
CORRIDOR
C1-5B
TEMPORARY
MEDICAL WASTE
HOLDING
1C-102A
STAIR 3
LPS
LPC
PLAN NORTH
TRUE NORTH
PLAN NORTH
TRUE NORTH
PLAN NORTH
TRUE NORTH
PLAN NORTH
TRUE NORTH
MD105
AREA OF WORK
KEYED PLAN
1" = 50'
PLAN NORTH
TRUE NORTH
A.
B.
C.
D.
E.
F.
G.
H.
I.
GENERAL MECHANICAL DEMOLITON NOTES
PLAN VIEWS ARE INTENDED TO SHOW GENERAL ROOM LAYOUT ONLY. EXISTING ROOM CONFIGURATIONS AND PIPING ARRANGEMENTS SHOWN ARE BASED ON AVAILABLE INFORMATION AND MAY VARY IN FIELD.
CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO DEMOLITION. REMOVE ONLY THAT
PIPING AND EQUIPMENT NECESSARY TO ACCOMMODATE WATER HEATER REPLACEMENT WHILE
MAINTAINING EXISTING DISTRIBUTION SYSTEMS TO REMAIN.
DEMOLITION WORK SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT
REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES INDICATED.
REMOVE ALL EXISTING MECHANICAL SYSTEM COMPONENTS, MATERIALS, APPARATUS, AND APPLIANCES WITHIN THE DESIGNATED PROJECT AREA, UNLESS OTHERWISE NOTED. COORDINATE WITH ELECTRICAL, AND PLUMBING CONTRACT DOCUMENTS FOR ADDITIONAL SCOPE OF WORK FOR SYSTEMS TO BE
REMOVED OR RETAINED TO EXTENT REQUIRED TO PERFORM NEW CONSTRUCTION ACTIVITIES
INDICATED.
DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF
PERSONNEL, CAREFUL REMOVAL AND OTHER DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED.
PROTECTION OF PROPERTY TO REMAIN UNDISTURBED, COORDINATION WITH OTHER WORK IN
PROGRESS, AND TIMELY DISCONNECTION OF UTILITY SERVICES.
EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED, OR TEMPORARILY REMOVED AND
REPLACED FOR PERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH
SIMILAR EXISTING WORK. STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED, EXCEPT AS SHOWN, WITHOUT AUTHORIZATION OF THE ENGINEER OF RECORD. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACT SHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE, OR TEMPORARILY REMOVE AND
REPLACE EXISTING WORK FOR INSTALLATION OF ELECTRICAL WORK.
UNLESS SPECIFIED OTHERWISE, ALL PIPING AND OTHER DEVICES ASSOCIATED WITH THE EQUIPMENT NOT RE-USED IN THE NEW WORK AREA SHALL BE COMPLETELY DEMOLISHED AND REMOVED FROM THE PROPERTY. THIS INCLUDES ALL PIPE, VALVES, FITTINGS, INSULATION, AND ALL HANGERS, INCLUDING THE TOP CONNECTION AND ANY FASTENINGS TO BUILDING STRUCTURAL SYSTEMS. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF EQUIPMENT, PIPES, DUCTS, AND OTHER PENETRATIONS IN ROOF, WALLS, FLOORS, IN AN APPROVED MANNER.
ONLY ONE WATER HEATER SHOULD BE REMOVED AT A TIME. AFTER THE FIRST UNIT IS REPLACED WITH A NEW ONE, THE SECOND WATER HEATER MAY THEN BE REMOVED. BOTH WATER HEATERS CANNOT BE DEMOLISHED SIMULTANEOUSLY TO ENSURE CONTINUOUS HOT WATER SERVICE TO THE BUILDING.
VERIFY PHASING APPROACH WITH THE COR PRIOR TO PROCEEDING WITH DEMOLITION WORK.
THIS PROJECT IS PHASED WITHIN EACH BUILDING. POWER, STEAM, AND CONDENSATE RETURN SERVING ONE FUNCTIONING WATER HEATER PER BUILDING SHALL REMAIN ACTIVE THROUGHOUT THE PROJECT DURATION. PERFORM LOCKOUT/TAGOUT (LOTO) OF ENERGY SYSTEMS ONLY AS REQUIRED TO SUPPORT PHASED DEMOLITION AND INSTALLATION. SAVE ALL REMOVED WATER HEATERS AND PUMPS FOR COR-
FMS REVIEW.
PROTECT AND PRESERVE ALL MECHANICAL VALVES, ACTUATORS, AND PUMPS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. VERIFY CONDITION WITH COR PRIOR TO REMOVAL OR WORK IN ADJACENT
AREAS.
LPC
LPS
LPS
LP
S
LP
C LP
C
HWH-B143-02 (E)
HWH-B143-02 (E)
EXISTING EQUIPMENT
PAD TO REMAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
4500 State Route 434 Apalachin, NY 13732 (607)223-4334
GENERAL NOTES:
KEYED MAP:
KEYED NOTES:
NOT FOR
CONSTRUCTION
2/20/2026
Au to de sk
D oc s:
//V
A-
Ly on s
VA
H ot W at er
H ea te r/L yo ns
H ot
W at er H ea te r_ R
.rv t 2/
/2
2:
:3
PM
MD105
MECHANICAL DEMOLITION -
BUILDING 143
REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
2/20/2026 JWE JWC
561A4-23-101100% CD SUBMISSION
1/4" = 1'-0"1 MECHANICAL REMOVAL PLAN - BUILDING 143
KEYED NOTES
1 REMOVE EXISTING LOW PRESSURE STEAM PIPING BACK TO NEAREST ISOLATION VALVE. REFER TO
DETAIL #1 ON M-701 FOR MORE INFORMATION.
2 REMOVE EXISTING LOW PRESSURE CONDENSATE PIPING BACK TO NEAREST ISOLATION VALVE. REFER
TO DETAIL #1 ON M-701 FOR MORE INFORMATION.
1/2" = 1'-0"2 MECHANICAL REMOVAL PLAN - BUILDING 143 - ENLARGED
PUMP RM
B013
MECHANICAL
B007
BUILDING
SUPPLIES /
EQUIP. STORAGE
B005
ELEVATOR
EQUIP. ROOM
B008
UTILITY TRENCH
CORRIDOR
B011
PC
LPC
LPS
LP
S
LPC
PC
PLAN NORTH
TRUE NORTH
M-101
AREA OF WORK
KEYED PLAN
1" = 50'
PLAN NORTH
TRUE NORTH
A.
B.
C.
D.
E.
F.
G.
GENERAL MECHANICAL NEW WORK NOTES
PLAN VIEWS ARE DIAGRAMMATIC AND INTENDED TO SHOW GENERAL ROOM LAYOUT AND EQUIPMENT
ARRANGEMENT ONLY. EXISTING CONDITIONS AND EXACT CONNECTION LOCATIONS MAY VARY.
CONTRACTOR SHALL FIELD VERIFY ROOM CONFIGURATION, PIPING ARRANGEMENT, AND CONNECTION POINTS PRIOR TO INSTALLATION. SYSTEMS SHALL FOLLOW THE ARRANGEMENT SHOWN AS CLOSELY AS
PRACTICABLE; HOWEVER, ACTUAL FIELD CONDITIONS SHALL GOVERN. PROVIDE NECESSARY
MODIFICATIONS TO SUIT FIELD CONDITIONS AND AVOID CONFLICTS WITH OTHER TRADES. IF A CONFLICT
CANNOT BE RESOLVED WITHOUT COMPROMISING THE DESIGN INTENT, NOTIFY ENGINEER FOR
RESOLUTION. IN AREAS OF CONFLICT, COMPLETE ONLY WORK NOT AFFECTED PRIOR TO RESOLUTION.
ALL MECHANICAL WORK SHALL BE DONE IN ACCORDANCE WITH ALL LOCAL AND STATE REGULATIONS.
ALL MECHANICAL WORK SHALL BE DONE IN ACCORDANCE WITH ALL LOCAL AND STATE REGULATIONS.
CONNECTIONS TO EQUIPMENT SHALL CONFORM TO MANUFACTURER'S SPECIFICATIONS AND
INSTALLATION MANUALS.
ALL HANGER SYSTEMS FOR PIPING AND EQUIPMENT SHALL BE SECURED TO BUILDING STRUCTURAL
SYSTEM.
ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
DUE TO THE SCALE OF THE DRAWINGS, NOT ALL PIPING, VALVES, OR FITTINGS ARE SHOWN. REFER TO DETAILS AND SCHEMATICS FOR PIPING LAYOUT, ARRANGEMENT, AND CONNECTION REQUIREMENTS.
IWH-B03-01
IWH-B03-02
LP
C
LPC
LPS
LPS
LP
C
LP
C
LPC
PC
LP
S
LP
S
SCP-01
PC
EXISTING
CONCRETE
EQUIPMENT PAD
EXISTING
CONCRETE
EQUIPMENT PAD
EXISTING
CONDENSATE
RETURN PUMPS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
4500 State Route 434 Apalachin, NY 13732 (607)223-4334
GENERAL NOTES:
KEYED MAP:
KEYED NOTES:
NOT FOR
CONSTRUCTION
2/20/2026
Au to de sk
D oc s:
//V
A-
Ly on s
VA
H ot W at er
H ea te r/L yo ns
H ot
W at er H ea te r_ R
.rv t 2/
/2
2:
:3
PM
M-101
MECHANICAL PLAN - BUILDING 03 REPLACE HOT WATER HEATERS
LYONS VAMC NJ
151 KNOLLCROFT RD, LYONS, NJ 07939
2/20/2026 JWE JWC
561A4-23-101100% CD SUBMISSION
1/4" =…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .